PURPA, COGENERATION, AND RESOURCE RECOVERY GARY BRIAN Ll and LEO LAROCHELLE Gershman, Brickner & Bratton, Inc. Portland, Maine ABSTRACT Cogeneration is the simultaneous production of two or more energy forms from a single fuel source. At resource recovery facilities, steam and electricity are generated from the combustion of solid waste. The Public Utility Regulatory Policies Act of 1978 (pURP A) provides new incentives for cogeneration which have the potential to favorably impact upon resource recovery facilities. PURP A mandates that utilities purchase energy from "qualifying facili� ties" (most resource recovery facilities) at the utilities' "full avoided costs." However, recent Federal court decisions have significantly affected PURP A's ability to provide incentives in this field. The paper focuses on these impacts on cogenera- tion at resource recovery facilities. The paper presents an overview of resource re- covery technologies, cogeneration technologies, and typical resource recovery/cogeneration con- figurations. Potential energy markets linked to co- generating resource recovery facilities are identi- fied and the economics of representative systems are examined. Key negotiating issues for public and private sector market$ are highlighted. BACKGROUND The passage of the Public Utility Regulatory Policies Act (PURP A) in 1978 marked a new era in the development of resource recovery projects in the United States. Whereas in the past, utilities hesitated to purchase fuel, steam or electricity from resource recovery facilities, PURP A required that they purchase such energy, and purchase it at the "full avoided costs" for power. In at least one lo- cation, this has more than tripled the price of electricity sold from resource recovery, and elec- tricity production has become a prime considera- tion in the development of resource recovery projects. Simultaneously, the sale of energy from re- source recovery facilities has been enhanced by the dramatic increases in the price of fossil fuel experienced over the past decade. The cost in- creases in imported fossil fuels and the deregula- tion of domestic fossil fuels has had a major im- pact on the energy planning of both utilities and industries. Both of these groups are seeking to stabilize their future prices for energy and to assure a continued supply of fuels. These two economic forces encourage the de- velopment of resource recovery projects that produce more than one energy product, and thus generate higher revenues. This is commonly known as "cogeneration": a primary form of energy (for example, high temperature and pressure steam) creates another energy product (electricity) and then is used again i n a lower quality state (steam/ hot water) in another application. Different de- mands for steam, process heat, and electricity exist for different industries, but those industries which are the most energy intensive are the best prospects for developing cogeneration and resource recovery projects. Such projects can decrease the costs of energy production, increase energy effi- 373

Upload: vudien

Post on 19-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

PURPA, COGENERATION, AND RESOURCE RECOVERY

GARY BRIAN LlSS and LEO LAROCHELLE Gershman, Brickner & Bratton, Inc.

Portland, Maine

ABSTRACT

Cogeneration is the simultaneous production of two or more energy forms from a single fuel source. At resource recovery facilities, steam and electricity are generated from the combustion of solid waste. The Public Utility Regulatory Policies Act of 1978 (pURP A) provides new incentives for cogeneration which have the potential to favorably impact upon resource recovery facilities. PURP A mandates that utilities purchase energy from "qualifying facili� ties" (most resource recovery facilities) at the utilities' "full avoided costs." However, recent Federal court decisions have significantly affected PURP A's ability to provide incentives in this field. The paper focuses on these impacts on cogenera­tion at resource recovery facilities.

The paper presents an overview of resource re­covery technologies, cogeneration technologies, and typical resource recovery/cogeneration con­figurations. Potential energy markets linked to co­generating resource recovery facilities are identi­fied and the economics of representative systems are examined. Key negotiating issues for public and private sector market$ are highlighted.

BACKGROUND

The passage of the Public Utility Regulatory Policies Act (PURP A) in 1978 marked a new era in the development of resource recovery projects in the United States. Whereas in the past, utilities hesitated to purchase fuel, steam or electricity from

resource recovery facilities, PURP A required that they purchase such energy, and purchase it at the "full avoided costs" for power. In at least one lo­cation, this has more than tripled the price of electricity sold from resource recovery, and elec­tricity production has become a prime considera­tion in the development of resource recovery projects.

Simultaneously, the sale of energy from re­source recovery facilities has been enhanced by the dramatic increases in the price of fossil fuel experienced over the past decade. The cost in­creases in imported fossil fuels and the deregula­tion of domestic fossil fuels has had a major im­pact on the energy planning of both utilities and industries. Both of these groups are seeking to stabilize their future prices for energy and to assure a continued supply of fuels.

These two economic forces encourage the de­velopment of resource recovery projects that produce more than one energy product, and thus generate higher revenues. This is commonly known as "cogeneration": a primary form of energy (for example, high temperature and pressure steam) creates another energy product (electricity) and then is used again in a lower quality state (steam/ hot water) in another application. Different de­mands for steam, process heat, and electricity exist for different industries, but those industries which are the most energy intensive are the best prospects for developing cogeneration and resource recovery projects. Such projects can decrease the costs of energy production, increase energy effi-

373

ciencies, and can use indigenous fuel resources that are actually negatively valued fuels (municipal and industrial wastes).

THE REGULATORY IMPETUS - PURPA

PURPA has provided an important regulatory impetus for the development of cogeneration and

resource recovery facilities. PURP A mandated the Federal Energy Regulatory Commission (FERC) to require all regulated and nonregulated electric utilities to purchase available electricity from "qualifying facilities" based on full avoided costs.

FERC has defined "avoided costs" as: "The incremental cost to an electric utility of electric energy or capacity, or both which, but for the purchase from the qua­lifying facilities, such utility would gener­ate itself or purchase from another source."

Full avoided costs are those which utilities do not have to bear if they can rely on an alternative source of energy for their needs. These costs apply to both the displacement of the costs of fuels as well as "capacity" requirements. A resource r�­covery facility displaces fuel purchases by supply­ing the utility with electricity for which it would otherwise require fuels (coal, oil, etc.) to produce.

"Capacity" reflects the alternative energy source's ability to operate reliably in response to all energy needs. If an alternative energy source, such as a resource recovery facility, can reliably

provide a portion of the utility's total power re­

quirements, the utility should give the facility

"capacity payments" for its contribution. A ca­

pacity payment is usually determined by the cost

of producing energy from the generating system

that the utility would operate if the resource re­covery facility were not available. Capacity pay­ments generally vary according to when the energy is supplied, because energy provided during peak

demand has a higher value than energy provided to meet base load demand.

The Federal Energy Regulatory Commission (FERC) adopted a variety of rules to implement PURP A provisions for "cogeneration" and "small power production" facilities. * According to these rules, there are three criteria for defining a quali­fying "small power production facility":

·1. 45 FR/12214-12237 (February 25, 1980).

2. 45 FR/17959-17976 (March 20, 1980).

3. 45 FR 33958-33964 (May 21,1980). 4. 45 F R/66787-66789 (October 8, 1980).

1. Total power production at any one site under any one ownership must not exceed 80 MW.

2. Seventy-five percent of the facility's total energy input must be from biomass, waste or re­

newable resources. 3. Less than 50 percent of the equity interest in

a small-scale power producer can be held by an

electric utility or public utility holding company. Other rules which apply to "cogeneration" systems eliminate size limitations and requirements, but maintain the same ownership requirements. Effi­

ciency standards are used to set output rates. The FERC rules also exempt qualifying cogen­

erators and small power production facilities from

certain state and federal regulations:

1. Qualifying small power production facilities under 30 MW and qualifying cogeneration facilities are exempt from certain provisions of the Federal Power Act.

2. Qualifying cogeneration facilities, qualifying small power production facilities under 30 MW and qualifying small power production facilitie� fueled primarily by biomass are exempt from the Public Utility Holding Company Act of 1935 and state laws regulating electric utility rates and finan­cial organization.

These exemptions are particularly important

for the development of cogeneration. In the past, many industries that are energy intensive produced

their own electricity and sold excess power to local utilities. In 1968, the U. S. Supreme Court decided that these industrial cogeneration opera­tions were subject to federal regulation of the pub­

lic utility industry under provisions of interstate commerce. As a result, many industries divested themselves of these operations, rather than be­come subject to the multitude of regulations re­stricting profits and investments in the utility industry. This inadvertently contributed to a decrease in electrical production efficiency for industry uses. PURP A sought to redress the Su­preme Court's interpretation by delineating a subsequent message in the Act. By exempting in­dustries from utility regulations, PURPA encour­aged them to participate once again in increasing their own energy efficiency.

The implementation of these rules is the respon­

sibility of the state regulatory agencies (e.g., Public Utility Commissions) and nonregulated utilities. FERC rules required state regulatory agencies to report to FERC by March 20, 1981 concerning

the status of their implementation of these pro­visions of PURP A. In Table 1, a listing of actions

374

taken by state agencies has been compiled. Of the 37 states reporting as of this date, 59 percent have adopted specific regulations and 41 percent are still working to complete those actions. In a land­mark case before the Mississippi Supreme Court, the Court struck down Sections 201 and 210 of PURP A as being an unconstitutional infringement of state rights. Although some states have sus­pended proceedings pending the outcome of the appeal of this case to the U. S. Supreme Court by the Federal Department of Energy, most have de­cided to proceed. Many states felt that this legisla­tion reflected the direction that they had already chosen to take, and merely expedited and justified this direction at the state level.

One of the most important tools that PURP A provided to developers of resource recovery proj­ects is access to information about utility costs and structures. This knowledge will be invaluable during negotiations with utilities for purchases of energy and capacity. Most utilities are being en­couraged to establish standard rates for purchasing energy and capacity as part of the process estab­lished by PURP A. However, these standard rates are only offered for small facilities generating less than 100 KW of electricity. For the larger facilities, the utilities will want to negotiate all the terms and conditions of the agreements to purchase energy and capacity, although generally they will base those negotiations on their standard agree­ments. As a result, a developer must underst.and as much as possible about the economic structure of a utility in order to obtain the best possible price and terms for a project.

Sections 290, 302 and 303 of PURP A are some of the key sections that provide project developers with the necessary information to improve their position in negotiations. Utilities must file infor­mation with the FERC in Washington, D. C., rang­ing from an analysis of a particular utility's gener­ation and transmission costs to a calculation of avoided costs for the purchase of electricity. Some of the key tables that are available in the extensive FERC files include:

1. Marginal Energy Costs by Costing Period and Year [PURPA 290.303(g)].

2. Fossil Fuel Escalation Rates [pURPA 290.303(d)] .

3. Study of Accounting Costs of Providing Electric Service [PURPA 290.502(c)].

4. Fuel Resource Mix [PURPA 302(a)(6)]. 5. Ten Year Projection of Capacity in Mega­

watts [PURPA 302(f)].

6. Plant Energy Costs, Capacity Costs, How Connected, and KW Cogeneration Capacity.

COGENERAT ION AND RESOURCE

RECOVERY

By definition, cogeneration projects produce two energy forms from one fuel source. When ap­plied to resource recovery, this generally involves the conversion of solid waste fuel into a combina­tion of steam and electrical energy. The steam can be used in industrial processes, district heating and cooling systems, the heating of sludge in cod is­posal facilities or for mechanical drive power. Elec­trical energy can be used internally to operate the resource recovery facility; it can be sold to neigh­boring industries as part of an integrated project structure, or to investor-owned or municipal utilities, or it can be "wheeled" to neighboring utilities.

To date, resource recovery facilities implement­ed in the United States have been designed to gen­erate single purpose energy products such as steam, electricity and/or fuels (RDF) from the combustible fraction of solid waste. Because markets are de­veloping for both steam and electricity, more re­source recovery facilities will add cogeneration capabilities using a turbine/generator set to gener­ate electricity from the steam produced by com­bustion. Primary components of this additional equipment include:

1. Steam Turbines. These are normally designed for available steam flow conditions and back pres­sure or extraction.

2. Generators. These translate the turbine's rotary kinetic energy into electrical energy.

3. Switch Gears. These allow connection of the •

turbine/generator set to the existing electricity distribution system.

A turbine converts energy in two steps. First, steam entering a turbine is expanded through a stationary nozzle thereby transforming the steam's heat energy to velocity. Secondly, rotary motion is accomplished by allowing the expanded steam jet to strike blades on a turbine wheel thereby mak­ing it spin. In this way, the steam turbine produces rotary motion or useable shaft power. In cogenera­tion, the power turns a generator and produces electricity. Turbines may be either single stage or multi-staged, depending on specific design condi­tions (e.g., steam flow, temperature and pressure). Generally, multi-staged turbines are more efficient but are more expensive.

375

TABLE 1 PURPA STATUS FOR SELECTED STATES (JUNE, 1981)

Compliance

State with PURPA* Action

Alabama Yes Docket 18005

Arkansas No Hearings

California Yes Decision 93054

Colorado Yes Decision R81-801

Connecticut Yes Act 79-214

Florida Yes Docket 780235-EU

Georgia No Hearings

Hawaii No Hearings

Idaho No Hearings

Illinois Yes Order 214 Indiana Yes Rules-3/20/81

Iowa Yes Docket RMU-80-15

Kansas No Hearings

Maine Yes Rules

Maryland No Proceedings

Michigan Yes Case U-6798

Minnesota Yes Dkt E-999/R80560

Mississippi No Filed Suit

Missouri Yes 4CSR 240-20.060

• Section 210, Cogeneration and Small Power Production

Numerous turbine configurations are available which allow steam to be extracted at varying pressures and quantities. Turbines are generally divided into two basic categories: condensing and noncondensing (back-pressure) turbines. Each of these is available in a wide variety of sizes. Nu­merous manufacturers exist for turbine/generator equipment, since this equipment has been in use for many years_ Significantly, there are no major modifications required of standard turbine/gener­

ator equipment for inclusion in resource recovery

facilities. The optimum steam market for a resource re­

covery facility generally would be able to pur-chase all the steam generated throughout the

operating year. In many cases, however, the energy market's steam needs may fluctuate significantly

during the year as industrial batch loads and heat­ing/cooling loads change. Process steam needs will normally be more uniform than space condition­ing, although some variation may occur due to

seasonal operation changes. Energy market heating needs will peak during the colder winter months. Since the size of a resource recovery facility is de­signed to handle the available solid waste stream,

the fluctuations in market demand may lead to a steam production capability exceeding the market's purchasing capacity. Cogeneration systems could generate electricity during such periods of low steam demand through the use of a condensing

Compliance State with PURPA* Action

Montana Yes Rules.o/4/81

Nevada Yes Dkt 2357Sub4

New Hampshire Yes Orders

New Jersey No Hearings

New Mexico Yes Case 1616

Ohio No Hearings

Oregon Yes Order R.o8

Pennsylvania Yes Title 52/C.57

Rhode Island No Docket 1549

Texas No 002.02.05.058

Utah Yes Case 80-999-06

Vermont Yes Order 65 Virginia No Hearings

Washington Yes C.480-106

West Virginia Yes Orders 206/207

Wisconsin No Hearings

Wyoming Yes Order 47

turbine. Condensing turbines exhaust steam at less than atmospheric pressure, providing the highest pressure drop available in performing work to turn a turbine. This maximizes the amount of electri­city produced from available steam, although ex­haust steam cannot then be used for further pur­poses. The greater the allowable pressure drop through a turbine/generator set, the greater the amount of electricity which can be generated.

Noncondensing or backpressure turbines ex­

haust steam at pressures higher than atmospheric pressure, leaving steam that is able to perform other work. The pressure of the steam exhaust is

normally determined by the specific needs of the ultimate steam user. In a backpressure application, a resource recovery facility produces steam of greater quality in terms of temperature and pres­

sure than that which is required by the market and/or internal steam needs. Electrical production is accomplished by passing the higher quality steam

through a backpressure turbine that drives a gener· ator. Steam is then exhausted at a temperature and pressure that can be used for work in the industrial process or for space conditioning.

A third type of turbine, the extraction turbine,

incorporates characteristics of both the condens· ing and backpressure turbines. Extraction turbines can be employed when steam flows are substantial or if system economics warrant the 'additional ex­penditure for this more expensive equipment.

376

These turbines utilize high quality steam twice. First, a portion of the steam is "extracted" from the steam flow to provide an industry steam of the required temperature and pressure for process or space conditioning needs. Secondly, the remaining steam flow is carried all the way to condensing to maximize electricity production.

Each of these turbines may be used in two basic cogeneration system configurations: topping cycle or bottoming cycle. Bottoming cycles gener­ate electricity after the industrial process is com­pleted, using heat or steam that would otherwise be wasted. Topping cycles generate electricity before the heat or steam is used in the industrial process. Figure I illustrates these two configura­tions.

The amount of electricity produced by a tur­bine/generator set is a function of the steam flow. rate and the available pressure drop through the turbine. Overall thermal recovery efficiencies in-

herent to different resource recovery technologies will result in different steam flow rates and steam quality characteristics. Factors which will deter­mine the potential for cogenerating electricity from a resource recovery facility include:

1. Steam Flow Rate. The actual steam flow rate is a function of the solid waste stream quantity and quality, and the efficiency of the resource recovery technology.

2. Turbine Inlet Steam Quality. Ability of the resource recovery technology and boilers to achieve high temperatures and pressures.

3. Turbine Outlet Steam Quality. Temperature, pressure and quantity required by energy market.

The steam flow rate is theoretically determined by the inlet temperature, pressure of the steam and the outlet pressure. The actual steam rate considers the overall efficiency of the turbine/generator sys­tem which varies according to its size. Charts are

available from turbine manufacturers to determine

Fuel Process Electricity

ScJpp/ .... .,,'� 0.101 C4J /.,

'uel

TOPPING:

1. 'H£�'" iLitBI'E

Fuel Electricity

. .

E'ecrrici,y ('"

Process

Electricity ("I

Mlnu/,cturin,.

H."in, md Coolin,

FIG.1 BOTTOMING CYCLE VERSUS TOPPING CYCLE COGENERATION SYSTEM (REF. COGENERATION; CALIFORNIA GOVERNOR'S OFFICE OF PLANNING AND RESEARCH, OCTOBER, 1980)

377

these efficiencies. The lower efficiencies for small­er turbine/generator sets have been responsible for

the few applications of small-scale cogeneration and resource recovery. However, as the prices for elec­tricity increase as a result of PURP A, it is expected

that sufficient revenues will be generated at in­

creasingly smaller sizes to justify the investment in turbine/generator sets in the future.

The relationship of inlet and outlet steam quali­ties also has a significant bearing on the approach to a cogeneration and resource recovery project. The amount of electricity which can be generated

decreases with increases in backpressure steam requirements. There is an inherent trade-off be­tween quantities of steam produced for productive work, and the amount of electricity produced. There is also a trade-off between the steam's tem­perature and pressure quality and the steam flow rate. To increase the temperature and pressure at steam inlets increases the amount of energy in each unit of steam, but decreases the steam flow rate. As a result, the development of a backpres­sure cogeneration application, for example, would lead to increased steam quality compared to a con­

densing system, but would decrease the steam flow rate.

ECONOMICS OF COGENERATION AND

RESOURCE RECOVERY

Of fundamental importance to structuring the

economics of cogeneration and resource recovery

is the original reason for developing a resource re­

covery plant. If the primary goal is to dispose of solid waste, regardless of the costs of operation,

the plant will be designed to maximize the relia­bility and minimize the cost of waste diSposal. The production of energy that may or may not be marketable in a given area becomes a secondary consideration. But if the primary goal is the pro­duction of energy, then the plant will be designed to maximize the reliability of energy production, regardless of the costs of waste disposal. This is particularly characteristic of many European facilities. In fact, in Denmark, the Netherlands, and West Germany, more than 90 percent of the waste-to-energy systems were installed in munici­palities already involved in the energy business in some way. Often European municipal govern­ments considered energy production to be part of the overall service owed to their constituencies, generally in the form of steam or hot water district

378

heating systems. The costs of such facilities are split between waste disposal, energy costs, and

other municipal expenditures. A clear accounting of the expenditures for each aspect of the facility's

operations generally has not been required, due to the institutional arrangement that is common in

Europe, such that the electricity facility is con­

structed by the municipally-owned public utility. In order to develop a resource recovery project

to serve the electrical generation and steam pro­duction needs of an area, one must identify the different interests of the parties, and negotiate a set of contracts to benefit them all. MuniCipalities

want a resource recovery project to dispose of solid waste while minimizing the costs of tipping fees. Because PURP A has required utilities to pur­chase electricity from such facilities at their full avoided costs, their primary concern is to guaran­tee reliable energy production. Industries are main­ly concerned with obtaining an alternative energy source that is reliable and less expensive than cur­rent operations. Project developers and system vendors are seeking to maximize their revenues from all parts of the project (tipping fee, electric rates, steam rates) but will recognize what can be obtained realistically based on similar projects. The vendors will have the greatest interest in bal­ancing these demands to develop a successful project. However, in some locations the need for

solid waste disposal or alternative sources of energy may be so great that those concerns will determine how quickly these competing interests

are balanced (see Table 2).

Within this framework, cogeneration and re­source recovery economics are passing through an

important evolution. The economics of cogenera­tjon in particular appear more favorable in many IU';utions throughout the United States as re­source recovery is pursued. In some locations, the price of electricity has become so attractive (e.g., California) that some projects are contemplating producing el ctricity only, and not considering complicated arrangements with industry for co­generation. More frequently steam sale revenues

are higher per Btu in the waste stream, and electri­city production becomes a desirable adjunct to the energy market of manufacturing industries.

The cost of adding cogeneration equipment to resource recovery facilities varies widely, depend­ing on the size, configuration, manufacturer and type of application. However, the costs shown in Tables 3 and 4 can be used as guidelines for the capital and operating an!! maintenance costs of

TABLE 2 APPLICATION OF RESOURCE RECOVERY ECONOMICS EQUATION TO DIFFERENT PARTIES OF INTEREST

BASIC EQUATION

Tipping fees

+

Electric Revenues Capital Costs (Debt Service)

+ +

Steam Revenues Operating and Maintenance Costs (including Residue Disposal-)

+ +

Material Revenues Excess Revenues (Losses) for Sharing (Subsidy)

MUNICIPAL PERSPECTIVE

Minimum Tipping Fee Maximum (Electric Revenues + Steam Revenues + Material Revenues) - Minimum (Capital and Operating and Maintenance Costs)

UTI LlTY PERSPECTIVE

Minimum Electrical Costs Maximum (Steam + Material Revenues) + Reasonable (Tipping Fee) -Minimum (Capital and Operating and Maintenance Costs)

INDUSTRY PERSPECTIVE

Minimum Steam Costs Maximum (Electric + Material Revenues) + Reasonable (Tipping Fee) - Mini­mum (Capital and Operating and Maintenance Costs)

VENDOR PERSPECTIVE

Maximum Profit Maximum (Electric Revenues + Steam Revenues + Material Revenues + Tipping Fees) - Minimum (Capital and Operating and Maintenance Costs)

adding turbine/generator sets to produce electri­city. Table 3 outlines the costs of turbine/gener­ator sets for various backpressure requirements, ranging from condensing applications to 200 psig. As can be seen, the amount of electricity to be generated, and therefore the costs of the turbine/ generator sets, decrease as the backpressure require­ment increases (assuming a constant turbine inlet pressure). Turbine/generators increase in cost as the amount of heat value from incoming waste is recovered. As the size of the turbine/generator sets increase, causing an increase in electrical generation efficiencies, the cost impact per unit ton of solid waste processed decreases substantially. This would be the case for. various backpressure con­figurations. Probably of greater significance is the impact that these turbine/generators would have on operating and maintenance costs of the system. These range between $2-3/ton ($2.2-3.3/1,000 kg) processed and are not as sensitive to the param­eters affecting capital costs.

Prices that will be offered by utilities for the purchase of electricity depend upon the nature of

379

their current operations. Under PURP A, utilities must offer a price for the electricity which is comparable to the full cost of their generating it. As a result, resource recovery developers must learn the following to determine the price they should be offered:

1. Fuel Resource Mix. The fuel resource mix of the utility, or percentage of different fuels used by the utility to generate electricity.

2. Marginal Costs. The cost of the marginal unit of generating equipment used by the utility to produce electricity that would not be required as a result of the sale of this energy to the utility.

3. Current Costs. The current cost of fuels used by the utility to generate electricity that would be displaced by the energy derived from solid waste.

4. Future Costs. The future projections for fuel supplies and generating costs to establish appropriate escalation formulas.

The fuel resource mix of utilities can be ob­tained by asking the utility for that .information, reviewing data on file at the state Public Utility Commission offices, or at the Federal Energy

w

00

a

TA

BL

E 3

IN

CR

EM

EN

TA

L C

OG

EN

ER

AT

ION

CA

PIT

AL

CO

ST

S (

TU

RB

INE

S,

ET

C.)

Inst

alla

tion

1 C

al2i t

al C

ost

Cos

t T

otal

C

ost

Ann

ual

r;os

t2

MO

DU

LA

R (

100

TPD

j 90

m

etri

c T

PD)

A

340,

000

260,

000

600,

000

74,0

00

B

130,

000

100,

000

230,

000

28,0

00

C

100,

000

75,0

00

175,

000

22,0

00

D

85,0

00

64,0

00

149,

000

18,0

00

E 70

,000

52

,000

12

2,00

0 15

,000

RD

P (

600

TPD

j 54

0 m

etri

c T

PD)

A

1,50

0,00

0 1,

000,

000

2,50

0,00

0 27

0,00

0 B

65

0,00

0 44

0,00

0 1,

090,

000

120,

000

C

490,

000

330,

000

820,

000

90,0

00

D

400,

000

270,

000

670,

000

n,O

O(}

E 36

0,00

0 24

0,00

0 60

0,00

0 66

,000

MA

SSBU

RN

(55

0 T

PDj

500

metr

ic T

PD

)

A

1,20

0,00

0 82

0,00

0 2,

020,

000

220,

000

B

650,

000

440,

000

1,09

0,00

0 12

0,00

0 C

49

0,00

0 33

0,00

0 82

0,00

0 90

,000

D

40

0,00

0 �7

0,OO

O 67

0,00

0 73

,000

E

360,

000

240,

000

600,

000

66,0

00

MA

SSBU

RN

(1

800

TP

Dj

1630

met

ric

TP

D)

A

4,00

0,00

0 2,

000,

000

6,00

0,00

0 66

0,00

0 B

1,

800,

000

890,

000

2,69

0,00

0 29

0,00

0 C

1,

300,

000

680,

000

1,98

0,00

0 22

0,00

0 D

1,

100,

000

580,

000

1,68

0,00

0 18

0,00

0 E

850,

000

420,

000

1,27

0,00

0 14

0,00

0

1.

A =

P

ull

Con

dens

ing

Tur

bine

fro

m 6

00 ps

ig/7

500P

to

3" H

g (4

000

kPA

gua

lte/7

320C

) B

=

Bac

kpr

essur

e T

urbi

ne f

rom

600

ps

ig/7

500P

to

50 p

sig

(400

0 k

Pa

guag

e/73

20C

to

300

kPa

Iroa

ge)

C =

B

ack

press

ure

Tur

bine

fro

m 6

00

psig

/750

0P t

o 10

0 ps

ig (

4000

kPa

gua

ge/7

320C

to

700

kPa

guag

e)

D =

B

ack

press

ure

Tur

bine

fro

m

600

psig

/750

Of

to

150

psi g

(40

00 k

Pa

ltUag

e/73

20C

to

100

0 k

Pa l1:

uage

\ E

=

Bac

kpr

essur

e T

ur�,

from

600

psi

g/75

00P

to

200

psig

(40

00 k

Pa

guag

e/73

2or;

to 1

400

kPa

gua

ge)

2.

Mod

ular

Sy

stem

s am

orti

zed o

ver

15 y

ears

at

9%.

All

othe

r sy

stem

s am

orti

zed

over

20

vears

at

9%.

Impa

ct

on

Tip

oinl1:

Fee

S/

ton

(S/m

etri

c to

n)

2.25

(2

.4R)

0.

85

(0.9

4)

0.67

(0.

74)

0.46

(0.

1 t)

1.61

(1.

77)

0.72

(0.

79)

0.04

(0.

60)

0.44

(0.

49)

0.39

(0.

43\

1.29

(1.

42)

0.70

(0.

77)

0.53

(0.

58)

0.43

(0.

47)

0.39

(0.

43)

1.18

0.3

0)

0.52

(0.

57)

0.39

(0.

43)

0.32

(0

.35)

0.

25 (

n.�8

)

TABLE 4 0 & M COSTS FOR COGENERATION INCREMENT (1981$)

System Annual Cost ($) Unit Cost

$/ton ($/metric ton) MODULAR

RDF

MASSBURN

(550 TPD;' 500 metric TPD)

MASS/JURN

(1800 TPD; 1630 metric TPD)

Regulatory Commission in Washington, D. C. States such as Alaska, the District of Columbia, Hawaii, Massachusetts and Rhode Island derived 85-100 percent of their electricity from oil in 1980, and undoubtedly have utilities that would be receptive to the purchase of electricity pro­duced from alternative energy sources, such as solid waste. Other states, such as California, have interested utilities not only because of their high reliance on oil and gas (64 percent in 1980), but also because of the aggressive leadership provided by that state's Public Utility Commission in en­couraging utilities to pursue these type of proj­ects and because of the difficulty of siting other generating capacity.

The cost of the marginal unit of generating equipment for the utility will also vary according to the particular load and demand characteristics in the utility's service area. Utilities will base their capacity payments for electricity on the avoidance of investment in a "peaking unit" of some form. These units are less capital intensive than base load or intermediate load plants in the utility system, and are relatively quick to install when necessary to meet shortfalls in electricity produc­tion. A common type of peaking unif used as the basis of avoided cost determinations is a combined cycle topping gen�rator.

The current and future costs of fuels displaced by the utility's purchase of cogenerated electricity are the last major factors to consider in determin­ing a just and reasonable avoided cost price for that energy. Depending on the nature of the utili­ty's fuel resource mix, the fuel displaced could be oil, gas or coal. According to the latest available data from the Energy Information Administration in June 1981, the average delivered prices of these fuels to utilities in the contiguous United States during the month of February 1981 were as follows:

99,000

340,000

340,000

3.00 (3.30)

2.00 (2.20)

2.00 (2.20)

1, tOO,OOO 2.00 (2.20)

381

1. Oil - $5.75/million Btu ($6.07/million kJ) $35.77 /barrel ($0.22/L).

2: Gas - $2.61/million Btu ($2.75/million kJ) $2.70/Mcf ($95.35/Mm3).

3. Coal - $1.46/million Btu ($1.54/million kJ) $30.71 /ton ($33.85/t).

These prices vary widely from state to state. Oil prices range from $20.05 per barrel (0.13/L) in Arkansas to $41.58 per barrel ($0.26/L) in lllinois. Gas prices range from $1.46 per million cubic feet ($51.55 /Mm3) in Florida to $5.1 0 per million cubic feet ($180. l 1/Mm3) in Delaware. Coal prices range from $8.46 per ton ($9 .33/t) in North Dakota to $56.02 per ton ($61.75 /t) in Mississippi. Projections of future costs also vary according to different assumptions and will result in different offers for escalation rates as part of energy market contracts.

As these factors indicate, the revenues for co­generation and resource recovery projects are high­ly site specific. However, in Table 5, revenues have been calculated for different resource recovery ap­plications to provide some insights into the impact of variables and configurations. In the fust section of Table 5, revenue� were calculated assuming that only steam would be produced at the facility, at

,

the pressure and temperature required by the steam market. For example, if an industrial steam market required steam at 150 psig (1,030jkPa saturated) and cogeneration were not being con­sidered, the waste-to-energy system would most likely be designed to generate steam at that re­quired pressure and temperature. Based on average steam prices of approximately $5.25/1 ,000 lb, ($11.57/1,000 kg), the amount of revenues that could be generated ranged from $22.56 to $26.87/ ton ($24.87 to $29.62/t).

In the second portion of Table 5, revenues were calculated assuming that the facility would generate only electricity. Given this consideration,

TABLE 5 REVENUES FOR DIFFERENT RESOURCE RECOVERY APPLICATIONS

REVENUES POR Sl'EA1i ONLY SY!JI'BM

System

MODULAR

RDP

Yearly Waste Throu�put tons (metric tons

Total Energy Revenues

$ Ener� Revenues

$/ton /metric ton)

32,850 (29,800) 777,000 23.65 (2fI.07)

22.56 (24.87)

26.83 (29.58) MASSBURN

168,480 (152,840)

170,640 (154,800)

3,801,480

4,577,800. (550 TPD; 500 metric TPO)

MASSBURN 558,450 (506,620) 15,003,000 26.87 (29.flZ) (1800 TPD; 1630 metric TPD)

REVENUES POR ELBCTRlcrrT ONLY SY!JI'BII

Yearly Waste Thro�PUt tons (metric tons

Total Energy Revenues

$ Ener Revenues

$/ton $/metric ton)

MODULAR 32,850 (29,800) 521,000 15.86 (17.48)

RDP 168,480 (152,840) 3,780,000 22.43 (24.7Z)

MASSBURN 170,640 (154,800) 3,780,000 22.15 (24.42) (550 TPD; 500 metric TPO)

MASSBURN 558,450 (506,620) 12,390,000 22.19 (24.46) (1800 TPO; 1630 metric TPD)

REVENUES POR COGENERATION (100 pille - 7500r - 100 psIr, 40 kPa)

Total Yearly Waste Throulthput Energy Revenues

tons (m etric tonS) $ Ener� Revenues

$/ton /metrlc ton)

MOOULAR 32,850

RDF 168,480

MASSBURN 170,640 (550 TPD; 500 metric TPO)

MASSBURN 558,450 (1800 TPO; 1630 metric TPD)

the waste-to-energy facility would be designed to generate steam at the highest possible pressure and temperature since the total amount of electricity which could be produced is a direct function of the allowable pressure drop through the turbine/ generator set. For example, steam might be gener­ated at 600 ps!g (4,000 kPa) with super heat and allowed to exhaust to a vacuum through the tur­bine/generator set. Based on average electricity prices of 5¢/kWh the revenues that could be gen­erated ranged from $15.86 to $22.43/ton ($17.48 to 24.72/t).

In the last portion of Table 5, revenues were calculated assuming that both steam and electri-

(29,800) 799,100 24.32 (26.81)

(152,840) 4,919,000 29.20 (32.19)

(154,800) 5,014,800 29.38 (32.39)

(506,620) 16,844,000 30.16 (33.25)

city were sold in a cogeneration application. In this consideration, steam may be generated at the resource recovery technology'S maximum pressure and temperature; the total electricity produced de­pends on the allowable drop from the turbine inlet steam conditions to those steam conditions (tem­perature and pressure) required by the energy market. Based on the same average prices noted above, the amount of revenues that could be gen­erated in this scenario range from $24.32 to $30.l6/ton or waste input ($26.81 to $33.25 It).

From Table 5 it can be seen that, under these assumptions, steam is more attractive to sell than electricity by itself, although the combination of

382

w

00

w

TA

BL

E 6

O

VE

RA

LL

EC

ON

OM

IC I

MP

AC

T O

F A

LT

ER

NA

TIV

E S

YS

TE

M C

ON

FIG

UR

AT

ION

S

System

Stea

m on

ly

'<tOO

(1

00 T

PD;

90 m

etr

ic

TPD

) RD

P (6

00 T

PD;

540

me

tric

T

PD)

MB

(5

50 T

PD;

SOO

met

ric

TPD

) M

B

(180

0 T

PD;

1980

me

tric

TPD

)

Elec

tric

ity

Only

:\tOO

(1

00 T

PD;

90 m

etri

c T

PD)

RD

P (6

00 T

PD;

540

me

tric

TPD

) M

B

(5S0

TPD

; 50

0 m

etri

c T

PD)

MB

(1

800

TPD

; 19

80 m

etric

TPD

)

Cog

ener

ation

MOD

(1

00 T

PD;

90 m

etri

c T

PD)

RDF

(600

TPD

; 54

0 m

etric

TPD

) '<t

B

(550

TPD

: 50

0 m

etri

c T

PD)

MB

(1

800

TPD

; 19

80 m

etr

ic T

PD)

-MOD

R

DF

:\IB

-

Mod

ular

Re

fuse

Der

ived

Fue

l :\t

assbu

ming

SCEN

ARI

O A

$5.2

5/10

00 •

(1

1.S7

/100

0 k g

) an

d $0

.07/

kwh

Tipp

ing

Fe

es

Net

Cos

t as

JI,f

ore

th

an

Year

ly

Costs

Re

venu

es

TiP8 i

n g F

ee

s St

eam

Pro

ject

s Cos

ts (

$) $

/ton

($7m

etri

c to

n)

(S7ton

\ (s

7ton

l -$

/ton

\

1,65

1,40

0 SO

.2S

(S5.3

9)

23.7

2 (2

6.15

) 26

.53

(29.

24)

8,50

1,00

0 50

.46

(55.

62)

27.1

7 (2

9.9S

) 23

.27

(25.

65)

-6,

910,

000

39.9

1 (4

3.99

) 26

.83

(29.

57)

13.0

8 (1

4.42

) -

17,9

39,4

00

32.1

2 (3

S.41

) 28

.87

(31.

82)

5.25

(5.

79)

-

1,87

4,00

9 57

.05

(62.

89)

22.2

3 (2

4.50

) 34

.82

(38.

38)

8.2

9

(9.1

4)

9,28

0,85

4 56

.43

(62.

20)

31.4

1 (3

4.62

) 25

.02

(27.

58)

1.75

0.9

3)

7,64

6,64

1 44

.81

(49.

40)

31.0

1 (3

4.18

) 13

.80

(15.

21)

0.72

CO.

79)

19,7

16,4

12

35.3

1 (3

8.92

) 31

.09

(34.

27)

4.2

2 (4

.6

S)

(1.0

3) (

-1.1

4)

1,77

4,76

1 54

.03

(59.

56)

25.8

7 (2

8.52

) 28

.16

(31.

04)

l.63

(1.8

0)

9,08

3,12

3 5S

.22

(60.

87)

28.7

1 (3

1.65

) 26

.51

(29.

22)

3 .24

(3

.57)

7,

498,

603

43.9

4 (4

8.44

) 31

.88

(35.

14)

12

.06

(13.

29)

(1.0

2) (

-1.1

2)

19,2

48,0

06

34.4

7 (3

8.00

) 31

.97

(35.

24)

2.50

(2.

76)

(2.7

S) (

-3.0

3)

,

SCE

NA

RIO

B

$6.0

0/10

00 #

($

13.2

3/10

00 k

g) a

nd S

O.OS

/kw

h

Tio

pin

l("

Fe

es

Ne

t C:o

st

\10

re

tha

n

Re

ve

nu

es

TiP f(i n

g Fe

es

Stea

m P

roje

cts

(S/to

n\

It/to

n)

S/to

n\

�7. 7

3 (3

0.57

\ ?'�

.52

(24.

82)

-

28.0

5 (�

0.92

) 2

�.4

1 (2

4.70

\ 31

.88

(35.

14)

8.0

3

(8.8

5)

-

31.9

3 (3

5.20

) 0.

19 (

0.21

) -

1�.8

6 (1

7.4

8)

41

.1!I

(4

�.4

0)

18

.67

(20.

�8

\ 22

.43

(24.

72)

14.0

0 (3

7.4

8)

11.5

9 (1

2.7

8\

22.1

5 (2

4.42

) n

n6

(2

4.9

8)

14

.n3

(I

n.P

)

22

.19

(2

4.41;

) 13

.12

(14.

46)

12

.93

0

4.2

5)

24.3

2 (2

6.81

) 29

.71

(32.

75

) 7.

19 (

7.93

) 29

.20

(32.

19)

26.0

2 (2

8.6

8)

�.IH

(3.

98)

29

.38

(3

2.39

) 14

.56

(16.

0S)

6.�1

(7.

20)

10.1

6 (3

3.25

) 4

.31

(4

.75

) 4

.12

(4

.�4

)

them in a cogeneration application can surpass either alone. Significantly, the feasibility and worthiness of cogeneration is affected by both economic and technical factors. These include:

1. The relative value of each energy form (steam and electricity) at the specific location under con-

, sideration. 2. The required steam conditions of the proj­

ect's steam market. 3. The maximum steam conditions (tempera­

ture and pressure) which can be achieved by avail­able resource recovery technologies.

Although the costs and revenues for cogenera­tion systems vary widely as noted above, Table 6 presents an overview of the impact on the tipping fees for the entire resource recovery project under different price conditions, technology options, and system configurations (steam, electric and co­generation). The annual cost for each system was calculated according to a variety of key assump­tions of operating approach, and then divided by the annual amount of waste processed to obtain a unit cost.

The revenues were calculated based on differ­ent prices for both steam and electricity. In Scenario A, a relatively low steam price was used, and a relatively high electricity price, reflecting current price conditions in certain sections of the country. The net cost (or tipping fee) was then calculated by subtracting the unit revenues from the unit costs. To facilitate comparisons between the different configurations, the steam-only con­figuration was used as a base to which the other two were compared.

In all but three of the cases noted on Table 6, cogeneration and electricity configurations were

, more expensive than steam-only configurations for resource recovery tipping fees. This is primari-

ly a result of the particular costs selected for comparison, and does not provide a general rule. Although the three promising cogeneration cases in this Table were massburning technologies, this does not mean that the other technologies cannot have favorable economic conditions for cogener­ation, but rather that they did not in these par­ticular situations.

The most important information obtained from this Table is the relative impact of price shifts in the two different scenarios. Although there were only small changes in price conditions, the tipping fees were affected dramatically. Clear-1y the developer must negotiate a strong energy market agreement or combination of agreements in order to achieve favorable economic conditions for tipping fees for waste diSposal. Considering the increasing prices for electricity resulting from PURP A, these facts also indicate the importance of exploring cogeneration opportunities, although they will not be advantageous in every situation.

CONCLUSION

In the future development of resource re­covery projects, cogeneration opportunities should 'be explored as having a significant potential for improving the economics of the project. With the passage and implementation of PURP A guidlines, state regulatory agencies are encouraging greater participation by investor-owned utilities in re­source recovery than previously was possible.

384

This regulatory impetus, combined with the major increase in prices for energy, provides an increasingly attractive climate for the develop­n:lent of cogeneration and resource recovery projects.

APPENDIX 1 ELECTRIC PRODUCING RESOURCE RECOVERY PROJECTS IN THE UNITED STATES

Size Startup Year (Actual throughQut) of Electric Operating-TPD (metric TPD) Location

Chicago NW, IL

Collegeville, MN

Columbus, OH

Dade County, FL

Gallatin, TN

Glen Cove, NY

Hempstead, NY

Lakeland, FL

Niagara Falls, NY

Oceanside, NY

Pinellas County, FL

Saugus, MA

Waukesha, WI

Windham, CT

Technology

MASS*

MOD

MASS

RDF

MOD**

COD

RDF

RDF

RDF**

MASS*

MASS

MASS***

COD**

MOD**

1,200 (1,100)

70 (63)

2,000 (1,800)

3,000 (2,700)

150 (140)

175 (158)

1,300 (1,200)

300 (270)

2,200 (2,000)

450 (410)

2,200 (2,000)

1,100 (1,000)

120 (110)

108 (98)

Production

1971

1981

1982

-

1981

1982

-

.1981

1981

1974

1983

1975

1981

1981

* **

-

-

Cogeneration of steam and mechanically driven steam turbines. Cogenerating steam and electricity

*** o S C D RDF MASS MOD COD

-

-

-

-

-

-

-

-

-

Market using steam for cogeneration Operating Start up Under construction Contract Dispute/Closed Down Refuse-Derived Fuel Masssburning Modular Combustion

. Codis posal

385

Status

0

S

S

D

S

c

D

S

S

o

C

o

S

C

AP

PE

ND

IX 2

E

XA

MP

LE

S O

F W

OR

LD

WID

E E

LE

CT

RIC

AL

PR

OD

UC

ING

RE

SO

UR

CE

RE

CO

VE

RY

FA

CIL

ITIE

S

Uni

t R

ated

SW

Gra

te M

anuf

actur

er V

on R

oll

Num

ber o

f C

al!!£itI

To

tal

Elec

tric

al

!'ltar

tup

Yea

r El

ectr

ic

Stea

m

il,far

ket

Locat

ion

Uni

ts-

TPD

(m

etri

c T

PD)

-Ca

paci

tI

Elec

tric

Pr

oduc

tion"

Us

e U

se i

f Cog

ener

atlng

Bieb

eshe

in,

W.

Ger

man

y 2

75 (

68)

1980

B�

mer

l)ave

n, W

. G

erm

any

3 24

0 (2

18)

1977

Fr

ankf

urt

Mai

n I,

W.

Ger

man

y 2

360

(327

) 19

66

Fran

kfur

t :'<f

ain

0,

W.

Ger

man

y 2

3fiO

(327

) 19

67

Ham

burg

0,

W.

Ger

man

y 3

200

(181

) 19

63

Lands

hut

0,

W.

Ger

man

y 1/

1/1

72/7

2/14

4 19

71/1

974/

1981

(6

5/65

/130

) Lud

wig

shate

n St

adt

2 24

0 (2

18)

1967

N

umber

g 3

360

(327

) 19

68

Soling

en

2 24

0 (2

18)

1970

He

lsink

i, Fi

nlan

d 2

200

(181

) 19

61

Dijan

, Fr

ance

2

300

(272

) 19

74

Stra

ssber

g, F

ranc

e 3

336

(305

) 19

74

Den

haag

, N

ethe

rlan

ds

3/1

360

(327

) 19

67/1

974

Gen

ua,

Ital

y 3

240

(218

) 19

72

Chl

ba,

Japa

n 3

150

(136

) 19

77

Hig

ashi

Osa

ka,

Japa

n 2

300

(272

) 19

81

Kit

akyu

shu,

Japan

2

300

(272

) 19

77

Nag

ano,

Jap

an

3 15

0 (1

36)

1982

O

saka

:'<f

i08to

, Ja

pan

2 36

0 (3

27)

1977

w

O

saka

Nis

hiyodo

Jap

an

2 20

0 (\

80

1964

00

0'1

O

saka

Tai

shO,

Japa

n 2

360

(327

) 19

80

Send

ai,

Japa

n 3

200

(181

) 19

76

Suit

a, J

apan

3

165

(\50

) 19

81

Toky

o A

dach

i, Ja

pan

4 31

6 (2

87)

1977

T

okyo

Ohi

, Ja

pan

4 30

0 (2

72)

1973

To

kyo

Seta

gaya

, Ja

pan

3 30

0 (2

72)

1968

To

kyo

Shak

ujii,

Jap

an

2 30

0 (2

72)

1968

To

yona

ka-[

tai,

Japa

n 3

225

(204

) 19

75

Yok

oha

ma,

Jap

an

3 42

0 (3

81)

1980

EB

S W

ien,

Aus

tria

2

506

(459

) 19

80

Wien

3

200

(181

) 19

63

Norr

torp,

Sw

eden

1

110

(100

) 19

82

Mun

leh N

orth

I,

W.

Ger

man

y 2

681

(600

) 68

MW

19

64

Mun

icip

al

Pow

er

Muni

eh N

orth

0,

W.

Ger

man

y 10

S8 (

960)

11

2 M

W

1966

l'I

Iunic

ipai

Po

wer

st

uttgart

, W

. G

erm

any

529

(480

) 15

6.5

MW

19

65

'fun

ielp

al

Pow

er

Mun

ich

South

, V

, W

. G

erm

any

1058

(96

0)

250

MW

19

69

!I.1un

icip

al

Pow

er

Mun

ich Sou

th IV

, W

. G

erm

any

1058

(96

0)

250

il,fW

19

71

!I.1un

icip

al

Pow

er

Con

tinu

ed

Mul

tipl

e lis

ting

s si

gni

fy e

xpans

ions

of

orig

inal

pla

nts.

AP

PE

ND

IX 2

E

XA

MP

LE

S O

F W

OR

LD

WID

E E

LE

CT

RIC

AL

PR

OD

UC

ING

RE

SO

UR

CE

RE

CO

VE

RY

FA

CIL

ITIE

S (

CO

NT

'D)

Uni

t R

ated

SW

Gra

te M

anufae

turer :'I

I.ti

n N

umber

of

C!,Q!ci

t:z:

Tot

al E

lect

rica

l St

artup

Yea

r El

ectr

ic

Stea

m \1

arl<e

t L

ocati

on

--U

nits

-T

PD {

met

ric

TPD)

· C

al!ac

it:z:

Elec

tric

Prod

ucti

on-

Use

if

C!!8:en

erat

inll'

Paris

I�

I_-M

onlinea

ux,

4 45

0 (4

10)

250

MW

19

65

Pren

ch

Stea

m

Prane

e Po

wer

D

istr

ict

H ea

tng

Aut

hori

ty

Ham

burg,

(Borsi

gstras

se) 31

8 (2

90)

1967

\f

unic

ipal

W

. G

erm

any

Pow

er

Par

is I

vry,

Fra

nce

2 13

23 (

1,20

0)

64 M

W

1969

Fr

ench

St

eam

Po

wer

D

istr

ict

Hea

ting

A

utho

ritv

M

unic

h N

orth

m,

2 52

9 (4

80)

W.

Ger

man

y V

ienna-Sp

itte

lan,

A

ustr

ia

2 �9

7 (3

60)

2.5

\1W

19

71

In-P

lant

H

ot W

ater

O

istr

ict

Hea

ting

N

otti

ngha

m,

Engl

and

2 31

0 (2

80)

3 \1

W

1973

In

-Pla

nt

Hot

Wat

er

Ois

tric

t H

eati

ng

Rot

terdam

, N

ether

lands

4

413

(375

) 21

MW

19

64

Am

ster

dam

, N

ethe

rlands

4

529

(480

) 41

MW

19

69

Hin

wil,

Sw

itze

rian

d 1

132

(120

) 2.

34

MW

19

70

Lim

mat

tal,

Swit

zerl

and

2 76

(70

) 1.

4 \1

W

1971

H

amburg

(St

elli

nger

Moor

),

2 65

3 (5

90)

32.6

MW

19

72

W.

Ger

man

y Zu

ricll

, Sw

itze

rlan

d 52

1 (4

73)

10.5

I\f

W

1973

In

-Pla

nt

Ois

tric

t H

eati

nll'

w

00

-.l

Uni

t R

ated

SW

G

rate

Man

ufac

turer V

KW

N

umber

of

CaJ2!

cit:z:

T

otal

Ele

ctri

cal

Star

tup

Yea

r El

ectr

ic

Stea

m

l\1ar

l<et

Locat

ion

Uni

ts-

TPD

(m

etri

c T

PD�I

C

aJ2!ci

t:z:

Elec

tr'ic

Pro

duct

ion-

Use

if

C!!8:en

euti

ng

Dus

seldor

f,

W.

Ger

man

y 1/

4/1

240/

240/

300

50

MW

19

61/1

965/

1972

(2

18/2

18/2

72)

Stut

tgart

, W

. G

erm

any

2 48

0 (4

35)

1965

/197

0 D

istr

ict

Hea

ting

W

est

Berl

in,

W.

Ger

man

y 8

384

(348

) 19

67/1

969/

1972

K

assel

, W

. G

erm

any

2 24

0 (2

18)

1968

/196

9 T

oulo

use,

Fra

nce

2/1

192

(174

) 19

68/1

978

Dis

tric

t H

eati

ng

Off

enba

ch,

W.

Ger

man

y 3

240

(218

) 19

69

Dis

tric

t H

eati

ng

Ros

enhe

im,

W.

Ger

man

y 1/

1 10

8/14

4 (9

8/13

0)

1969

D

istr

ict

Hea

ting

St

oekho

lm,

Swed

en

2 36

0 (3

27)

1970

£d

mon

ton,

Engl

and

5 33

6 (3

05)

1971

O

berha

usen,

W.

Ger

man

y 3

528

1479

) 19

72

Dis

tric

t H

eati

nlt

Iser

lohn

, W

. G

erm

any

1 38

4 (3

48)

1973

D

istr

ict

Hea

ting

K

refe

ld,

W.

Ger

man

y 2

288

(261

) 28

MW

19

74

Cod

isDOSl

li G

oppincen

, W

. G

erm

any

2 28

8 (2

61)

1975

D

istr

ict

Hes

tinll'

W

up4!I'ta

l,

W.

Ger

man

y -4

360

(327

) 40

MW

19

75

Shef

fiel

d, E

ngla

nd

2 24

0 (2

18�

1975

D

istr

ict

Hea

ting

H

amei

n, W

. G

erm

any

1 24

0 (2

18)

1977

Si

ngapore

3 48

11 (4

35)

1978

"B

udapest,

Hun

gary

4

360

(327

) 19

79

., M

ulti

ple

listi

ngs s

igni

fy e

xpansions

of

orig

inal [t

lants

.

AP

PE

ND

IX 2

E

XA

MP

LE

S O

F W

OR

LD

WID

E E

LE

CT

RIC

AL

PR

OD

UC

ING

RE

SO

UR

CE

RE

CO

VE

RY

F

AC

ILIT

IES

(C

ON

T'D

)

Uni

t R

ated

SW

G

rate

Mll

llufac

turer

Von

Rol

l N

umber

of

Ca�

cit:t

To

tal

Elec

tric

al

Star

tup

Year

El

ectr

ic

Ste

am

M

ark

et

Locat

ion

Uni

ts-

TPD

(m

etri

c TP

D)-

Capa

city

El

ectr

ic P

roduc

tion-

Use

it

Cog

en

era

ting

Basel,

Switz

erland

2

360

(327

) 19

69

Bern

, Swi

tzer

land

2

240

(218

) 19

75

Em m

enopi tz/

Solo

thurn,

2 24

0 (2

18)

1976

Sw

itzer

land

1961l

' G

enf,

Swit

zerlan

d 2

240.

(21

8)

Laus

anne

, Sw

itzer

land

2 12

0 (1

09)

1958

Lu

zern

, Sw

itzer

land

2

120

(l09

) 19

71

Win

tert

hur,

Switz

erla

nd

2 12

0 (l

09)

1965

Zu

rich

, Sw

itzer

land

2

260

(236

) 19

69

Bar

alona

, Sp

ain

3 36

0 (3

27)

1975

T

he H

ague,

Net

herla

nds

3/1

360

(327

) 23

MW

19

68/1

975

Mun

icip

al

Pow

er

Gra

te M

anuf

actu

rer W

idm

er +

Ern

st

w

00

00

Wer

denber

g, L

iecht

en S

tein

32

(2

9)

0.85

M

W

1974

In

dus

tria

l P

lan

ts a

nd

D

istr

ict

He

ati

ng

Ba

den-

Brug

g, Sw

itzer

land

2

110

(100

) 5.

2 M

W

1970

-M

ulti

ple

listi

ngs si

gnif

y exp

ans

ions

ot or

igin

al p

lant

s.