RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT Implementation Agency under R-APDRP SCHEME for CESU, Odisha Page | 1 CESU, Odisha Page 1 Release Date: 27 th February 2016 An initiative of Ministry of Power, Government of India Restructured Accelerated Power Development and Reforms Program (R-APDRP) of Govt. of India REQUEST FOR PROPOSAL (RFP) for Selection of ‘IT Implementation Agency’ to assist the Central Electricity Supply Utility of Odisha for implementation of IT infrastructure For further details, please visit the website: www.cesuodisha.com / www.cescoorissa.com Purchaser: CESU of Odisha Central Electricity Supply Utility of Odisha RFP Identification No: CESU/ITCC/R-APDRP/07 Single Stage – Double Envelope Selection Procedure The last date for submission of RFP is 28 th March 2016 (Up to 13:00 Hrs) (This document is meant for the exclusive purpose of RFP and shall not be transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued.)

Upload: duongtuong

Post on 14-Jun-2018

248 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 1

CESU, Odisha Page 1 Release Date: 27th February 2016

An initiative of

Ministry of Power,

Government of

India

Restructured Accelerated Power Development and Reforms

Program (R-APDRP) of Govt. of India

REQUEST FOR PROPOSAL (RFP)

for Selection of ‘IT Implementation Agency’ to assist the

Central Electricity Supply Utility of Odisha for

implementation of IT infrastructure

For further details, please visit the website:

www.cesuodisha.com / www.cescoorissa.com

Purchaser: CESU of Odisha

Central Electricity Supply Utility of Odisha

RFP Identification No: CESU/ITCC/R-APDRP/07

Single Stage – Double Envelope Selection Procedure

The last date for submission of RFP is 28th March 2016 (Up to 13:00 Hrs)

(This document is meant for the exclusive purpose of RFP and shall not be transferred, reproduced or otherwise used for purposes other than that for which it is specifically issued.)

Page 2: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 2

CESU, Odisha Page 2 Release Date: 27th February 2016

NOTIFICATION INVITING TENDER (NIT) / REQUEST FOR PROPOSAL

CENTRAL ELECTRICITY SUPPLY UTILITY OF ODISHA Head Office: IDCO TOWER, 2

nd Floor, Janpath, Bhubaneswar-751022

TELEPHONE: 0674-2545685, FAX: 0674–2543125

Website: www.cescoorissa.com OR www.cesuodisha.com

Tender Notice No.: CESU/IT-406/ Vol-III /2016/ 4677 Dt. 26/02/2016

For and on behalf of CESU, the undersigned invites sealed bids from qualified and eligible bidders to Implement IT infrastructure at CESU as per R-APDRP Part-A norms.

BRIEF DESCRIPTION: Event / Particulars Date and Time Location

Download of RFP / Bid Document

27th February 2016

from 13:00 Hrs onwards

www.cesuodisha.com / www.cescoorissa.com

Date of Pre-Bid Conference 10

th March 2016

from 12:00 Hrs to 14:00 Hrs.

Conference Hall, Central Electricity Supply Utility of Odisha, 3

rd

Floor, IDCO Tower, Janpath, Bhubaneswar – 751022 Odisha

Tender Participation Cost

Indian Rupees 25,000/- (Twenty Five Thousand) +

VAT 5%

Rs. 25,000/- (Twenty Five Thousand) Plus VAT 5%, by Demand Draft payable to CESU of Odisha, Bhubaneswar, Odisha. The interested empanelled SIs may download the tender document from website (www.cesuodisha.com / www.cescoorissa.com) and the cost may be submitted along with the bid.

Bid Security (EMD) Indian Rupees 1.00

Crore

Bid Security (EMD) to be submitted as Bank Guarantee in the prescribed format for a period of 150 days from the date of Bid Opening.

Final Bid Submission 28

th March 2016

(Up to 13:00 Hrs)

IT Center, Central Electricity Supply Utility of Odisha, 8

th Floor, IDCO Towers, Janpath,

Bhubaneswar -751022 Odisha

Technical Bid Opening 28

th March 2016 15:00 Hrs

Conference Hall, Central Electricity Supply Utility of Odisha, 3

rd

Floor, IDCO Tower, Janpath, Bhubaneswar – 751022 Odisha

Financial Bid Opening Will be Notified Later

The aforesaid dates are firm and will not be extended.

CESU reserves the rights to cancel the RfP without assigning any reason thereof.

Sd/- Sr. GM (IT)

Page 3: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 3

CESU, Odisha Page 3 Release Date: 27th February 2016

General Instructions to bidders:

A. CESU invites PFC Empanelled companies to purchase the Request for Proposal (this “RFP”) to participate in the bidding and selection process for the appointment of IT Implementing Agency to implement R-APDRP PART-A.

B. This RFP can be downloaded from www.cesuodisha.com / www.cescoorissa.com on or after 27th February 2016, 13:00 Hrs Indian Standard Time by meeting the criteria and following the procedure indicated herein.

C. This RFP comprises of following documents, wherein the bidders are expected to inform themselves of the content fully:-

a. This RFP Document b. SRS Document issued by Nodal Agency (PFC) c. Amendments to the RFP and SRS documents issued by Nodal Agency (PFC) till

the date of bid submission

D. All interested parties are requested to strictly abide by ALL terms prescribed in this RFP and provide accurate information to the best of their knowledge without misleading CESU to be considered for participation in this Project.

E. CESU reserves the rights to reject any or all offers without assigning any reasons thereof.

F. The nodal person for all enquiries, correspondence and clarifications with respect to the

RFP and submission of the bid shall be Sr.GM(IT), CESU; e-Mail: part-

[email protected] Phone: 0674-2545685.

No tender shall be accepted /opened after the due date and time of receipt of tender irrespective of delay due to postal services or any other reasons and CESU shall not assume any responsibility for late receipt of the tender. In case the due date happens to be a holiday, the bids shall be received/ opened on the next working day at the same time & place.

G. It should be clearly understood that CESU will not reimburse any cost incurred by you for the preparation of offer, site visit, collection of information, or, if you are selected, for contract or negotiations.

H. Maximum of two members per empanelled System Integrator are permitted for attending the pre-bid conference. OEMs or other Partners shall raise their queries through respective SIs. All the queries / clarifications are to be sent in format given below. All queries / clarifications should be sent in advance, any query sent after the closing of bid query acceptance timeline i.e. 24 Hours before the pre bid conference shall not be entertained:

Name and Address of the Organization submitting

Request Name, Position and Contact details of person submitting

request

Sr. No Section No / Clause No.

Page No. RFP / SRS Sentence

Query / Clarification Sentence

Page 4: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 4

CESU, Odisha Page 4 Release Date: 27th February 2016

I. Bidders should observe a high standard of ethic during the selection process and in the execution of this contract.

J. Any bid i.e. Technical, price or Bid Security cover received after the due date and time will not be accepted and the offer will be categorically ignored without any communication.

K. The bid, even though fulfilling the specified qualifying requirements/criteria as specified in the RFP bid document, are liable to be disqualified in case of non-compliance to the followings by the bidders :-

a. Not made misleading or false representations in the forms statements and

attachments submitted in proof of the qualification requirements. b. Has not been blacklisted by any company, Board, organization or government

body.

Page 5: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 5

CESU, Odisha Page 5 Release Date: 27th February 2016

1.0 Power Sector overview

From modest beginnings at the time of Independence, the Indian power sector has grown a

hundredfold – and is targeting a further doubling of capacity within the next decade or so. No

doubt, a tremendous achievement and there is no escaping the fact that the sustained growth

of the power sector has been one of the major drivers for the success story that is the Indian

economy, certain pain areas notwithstanding.

Starting from the opening up of the generation sector to private sector in October 1991 to the

1998 Act through which the regulatory agencies were sought to be set up and culminating in

the integrated Electricity Act, 2003, a remarkable continuity of vision and thought process has

been demonstrated by the highest level of planners, changes in government and other factors

notwithstanding. From the distribution utilities’ point of view, the two most significant

programmes taken up by the Ministry of Power, Government of India are the two versions of

the Accelerated Power Development Reforms Program i.e. APDRP-I and APDRP-II.

The thinking and policy directions that have now been decided on by the Ministry of Power,

Government of India in consultation with the leading power utilities in the fields of generation,

transmission and distribution can be summarized as follows:

� Protection of the interests of economically weaker sections of society; in particular those

living Below the Poverty Line (BPL) and whose daily energy consumption does not exceed

30 kWh per month

� Centers of excellence across the country to show the way

� 11 kV feeder will be treated as a profit center, with the concerned Junior Engineer playing

the role of a Feeder Manager (for one or more feeders as necessary)

� Committed and sustained movement towards improving the financial viability of the power

distribution utility

� Identification of Key Result Areas to help in prioritizing the various organizational initiatives

� Preparing all the market players to play an active, responsible but commercially-oriented

role in an ABT environment; both at the inter-State as well at the intra-State level when the

necessary communication infrastructure is in place and organizational capabilities have

been suitably enhanced

� Move towards rational tariff structures and reduce, if not eliminate, subsidies and cross-

subsidies to within 20% of properly ascertained cost of supply for all categories of

consumers

Page 6: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 6

CESU, Odisha Page 6 Release Date: 27th February 2016

2.0 Overview of CESU of Odisha CESU has come into effect from 08.09.2006 after restructuring of erstwhile CESCO in compliance of Electricity Act 2003. CESU is a major power utility of the state with consumer strength over 20 Lacs approximately. 5 Circles, 20 distribution divisions, 65 Sub divisions and 250 electric supply offices make up the backbone to the power CESU, Odisha distribution system of the CESU area of operation. At present database of all IT activities of CESU is being maintained at Divisional Computer Centre (DCC) under the control of Divisional Manager of respective Divisions. At present, CESU is having 20 nos of such DCCs located all over CESU area. In its corporate Headquarters, CESU has a central Data Centre with 4 Mbps & 8 Mbps dedicated leased ISPs for connectivity with all the DCCs. Electric Supplies under the control of Distribution Divisions are mainly dealing with all consumers except EHT consumers. Most of the Subdivision offices in urban area are facilitated with Broadband connectivity. CESU has two categories of bulk consumers namely, Division billed and Spot Billed consumers. CESU has taken steps towards reduction of ATC loss by appointing Distribution Franchisees in 14 out of 20 divisions in BOT model. In order to provide better service to the customers of CESU and meet various stakeholders like Regulators, State Government, the CESU proposes to implement various IT infrastructure across its core business functions so that IT enabled process automation can be achieved without human intervention or manual work. MoP, GoI sanctioned the R-APDRP Scheme for 12 towns of CESU area in Odisha on 1st March 2014 and accordingly CESU has initiated various activities for the implementation of the scheme. Considering the objectives of the R-APDRP scheme, CESU proposes that a GPRS based Energy Audit & Accounting system will be implemented across its project areas covering network as well as high value consumers which be based on open protocol rather than vendor specific protocols. CESU will also move from the current decentralized billing database to adopt a centralized approach. As CESU Head Office is located in Bhubaneswar and also it is centrally located and has access to better communication as well as infrastructure. Hence, it is proposed that CESU's data centre will be located in Bhubaneswar which is under Bhubaneswar UA. Similarly, CESU also proposes that a Disaster Recovery Site will be located at the Berhampur Town or any other town to be selected by CESU for business continuity.

Page 7: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 7

CESU, Odisha Page 7 Release Date: 27th February 2016

Electricity Sector organizations in Odisha

OERC Odisha Electricity Regulatory Commission http://www.orierc.org

OHPC Odisha Hydro Power Corporation Limited http://www.ohpcltd.com

OPGC Odisha Power Generation Corporation Limited http://www.opgc.co.in

NTPC

(TTPS) Talcher Thermal Power Station http://www.ttps.com

OPTCL Odisha Power Transmission Corporation

Limited http://www.optcl.co.in

GRIDCO Grid Corporation of Odisha Limited http://www.gridco.co.in

CESU Central Electricity Supply Utility of Odisha http://www.cescoorissa.com

http://www.cesuodisha.com

3.0 CESU Vision

• To ensure uninterrupted quality and reliable power supply to its consumers.

• To be the best distribution utility of India.

• To make every work place a safe working place.

• To be socially responsible for employees and society.

3.1 CESU Area Covered in R-APDRP Scheme

Under R-APDRP scheme, The Ministry of Power, Govt. of India has sanctioned Detailed

Project Reports (DPRs) of 12 towns of Central Electricity Supply Utility of Odisha.

Details of approved towns are as follows:

Page 8: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 8

CESU, Odisha Page 8 Release Date: 27th February 2016

Details of

CESU

towns for

R-APDRP

ProjectSr.

No

Town Name Connections

Area

(Sq.

Km.)

No. of Sub

Division &

Division

Offices

No. of Other

Offices

Total

No. of

Offices

1 Cuttack 90,252 64 7* 16* 23*

2 Bhubaneswar (HQ) 2,21,595 135 8* 37* 45*

3 Puri 37,496 17 3 16 19

4 Khordha 8,547 26 2 3 5

5 Jatni 7,138 25 1 3 4

6 Dhenkanal 14,878 31 1 8 9

7 Angul 13,669 19 1 5 6

8 Talcher 6,375 26 1 2 3

9 Kendrapara 9,008 11 2 3 5

10 Pattamundai 6,137 24 1 5 6

11 Jagatsinghpur 6,385 18 1 7 8

12 Paradeep 3,654 32 1 1 2

CESU Total 425,134 428 29 106 135

Note: * Number of offices may change during the period of R-APDRP Project.

The data provided above is as on 1st April 2013 for the area and consumer base covered

under R-APDRP. Bidder has to assume per annum growth of 7.5% in asset and consumer

base. However, consumer for entire CESU as on date is 20 Lacs approximately.

While Power distribution in Bhubaneswar & Cuttack is directly under CESU, two different Distribution Franchisees are managing 33kV and below electrical network, power distribution, billing and collection in remaining ten towns. Power distribution in Puri, Khordha & Jatni is handled by M/s FEDCO whereas M/s Enzen Global Solution is entrusted for handling the same in Dhenkanal, Angul, Talcher, Kendrapara, Pattamundai, Jagatsinghpur & Paradeep. These ten towns would be collectively referred as Franchisee Towns for the purpose of this document.

Page 9: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 9

CESU, Odisha Page 9 Release Date: 27th February 2016

3.2 Scope of Work for ITIA in R-APDRP Area

Under the R-APDRP (Part-A) Scheme, the following IT Infrastructure Setup has been

envisaged:

1. Establishment of Data Center at Bhubaneswar

2. Establishment of Disaster Recovery Center at Berhampur or any other town to be

selected by CESU.

3. Establishment of Customer Care Call Center at Bhubaneswar for seating capacity of 5

with a Toll Free No.

4. Providing all of the following modules and systems for the towns of Bhubaneswar and

Cuttack

i. Meter Data Acquisition System

ii. Energy Audit

iii. New Connection

iv. Disconnection & Dismantling

v. GIS based Customer Indexing and Asset Mapping

vi. GIS based integrated Network Analysis Module

vii. Centralized Customer Care Services

viii. Management Information System (MIS)

ix. Web Self Service

x. Identity and Access Management System

xi. System Security Requirement

xii. Development of Commercial Database of Consumers

xiii. Metering

xiv. Billing

xv. Collection

xvi. Asset Management

xvii. Maintenance Management

xviii. Document Management System

xix. Mail / Messaging System

xx. Enterprise Management System and Network Management System

xxi. Antivirus & Firewall System

xxii. Data Warehouse System with MIS application

5. AMR Implementation, including installation of meter modems and data concentrator

6. DGPS based GIS Survey

7. Establishment of LAN, MPLS-VPN and other networking in all the identified towns of

the CESU. Number of offices mentioned in Appendix – S.

8. Facility Management Services for 5 years from the “Go-Live” Date of Project

a. Integration, as envisaged in G1 section under 3.10 paragraph of SRS

Document, with existing applications

9. Data Migration for following applications as envisaged in section G1 under 3.9

paragraph of SRS, but not limited to

Page 10: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 10

CESU, Odisha Page 10 Release Date: 27th February 2016

a. Metering

b. Billing

c. Collection

d. New Connection

e. Disconnection and Dismantling

f. Asset Management

g. Maintenance Management

h. GIS field survey data

10. Following modules are to be implemented in franchisee towns as well.

a. Energy Audit

b. GIS based Asset Mapping

c. GIS based integrated Network Analysis Module

d. Incremental Asset Data Import in GIS

e. Incremental data imports for Energy Audit

11. The software shall be centralised with customised requirements of the town. CESU

users shall have access to the system based on their roles and responsibilities.

For Towns Other than Bhubaneswar & Cuttack

a. DF (Distribution Franchisee) shall create non-GIS based Consumer Indexing

(CI) and Asset Mapping (AM) database and shall carry-out MBC activities

along with AMR data capture and changes related to meters / consumers

b. CESU will ensure that required infrastructure and processes are established in

Franchisee Towns for making live and sustenance of applications mentioned in

point 10- above. Some of these requirements are mentioned below.

i. Installation, maintenance and replacement of energy audit meters

before go-live as well as after go-live

ii. Regular reading download of energy audit meters and making these

available at DC and upload of same

iii. Mapping of Assets and its regular updates for changes on GIS map

iv. Process for incremental assets, meters and reading upload

v. IT infrastructure, network bandwidth and resources with requisite skills

for franchisee towns

c. CESU shall ensure that the data from the above mentioned activities are being

available in the server at DC on regular basis along with the CI and AM data

updation / upgradation.

d. ITIA shall import and process the above mentioned data into the newly build

Integrated system and shall ensure the Energy Audit & Accounting processing

including report preparation.

Note:

Energy audit meters are installed up to LT feeder level in all 12 towns. Since only

Bhubaneswar and Cuttack are under direct control of CESU, following approach would

be followed.

Page 11: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 11

CESU, Odisha Page 11 Release Date: 27th February 2016

Bhubaneswar and Cuttack:

With the help of correct consumer indexing and billing data, system should

automatically link the feeder level billed units and corresponding data from respective

energy audit meters at feeder to arrive at feeder level energy audit report. Same would

get linked to audit reports at DT/HT/EHT level. Consumption data is to be extrapolated

on pro-rata basis for any difference in duration of reading period.

Franchisee Towns:

Provision should be there to upload en-mass or enter feeder wise billed consumption

for specific dates (data to be provided by respective franchisees). Subsequent process

/ logic would remain same as defined for Bhubaneswar and Cuttack.

Since there is distinct possibility of conversion of any Franchisee town to non-

franchisee town, provision should also be made for conversion of Franchisee Town to

non-Franchisee town for all the applications

Exclusive Features

For the purpose of Software licenses and scalability of IT Hardware & networking equipment

in datacenter & disaster recovery center of this project, ‘Enterprise’ is to be considered as all

entities (or legal heir) authorized to distribute electricity in the State of Odisha whereas utility

would mean CESU and its current license area.

CESU of Odisha plans to build integrated IT solution for the entire enterprise. Through this

bidding process, CESU intends to select IT implementation Agency (ITIA) to build IT

Infrastructure for Data Centre for entire area of CESU of Odisha and implement all

applications of R-APDRP scheme as specified in the scope of work for Bhubaneswar &

Cuttack. In addition to these, for remaining ten towns (specified in the scope of work) selected

bidder is required to roll out GIS, GIS based asset survey and mapping, GIS based integrated

network analysis, energy audit, MDAS and integrated MIS for CESU. For this purpose, ITIA is

expected to build the required interfaces for data upload of incremental changes in assets,

electrical network, consumer indexing, MBC (metering, billing and collection) and other

modules of Franchisee Towns. The technical specifications for the scoped items would be

same as elaborated in this section and as mentioned in SRS and subsequent corrigenda

issued by PFC or CESU till the time of Bid Submission.

ITIA is also required to build interfaces for migration of base data from existing systems,

transit (incremental change) data during roll out and interfaces for existing applications, which

CESU would like to retain. Some of these applications are mentioned below.

1. Spot billing: Presently SBMs are of M/s Analogic and M/s Linkwell (Visiontek) make

and billing code for these machines are provided and maintained by the respective

vendors. For ease of maintenance and support, ITIA is to build its own billing code

for these machines. Hardware specs of SBMs are mentioned in Appendix – O.

Page 12: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 12

CESU, Odisha Page 12 Release Date: 27th February 2016

2. ECS registration module: To register and get collection information for consumers

opting for payment through ECS.

3. Existing Payment Gateway with Odisha e-Governance Services Limited (OeSL) is to

be integrated with ITIA’s system along with any other future payment gateway.

4. A scheme is proposed specifying the responsibilities of ITIA, CESU and Distribution

Franchises for GIS Implementation in the franchised towns as mentioned in

Appendix – R.

5. The Bidder has to provide the network connectivity to CESU offices and the meters

only in Bhubaneswar and Cuttack. Number of offices mentioned in Appendix – S.

Till the roll out of the entire system in proposed R-APDRP applicable towns, the R-APDRP

application will go live one after another town. The data from Go live town should be made

available to old CESU system through computerized automated interface as per the CESU’s

required specification. The ITIA should develop such an interface in the delivered system.

The detailed interface requirements document shall be provided to the Selected ITIA during

the ‘To-Be’ document phase.

It may be noted that above listed applications are only illustrative for the purpose of building

interfaces and hence it is advised that the intended bidders should study and carry-out

necessary due-diligence prior to quoting in the bid process.

Page 13: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 13

CESU, Odisha Page 13 Release Date: 27th February 2016

4.0 Bid Highlights

1. The requirement of the hardware and other units mentioned in BOM Appendix L are as

per the CESU’s approved DPRs. However, the payment will be made as per the actual

quantity consumed during the execution as per the site and solution requirements.

2. The evaluation shall be made on the overall cost of the items and quantities quoted in the

bid in compliance to RFP. However, while placing the order, or during the execution, the

utility reserves the right to modify the quantities of individual items to the extent of +/- 20%

of the mentioned BOQ subject to within a range of 10% of the value of the overall project

cost.

3. Accordingly the selected bidder, after the award of contract, will finalize the actual

quantities to be deployed after approval of the CESU, before initiating the purchase

process of such items.

4. The bidder is expected to complete the pilot implementation at Sub Division-3 area under

BCDD-1 division of Bhubaneswar Town of CESU including the Centralized Call Center,

Data Centre at Bhubaneswar and Disaster Recovery Centre at Berhampur (or any other

place as finalized by CESU) within 12 months from the date of LOI and complete rollout in

all the approved towns in next 6 months.

5. All application software, hardware, data, plans, drawings, specifications, designs, reports

and other documents procured or developed by the selected vendor in the execution of the

contract shall remain the property of the CESU, right from the beginning of the contract,

during the whole duration of the project and after the expiry or termination of the contract.

The CESU shall also remain the sole owner of the property (Hardware / Software) in case

the contract is terminated for any other reasons. This should be handed over to CESU

before go-live. Bidder would also hand over to CESU the code, documentation and version

details for any changes/ customization/ configuration/ modification done on bought out

applications or indigenously developed applications (for CESU) before the same is moved

from development/ test/ quality to production servers.

6. The source code of the customized part of the application software will remain the

exclusive property of the CESU, even after the termination or expiry of the contract. The

ownership shall also remain with the CESU in case the selected vendor fails to execute

tasks to the satisfaction of the CESU.

7. If the MoP or PFC issues any amendment to the SRS or Model RFP document till the date

of opening of this bid document, those amendments will become an integral part of this bid

document, for which no separate intimation will be given to the empanelled SIs.

Page 14: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 14

CESU, Odisha Page 14 Release Date: 27th February 2016

8. The bidder shall give self-declaration in the technical proposal that the FMS Cost has been

taken as minimum 20% of the total project cost (excluding FMS and bandwidth cost) and if

it is less than 20%, its bid may be declared as non-responsive.

9. The Bid Security mentioned in this document is for the entire bid.

10. The Performance Security will be 10% of the total bid amount as per SCC of this bid

document. However, an additional FMS Performance Bank Guarantee (FMS-PBG) equal

to 20% of the total FMS value for a period of 5 years starting from beginning of FMS

period is required to be submitted by the bidder.

11. Bidders to provide power point presentation in soft copy and hard copy with the Technical

proposal, to detail the functionality of below listed modules. The major Modules to be

covered are as under:

a. Metering

b. Billing

c. Collection

d. New Connection

e. Meter Data Acquisition System

f. CRM for Call Center

g. Energy Audit

h. Asset Management

12. During the course of evaluation of technical bid, the purchaser reserves the right to verify

the availability of various functionalities mentioned by the bidder in Appendix-B as

“available without modification” in a live demo of the system. . However, no bid shall be

rejected on the basis of Demo.

13. Since the execution of R-APDRAP scheme within the stipulated time is a pre-requisite to

convert the amount sanctioned by Ministry of Power (MoP) from loan to grant, the vendor

is required to plan project execution activities strictly as per the timelines.

14. Meter data captured through GPRS/CDMA Modem will be transmitted directly to Data

Centre / DRC for which appropriate connectivity bandwidth will be provided along with SIM

Cards in the name of CESU and enable it to pay directly to the service provider

15. Architecture Designs: The Software Application architecture should be designed in a way

that it should be possible to integrate the application and database of additional towns, if

the need be. The integration mechanism should be flexible and implemented at no cost to

the CESU.

16. The bidder should give a declaration on its Letterhead that its bid DOES NOT DEVIATE

from the RFP, SRS and their amendment/corrigendum issued till the date of bid

submission.

Page 15: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 15

CESU, Odisha Page 15 Release Date: 27th February 2016

17. The proposed solution should have the provision for integration with near future systems

like Automated Metering Infrastructure (AMI), SCADA, etc. System Integrator would be

solely responsible for providing the necessary touch points in required technology for

integrating future solutions with proposed systems during the complete contract period.

18. Data Center and Disaster Recovery Center:

The following will be considered and factored for sizing Data Center and Disaster

Recovery Centre and all its hardware, network components and their operating

systems.

i. Total consumer base and entire asset base of the CESU of Odisha will need to

be considered along with the scalability of 7.5 per annum to factor future growth

for sizing of servers and network bandwidth.

ii. For all software, licenses (except operating systems) in datacenter (and DR

centre) like database, applications, exchange, AD, monitoring, backup,

middleware, GIS, MDAS, access control, etc are to be sourced for entire

enterprise.

iii. For this purpose current consumer base for the utility is to be taken as 20 Lacs

approximately.

iv. The increase in consumer base and electrical asset base may be assumed at

the rate of 7.5 per annum compounding as specified by PFC on the base data

provided as on 1st April 2013 in the RFP up-to the date of Go- live and five

year support after go-live.

v. The bidder will have to size the system keeping in mind the contingencies such

as change in business process and business logic from the date of

commencement of work up-to the end of 5 years from date of Go-live of total

project.

vi. The sizing of applications and database servers, storage, network, operating

systems, Anti-virus etc. shall be done to comply with and maintain the SLAs

defined in SRS document and the scalability factors.

vii. In case of performance issues (non-compliance of SLA) for CESU area

requiring additional hardware or need for additional software license in Data

Centre or Disaster Recovery Centre for roll out of applications within state of

Odisha, ITIA to procure, install and configure these without any additional cost

to CESU up to 5 years from Go-Live.

Page 16: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 16

CESU, Odisha Page 16 Release Date: 27th February 2016

viii. The system must comply with the SLAs defined in SRS and included here-in

from the date of commencement of work up-to the end of 5 years from date of

complete live roll out of total project.

ix. In case bidder assumes any data or works out sizing in the absence of required

data, it should inform in writing to CESU so that necessary input can be

provided.

19. The quantities / capacity given in respect of servers for DC / DRC/CCC are only

indicative but the bidder shall quote as per the quantity required for its proposed

solution.

20. The DRC will be an exact replica of DC i.e. all the software, hardware and network

equipment and other items etc. provided at DC will also be installed and commissioned

at DRC along with relevant licenses to support all operations from DRC during DR drill

and in event of disaster.

21. It is mandatory requirement to provide the details of the basis for sizing of servers,

storage and network bandwidth in the technical proposal.

22. SAN cable is to be quoted as lot irrespective of its length. Bidders to provide minimum

usable SAN Capacity of 75 TB each at DC and DR.

23. Each database server shall be enterprise level SMP RISC / EPIC / CISC / x-86 64-

Bit processor based system and should be capable of minimum TPM-C rating of

14,00,000 (14 Lacs) or higher for fully populated configuration. OEM should certify this

on its letterhead with the estimated benchmark.

24. Application and other Servers shall be enterprise level SMP RISC / EPIC / CISC / x86

64-bit processing based system and each should be capable of minimum SPEC JBB

2005 rating of 800,000 bops (business operations per second) for fully populated

configuration. OEM should certify on its letterhead the estimated benchmark, in case it

is not published. The bidder shall offer the suitable servers considering the SRS

document along with its amendment and the benchmark parameters as mentioned

above as a referral point.

25. All Servers should be offered with latest CPU with highest clock speed available on the

server model being offered by the bidder at the time of bidding

26. All operating systems, databases and applications should be of latest version as

supported by OEM.

27. Each Server shall be configured with even number of CPUs.

Page 17: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 17

CESU, Odisha Page 17 Release Date: 27th February 2016

28. Server OEMs must be member of Transaction Processing Council (TPC) or Standard

Performance Evaluation Council (SPEC).

29. The Centralized Data Centre will be at Bhubaneswar. The Centralized DRC at

Berhampur town or any other town to be selected by CESU.

30. The successful bidder shall provide the DC requirements relating to all relevant

components, layouts, air conditioning requirements, detailed requirements of Civil and

Electrical work like earth pit, Electric Connection to UPS, DG set, Change over switch,

Cooling arrangement, Harmonic filter, Fire system, Access control and CCTV, Smart

cards, Cage construction, False ceiling, False Flooring, Interiors, furniture, etc. which

are in Scope of the Purchaser.

31. Facility Management Services: FMS Charges are required to be mentioned town wise

for 5 years from the date of Project “GO-LIVE”.

32. Licensing

a. All the licenses shall be procured in the name of “Central Electricity Supply Utility of

Odisha”.

b. The bidder shall provide enterprise wide license without constraint of number of

CPU / Core / Number of Users / Number of Consumers for all applications and

system software.

c. The GIS licensing should cover viewing rights to all users and edit/deletion/addition

rights to one Authorized User per Sub Division in the CESU.

d. All the licenses shall be owned by CESU of Odisha even after the end of period of

5 years from the date of “GO- LIVE” of the Project. CESU and any new power

distribution entity that emerges in CESU shall have complete right to use these

licenses.

e. The purchaser shall be at liberty to deploy the solution anywhere within the CESU

of Odisha.

33. Messaging Server: Utilities of Odisha intend to opt for messaging server and it is

required that the ITIA to provide this facility to the utilities with following highlights in

addition to requirements envisaged in SRS

a. The utilities will be having mail messaging facility which they can access by using

either Internet or Intranet.

b. CESU will have its own unique email extensions. For example CESU utility may

use [email protected]

Page 18: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 18

CESU, Odisha Page 18 Release Date: 27th February 2016

34. Performance Parameters for Switches: Type Port Densities

Support MAC Address Support

VLAN Support

Core Switch 200+ (10/100/1000) 64K 4000

Distribution Switch 100+ (10/100/1000) 32K 2000

Layer III Switch 48 (10/100) 8K 255

Access Switch (DMZ) 48 (10/100/1000) 8K 255

Core Switch & MPLS router packet forwarding rate should be minimum 200 Mpps

35. The ITIA will propose bandwidth sizing requirements for all offices and for GPRS modems

to meet the requirements of the proposed solution to achieve performance level and SLA

level during the entire period of engagement. The ITIA will resource Bandwidth from a

Network Bandwidth Service Provider (NBSP). The Utility shall pay the bandwidth charges

directly to the Bandwidth Provider. The ITIA would be required to enter into Tripartite

Agreement with the Utility and Network bandwidth service provider to manage and

oversee the network bandwidth service provider to ensure performance levels meeting

SLAs.

The minimum bandwidth requirements are given below:

No. Office/

Location Type of Connectivity Minimum Bandwidth

Requirement

1 Data Centre

Internet – Primary

Linkage

10 Mbps

Bidder to reassess for proposed solution

Internet – Secondary

Linkage (In H/A load

balancing Mode)

4 Mbps

Bidder to reassess for proposed solution

MPLS VPN – Primary

8 Mbps

Bidder to reassess for proposed solution

Secondary Linkage

2 Mbps

Bidder to reassess for proposed solution

2 DRC Internet – Primary

Linkage 8 Mbps

Bidder to reassess for proposed

Page 19: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 19

CESU, Odisha Page 19 Release Date: 27th February 2016

solution

Internet – Secondary

Linkage (In H/A load

balancing Mode)

4 Mbps

Bidder to reassess for proposed solution

MPLS VPN – Primary

8 Mbps

Bidder to reassess for proposed solution

Secondary Linkage

2 Mbps

Bidder to reassess for proposed solution

3 DC / DR

Replication

Primary Linkage Bidder will size to meet the RPO & RTO-Refer SRS (Section 22.6 of G3)

Secondary Linkage (In

H/A load balancing

Mode)

Bidder will size to meet the RPO & RTO-Refer SRS (Section 22.6 of G3)

4 Customer Care

Centre

MPLS VPN – Primary

4 Mbps

Bidder to reassess for proposed solution

Secondary Bandwidth

2 Mbps

Bidder to reassess for proposed solution

5

Division and

Subdivision

Office

MPLS VPN – Primary

Linkage

Min 2 Mbps

Bidder to reassess for proposed solution

Secondary Linkage

Minimum 512Kbps

Bidder to reassess for proposed solution

6 Other Offices

MPLS VPN – Primary

Linkage

512 Kbps

Bidder to reassess for proposed solution

Secondary Linkage Not required

7

From GPRS

Modem to

DC/DRC

Should be assessed by bidder

Note:

Page 20: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 20

CESU, Odisha Page 20 Release Date: 27th February 2016

� Mentioned bandwidths are minimum requirement and in case bidder requires higher

bandwidth for meeting the required SLA, the same shall be proposed by the bidder in

bid response.

� All the connectivity terminating at DC and DRC should be on fiber, the bidder should

provide sizing documents.

� The CESU reserves the right to ascertain the actual bandwidth usage pattern of the

different offices and if required the bandwidth may be revised accordingly on mutually

agreed terms and condition.

� Primary & secondary connectivity for DC/DRC/CCC and internet connectivity should

be sourced from two different ISPs.

36. Trainings: In addition to the scope envisaged in SRS document for trainings and

documentation, followings will be part of ITIA scope:

a. The selected vendor will provide the training on the various applications to application

users of CESU as per client requirements.

b. The training shall be conducted by experienced instructors of ITIA and OEM.

The System Integrator in consultation and convenience of the CESU shall workout the

training program and all the other modalities of the training, which should be delivered

by OEM certified and SI.

c. The training shall be conducted at sites to be specified by CESU.

d. System Integrator to conduct a training need analysis to determine the training and

development needs for all the job roles that will be affected by the CESU technology

initiatives. This will result in Training and Development plan including

i. The training requirements per user group

ii. Recommendations on the most appropriate training delivery methods and

channels.

iii. Identification of the criteria for training success along with any challenges and

risks.

iv. Knowledge sharing strategy to enable to perform future customizations

internally.

v. Content Development: Development of customized, modular training materials

based upon user roles and business processes and customized application.

OEM consultant along with ITIA will work together with CESUs resources to

enable knowledge transfer. The following material will be developed

o Paper Based Class room Participant guides,

o Paper Based Class room Instructor guides,

o Media Based training simulations for pre-class preparation

e. ITIA to provide the separate training delivery plan for the CESU in the Technical Bid

proposal.

Page 21: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 21

CESU, Odisha Page 21 Release Date: 27th February 2016

37. Electronic data migration is required from the existing applications to the new application

systems. Also digitization of assets and consumer records etc, as appropriate (serviced

over last three years) will be needed by data entry / document scanning to create

electronic data for use in various applications and document management system etc. by

the ITIA at the respective Division & Sub-Division offices.

38. ITIA shall integrate all R-APDRP applications with the SCADA system to be installed

separately. Also it will be required to integrate all such future applications deployed by the

Utility (during the contract period) with the applications provided under R-APDRP without

any extra cost.

39. The following elaboration is the requirements of SRS item “MIS 9: Provision of Business

Intelligence Tools. This module should provide Business Intelligence Tools for data

mining, analysis, trending, simulation etc”.

a. Provision of Business Intelligence Tools in the SRS and the specifications “Data stores

for transaction processing shall be kept separate from data stores for decision support”

given in System Functionalities section of SRS.

b. It is clarified that the Business Intelligence tools like Query and Report, On Line

Analytical Processing (OLAP) and Data Mining etc. will be configured and data stores

created in the framework of Data Warehouse. The data on which BI Tools will be used

will require data from disparate source applications and systems. The Extraction,

Transformation and Loading Tools (ETL) will be used to extract, transform data to

establish a common format, scrub and homogenize data, summarize and aggregate

data before loading into Data Warehouse. The data stores for Decision Support

System will form the Data Warehouse. The number of reports will be unlimited for

Utility.

40. If the MoP, PFC or Utility issue any amendment to the SRS or RfP till the date of

submission of this bid document, those amendments will become a part of this BID

document and no separate intimation shall be given to empanelled ITIAs. This, however,

will be no reason for any extension of bid submission/ opening date. The bidders are

advised to remain updated with the latest amendments issued by MoP, PFC & Utilities.

The SIs are also advised to check websites of MoP (www.apdrp.gov.in), PFC

(www.pfcindia.com) & Utility (www.cescoorissa.com / www.cesuodisha.com) regularly for

any amendment or addendum. For any amendments to this tender, the same shall be

updated in CESU’s website and no separate notifications shall be issued in the news

media or letters to the empanelled firms.

41. Clarification on User acceptance Testing(UAT): Acceptance testing has been defined in

the clause 3.6 (Testing and Acceptance procedure) in SRS section–G1, General Technical

specification and it is clarified that the performance testing will be part of Acceptance

testing as already defined in this clause of SRS document.

The term ”User Acceptance Testing” as used in RfP, as referred above and “Acceptance

Testing” as defined in the SRS document shall mean the same and vice versa”

Page 22: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 22

CESU, Odisha Page 22 Release Date: 27th February 2016

42. Clarification on Go Live of a Project area; Pilot is the first project area that goes live in the

utility (CESU) along with the Data Center. The Go–Live of the pilot area may be

considered complete provided -

i. The Data Center has been completed in all respects including installation,

commissioning of all hardware and networking devices, installation, configuration and

customization of all RAPDRP application software as per requirement of utility and

their integration, integration with legacy applications (limited to applications defined in

SRS), if any, completion of functionality and other tests required as per specification,

availability of network connectivity etc.

ii. All the works in pilot area have been completed including installation, commissioning

of all Hardware and networking devices, completion of GIS survey activities and its

approval by utility, GIS data migration into GIS application, availability of meter data

from all system and HT consumer meters in MDAS system, operational connectivity

with data center and access of all the R-APDRP application at data center by the end

user in pilot area as per utility defined access rights.

iii. The Go live of the other project areas (towns) shall be completed progressively similar

to pilot area as clarified in para (ii) under this clause mentioned above.

43. The Bid Submission Sheets and Price Schedules given in RFP Section V. ‘Price Bid

Forms’ should be submitted on Company Letter Head and signed by an officially

authorized representative to sign the bid and stamp it with company seal. All other pages

of the documents – the RFP, the SRS and any addendum to SRS issued by PFC as also

any modification / elaboration or deviation taken by Utilities to SRS or RFP shall be signed

on each page with stamp of company seal by the authorized representative.

44. Technical proposal should have detailed Un-priced BOM with Make, Model and

Quantities of all the items for the proposed solution as per the annexure “Un-Priced

Technical Bid Form”. It should not have cost of any item.

45. The bidder should, if it feels necessary, study on its own, at its own cost, the existing

status, data, consumer base, geographical spread of the Utility. The bidder shall structure

the proposal as per the requirement of the system/solution being envisaged. Utility under

no circumstances shall accept any disclaimers from Successful Bidder on this account.

The ‘out of scope’, ‘exclusions’ and ‘assumptions’ having cost implications will not be

entertained and will be treated as deviations.

46. All update/upgrades and maintenance of all software and hardware should be provided as

per SRS Section G-1 Clause 9(D)-Annual Technical Support at no extra cost.

47. All equipment shall have onsite warranty from OEM and in accordance with SRS. OEM

certificate needs to be enclosed for after sale support. Successful bidder should maintain

adequate spare parts/hardware to support SLAs throughout contract period.

Page 23: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 23

CESU, Odisha Page 23 Release Date: 27th February 2016

48. The unit prices mentioned for various components should be the same for all Project

Areas. In case of any variance in unit prices for different Project Areas, the lowest unit

price of equipment mentioned for any Project Area shall be applicable and payable across

all the project areas.

49. All queries relating to this bid document that the prospective bidder wants to be clarified

during Pre-Bid Conference should be emailed to [email protected] at

least 24 hours before the pre-bid meeting date. No queries about the G3 section of SRS

will be entertained.

50. The source code of the customized part of the application software will remain the

exclusive property of Utility, even after termination or expiry of the contract.

51. Utility will define own archiving and data / document retention policy. The ITIA will

implement and observe these policies during the FMS period.

52. ITIA shall implement the Odisha IT security policy (currently under development) and any

modifications thereto during the period of its engagement.

Utility will have a defined enterprise wide Information Security Policy. The ITIA will be

responsible to incorporate all such security policies and modifications thereto during

implementation and FMS periods in the solution without any additional cost to CESU.

53. The vendor needs to incorporate all changes and additions in the applications suggested

by CESU during the implementation phase.

54. ITIA need to carry out the study of Business Processes, requirements and the

modifications to as being followed till Go-live and the same shall be implemented by the

ITIA.

55. Web pages will be developed for CESU of Odisha as per their requirements. The

necessary web pages will be designed irrespective of number of pages. Any updation /

addition / deletion in the web pages during the implementation and 5 years after the date

of “GO-LIVE” will be responsibility of ITIA without any additional cost to the utilities.

56. The bidders shall furnish the details of their quality assurance plan and test set up along

with the bid. A detailed quality assurance program shall be finalized with the successful

bidder during the award stage. However, the Quality Assurance plan shall conform to the

following standards and the bidder shall provide undertaking regarding the same.

a. IS / ISO / IEC 27001 - ISMS

b. IT Security, IT Services (10 Standards) – All harmonized with ISO / IEC

c. LITD 16 – Standards on computer hardware

d. IS 13252 : 2003 / IEC 60950

Page 24: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 24

CESU, Odisha Page 24 Release Date: 27th February 2016

57. CESU of Odisha will provide necessary authorization to ITIA for obtaining meter protocol

and memory map from meter manufacturers. ITIA and Meter manufacturer will sign Non-

Disclosure Agreement with CESU.

58. Meter data captured through GPRS/CDMA Modem will be transmitted directly to Data

Centre for which appropriate connectivity bandwidth will be provided by bidders.

59. Procurement, supply and installation of SIMs for AMR solution will be under the scope of

ITIA.

60. All workstations should be provided with TFT Monitor having 15” or more size with

Resolution of 1024 x 768). It is mandatory that all the PCs need to be supplied with UPS

as specified in the SRS.

61. The Operating System on desktop machines will be latest Microsoft Windows with free

updates for the period of 5 years at no extra cost to CESU. There will be an enterprise

wide license for Operating System for the total PCs under this bid.

62. ITIA to do the following activities for the Data Health Assessment on legacy data

a. Identification of data cleansing requirements and submission of detailed report

b. Correction of data in production source systems

63. The ITIA to set up Project Management Offices at head quarter (Bhubaneswar), CESU

and propose the organizational structure for project execution and management with

details of personnel and their period of deployment and keep the Utility updated. The

Curriculum Vitae (CV) of the proposed resource personnel should clearly indicate the

position of the resource for this project as well as the proposed period of engagement on

this project. The relevant entries would be included in the format of the CV to be

submitted. The CV to be submitted shall duly have the signature of the authorized

representative of the bidder for verification of the details.

64. The successful bidder shall give presentation to CESU on project initiation and periodically

about the status of the project implementation on periodical basis or as desired by the

CESU.

65. Recovery Time Objective (RTO) and Recovery Point objective (RPO) shall be as per the

SRS document.

66. Bidders to provide 5KVA Online UPS at all division and sub division Offices and 2 KVA

Ups in all other offices in the areas under the scopes.

67. All FMS services as specified for DC will also be performed at DRC

68. All SLAs defined and applicable for DC will also be applicable and measured at DRC,

When DRC is live.

Page 25: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 25

CESU, Odisha Page 25 Release Date: 27th February 2016

69. The ITIA will conduct a DRC drill before DRC acceptance test.

The utility may conduct an annual DRC Drill for which ITIA shall fully provide support for

switch over of operations to DRC and back to DC. The RTO and RPO shall be complied

with.

70. The ITIA shall define the procedure for the DR drill and demonstrate the same during UAT

phase. During the FMS period the department intends to carry out annual DR drill for all

services covered under this project and ITIA to support. The ITIA shall perform the FMS

activities during the DR drill both at DC and DR sites. The level of services during this

period will be part of SLA measurement as defined in Appendix C of RFP.

71. The measurement of the SLAs mentioned above shall cover for both Data Center and

Disaster Recovery center as applicable. For example: SLA 5.10 above shall be measured

for both Data Center and Disaster Recovery Center.

72. Handholding support for application related operations at Division and Sub Division level

shall be provided by the selected vendor for which at least one person per Division and

Sub Division shall be deputed for the period till the complete rollout.

73. CVC Guidelines may be followed regarding the issue of price negotiations with L1 bidder.

74. At least Quad Core Desktops are to be quoted instead of Dual Core.

75. Bids are liable to be rejected in case bidder engages any of CESU's existing franchisee

agencies or their sister concerns / subsidiaries as its partner during implementation and

support of the project.

76. Except for the Enterprise Applications (as per the model SRS and RFP), user counts are

as below:

a) Total count of users who will be accessing mailing solution – 1200 approx.

b) Total count of users who will be accessing R-APDRP applications – 2000 approx.

c) Total count of GIS users who will perform editing – 100 approx.

d) Total count of locations from which digitization/ scanning of documents are to happen –

10 approx.

Page 26: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 26

CESU, Odisha Page 26 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Meter data Acquisition

Meter data Acquisition

The above objective under this specification is achieved by providing an Automatic Meter Reading (AMR) based Data Logging System using any of the available Communication Technologies available like GSM, GPRS, EDGE, CDMA, PSTN or Low Power Radio covering all the Feeder Meter, DT Meters and select Consumer Meters in the entire Utility area.

The above objective under this specification is achieved by providing an Automatic Meter Reading (AMR) based Data Logging System using any of the available Communication Technologies available like GPRS, EDGE, CDMA covering all the Feeder Meter, DT Meters and select Consumer Meters in the entire Utility area.

Meter data Acquisition

The substation Data logger PC will acquire data from Feeder Meters and will transmit the same to Sub division office server through a GSM/GPRS/EDGE/CDMA/PSTN/LPR Modem, whereas the Sub division office Data Acquisition server will acquire data directly from all Distribution Transformers as well as HT/select LT Consumers through GSM/GPRS/EDGE/CDMA/LPR Modems. The Data acquisition servers at all sub division offices shall push the entire meter data to central data center on incremental basis during off-peak period on daily basis through MPLS/VPN based WAN network for data aggregation, analysis and generation of MIS report as per requirement of the utility.

- - deleted --

Meter data Acquisition

The meter data from all distribution transformers as well as HT consumers will be transmitted to the central data centre server(s) through GPRS/EDGE/CDMA. A PC will be installed at each substation with a purpose for local viewing and monitoring of feeders by substation staff.

Page 27: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 27

CESU, Odisha Page 27 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das1.2 Remote capturing of meter data from system & select consumer meters

A system that captures the meter data remotely from all the meters at 33 KV & 11 KV Feeders, Distribution Transformers and HT/select LT Consumers for sending it directly to the remote collection center i.e. sub division office and data center.

Remote capturing of meter data from system & select consumer meters

A system that captures the meter data remotely from all the meters at 33 KV & 11 KV Feeders, Distribution Transformers and HT Consumers for sending it directly to the remote collection center i.e. Central data center.

Das1.3 Provision of communication media

The system provides for GSM /GPRS/EDGE/CDMA/PSTN/Low Power radio or any other suitable Communication technology between Meters located at Distribution transformer/HT/LT consumers and Sub division office. The system also provides for above mentioned or any other suitable communication technology from Data Logger PC located at substation to the Sub division Office.

Provision of communication media

The system provides for GPRS/EDGE/CDMA Communication technology between Meters located at Distribution transformer/HT consumers and central data centre. The system also provides for above mentioned communication technology from Data Logger located at substation to the Central Data Centre.

Das2.1 Supply /installation of Hardware

Supply and installation of Server, Work station/HMI with Printer and all other hardware system for data logging system at required locations.

Supply /installation of Hardware

Supply and installation of Server, Work station/HMI with Printer and all other hardware system for data logging system at Central Data Centre and at required locations.

Page 28: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 28

CESU, Odisha Page 28 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das2.2 Application software for capturing, validating and analyzing the Meter data

Application software for capturing, validating, scheduling and analyzing the Meter data at the electrical Substation and Sub division offices scalable for a size of Network as defined in Annexure-A of Section: G6.

Application software for capturing, validating and analyzing the Meter data

Web based Application software for capturing, validating, scheduling and analyzing the Meter data at any of the Utility Offices scalable for a size of Network as defined in Annexure-A of Section: G6.

Das2.3 Application software at data center

Application software for acquiring incremental meter data from Data logging system of all the sub division offices under the utility area for aggregation, analysis and generation of various MIS report through appending of the Metering module.

Application software at data center

Application software for acquiring incremental meter data from all the metering points under the utility area for aggregation, analysis and generation of various MIS report through appending of the Metering module.

Das2.4 Daisy Chaining, Supply/ installation of data converters at sub stations

Supply and installation of RS 485 to RS 232 Converter at Sub stations along with field wiring/cabling from Feeder Meters to Data Converter unit and from data converter unit to the Computer system at Sub station

Daisy Chaining. Supply / installation of Data Concentrator Unit at sub stations

Supply and installation of data Concentrator Unit and Daisy Chaining of all Substations meter along with field wiring / cabling from feeder meter to Data Concentrator Unit and from Data Concentrator Unit to the computer system at sub-station (Data Acquisition Unit).

Page 29: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 29

CESU, Odisha Page 29 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das2.5 Supply/ installation of Modems at sub stations

Supply and installation of suitable Modem (GSM/GPRS/ EDGE/ CDMA/ PSTN/ LPR) at sub stations for communication between data logging unit located at substation and the same at Sub division office.

Supply/ installation of Modems at sub stations

Supply and installation of Modem (GPRS/EDGE/CDMA) at sub stations for communication between the Data Acquisition Unit at Sub-station and Data Centre

Das2.6 Supply/ installation of Modems at DTs and HT consumers

Supply and installation of suitable Modem (GSM/GPRS/ EDGE/CDMA/PSTN/LPR) at meter ends for communication between Meters located at Distribution transformer and HT/select LT consumers and Sub division office server. If required necessary, the Modem may be retrofitted on optical port of the meter.

Supply/ installation of Modems at DTs and HT consumers

Supply and installation of suitable Modem (GPRS/ EDGE/CDMA) at meter ends for communication between Meters located at Distribution transformer and HT consumers and Data Centre Server(s).

Das3.2 Flexible deployment / implementation of software system

The software system deployment/ implementation should be flexible. The deployment may include installing the software at various locations like substations, sub divisions and data center. The system architecture will be modular so that only the required modules need to be installed at any given location. (e.g. installation at substation computer may have modules like data acquisition or network

Flexible deployment / implementation of software system

The software system deployment/ implementation should be flexible. The deployment should be web based and there should be no need for any installation / licensing at client end.

Page 30: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 30

CESU, Odisha Page 30 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

topology management. But data aggregation/analysis modules may be installed at sub division offices, data center etc. as per the requirement of utility)

Das3.3 Menu driven software system

The software shall be menu driven functions for automatic data capturing, periodic data uploading etc.

Web based software system

The software shall be web based system for automatic data display and reporting

Das3.6 Provision for data validation at both ends

The software shall ensure data validation at both ends e.g. at the substation end before transmission and Sub division office after reception to eliminate possibility of garbage data. The system at Sub division office should apply comprehensive data validation before accepting and using meter data.

Provision for data validation.

The software shall ensure data validation at Central Data Centre after reception to eliminate possibility of garbage data. The system at Central Data Centre should apply comprehensive data validation before accepting and using meter data.

Das4.0 Features of Data logging system at Substation:-

Features for Data logging system at Substation:-

Page 31: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 31

CESU, Odisha Page 31 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das4.2

Data Collection at substation via RS 485/ RS 232 data converters

The software at substation will have the ability to perform remote data acquisition from Meters using RS 485/ RS 232 port converters

Data Collection at substation via Data Concentrator Unit.

The software at substation will have the ability to perform remote data acquisition from substation meters via Data Concentrator Unit.

Das4.4 Typical list of data acquisition from the Meters

A typical list of data acquisition from the Meters has been mentioned below: Acquire real time instantaneous data like voltage, current frequency, power factor, active power, reactive power etc. at the specified regular intervals (15 minutes- 30 minutes as per meter specification) for online local monitoring substation level. Acquire stored historical values of data at regular interval with power consumptions, accumulated energy, accumulated power, maximum demand and other parameters. Acquire real values of specified parameters on demand. Synchronize date and time of all meters.

Typical list of data acquisition from the Meters

A typical list of data acquisition from the Meters has been mentioned below : Acquire real time instantaneous data like voltage, current frequency, power factor, active power, reactive power etc. at the specified regular intervals ( 15 minutes-30 minutes as per meter specification) for online monitoring anywhere across Utility. Acquire stored historical values of data at regular interval with power consumptions, accumulated energy, accumulated power, maximum demand and other parameters. Acquire real values of specified parameters on demand. Synchronize date and time of all meters.

Page 32: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 32

CESU, Odisha Page 32 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das4.9 Mode of data transfer from substation to Sub division office

Normally the data transfer from Substation data logging system to sub division office will be over GSM/GPRS/ EDGE/CDMA/ PSTN/LPR by dialing from either end at some specified interval of time.

Mode of data transfer from substation to Central Data Centre

Normally the data transfer from Substation data logging system to Central Data Centre will be over GPRS/ EDGE/CDMA by Pushing the data from the substation device at some specified interval of time (15-30 minutes).

Das4.10 Facility for back up and restoration of data

Facility for taking backup & restore of data collected at substation shall be provided in software.

Facility for back up and restoration of data

Facility for taking backup & restore of data collected at Data Centre shall be provided in software.

Das5.0 Features of Data logging system at sub division office :-

Features of Data logging system for Central Data Centre :-

Page 33: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 33

CESU, Odisha Page 33 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das5.1 Periodicity of data collection

System shall be capable of collecting data from all the HT consumers at least every one Hour and from all the Distribution Transformers at least once in 24 Hours. The substation data shall also be polled at least once in 24 Hours. The number of HT consumers and number of DTs have been furnished in the enclosed Annexure-A of Section: G6. However, the bidder may visit the area and collect the exact details about the number of HT consumers and number of DTs at site and design and supply the system as per actual availability at site. Further, the system shall be designed and shall have provisions for inclusion of new Consumers and Assets in future and shall provide additional spare capacity to cater 10% per annum growth over and above the actual requirement at site on account of the future provisions.

Periodicity of data collection

System shall be capable of collecting data from all the HT consumers at least every half Hour and from all the Distribution Transformers at least once in 24 Hour. The substation meter data from the substation data loggers shall also be captured at least once in 24 Hours. The number of HT consumers and number of DTs have been furnished in the enclosed Annexure-A of Section: G6. However, the bidder may visit the area and collect the exact details about the number of HT consumers and number of DTs at site and design and supply the system as per actual availability at site. Further, the system shall be designed and shall have provisions for inclusion of new Consumers and Assets in future and shall provide additional spare capacity to cater 10% per annum growth over and above the actual requirement at site on account of the future provisions.

Page 34: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 34

CESU, Odisha Page 34 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das5.2 Functionality of Sub division office Data acquisition software

The Data acquisition software at Central Data Centre Sub division office must have the following functions : a) Data Collection: It shall collect data from the remote Data logger systems installed at the substations and store in its local Database. It shall also collect Meter data directly from DTs and HT/select LT consumers through GSM/GPRS/ EDGE/CDMA/PSTN/LPR Modems and store in its local database. b) Data Processing: It shall use data from the database to create reports, charts and spread sheets. c) Data transfer to data center : It shall be able to transmit entire incremental meter data to data center and shall reside in the Metering module for further aggregation, analysis and MIS generation as per request from various utility offices d) Messaging : Via GSM/GPRS/EDGE/CDMA e) Program Generator : It shall have editors and configuration

Mode of Data Transfer from DTs/HT/Select LT consumers

The Data acquisition software at central data centre must have the following functions : a) Data Collection: It shall collect data from the remote Data logger systems installed at the substations and store in its local Database. It shall also collect Meter data directly from DTs and HT consumers through GPRS/EDGE/CDMA Modems and store in the database. b) Data Processing: It shall use data from the database to create reports, charts and spread sheets. c) Data transfer to data center : All the modems should be able to transmit the meter data to central data centre which shall reside in the Metering module for further aggregation, analysis and MIS generation as per request from various utility offices d) Messaging : Via GPRS/EDGE/CDMA e) Program Generator : It shall have editors and configuration software. f) Facility to communicate with multiple clients simultaneously through multiple communication lines. g) The communication shall be scalable and configurable to various media like CDMA, GPRS and EDGE.

Page 35: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 35

CESU, Odisha Page 35 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

software. f) Facility to communicate with multiple clients simultaneously through multiple communication lines. g) The communication shall be scalable and configurable to various media like PSTN, CDMA, GSM, GPRS, EDGE or LPR Modem etc.

Das5.6 Manual/ automatic mode of data transmission

There should be provision for manually dialing the modems connected to the DT and Consumer meters and feeder meters/data loggers or by configuring the software to collect the data from meters automatically with the help of Scheduler feature provided for auto dialing.

Manual/ automatic mode of data transmission

The modems (remote devices) should automatically push the data at pre configured interval of time. There should be option for changing the frequency of data transfer from the central server. There should also be a provision to get the data on manual request under special circumstances. There should be provision for manually dialing the modems connected to the DT, Consumer meters and feeder meters/data loggers or by configuring the software to collect the data from meters automatically with the help of Scheduler feature provided for auto dialing.

Das5.8 Mode of transfer of Meter data

The data file will be transferred from the sub-stations to sub division office server in one of the following possible methods

Mode of transfer of Meter data

The data will be transferred from various AMR devices/data loggers to the data centre server in one of the

Page 36: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 36

CESU, Odisha Page 36 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

following possible methods :-

a) Data retrieval by sub division office from sub-station

Data acquisition software at sub division office may dial up the substation software over PSTN/GSM/GPRS/EDGE/ CDMA/Low power radio at some specified intervals and retrieve the data file.

Automatic Data Transfer By default data shall be automatically sent in push mode by the AMR devices/data loggers to the Data Centre at preconfigured time interval.

b) Data transfer from sub-station to sub division office

Substation software may dial up sub division office data logger system over PSTN/ GSM/GPRS/EDGE/CDMA or Low power radio at some specified interval and transfer the data file.

Manual Request for Data

Under special circumstances there should also be a provision to get the data on manual request from AMR devices/data loggers.

Das5.9 Facility for archiving, deletion, backup & restoration of the data

Facility for archiving, deletion and taking backup & restore of entire or part of the data collected at Sub division office shall be provided in Software.

Facility for archiving, deletion, backup & restoration of the data

Facility for archiving, deletion and taking backup & restore of entire or part of the data collected at Central Server shall be provided in Software.

Das6.3 Enabling of data acquisition over any communication media

The software will enable data acquisition over any of the locally and reliably available communication media : GSM/GPRS, EDGE, CDMA, PSTN, Low power radio etc.

Enabling of data acquisition over any communication media

The software will enable data acquisition over any of the locally and reliably available communication media: GPRS, EDGE, and CDMA.

Page 37: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 37

CESU, Odisha Page 37 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das6.5 Provision of remote reading & collection in both scheduled batch mode

Remote reading collection will be possible in both scheduled batch mode (automated) as well as in the on-demand (real-time) mode.

Provision of remote reading & collection in both automated and manual mode.

Remote reading collection will be possible in both data push from the field devices in automated as well as in the on-demand (real-time) mode.

Das6.6 Features of scheduled mode of data collection

In the In the scheduled mode of data collection, the software will allow reading cycles to be configured for either individual meters or groups of meters. Appropriate time windows for data collection from different meters based on location/type can be set. The data collection could be at any one of the pre-defined monthly, daily, hourly or quarter-hourly frequencies or at any user-defined frequency greater than 15 minutes.

Features of data collection

Data from remote AMR devices will be acquired automatically. Software will allow reading cycles to be configured for either individual meters or groups of meters. Appropriate time windows for data collection from different meters at pre-configured interval of time to the Data Collection Server at the Data Centre can be set. The data collection could be at any one of the pre-defined daily, hourly or quarter-hourly frequencies or at any user-defined frequency greater than 15 minutes.

Das6.7 Support for both inbound and outbound communication

The software will support both inbound and outbound communication, i.e. data transfer could be initiated by either the remote meter or the central software

Support for both inbound and outbound communication

The software will support both inbound and outbound communication, i.e. data transfer could be initiated by either the remote meter in general or the central software in case of special requirements

Page 38: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 38

CESU, Odisha Page 38 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das6.12 Synchronization of all meters to a common fixed reference

The software will be able to synchronize the date and time of all meters to a common fixed reference. All the raw meter data entering the system via AMR or any external means is time-stamped and stored for audit and further analysis.

Synchronization of all meters to a common fixed reference

The software will be able to synchronize the date and time of all remote devices to a common fixed reference. All the raw meter data entering the system via AMR or any external means is time-stamped and stored for audit and further analysis.

Das 8.1 Supporting of automated rule- based validation

Software will support automated rule-based validation and estimation of raw metered data.

Supporting of automated rule- based validation

Software will support automated rule-based validation and estimation of raw metered data. The system should trigger The validation process automatically as and when the data is received from Meter data collection system built in validation routines: The system should have pre-defined validation rules that can be adjusted by user inputs. System should also have ability to define new validation and estimation rules Detail requirements need to be finalized by ITIA along with utility.

Das 8.6 Provision of meter data estimation routine

The software will have a meter data estimation routine that will be triggered on occurrence of validation failures.

Provision of meter data estimation routine

The software will have a meter data estimation routine that will be triggered on occurrence of validation failures. System should also have facility to define, add and revise estimation methods.

Das11.6 Reports at Sub stations : Reports for Sub stations :

Page 39: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 39

CESU, Odisha Page 39 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das11.7 Reports at Sub Division Office: Reports for Sub Division Office:

Das11.7.1 Provision for comprehensive reporting and MIS facility

Software at Sub division office shall provide comprehensive reporting & MIS facility and it should provide fixed format as well as query based reports in tabular & graphic format as required by user.

Provision for comprehensive reporting and MIS facility

Software for Sub division office shall provide comprehensive reporting & MIS facility and it should provide fixed format as well as query based reports in tabular & graphic format as required by user.

Das11.8 Reports at various Utility offices, such as Division, Circle, Head Quarter etc. :

Reports for various Utility offices, such as Division, Circle, Head Quarter etc. :

Das11.8.1 Reporting facility at various utility offices

Various utility offices, which can interact with Metering/ Billing database at Data center to provide extensive analysis & reporting facility. It shall also have extensive search options and should provide fixed format as well as query based reports in tabular & graphic format as per the requirement of the utility and described in detail at para Das.11.7 above (i.e. Reports at Sub division offices).

Reporting facility at various utility offices

Web based Reporting Software shall be available through web browser to various utility offices, which can interact with Metering/ Billing database at Data center to provide extensive analysis & reporting facility. It shall also have extensive search options and should provide fixed format as well as query based reports in tabular & graphic format as per the requirement of the utility and described in detail at para Das.11.7 above (i.e. Reports at Sub division offices).

Page 40: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 40

CESU, Odisha Page 40 Release Date: 27th February 2016

Elaborations Regarding MDAS System

Section Original Changes

Functionality Description Functionality Description

Das 13.0 Time synchronization

Time synchronization : The time synchronization shall be possible from the Work Station/ HMI through built-in function. An accuracy of ±1 milli- second within the station is required. However provision is to be made available for time stamping through GPS.

Time synchronization Time synchronization : The time synchronization shall be possible from the Work Station/ HMI through built-in function. An accuracy of ±1 milli-second within the station is required. However provision is to be made available for time stamping through GPS. System should allow configuring the frequency of the synchronisation.

Page 41: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 41

CESU, Odisha Page 41 Release Date: 27th February 2016

Sections in the RFP Document

Section Content

Section I Preface

Section II Instructions to Bidders

Section III Bid Data Sheet

Section IV Eligibility Criteria

Section V Bidding Forms

Section VI Scope of Work

Section VII General Conditions of Contract

Section VIII Special Conditions of Contract

Section IX Contract Forms

Appendix A Mandatory technical specifications

Appendix B Technical specifications

Appendix C Service level agreement

Appendix D Supplier response format

Appendix E Evaluation methodology

Appendix F Geographical and administrative information

Appendix G List of offices for WAN connectivity

Appendix H Review of current IT systems

Appendix I List of manual/business processes to be converted to electronic

form

Appendix J Review of current business processes

Appendix K Website

Appendix L List of goods and related services

Appendix M Estimated manpower requirement

Appendix N Expected implementation schedule

Appendix O Spot Billing Machines Specification

Page 42: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 42

CESU, Odisha Page 42 Release Date: 27th February 2016

Appendix P Map of CESU of Odisha

Appendix Q Formats for Price Bids

Appendix R Proposed Interface Scheme v2.4

Appendix S CESU Offices Locations for Network Connectivity

Appendix T Additional Clarifications

Appendix U No Deviation Certificate

Appendix V Abbreviations

Page 43: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 43

CESU, Odisha Page 43 Release Date: 27th February 2016

Section I. Preface

About this Document

The purpose of this document is selection of IT Implementation Agency (ITIA) for the

Restructured Accelerated Power Development and Reforms Programme (R-APDRP) - An

Initiative of Ministry of Power, Govt. of India.

Bidders are advised to study this document carefully. Submission of RFP shall be deemed to

have been done after careful study and examination of this document with full understanding

of its implications. This RFP document is not transferable. This document must be read in its

entirety. Please verify that you have a complete copy.

The Opportunity

Ministry of Power, Govt. of India, has launched the Restructured Accelerated Power

Development and Reforms Programme (R-APDRP) in the XI Five year Plan. Power Finance

Corporation Limited (PFCL) has been designated by GoI as the Nodal Agency for the

programme. The programme spans from data acquisition at distribution level till monitoring of

results of steps taken to provide an IT backbone and strengthening of the Electricity

Distribution system across the Country under the programme. The objective of the programme

is reduction of AT&C losses to 15% in project areas. The program is divided into 2 parts Part-

A and Part-B. Part-A will include projects for establishment of baseline data and IT

applications like Meter Data Acquisition, Meter Reading, Billing, Collections, GIS, MIS,

Energy Audit, New Connection, Disconnection, Customer Care Services, Web self service,

etc. to get verified baseline AT&C losses. Part-B will include distribution strengthening

projects.

The ITIA would supply, install and commission one integrated solution within the broad

framework provided in the SRS (System Requirement Specification) document. SRS

Committee under the guidance of Ministry of Power has finalized a detailed SRS document

which covers all the components of the project including hardware, software, networking; GIS

among others which shall help the utilities improve their performance.

Page 44: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 44

CESU, Odisha Page 44 Release Date: 27th February 2016

The Programme

The size of the programme is to the tune of Rs. 500 billion. The programme consists of Part-A

(to the tune of around Rs. 10,000 crore) covering Information Technology application in the

electricity distribution system and Part B (to the tune of around Rs. 40,000 crore) covering the

System strengthening, Improvement and augmentation of distribution system capacity. Both

parts entail planning of measures to be taken under the programme, implementation of such

measures to be taken and monitoring / evaluation of results / impact of the programme as a

whole and of its various components across the Country. The focus of the programme shall be

on actual, demonstrable performance in terms of loss reduction. Establishment of reliable and

automated systems for sustained collection of accurate base line data, and the adoption of

Information Technology in the areas of energy accounting will be essential for the success of

the R-APDRP.

• The Programme is proposed to be implemented on all India basis covering Towns and

Cities with a population of more than 30,000 (10,000 in case of Special Category States)

as per population data of 2001 Census. In addition, in certain high-load density rural areas

with significant loads, works of separation of agricultural feeders from domestic and

industrial ones, and of High Voltage Distribution System (11kV) will also be taken up.

• Towns / areas for which projects have been sanctioned in X Plan APDRP shall be

considered for the XI Plan only after either completion or short closure of the earlier

sanctioned projects. Projects under the scheme shall be taken up in Two Parts. Part-A

shall include the projects for establishment of baseline data and IT applications for energy

accounting/auditing & IT based consumer service centers. Part-B shall include regular

distribution strengthening projects. The activities to be covered under each part are as

follows:

Part – A: Preparation of Base-line Data System for the project area covering Consumer

Indexing, GIS Mapping, Automatic Metering (AMR) on Distribution Transformers and

Feeders, and Automatic Data Logging for all Distribution Transformers & Feeders and

SCADA / DMS system for big cities only. It would include Asset Mapping of the entire

distribution network at and below the 11kV transformers and include the Distribution

Transformers and Feeders, Low Tension lines, poles and other distribution network

equipment. It will also include adoption of IT applications for meter reading, billing &

Page 45: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 45

CESU, Odisha Page 45 Release Date: 27th February 2016

collection; energy accounting & auditing; MIS; redressal of consumer grievances and

establishment of IT enabled consumer service centers etc.

Part – B: Renovation, modernization and strengthening of 11 kV level Substations,

Transformers/Transformer Centers, Re-conductoring of lines at 11kV level and below,

Load Bifurcation, Feeder segregation, Load Balancing, Aerial Bunched Conductoring

in thickly populated areas, HVDS, installation of capacitor banks and mobile service

centers etc. In exceptional cases, where sub-transmission system is weak,

strengthening at 33 kV or 66 kV levels may also be considered.

Calendar of Events

Event / Particulars Date and Time Location

Download of RFP / Bid Document

27th February 2016

from 13:00 Hrs onwards

www.cesuodisha.com / www.cescoorissa.com

Date of Pre-Bid Conference 10

th March 2016

from 12:00 Hrs to 14:00 Hrs.

Conference Hall, Central Electricity Supply Utility of Odisha, 3

rd

Floor, IDCO Tower, Janpath, Bhubaneswar – 751022 Odisha

Tender Participation Cost

Indian Rupees 25,000/- (Twenty Five Thousand) +

VAT 5%

Rs. 25,000/- (Twenty Five Thousand) Plus VAT 5%, by Demand Draft payable to CESU of Odisha, Bhubaneswar, Odisha. The interested empanelled SIs may download the tender document from website (www.cesuodisha.com / www.cescoorissa.com) and the cost may be submitted along with the bid.

Bid Security (EMD) Indian Rupees 1.00

Crore

Bid Security (EMD) to be submitted as Bank Guarantee in the prescribed format for a period of 150 days from the date of Bid Opening.

Final Bid Submission 28

th March 2016

(Up to 13:00 Hrs)

IT Center, Central Electricity Supply Utility of Odisha, 8

th Floor, IDCO Towers, Janpath,

Bhubaneswar -751022 Odisha

Technical Bid Opening 28

th March 2016 15:00 Hrs

Conference Hall, Central Electricity Supply Utility of Odisha, 3

rd

Floor, IDCO Tower, Janpath, Bhubaneswar – 751022 Odisha

Financial Bid Opening Will be Notified Later

Page 46: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 46

CESU, Odisha Page 46 Release Date: 27th February 2016

Section II. Instructions to Bidders

Table of Clauses

A. GENERAL ................................................................................................................................... 48

1. SCOPE OF BID ............................................................................................................................................ 48

2. SOURCE OF FUNDS .................................................................................................................................... 48

3. CORRUPT PRACTICES ................................................................................................................................ 48

4. ELIGIBLE BIDDERS ..................................................................................................................................... 50

5. ELIGIBLE GOODS AND RELATED SERVICES............................................................................................... 53

B. CONTENTS OF BIDDING DOCUMENT ....................................................................................... 54

6. SECTIONS OF THE BIDDING DOCUMENT ................................................................................................... 54

7. CLARIFICATION OF BIDDING DOCUMENT ................................................................................................... 54

8. AMENDMENT OF BIDDING DOCUMENT ....................................................................................................... 55

C. PREPARATION OF BIDS ............................................................................................................ 56

9. COST OF BIDDING ...................................................................................................................................... 56

10. LANGUAGE OF BID ................................................................................................................................. 56

11. DOCUMENTS COMPRISING THE BID ...................................................................................................... 56

12. BID SUBMISSION SHEETS AND PRICE SCHEDULES .............................................................................. 58

13. ALTERNATIVE BIDS ................................................................................................................................ 59

14. BID PRICES AND DISCOUNTS ................................................................................................................ 59

15. CURRENCIES OF BID .............................................................................................................................. 60

16. DOCUMENTS ESTABLISHING THE ELIGIBILITY OF THE BIDDER ............................................................. 60

17. DOCUMENTS ESTABLISHING THE CONFORMITY OF THE GOODS AND RELATED SERVICES TO THE

BIDDING DOCUMENT ........................................................................................................................................... 60

18. DOCUMENTS ESTABLISHING THE QUALIFICATIONS OF THE BIDDER ..................................................... 60

19. PERIOD OF VALIDITY OF BIDS ................................................................................................................ 61

20. BID SECURITY ........................................................................................................................................ 61

21. FORMAT AND SIGNING OF BID ............................................................................................................... 62

D. SUBMISSION AND OPENING OF BIDS ...................................................................................... 63

22. SEALING AND MARKING OF BIDS ........................................................................................................... 63

23. DEADLINE FOR SUBMISSION OF BIDS .................................................................................................... 64

24. LATE BIDS .............................................................................................................................................. 64

25. WITHDRAWAL, SUBSTITUTION, AND MODIFICATION OF BIDS ............................................................... 65

26. BID OPENING ......................................................................................................................................... 65

E. EVALUATION AND COMPARISON OF BIDS ............................................................................. 68

27. CONFIDENTIALITY .................................................................................................................................. 68

28. CLARIFICATION OF BIDS ........................................................................................................................ 69

29. RESPONSIVENESS OF TECHNICAL PROPOSAL ..................................................................................... 69

30. NON CONFORMITES, ERRORS, AND OMISSIONS .................................................................................. 70

31. PRELIMINARY EXAMINATION OF BIDS ................................................................................................... 71

32. EXAMINATION OF TERMS AND CONDITIONS; TECHNICAL EVALUATION ................................................ 72

33. MARGIN OF PREFERENCE ..................................................................................................................... 73

34. EVALUATION OF BIDS ............................................................................................................................ 73

35. COMPARISON OF BIDS ........................................................................................................................... 74

36. POST-QUALIFICATION OF THE BIDDER .................................................................................................. 74

37. PURCHASER’S RIGHT TO ACCEPT ANY BID, AND TO REJECT ANY OR ALL BIDS ................................. 74

Page 47: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 47

CESU, Odisha Page 47 Release Date: 27th February 2016

F. AWARD OF CONTRACT ............................................................................................................. 74

38. AWARD CRITERIA ................................................................................................................................... 75

39. PURCHASER’S RIGHT TO VARY QUANTITIES AT TIME OF AWARD ........................................................ 75

40. NOTIFICATION OF AWARD ...................................................................................................................... 75

41. SIGNING OF CONTRACT ......................................................................................................................... 75

42. PERFORMANCE SECURITY ..................................................................................................................... 76

43. LOCAL CONDITIONS ............................................................................................................................... 76

G. INTERPRETATION ...................................................................................................................... 76

44. INTERPRETATION OF THE SRS AND THE RFP DOCUMENT ................................................................... 76

Page 48: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 48

CESU, Odisha Page 48 Release Date: 27th February 2016

A. General

1. Scope of Bid 1.1 In support of the Invitation for Bids indicated in the Bid Data

Sheet (BDS), the Purchaser, as indicated in the BDS, issues

this Bidding Document for the supply of Goods and Related

Services incidental thereto as specified in the Scope of Work

at Section VI. The name and identification number of the

International competitive Bidding (ICB) are provided in the

BDS.

2. Source of

Funds

2.1 The Purchaser has received sanction from Nodal Agency

(Power Finance Corporation Limited (PFC) under the aegis of

Ministry of Power (MoP), Government of India (GoI)) under

Part-A of R-APDRP towards the implementation cost of the

project named in the BDS (hereinafter called “funds”). The GoI

has agreed to convert the sanctioned loan into grant after

successful completion of project and meeting the guidelines of

R-APDRP. The Purchaser intends to apply a portion of funds

to eligible payments under the contract for which this bidding

document is issued.

2.2 Payments made under the Contract shall be in accordance

with the terms and conditions of the financing agreement

between the Purchaser and the Nodal Agency (hereinafter

called the Loan Agreement), and will be subject in all respects

to the terms and conditions of that Agreement. No party other

than the Purchaser shall derive any rights from the Loan

Agreement or have any claim to the funds.

3. Corrupt

Practices

3.1 Purchaser requires bidders to observe the highest standard of

ethics during the procurement and execution of such

contracts.

3.2 The following definitions apply:

o “Corrupt practice” means the offering, giving receiving, or

soliciting, directly or indirectly, of anything of value to influence

Page 49: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 49

CESU, Odisha Page 49 Release Date: 27th February 2016

the action of any party in the procurement process or the

execution of a contract;

o “Fraudulent practice” means a misrepresentation or omission

of facts in order to influence a procurement process or the

execution of a contract;

o “collusive practices” means a scheme or arrangement

between two or more bidders, with or without the knowledge

of the Purchaser, designed to influence the action of any party

in a procurement process or the execution of a contract;

o “coercive practices” means harming or threatening to harm,

directly or indirectly, persons, or their property to influence

their participation in a procurement process, or affect the

execution of a contract;

o Purchaser will reject a proposal for the award of Contract if it

determines that the bidder recommended for award has,

directly or through an agent, engaged in corrupt, fraudulent,

collusive, or coercive practices in competing for the Contract

o the Nodal Agency will declare a firm ineligible, either

indefinitely or for a stated period of time, for awarding a R-

APDRP funded contract if it at any time determines that the

firm has engaged in corrupt of fraudulent practices in

competing for, or in executing, a RAPDRP funded contract.

3.2 In continuance of ITB clause 3.1 above, the Nodal Agency will

cancel the portion of the fund allocated to a contract for goods,

works or services if it at any time determines that corrupt or

fraudulent practices were engaged in by representatives of the

purchaser or a beneficiary of the fund, during the procurement

or the execution of that contract, without the Purchaser having

taken timely and appropriate remedial action satisfactory to

the Nodal Agency.

3.3 Any communication between the bidder and the purchaser

related to matters of alleged fraud or corruption must be made

Page 50: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 50

CESU, Odisha Page 50 Release Date: 27th February 2016

in writing.

By signing the contract, the bidder shall represent that it is

either the owner of the Intellectual Property Rights (IPR) in the

hardware, software or materials offered, or that it has proper

authorization and/or license to offer them from the owner of

such rights. For the purpose of this clause, IPR shall be

defined in the GCC Clause 17. Willful misrepresentation of

these facts shall be considered a fraudulent practice subject to

the provisions of Clauses 3.1 to 3.3 above, without prejudice

to other remedies that the Purchaser may take.

Furthermore, Bidders shall also note the provision stated in Sub-

Clause 2 and Sub-Clause 33.1.1 (ii) of the General Conditions of

Contract.

4. Eligible

Bidders

4.1 Bidders empanelled as System Integrator (SI) by Nodal

Agency shall be eligible to bid

(a) SI shall have flexibility to subcontract Meter Data

Acquisition Solution Provider (MDASP) services, as per

requirement. In case SI decides to subcontract Meter

Data Acquisition Solution Provider services, the Meter

Data Acquisition Solution Provider shall only be selected

from the empanelled list of MDASPs. The SI shall

necessarily subcontract other ITIA roles of GIS Solution

Provider (GSP) and Network Solution Provider (NSP)

from the empanelled list of GSP and MDASP.

(b) The SI (Lead member in case of a consortium for SI

Role) shall have the authority to conduct all businesses

for and on behalf of any and all the parties during the

bidding process and, in the event the SI is awarded the

Contract, during contract execution.

(c) The SI (Lead member in case of a consortium for SI

Role) shall be wholly responsible for execution of the

Page 51: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 51

CESU, Odisha Page 51 Release Date: 27th February 2016

contract.

(d) In case of non-performance (slippage in milestones,

scope & quality of work, discipline, etc. as assessed by

utility) and/or bankruptcy of any of the subcontracted ITIA

roles (GSP, NSP, MDASP), the SI (Lead member in case

of a consortium for SI Role) shall take necessary

remedial action through addition/change of subcontractor

for the concerned ITIA role. The addition/change of

subcontractor for concerned ITIA role (GSP, NSP,

MDASP) shall be with necessary prior approval of the

utility and shall be at no additional cost to the project cost

already quoted at the time of bidding for the project. The

addition/change of subcontractor for concerned ITIA role

(GSP, NSP, MDASP) shall only be from the list of

empanelled members for ITIA roles

(e) In case of exceptional circumstance of continued non-

performance, even subsequent to exercising of remedies

provided under clause 4.1.d above, as assessed and

reported by the utility, the empanelment is liable to be

cancelled by the Nodal Agency.

4.2 Bidder or the Lead Member in case of a Consortium shall not

have a conflict of interest with one or more parties in this bidding

process. Participation by Bidder(s) with a conflict of interest

situation will result in the disqualification of all Bids in which it is

involved. Purchaser considers a conflict of interest to be a

situation in which a party has interests that could improperly

influence that party’s performance of official duties or

responsibilities, contractual obligations, or compliance with

applicable laws and regulations, and that such conflict of interest

may contribute to or constitute a prohibited corrupt practice. A

Bidder may be considered to be in a conflict of interest with one

or more parties in this bidding process if, including but not

Page 52: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 52

CESU, Odisha Page 52 Release Date: 27th February 2016

limited to:

(a) receive or have received any direct or indirect subsidy

from any of them; or

(b) have the same legal representative for purposes of this

Bid; or

(c) have a relationship with each other, directly or through

common third parties, that puts them in a position to

have access to information about or influence on the Bid

of another Bidder, or influence the decisions of the

Purchaser regarding this bidding process; or

(d) a Bidder (the SI/Lead member in case of a consortium

for SI Role) participates in more than one bid in this

bidding process. Participation by a Bidder or Lead

Member in more than one Bid will result in the

disqualification of all Bids in which it is involved.

However, this does not limit the inclusion of the same

product (commercially available hardware, software or

network product manufactured or produced by the firm),

as well as purely incidental services such as installation,

configuration, routine training and ongoing

maintenance/support, in more than one bid; or

(e) a Bidder or any of its sub-contractors or consortium

member(s) participated as a consultant in the preparation

of the design or technical specifications of the goods and

services that are the subject of the bid.

(f) if the SI (single bidder or consortium) or any of its sub-

contractors is/are part of IT Consultant appointed by that

utility

(g) if the SI or any of its sub-contractors get associated as

Consultant / Advisor / Third party independent evaluating

agency with any of the agencies taking part in the bid

Page 53: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 53

CESU, Odisha Page 53 Release Date: 27th February 2016

process of the concerned utility under R-APDRP

(h) For any given project area, the IT consultant and the IT

implementation agency cannot be the same. An IT

Consultant and IT implementation agency (SI and/or its

subcontractors if any) agency may be considered to be in

a conflict of interest with one or more parties in this

process if they have controlling shareholders in common;

(i) Participation by Bidder(s) with a conflict of interest

situation will result in the disqualification. Furthermore,

the Nodal Agency reserves the right to debar/bar bidders

from all other process of empanelment including

cancellation of existing panels under R-APDRP.

Except SI, empanelled NSP, GSP and MDASP may provide

sub-contractual services to more than one bidder for the same

bid.

4.3 Government-owned enterprises who have been empanelled

shall be eligible

4.4 Bidders shall provide such evidence of their continued eligibility

satisfactory to the Purchaser, as the Purchaser shall reasonably

request.

5. Eligible

Goods and

Related

Services

5.1 For the purpose of this Clause, the term “Goods” includes

hardware, software, networking equipments and cables; and

“Related services” includes services such as insurance,

transportation, associated documentation, installation,

customization, integration, field survey, testing and

commissioning, training, technical support, maintenance, repair

and other necessary services to be provided by the selected

bidder and necessary for successful implementation of the

project as specified in the contract.

5.2 In case Bidder that does not manufacture or produce the Goods

it offers to supply shall submit the Manufacturer’s Authorization

Page 54: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 54

CESU, Odisha Page 54 Release Date: 27th February 2016

using the form included in Section V, Bidding Forms to

demonstrate that it has been duly authorized by the

manufacturer or producer of the Goods to supply these Goods.

B. Contents of Bidding Document

6. Sections of

the Bidding

Document

6.1 The Bidding Document consists of the sections as indicated

below and should be read in conjunction with any Addenda

issued in accordance with ITB Clause 8.

• Section I. Preface

• Section II. Instructions to Bidders (ITB)

• Section III. Bid Data Sheet (BDS)

• Section IV. Eligibility Criteria

• Section V. Bidding Forms

• Section VI. Scope of Work

• Section VII. General Conditions of Contract (GCC)

• Section VIII. Special Conditions of Contract (SCC)

• Section IX. Contract Forms

• Appendix A to U

6.2 The Invitation for Bids issued by the Purchaser is a part of the

Bidding Document.

6.3 The Purchaser is not responsible for the completeness of the

Bidding Document and its addenda, if they were not obtained

directly from the Purchaser.

6.4 The Bidder is expected to examine all instructions, forms, terms,

and specifications in the Bidding Document. Failure to furnish all

information or documentation required by the Bidding Document

may result in the rejection of the Bid.

7. Clarification 7.1 A prospective Bidder requiring any clarification of the Bidding

Page 55: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 55

CESU, Odisha Page 55 Release Date: 27th February 2016

of Bidding

Document

Document shall contact the Purchaser in writing at the

Purchaser’s address indicated in the BDS. The Purchaser shall

forward copies of its response to all Bidders who have acquired

the Bidding Document directly from it, including a description of

the inquiry but without identifying its source. Should the

Purchaser deem it necessary to amend the Bidding Document

as a result of a clarification, it shall do so following the

procedure under ITB Clause 8 and Sub-Clause 23.2.

7.2 The Purchaser will organize a pre-bid conference at the time

and place indicated in BDS. The purpose of the conference will

be to clarify issues and answer queries that the bidders might

have. Bidders are requested to submit the queries in writing to

reach the purchaser not later than 5 days before the conference.

Queries and responses shall be communicated in accordance

with ITB Clause 7.1. Any modifications to the Bidding document

listed in ITB Clause 6.1 which may become necessary as a

result of pre-bid conference shall be made by the Purchaser

exclusively by issuing Addendum and not through the

clarifications of the pre-bid conference.

8. Amendment

of Bidding

Document

8.1 At any time prior to the deadline for submission of the Bids or

the award of the contract, the Purchaser may amend the

Bidding Document by issuing addenda.

8.2 The Purchaser, at its discretion for any reason whether at its

own initiative or in response to a clarification requested by a

bidder may add, modify or remove any element of the Goods

(including hardware, software, networking, etc) or any

component of Related Service entirely or any part thereof from

the bid document till the time of award of contract. All bidders

will be notified of any such change.

8.3 In order to provide prospective Bidders reasonable time in which

to take the amendment into account in preparing their bids, the

Purchaser may, at its discretion, extend the last date for the

Page 56: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 56

CESU, Odisha Page 56 Release Date: 27th February 2016

receipt of Bids.

8.4 Any addendum issued shall be part of the Bidding Document

and shall be communicated in writing to all who have obtained

the Bidding Document directly from the Purchaser.

8.5 To give prospective Bidders reasonable time in which to take an

addendum into account in preparing their Bids, the Purchaser

may, at its discretion, extend the deadline for the submission of

the Bids, pursuant to ITB Sub-Clause 23.2.

C. Preparation of Bids

9. Cost of

Bidding

9.1 The Bidder shall bear all costs associated with the preparation

and submission of its Bid, and the Purchaser shall not be

responsible or liable for those costs, regardless of the conduct

or outcome of the bidding process.

10. Language of

Bid

10.1 The Bid, as well as all correspondence and documents relating

to the Bid exchanged by the Bidder and the Purchaser, shall be

written in the English. Supporting documents and printed

literature that are part of the Bid may be in another language

provided they are accompanied by an accurate translation of the

relevant passages in English, in which case, for purposes of

interpretation of the Bid, such translation shall govern.

11. Documents

Comprising

the Bid

11.1 The Bid shall comprise two envelopes submitted simultaneously,

one containing the Technical Proposal and the other the Price

Proposal, enclosed together in an outer single envelope.

11.2 Initially, only the Technical Proposals opened at the address,

date and time specified in ITB Sub-Clause 26.1. The Price

Proposals remain sealed and held in custody by the Purchaser.

The Technical Proposals shall be evaluated by the Purchaser as

per Evaluation Methodology mentioned in Appendix-E. No

amendments or changes to the Technical Proposals are

permitted. Bids with Technical Proposals which do not conform

Page 57: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 57

CESU, Odisha Page 57 Release Date: 27th February 2016

to the mandatory requirements (as specified in Appendix-A) will

be termed as non-responsive and will not be evaluated further.

11.3 Price Proposals of technically responsive Bids shall be opened

in public at the date and time to be advised by the Purchaser.

The Price Proposals shall be evaluated as per Evaluation

Methodology mentioned in Appendix-E.

11.4 Contract shall be awarded to the Bidder whose Proposal

(Technical and Financial) obtains the maximum score

11.5 The Technical Proposal shall contain the following:

(a) Technical Proposal Submission Sheet;

(b) Bid Security, in accordance with ITB Clause 20;

(c) written confirmation authorizing the signatory of the Bid

to commit the Bidder, in accordance with ITB Clause 21;

(d) documentary evidence in accordance with ITB Clause 16

establishing the Bidder’s eligibility to bid;

(e) documentary evidence in accordance with ITB Clauses

17 and 29, that the Goods and Related Services conform

to the Bidding Document;

(f) documentary evidence in accordance with ITB Clause 18

establishing the Bidder’s qualifications to perform the

contract if its Bid is accepted; and

(g) any other document required in the BDS.

11.6 The Price Proposal shall contain the following:

(a) Price Proposal Submission Sheet and the applicable

Price Schedules, in accordance with ITB Clauses 12, 14,

and 15;

(b) any other document required in the BDS.

Page 58: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 58

CESU, Odisha Page 58 Release Date: 27th February 2016

12. Bid

Submission

Sheets and

Price

Schedules

12.1 The Bidder shall submit the Technical Proposal and the Price

Proposal using the appropriate Submission Sheets provided in

Section V, Bidding Forms and Supplier response format,

Appendix D. These forms must be completed without any

alterations to their format, and no substitutes shall be accepted.

All blank spaces shall be filled in with the information requested.

12.2 The Bidder shall submit, as part of the Price Proposal, the Price

Schedules for Goods and Related Services, using the forms

furnished in Section V, Bidding Forms and Supplier response

format, Appendix D.

12.3 The Bidders should take note of following points while submitting

the Price Proposal:-

(a) Price Proposal should clearly indicate the price to be

charged without any qualifications whatsoever and should

include all taxes (sales, service, etc.), duties (excise &

customs, etc), octroi, fees, levies, works contract tax, Entry

tax and other charges as may be applicable, to be paid pre-

or post-delivery or to be deducted by the purchaser at

source, in relation to the Goods and Related Services. Such

taxes, duties, cess, charges etc, if not explicitly mentioned in

the Price bid tables in Appendix D.3, but applicable under

law, should be included in the Quote under “Any other

levies” column.

(b) The Purchaser will provide Central sales tax Form C,

whenever applicable.

(c) The Bidder will provide Tax rates assumed for the

calculation at the time of proposal for each item in notes to

respective table in Appendix D.3.

(d) Please refer to GCC Clause [13.2] and the SCC for Price

adjustments due to change in Tax rates (including local

taxes), duties, levies, cess, charges etc.

Page 59: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 59

CESU, Odisha Page 59 Release Date: 27th February 2016

13. Alternative

Bids

13.1 Alternative (alternate technology/architecture/design/functionality

or proposals with multiple options) bids shall be rejected.

14. Bid Prices

and

Discounts

14.1 The prices quoted by the Bidder in the Price Proposal

Submission Sheet and in the Price Proposal shall conform to the

requirements specified below.

14.2 All items in the Appendix L must be listed and priced separately

in the Price Schedules. If an item listed in Price Schedule is not

priced, their prices shall be assumed to be included by the

bidder in the prices of other items.

14.3 If an item is not listed in the Price Schedule, it shall be assumed

not to be included in the Bid. In such event, if the bid is

otherwise substantially responsive, Bid Price shall be adjusted

during evaluation of Price Proposals, for comparison purposes

only, to reflect the price of the missing or non-conforming item or

component. The price of the missing or non-conforming item or

component for this purpose shall be the highest of the prices

quoted by the other bidders for such missing item or component.

14.4 The terms EXW, CIF, CIP, and other similar terms shall be

governed by the rules prescribed in the current edition of

Incoterms, published by The International Chamber of

Commerce, at the date of the Invitation for Bids or as specified

in the BDS.

14.5 Prices quoted by the Bidder must be firm and final and shall

remain constant throughout the period of the contract and shall

not be subject to any upward modifications, except as specified

in the GCC Clause 14.2

14.6 The bidders are advised not to indicate any separate discount.

Discount, if any, should be merged with the quoted prices.

Discount of any type, indicated separately, will not be taken into

account for evaluation purpose. However, in the event of such

an offer, without considering the separate discount, is found to

Page 60: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 60

CESU, Odisha Page 60 Release Date: 27th February 2016

be the lowest, the Purchaser shall avail such discount at the

time of award of contract.

15. Currencies of

Bid

15.1 Bidders may express their bid price in Indian Rupees only.

16. Documents

Establishing

the Eligibility

of the Bidder

16.1 To establish their eligibility in accordance with ITB Clause 4,

Bidders shall:

(a) complete the eligibility declarations in the Bid Submission

Sheet, included in Section V, Bidding Forms

17. Documents

Establishing

the

Conformity of

the Goods

and Related

Services to

the Bidding

Document

17.1 To establish the conformity of the Goods and Related Services

to the Bidding Document, the Bidder shall furnish as part of its

Technical Proposal the documentary evidence against Goods

and related Services provided in Appendix L.

17.2 The documentary evidence may be in the form of literature,

drawings or data, and shall consist of a detailed description of

the essential technical and performance characteristics of the

Goods and Related Services, demonstrating substantial

responsiveness of the Goods and Related Services to those

requirements, and if applicable, a statement of deviations and

exceptions to the provisions of Appendix D;

17.3 Standards for workmanship, process, material, and equipment,

as well as references to brand names or catalogue numbers

specified by the Purchaser in the Scope of Work, are intended

to be descriptive only and not restrictive. The Bidder may offer

other standards of quality, brand names, and/or catalogue

numbers, provided that it demonstrates, to the Purchaser’s

satisfaction, that the substitutions ensure substantial

equivalence or are superior to those specified in the Scope of

Work

18. Documents

Establishing

the

18.1 To establish its qualifications to perform the Contract, the Bidder

shall submit as part of its Technical Proposal the evidence

indicated for each qualification criteria specified in Section IV,

Page 61: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 61

CESU, Odisha Page 61 Release Date: 27th February 2016

Qualifications

of the Bidder

Eligibility Criteria. However, only those bidders which have been

empanelled by Nodal Agency shall be eligible to bid.

19. Period of

Validity of

Bids

19.1 Bids shall remain valid for the period of 90 days after the bid

submission deadline date prescribed by the Purchaser. A Bid

valid for a shorter period shall be rejected by the Purchaser as

non responsive.

19.2 In exceptional circumstances, prior to the expiration of the bid

validity period, the Purchaser may request Bidders to extend the

period of validity of their Bids. The request and the responses

shall be made in writing. The Bid Security furnished in

accordance with ITB Clause 20, it shall also be extended for a

corresponding period. A Bidder may refuse the request without

forfeiting its Bid Security. A Bidder granting the request shall not

be required or permitted to modify its Bid.

20. Bid Security 20.1 The Bidder shall furnish as part of its Technical Proposal, a Bid

Security in original form and in the amount and currency

specified in the BDS

20.2 The Bid Security shall be in the form of a bank guarantee from a

Scheduled bank as notified by Reserve Bank of India. In case of

a bank guarantee, the Bid Security shall be submitted using the

Bid Security Form included in the Bidding Forms at Section V.

The form must include the complete name of the Bidder. The

Bid Security shall be valid for sixty (60) days beyond the end of

the validity period of the bid. This shall also apply if the period

for bid validity is extended

20.3 Any Bid not accompanied by a substantially responsive Bid

Security in accordance with ITB Sub-Clause 20.2, shall be

rejected by the Purchaser as non responsive.

20.4 The Bid Security of unsuccessful Bidders shall be returned as

promptly as possible upon the signing of the Contract with the

successful Bidder pursuant to ITB Clause 41 and 42

Page 62: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 62

CESU, Odisha Page 62 Release Date: 27th February 2016

20.5 The Bid Security of the successful Bidder shall be returned as

promptly as possible once the successful Bidder has furnished

the required Performance Security and signed the Contract.

20.6 The Bid Security may be forfeited:

(a) if a Bidder withdraws its Bid during the period of bid

validity as specified in ITB Clause 19.1, except as

provided in ITB Sub-Clause 19.2 or 25 ; or

(b) if the successful Bidder fails to :

o sign the Contract in accordance with ITB Clause 41; or

o furnish a Performance Security in accordance with ITB Clause

42; or

o accept the correction of its Bid Price pursuant to ITB Sub-

Clause 30.5

o If the bidder is found to have submitted false particulars / fake

documents; or

o If the IT Implementation Agency (SI and its sub-contractors)

refuses to execute the job at his agreed scope/quoted rates

after the utilities issue the letter of intent (LoI)

o incidents of manipulation of rates by cartelization

20.7 The Bid Security must be in the name of the system integrator

(Lead Member in case of consortium for system integrator role)

21. Format and

Signing of Bid

21.1 The Bidder shall prepare one original of the Technical Proposal

and one original of the Price Proposal as described in ITB

Clause 11 and clearly mark each “ORIGINAL - TECHNICAL

PROPOSAL” and “ORIGINAL - PRICE PROPOSAL”. In

addition, the Bidder shall submit 1 (One) copy of the Technical

Proposal and the Price Proposal, and clearly mark them “COPY

- TECHNICAL PROPOSAL”. And five soft copies in separate

compact discs(CD)/DVD. In the event of any discrepancy

between the original and the copies, the original shall prevail.

Page 63: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 63

CESU, Odisha Page 63 Release Date: 27th February 2016

21.2 The original and all copies of the Bid shall be typed or written in

indelible ink and shall be signed by a person duly authorized to

sign on behalf of the Bidder. This authorization shall consist of

a written confirmation as specified in the BDS and shall be

attached to the Bid. The name and position held by each person

signing the authorization must be typed or printed below the

signature. All pages of the Bid, except for un-amended printed

literature, shall be signed or initialled by the person signing the

Bid. Response Formats duly filled along with supporting

documents shall be page numbered and stitched, book bound

as one volume. Each page of the bid (along with the supporting

documents including CVs) should be signed by the authorised

signatory. Spiral/Spico bound documents with end sealed may

also be accepted. The documents submitted in any other way is

liable to be rejected.

21.3 Any interlineations, erasures, or overwriting shall be valid only if

they are signed or initialled by the person signing the Bid.

D. Submission and Opening of Bids

22. Sealing and

Marking of

Bids

22.1 The Bidder shall enclose the original of the Technical Proposal,

the original of the Price Proposal, and one copy of the

Technical Proposal and one copy of the Price Proposal, , in

separate sealed envelopes, duly marking the envelopes as

“ORIGINAL - TECHNICAL PROPOSAL”, “ORIGINAL - PRICE

PROPOSAL” and “COPY - TECHNICAL PROPOSAL” and

“COPY - PRICE PROPOSAL”, as appropriate. These

envelopes containing the original and the copies shall then be

enclosed in one single envelope.

Page 64: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 64

CESU, Odisha Page 64 Release Date: 27th February 2016

22.2 The inner and outer envelopes shall:

(a) bear the name and address of the Bidder;

(b) be addressed to the Purchaser in accordance with ITB

Sub-Clause 23.1; and

(c) bear the specific identification of this bidding process

indicated in the BDS.

22.3 The outer envelopes and the inner envelopes containing the

Technical Proposals shall bear a warning not to open before the

time and date for the opening of Technical Proposals, in

accordance with ITB Sub-Clause 26.1.

22.4 The inner envelopes containing the Price Proposals shall bear a

warning not to open until advised by the Purchaser in

accordance with ITB Sub-Clause 26.2.

22.5 If all envelopes are not sealed and marked as required, the

Purchaser will assume no responsibility for the misplacement or

premature opening and resultant disqualification of the bid.

23. Deadline for

Submission

of Bids

23.1 Bids must be received by the Purchaser no later than the date

and time, and at the address indicated in the BDS.

23.2 The Purchaser may, at its discretion, extend the deadline for the

submission of Bids by amending the Bidding Document in

accordance with ITB Clause 8, in which case all rights and

obligations of the Purchaser and Bidders previously subject to

the deadline shall thereafter be subject to the deadline as

extended.

24. Late Bids 24.1 The Purchaser shall not consider any Bid that arrives after the

deadline for submission of Bids, in accordance with ITB Clause

23. Any Bid received by the Purchaser after the deadline for

submission of Bids shall be declared late, rejected, and returned

unopened to the Bidder.

Page 65: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 65

CESU, Odisha Page 65 Release Date: 27th February 2016

25. Withdrawal,

Substitution,

and

Modification

of Bids

25.1 A Bidder may withdraw, substitute, or modify its Bid after it has

been submitted by sending a written Notice, duly signed by an

authorized representative, and shall include a copy of the

authorization in accordance with ITB Sub-Clause 21.2. The

corresponding substitution or modification of the bid must

accompany the respective written notice. All Notices must be:

(a) submitted in accordance with ITB Clauses 21 and 22

(except that Withdrawal Notices do not require copies),

and in addition, the respective inner and outer envelopes

shall be clearly marked “Withdrawal,” “Substitution,”

“Modification”; and

(b) received by the Purchaser prior to the deadline

prescribed for submission of bids, in accordance with ITB

Clause 23.

25.2 Bids requested to be withdrawn in accordance with ITB Sub-

Clause 25.1 shall be returned unopened to the Bidders.

25.3 No Bid shall be withdrawn, substituted, or modified in the interval

between the deadline for submission of bids and the expiration

of the period of bid validity specified in ITB Clause 19.1 or any

extension thereof.

26. Bid Opening 26.1 The Purchaser shall conduct the opening of Technical Proposals

in the presence of Bidders’ representatives who choose to

attend, at the address, date and time specified in the BDS.

26.2 The Price Proposals will remain unopened and will be held in

custody of the Purchaser until the time of opening of the Price

Proposals. The Purchaser shall advise the responsive bidders in

writing about the date, time, and location of the opening of Price

Proposals.

26.3 First, envelopes marked “WITHDRAWAL” shall be opened, read

out, and recorded, and the envelope containing the

corresponding Bid shall not be opened, but returned to the

Page 66: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 66

CESU, Odisha Page 66 Release Date: 27th February 2016

Bidder. No Bid shall be withdrawn unless the corresponding

Withdrawal Notice contains a valid authorization to request the

withdrawal and is read out and recorded at bid opening.

26.4 Next, outer envelopes marked “SUBSTITUTION” shall be

opened. The inner envelopes containing the Substitution

Technical Proposal and/or Substitution Price Proposal shall be

exchanged for the corresponding envelopes being substituted,

which are to be returned to the Bidder unopened. Only the

Substitution Technical Proposal, if any, shall be opened, read

out, and recorded. Substitution Price Proposals will remain

unopened in accordance with ITB Sub-Clause 26.2. No

envelope shall be substituted unless the corresponding

Substitution Notice contains a valid authorization to request the

substitution and is read out and recorded at bid opening.

26.5 Next, outer envelopes marked “MODIFICATION” shall be

opened. No Technical Proposal and/or Price Proposal shall be

modified unless the corresponding Modification Notice contains

a valid authorization to request the modification and is read out

and recorded at the opening of Technical Proposals. Only the

Technical Proposals, both Original as well as Modification, are

to be opened, read out, and recorded at the opening. Price

Proposals, both Original as well as Modification, will remain

unopened in accordance with ITB Sub-Clause 26.2.

26.6 All other envelopes holding the Technical Proposals shall be

opened one at a time, and the following read out and recorded :

(a) the name of the Bidder;

(b) whether there is a modification or substitution;

(c) the presence of a Bid Security, if required; and

(d) any other details as the Purchaser may consider

appropriate.

Page 67: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 67

CESU, Odisha Page 67 Release Date: 27th February 2016

Only Technical Proposals read out and recorded at bid

opening shall be considered for evaluation. No Bid shall be

rejected at the opening of Technical Proposals except for late

bids in accordance with ITB Sub-Clause 24.1.

26.7 The Purchaser shall prepare a record of the opening of

Technical Proposals that shall include, as a minimum: the name

of the Bidder and whether there is a withdrawal, substitution,

modification; and the presence or absence of a Bid Security.

The Bidders’ representatives who are present shall be

requested to sign the record. The omission of a Bidder’s

signature on the record shall not invalidate the contents and

effect of the record. A copy of the record shall be distributed to

all Bidders.

26.8 On the basis of the evaluation of the Technical Proposals, the

Purchaser will invite bidders who have submitted responsive

Technical Proposals to attend the opening of the Price

Proposals. The date, time, and location of the opening of Price

Proposals will be advised in writing by the Purchaser. Bidders

shall be given reasonable notice of the opening of Price

Proposals.

26.9 The Purchaser will notify Bidders in writing who have been

rejected on the grounds of being non-responsive to the

requirements of the Bidding Document and return their Price

Proposals unopened, before the opening of the price proposal.

26.10 The Purchaser shall conduct the opening of Price Proposals

of all Bidders who submitted responsive Technical Proposals, in

the presence of Bidders` representatives who choose to attend

at the address, date and time specified by the Purchaser. The

Bidder’s representatives who are present shall be requested to

sign a register evidencing their attendance.

26.11 All envelopes containing Price Proposals shall be opened one

Page 68: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 68

CESU, Odisha Page 68 Release Date: 27th February 2016

at a time and the following read out and recorded:

(a) the name of the Bidder

(b) whether there is a modification or substitution;

(c) the Bid Prices,; and

(d) any other details as the Purchaser may consider

appropriate.

Only Price Proposals, read out and recorded during the opening

of Price Proposals shall be considered for evaluation. No Bid

shall be rejected at the opening of Price Proposals.

26.12 The Purchaser shall prepare a record of the opening of Price

Proposals that shall include, as a minimum: the name of the

Bidder, the Bid Price. The Bidders’ representatives who are

present shall be requested to sign the record. The omission of a

Bidder’s signature on the record shall not invalidate the contents

and effect of the record. A copy of the record shall be distributed

to all Bidders.

E. Evaluation and Comparison of Bids

27. Confidentialit

y

27.1 Information relating to the examination, evaluation, comparison

and recommendation of contract award, shall not be disclosed

to Bidders or any other persons not officially concerned with

such process.

27.2 Any attempt by a Bidder to influence the Purchaser in the

examination, evaluation, comparison, and post qualification of

the Bids or Contract award decisions may result in the rejection

of its Bid.

27.3 Notwithstanding ITB Sub-Clause 27.2, from the time of opening

the Technical Proposals to the time of Contract award, if any

Bidder wishes to contact the Purchaser on any matter related to

the bidding process, it should do so in writing. If the bidder or

Page 69: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 69

CESU, Odisha Page 69 Release Date: 27th February 2016

any of his subcontractors/consortium members meet the

Purchaser’s personnel, it will be considered as “coercive

practices”, and may result in rejection of the bid.

28. Clarification

of Bids

28.1 To assist in the examination, evaluation, comparison and post-

qualification of the Bids, the Purchaser may, at its discretion,

ask any Bidder for a clarification of its Bid. Any clarification

submitted by a Bidder that is not in response to a request by the

Purchaser shall not be considered. The Purchaser’s request for

clarification and the response shall be in writing. No change in

the prices or substance of the Bid shall be sought, offered, or

permitted, except to confirm the correction of arithmetic errors

discovered by the Purchaser in the evaluation of the Price

Proposals, in accordance with ITB Clause 30.

29. Responsivene

ss of

Technical

Proposal

29.1 The Purchaser’s determination of the responsiveness of a

Technical Proposal is to be based on the contents of the

Technical Proposal itself.

29.2 A responsive Technical Proposal is one that conforms to all the

mandatory requirements, terms, conditions, and specifications

of the Bidding Document without material deviation, reservation,

or omission. A material deviation, reservation, or omission is

one that:

(a) does not meet all the mandatory requirements (as

specified in Appendix-A)

(b) affects the scope, quality, or performance of the Goods

and Related Services specified in the Contract; or

(c) limits or is inconsistent with the Bidding Document, the

Purchaser’s rights or the Bidder’s obligations under the

Contract; or

(d) if rectified would unfairly affect the competitive position of

other Bidders presenting responsive Technical

Page 70: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 70

CESU, Odisha Page 70 Release Date: 27th February 2016

Proposals.

29.3 If a Technical Proposal is not responsive to the Bidding

Document, it shall be rejected by the Purchaser and shall not

subsequently be made responsive by the Bidder by correction of

the material deviation, reservation, or omission.

30. Non

conformités,

Errors, and

Omissions

30.1 Provided that a Technical Proposal is responsive, the Purchaser

may waive any non-conformity or omission in the Bid that does

not constitute a material deviation.

30.2 Provided that a Technical Proposal is responsive, the Purchaser

may request that the Bidder submit the necessary information or

documentation, within a reasonable period of time, to rectify

nonmaterial, nonconformities or omissions in the Technical

Proposal related to documentation requirements. Such

omission shall not be related to any aspect of the Price Proposal

of the Bid. Failure of the Bidder to comply with the request may

result in the rejection of its Bid.

30.3 Provided that a Technical Proposal is responsive, the Purchaser

will rectify nonmaterial nonconformities or omissions. To this

effect, the Bid Price shall be adjusted during evaluation of Price

Proposals, for comparison purposes only, to reflect the price of

the missing or non-conforming item or component. The

adjustment shall be made using the method indicated in Section

13.2 of Section VII - GCC.

30.4 Provided that the Technical Proposal is responsive, the

Purchaser will correct arithmetical errors during evaluation of

Price Proposals on the following basis:

(a) if there is a discrepancy between the unit price and the

total price that is obtained by multiplying the unit price

and quantity, the unit price shall prevail and the total

price shall be corrected, unless in the opinion of the

Purchaser there is an obvious misplacement of the

Page 71: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 71

CESU, Odisha Page 71 Release Date: 27th February 2016

decimal point in the unit price, in which case the total

price as quoted shall govern and the unit price shall be

corrected;

(b) if there is an error in a total corresponding to the addition

or subtraction of subtotals, the subtotals shall prevail and

the total shall be corrected; and

(c) if there is a discrepancy between words and figures, the

amount in words shall prevail. However, where the

amount expressed in words is related to an arithmetic

error, the amount in figures shall prevail subject to (a)

and (b) above.

(d) if there is a discrepancy between percentage and figures

related to various taxes or levies, the percentage shall

prevail over figure mentioned. However, where the

amount expressed in percentage is related to an

arithmetic error, the amount in figures shall prevail

subject to (a) and (b) above. It should also be noted that

at time of payment against, the prevailing tax/levy rates

will be used as on the date of approval of payment.

(e) Except as provided in sub-clauses (a) to (c) herein

above, the Purchaser shall reject the Price Proposal if

the same contains any other computational or arithmetic

discrepancy or error.

30.5 If the Bidder that submitted the lowest evaluated Bid does not

accept the correction of errors, its Bid shall be disqualified and

its Bid Security shall be forfeited.

31. Preliminary

Examination

of Bids

31.1 The Purchaser shall examine the Technical Proposal to confirm

that all documents and technical documentation requested in

ITB Sub-Clause 11.5 have been provided, and to determine the

completeness of each document submitted.

Page 72: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 72

CESU, Odisha Page 72 Release Date: 27th February 2016

31.2 The Purchaser shall confirm that the following documents and

information have been provided in the Technical Proposal. If

any of these documents or information is missing, the offer

shall be rejected.

(a) Technical Proposal Submission Sheet in accordance

with ITB Sub-Clause 12.1;

(b) written confirmation of authorization to commit the

Bidder;

(c) Bid Security; and

(d) Manufacturer’s Authorization, where applicable.

31.3 Likewise, following the opening of Price Proposals, the

Purchaser shall examine the Price Proposals to confirm that all

documents and financial documentation requested in ITB Sub-

Clause 11.6 have been provided, and to determine the

completeness of each document submitted.

31.4 The Purchaser shall confirm that the following documents and

information have been provided in the Price Proposal. If any of

these documents or information is missing, the offer shall be

rejected.

(a) Price Proposal Submission Sheet in accordance with ITB

Sub-Clause 12.1; and

(b) Price Schedules, in accordance with ITB Clauses 12, 14,

and 15.

32. Examination

of Terms and

Conditions;

Technical

Evaluation

32.1 The Purchaser shall examine the Bids to confirm that all terms

and conditions specified in the GCC and the SCC have been

accepted by the Bidder without any material deviation or

reservation.

Page 73: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 73

CESU, Odisha Page 73 Release Date: 27th February 2016

32.2 The Purchaser shall evaluate the technical aspects of the Bid

submitted in accordance with ITB Clause 18, to confirm that all

requirements specified in the Scope of Work at Section VI, of

the Bidding Document have been met without any material

deviation or reservation.

32.3 If, after the examination of the terms and conditions and the

technical evaluation, the Purchaser determines that the

Technical Proposal is not responsive in accordance with ITB

Clause 29, it shall reject the Bid.

33. Margin of

Preference

33.1 No margin of preference shall apply.

34. Evaluation of

Bids

34.1 The Purchaser shall evaluate Price Proposals of each Bid for

which the Technical Proposal has been determined to be

responsive.

34.2 To evaluate a Price Proposal, the Purchaser shall only use all

the criteria and methodologies defined in this Clause and in

Section IV, Eligibility Criteria and evaluation methodology in

Appendix-E. No other criteria or methodology shall be

permitted.

34.3 To evaluate a Price Proposal, the Purchaser shall consider the

following:

(a) the Bid Price quoted in Price Proposal Submission Sheet

i.e. inclusive of all duties, levies and taxes.

(b) Price adjustment in accordance with Clause 14.3 of ITB

for missing or non-conforming item(s) or component(s).

(c) price adjustment for correction of arithmetic errors in

accordance with ITB Sub-Clause 30.4;

34.4 For comparison of the combined Technical and Price Score of

all responsive bidders, following formula shall be used

Page 74: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 74

CESU, Odisha Page 74 Release Date: 27th February 2016

(a) Total Score = (Technical Score x 0.50) + (LP/FPx100) x

0.50. Where LP is the lowest price offer and FP is the price

offer of the firm being evaluated

(b) Contracts shall be awarded only to the bidder with the

highest evaluated Total Score

35. Comparison

of Bids

35.1 The Purchaser shall compare all responsive bids to determine

the bid with the maximum score, in accordance with ITB Clause

34.

36. Post-

qualification

of the Bidder

36.1 The Purchaser shall determine to its satisfaction during the

evaluation of Technical Proposals whether Bidders are qualified

to perform the Contract satisfactorily.

36.2 The determination shall be based upon an examination of the

documentary evidence of the Bidder’s qualifications submitted

by the Bidder, pursuant to ITB Clause 18 and to clarifications in

accordance with ITB Clause 28. The eligible bidders shall only

be as empanelled by Nodal Agency meeting qualifying

requirements as mentioned in Eligibility Criteria (Section IV).

36.3 An affirmative determination in accordance with this clause shall

be a prerequisite for the opening and evaluation of a Bidder’s

Price Proposal. A negative determination shall result into the

disqualification of the Bid, in which event the Purchaser shall

return the unopened Price Proposal to the Bidder.

37. Purchaser’s

Right to

Accept Any

Bid, and to

Reject Any or

All Bids

37.1 The Purchaser reserves the right to accept or reject any Bid, and

to annul the bidding process and reject all Bids at any time prior

to Contract award, without thereby incurring any liability to the

Bidders.

F. Award of Contract

Page 75: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 75

CESU, Odisha Page 75 Release Date: 27th February 2016

38. Award Criteria 38.1 The Purchaser shall award the Contract to the Bidder whose

offer has been awarded the maximum score and is responsive

to the Bidding Document, provided that such Bidder continues to

remain empanelled as per the list (along with any

updation/modifications from time to time) released by the Nodal

Agency.

39. Purchaser’s

Right to Vary

Quantities at

Time of

Award

39.1 At the time the Contract is awarded, the quantity of Goods and

Related Services for a town shall not be modified. However

Purchaser reserves the right to increase or decrease the

number of towns under the contract subject to the limit of 30% of

the existing number of towns covered under the contract,

without any change in the unit prices or other terms and

conditions of the Bid and the Bidding Document.

40. Notification of

Award

40.1 Prior to the expiration of the period of bid validity, the Purchaser

shall notify the successful Bidder, in writing, that its Bid has

been accepted.

40.2 Until a formal Contract is prepared and executed, the notification

of award shall constitute a binding Contract.

41. Signing of

Contract

41.1 Promptly after notification, the Purchaser shall send to the

successful Bidder the Agreement, a copy of SLA and the

General and Special Conditions of Contract.

41.2 Within fourteen (14) days of receipt of the Agreement, the

successful Bidder shall sign, date, and return it to the

Purchaser.

41.3 The successful Bidder shall provide an undertaking that the key

staff identified for the project (as submitted in its bid proposal)

shall be available for the respective proposed work requirement,

anytime during the duration of the project, till its successful

completion. The same is intended to be published by the Nodal

Agency on their website for the information of other utilities who

intend to appoint ITIA, for avoiding any duplicacy in resource

Page 76: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 76

CESU, Odisha Page 76 Release Date: 27th February 2016

deployment

42. Performance

Security

42.1 Within fourteen (14) days of the receipt of notification of award

from the Purchaser, the successful Bidder shall furnish the

Performance Security in accordance with the GCC, using for

that purpose the Performance Security Form included in Section

IX, Contract Forms.

42.2 Failure of the successful Bidder to submit the above-mentioned

Performance Security or sign the Contract shall constitute

sufficient grounds for the annulment of the award and forfeiture

of the Bid Security. In that event the Purchaser may award the

Contract to the next successful Bidder whose offer is responsive

and is determined by the Purchaser to be qualified to perform

the Contract satisfactorily.

43. Local

Conditions

It will be imperative on each bidder to fully inform himself of all

local conditions and factors which may have any effect on the

execution of the works covered under these documents and

specifications. The purchaser shall not entertain any request for

clarifications from the bidders, regarding such local conditions. It

must be understood and agreed that such factors have properly

been investigated and considered while submitting the

proposals. No claim for financial adjustment to the contract

awarded under these specifications and documents will be

entertained by the purchaser. Neither any change in the time

schedule of the contract nor any financial adjustments arising

thereof shall be permitted by the purchaser, which are based on

the lack of such clear information or its effect on cost of the

works to the bidder.

G. Interpretation

44. Interpretation

of the SRS

44.1 This Bid Document, inclusive of the SRS document, Schedules,

annexure(s), the statements, exhibits and sections, if any,

Page 77: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 77

CESU, Odisha Page 77 Release Date: 27th February 2016

and the RFP

document

comprises the whole and complete Document

44.2 This RFP document should be read in consonance with the SRS

document. In the RFP document references to the SRS have

been provided. In case there is no reference relating to a

particular clause(s) of the SRS, it should be deemed as the said

reference has been provided. The bidder is required to read

both the documents and would be deemed to be in knowledge

of the provisions of both the SRS and the RFP document. No

claim of any nature whatsoever shall be entertained in this

regard.

44.3 In case of any conflict with any provision relating to the SRS

document and the RFP document, the provisions of the RFP

document shall prevail for all intents and purposes

Page 78: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 78

CESU, Odisha Page 78 Release Date: 27th February 2016

Section III. Bid Data Sheet

A. Introduction

ITB 1.1 The number of the Invitation for Bids is : CESU/ITCC/R-APDRP/07

ITB 1.1 The Purchaser is:

Senior General Manager (IT),

Central Electricity Supply Utility of Odisha,

8th Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha

Phone No. - 0674-2545685 Fax No. - 0674-2543125

Email : [email protected]

ITB 1.1 The name of the ICB is: Supply, installation, integration, testing,

commissioning and facility management service of System Integration

Project covering software, hardware, field survey and networking

The identification number of the ICB is: CESU/ITCC/R-APDRP/07

B. Bidding Document

ITB 7.1 For clarification purposes only, the Purchaser’s address is:

Senior General Manager (IT),

Central Electricity Supply Utility of Odisha,

8th Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha

Phone No. - 0674-2545685 Fax No. - 0674-2543125

Email : [email protected]

ITB 7.2 Details of Pre-Bid conference:

Date: 10th March 2016

Venue: Conference Hall, CESU, 3rd Floor, IDCO Towers, Janpath,

Bhubaneswar - 751 022

Time: from 12:00 Hrs to 14:00 Hrs

Page 79: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 79

CESU, Odisha Page 79 Release Date: 27th February 2016

C. Preparation of Bids

ITB 10.1 The language of the Bid is: English

ITB 11.5 (g) The Bidder shall submit with its Technical Proposal the following additional

documents:

Refer to Appendix D.2

ITB 11.6 (b) The Bidder shall submit with its Price Proposal the following additional

documents:

Refer to Appendix D.3

ITB 13.1 Alternative Bids shall not be permitted.

ITB 14.4 The Incoterms edition is: Year 2000

ITB 14.5 The prices quoted by the Bidder shall be: Firm (subject to Section VII

GCC 13.2)

ITB 15.1 Bidders may express their bid price in INR. Wherever reference to

“Rupees” or “Rs” as currency has been made, the same should be taken

as “Indian Rupees”.

ITB 19.1 The bid validity period shall be 90 days after the bid submission deadline

date prescribed by the Purchaser.

ITB 20.1 The Bid Security shall be required and the amount required to be

furnished in Indian Rupee is indicated hereunder

Bid Identification No: CESU/ITCC/R-APDRP/07

Bid Security (INR): Rs. 1 Crore (One Crore only) in the form of Bank Guarantee in favour of “Central Electricity Supply Utility of Odisha”, Bhubaneswar, Odisha

D. Submission and Opening of Bids

ITB 21.1 In addition to the original of the bid, the number of copies is : ONE (Hard

Page 80: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 80

CESU, Odisha Page 80 Release Date: 27th February 2016

Copy), FOUR (Soft Copies)

ITB 21.2 The written confirmation of Authorization to sign on behalf of the Bidder

shall consist of:

Notarized Power of Attorney: - If the bidder is from a country where this

practice is not used then a similar legal instrument of authorization as

applicable under the home country laws of bidder must be provided.

ITB 22.2 (c) The identification of this bidding process is:

The identification of this bidding process is: Single stage Two envelope

The name of ICB: Supply, installation, integration, testing,

commissioning and facility management service of System

Integration Project covering software, hardware, field survey

and networking

Bid Identification

No Particulars

The bid identification No. shall be mentioned by the Bidder prominently on

the top of envelope for the lots in the following manner :

(a) Bidding process for the bid is : “Single stage Two envelope”

(b) Bid identification No. CESU/ITCC/R-APDRP/07

Page 81: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 81

CESU, Odisha Page 81 Release Date: 27th February 2016

ITB 23.1 For bid submission purposes only, the Purchaser’s address is :

IT Center,

Central Electricity Supply Utility of Odisha,

8th Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha

Phone No. - 0674-2545685 Fax No. - 0674-2543125

Email : [email protected]

ITB 23.1 The deadline for bid submission is:

Date: 28th March 2016

Time: up to 13:00 Hrs

Wherever reference to “Time” has been made, the same shall be taken as

Indian Standard Time. If time is mentioned in “P.M.”, the same shall be

converted into Hours by adding 12 Hours e.g. 2 P.M. equal to 2 + 12 i.e.

“14.00 Hours IST”

ITB 26.1 The bid opening shall take place at:

Conference Hall

Central Electricity Supply Utility of Odisha,

3rd Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha

Phone No. - 0674-2545685 Fax No. - 0674-2543125

Email : [email protected]

Date: 28th March 2016

Time: at 15:00 Hrs

E. Evaluation, and Comparison of Bids

ITB 33.1 A margin of preference shall not apply.

Page 82: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 82

CESU, Odisha Page 82 Release Date: 27th February 2016

ITB 34 The currency that shall be used for bid evaluation and comparison

purposes to convert all bid prices expressed in various currencies into a

single currency is: Indian Rupees.

F. Award of Contract

ITB 39.1 The percentage by which number of towns may be increased is: 30

percent of the total number of towns

The percentage by which number of towns may be decreased is: 30

percent of the total number of towns

ITB 42.1 If the successful bidder fails to furnish the required Performance Security

within 14 days of the receipt of notification of award, the Purchaser

reserves the right to terminate the award by forfeiting Bid Security without

any notice.

ITB 42.2 If the successful bidder fails to sign the Contract Agreement within 14

days from the date the successful bidder’s receipt of the Contract

Agreement, the Purchaser reserves the right to terminate the award by

forfeiting Bid Security without any notice.

Page 83: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 83

CESU, Odisha Page 83 Release Date: 27th February 2016

Section IV. Eligibility Criteria

Only those bidders which have been empanelled by the Nodal Agency shall be eligible for

bidding. The qualifying requirements for the various ITIA roles have been provided as

reference.

Qualifying Requirements

QR for System Integrator

The Lead member (referred as SI-Lead) and the 2nd consortium member (in case of a

consortium; referred as SI-2nd) should meet the QR as mentioned below:

For all bidders (except power sector utilities)

i. The SI must have implemented at least one system integration project covering IT

applications, Servers and PCs, WAN with connectivity between at least 10

locations, during the last three financial years. In case of a consortium, this

requirement needs to be met by the SI-Lead.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3

financial years needs to be submitted)

ii. The SI should have cumulative turnover of at least Rs. 300 crore for the last three

audited financial years. In case of a consortium, the consortium as a whole (SI-

Lead and SI-2nd combined) should have cumulative turnover of at least Rs. 300

crore for the last three audited financial years. The SI-Lead should have a turnover

of at least Rs. 270 crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The SI should have a positive net worth not less than paid-up equity, in each of the

last three audited financial years. In case of a consortium, both the SI-Lead and SI-

2nd should have positive net worth not less than paid-up equity in each of the last

three audited financial years.

(Proof: Annual Accounts for last three financial years )

iv. The SI should have been in the IT / Software services for the last 3 years. In case

of a consortium, this requirement needs to be met by the SI-Lead.

(Proof for which to be submitted in the form of Incorporation Certificate along with

Memorandum & Articles of Association)

Page 84: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 84

CESU, Odisha Page 84 Release Date: 27th February 2016

v. The SI should have implemented a turnkey Systems Integration project in the last

three financial years involving at least 5 of the following modules: GIS, MIS, Web

Self Service, Asset Management, Maintenance Management, Billing, Metering,

Energy Auditing/Accounting, Customer Care, Network, Hardware in any Utility

(Power/Gas/Water/Telecom sectors) or infrastructure sector (rail/road/port/airport).

The total consumer base covered by the SI for such project in the any Utility should

not be less than 50,000. This requirement is not applicable for infrastructure sector

(rail/road/port/airport) projects as these cater to mass consumers. In case of a

consortium, the requirement of at least 5 modules is distributed as follows: SI-Lead

needs to meet the above requirement for at least 4 modules, and the SI-2nd for at

least 1 module.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3 financial

years needs to be submitted)

vi. The SI should have worked with at least one utility (Power/Gas/Water/Telecom

sectors) or infrastructure sector (rail/road/port/airport) in implementing turnkey

Systems Integration projects. The total worth of projects executed in this domain for

the last three financial years should be at least INR 50 crore (USD10 million). In

case of a consortium, this requirement needs to be met by the SI-Lead.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3 financial

years needs to be submitted)

vii. The SI should be ISO 9001:2000 or have at least CMM/CMMI level 4 certification.

In case of a consortium, this requirement needs to be met by the SI-Lead.

(Proof: Copy of certification from authorized certification body)

viii. The SI should have at least 20 personnel on its rolls with a minimum experience of

5 years (either in his/her own or other organization). The roles & responsibilities of

the personnel should include system integration of IT applications or software or

hardware or network. In case of a consortium, the requirement of at least 20

personnel is distributed as follows: SI-Lead needs to meet the above requirement

for at least 15 CVs, and the SI-2nd for at least 5 CVs

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall

be accepted.)

Page 85: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 85

CESU, Odisha Page 85 Release Date: 27th February 2016

For power sector utility as bidder (no consortium allowed under this category)

i. The SI must have implemented, within its own organization, at least one system

integration project covering IT applications, Servers and PCs, WAN project with

connectivity between at least 10 locations during the last three financial years.

ii. The SI should have cumulative turnover of at least Rs.2,500 crore for the last three

audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The SI should have a positive net worth not less than paid-up equity in each of the

last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The SI should have implemented a turnkey Systems Integration project involving at

least any 5 of the following modules: GIS, MIS, Web Self Service, Asset

Management, Maintenance Management, Billing, Metering, Energy Auditing /

Accounting, Customer Care, Network, hardware. The total consumer base covered

by the SI for such project in the any Utility should not be less than 50,000. This

requirement is not applicable for infrastructure sector (rail/road/port/airport) projects

as these cater to mass consumers. The total worth of turnkey Systems Integration

projects implemented by the SI in above domain should be at least INR 50 crore

(USD10 million).

v. The SI should have at least 20 personnel on its rolls with a minimum experience of

5 years (either in his/her own or other organization). The roles & responsibilities of

the personnel should include system integration of IT applications or software or

hardware or network.

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall

be accepted.)

Proof of credentials for experience (refer i and iv above) should be either of the following:

•The ARR/DPRs which have been approved by Regulatory Commission, with clear mention of

the project details and its value. The same should be supported by an undertaking from the

Company Secretary

Page 86: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 86

CESU, Odisha Page 86 Release Date: 27th February 2016

•Auditor’s certification along with Undertaking by Company Secretary with clear mention of the

project details and its value (including module wise go-live dates and the current status of the

project)

QR for Network Solution Provider

For all bidders (except power sector utilities)

i. The Network Solution Provider should have implemented at least 5 multi location

WAN projects (installation, integration, maintenance & management) during the

last three financial years out of which at least two projects should have involved

Leased Lines or ISDN or VSAT or RF or DSL or VPN /MPLS or Fibre Optics or a

combination of these technologies for a customer having a minimum of 10 WAN

locations.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3

financial years needs to be submitted)

ii. The Network Solution Provider should have been in the Network

installation/maintenance services for the last 3 years.

(Proof for which to be submitted in the form of Incorporation Certificate along with

Memorandum & Articles of Association)

iii. The Network Solution Provider should have cumulative turnover of at least Rs. 60

crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The Network Solution Provider should have a positive net worth in each of the last

three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

v. Network Solution Provider should be an ISO 9001:2000 certified company.

(Proof: Copy of certification from authorized certification body)

vi. The Network Solution Provider should have at least 10 personnel on its rolls with

a minimum experience of 5 years (either in his/her own or other organization).

The roles & responsibilities of the personnel should include installation or

integration or maintenance or management of network systems.

(Proof: Signed resume of employees need to be submitted. Scanned signatures

shall be accepted.)

Page 87: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 87

CESU, Odisha Page 87 Release Date: 27th February 2016

For power sector utility as bidder

i. The Network Solution Provider should have implemented, within its own

organization, at least one project involving Leased Lines or ISDN or VSAT or RF

or DSL or VPN /MPLS or Fibre Optics or a combination of these technologies

having a minimum of 10 WAN locations during last three financial years.

ii. The Network Solution Provider should have cumulative turnover of at least Rs.

2500 crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The Network Solution Provider should have a positive net worth in each of the last

three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The Network Solution Provider should have at least 10 personnel on its rolls with

a minimum experience of 5 years (either in his/her own or other organization).

The roles & responsibilities of the personnel should include installation or

integration or maintenance or management of network systems.

(Proof: Signed resume of employees need to be submitted. Scanned signatures

shall be accepted.)

Proof of credentials for experience (refer i above) should be either of the following:

• The ARR/DPRs which have been approved by Regulatory Commission, with clear mention

of the project details and its value. The same should be supported by an undertaking from

the Company Secretary

• Auditor’s certification along with Undertaking by Company Secretary with clear mention of

the project details and its value (including module wise go-live dates and the current status

of the project)

Page 88: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 88

CESU, Odisha Page 88 Release Date: 27th February 2016

QR for GIS Solution Provider

All bidders (except power sector utilities)

i. The GIS Solution Provider should have executed at least two GIS projects

(software development & customization & mapping and digitization) in utility

(Power/Gas/Water/Telecom sectors) or infrastructure sector (rail/road/port/airport)

during the last three financial years.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3 financial

years needs to be submitted)

Additional Note: In case a company has implemented GIS systems in the last 5

years, and has been maintaining the same system since commissioning till date,

such maintenance contracts for the last three years, shall be acceptable as proof

ii. The GIS Solution Provider should have cumulative turnover of at least Rs. 10 crore

for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The GIS Solution Provider should have a positive net worth not less than paid-up

equity in each of the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The GIS Solution Provider should have been in the GIS Software development &

customization or mapping or digitization services for the last 3 years.

(Proof for which to be submitted in the form of Incorporation Certificate along-with

Memorandum & Articles of Association)

v. GIS Solution Provider should be an ISO 9001:2000 certified company.

(Proof: Copy of certification from authorized certification body)

vi. The GIS Solution Provider should have at least 10 personnel on its rolls with a

minimum experience of 5 years (either in his/her own or other organization). The

roles & responsibilities of the personnel should include GIS software development

& customization or mapping or digitization.

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall

be accepted)

Page 89: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 89

CESU, Odisha Page 89 Release Date: 27th February 2016

For power sector utility as bidder

i. The GIS Solution Provider should have executed, within its own organization, at

least one GIS project (software development & customization & mapping and

digitization).

Additional Note: In case a company has implemented GIS systems in the last 5

years, and has been maintaining the same system since commissioning till date,

such maintenance contracts for the last three years, shall be acceptable as proof

ii. The GIS Solution Provider should have cumulative turnover of at least Rs. 2500

crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The GIS Solution Provider should have a positive net worth not less than paid-up

equity in each of the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The GIS Solution Provider should have at least 10 personnel on its rolls with a

minimum experience of 5 years (either in his/her own or other organization). The

roles & responsibilities of the personnel should include GIS software development

& customization or mapping or digitization.

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall

be accepted)

Proof of credentials for experience (refer i above) should be either of the following:

• The ARR/DPRs which have been approved by Regulatory Commission, with clear mention

of the project details and its value. The same should be supported by an undertaking from

the Company Secretary

• Auditor’s certification along with Undertaking by Company Secretary with clear mention of

the project details and its value (including module wise go-live dates and the current status

of the project)

Page 90: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 90

CESU, Odisha Page 90 Release Date: 27th February 2016

QR for Meter Data Acquisition Solution Provider

All bidders (except power sector utilities)

i. The Meter Data Acquisition Solution Provider must have successfully implemented

at least one AMR project or data logging system or served a power distribution

utility providing services using meter reading instrument (MRI) in the last 3 financial

years.

(Proof: Necessary Purchase order/LOI/Contract/Certification on client

letterhead/Performance certificate as proof of services provided for the last 3

financial years needs to be submitted)

In case a company has implemented MDA systems in the last 5 years, and has been

maintaining the same system since commissioning till date, such maintenance

contracts for the last three years, shall be acceptable as proof.

ii. The Meter Data Acquisition Solution Provider should have been in the business of

Meter Data Acquisition (development and customization of software, and/or

commissioning AMR/Data logging system/MRI) for the last 3 financial years.

(Proof for which to be submitted in the form of Incorporation Certificate along-with

Memorandum & Articles of Association)

iii. The Meter Data Acquisition Solution provider should have cumulative turnover of at

least Rs. 10 crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The Meter Data Acquisition Solution Provider should have a positive net worth not

less than paid-up equity in each of the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

v. Meter Data Acquisition Solution Provider should be an ISO 9001:2000 certified

company.

(Proof: Copy of certification from authorized certification body)

vi. The Meter Data Acquisition Solution provider should have at least 10 personnel on

its rolls with a minimum experience of 5 years (either in his/her own or other

organization). The roles & responsibilities of the personnel should include

development and/or customization of Meter Data Acquisition System.

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall

be accepted.)

Page 91: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 91

CESU, Odisha Page 91 Release Date: 27th February 2016

For power sector utility as bidder

i. The Meter Data Acquisition Solution Provider must have successfully implemented at least

one AMR project or data logging system or served a power distribution utility providing

services using meter reading instrument (MRI) in the last 3 financial years.

Additional note: In case a company has implemented MDA systems in the last 5 years, and

has been maintaining the same system since commissioning till date. Such maintenance

contracts for the last three years, shall be acceptable as proof

ii. The Meter Data Acquisition Solution provider should have cumulative turnover of at least

Rs. 2500 crore for the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iii. The Meter Data Acquisition Solution Provider should have a positive net worth not less

than paid-up equity in each of the last three audited financial years.

(Proof: Annual Audited Financial Statements for last three financial years )

iv. The Meter Data Acquisition Solution provider should have at least 10 personnel on its rolls

with a minimum experience of 5 years (either in his/her own or other organization). The

roles & responsibilities of the personnel should include development and/or customization

of Meter Data Acquisition System.

(Proof: Signed resume of employees need to be submitted. Scanned signatures shall be

accepted.)

Proof of credentials for experience (refer i above) should be either of the following:

• The ARR/DPRs which have been approved by Regulatory Commission, with clear mention

of the project details and its value. The same should be supported by an undertaking from

the Company Secretary

• Auditor’s certification along with Undertaking by Company Secretary with clear mention of

the project details and its value (including module wise go-live dates and the current status

of the project)

Page 92: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 92

CESU, Odisha Page 92 Release Date: 27th February 2016

Section V. Bidding Forms

Table of Forms

1. TECHNICAL PROPOSAL SUBMISSION SHEET ............................................................... 93

2. PRICE PROPOSAL SUBMISSION SHEET ......................................................................... 95

3. BID SECURITY ........................................................................................................................ 96

4. MANUFACTURER’S AUTHORIZATION .............................................................................. 98

5. CERTIFICATE AS TO CORPORATE PRINCIPAL ............................................................. 99

Page 93: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 93

CESU, Odisha Page 93 Release Date: 27th February 2016

1. Technical Proposal Submission Sheet

Date:

ICB No.:

Invitation for Bid No.:

Alternative No.:

To:

_______________________________________________________________________

We, the undersigned, declare that:

(a) We have examined and have no reservations to the Bidding Document, including

Addenda No. (if Any):

(b) We offer to supply in conformity with the Bidding Document and in accordance with

the delivery schedule, the following Goods and Related Services:

(c) Our Bid shall be valid for a minimum period of 90 days from the date fixed for the bid

submission deadline in accordance with the Bidding Document, and it shall remain

binding upon us and may be accepted at any time before the expiration of that period;

(d) If our Bid is accepted, we commit to obtain a Performance Security in the amount of

10 percent of the Contract Price for the due performance of the Contract;

(e) We are not participating, as Bidders, in more than one Bid in this bidding process in

accordance with the Bidding Document;

(f) Our firm, its affiliates or subsidiaries, including any subcontractors or suppliers for any

part of the Contract, has not been declared ineligible by the CESU.

(g) We understand that this Bid, together with your written acceptance thereof included in

your notification of award, shall constitute a binding contract between us, until a

formal Contract is prepared and executed.

Page 94: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 94

CESU, Odisha Page 94 Release Date: 27th February 2016

(h) We understand that you are not bound to accept the best evaluated bid or any other

bid that you may receive.

(i) We undertake to open office in Bhubaneswar after award of contract.

(j) The bidder shall give self declaration that the FMS Cost has been taken as minimum

20% of the total project cost (excluding FMS and bandwidth cost) and if it is less than

20%, its bid may be declared as non-responsive.

(k) We undertake to comply to the Quality Assurance plan conforming to the defined

standards in the SRS and RFP documents.

……………………………………………………………………………….

Name

In the capacity of

Signed

Duly authorized to sign the Bid for and on behalf of

Date

Page 95: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 95

CESU, Odisha Page 95 Release Date: 27th February 2016

2. Price Proposal Submission Sheet

Date:

ICB No.:

Invitation for Bid No.:

Alternative No.:

To:

_______________________________________________________________________

We, the undersigned, declare that:

(a) We have examined and have no reservations to the Bidding Document, including

Addenda No. (if any):

(b) We offer to supply in conformity with the Bidding Document and in accordance with

the delivery schedule, the following Goods and Related Services:

(c) The total price of our Bid is:

(d) The following commissions, gratuities, or fees have been paid or are to be paid with

respect to the bidding process or execution of the Contract:

Name of Recipient Address Reason Amount

(If none has been paid or is to be paid, indicate “none.”)

Name

In the capacity of

Signed

Duly authorized to sign the Bid for and on behalf of

Date

Page 96: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 96

CESU, Odisha Page 96 Release Date: 27th February 2016

3. Bid Security

(To be accompanied with the bank Guarantee)

Date: ________________________

ICB No.: _____________________

Invitation for Bid No.: __________

To: _____________________________________________________________________

Whereas

___________________________________________________________________

________________________________________________________________________

___ (hereinafter called “the Bidder”) has submitted its Bid dated

____________________________ for ICB No. ___________ for the supply of

______________________________________

____________________________________________________________ hereinafter

called “the Bid.”

KNOW ALL PEOPLE by these presents that WE _________________________________ of

___________________________________________________ having our registered

office at _________________________________________________ (hereinafter called

“the Guarantor”), are bound unto

___________________________________________________

_________________________________________________________________

(hereinafter called “the Purchaser”) in the sum of

________________________________________________ for which payment well and

truly to be made to the aforementioned Purchaser, the Guarantor binds itself, its

successors, or assignees by these presents. Sealed with the Common Seal of this

Guarantor this ____________________day of _________________________, _____.

THE CONDITIONS of this obligation are the following:

Page 97: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 97

CESU, Odisha Page 97 Release Date: 27th February 2016

1. If the Bidder withdraws its Bid during the period of bid validity specified by the

Bidder in the Bid Submission Sheet, except as provided in ITB Sub-Clause 19.2; or

2. If the Bidder, having been notified of the acceptance of its Bid by the Purchaser,

during the period of bid validity, fails or refuses to:

(a) Execute the Contract; or

(b) Furnish the Performance Security, in accordance with the ITB Clause 42; or

(c) Accept the correction of its Bid by the Purchaser, pursuant to ITB Clause 30.

We undertake to pay the Purchaser without protest or demur up to the above amount upon

receipt of its first written demand, without the Purchaser having to substantiate its

demand, provided that in its demand the Purchaser states that the amount claimed by it is

due to it, owing to the occurrence of one or more of the above conditions, specifying the

occurred conditions.

This security shall remain in force up to and including sixty (60) days after the period of bid

validity, and any demand in respect thereof should be received by the Guarantor no later

than the above date.

Name

In the capacity of

Signed

Duly authorized to sign the Bid Security for and on behalf of

Date

Page 98: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 98

CESU, Odisha Page 98 Release Date: 27th February 2016

4. Manufacturer’s Authorization

(To be obtained from all OEMs)

Date:

ICB No.:

Invitation for Bid No.:

Alternative No.:

To:

WHEREAS___________________________________________________ who are official

manufacturers of ____________________________________________________ having

factories at _______________________________________________________________

do hereby authorize ____________________________________________________ to

submit a Bid in relation to the Invitation for Bids indicated above, the purpose of which is

to provide the following Goods, manufactured by us ______________________________

and to subsequently negotiate and sign the Contract.

We hereby extend our full guarantee and warranty in accordance with Clause 26 of the

General Conditions of Contract, with respect to the Goods offered by the above firm in

reply to this Invitation for Bids.

Name

In the capacity of:

Signed

Duly authorized to sign the Authorization for and on behalf of

Date

Page 99: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 99

CESU, Odisha Page 99 Release Date: 27th February 2016

5. Certificate as to Corporate Principal

CERTIFICATE AS TO CORPORATE PRINCIPAL

(To be signed by any of Board Directors or Co.Secry)

(To be accompanied along with requisite copy of the board resolution)

I _______________________ certify that I am _________________ of the

Company under the laws of _____________________ and that __________________ who

signed the above tender is authorized to bind the Company / Firm by authority of its

governing body.

Signature : _________________

Full Name : _________________

Address : _________________

Page 100: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 100

CESU, Odisha Page 100 Release Date: 27th February 2016

Section VI. Scope of Work

1) Section G1

a. Clause 2: Intent of Specification

b. Clause 3: Scope of Work

c. Clause 4: Other Services and Items

d. Clause 5: Specific Exclusions

e. Clause 16: Spares

2) Section G2

a. ‘Objective’ mentioned in Clause 1.0: Meter data acquisition system

b. ‘Objective’ mentioned in Clause 2.0: Energy Audit

c. ‘Objective’ mentioned in Clause 3.0: New Connection

d. ‘Objective’ mentioned in Clause 4.0: Disconnection and Dismantling

e. ‘Objective’ mentioned in Clause 5.0: GIS based customer Indexing and asset mapping

f. ‘Objective’ mentioned in Clause 6.0: GIS based integrated network analysis module

g. ‘Objective’ mentioned in Clause 7.0: Customer care services

h. ‘Document Management Solution’ and ‘Data Warehousing and Business Intelligence’ mentioned in Clause 8.0: MIS

i. ‘Objective’ mentioned in Clause 9.0: Web self service

j. ‘Objective’ mentioned in Clause 10.0: Identity and Access Management System

k. ‘Objective’ mentioned in Clause 11.0: System Security Requirement

l. ‘Development of Commercial Database of Consumers’ mentioned in clause 12.0

m. ‘Objective’ mentioned in Clause 13.0: Metering

n. ‘Objective’ mentioned in Clause 14.0: Billing

o. ‘Objective’ mentioned in Clause 15.0: Collection

p. ‘Objective’ mentioned in Clause 16.0: Asset Management

q. ‘Objective’ mentioned in Clause 17.0: Maintenance Management

3) Section G3

a. Clause 1: Introduction

b. Clause 2: LAN

c. Clause 3: VPN/MPLS Wide Area Network

d. Clause 4: Implementation Plan

e. Clause 22: Disaster Recovery Centre

Page 101: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 101

CESU, Odisha Page 101 Release Date: 27th February 2016

4) Section G4

a. Clause 2: Objectives

b. Clause 3: Scope of Work

c. Clause 4: Field survey and mapping

d. Clause 5: Indexing

e. Clause 6: Deliverables

f. Clause 7: Implementation Methodology

g. Clause 8: Satellite Imagery Specifications

5) Section G5

a. Clause 5: Scope of Work

6) Any other scope mentioned in the RFP Document

7) Scope of work mentioned for Non-R-APDRP Area in Bid Feature Section

The ITIA shall be responsible for integration of the IT system created under the R-APDRP scheme at all the selected Project Areas, Central Customer Care Centre, Disaster Recovery Centre and Data Centre, by using inter-operability profile/APIs, etc., for data exchange & seamless integration.

Since CESU is floating the RFP for IT Implementation Project across all selected Project Areas in CESU, the ITIA shall be interacting with utility for seamless operational integration of the whole project.

The bidders shall refer to the following appendices for details

Appendix-F: Geographic and administrative information

Appendix-G: List of offices for WAN connectivity

Appendix-H: Review of current IT Systems

Appendix-I: List of manuals/business processes to be converted to electronic form

Appendix-J: Review of current business processes

Appendix-K: Website

Appendix-L: List of goods and related services

Appendix-M: Estimated Man Power Requirement

Appendix-N: Expected Implementation Schedule

Appendix-O: Spot Billing Machine Specification

Appendix-P: Map of CESU of Odisha

Appendix-Q: Format of Price Bids

Appendix-R: Proposed Interface Scheme

Appendix-S: CESU Offices Locations for Network Connectivity

Appendix-T: Additional Clarifications

Page 102: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 102

CESU, Odisha Page 102 Release Date: 27th February 2016

Appendix-U: No Deviation Certificate

Appendix-V: Abbreviations

Section VII. General Conditions of Contract

Table of Clauses

1. CONTRACT DOCUMENTS ....................................................................................................... 107

2. CORRUPT PRACTICES ............................................................................................................ 107

3. INTERPRETATION ................................................................................................................... 108

4. LANGUAGE .............................................................................................................................. 110

5. CONSORTIUM .......................................................................................................................... 111

6. NOTICES .................................................................................................................................. 112

7. GOVERNING LAW .................................................................................................................... 112

8. SETTLEMENT OF DISPUTES ................................................................................................... 112

9. SCOPE OF WORK .................................................................................................................... 113

10. DELIVERY ............................................................................................................................. 113

11. SUPPLIER’S RESPONSIBILITIES .......................................................................................... 113

12. PURCHASER’S RESPONSIBILITIES ..................................................................................... 114

13. CONTRACT PRICE ............................................................................................................... 114

14. TERMS OF PAYMENT .......................................................................................................... 115

15. TAXES AND DUTIES ............................................................................................................ 115

16. PERFORMANCE SECURITY ................................................................................................ 116

17. INTELLECTUAL PROPERTY ................................................................................................ 117

18. CONFIDENTIAL INFORMATION ........................................................................................... 118

19. SUBCONTRACTING............................................................................................................... 120

20. SPECIFICATIONS AND STANDARDS .................................................................................. 122

21. PACKING AND DOCUMENTS .............................................................................................. 122

22. INSURANCE ......................................................................................................................... 123

23. TRANSPORTATION ............................................................................................................... 123

24. INSPECTIONS AND TESTS .................................................................................................. 123

25. LIQUIDATED DAMAGES AND PENALTY ............................................................................ 125

26. WARRANTY .......................................................................................................................... 125

27. LIABILITY/ INDEMNITY ........................................................................................................ 126

28. LIMITATION OF LIABILITY ................................................................................................... 129

29. CHANGE IN LAWS AND REGULATIONS ............................................................................. 129

30. FORCE MAJEURE ................................................................................................................ 129

31. CHANGE ORDERS AND CONTRACT AMENDMENTS ........................................................ 131

Page 103: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 103

CESU, Odisha Page 103 Release Date: 27th February 2016

32. EXTENSIONS OF TIME ......................................................................................................... 131

33. TERMINATION ...................................................................................................................... 132

34. ASSIGNMENT ....................................................................................................................... 135

35. DISCLAIMER ........................................................................................................................ 135

36. PUBLIC DISCLOSURE ......................................................................................................... 135

37. SLA AUDIT ............................................................................................................................ 135

38. ADHERENCE TO SAFETY PROCEDURES, RULES REGULATIONS AND RESTRICTION . 136

39. NON-SOLICITATION OF STAFF ........................................................................................... 137

40. SURVIVAL............................................................................................................................. 137

Page 104: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 104

CESU, Odisha Page 104 Release Date: 27th February 2016

General Conditions of Supply

(1) Definitions The following words and expressions shall have the meanings

hereby assigned to them:

(a) “Contract” means the Agreement entered into

between the Purchaser and the Supplier, together with

the Contract Documents referred to therein, including all

attachments, appendices, and all documents

incorporated by reference therein.

(b) “Contract Documents” shall mean the following

documents listed, including any amendments thereto be

read and construed as part of this Agreement, viz.:

i. the Detailed award of contract;

ii. the Service level agreement;

iii. the Special Conditions of Contract;

iv. the General Conditions of Contract;

v. the Scope of Work;

vi. the System Requirement Specification Document (SRS)

vii. the Instructions to bidders;

viii. the Purchaser’s Notification to the Supplier for Award of

Contract;

ix. Supplier’s response (proposal) to the RFP, including the

Bid Submission Sheet and the Price Proposal submitted

by the Supplier;

x. Appendix A to B & E to S;

xi. Acceptance of purchaser’s notification

xii. RFQ document (Identification No: R-

APDRP/ITIA/2008/11) along with all corrigendum,

clarifications and related documents issued by the

Nodal Agency

Page 105: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 105

CESU, Odisha Page 105 Release Date: 27th February 2016

(b) “Contract Price” means the price payable to the

Supplier as specified in the Agreement, subject to such

additions and adjustments thereto or deductions there

from, as may be made pursuant to the Contract.

(c) “Day” means calendar day.

(d) “Delivery” means the transfer of the Goods and

services from the Supplier to the Purchaser in

accordance with the terms and conditions set forth in

the Contract.

(e) “Completion” shall mean the completion of the

Related Services by the Supplier in accordance with the

terms and conditions set forth in the Contract.

(f) “GCC” means the General Conditions of Contract.

(g) “Goods” means all hardware, software, networking

equipment and/or other equipment accessories and

materials that the Supplier is required to supply to the

Purchaser under the Contract.

(h) “Intellectual Property Rights” means any patent,

copyright, trademark, trade name, service marks,

brands, propriety information, whether arising before or

after the execution of this Contract and the right to

ownership and registration of these rights.

(i) “Purchaser’s Country” shall mean India.

(j) “Purchaser” means the entities purchasing the

Goods and Related Services.

(k) “Related Services” means the services to be

provided as per the requirements / conditions specified

Page 106: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 106

CESU, Odisha Page 106 Release Date: 27th February 2016

in the Contract. In addition to this, the definition would

also include other related/ancillary services that may be

required to execute this Contract.

(l) “SCC” means the Special Conditions of Contract.

(m) “Service Level Agreement” (SLA) shall mean the

Service Level Agreement entered into between the

Purchaser and the Supplier.

(n) “Subcontractor” means any natural person, private

or government entity, or a combination of the above,

including its legal successors or permitted assigns, to

whom any part of the Goods to be supplied or execution

of any part of the Related Services is subcontracted by

the Supplier, as per the provisions of Clauses 19 of the

GCC.

(o) “Supplier” means the empanelled System Integrator

(SI) whose bid to perform the Contract has been

accepted by the Purchaser and is named as such in the

Agreement, and includes the legal successors or

permitted assigns of the Supplier.

(p) “The MoP” is the Ministry of Power, Government of

India.

(q) “The Site,” shall mean all identified locations within

the CESU of Odisha, where the Supplier carries out any

installation of Goods or is required to provide any

Related Services.

(r) “OEM” means the Original Equipment Manufacturer

of any equipment / system / software / product that are

providing such goods to the Purchaser under the scope

of this Tender / Contract.

Page 107: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 107

CESU, Odisha Page 107 Release Date: 27th February 2016

(s) “Kick Off Meeting” means a meeting convened by

the Purchaser to discuss and finalize the work execution

plan and procedures with the Supplier.

(t) the term “in writing” means communicated in written

form with proof of receipt

1. Contract

Documents

1.1 Subject to the order of precedence set forth in the Agreement, all

documents forming the Contract (and all parts thereof) are intended

to be correlative, complementary, and mutually explanatory.

2. Corrupt

Practices

2.1 The Purchaser requires bidders, suppliers, and contractors to

observe the highest standard of ethics during the execution of

such contracts.

o The following definitions apply:

o “corrupt practice” means the offering, giving receiving, or

soliciting, directly or indirectly, of anything of value to

influence the action of any party in the procurement process

or the execution of a contract;

o “fraudulent practice” means a misrepresentation or omission

of facts in order to influence a procurement process or the

execution of a contract;

o “collusive practices” means a scheme or arrangement

between two or more bidders, with or without the knowledge

of the CESU, designed to influence the action of any party in

a procurement process or the execution of a contract;

o “coercive practices” means harming or threatening to harm,

directly or indirectly, persons, or their property to influence

their participation in a procurement process, or affect the

execution of a contract;

(a) The Purchaser will reject a proposal for award if it

determines that the bidder recommended for award has,

directly or through an agent, engaged in corrupt,

fraudulent, collusive, or coercive practices in competing

Page 108: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 108

CESU, Odisha Page 108 Release Date: 27th February 2016

for the Contract.

(b) After the award of the contract if it is comes to the

knowledge of the Utility that the Supplier has engaged

in corrupt, fraudulent, collusive, or coercive practices at

any stage, the Purchaser shall forthwith terminate the

contract as per the provisions of GCC Clause 33.

3. Interpretation 3.1 In this Contract unless a contrary intention is evident:

A. In case of any conflict with any provision relating to the SRS

document and the RFP document, the provisions of the RFP

document shall prevail for all intents and purposes

B. the clause headings are for convenient reference only and do not

form part of this Contract;

C. unless otherwise specified a reference to a clause number is a

reference to all of its sub-clauses;

D. unless otherwise specified a reference to a clause, sub-clause or

section is a reference to a clause, sub-clause or section of this

Contract including any amendments or modifications to the same

from time to time;

E. a word in the singular includes the plural and a word in the plural

includes the singular;

F. a word importing a gender includes any other gender;

G. a reference to a person includes a partnership and a body

corporate;

H. a reference to legislation includes legislation repealing, replacing

or amending that legislation;

I. where a word or phrase is given a particular meaning it includes

the appropriate grammatical forms of that word or phrase which

have corresponding meanings

J. In the event of an inconsistency between the terms of this

Contract and the Bid document and the proposal, the terms of

this contract hereof shall prevail.

Page 109: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 109

CESU, Odisha Page 109 Release Date: 27th February 2016

K. Whenever a material or article is specified or described by the

name of a particular brand, manufacturer or trade mark, the

specific item shall be understood as establishing type, function

and quality desired. Products of other manufacturers may also

be considered, provided sufficient information is furnished so as

to enable the Purchaser to determine that the products are

equivalent to those named

3.2 Incoterms

The meaning of any trade term and the rights and obligations of

parties thereunder shall be as prescribed by Incoterms.

1. EXW, CIF, CIP, and other similar terms, shall be governed by

the rules prescribed in the current edition of Incoterms,

published by the International Chamber of Commerce at the

date of the Invitation for Bids or as specified in the SCC.

3.3 Entire Agreement

The Contract constitutes the entire agreement between the

Purchaser and the Supplier and supersedes all

communications, negotiations and agreements (whether

written or oral) of parties with respect thereto made prior to the

date of Contract.

3.4 Amendment

No amendment or other variation of the Contract shall be valid

unless it is in writing, is dated, expressly refers to the Contract,

and is signed by a duly authorized representative of each

party thereto.

3.5 Waiver

(a) Subject to GCC Sub-Clause 3.5.2 below, no relaxation,

forbearance, delay, or indulgence by either party in enforcing

any of the terms and conditions of the Contract or the

Page 110: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 110

CESU, Odisha Page 110 Release Date: 27th February 2016

granting of time by either party to the other shall prejudice,

affect, or restrict the rights of that party under the Contract.

Neither shall any waiver by either party of any breach of

Contract operate as waiver of any subsequent or continuing

breach of Contract.

(b) The waiver by either party of a breach or default of any of

the provisions of this contract by the other party shall not be

interpreted as :

A) A waiver of any succeeding breach of the same or other

provision, nor shall any delay or omission on the part of

the other party to exercise; or

B) A way to avail itself of any right, power, or privilege that it

has or may have under this contract to operate as waiver

of any breach or default by the other party.

(c) Any waiver of a party’s rights, powers, or remedies under the

Contract must be in writing, dated, and signed by an

authorized representative of the party granting such waiver,

and must specify the right and the extent to which it is being

waived.

3.6 Severability

If any provision or condition of the Contract is prohibited or

rendered invalid or unenforceable, such prohibition, invalidity

or unenforceability shall not affect the validity or enforceability

of any other provisions and conditions of the Contract or the

contract as a whole and the remaining provisions of the

contract shall remain in full force and effect.

4. Language 4.1 The official language of the Contract is English. Contract as

well as all correspondence and documents relating to the

Page 111: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 111

CESU, Odisha Page 111 Release Date: 27th February 2016

Contract exchanged by the Supplier and the Purchaser, shall

be written in English. Supporting documents and printed

literature that are part of the Contract may be in another

language provided they are accompanied by an accurate

translation of the relevant passages in English, in which case,

for purposes of interpretation of the Contract, the English

translation shall govern.

4.2 The Supplier shall bear all costs of translation to English and all

risks of the accuracy of such translation. The Supplier shall be

bound to the English translation and what has been stated

therein.

5. Consortium 5.1 If the Supplier is a consortium, the members of such

consortium shall be jointly and severally liable to the

Purchaser for the fulfillment of the provisions of the Contract.

Only the Lead Member (as mentioned at the Empanelment

stage) shall have the authority to conduct all businesses for

and on behalf of the Consortium during the bidding process

and, in the event the Consortium is awarded the Contract,

during contract execution, the composition of the consortium

cannot be altered.

(a) Without prejudice to Clause 5.1 of this GCC, for the

purposes of fulfillment of it’s obligations as laid down

under the Contract where the Purchaser deems fit and

unless the context requires otherwise, Supplier shall

refer to the Lead Member who shall be the sole point of

interface between the Purchaser and the Consortium

and would be absolutely accountable for the

performance of its own, the other members of

Consortium and/or its Team’s functions as also the

subcontractors.

Page 112: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 112

CESU, Odisha Page 112 Release Date: 27th February 2016

(b) All payments shall be made by the Purchaser in

favour of the Lead Member.

6. Notices 6.1 All notices and other communications under this contract must

be in writing, and must either be mailed by registered mail with

acknowledgement Due. Or hand delivered with proof of it

having been received.

6.2 If mailed, all notices will be considered as delivered after 5

days, of the notice having been mailed. If hand delivered, all

notices will be considered, when received by the party to

whom the notice is meant and sent for.

6.3 All notices under this contract shall be sent to or delivered at

the address as specified by the parties in the SCC.

6.4 A Notice shall be effective when delivered or on the Notice’s

effective date, whichever is later.

7. Governing Law 7.1 The Contract shall be governed by and interpreted in

accordance with the laws of the India. The High Court of

Judicature at Odisha High Court, Cuttack and Courts

subordinate to such High Courts shall have exclusive

jurisdiction in respect of any disputes relating to the tendering

process, award of Contract and execution of the Contract.

7.2 In all cases, this contract shall be governed by and interpreted

in accordance with the Law of the Union Of India. In this

context, the expression ‘Law’ takes within it’s fold Statutory

law, Judicial Decisional Law and Delegated Legislation as well

8. Settlement of

Disputes

8.1 The Purchaser and the Supplier shall make every effort to

resolve amicably by direct informal negotiation any

disagreement or dispute arising between them under or in

connection with the Contract.

Page 113: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 113

CESU, Odisha Page 113 Release Date: 27th February 2016

8.2 If the parties fail to resolve such a dispute (The date of

commencement of the dispute shall be taken from the date

when this clause reference is quoted by either party in a

formal communication clearly mentioning existence of dispute

or as mutually agreed) or difference by mutual consultation

within twenty-eight (28) days from the commencement of such

consultation, either party may require that the dispute be

referred for resolution to the formal mechanisms specified in

the SCC.

9. Scope of Work 9.1 The Goods and Related Services to be supplied are specified

in Appendix-L. At the time of awarding the contract, the

Purchaser shall specify any change in the Scope of Work.

Such changes may be due for instance, if the quantities of

goods and related services are increased or decreased at the

time of award.

9.2 Unless otherwise stipulated in the Contract, the Scope of Work

shall include all such items not specifically mentioned in the

Contract but that can be reasonably inferred from the Contract

as being required for attaining Delivery and Completion of the

Goods and Related Services as if such items were expressly

mentioned in the Contract.

10. Delivery 10.1 Subject to GCC Sub-Clause 32.1, the Delivery of the Goods

and Completion of the Related Services shall be in

accordance with the Implementation Schedule specified in the

Appendix-N. The details of shipping and other documents to

be furnished by the Supplier are specified in the SCC.

11. Supplier’s

Responsibilities

11.1 The Supplier shall supply all the Goods and Related Services

included in the Scope of Work and Appendix-L in accordance

with GCC Clause 9, and the Implementation Schedule, as per

GCC Clause 10.

Page 114: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 114

CESU, Odisha Page 114 Release Date: 27th February 2016

12. Purchaser’s

Responsibilities

12.1 Whenever the supply of Goods and Related Services requires

that the Supplier obtain permits, approvals, and import and

other licenses from local public authorities, the Purchaser

shall, if so required by the Supplier, make its best effort to

assist the Supplier in complying with such requirements in a

timely and expeditious manner.

12.2 The Purchaser shall bear all costs involved in the performance

of its responsibilities, in accordance with GCC Sub-Clause

13.1.

12.3 The IT Head / Chief Information Officer (CIO) of CESU or any

other person designated by the utility shall act as the nodal

point for implementation of the contract and for issuing

necessary instructions, approvals, commissioning, acceptance

certificates, payments etc. to the Supplier.

12.4 The IT Head / CIO of CESU or any other person designated by

the utility shall approve all such documents within 15 working

days.

12.5 Purchaser may provide on Supplier’s request, particulars/

information / or documentation that may be required by the

Supplier for proper planning and execution of Scope of Work

under this contract.

12.6 Purchaser shall provide to the Supplier sitting space and

infrastructure and utilities, in the Purchaser’s offices at such

location as may be mutually decided by the Parties.

13. Contract Price 13.1 The Contract Price shall be as specified in the Agreement

subject to any additions and adjustments thereto, or

deductions there from, as may be made pursuant to the

Contract as also subject to provisions of Clause 13.2.

Page 115: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 115

CESU, Odisha Page 115 Release Date: 27th February 2016

13.2 Prices charged by the Supplier for the Goods delivered and the

Related Services performed under the Contract shall not vary

from the prices quoted by the Supplier in its bid, with the

exception of any price adjustments authorized in the SCC.

14. Terms of

Payment

14.1 The Contract Price shall be paid in the manner specified in the

SCC. No invoice for extra work/change order on account of

change order will be submitted by the Supplier unless the said

extra work /change order has been authorized/approved by

the Purchaser in writing.

14.2 The Supplier’s request for payment shall be made to the

Purchaser in writing, accompanied by invoices describing, as

appropriate, the Goods delivered and Related Services

performed, accompanied by the documents submitted

pursuant to GCC Clause 10.

14.3 Payments shall be made promptly by the Purchaser, no later

than forty five (45) days after submission of an invoice or

request for payment by the Supplier, and the Purchaser has

accepted it.

14.4 If any excess payment has been made by the Purchaser due to

difference in quoted price in proposal and Supplier’s invoice,

the purchaser may without prejudice to its rights recover such

amounts by other means after notifying the Supplier or deduct

such excess payment from any payment subsequently falling

due to the Supplier.

14.5 The currency in which payment shall be made to the supplier

under this contract is Indian Rupees (INR).

15. Taxes and

Duties

15.1 The prices quoted by the supplier shall be inclusive of all

duties/taxes/levies. Responsibility for including all applicable

taxes/duties/levies in the proposal lie with the bidder and the

utility shall not be responsible for any error/omission on the

Page 116: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 116

CESU, Odisha Page 116 Release Date: 27th February 2016

part of the bidder. Payment of taxes/duties/levies shall not be

made separately.

15.2 For goods supplied from outside the Purchaser’s country, the

Supplier shall be entirely responsible for all taxes, duties,

stamp duties, license fees, and other such levies imposed

outside the Purchaser’s country.

15.3 For goods supplied from within the Purchaser’s country, the

Supplier shall be entirely responsible for all taxes, duties, entry

tax, license fees, other levies etc, incurred until delivery of the

Goods and Related service to the Purchaser. The Purchaser

will provide Central sales tax Form C, whenever applicable.

15.4 The cost of Entry Tax as applicable will be the liability of the

Supplier i.e. the price quoted will be inclusive of Entry Tax.

The amount of Entry Tax will be deducted from the Supplier’s

invoice and remittance to tax dept. will be made by the

Purchaser under the TIN number of Purchaser. If any liability

is raised by the commercial tax department, Govt. of Odisha

on account of Entry Tax at a later date, the same shall be to

the Supplier's account and accordingly recovery shall be made

from the supplier's pending bills/security deposit as available

with the Purchaser.

16. Performance

Security

16.1 The Supplier shall, within fourteen (14) days of the notification

of Contract award, provide a Performance Security for the due

performance of the Contract in the amounts and currencies

specified in the SCC.

16.2 The Purchaser shall at its sole discretion invoke the Performance

Security and appropriate the amount secured thereunder, in the

event that the Supplier commits any delay or default in Delivery

of the Goods or Related Services or commits any other breach of

the terms and conditions of the Contract.

Page 117: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 117

CESU, Odisha Page 117 Release Date: 27th February 2016

16.3 The Performance Security shall be denominated in the

currencies of the Contract, and shall be in one of the forms

stipulated by the Purchaser in the SCC.

16.4 The Performance Security shall be discharged by the

Purchaser and returned to the Supplier not later than fourteen

(14) days following the date of completion of the Supplier’s

performance obligations including FMS under the Contract,

including any warranty obligations, unless specified otherwise

in the SCC.

17. Intellectual

Property

17.1 Purchaser shall own and have a right in perpetuity to use all

newly created Intellectual Property Rights which have been

developed solely during execution of this Contract, including

but not limited to all Source code, Object code, records,

reports, designs, application configurations, data and written

material, products, specifications, reports, drawings and other

documents which have been newly created and developed by

the Supplier solely during the performance of Related

Services and for the purposes of inter-alia use or sub-license

of such Services under this Contract. The Supplier undertakes

to disclose all such Intellectual Property Rights arising in

performance of the Related Services to the Purchaser and

execute all such agreements/documents and file all relevant

applications, effect transfers and obtain all permits and

approvals that may be necessary in this regard to effectively

transfer and conserve the Intellectual Property Rights of the

Purchaser. To the extent that Intellectual Property Rights are

unable by law to so vest, the Supplier assigns those

Intellectual Property Rights to Purchaser on creation.

17.2 The Supplier shall be obliged to ensure that all approvals,

registrations, licenses, permits and rights etc. which are inter-

alia necessary for use of the goods supplied / installed by the

Supplier, the same shall be acquired in the name of the

Page 118: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 118

CESU, Odisha Page 118 Release Date: 27th February 2016

Purchaser, and the same may be assigned by the Purchaser

to the Supplier solely for the purpose of execution of any of its

obligations under the terms of this Contract. However,

subsequent to the term of this Contract, such approvals,

registrations, licenses, permits and rights etc. shall endure to

the exclusive benefit of the Purchaser.

17.3 The Supplier shall ensure that while it uses any software,

hardware, processes, document or material in the course of

performing the Services, it does not infringe the Intellectual

Property Rights of any person and the Supplier shall keep the

Purchaser indemnified against all costs, expenses and

liabilities howsoever, arising out any illegal or unauthorized

use (piracy) or in connection with any claim or proceedings

relating to any breach or violation of any permission/license

terms or infringement of any Intellectual Property Rights by the

Supplier or its personnel during the course of performance of

the Related Services. In case of any infringement by the

Supplier, the Supplier shall have sole control of the defense

and all related settlement negotiations

17.4 Subject to sub-clauses 17.1 to 17.3, the Supplier shall retain

exclusive ownership of all methods, concepts, algorithms,

trade secrets, software documentation, other intellectual

property or other information belonging to the Supplier that

existed before the effective date of the contract. .

18. Confidential

Information

18.1 Both parties undertake to each other to keep confidential all

information (written as well as oral) concerning the business

and affairs of the other, which has been obtained or received

as a result of the discussions leading upto or the entering of

the contract

18.2 After the entering of the contract the Purchaser and the

Supplier shall keep confidential and shall not, without the

Page 119: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 119

CESU, Odisha Page 119 Release Date: 27th February 2016

written consent of the other party hereto, divulge to any third

party any documents, data, or other information furnished

directly or indirectly by the other party hereto in connection

with the Contract, whether such information has been

furnished prior to, during or following completion or termination

of the Contract. Notwithstanding the above, the Supplier may

furnish to its Subcontractor such documents, data, and other

information it receives from the Purchaser to the extent

required for the Subcontractor to perform its work under the

Contract, in which event the Supplier shall obtain from such

Subcontractor an undertaking of confidentiality similar to that

imposed on the Supplier under this Clause.

18.3 The Purchaser shall not use such documents, data, and other

information received from the Supplier for any purposes

unrelated to the Contract. Similarly, the Supplier shall not use

such documents, data, and other information received from

the Purchaser for any purpose other than the design,

procurement, or other work and services required for the

performance of the Contract.

18.4 The obligation of a party under GCC Sub-Clauses 18.1 and

18.2 above, however, shall not apply to information that:

(a) the Purchaser or Supplier need to share with the institutions

participating in the financing of the Contract;

(b) now or hereafter enters the public domain through no fault of

that party;

(c) can be proven to have been possessed by that party at the

time of disclosure and which was not previously obtained,

directly or indirectly, from the other party; or

(d) Otherwise lawfully becomes available to that party from a

third party that has no obligation of confidentiality.

18.5 The above provisions of GCC Clause 18 shall not in any way

modify any undertaking of confidentiality given by either of the

parties hereto prior to the date of the Contract in respect of the

Page 120: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 120

CESU, Odisha Page 120 Release Date: 27th February 2016

Supply or any part thereof.

18.6 Each of the parties to this contract, undertakes to the other to

take all such steps as shall from time to time be necessary to

ensure compliance with the provisions of the above clauses by

it’s employees, agents and sub-contractors.

18.7 The provisions of GCC Clause 18 shall survive completion or

termination, for whatever reason, of the Contract.

19. Subcontracting 19.1 Except as provided hereunder under Clause 19.2 of the GCC,

the Supplier shall not be permitted to sub-contract any part of

its obligations under the Contract.

19.2 Supplier shall sub-contract the Network solution provider (NSP)

role and GIS solution provider (GSP) role only from the

empanelled members (as per the list issued/updated by the

Nodal Agency). Supplier shall have flexibility to subcontract

Meter Data Acquisition Solution Provider (MDASP) role, as

per his requirement. In case Supplier decides to subcontract

MDASP role, the MDASP subcontractor shall only be selected

from the empanelled list of MDASP (as per the list

issued/updated by the Nodal Agency).

19.3 The Supplier shall select the sub-contractors from the

empanelled list only. The names and roles of the same shall

be clearly mentioned in the proposal/bid.

19.4 The Supplier shall ensure that the sub-contractor appointed has

sufficient capacity to undertake the execution of the tasks they

will perform under this Contract.

19.5 The Supplier indemnifies and shall keep indemnified Purchaser

against any losses, damages, claims or such other

implications arising from or out of the acts and omissions of

such subcontractor. The Supplier shall be responsible for

making all payments to the subcontractor as may be

necessary, in respect of any Services performed or task

Page 121: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 121

CESU, Odisha Page 121 Release Date: 27th February 2016

executed, and the Purchaser shall not be responsible for any

part or full payment which is to due to such subcontractor.

19.6 All rights of use of any process, product, service or facility

developed or any other task performed by the subcontractor

for the Supplier, under this contract would lie exclusively with

the Purchaser in perpetuity free from all liens, encumbrances

and other third party rights and the Supplier shall, wherever

required, take all steps that may be necessary to ensure the

transfer of such ownership in favor of the Purchaser.

19.7 Nothing in this clause 19 of the GCC shall relieve the Supplier

from its any of its liabilities or obligations under this Contract.

The Purchaser reserves the right to hold Supplier liable for

any act/omission of any subcontractor.

19.8 Where the Purchaser deems necessary, it shall have the right

to require replacement of any subcontractor with another

subcontractor and the Supplier shall in such case terminate

forthwith all agreements/contracts other arrangements with

such subcontractor and find suitable replacement for such

subcontractor to the satisfaction of the Purchaser at no

additional charge, from the empanelled list (as per the list

issued/updated by the Nodal Agency). Failure to terminate all

agreements/contracts with such sub-contractors, shall amount

to a breach of the terms hereof.

19.9 The Supplier shall be responsible for ensuring that the

Subcontractor shall comply with all relevant and applicable

provisions of the Contract. In default on the part of the sub-

contractor to comply with the terms and conditions of the

Contract wherever applicable, shall amount to breach on the

part of the Supplier, and the Purchaser in addition to all other

rights, have the right to claim damages add recover from the

Supplier all losses/ or other damages that may have resulted

Page 122: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 122

CESU, Odisha Page 122 Release Date: 27th February 2016

from such failure

20. Specifications

and Standards

20.1 Technical Specifications and Drawings

(a) The Supplier shall ensure that the Goods and Related

Services comply with the technical specifications and other

provisions of the Contract.

(b) The Supplier shall be entitled to disclaim responsibility for

any design, data, drawing, specification or other document, or

any modification thereof provided or designed by or on behalf

of the Purchaser, by giving a notice of such disclaimer to the

Purchaser.

(c) The Goods and Related Services supplied under this

Contract shall conform to the standards mentioned in Section

VI, Scope of Work and, when no applicable standard is

mentioned, the standard shall be equivalent or superior to the

official standards whose application is appropriate to the

country of origin of the Goods.

20.2 Wherever references are made in the Contract to codes and

standards in accordance with which it shall be executed, the

edition or the revised version of such codes and standards

shall be those specified in the Section VI, Scope of Work.

During Contract execution, any changes in any such codes

and standards shall be applied only after approval by the

Purchaser and shall be treated in accordance with GCC

Clause 31.

21. Packing and

Documents

21.1 The Supplier shall provide such packing of the Goods as is

required to prevent their damage or deterioration during transit

to their final destination, as indicated in the Contract. During

Page 123: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 123

CESU, Odisha Page 123 Release Date: 27th February 2016

transit, the packing shall be sufficient to withstand, without

limitation, rough handling and exposure to extreme

temperatures, salt and precipitation, and open storage.

Packing case size and weights shall take into consideration,

where appropriate, the remoteness of the final destination of

the Goods and the absence of heavy handling facilities at all

points in transit. The Purchaser shall not be responsible in any

manner for any loss or damage caused to the Goods during

Transit.

21.2 The packing, marking, and documentation within and outside

the packages shall comply strictly with such special

requirements as shall be expressly provided for in the

Contract and in any other instructions ordered by the

Purchaser.

22. Insurance 22.1 The Goods supplied under the Contract shall be fully insured by

the Supplier, in INR, against loss or damage incidental to

manufacture or acquisition, transportation, storage, and

delivery, in accordance with the applicable Incoterms or in the

manner specified in the SCC.

23. Transportation 23.1 Obligations for transportation of the Goods shall be borne by

the Supplier and shall be in accordance with the Incoterms

specified in Sections VI, Schedule of Supply.

24. Inspections and

Tests

24.1 The Supplier shall at its own expense and at no cost to the

Purchaser carry out all such tests and/or inspections of to

ensure that the Goods and Related Services are complying

with the functional parameters, codes and standards specified

in the Scope of Work at Section VI, to the satisfaction of the

Purchaser.

24.2 The inspections and tests may be conducted on the premises

of the Supplier, at point of delivery, and/or at the final

destination of the Goods, or in another place in the

Page 124: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 124

CESU, Odisha Page 124 Release Date: 27th February 2016

Purchaser’s country as per the requirement of Section VI.

Subject to GCC Sub-Clause 24.3, if conducted on the

premises of the Supplier or its Subcontractor, all reasonable

facilities and assistance, including access to drawings and

production data, shall be furnished to the inspectors at no

charge to the Purchaser.

24.3 The Purchaser or its designated representative shall be entitled

to attend the tests and/or inspections referred to in GCC Sub-

Clause 24.2, provided that the Purchaser bear all of its own

costs and expenses incurred in connection with such

attendance including, but not limited to, all traveling and board

and lodging expenses.

24.4 Whenever the Supplier is ready to carry out any such test and

inspection, it shall give a reasonable advance notice, including

the place and time, to the Purchaser.

24.5 The Purchaser may require the Supplier to carry out any test

and/or inspection to verify that the characteristics and

performance of the Goods or Related Services comply with

the technical specifications, codes and standards under the

Contract.

24.6 The Supplier shall provide the Purchaser with a report of the

results of any such test and/or inspection.

24.7 The Purchaser may reject any Goods / Related Services or any

part thereof that fail to pass any test and/or inspection or do

not conform to the specifications. The Supplier shall either

rectify or replace such rejected Goods/ Related Services or

parts thereof or make alterations necessary to meet the

specifications at no cost to the Purchaser, and shall repeat the

test and/or inspection, at no cost to the Purchaser, upon giving

a notice pursuant to GCC Sub-Clause 24.4.

24.8 The Supplier agrees that neither the execution of a test and/or

inspection of the Goods / Related Services or any part thereof,

nor the attendance by the Purchaser or its representative, nor

Page 125: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 125

CESU, Odisha Page 125 Release Date: 27th February 2016

the issue of any report pursuant to GCC Sub-Clause 24.6,

shall release the Supplier from any warranties or other

obligations under the Contract.

25. Liquidated

Damages and

Penalty

25.1 Except as provided under GCC Clause 30, if the Supplier fails

to deliver any or all of the Goods or perform the Related

Services within the period specified in the Contract, the

Purchaser may without prejudice to all its other remedies

under the Contract, deduct from the Contract Price, as

liquidated damages, a sum equivalent to 0.5% of the value of

the Goods or Related Services, supplied beyond stipulated

delivery schedule for each week or part thereof of delay until

actual delivery or performance, subject to a maximum of 10%

of value of such goods and services.

25.2 In addition, the Supplier is liable to the Purchaser for payment

penalty as specified in the SLA.

25.3 If the Goods and Related Services supplied do not meet the

minimum specifications as per the Contract, and the same is

not replaced/modified by the Supplier to meet the

requirements within 14 days of being informed by the Utility,

the Utility shall be free to impose any penalty as deemed fit. In

addition, the Utility shall reserve the right to terminate the

contract and recover liquidated damages by forfeiting the

performance guarantee submitted by the Purchaser.

26. Warranty 26.1 The Supplier warrants that all the Goods are new, unused, and

of the most recent or current models, and that they incorporate

all recent improvements in design and materials, unless

provided otherwise in the Contract.

26.2 Subject to GCC Sub-Clause 20.1, the Supplier further warrants

that the Goods shall be free from defects arising from any act

or omission of the Supplier or arising from design, materials,

and workmanship, under normal use in the conditions

Page 126: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 126

CESU, Odisha Page 126 Release Date: 27th February 2016

prevailing in the country of final destination.

26.3 The warranty shall remain valid for the period Specified in the

SCC.

26.4 The Purchaser shall give Notice to the Supplier stating the

nature of any such defects together with all available evidence

thereof, promptly following the discovery thereof. The

Purchaser shall afford all reasonable opportunity for the

Supplier to inspect such defects.

26.5 Upon receipt of such Notice, the Supplier shall, within the

period specified in the SCC, expeditiously repair or replace the

defective Goods or parts thereof, at no cost to the Purchaser.

26.6 If having been notified, the Supplier fails to remedy the defect

within the period of warranty specified in the SCC; the

Purchaser may proceed to take within a reasonable period

such remedial action as may be necessary, at the Supplier’s

risk and expense and without prejudice to any other rights

which the Purchaser may have against the Supplier under the

Contract.

27. Liability/

Indemnity

27.1 The Supplier hereby agrees to indemnify the Purchaser, for all

conditions and situations mentioned in this clause, in a form

and manner acceptable to the Purchaser. The supplier agrees

to indemnify the Purchaser and its officers, servants, agents

(“Purchaser Indemnified Persons”) from and against any

costs, loss, damages, expense, claims including those from

third parties or liabilities of any kind howsoever suffered,

arising or incurred inter alia during and after the Contract

period out of:

(a) any negligence or wrongful act or omission by the

Page 127: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 127

CESU, Odisha Page 127 Release Date: 27th February 2016

Supplier or its agents or employees or any third party

associated with Supplier in connection with or incidental

to this Contract; or

(b) any infringement of patent, trademark/copyright or

industrial design rights arising from the use of the

supplied Goods and Related Services or any part thereof.

27.2 The Supplier shall also indemnify the Purchaser against any

privilege, claim or assertion made by third party with respect

to right or interest in, ownership, mortgage or disposal of any

asset, property, movable or immovable as mentioned in any

Intellectual Property Rights, licenses and permits

27.3 Without limiting the generality of the provisions of this

clause 27.1 and 27.2, the Supplier shall fully indemnify, hold

harmless and defend the Purchaser Indemnified Persons from

and against any and all suits, proceedings, actions, claims,

demands, liabilities and damages which the Purchaser

Indemnified Persons may hereafter suffer, or pay by reason of

any demands, claims, suits or proceedings arising out of

claims of infringement of any domestic or foreign patent rights,

copyrights or other intellectual property, proprietary or

confidentiality rights with respect to any Goods, Related

Services, information, design or process supplied or used by

the Supplier in performing the Supplier’s obligations or in any

way incorporated in or related to the Project. If in any such

suit, action, claim or proceedings, a temporary restraint order

or preliminary injunction is granted, the Supplier shall make

every reasonable effort, by giving a satisfactory bond or

otherwise, to secure the suspension of the injunction or

restraint order. If, in any such suit, action, claim or

proceedings, the Goods or Related Services, or any part

thereof or comprised therein, is held to constitute an

Page 128: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 128

CESU, Odisha Page 128 Release Date: 27th February 2016

infringement and its use is permanently enjoined, the Supplier

shall promptly make every reasonable effort to secure for the

Purchaser a license, at no cost to the Purchaser, authorizing

continued use of the infringing work. If the Supplier is unable

to secure such license within a reasonable time, the Supplier

shall, at its own expense, and without impairing the

specifications and standards, either replace the affected work,

or part, or process thereof with non-infringing work or part or

process, or modify the same so that it becomes non-infringing.

Survival on Termination

The provisions of this Clause 27 shall survive Termination.

27.4 Defense of Claims:

(a) If any proceedings are brought or any claim is made

against the Purchaser arising out of the matters referred

to in GCC Sub-Clause 27.1, 27.2, or 27.3 the Purchaser

shall promptly give the Supplier a notice thereof, and

the Supplier may at its own expense and in the

Purchaser’s name conduct such proceedings or claim

and any negotiations for the settlement of any such

proceedings or claim.

(b) If the Supplier fails to notify the Purchaser within

twenty-eight (28) days after receipt of such notice that it

intends to conduct any such proceedings or claim, then

the Purchaser shall be free to conduct the same on its

own behalf

(c) The Purchaser shall, at the Supplier’s request,

afford all available assistance to the Supplier in

conducting such proceedings or claim, and shall be

reimbursed by the Supplier for all reasonable expenses

Page 129: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 129

CESU, Odisha Page 129 Release Date: 27th February 2016

incurred in so doing

28. Limitation of

Liability

28.1 Except in cases of gross negligence or willful misconduct :

(a) neither party shall be liable to the other party for any

indirect or consequential loss or damage, loss of use,

loss of production, or loss of profits or interest costs,

provided that this exclusion shall not apply to any

obligation of the Supplier to pay liquidated damages to

the Purchaser; and

(b) the aggregate liability of the Supplier to the

Purchaser, whether under the Contract, in tort, or

otherwise, shall not exceed the amount specified in the

Contract Price. Provided that this limitation shall not

apply to the cost of repairing or replacing defective

equipment, or to any obligation of the Supplier to

indemnify the Purchaser with respect to patent

infringement.

29. Change in Laws

and Regulations

29.1 Unless otherwise specified in the Contract, if after the date of

the Invitation for Bids, any law, regulation, ordinance, order or

bylaw having the force of law is enacted, promulgated,

abrogated, or changed in the place of the Purchaser’s country

where the Site is located (which shall be deemed to include

any change in interpretation or application by the competent

authorities) that subsequently affects the Delivery Date, then

such Delivery Date shall be correspondingly increased or

decreased, to the extent that the Supplier has thereby been

affected in the performance of any of its obligations under the

Contract.

30. Force Majeure 30.1 The Supplier shall not be liable for forfeiture of its Performance

Security, liquidated damages, or termination for default if and

Page 130: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 130

CESU, Odisha Page 130 Release Date: 27th February 2016

to the extent that it’s delay in performance or other failure to

perform its obligations under the Contract is the result of an

event of Force Majeure.

30.2 For purposes of this Clause, “Force Majeure” means an event

or situation beyond the control of the Supplier that is not

foreseeable, is unavoidable, and its origin is not due to

negligence or lack of care on the part of the Supplier. Such

events may include, but not be limited to wars or revolutions,

earthquake, fires, floods, epidemics, quarantine restrictions,

and freight embargoes.

30.3 If a Force Majeure situation arises, the Supplier shall promptly

and no later than seven days from the first occurrence thereof,

notify the Purchaser in writing of such condition and the cause

thereof. Unless otherwise directed by the Purchaser in

writing, the Supplier shall continue to perform its obligations

under the Contract as far as is reasonably practical, and shall

seek all reasonable alternative means for performance not

prevented by the Force Majeure event

30.4 The decision of the Purchaser with regard to the occurrence,

continuation, period or extent of Force Majeure shall be final

and binding on the Supplier.

Page 131: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 131

CESU, Odisha Page 131 Release Date: 27th February 2016

31. Change Orders

and Contract

Amendments

31.1 The Purchaser may at any time order the Supplier through

Notice in accordance GCC Clause 6, (“Change Order”) to

make changes within the general scope of the Contract in any

one or more of the following:

(a) drawings, designs, or specifications, where Goods to be

furnished under the Contract are to be specifically

manufactured for the Purchaser;

(b) Specifications for hardware, software and Related Services

(c) the method of shipment or packing;

(d) the place of delivery; and

(e) the Related Services to be provided by the Supplier.

31.2 If any such Change Order causes an increase or decrease in

the cost of, or the time required for, the Supplier’s

performance of any provisions under the Contract, an

equitable adjustment shall be made in the Contract Price or in

the Delivery and Completion Schedule, or both, and the

Contract shall accordingly be amended. Any claims by the

Supplier for adjustment under this Clause must be asserted

within twenty-eight (28) days from the date of the Supplier’s

receipt of the Purchaser’s Change Order.

31.3 No variation or modification of the terms of the contract shall be

made except by written amendment signed by the parties.

32. Extensions of

Time

32.1 If at any time during performance of the Contract, the Supplier

or its Subcontractors should encounter conditions impeding

timely delivery of the Goods or completion of Related Services

pursuant to GCC Clause 10, the Supplier shall promptly notify

the Purchaser in writing of the delay, its likely duration, and its

Page 132: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 132

CESU, Odisha Page 132 Release Date: 27th February 2016

cause. As soon as practicable after receipt of the Supplier’s

notice, the Purchaser shall evaluate the situation and may at

its discretion extend the Supplier’s time for performance, in

which case the extension shall be ratified by the parties by

amendment of the Contract.

32.2 Except in case of Force Majeure, as provided under GCC

Clause 30 or where the delay in delivery of the Goods or

completion of Related Services is caused due to any delay or

default of the Purchaser, any extension granted under clause

32.1 shall not absolve the Supplier from its liability to the pay

of liquidated damages pursuant to GCC Clause 25.

33. Termination 33.1 Termination for Default

(a) The Purchaser may, without prejudice to any other

remedy for breach of Contract, by Notice of default sent

to the Supplier, terminate the Contract in whole or in

part:

(i) if the Supplier fails to deliver any or all of the

Goods or Related Services within the period

specified in the Contract, or within any extension

thereof granted by the Purchaser pursuant to

GCC Clause 32; or

(ii) if the Supplier, in the judgment of the Purchaser

has engaged in corrupt, fraudulent, collusive, or

coercive practices, as defined in GCC Clause 2,

in competing for or in executing the Contract; or

(iii) Any representation made by the bidder in the

proposal is found to be false or misleading

(iv) if the Supplier commits any breach of the

Contract and fails to remedy or rectify the same

Page 133: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 133

CESU, Odisha Page 133 Release Date: 27th February 2016

within the period of two weeks (or such longer

period as the Purchaser in its absolute discretion

decide) provided in a notice in this behalf from

the Purchaser.

(v) as specified in the SLA

(b) In the event the Purchaser terminates the Contract in

whole or in part, pursuant to GCC Clause 33.1.1, the

Purchaser may procure, upon such terms and in such

manner as it deems appropriate, Goods or Related

Services similar to those undelivered or not performed,

and the Supplier shall be liable to the Purchaser for any

additional costs for such similar Goods or Related

Services. However, the Supplier shall continue

performance of the Contract to the extent not

terminated.

33.2 Termination for Insolvency

The Purchaser may at any time terminate the Contract by

giving Notice to the Supplier if the Supplier becomes bankrupt

or otherwise insolvent. In such event, termination will be

without compensation to the Supplier, provided that such

termination will not prejudice or affect any right of action or

remedy that has accrued or will accrue thereafter to the

Purchaser.

33.3 Termination for Convenience

(a) The Purchaser, by Notice sent to the Supplier, may

terminate the Contract, in whole or in part, at any time

for its convenience. The Notice of termination shall

specify that termination is for the Purchaser’s

convenience, the extent to which performance of the

Page 134: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 134

CESU, Odisha Page 134 Release Date: 27th February 2016

Supplier under the Contract is terminated, and the date

upon which such termination becomes effective.

(b) The Goods that are complete and ready for shipment

within twenty-eight (28) days after the Supplier’s receipt

of the Notice of termination shall be accepted by the

Purchaser at the Contract terms and prices. For the

remaining Goods, the Purchaser may elect:

(i) To have any portion completed and delivered at the Contract

terms and prices; and/or

(ii) to cancel the remainder and pay to the Supplier an agreed

amount for partially completed Goods and Related Services and for

materials and parts previously procured by the Supplier.

33.4 Consequences of Termination

Upon Termination of the Contract, the Supplier shall:

(i) Prepare and present a detailed exit plan within five

calendar days of termination notice receipt to the IT Head

/ CIO of CESU (“Exit Plan”).

(ii) The IT Head / CIO and along with designated team will

review the Exit plan. If approved, Supplier shall start

working on the same immediately. If the plan is rejected,

Supplier shall prepare alternate plan within two calendar

days. If the second plan is also rejected, the IT Head

/CIO or the authorized person will provide a plan for

Supplier and it should be adhered by in totality.

(iii) The Exit Plan should cover at least the following :-

a. Execute all documents that may be necessary to

effectively transfer the ownership and title, including

Page 135: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 135

CESU, Odisha Page 135 Release Date: 27th February 2016

OEM warranties in respect of all equipment;

b. Handover all developed codes, related documentation

and other Configurable Items, if any in his

possession;

c. Handover the list of all IT Assets, passwords at all

locations to the Purchaser.

(iv) The supplier and the IT Head /CIO (or the authorized

person) will sign a completion certificate at the end of

successful completion (all points tracked to closure) of

the Exit Plan.

34. Assignment 34.1 The Supplier shall not assign, in whole or in part, their

obligations under this Contract.

35. Disclaimer 35.1 Purchaser reserves the right to share, with any consultant of its

choosing, any resultant Proposals in order to secure expert

opinion.

35.2 Purchaser reserves the right to accept any proposal deemed to

be in the best interest of the CESU

36. Public

Disclosure

36.1 All materials provided to the Purchaser by bidder are subject to

Country and Odisha public disclosure laws such as RTI etc.

36.2 The Supplier’s Team shall not make or permit to be made a

public announcement or media release about any aspect of

this Contract unless the Purchaser first gives the Supplier its

written consent.

37. SLA Audit 37.1 A designated team / person from CESU will review the

performance of Supplier against the SLA each month. The

review / audit report will form basis of any action relating to

Page 136: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 136

CESU, Odisha Page 136 Release Date: 27th February 2016

imposing penalty on or breach of contract of the Supplier.

38. Adherence to

safety

procedures, rules

regulations and

restriction

38.1 Supplier shall comply with the provision of all laws including

labour laws, rules, regulations and notifications issued there

under from time to time. All safety and labour laws enforced by

statutory agencies and by Purchaser shall be applicable in the

performance of this Contract and Supplier’s Team shall abide

by these laws.

38.2 Access to the Datacenter Sites and Purchaser’s locations shall

be strictly restricted. No access to any person except the

essential personnel belonging to the Supplier who are

genuinely required for execution of work or for carrying out

management/maintenance who have been explicitly

authorized by the Purchaser shall be allowed entry to the

Datacenter Sites and some Purchaser’s locations. Even if

allowed, access shall be restricted to the pertaining equipment

of the Purchaser only. The Supplier shall maintain a log of all

activities carried out by each of its personnel.

38.3 The Supplier shall take all measures necessary or proper to

protect the personnel, work and facilities and shall observe all

reasonable safety rules and instructions. Supplier’s Team

shall adhere to all security requirement/regulations of the

Purchaser during the execution of the work. Purchaser’s

employee also shall comply with safety procedures/policy.

38.4 The Supplier shall report as soon as possible any evidence,

which may indicate or is likely to lead to an abnormal or

dangerous situation and shall take all necessary emergency

control steps to avoid such abnormal situations.

38.5 The Purchaser will be indemnified for all the situations

mentioned in this clause in the similar way as defined in GCC

Page 137: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 137

CESU, Odisha Page 137 Release Date: 27th February 2016

clause 28.

39. Non-Solicitation

of Staff

39.1 For the purpose of this contract, both parties to this contract

agree, not to solicit either directly or indirectly with a view to

provide or offer employment to, offer to contract with or entice

a staff member of the other party to leave without the consent

of the other during the term of this agreement and for an

additional period of 180 days after termination

40. Survival 40.1 The clauses of this contract, which by nature are intended to

survive termination of this contract, shall remain in effect after

such termination

Page 138: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 138

CESU, Odisha Page 138 Release Date: 27th February 2016

Section VIII. Special Conditions of Contract

The following Special Conditions of Contract (SCC) shall supplement the General Conditions of

Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the

GCC.

GCC 1.1(j) The Purchaser’s country is: The Union Of India

GCC 1.1(k) The Purchaser is:

CESU of Odisha, India

GCC 1.1 (q) The web-sites are: www.cescoorissa.com/ www.cesuodisha.com

The details regarding the RFP process shall be available on the same. The eligible

bidders should visit the website from time to time and get the status updates. All

details uploaded on the website from time to time shall be deemed to have been

provided to all the bidders.

GCC 3.2 The version of Incoterms shall be: Incoterms 2000

GCC 4.1 The language shall be: English

GCC 6.1 For notices, the Purchaser’s contact details shall be:

Senior General Manager (IT),

Central Electricity Supply Utility of Odisha,

8th Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha

Phone No. - 0674-2545685 Fax No. - 0674-2543125

Email : [email protected]

GCC 7.1 The governing law shall be: Laws applicable in exclusive jurisdiction of The High

Court Of Judicature at Odisha High Court, Cuttack, India and all courts

subordinate to it’s exclusive Jurisdiction.

Page 139: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 139

CESU, Odisha Page 139 Release Date: 27th February 2016

GCC 8.2 The formal mechanism for the resolution of disputes shall be:

If the parties fail to resolve such a dispute or difference by mutual consultation

within twenty-eight (28) days from the commencement of such dispute and

difference, either party may require that the dispute be referred for resolution to the

formal mechanisms, described below (The date of commencement of the dispute

shall be taken from the date when this clause reference is quoted by either party in

a formal communication clearly mentioning existence of dispute or as mutually

agreed) :

a. The mechanism for resolution of disputes for bidders shall be in accordance

with the Indian Arbitration and Conciliation Act of 1996. The Arbitral Tribunal

shall consist of 3 (Three) Arbitrators. Each Party shall nominate an

Arbitrator and the two nominated Arbitrators shall mutually agree and

nominate a third Presiding Arbitrator.

b. The Arbitrators shall necessarily be retired High Court Judges and the

umpire shall be a retired Chief Justice.

c. The place for arbitration shall be Bhubaneswar, Odisha

GCC 10.1

Details of shipping and documents to be furnished by the Supplier shall be:

FOR GOODS SUPPLIED FROM ABROAD AS PER INCOTERMS CIF :

Upon shipment, the Supplier shall notify the Purchaser and the Insurance Company

by telex or fax the full details of the shipment (Consignment through air is also

possible), including Contract number, description of Goods, quantity, the vessel,

the bill of lading number and date, port of loading, date of shipment, port of

discharge, etc. The Supplier shall send the following documents to the Purchaser,

with a copy to the Insurance Company.

(a) Copy of the Supplier’s invoice showing the description of the Goods, quantity,

unit CIF price and total amount;

(b) Copy of on-board bill of lading marked “freight prepaid”.

(c) Copy of the packing list identifying contents of each lot.

(d) Insurance certificate;

Page 140: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 140

CESU, Odisha Page 140 Release Date: 27th February 2016

(e) Copy of test certificate approval and dispatch instructions issued by the

purchaser (combined or separately).

(f) Certificate of Origin.

(g) Manufacturer’s or supplier’s Warranty Certificate

The Purchaser shall receive the above documents at least two weeks before arrival

of the Goods at the port or place of arrival and, if not received, the Supplier will be

responsible for any consequent expenses.

For goods from within the Purchaser’s country as per INCOTERMS EXW

basis including freight and insurance charges:

Upon delivery of the Goods to the transporter, the Supplier shall notify the

Purchaser and send the following documents to the Purchaser;

a) Copy of the Supplier’s invoice showing the description of the Goods, quantity,

unit Ex-works price and total amount;

b) Copy of Motor Transport Receipt (MTR) of a transport contractor approved by

Indian Bankers Association or material receipt certificate from consignee.

c) Copy of test certificate approval and dispatch instructions issued by the

purchaser combined or separately.

d) Copy of packing list identifying contents of each lot.

e) Insurance certificate;

f) Certificate of Origin.

g) Manufacturer’s or supplier’s Warranty Certificate

The Purchaser shall receive the above documents before the arrival of the Goods

and, if not received, the Supplier will be responsible for any consequent expenses.

GCC 13.2 The price adjustment shall be:

The bidders may please note that the prices are upward/downward Adjustable.

Purchaser reserves the right to review and negotiate the charges payable at any

time to incorporate downward revisions as applicable and necessary, including due

to lowering of any applicable taxes, duties and any other statutory levies.

Page 141: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 141

CESU, Odisha Page 141 Release Date: 27th February 2016

Prices shall not be subject to any upward/downward revision on any account

whatsoever throughout the period of contract. Provided that any revision in taxes,

statutory levies, duties which is not occasioned due to any change in place, method

and time of supply or non-performance / non-fulfillment of any condition of any

exemption considered by the vendor at the time of proposal, shall be considered for

price adjustments.

The utility reserves the right to increase or decrease the number of towns under the

contract subject to the limit of 30% of the number of towns covered under the

contract. It is clarified that this increase or decrease of 30% shall not entitle either

party to claim revision of the unit price of the goods supplied.

In case of services where lump-sum prices are quoted, the increase or decrease of

30% of the number of towns shall be subject to mutual negotiations.

GCC 14.1 General terms and conditions of Payment Schedule

1) All payments shall be made by the Purchaser in favour of the Supplier

(System Integrator)

2) The release of payments will be Performance (output) based, where the

payments are made for measured deliverables and outputs. The SLAs will

govern the penalty and reductions from payments for inferior deliverables.

3) Payments made under the Contract shall be approved by the MoP in

accordance with the terms and conditions of the financing agreement

between the Purchaser and the MoP, and will be subject in all respects to

the terms and conditions of that financing/Loan Agreement

4) System Integrator should obtain completion certificate for each project area

from the utility and raise an invoice against the same.

5) Payments against invoice submitted (accompanied with all requisite

documents) shall be released within 45 days of submission of invoice.

6) System Integrator needs to ensure completion of all works for a project area

(town). This includes supply of required hardware, software, customization,

installation and commissioning. In addition others activities like field survey,

integration of identified legacy systems etc. shall also be completed.

Payments shall be made town wise based on activity/Milestone achieved. In

Page 142: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 142

CESU, Odisha Page 142 Release Date: 27th February 2016

case part of the work is pending (applications or hardware or networking

etc.), for the town, payment for that activity/Milestone shall not be made.

7) Cost of setting up the data centre (including all hardware and

implementation cost) should be mentioned separately.

8) In case go-live of any project area/data centre is delayed, the entire cost

and/or time over-run shall be the responsibility of the Supplier and shall be

borne by him only.

9) Power to withhold: Notwithstanding anything contained in the payment

schedule mentioned below, if in the opinion of the Purchaser, any work

done or supply made or service rendered by Supplier is deficient in any

manner in comparison to the prescribed standards, Purchaser shall be at

liberty to withhold a reasonable portion of the payments due to the Supplier,

till such work/ supply/ service is made confirming to the prescribed

standards. These powers to withhold payments shall be without prejudice to

any other power/ right of the purchaser under this contract.

10) All payments for Facilities Management Services (FMS) shall only be made

after submission of the Audit reports (in original) which shall be submitted

by the Supplier along with the invoices and acceptance of the same by the

Purchaser.

Payment Schedule

Phase Activity Payment

Schedule Milestones

Advance

Payment

10 % of Project

Cost (excluding

FMS and

Bandwidth)

On Issuance of Letter

of Award by Utility &

team mobilization by

Vendor

Data Centre

(DC)

Data Centre

Design

5% of cost

quoted for Data

centre

On submission &

approval of High Level

Design, Low Level

Design

Page 143: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 143

CESU, Odisha Page 143 Release Date: 27th February 2016

Installation,

Commissioning

& Configuration

of Hardware,

Networks &

Operating

System

25% of cost

quoted for Data

centre

On System testing by

Vendor &

management

confirmation that

material is received &

commissioned as per

the Work order

Installation,

Configuration &

Customization

Application

Software

20% of cost

quoted for Data

centre

On System testing by

Vendor &

management

confirmation that

software is installed &

running

User

Acceptance

testing

30% of cost

quoted for Data

centre

15% of Project

management cost

On Management

approval of User

Acceptance testing,

established through

operational

connectivity of project

areas of CESU (utility),

Disaster Recovery

centre, central

customer care centre,

etc. with the data

centre

Disaster

Recovery

Centre (DRC)

Disaster

Recovery

Centre Design

5% of cost

quoted for

Disaster

Recovery centre

On submission &

approval of High Level

Design, Low Level

Design

Page 144: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 144

CESU, Odisha Page 144 Release Date: 27th February 2016

Installation,

Commissioning

& Configuration

of Hardware,

Networks &

Operating

System

25% of cost

quoted for

Disaster

Recovery centre

On System testing by

Vendor &

management

confirmation that

material is received &

commissioned as per

the Work order

Installation,

Configuration &

Customisation

of Application

Software

20% of cost

quoted for

Disaster

Recovery centre

On System testing by

Vendor &

management

confirmation that

software is installed &

running

User

Acceptance

testing

30% of cost

quoted for

Disaster

Recovery centre

5% of Project

management cost

On Management

approval of User

Acceptance testing,

established through

operational

connectivity of data

centre with the

Disaster Recovery

centre

Customer

Care Centre

(CC)

Customer Care

Centre Design

5% of cost

quoted for

Customer Care

Centre

On submission &

approval of High Level

Design, Low Level

Design

Installation,

Commissioning

& Configuration

of Hardware,

Networks &

Operating

System

25% of cost

quoted for

Customer Care

centre

On System testing by

Vendor &

management

confirmation that

material is received &

commissioned as per

the Work order

Page 145: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 145

CESU, Odisha Page 145 Release Date: 27th February 2016

Installation,

Configuration,

Customisation &

Customisation

of Application

Software

20% of cost

quoted for

Customer Care

centre

On System testing by

Vendor &

management

confirmation that

software is installed &

running

User

Acceptance

testing

30% of cost

quoted for Data

centre

10% of Project

management cost

On Management

approval of User

Acceptance testing,

established through

operational

connectivity of project

areas with the central

customer care centre,

etc.

Sub-Division

Office

Infrastructure

Design

5% of cost

quoted for SDO

On submission &

approval of High Level

Design, Low Level

Design

DGPS Survey

Results

80% of DGPS

Cost (divided by

number of project

areas covered)

On Submission of

DGPS Survey results

& approval (project

area wise)

Installation,

Commissioning

& Configuration

of Hardware,

Networks &

Operating

System

25% of cost

quoted for SDO

On System testing by

Vendor &

management

confirmation that

material is received &

commissioned as per

the Work order

Installation,

Configuration &

Customisation

of Application

15% of cost

quoted for SDO

On System testing by

Vendor &

management

Page 146: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 146

CESU, Odisha Page 146 Release Date: 27th February 2016

Software confirmation that

software is installed &

running

Integration with

legacy

applications &

Data Centre

network

5% of cost

quoted for SDO

5% of Project

management cost

On Management

approval that the

systems are integrated

with Data Centre &

legacy apps

User

Acceptance

testing

30 % of cost

quoted for SDO

5% of Project

management cost

On Management

approval of User

Acceptance testing

User Training

5% of Project

management cost

On User Training as

confirmed by

Management

Other offices

Infrastructure

Design

5% of cost

quoted for

individual offices

On submission &

approval of High Level

Design, Low Level

Design

DGPS Survey

Results

80% of DGPS

Cost (divided by

number of project

areas covered)

On Submission of

DGPS Survey results

& approval

Installation,

Commissioning

& Configuration

of Hardware,

Networks &

Operating

System

25% of cost

quoted for

individual offices

On System testing by

Vendor &

management

confirmation that

material is received &

commissioned as per

the Work order

Installation,

Configuration &

Customisation

of Application

15% of cost

quoted for

individual offices

On System testing by

Vendor &

management

Page 147: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 147

CESU, Odisha Page 147 Release Date: 27th February 2016

Software confirmation that

software is installed &

running

Integration with

legacy

applications &

Data Centre

network

5% of cost

quoted for SDO

5% of Project

management cost

On Management

approval that the

systems are integrated

with Data Centre &

legacy apps

User

Acceptance

testing

30% of cost

quoted for

individual offices

20% of Project

management cost

(divided by

number of offices

covered)

On Management

approval of User

Acceptance testing

User Training

10 % of Project

management cost

(divided by

number of offices

covered)

On User Training as

confirmed by

Management

After

Completion

10 % of Project

Cost (excluding

FMS and

Bandwidth)

After 3 months of Go-

Live date, based on

management

confirmation that

system is meeting the

performance

requirements as

specified in Work order

End of Contract: Payment of the balance 10% of the contract value (except the

FMS cost) will be made after three months of successful running of the system. The

payment may be released earlier provided the supplier submits the Bank

Guarantee (BG) for an amount equivalent to 20% of contract value. This BG shall

remain in force up to and including 6 months after warranty period.

Facilities Management Services: Cost for support and maintenance will be payable

Page 148: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 148

CESU, Odisha Page 148 Release Date: 27th February 2016

quarterly during the 5 years support and maintenance period from the date of

“Entire utility (CESU) wide rollout – go live date”. Quarterly installments will be

1/20th of the total IT support and maintenance cost. Payments will be subject to the

Audit reports for that quarter. The payment will be with reference to the cost

mentioned in Appendix D.3.

GCC 14.5 The currencies for payments shall be in Indian Rupees (INR).

GCC 16.1 The Supplier shall provide Performance Security of ten (10) percent of the total

Contract Price. The currency and amount of Performance Security shall be

specified at the time of awarding the contract to successful bidder.

However, an additional FMS Performance Bank Guarantee (FMS-PBG) equal to

20% of quoted FMS value shall be submitted by the selected bidder for a period of

5 years starting from beginning of the FMS period to take care of any non-

performance during FMS period. .

GCC 16.3 The Performance Security shall be in the form of Bank Guarantee issued by a

Scheduled Bank as notified by Reserve Bank of India

GCC 21.2 The packing, marking and documentation within and outside the packages if

applicable shall be: As specified (if any) in Technical Specification

GCC 22.1 The insurance coverage: Goods supplied under the contract shall be also fully

insured on all risk basis during inland transit up to destination store in the

purchaser’s country. The supplier must insure the Goods in an amount equal to

110% of CIF/EXW price of Goods.

GCC 26.3 The period of validity of the warranty shall be 36 (Thirty Six) months from the date

of commissioning or 42 (forty two) months from date of delivery at Purchaser’s

stores whichever is earlier.

Page 149: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 149

CESU, Odisha Page 149 Release Date: 27th February 2016

GCC 26.5 In case any damage or defect is found during verification after receipt of material at

Purchaser’s stores or material develops defects within warranty period, the supplier

shall attend/replace such defects free of all charges within 30 days of being notified

by the Purchaser, of the occurrence of such defects. In case the defect is not

attended or replacement of material is not received within specified period, then

apart from encashing the performance security deposit, the Purchaser may also

take suitable penal action including debarring from all future business.

Page 150: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 150

CESU, Odisha Page 150 Release Date: 27th February 2016

Section IX. Contract Forms

1 Agreement

THIS AGREEMENT is made on this ________ (eg. 3rd) day of

________________________(eg. November), _____(eg. 2015), between

______________________________________of __________________________

(hereinafter called “the Purchaser”) which expression shall unless repugnant to the context

thereof include his successors, heirs, assigns, of the one part, and

__________________________________ of ______________________________

(hereinafter called “the Supplier”) which expression shall unless repugnant to the context

thereof include his successors, heirs, assigns, of the other part.

WHEREAS the Purchaser had invited bids for certain Goods and Related Services, viz.,

____________________________________________________________________ (eg.

Name of bid) vide their bid document number

__________________________________________, dated _______________

AND WHEREAS various applications were received pursuant to the said bid

AND WHEREAS the Purchaser has accepted a Bid by the Supplier for the supply of those

Goods and Related Services in the sum of

________________________________________________________ (hereinafter “the

Contract Price”).

And in pursuance of having accepted the said bid the parties have agreed to enter into this

agreement.

NOW THIS AGREEMENT WITNESSETH AS FOLLOWS:

1. In this Agreement words and expressions shall have the same meanings as are

respectively assigned to them in the Contract referred to.

2. The following documents (collectively referred to as “Contract Documents”) shall be

deemed to form and be read and construed as part of this Agreement, viz.:

i. the Detailed award of contract;

ii. the Service level agreement;

iii. Instructions to Bidders

iv. the Special Conditions of Contract;

v. the General Conditions of Contract;

vi. the SRS document

vii. the Scope of Work;

viii. the Technical Specifications

ix. the Purchaser’s Notification to the Supplier for Award of Contract;

Page 151: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 151

CESU, Odisha Page 151 Release Date: 27th February 2016

x. Vendor’s response (proposal) to the RFP, including the Bid Submission Sheet

and the Price Schedules submitted by the Supplier;

xi. Appendix A to B & E to U;

xii. Acceptance of purchaser’s notification

In the event of any discrepancy or inconsistency within the Contract documents, then the

documents shall prevail in the order listed above.

3. In consideration of the payments to be made by the Purchaser to the Supplier as

indicated in this Agreement, the Supplier hereby covenants with the Purchaser to provide

the Goods and Related Services and to remedy the defects therein and bring them in

conformity in all respects with the provisions of the Contract.

4. The Purchaser hereby covenants to pay the Supplier in consideration of the

provision of the Goods and Related Services and the remedying of defects therein, the

Contract Price or such other sum as may become payable under the provisions of the

Contract at the times and in the manner prescribed by the Contract.

IN WITNESS whereof the parties hereto have caused this Agreement to be executed in

accordance with the laws of ________________________ on the day, month and year

indicated above.

Signed by __________________________________________ (Authorised Utility official)

Signed by __________________________________________________ (for the Supplier)

Witness-1

Witness-2

Page 152: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 152

CESU, Odisha Page 152 Release Date: 27th February 2016

2 Performance Security (To be accompanied with the bank Guarantee)

Date:

Contract Name and No. :

To:

WHEREAS _______________________________________ (hereinafter called “the

Supplier”) which expression shall unless repugnant to the context thereof include his

successors, heirs, assigns has undertaken, pursuant to Contract No. ____________ dated

________________, _______ to supply

__________________________________________ (hereinafter called “the Contract”).

AND WHEREAS it has been stipulated by you in the aforementioned Contract that the

Supplier shall furnish you with a security ____________________ issued by a reputable

guarantor for the sum specified therein as security for compliance with the Supplier’s

performance obligations in accordance with the Contract.

AND WHEREAS the undersigned _____________________________________________

______________________, legally domiciled in ________________________________

____________________________________________, (hereinafter “the Guarantor”) which

expression shall unless repugnant to the context thereof include his successors, heirs,

assigns have agreed to give the Supplier a security:

THEREFORE WE hereby affirm that we are Guarantors and responsible to you, on behalf of

the Supplier, up to a total of

____________________________________________________ and we undertake to pay

you without protest and demur, upon your first written demand declaring the Supplier to be

in default under the Contract, without cavil or argument, any sum or sums within the limits

of __________ ____________ as aforesaid, without your needing to prove or to show

grounds or reasons for your demand or the sum specified therein.

This security is valid until _________ hours of the ___________________ day of

__________________, _____.

Page 153: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 153

CESU, Odisha Page 153 Release Date: 27th February 2016

Name

In the capacity of

Signed

Duly authorized to sign the security for and on behalf of

Date

Page 154: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 154

CESU, Odisha Page 154 Release Date: 27th February 2016

Appendices

APPENDIX A – MANDATORY TECHNICAL SPECIFICATIONS ....................................................... 157

APPENDIX B – TECHNICAL SPECIFICATIONS ............................................................................... 162

APPENDIX C – SERVICE LEVEL AGREEMENT .............................................................................. 163

C.1 PURPOSE OF THIS AGREEMENT ..................................................................................................................... 163

C.2 DESCRIPTION OF SERVICES PROVIDED ......................................................................................................... 163

C.3 DURATION OF SLA.......................................................................................................................................... 163

C.4 SERVICE LEVEL AGREEMENTS & TARGETS ................................................................................................... 163

C.5 BREACH OF SLA ............................................................................................................................................. 172

C.6 EXCLUSIONS ................................................................................................................................................... 172

C.7 MONITORING AND AUDITING ........................................................................................................................... 172

C.8 REPORTING PROCEDURES ............................................................................................................................. 172

C.9 ISSUE MANAGEMENT PROCEDURES............................................................................................................... 172

C.9.1 General .................................................................................................................................................. 173

C.9.2 Issue Management Process ............................................................................................................... 173

C.10 SLA CHANGE CONTROL ............................................................................................................................... 173

C.10.1 General ................................................................................................................................................ 173

C.10.2 SLA Change Process ........................................................................................................................ 174

C.10.3 Version Control ................................................................................................................................... 174

C.11 MANAGEMENT ESCALATION PROCEDURES ................................................................................................. 174

C.12 SIGNATURE PAGE ......................................................................................................................................... 175

APPENDIX D - SUPPLIER RESPONSE FORMAT ............................................................................ 176

D.1 GENERAL GUIDELINES TO THE BIDDERS ........................................................................................................ 176

D.1.1 Guidelines for Technical proposal ...................................................................................................... 176

D.1.2 Guidelines for Price proposal .............................................................................................................. 176

D.1.3 Submission of proposal ....................................................................................................................... 177

D2 TECHNICAL PROPOSAL .................................................................................................................................... 178

D.2.1.1 Bid structure ...................................................................................................................................................... 178

D.2.1.2 Bidder - Company Statistics ........................................................................................................................... 178

D.2.2 Technical Specification requirement of Application packages ....................................................... 179

D.2.3 Hardware Technical Specifications (Including network equipment’s, LAN/WAN, Kiosk etc.) ... 179

Kindly attach the data sheets for the offered products. ............................................................................. 180

D.2.4 Approach and Methodology ................................................................................................................ 180

D.2.4.1 Understanding of Utility and its requirement ................................................................................................ 180

D.2.4.2 Details of proposed methodology .................................................................................................................. 181

D.2.4.3 Project Team Structure ................................................................................................................................... 181

D.2.4.4 Resource planning and estimation ................................................................................................................ 181

D.2.4.5 Risk planning .................................................................................................................................................... 182

D.2.4.6 Detailed work plan with timelines ................................................................................................................... 182

D.2.5 Project Experience ............................................................................................................................... 182

D.2.6 Team details (CVs)............................................................................................................................... 183

D.2.7 Firm Detail ............................................................................................................................................. 185

D.2.8 Facility Management Services Plan................................................................................................... 185

D.2.9 Project Management Practices .......................................................................................................... 185

D.2.10 Quality Assurance .............................................................................................................................. 185

D.2.11 Documentation .................................................................................................................................... 186

D.2.12 Deviations Sheet ................................................................................................................................ 186

D.3 PRICE PROPOSAL ............................................................................................................................................ 188

D.3.1 Project Area with Data Centre & Customer Care Centre ............................................................... 188

D.4 CHECKLISTS .................................................................................................................................................... 190

Page 155: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 155

CESU, Odisha Page 155 Release Date: 27th February 2016

D.4.1 Mandatory forms that needs to be submitted ................................................................................... 190

D.4.2 Compliance checklist ........................................................................................................................... 190

APPENDIX E – EVALUATION METHODOLOGY .............................................................................. 192

E.1 SINGLE-STAGE: TWO-ENVELOPE BIDDING PROCEDURE ............................................................................... 192

E.2 EVALUATION AND COMPARISON OF BIDS ........................................................................................................ 193

APPENDIX F – GEOGRAPHICAL & ADMINISTRATIVE INFORMATION ......................................... 197

APPENDIX G – LIST OF OFFICES FOR WAN CONNECTIVITY ....................................................... 198

APPENDIX H – REVIEW OF CURRENT IT SYSTEMS ...................................................................... 199

EXISTING SOLUTIONS ............................................................................................................................................. 199

TECHNICAL EVALUATION – EXISTING IT SOLUTION ............................................................................................... 206

EXISTING HARDWARE ............................................................................................................................................ 209

APPENDIX I – LIST OF MANUALS/BUSINESS PROCESSES TO BE CONVERTED (DATA-ENTRY) INTO ELECTRONIC FORM ............................................................................................................... 214

APPENDIX J – REVIEW OF CURRENT BUSINESS PROCESSES ................................................... 215

NUMBER OF CONSUMER & ASSET INFORMATION IN CESU ................................................................................. 221

METERING, CONSUMER INDEXING AND ASSET MAPPING INFORMATION .............................................................. 222

PROJECT AREA NAME: CUTTACK ................................................................................................ 227

PROJECT AREA NAME: BHUBANESWAR ..................................................................................... 230

PROJECT AREA NAME: PURI ......................................................................................................... 233

PROJECT AREA NAME: KHORDHA................................................................................................ 236

PROJECT AREA NAME: JATNI ....................................................................................................... 239

PROJECT AREA NAME: DHENKANAL ........................................................................................... 243

PROJECT AREA NAME: ANGUL ..................................................................................................... 246

PROJECT AREA NAME: TALCHER ................................................................................................. 249

PROJECT AREA NAME: KENDRAPARA ......................................................................................... 252

PROJECT AREA NAME: PATTAMUNDAI ........................................................................................ 255

PROJECT AREA NAME: JAGATSINGHPUR ................................................................................... 258

PROJECT AREA NAME: PARADEEP .............................................................................................. 261

APPENDIX K – WEBSITE ................................................................................................................. 264

APPENDIX L: LIST OF GOODS AND RELATED SERVICES ........................................................... 266

APPENDIX M – ESTIMATED MANPOWER REQUIREMENT ............................................................ 267

APPENDIX N – EXPECTED IMPLEMENTATION SCHEDULE .......................................................... 268

APPENDIX O: SPOT BILLING MACHINE SPECIFICATION .......................................................... 270

APPENDIX P: MAP OF CESU OF ODISHA ................................................................................... 271

APPENDIX Q: FORMATS FOR PRICE BIDS .................................................................................. 272

APPENDIX R: PROPOSED INTERFACE SCHEME V2.4 ................................................................ 273

APPENDIX S: CESU OFFICES LOCATIONS FOR NETWORK CONNECTIVITY ............................ 274

APPENDIX T: ADDITIONAL CLARIFICATIONS ............................................................................. 274

APPENDIX U: NO DEVIATION CERTIFICATE ................................................................................ 276

APPENDIX V: ABBREVIATIONS ..................................................................................................... 277

Page 156: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 156

CESU, Odisha Page 156 Release Date: 27th February 2016

List of Tables

Table 1: Mandatory Technical Specifications ............................................................................................ 157

Table 2: Service Level Chart ...................................................................................................................... 164

Table 3: Severity Definition Chart ............................................................................................................. 171

Table 4: Bid Structure ................................................................................................................................ 178

Table 5: Bidder – Company Statistics ........................................................................................................ 178

Table 6: Technical Specification for Application Packages ....................................................................... 179

Table 7: Details of Product Offered ........................................................................................................... 179

Table 8: Technical Specifications of Hardware ......................................................................................... 179

Table 9: Details of Hardware Offered ........................................................................................................ 180

Table 10: Proposed Project Team Structure ............................................................................................... 181

Table 11: Proposed Resource Planning and Estimation ............................................................................. 181

Table 12: Details of Project Experience ..................................................................................................... 182

Table 13: Format of Curriculum Vitae ....................................................................................................... 184

Table 14: Firm Detail ................................................................................................................................. 185

Table 15: Details of Certification ............................................................................................................... 186

Table 16: Format for Deviations ................................................................................................................ 187

Table 17: Check List for Mandatory Forms ............................................................................................... 190

Table 18: Check List for proper Documentation & Compliance ............................................................... 190

Table 19: Distribution of weights for bid evaluation ................................................................................. 193

Table 20: Score for Technical Evaluation .................................................................................................. 194

Table 21: Calculation of Technical Score .................................................................................................. 195

Table 22: Geographical & Administrative Information of all the Project Areas in CESU ........................ 197

Table 23: Geographical & Administrative Information of all the Project Areas in CESU ........................ 197

Table 24: List of Offices for WAN Connectivity in CESU ....................................................................... 198

Table 25: Details of existing Applications to be Upgraded or Integrated with new System ...................... 200

Table 26: Technical Evaluation of Existing IT Applications ..................................................................... 206

Table 27: Details of existing Hardware to be Upgraded or Integrated with new system ........................... 209

Table 28: List of Manuals/ Business Process to be converted into Electronic Form in CESU .................. 214

Table 29: Consumer Information for Utility and Project Areas ................................................................. 221

Table 30: Metering Information for Utility and Project Areas ................................................................... 222

Table 31: Consumer Indexing and Asset Mapping Information for Utility and Project Areas ................. 223

Table 32: Detail of existing Website in CESU ........................................................................................... 264

Table 33: Estimated Manpower Requirement ............................................................................................ 267

Table 34: Expected Implementation Schedule ........................................................................................... 268

Page 157: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 157

CESU, Odisha Page 157 Release Date: 27th February 2016

Appendix A – Mandatory Technical Specifications

ITIA should provide documentary proof of compliance of following specification. Where it is not

possible to submit any certified proof for the same, ITIA shall self-certify that it would comply with

the specification during implementation.

Table 1: Mandatory Technical Specifications

A Solution Specifications Validation Through

(Certificate/

Document/ Self

Certify)

Available/

Not

available

A.1 The solution shall be designed with Service

Oriented Architecture.

The solution shall be designed based on

Component-based approach. It shall be highly

granular and loosely coupled to ensure that the

failure of one component does not cascade to

others.

Document

A.2 The solution shall be designed on web based

architecture.

Self Certify and

Document

A.3 The solution shall be horizontally and vertically

scalable and also have virtualization capability.

Self Certify and

Document

A.4 The solution shall be designed with Open Industry

Standards and not with Supplier’s proprietary

protocol.

Self Certify and

Document

A.5 The directory services shall be based on commonly

accepted application protocol like LDAP.

Self Certify and

Document

A.6 The proposed solution should be based on WS-*

specifications (Web services specifications) &

unified access framework compliant to W3C (World

Wide Web Consortium) specifications.

Self Certify and

Document

A.7 The application shall provide the functionality to

configure the parameters to define the business

rules with the application. These parameters shall

not be hard-coded in the application.

Self Certify

A.8 The solution shall provide the functionality to

configure the roles & responsibilities and grant role

based access to the users. Also, the system shall

Document and Self

Certify

Page 158: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 158

CESU, Odisha Page 158 Release Date: 27th February 2016

have the capability to integrate with various

standard SSO (Single Sign-On) or IDM (Identity

Management) applications.

A.9 The solution shall use an integration middleware

layer so that all required external systems shall be

integrated on a continuous basis. The solution shall

conform to the requirements specified in Section

3.10 G1 of SRS document.

Self Certify and

Document

A.10 The solution shall provide the functionality to

encrypt the data stored or transmitted data.

Self Certify

A.11 The solution shall provide the functionality to

maintain the audit trail of all critical transactions.

Self Certify and

Document

A.12 The solution shall be able to interoperate with:

• standard RDBMS platforms like Oracle, MS

SQL, MY SQL, DB2, Informix, Sybase or any

other RDBMS confirming to ANSI/ISO SQL-

200n standards

• operating systems like Windows, Unix, Solaris

etc

• web browsers like Internet explorer, Mozilla

Firefox, Opera etc.

Self Certify and

Document

A.13 The solution shall be installed with the latest

security updates provided by software Supplier.

Self Certify

A.14 The software version shall be supported by the

software vendor for a minimum period of next five

years.

Self Certify and

Document

A1 Module: Meter Data Acquisition

A1.1 The Meter data acquisition Solution shall be

capable of collecting and analyzing data on a

common data structure/ format from system/

consumer meters of various makes and models.

The solution shall be compatible with present

modbus compliant meters installed in utilities as

well as future meters likely to be introduced in

Indian market complying with DLMS /COSEM/IEC-

62056/ANSI C-12.19/IEEE P-1377 Standards.

Certificate

Page 159: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 159

CESU, Odisha Page 159 Release Date: 27th February 2016

A1.2 The regional hierarchy and network topology shall

be specific to the Indian context and flexible enough

to account for different voltage levels in Indian sub-

transmission and distribution networks e.g.

66/33/22/11/ 0.4 KV.

Self Certify

A2 Energy Audit

A2.1 The Energy Audit solution shall be able to

calculate allowable technical losses and estimated

technical & commercial losses in every part of the

network via integration with Network analysis

module, Meter data acquisition module, GIS

based indexing and asset mapping and

computerized billing & collection system.

Self Certify and

Document

A3 Module : GIS based customer Indexing and

asset mapping

A3.1 The Indexed customer database, when created and

operational, shall be capable of being ‘on line’

connected to other business process software

without any limitation.

The updation of GIS database is mandatory in case

of addition of customer/asset or dismantling of

existing customer/asset.

Self Certify and

Document

A3.2 The solution shall be based on open GIS

standards and shall be OGC (Open Geospatial

Consortium) Compliant.

The solution shall have a ready provision / facility

so that it can be easily integrated to the other

systems/applications, such as :

• SCADA

• Energy Audit and accounting system

• New connection, disconnection & dismantling

system

• Customer Care Centers

• Customer Information & Billing System

• Project Management etc.

Certificate and

Document

Page 160: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 160

CESU, Odisha Page 160 Release Date: 27th February 2016

A4 Module: Customer care services

A4.1 The Customer care service solution shall have

single window interface through multiple touch

points.

Self Certify

A4.2 The Customer care service solution shall have call

escalation facility, in case the issues are not

resolved within the defined service levels.

Self Certify and

Document

A5 Module: Management information Systems

A5.1 The MIS solution shall provide Business

Intelligence Tools for data mining, analysis,

trending, simulation etc.

Document and Self

Certify

A6 Module: Identity and Access Management

Systems

A6.1 The Identity and access management solution shall

support two factor authentication (Biometrics,

tokens etc.)

Certificate

A6.2 The solution shall have feature to generate reports

in the lines of ISO 27001 standard.

Certificate

A6.3 The solution shall provide secure environment for

transmitting information across the Internet.

Self Certify

A6.4 The solution shall provide a mechanism to perform

the user authentication procedure. In case of

authentication failure, the feedback should not

include the reasons for such failure.

Document and Self

Certify

A7 Billing

A7.1 The Solution shall have a ready provision / facility

so that it can be easily integrated with

• Automatic online Meter Reading devices

and

• Handheld Computers / CMRI used for spot

metering and billing

Document and Self

Certify

A8 Asset Management, Maintenance

A8.1 The solution shall have a ready provision / facility

so that it can be easily integrated with

• GIS System

• Customer Care System

• SCADA

Document and Self

Certify

Page 161: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 161

CESU, Odisha Page 161 Release Date: 27th February 2016

B Hardware Technical Specifications

B.1 The hardware solution shall meet the performance

criteria specified in the contract.

In case the offered hardware does not meet the

performance criteria, the supplier must provide

additional equipments or upgrade the equipments

without any additional cost to the utility.

Certificate

B.2 The hardware shall be scalable to manage

enterprise level solution for the entire utility.

Document and Self

Certify

B.3 The server hardware shall have 64 bit processing

capability.

Database servers shall be in cluster fail over mode

and Application servers shall be in scale out mode.

Document and Self

Certify

B.4 The supplier shall submit the data sheets for each

of the hardware model detailing the specifications of

the hardware.

Document

B.5 The hardware models shall be supported by the

hardware OEM for a minimum period of next five

years.

Self Certify from OEM

B.6 The hardware device operating system shall be

EAL 2 certified (Evaluation Assurance Level).

Certificate

C Mandatory Requirements of OEM for Hardware

C.1 The OEM vendor shall have ISO 9001:2000 and

ISO 14000 certifications. Certificate

C.2

The OEM vendor shall have an annual turnover

more than Rs. 250 crores from hardware business

in each of the last three financial years.

Document & Self

Certify

C.3

The OEM vendor shall have at least one service

center within the State of Odisha with sufficient

infrastructure.

Self Certify with

address details

Page 162: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 162

CESU, Odisha Page 162 Release Date: 27th February 2016

Appendix B – Technical Specifications

• Please refer Excel Sheet – Appendix B

• The excel sheet has to be filled by the bidder as its response to technical

specifications requirements and to be submitted along with the bid, in a CD (in

duplicate)

• The hardcopy of the same should necessarily be submitted along with the

technical bid submission

Page 163: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 163

CESU, Odisha Page 163 Release Date: 27th February 2016

Appendix C – Service Level Agreement

C.1 Purpose of this Agreement

The purpose of this SLA is to clearly define the levels of service to be provided by Supplier to

Purchaser for the duration of this contract or until this SLA has been amended. The benefits of

this SLA are to:

1 Trigger a process that applies Purchaser and Supplier management attention to some aspect

of performance only when that aspect drops below an agreed upon threshold, or target.

2 Makes explicit the performance related expectations on performance required by the

Purchaser

3 Assist the Purchaser to control levels and performance of services provided by Supplier

4 This SLA is between Supplier and Purchaser.

C.2 Description of Services Provided

Supplier shall provide service as defined in Section VI - Scope of Work, in accordance to the

definitions and conditions as defined in the Section VII - GCC and Section VIII - SCC.

C.3 Duration of SLA

This Service level agreement would be valid for entire period of contract. This SLA may be

reviewed and revised according to the procedures detailed in Section C.10 of SLA (SLA Change

Control).

C.4 Service Level Agreements & Targets

This section is agreed to by Purchaser and Supplier as the key supplier performance indicator for

this engagement. The following section reflects the measurements to be used to track and report

systems performance on a regular basis. The targets shown in the following tables are for the

period of contact or its revision whichever is later.

Page 164: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 164

CESU, Odisha Page 164 Release Date: 27th February 2016

Table 2: Service Level Chart

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

5.1 Project Management

Submission of Monthly Project Status reports & Conducting Status meetings

100% • Minutes of Meetings

• Approval of Status reports by Engineer-in-Charge

2% of monthly FMS charges for every default

5.2 Helpdesk Resolution of ticket logged as per the Severity definition chart

99% Reports generated from Ticket logging system

95%-99% calls resolved in specified time: 2% penalty on the monthly FMS charges

90% - 95% calls resolved in specified time: 5% penalty on the monthly FMS charges

5.3 Install, Moves, Add, Changes (IMAC) Services

Should be part of Monthly project status report

95% Report 0.2% of monthly FMS charges

5.4 Asset / Inventory Management

Provide monthly MIS Asset Inventory

95% Report 0.2% of monthly FMS charges

Provide monthly MIS on new requirements with procurement time

95% Report 0.2% of monthly FMS charges

Conduct Annual Physical Asset verification

100% Management approval of Physical Asset Verification report

0.5% of Yearly FMS charges

5.5 Supplier Management Services

Evaluation of Supplier Performance on quarterly basis

100% Management approval of Supplier Performance evaluation report

0.5% of Quarterly FMS charges

Tracking of Supplier SLA & tickets logged with suppliers

95% Status of tickets logged with Suppliers

0.5% of monthly FMS charges

MIS reporting on AMC tenure, License fees

95% Report 0.2% of monthly FMS charges

5.6 Desk Side Technical support Services

Resolution of ticket logged as per the Severity definition chart

95% Reports generated from Ticket logging system

1% of monthly FMS charges

Page 165: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 165

CESU, Odisha Page 165 Release Date: 27th February 2016

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

5.7 Antivirus Management

Rollout of latest anti-virus definition file on workstations and Servers on being made available on Supplier's website within 24 Hours on Test Environment and within 48 hours on production environment

98% Reports generated from Anti Virus software console

1% of monthly FMS charges

5.8 LAN & local server administration

Resolution of ticket logged

99% Reports generated from Ticket logging system

Covered under 5.1

5.9

Network Monitoring & Management

SI to monitor the availability of the network link for 99% uptime. SI should measure link availability on a monthly basis.

99% Downtime reports

Reports on the Network performance

Penalty of 2% per month will be deducted from the monthly FMS charges of that utility, if the reports are not submitted by the SI.

Important: A separate SLA will be signed with bandwidth provider.

Resolution of ticket logged related to Networks

99% Reports generated from Ticket logging system

Covered under 5.1

Data Centre Network Availability

Minimum of 99.8% uptime measured on a monthly basis

99.8% Report • 2% of monthly FMS charges for less than 99.8%

• 3% of monthly FMS charges for less than 98.0%

• 5 % of monthly FMS charges for less than 95%

Regional Offices Network Availability

98% Report • 2% of monthly FMS charges for less than 98%

Page 166: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 166

CESU, Odisha Page 166 Release Date: 27th February 2016

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

Minimum of 98% uptime measured on a monthly basis

• 3% of monthly FMS charges for less than 97%

• 5 % of monthly FMS charges for less than 95 %

Divisional & Other Offices Network Availability

Minimum of 97% uptime measured on a monthly basis

97% Report • 2% of monthly FMS charges for less than 97%

• 3% of monthly FMS charges for less than 95%

5.10 Data Centre Operations

MIS reporting on physical and environmental conditions controls

95% Report 0.2 % of monthly FMS charges

MIS reporting of health checkup of all systems & modules installed

95% Report 0.2 % of monthly FMS charges

5.11 Server Administration / Management

Rollout of patches (OS, infra level) on workstations and Servers after patch being approved on test environment

98% Patch update report

0.5% of monthly FMS charges

Uptime of app servers 99.8% Report • 2% of monthly FMS charges for less than 99.8%

• 3% of monthly FMS charges for less than 98%

• 5 % of monthly FMS charges for less than 95%

Page 167: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 167

CESU, Odisha Page 167 Release Date: 27th February 2016

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

Uptime of utility servers except email

99.8% Report • 2% of monthly FMS charges for less than 99.8%

• 3% of monthly FMS charges for less than 98%

• 5 % of monthly FMS charges for less than 95%

5.12 Database Administration services

MIS report of database scheme, disk space, storage and user role

99% Report 0.5% of monthly FMS charges

5.13 Backup/ Restore Management

The Supplier should take backup as per the backup schedule defined by utility

99% Report If the negligence is found in monthly audit, the Bidder would be penalised a sum of Rs. 5,000/- per negligence.

Utility would periodically (once a quarter on a random day) request the Supplier to restore the backup data

100% Report Rs 5000/- for every restore test failure

5.14 Mail / Messaging System

Uptime of email server 99% Report • 2% of monthly FMS charges for less than 99%

• 3% of monthly FMS charges for less than 98%

• 5 % of monthly FMS charges for less than 95%

Provide monthly MIS of user account and mailboxes created/deleted.

95% Report 0.2% of monthly FMS charges

5.15 Management of utility’s EMS

Daily MIS of server and device health checkup (CPU, disk space, memory utilization, I/O

100% Reports generated from EMS system

0.5% of monthly FMS charges

Page 168: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 168

CESU, Odisha Page 168 Release Date: 27th February 2016

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

utilization, Central Storage etc.)

6.1 Incident management

Resolution of ticket logged in Incident Management tool

99% Reports generated from Ticket logging system

0.5% of monthly FMS charges

6.2 Ticketing Management

Same as 6.1

6.3 Problem Management

Supplier shall analyze all the incidents and provide a root cause report every month if there are more than 10 incidents of the same type. Supplier shall take the needed corrective action to prevent further issues due to the same cause.

100% timely submission covering all incidents logged in that month

• Root cause report

• Incident report stating problems faced by the users

• Document detailing corrective action

• 5% penalty on the monthly FMS charges of that Project Area, if the Supplier does not submit a problem report for that month.

• 5% penalty on the monthly FMS charges of that Project Area, if the Supplier does not perform the corrective action for more than one calendar month.

6.4 Change Management

Resolution of Change Management ticket logged in Change Management tool

99% Reports generated from Change Management System

Covered under 5.1

6.5 Release Management

Same as 6.1

6.6 Email Listener Same as 5.14

6.7 Availability Management

Should be part of Monthly status report

95% Report 0.2% of monthly FMS charges

6.8 Performance Management

Should be part of Monthly status report

95% Report 0.2% of monthly FMS charges

6.9 Capacity management

Should be part of Monthly status report

95% Report 0.2% of monthly FMS charges

Page 169: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 169

CESU, Odisha Page 169 Release Date: 27th February 2016

Mapping with Section G5 of SRS Document

Service Parameter Service Level

Validation Penalty

6.10 Security Management

Should be part of Monthly status report

95% Report 0.2% of monthly FMS charges

7

Resource Management

Number of shift days for which resource present at the designated location / Total number of shift days

98% averaged over all resources designated for SI services - calculated on a monthly basis

• Attendance track

• Call Log

• Audit calls/ visits

Measured on a monthly basis

If the resource availability is less than 95%, then payment shall be deducted based on the pro-rata basis.

(Total FMS cost per day divided by nos. of persons deployed)

Further deduction Rs.2,000/- per day per engineer/shall also be made on account of loss of utility/service

Resource provided is not as per specified certification / experiences

100% of the resource given

Experience Certificate of FMS personnel submitted by Supplier to Utility

Per day deduction =

0.5 * (Monthly value for that manpower as per SOR) / 30

Page 170: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 170

CESU, Odisha Page 170 Release Date: 27th February 2016

Uptime Calculation for the month:

{[(Actual Uptime + Scheduled Downtime) / Total No. of Hours in a Month] x 100}

"Actual Uptime" means, of the Total Hours, the aggregate number of hours in any month during

which each equipment, is actually available for use.

"Scheduled Downtime" means the aggregate number of hours in any month during which each

equipment, is down during total Hours, due to preventive maintenance, scheduled maintenance,

infrastructure problems or any other situation which is not attributable to Supplier’s (or Service

provider's) failure to exercise due care in performing Supplier’s responsibilities.

The Purchaser would provide a maximum of 04 hours of planned downtime for the preventive

maintenance (as part of scheduled downtime) per month per equipment/service.

The downtime for scheduled maintenance (patch application, upgrades – OS, Database, etc.)

would need to be mutually agreed between Utility and the Bidder. To reduce this time, various

maintenance activities can be clubbed together with proper planning.

"Total Hours" means the total hours over the measurement period i.e. one month (24 * number of

days in the month).

Downtime Calculation:

The recording of downtime shall commence at the time of registering the call with Supplier or

Service Provider for any downtime situation for the equipment.

Downtime shall end when the problem is rectified and the application/ service is available to the

user.

Down time will not be considered for following:

1. Pre-scheduled preventive maintenance and health checks (Scheduled Downtime).

2. Failover time (30 minutes) in case of cluster environment. Beyond which the service

would be considered to be not available and appropriate penalty shall be imposed on the

Supplier.

3. Bug in any application which causes the non-availability of the service.

If the utility elects to continue the operation of the machine / equipment, when a part of the

machine is giving problem and leading to downtime, the commencement of downtime shall be

deferred until the utility releases the machine / equipment to the Bidder for remedial action.

Page 171: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 171

CESU, Odisha Page 171 Release Date: 27th February 2016

Severity definition chart is tabulated below for reference.

Table 3: Severity Definition Chart

Support

Category

Criteria Resolution Maximum

Response

Time

Critical

The system is unable to be used for

normal business activities. There is

certainty of financial loss to

PURCHASER.

90 Minutes

15 Minutes

Urgent

There is a problem with part of the

system, which impacts on Purchaser’s

decision making. No viable

workaround is available. There is a

likelihood of financial loss.

4 Hours

1 Hour

High

The efficiency of users is being

impacted, but has a viable

workaround.

6 hours

2 Hours

Medium

A low impact problem that affects the

efficiency of users but has a simple

workaround.

12 Hours

8 Hours

Low

A fault, which has no particular impact

on processing of normal business

activities.

One Week

8 Hours

Page 172: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 172

CESU, Odisha Page 172 Release Date: 27th February 2016

C.5 Breach of SLA

In case the Supplier does not meet the service levels mentioned in Section C.4 of this Appendix

& Section G5 of SRS document, for three (3) continuous time-periods as specified in the relevant

clause, the Purchaser will treat it as a case of breach of Service Level Agreement. The following

steps will be taken in such a case:-

1. Purchaser issues a show cause notice to the Supplier.

2. Supplier should reply to the notice within three working days.

3. If the Purchaser authorities are not satisfied with the reply, the Purchaser will initiate

termination process as described in clause 33 of Section VII, GCC.

C.6 Exclusions

The Supplier will be exempted from any delays or slippages on SLA parameters arising out of

following reasons:-

1 Delay in execution due to delay (in approval, review etc) from Purchaser’s side. Any such

delays will be notified in written to the IT Team.

2 The network links will be provided by a third party and the Supplier will monitor and report

any problems on behalf of third party. If Supplier notifies and Purchaser approves that the

delay or fault was due to the third party link services then such loss will not be considered for

tracking Supplier’s SLA parameters (Also reduced from total service time).

C.7 Monitoring and Auditing

IT Team of Purchaser will review the performance of Supplier against the SLA parameters each

month, or at any periodicity defined in the contract document. The review / audit report will form

basis of any action relating to imposing penalty or breach of contract. Any such review / audit can

be scheduled or unscheduled. The results will be shared with the Supplier as soon as possible.

Purchaser reserves the right to appoint a third-party auditor to validate the SLA.

C.8 Reporting Procedures

The Supplier’s representative will prepare and distribute SLA performance reports in an agreed

upon format by the 10th working day of subsequent month of the reporting period. The reports

will include “actual versus target” SLA performance, a variance analysis and discussion of

appropriate issues or significant events. Performance reports will be distributed to the

Purchaser’s IT Team.

C.9 Issue Management Procedures

Page 173: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 173

CESU, Odisha Page 173 Release Date: 27th February 2016

C.9.1 General

This process provides an appropriate management structure for the orderly consideration and

resolution of business and operational issues in the event that quick consensus is not reached

between Purchaser and Supplier. It is expected that this pre-defined process will only be used on

an exception basis if issues are not resolved at lower management levels.

C.9.2 Issue Management Process

• Either Purchaser or Supplier may raise an issue by documenting the business or technical

problem, which presents a reasonably objective summary of both points of view and identifies

specific points of disagreement with possible solutions.

• Purchaser and the Supplier’s representative will determine which committee or executive

level should logically be involved in resolution.

• A meeting or conference call will be conducted to resolve the issue in a timely manner. The

documented issues will be distributed to the participants at least 24 hours prior to the

discussion if the issue is not an emergency requiring immediate attention.

• Management of Purchaser and Supplier will develop a temporary, if needed, and the

permanent solution for the problem at hand. The Supplier will then communicate the

resolution to all interested parties.

• In the event a significant business issue is still unresolved, the arbitration procedures

described in the Contract will be used.

C.10 SLA Change Control

C.10.1 General

It is acknowledged that this SLA may change as Purchaser’s business needs evolve over the

course of the contract period. As such, this document also defines the following management

procedures:

1 A process for negotiating changes to the SLA.

2 An issue management process for documenting and resolving particularly difficult issues.

3 Purchaser and Supplier management escalation process to be used in the event that an

issue is not being resolved in a timely manner.

Page 174: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 174

CESU, Odisha Page 174 Release Date: 27th February 2016

Any changes to the levels of service provided during the term of this agreement will be

requested, documented and negotiated in good faith by both parties. Either party can request a

change. Changes will be documented as an addendum to this document and consequently the

contract.

C.10.2 SLA Change Process

Both the parties may amend this SLA by mutual agreement in accordance. Changes can be

proposed by either party. Normally the forum for negotiating SLA changes will be Purchaser’s

monthly review meetings.

C.10.3 Version Control

All negotiated SLA changes will require changing the version control number. As appropriate,

minor changes may be accumulated for periodic release (e.g. every quarter) or for release when

a critical threshold of change has occurred.

C.11 Management Escalation Procedures

The purpose of this escalation process is to provide a quick and orderly method of notifying both

parties that an issue is not being successfully resolved at the lowest possible management level.

Implementing this procedure ensures that purchaser and Supplier management are

communicating at the appropriate levels. Escalation should take place on an exception basis and

only if successful issue resolution cannot be achieved in a reasonable time frame.

1. All issues would be raised to the project management team, which is completely

responsible for the day to day aspects of the implementation. The project management

team shall classify the issues based on their severity level and resolve them within

appropriate timelines.

2. If project management team is unable to resolve an issue, the issue would be escalated

to the top management with options/ risks detailed for decision. Top management will

make decisions based on the options/ risks presented by the IT team.

3. In case one or both the parties are unsatisfied with the decision of the top management of

the Purchaser, the dispute will be resolved as specified in clause 8 of Section VIII – GCC.

Page 175: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 175

CESU, Odisha Page 175 Release Date: 27th February 2016

C.12 Signature Page

IN WITNESS WHEREOF, the parties hereto have caused this Service Level Agreement to be

executed by their respective authorized representatives as of the date first written above.

Supplier Purchaser

(On Behalf of all consortium members also)

Signature ------------------------ Signature ------------------------

Name ------------------------ Name ------------------------

Address ------------------------ Designation ------------------------

Company ------------------------

Date ------------------------ Date ------------------------

Page 176: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 176

CESU, Odisha Page 176 Release Date: 27th February 2016

Appendix D - Supplier Response Format

D.1 General Guidelines to the bidders

The Purchaser will select a Supplier (also referred as the ‘bidder’) in accordance with the eligibility criteria indicated in Section IV.

The bidders are invited to submit a Technical Proposal and a Price Proposal for goods and related services required for the project as defined in Section VI, Scope of Work and Appendix L. This proposal will be the basis for contract negotiations and finalization of the contract with the successful bidder.

The bidders must familiarize themselves with local conditions and take these into account while preparing their proposals. To facilitate the bidders in making the Proposal, the Purchaser shall have a ‘Pre-Bid conference’ at the address and date as given in ITB, Section II.

Please note that:

• Costs involved in preparation of the proposal and of negotiating the contract, including a visit to the Purchaser, are not reimbursable.

• The final evaluation will be based on both technical and commercial factors as per the evaluation methodology mentioned in the Appendix E.

• Please check all attachments with the checklist provided at the end, prior to submission of bid.

D.1.1 Guidelines for Technical proposal

In preparing the Technical Proposal, bidders are expected to examine this Bid document in detail. The proposal should cover all the aspects of this bid document. Any bid not found responsive to this bid document shall be rejected. Material deficiencies in providing the information requested may also result in rejection of the proposal.

While preparing the technical proposal, bidders must give particular attention that the technical proposal does not include any financial information.

D.1.2 Guidelines for Price proposal

In preparing the price proposal, bidders are expected to take into account the requirements and conditions of the bid document. The price proposal should follow standard formats/forms as given in Appendix D.3.

Bidder should quote for each Project Area cost separately and also provide the consolidated cost of the project.

Page 177: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 177

CESU, Odisha Page 177 Release Date: 27th February 2016

Price Proposal should clearly indicate the price to be charged without any qualifications whatsoever and should include all taxes (sales, service, etc.), duties (excise & customs, etc), octroi, fees, levies, works contract tax, Entry tax and other charges as may be applicable, to be paid pre- or post-delivery or to be deducted by the purchaser at source, in relation to the Goods and Related Services. Such taxes, duties, cess, charges etc, if not explicitly mentioned in the Price bid tables in Appendix H.3, but applicable under law, should be included in the Quote under “Any other levies” column. The price proposal should be conformance to clause 12.3 of ITB, Section II.

D.1.3 Submission of proposal

• The original technical proposal and price proposal shall be prepared in indelible ink. It shall contain no inter-lineation or overwriting, except as necessary to correct errors made by the bidder itself. The authorised representative must initial any such corrections as mentioned in clause 21.2 ITB, Section II.

• An authorised representative of the bidder should initial all pages of the proposal.

• The bidders should submit two hard copies and five soft copies in separate compact discs (CD)/DVD as per clause 21.1 ITB, Section II. The soft copies should be necessarily in MS Word / MS Excel format (editable) besides other format(s).

• Bidders are requested to submit a proposal written in the English language. Bidders would need to submit both the technical and the price proposals.

• The proposal should be typed in “Times New Roman” font, size 11 with single line spacing.

• The document should be precise to requirements and concise in nature.

• Each technical proposal and price proposal should be marked "Original" or "Copy" as per clause 21.1 ITB. Section II. If there are any discrepancies between the original and the copy of the Proposal, the original governs. Proposals containing erasures or alterations are liable to be excluded from the evaluation process.

• The original and copy (also softcopies) of the technical proposal shall be placed in a sealed envelope clearly marked "Technical Proposal". The original and copy (also softcopies) of the price proposal should also be placed in a sealed envelope clearly marked "Price proposal" along with a warning: "Do not open with the Technical Proposal." Both envelopes shall be placed into an outer envelope and sealed. This outer envelope shall be super scribed with the following information:

1. Name of the bidder 2. Due date and time of submission 3. Submission address and contact detail

A clear marking stating: "DO NOT OPEN, EXCEPT IN PRESENCE OF THE EVALUATION COMMITTEE."

• Any omissions / deviations on the above, will cause rejection of the bid

The completed technical and price proposal must be delivered at the submission address on or before the time and date stated in the Bid Data Sheet, Section III. The Purchaser will not be responsible for any postal or transit delays. Any proposal received after the closing time for submission of proposals shall be returned unopened.

Page 178: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 178

CESU, Odisha Page 178 Release Date: 27th February 2016

D2 Technical Proposal

D.2.1 General Requirements D.2.1.1 Bid structure

THE RESPONSE SHOULD INCLUDE DETAILED STRUCTURE OF THE BID SPECIFYING THE NAMES OF

BIDDER, CONSORTIUM MEMBER (IF ANY) AND SUBCONTRACTORS, STATING THEIR RESPECTIVE

RESPONSIBILITIES. USE FOLLOWING FORMAT:-

Table 4: Bid Structure

Role Name of Company & Address

Bidder (SI/ Lead member in case of consortium for SI role) Consortium member (Second member in case of consortium for SI Role)

GIS Solution Provider

Network Solution Provider

Meter Data Acquisition Solution Provider, if required

D.2.1.2 Bidder - Company Statistics

PLEASE PROVIDE THE GENERAL AND FINANCIAL DETAILS OF EACH OF THE ENTITIES (BIDDER, CONSORTIUM MEMBER (IF ANY) AND SUBCONTRACTORS) IN THE FOLLOWING FORMATS:

Table 5: Bidder – Company Statistics

DETAILS SUPPLIER RESPONSE

BIDDER’S NAME

ADDRESS

CONTACT (S), TITLE (S), TELEPHONE (S), E-MAIL ID

(S)

NAME OF THE CHAIRMAN/ MD/ CEO/ PARTNERS

NATURE OF OWNERSHIP

DATE OF INCORPORATION OF COMPANY/ENTITY

HEADQUARTER LOCATION

OTHER OFFICE LOCATIONS, FUNCTIONS AND

PERSONNEL STRENGTH

NUMBER OF EMPLOYEES BY FUNCTION

Implementation Sales Support Quality Assurance Administrative Management

SIZE OF TEAM FOR THE PROPOSED SOLUTION

LOCATION OF SUPPORT CENTERS FOR PROPOSED

SOLUTION

OTHER BUSINESSES

Page 179: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 179

CESU, Odisha Page 179 Release Date: 27th February 2016

D.2.2 Technical Specification requirement of Application packages

Refer to Technical Specifications, Appendix B.1 for details. Please respond to each specification in following format. Copy first three columns from Appendix B.1.

Table 6: Technical Specification for Application Packages

No Functional Requirements Criticality Supplier

Response Remarks

The code to be used for providing Supplier rating responses in the column "Supplier Response" for the functional requirements is provided below:

A - Functionality not available;

B - Available with modification/workaround

C - Functionality available

Please note that the rating as per the above scale is to be entered in the "Supplier Response" column, and column titled “Remarks” is to be used for commenting on aspects related to the functional specification. Bidders have to fill on two columns ("Supplier Response" & “Remarks”).

Please also note that the serial no. and format of response should be exactly similar to that given in Appendix B.1

PLEASE PROVIDE A SUMMARY OF VERSIONS OF VARIOUS MODULES, IF THE PROPOSED SOLUTION IS A

PRODUCT. USE FOLLOWING FORMAT:-

Table 7: Details of Product Offered

Name of product Module details Version and year of release

D.2.3 Hardware Technical Specifications (Including network equipment’s, LAN/WAN, Kiosk etc.)

Refer to Technical Specifications, Appendix B.2 for details.

Please respond to each specification in following format.

Table 8: Technical Specifications of Hardware

No Description/Requirements Priority Supplier Respons

e Remarks

Page 180: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 180

CESU, Odisha Page 180 Release Date: 27th February 2016

The code to be used for providing Supplier rating responses in the column "Supplier Response" for the hardware requirements is provided below: The distribution of marks for Essential and Desirable specifications shall be as follows: A - Specifications not available B - Specifications available with modification* C - Specifications available The distribution of marks for vital specifications shall be as follows: A - Specification not available C - Specifications available

* This response is only acceptable for “Essential” & “Desirable” requirements.

Please note that the rating as per the above scale is to be entered in the "Supplier Response" column, and column titled “Remarks” is to be used for commenting on aspects related to the functional specification. Bidders have to fill on two columns ("Supplier Response" & “Remarks”).

Please also note that the serial no. and format of response should be exactly similar to that given in Appendix B.2.

PLEASE MENTION THE DETAILED SPECIFICATION OF HARDWARE EQUIPMENT AND SYSTEM SOFTWARE

(OPERATING SYSTEM, DATABASE ETC.) INCLUDING MANUFACTURER, TECHNICAL DETAILS ETC. THE

BIDDERS SHOULD PROVIDE DETAILS OF REQUIRED SYSTEM SOFTWARE LIKE OPERATING SYSTEM , DATABASE FOR SOLUTION AND UTILITIES IN FOLLOWING FORMAT :-

Table 9: Details of Hardware Offered

Product details No. of

installations Make and Model Version and year of release

Kindly attach the data sheets for the offered products.

D.2.4 Approach and Methodology

THE FOLLOWING TABLE ELABORATES VARIOUS REQUIREMENTS WITHIN A&M:

i. Understanding of Purchaser and its requirement with clear mention of the deliverables

ii. Details of proposed methodology iii. Project Team Structure iv. Resource planning and estimation v. Risk planning vi. Detailed work plan with timelines

D.2.4.1 Understanding of Utility and its requirement

BIDDER SHOULD DEPICT COMPLETE UNDERSTANDING OF THE AS-IS SYSTEM OF THE UTILITY BASED ON

THE INFORMATION PROVIDED IN THE BID DOCUMENT. IT SHOULD ALSO REQUIRE TO LIST DOWN ALL THE

DELIVERABLES THAT HAS BEEN PLANNED AS A PART OF THE OVERALL PROJECT WITH TIMELINES. ALSO

PROVIDE DETAILS OF PRIOR INTERACTION WITH UTILITY, IF ANY.

Page 181: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 181

CESU, Odisha Page 181 Release Date: 27th February 2016

D.2.4.2 Details of proposed methodology

PLEASE PROVIDE DETAILS OF METHODOLOGY FOLLOWED BY YOUR ORGANIZATION IN SUCCESSFULLY

IMPLEMENTING SIMILAR PROJECTS. ALSO HIGHLIGHT THE SPECIAL STEPS THAT YOUR ORGANIZATION/ CONSORTIUM INTENDS TO TAKE IN ORDER TO ENSURE THAT THE CHANGE FROM CURRENT SYSTEM TO

PROPOSED ONE WILL BE SMOOTH AND EFFECTIVE.

D.2.4.3 Project Team Structure

IN THIS SECTION PLEASE PROVIDE DETAIL OF THE TEAM THAT WOULD BE DEPLOYED BY YOUR

ORGANIZATION TO EXECUTE THE PROJECT. PLEASE PROVIDE DETAILS OF THE TEAM STRUCTURE IN THE

FOLLOWING FORMAT:

Table 10: Proposed Project Team Structure NAME OF

STAFF POSITION

ASSIGNED INTERNAT

IONAL OR

DOMESTI

C

FIRM EMPLOYME

NT STATUS

WITH THE

FIRM (FULL

TIME/ ASSOCIATE)

EDUCATION

(DEGREE, YEAR, INSTITUTION)

AREA OF

EXPERTISE AND

NUMBER OF

YEARS OF

RELEVANT

EXPERIENCE

TASK

ASSIGNED

A. PROFESSION

AL STAFF

B. SUPPORT

STAFF

D.2.4.4 Resource planning and estimation

BIDDER SHALL PROVIDE DETAILED STAFFING SCHEDULE OF THE PROFESSIONAL AND SUPPORT STAFF

IN THE FOLLOWING FORMAT:

For Professional Staff the input should be indicated individually; for Support Staff it should be indicated by category (e.g.: IT administrator, field survey staff etc.).

Months are counted from the start of the assignment. For each staff indicate separately staff input for off-site and on-site work.

Table 11: Proposed Resource Planning and Estimation NO

. NAME OF STAFF POSITIO

N STAFF INPUT

IN

WEEKS W1 W2 W3 W4 W5 ….. TOTAL

A. PROFESSIONAL

STAFF

Page 182: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 182

CESU, Odisha Page 182 Release Date: 27th February 2016

B. SUPPORT STAFF

D.2.4.5 Risk planning

BIDDER SHALL ASSESS UNDERLYING RISKS IN IMPLEMENTATION OF THE PROJECT AND DETAIL OUT THE

METHODOLOGY TO MITIGATE THEM. IT MAY INCLUDE DEVELOPMENT OF A RISK ASSESSMENT MATRIX

INDICATING SEVERITY OF THE RISK, CHANCE OF ITS OCCURRENCE AND ITS MITIGATION APPROACH.

D.2.4.6 Detailed work plan with timelines

PLEASE REFER APPENDIX N FOR THE FORMAT.

D.2.5 Project Experience

BIDDER SHALL PROVIDE DETAILS OF PROJECTS WITH APPLICATION MODULES AND OTHER

REQUIREMENTS (AS MENTIONED IN ELIGIBILITY CRITERIA, SECTION IV) WHICH HAVE BEEN

SUCCESSFULLY COMPLETED DURING THE LAST 3 FINANCIAL YEARS.

PLEASE DO NOT SUPPLY THE NAMES OF CLIENTS WHO ARE NO LONGER USING YOUR

PRODUCT/SYSTEM.

Bidders need to submit the details as per the format in the table provided. Table: The details of the same should be included in the following format and necessary supporting documents should be attached with RFP:

Table 12: Details of Project Experience

SI. No

Name of project

Brief Scope necessarily including role played by Bidder, modules implemented, sector classification

Owner of Project assignment (Client name)

Cost of assignment

Date of Awarded commencement

Date of completion

Was assignment satisfactorily completed

Was it a Power Sector Project? (Y/N) Provide Detail

Page 183: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 183

CESU, Odisha Page 183 Release Date: 27th February 2016

Please provide separate client details for bidder & each consortium member (Implementation partner, product Supplier, WAN/bandwidth/Internet service provider etc.)

D.2.6 Team details (CVs)

USE THE FOLLOWING FORMAT FOR KEY PERSONNEL WHO WOULD BE INVOLVED IN THE PROJECT. PLEASE INCLUDE DETAILS OF TEAM MEMBERS PROPOSED TO IMPLEMENT THE PROJECT, INSTALL OR

MANAGE HARDWARE, INSTALL AND MANAGE LAN/WAN AND RELATED EQUIPMENTS, PROVIDE GIS

SOLUTION ETC., PLEASE ENSURE THAT THE CV HAS A MAXIMUM LENGTH OF 3 PAGES.

IN CASE OF REPLACEMENT OF SUPPLIER PERSONAL FROM THE PROJECT TEAM, SUPPLIER IS REQUIRED

TO SUBMIT TO THE NOMINATED UTILITY PERSONAL THE CV OF THE NEW PERSON WITH EQUIVALENT OR

BETTER EDUCATION QUALIFICATION AND RELEVANT PROFESSIONAL EXPERIENCE WHO WILL BE JOINING

THE TEAM AND GET IN DULY APPROVED. THE NEW PERSON CAN START WORKING IN THE PROJECT ONLY

AFTER HIS/HER CV HAS BEEN APPROVED BY THE UTILITY.

Page 184: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 184

CESU, Odisha Page 184 Release Date: 27th February 2016

Table 13: Format of Curriculum Vitae

1. PROPOSED POSITION:

2. NAME OF FIRM AND ITIA ROLE

(SI/NSP/GSP/MDASP)

3. NAME OF STAFF:

4. DATE OF BIRTH: NATIONALITY:

5. EDUCATION:

YEAR DEGREE/EXAMINATION INSTITUTE/BOARD

6. MEMBERSHIP OF

PROFESSIONAL

ASSOCIATIONS:

7. OTHER TRAINING:

8. COUNTRIES OF WORK

EXPERIENCE:

9. LANGUAGES:

LANGUAGE SPEAKING READING WRITING

10. EMPLOYMENT RECORD:

FROM TO EMPLOYER POSITIONS HELD

11. DETAILED TASKS ASSIGNED: 12. WORK UNDERTAKEN THAT BEST ILLUSTRATES CAPABILITY TO

HANDLE THE TASKS ASSIGNED:

13. Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience. I understand that any wilful misstatement described herein may lead to my disqualification or dismissal, if engaged.

Signature of authorised representative of the staff Date:

Full name of authorised representative:

Page 185: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 185

CESU, Odisha Page 185 Release Date: 27th February 2016

D.2.7 Firm Detail

BIDDER SHALL PROVIDE DETAILS OF CMM/CMMI AND ISO CERTIFICATION ALONG WITH THE DETAILS

OF NET-WORTH AND TURNOVER FOR THE PAST THREE AUDITED FINANCIAL YEARS IN THE FOLLOWING

FORMAT:

Table 14: Firm Detail

DETAILS FY11-12 FY12-13 FY13-14

NET-WORTH

TURN-OVER

LEVEL OF CMM/CMMI CERTIFICATION (YES/NO)

ISO CERTIFICATION (YES/NO)

AUDITED FINANCIAL REPORTS AND COPY OF THE CERTIFICATES SUPPORTING THE ABOVE NEED TO BE

SUBMITTED AS PROOF.

D.2.8 Facility Management Services Plan

THE DETAIL PLAN FOR FMS SHALL BE GIVEN IN ACCORDANCE WITH THE SECTION G5 OF SRS

DOCUMENT.

D.2.9 Project Management Practices

PLEASE PROVIDE HIGH-LEVEL DETAILS OF THE PROJECT MANAGEMENT PRACTICES THAT WILL BE

FOLLOWED TO MANAGE THE PROJECT. THE PROJECT MANAGEMENT PRACTICES WOULD INCLUDE (BUT

NOT BE LIMITED TO) DETAILS OF:-

• BIDDER MUST PROVIDE DETAILS OF HOW THEY ENVISAGE THE CONTRACT BEING MANAGED

INCLUDING PRINCIPLES SUCH AS (BUT NOT LIMITED TO) JOINT PLANNING AND CONTROL

MECHANISMS; REGULAR AND ACTIVE REVIEW MEETINGS; PROJECT MANAGEMENT OF INDIVIDUAL

WORK STREAMS AND OVERALL PROGRAM MANAGEMENT OF THE ENTIRE SERVICE; PERFORMANCE

REPORTING

• BIDDER SHOULD OUTLINE THEIR PROPOSED GOVERNANCE STRUCTURE AND DESIGNATE A SERVICE

MANAGER TO CO-ORDINATE THEIR ACTIVITIES AND PROVIDE A FOCAL POINT OF CONTACT TO WHOM

UTILITY CAN REFER ON ANY MATTER CONCERNING THE SERVICE.

• REPORTING LINES AND DECISION-MAKING POWERS WITHIN THE BIDDER’S ORGANIZATION MUST BE

EXPLAINED

• REPORTING FORMATS AND TEMPLATES THAT WOULD BE FOLLOWED BY THE BIDDERS

• OUTLINE THE PROPOSED ESCALATION PROCEDURES IN THE EVENT THAT ISSUES ARISE.

D.2.10 Quality Assurance

• QUALITY OF SERVICE - SUPPLIERS MUST PROVIDE DETAILS OF THEIR PROPOSED APPROACH TO

QUALITY ASSURANCE TO ENSURE THE QUALITY OF SERVICES IN ACCORDANCE WITH CLAUSE 19 OF

SECTION G1 OF SRS DOCUMENT. THIS SHOULD INCLUDE:

Page 186: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 186

CESU, Odisha Page 186 Release Date: 27th February 2016

• RESPONSIBILITY OF QUALITY OF SERVICE;

• HOW THE SUPPLIER WILL ENSURE QUALITY SERVICE IS PROVIDED;

• HOW QUALITY WILL BE MEASURED

Does your company (and consortium partner) have any quality certification / Assessment? If so, please provide your responses for the following:

Table 15: Details of Certification DESCRIPTION BIDDER’S

RESPONSE

CERTIFICATION / ASSESSMENT NAME

WHO ISSUED THE CERTIFICATION/ASSESSMENT?

WHEN WAS THE CERTIFICATION/ASSESSMENT OBTAINED?

DOES THIS CERTIFICATION/ASSESSMENT PROCESS INVOLVE PERIODIC

REVIEWS AND OBSERVATIONS/ REMARKS AFTER SUCH REVIEW? IF SO, PLEASE PROVIDE DETAILS AND SPECIFY WHEN YOUR COMPANY IS DUE FOR

ITS NEXT QUALITY REVIEW?

Please specify your company’s process for product development and enhancements

D.2.11 Documentation

PLEASE PROVIDE A LIST OF ALL USER DOCUMENTS THAT WILL BE PROVIDED ALONG WITH THE

SOFTWARE PACKAGE. THIS MUST INCLUDE THE FOLLOWING MINIMUM DOCUMENTS:

• SYSTEM AND ADMINISTRATION MANUALS

• TECHNICAL SUPPORT HANDBOOK

• USER MANUALS;

• ERROR MESSAGES AND THEIR MEANINGS;

• TRAINING MANUALS;

• ANALYSIS & DESIGN MANUALS WITH THE RELEVANT DATA FLOW DIAGRAMS, ENTITY RELATIONSHIP

DIAGRAMS, SCHEMAS ETC.;

• ADDITIONS/ CHANGES TO THE DOCUMENTS AFTER UPGRADES; AND

• OPERATIONS MANUALS.

D.2.12 Deviations Sheet Only “non-material deviations” (which means only those deviations that do not qualify as material deviations as defined in ITB clause 29.2 of bid document) will be considered by the purchaser. Please describe all the non-material deviations w.r.t Terms and conditions described in the General conditions of contract, Section VII & Special conditions of contract, Section VIII. If bidder desires to take any non-material deviation from the terms & conditions of the tender, it should be mentioned specifically in this deviation sheet. Unless such deviations are mentioned in this deviation sheet, the same will not be taken into consideration.

Page 187: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 187

CESU, Odisha Page 187 Release Date: 27th February 2016

Table 16: Format for Deviations

Tender Clarifications – Terms and Conditions Sl. No. Tender Reference (Section /

Clause number ) Details of Clauses / Section needing deviation

Deviation proposed

Except aforesaid deviations, the entire order, if placed, shall be executed in accordance with specifications and any other conditions, variations/deviations etc. if found, elsewhere in this proposal should not be given any consideration while finalizing the tender. It is not mandatory to consider and accept the deviation mentioned on deviation sheet proposed by the bidder. Note: - Continuation sheet of like size & format may be used as per bidder’s requirement wherever necessary.

Page 188: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 188

CESU, Odisha Page 188 Release Date: 27th February 2016

D.3 Price proposal Bidders are requested to provide cost for each of the Project Area in the subsequent formats. The Bidders should take a note of following points while filling the Price proposal.

1 Bidder will be responsible for payment of Taxes (including local entry taxes), duties, cess, charges etc, including taxes, duties, cess, charges etc, to be paid by the Supplier pre- or post-delivery. Such taxes, duties, cess, charges etc, if not explicitly mentioned in the following tables, but applicable under law, should be included in the Quote under “Any other levies” column.

2 The Bidder will provide Tax rates assumed for the calculation at the time of proposal for each item in notes to respective table.

3 Please refer to GCC Clause 13.2 and the SCC for Price adjustments due to change in Tax rates (including local entry taxes), duties, cess, charges etc.

4 Purchaser reserves the right to deduct and pay to the government authorities the taxes at applicable rates from the price payable to the supplier.

5 The unit prices mentioned for various components should be the same for all Project Areas. In case of any discrepancy among unit prices of various Project Areas, the lowest unit price of equipment mentioned for any Project Area shall prevail.

6 Utility proposes establishment of one centralized Data Centre and Customer Care Centre which are located in the Project Area(s) defined in the Appendix F (List of offices for WAN connectivity).

D.3.1 Project Area with Data Centre & Customer Care Centre

BIDDER SHOULD REFER APPENDIX F TO FILL IN FOLLOWING INFORMATION:

NAME OF PROJECT AREA (TOWN):-

LOCATION DATA CENTRE:-

LOCATION OF CUSTOMER CARE CENTRE:-

NUMBER SUBDIVISION OFFICES UNDER THE PROJECT

AREA:-

NUMBER OF OTHER OFFICES UNDER THE PROJECT AREA:-

• FORMS (FORM 1 TO FORM 6) MENTIONED IN THE APPENDIX C.3.1 SHOULD ONLY BE FILLED, BY THE

BIDDER, TO PROVIDE COST OF IT IMPLEMENTATION FOR PROJECT AREA WHERE DATA CENTRE AND

CUSTOMER CARE CENTRE ARE LOCATED. FOR OTHER PROJECT AREA(S) OF THE UTILITY, FORMS

(FORM 3 TO FORM 6) MENTIONED IN APPENDIX C.3.2 SHOULD BE FILLED.

• BIDDER SHOULD DEFINE QUANTITY AND UNIT PRICE WHICH INCLUDES FOB, FREIGHT & INSURANCE, EXCISE DUTY, CST/VAT AND ANY OTHER LEVIES FOR EACH ITEM LISTED BELOW IN THE

FOLLOWING FORMAT.

Page 189: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 189

CESU, Odisha Page 189 Release Date: 27th February 2016

• Sub-division offices are separated from other offices as Meter Data Acquisition Servers are planned to be setup only in sub-division offices. Other offices cover (but not limited to) head quarter, regional offices, circle offices, division offices, collection centre etc. These offices are not provided with any server and shall have connectivity with Data Centre to transfer/access information.

Form 1: Data Centre Cost • Bidder should provide lumpsum cost of installation, testing & commissioning, training of

employees, data migration cost etc. including all taxes in the format provided below. • WAN/LAN implementation charges shall include charges for setup, configuration, training,

installation, cables, liaisoning with service provider, etc.

Price Details are to be provided as per attached Price annexure. Bid Forms in Price Annexure are to be used as mentioned below (Details of Price Bid Formats are provided in Appendix Q):-

Bid Form No.

Bid Form Description

I This form is to be used for providing the price proposal of Bhubaneswar City including the Data Center Cost

II This form is to be used for providing the price proposal of Berhampur town or any other town to be selected by CESU for Disaster Recovery Center Cost

III This form is to be used for providing the price proposal of Bhubaneswar City including the Call Center Cost

IV This form is to be used for providing the price proposal of R-APDRP Towns other than Bhubaneswar and Cuttack.

V This form is to be used for FMS Charges

VI This form is to be used for providing the FMS Charges for R-APDRP

VII This form is to be used for providing the Total Cost of Ownership for R-APDRP area

VIII This form is to be used for Total Cost of Project covering both the Areas and including the FMS Charges. Project Proposals will be compared based on the Total project Cost mentioned in this sheet.

Page 190: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 190

CESU, Odisha Page 190 Release Date: 27th February 2016

D.4 Checklists

PLEASE SUBMIT A COPY OF THIS SECTION WITH COVER LETTER WHILE SUBMITTING THE PROPOSAL.

D.4.1 Mandatory forms that needs to be submitted

Table 17: Check List for Mandatory Forms S. No. Item Furnished

1 Documents against eligibility criteria Yes/ No

2 Bid Security Yes/ No

3 One original copy duly signed- Technical Proposal Yes/ No

4 One copy Technical Proposal - Hard copy Yes/ No

5 Five copies of Technical Proposal - Soft copies Yes/ No

6 One original copy duly signed- Price proposal Yes/ No

7 One copy of Financial Proposal - Hard copy Yes/ No

8 Five copies of Financial Proposal - Soft copies Yes/ No

9 Proof of turnover and net worth for the last three audited financial years of Bidder, consortium member (if any) and sub-contractors

Yes/ No

10 CV of key personnel in suggested format Yes/ No

11 Proposed SLA template Yes/ No

12 Filled-in copy of Bidding forms (Section V) Yes/ No

13 Receipt of purchase of tender Yes/ No

D.4.2 Compliance checklist

Table 18: Check List for proper Documentation & Compliance S. No. Item Furnished

1 Please confirm you agree to all clauses specified in the Section II, ITB Yes/ No

2 Please confirm you have submitted all the mandatory forms specified in Appendix D (Technical & Financial Proposal)

Yes/ No

3 Please confirm you have noted the bid submission deadline specified in Section III, BDS (ITB 23.1)

Yes/ No

4 Please confirm you have noted that the performance security will be furnished within time period as specified in Section II, ITB clause 42.1

Yes/ No

5 Please confirm you have provided all document proof to substantiate you qualifying the eligibility criteria as mentioned in Section IV

Yes/ No

6 PLEASE CONFIRM YOU HAVE COMPLIED WITH THE PROPOSED SOLUTION

ARCHITECTURE SPECIFIED IN SRS DOCUMENT Yes/ No

7 PLEASE CONFIRM YOU HAVE COMPLIED WITH ALL SERVICES SPECIFIED IN THE

SCOPE OF SERVICES MENTIONED IN SECTION VI Yes/ No

8 PLEASE CONFIRM THAT YOU COMPLY WITH ALL CLAUSES SPECIFIED IN THE

GENERAL CONDITIONS OF CONTRACT SPECIFIED IN SECTION VII Yes/ No

9 PLEASE CONFIRM THAT YOU COMPLY WITH ALL CLAUSES SPECIFIED IN THE

SPECIAL CONDITIONS OF CONTRACT SPECIFIED IN SECTION VIII Yes/ No

10 Please confirm that all goods (software and hardware) and services have been included in the price proposal and is complete in all respects without any deviation/ missing items

Yes/ No

11 Please confirm that you have not submitted any alternate proposal Yes/ No

12 PLEASE CONFIRM THAT YOU HAVE NOTED THE SLA GUIDELINES AND PENALTY

CLAUSES APPLICABLE AS SPECIFIED IN APPENDIX C. Yes/ No

13 PLEASE CONFIRM YOU HAVE PROVIDED SUFFICIENT BID SECURITY IN PROPER

FORM AS SPECIFIED IN CLAUSE 20, SECTION II ITB Yes/ No

14 PLEASE CONFIRM YOU HAVE RESPONDED TO ALL MANDATORY TECHNICAL

SPECIFICATION GIVEN IN APPENDIX A Yes/ No

Page 191: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 191

CESU, Odisha Page 191 Release Date: 27th February 2016

15 PLEASE CONFIRM YOU HAVE RESPONDED TO ALL TECHNICAL SPECIFICATIONS (APPLICATIONS) GIVEN IN THE APPENDIX B.1

Yes/ No

16 PLEASE CONFIRM YOU HAVE RESPONDED TO ALL TECHNICAL SPECIFICATIONS

(HARDWARE) GIVEN IN THE APPENDIX B.2 Yes/ No

17 PLEASE CONFIRM THAT YOU HAVE CHECKED THE FINAL QUOTE PROVIDED IN

APPENDIX D (PRICE PROPOSAL) Yes/ No

Page 192: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 192

CESU, Odisha Page 192 Release Date: 27th February 2016

Appendix E – Evaluation Methodology

• Alternate bids are not allowed

• Only bids from empanelled (by the nodal agency) bidders shall be evaluated

• The evaluation team will thoroughly review the proposals submitted by various bidders /

consortiums. The broad evaluation will be based as following:-

• Technical Proposal: 50% Weight

• Price Proposal: 50% Weight

• Pre-demo meetings will be conducted with all the bidders

• Each of the bidder will be requested to demonstrate the product and services.

• The technical evaluation will commence post the demonstrations

• Based on multiple parameters, the evaluation team will calculate the technical evaluation

score for each Supplier at the end of this phase

• Utility, in observance of best practices, shall:

• Maintain the bid evaluation process strictly confidential

• Reject any attempts or pressures to distort the outcome of the evaluation, including

fraud and corruption

• Strictly apply only and all of the evaluation and qualification criteria specified in the Bid

document

E.1 Single-Stage: Two-Envelope Bidding Procedure

In the Single-Stage: Two-Envelope bidding procedure, Bidders should submit two sealed

envelopes simultaneously, one containing the Technical Proposal and the other the Price

Proposal, enclosed together in an outer single envelope. Initially, only the Technical Proposals

are opened at the date and time advised in the Bidding Document. The Price Proposals remain

sealed and are held in custody by the Purchaser. The Technical Proposals are evaluated by the

Purchaser. No amendments or changes to the Technical Proposals are permitted. The objective

of the exercise is to allow the Purchaser to evaluate the Technical Proposals without reference to

price.

Bids of Bidders which do not conform to the mandatory requirements may be termed as non-

responsive and will not be evaluated further. Following the approval of the technical evaluation,

and at an address, date and time advised by the Purchaser, the Price Proposals are opened in

public. The Price Proposals are evaluated and, following approval of the price evaluation, the

Contract is awarded to the Bidder whose Bid has been determined to be have scored maximum

in the composite formula as defined below:

Total Score = 50% x Technical Proposal Score + 50% x Price Proposal Score

Page 193: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 193

CESU, Odisha Page 193 Release Date: 27th February 2016

E.2 Evaluation and Comparison of bids

Initially the Supplier’s responses are reviewed for compliance with the Commercial terms and

conditions. The Suppliers who fail to comply with any of the commercial terms and conditions

mentioned may be termed as non-responsive and will not be evaluated further. For those

Suppliers who have qualified the commercial terms and conditions Technical evaluation will be

conducted followed by the Price-Bid evaluation. The Suppliers who qualify the minimum

technical requirement will be considered for the price-bid evaluation. The price bids will remain

sealed until the technical evaluation is complete.

Technical Evaluation

The technical bid has a weightage of 50%. Technical evaluation will happen in two stages.

Stage-1: Preliminary Evaluation

In stage-1, the following shall be confirmed: Deviations, Submission of Bank Guarantee,

Acceptance of terms and conditions, Acceptance to scope of work and compliance to mandatory

technical requirements (as mentioned in Appendix A). In case the bid doesn’t meet all the

mandatory requirements, the bid shall be termed as non-responsive and will not be evaluated

further

Stage-2

The distribution of weights shall be as follows:

Table 19: Distribution of weights for bid evaluation

No Description Weight

A Technical Proposal 50

1 Technical solution as per Appendix B.1 21

2 Approach & Methodology Nil

3 Project Experience 15

4 Team Details (CV) 6

5 Firm Details 8

B Price Proposal 50

Total Marks 100

Details for each of the above parameters is as mentioned subsequently.

Page 194: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 194

CESU, Odisha Page 194 Release Date: 27th February 2016

A. Technical Proposal: Following is the methodology which shall be used to evaluate the

various parameters under the technical proposal.

A.1 Technical solution Evaluation

Table 20: Score for Technical Evaluation

No Description Maximum

Score

Technical Solution Score 21

i) Appendix B.1 21

Each module has a relative importance based on the functionality/

requirements.

Module Weightage = Relative Importance of Module / Summation of

Relative Importance of Modules * 19 (max module score)

Each module has requirement which has been classified and given

score based on the following:

o Vital: 5

o Essential: 2

o Desirable: 1

Supplier shall submit their response (self evaluation as per the format

mentioned in Appendix D.2.2) against the requirement and score shall

be given as per the following:

o Functionality Not Avail: 0 marks

o Available with modifications / workaround: 2 marks

o Functionality available: 5 marks

ii) G3 Section of SRS (refer Appendix B.2) No Marks

The entire G3 section is the minimum requirement (and hence

mandatory) for the Utility and needs to be supplied as per the

specifications. In case the bidder decides to take any deviation, the

same has to be clearly mentioned under the deviations (D.2.12). Utility

shall decide if the same is acceptable or not. In case the same is not

acceptable, the bid shall be rejected and financial bid of the bidder

shall not be opened.

Bidder’s self-response to the solution (refer A.1 above) shall be as per the manner as indicated

in Appendix-B.

Page 195: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 195

CESU, Odisha Page 195 Release Date: 27th February 2016

The final score for Technical Specifications (G2 Section of SRS) will be calculated as follows:

Table 21: Calculation of Technical Score

Calculation of Score for Technical Solution

Step Description Calculation

1 Each requirement will have maximum

score

Criticality X Options Available for

Supplier

2 Supplier will get the score for each

requirement

Criticality X Options Chosen by

Supplier

3 Weightage Score Calculation per

module

Module Score / Maximum Module

Score * Module weightage

4 Weightage Score Calculation per TS TS Score / Maximum TS Score *

TS weightage

5 Final Score Summation of weightage score of

each module (refer step 3 & 4) of

G2

For qualifying, Supplier must score minimum of 10 marks in G2 Section and should comply with

all requirements of G2 Section . In case the bidder has taken any deviation in G2 Section Utility

shall decide whether the same shall be acceptable or not.

A.2 Approach & Methodology

This section shall be assigned 0 marks.

A.3 Project Experience: Shall be assigned 15 marks. The distribution of marks shall be as

follows:

• Indian Power Utilities Experience in Billing (3 marks)

• Indian Power Utilities Experience in Consumer Indexing (4 marks)

• Project Specific Experience (4 marks)

• IT Experience: Application Modules implemented (4 marks)

A 4 CV: Shall be assigned 6 marks. Following is the list of categorization of requirement of

personnel:

Page 196: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 196

CESU, Odisha Page 196 Release Date: 27th February 2016

• GIS (Customer Indexing/ Asset Mapping/ Integrated Network Analysis

• Meter Data Acquisition/ Energy Audit

• Billing/Collection/New Connection/Disconnection

• Web Self Service/ Security/ MIS

• Customer Care

A.5 Firm details: Shall be assigned 8 marks. The distribution of marks shall be as follows:

i. Cumulative Turn-Over in the last 3 financial years (2.0 marks)

ii. Level of CMM/CMMI certification (2.0 marks)

Or ISO certification (2.0 marks)

iii. No. of locations in India (2 marks)

Bidders need to score a minimum score of “35” out of 50 in the technical evaluation; else

the bid shall be termed as non-responsive and will not be evaluated further.

B. Price-Bid Evaluation

The Price-Bid evaluation is done only for those bids which are responsive and which have a

Final Technical score which is more than or equal to the minimum score for technical proposal

mentioned in sub-section A above.

The net cost quoted will be calculated as simple addition of all the cost mentioned in the price

proposal (Clause D.3, Appendix D). The price proposal score shall be calculated with following

formula:

Price proposal score = (LP/FP)*50, where

LP: Lowest Price offer; FP: Firm’s Price

C. Total Score

Total score shall be calculated as below:

Total Score = Technical Proposal Score + Price Proposal Score

The bid with the highest overall score will be awarded the project.

CVC Guidelines will be followed regarding the issue of price negotiations with L1 bidder.

Page 197: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 197

CESU, Odisha Page 197 Release Date: 27th February 2016

Appendix F – Geographical & Administrative Information

Following is the list of towns which are included under the scope of work and Map of CESU of

Odisha is attached in the Appendix – P.

Table 22: Geographical & Administrative Information of all the Project Areas in CESU

General Description Detail

Name of town with HQ Bhubaneswar

Name of town with Data Centre Bhubaneswar

Name of Town with Disaster Recovery Centre

Berhampur or any other town to be

selected by CESU

Name of town with Customer Care Centre Bhubaneswar

Table 23: Geographical & Administrative Information of all the Project Areas in CESU

Name of

Project Area

(town)

Number of

Sub-

divisions

Offices

Number

of Other

Offices

Nearest

Railway

Station to HQ

Nearest

Functional

Airport to HQ

Total Area

of

Coverage

(Sq. Km.)

Total

Population

(as per 2001

census)

Cuttack 7 17 Cuttack Bhubaneswar 64 5,87,182

Bhubaneswar 8 38 Bhubaneswar Bhubaneswar 135 6,58,220

Puri 3 16 Puri Bhubaneswar 17 1,57,837

Khordha 2 3 Jatni Road Bhubaneswar 26 39,054

Jatni 1 3 Jatni Road Bhubaneswar 25 57,957

Dhenkanal 1 8 Dhenkanal Bhubaneswar 31 57,677

Angul 1 5 Angul Bhubaneswar 19 38,018

Talcher 1 2 Talcher Bhubaneswar 26 34,998

Kendrapara 2 3 Paradeep Bhubaneswar 11 30,824

Pattamundai 1 5 Dhanmandal Bhubaneswar 24 51,845

Jagatsinghpur 1 7 Gorekhnath Bhubaneswar 18 32,730

Paradeep 1 1 Paradeep Bhubaneswar 32 73,625

Page 198: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 198

CESU, Odisha Page 198 Release Date: 27th February 2016

Appendix G – List of Offices for WAN Connectivity

List of Offices

Table 24: List of Offices for WAN Connectivity in CESU

Name of the

Town Name of Office at

Level 2*

Name of

Office at

Level 3*

Name of

Office at

Level 4*

Name of

Office at

Level 5*

Name of

Office at

Level 6*

Name of

any other

Office

Cuttack

1. CDD1–Div.Off-I Ranihat (BB) 2. CDD2-Div.Off. - II Badambadi Gridco Colony (BB)

- - - - -

Bhubaneswar Only HQ has Leased Lines from BSNL (Primary) and STPI (Secondary)

Bhubaneswar

1. BCDD1 Powerhouse Colony (BB) 2. BCDD2 IRC Village (BB) 3. BED Rasulgarh (BB)

- - - - -

Puri Puri Electrical Division, (BB)

- - - - -

Khordha Khordha Electric Divi. (BB)

- - - - -

Jatni - - - - - -

Dhenkanal Dhenkanal Electrical Div. Dhenkanal (BB)

- - - - -

Angul Angul Electrical Division, Angul (BB)

- - - - -

Talcher Talcher Electrical Division, Chainpal (BB)

- - - - -

Kendrapara Kendrapara Electrical Div – I (BB)

- - - - -

Pattamundai - - - - - -

Jagatsinghpur Jagatsinghpur Electrical Division (BB)

- - - - -

Paradeep Paradeep Electrical Division (BB)

- - - - -

Note: BB – Broadband Connection

• Levels refer to the position in the hierarchy of the office in the administrative setup assuming

Head Quarter as level 1.

Page 199: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 199

CESU, Odisha Page 199 Release Date: 27th February 2016

Appendix H – Review of Current IT Systems

Utility has reviewed its current IT infrastructure in order to provide complete picture of existing IT

system in the Utility to bidders. Following sections provide detail of applications, hardware &

network available in the Utility.

Existing solutions

The CESU has internally developed and implemented Information Technology (IT) systems for

computerization of various business processes. These are:

Page 200: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 200

CESU, Odisha Page 200 Release Date: 27th February 2016

Table 25: Details of existing Applications to be Upgraded or Integrated with new System

Ap

plicati

on

Na

me &

fu

ncti

on

al d

es

cri

pti

on

Sta

nd

-alo

ne /In

teg

rate

d A

pp

licati

on

Oth

er

ap

plic

ati

on

s in

teg

rate

d w

ith

?

Fu

ture

Pla

ns (

Ph

ase o

ut

or

co

nti

nu

e)

Ap

plicati

on

Typ

e -

Batc

h (

BC

H),

On

lin

e (

ON

), P

C,

Clien

t S

erv

er

(CS

), W

eb

(W

EB

)

Ho

urs

of

Ap

plic

ati

on

Av

ail

ab

ilit

y t

o B

us

iness

(D

ay

s

X H

ou

rs)

Su

pp

lier

nam

e,

rele

ase

Make

/ V

ers

ion

Nu

mb

er

of

Lic

en

se

s

Pla

tfo

rm

OS

Data

bas

e

A B C D E F G H I J K L

NRBS- SBM Billing System S N Y BCH 250 NA NA NA FoxPro Win FoxPro

EBSYS- Non-SBM Billing System I Y Y BCH 250 NA NA NA FoxPro Win FoxPro

Fixed Asset Information System

(Both Online & Offline) S N Y BCH

Once

in

Year

NA NA NA VB,ASP Win Oracle

Page 201: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 201

CESU, Odisha Page 201 Release Date: 27th February 2016

Consumer Billing and Payment Information I Y Y ON 250 NA NA NA ASP Win Oracle

Cash Collection Management System

(Both Online & Offline) I Y Y ON 150 NA NA NA VB,ASP Win Oracle

Billing and Payment information to the high value consumers through e-Mail and SMS

I Y Y BCH,

ON 250 NA NA NA Java

Win,

Linux Oracle

New Service Connection Management System I Y Y ON 150 Phoeni

x NA 1 Java

Win,

Linux Oracle

Advanced Complaint Handling Procedure I Y Y ON 250 Phoeni

x NA 1 Java Win Oracle

KYC (Know Your Consumer) Data Entry S N Y ON 150 NA NA NA ASP Win Oracle

Management Information System (MIS) I Y Y ON 250 NA NA NA ASP,

Java

Win,

Linux Oracle

Meter Testing & MRT Squad Operation Management I Y Y BCH,

ON NA NA NA Java

Win,

Linux Oracle

Load Monitoring System (schedule vs. Drawal) I Y Y BCH,

ON NA NA NA NA Java

Win,

Linux Oracle

CWTT (Consumer wise Transformer Tagging) S N Y BCH 250 NA NA NA FoxPro Dos,

Win FoxPro

Page 202: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 202

CESU, Odisha Page 202 Release Date: 27th February 2016

Mi-Power software for Consumer-Indexing based energy audit.

S N Y BCH 250 PRDC NA NA C, C++ Win Access

ASD Software - Additional Security Deposit

Calculation and Notifications S N Y BCH

Once

in a

year

PRDC NA NA FoxPro Win FoxPro

Software workflow for requisition of meters for 3-

phase consumers from requisition to installation

process handling

I Y Y BCH,

ON 250 PRDC NA NA ASP Win Oracle

Human Resource Information System. S N Y BCH,

ON 250 NA NA NA Java

Win,

Linux Oracle

Tally Software S N Y BCH 250 Tally ERP

Tally

Softwar

e

Win Prop.

DB

Capacity Building Management System S N Y BCH 250 NA NA NA JAVA Win/

Linux Oracle

Collaboration with SREI Sahaj e-Village Limited for

Bill Collection in remote areas operated by OCAC.

(IT Integration provided at division level)

I Y Y ON 250

Govt

Of

Odisha

NA NA

Service provided by Govt of

Odisha Online Bill Payment through web via

<www.orissaonline.gov.in> (OCAC/ OeSL)

(IT Integration provided at division level)

I Y Y ON 250

Govt

Of

Odisha

NA NA

Bill Payment through via ECS (Direct Debit)

(IT Integration provided at division level) I Y Y BCH 250 RBI NA NA FoxPro Win

MS

Access,

FoxPro

Page 203: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 203

CESU, Odisha Page 203 Release Date: 27th February 2016

Single Sign On (SSO) I Y Y ON 250 NA NA NA Java Win,

Linux Oracle

Interfacing Tools S N Y ON 24Hrs NA NA NA Java/

FTP Linux Oracle

Reports, Statistics and Data Analysis I Y Y ON 24Hrs NA NA NA ASP WIN Oracle

Email Service I N Y WEB 24Hrs Service provided by Gmail

File Transfer Protocol – Secured Platform for data

file movement between Divisions, Circles and HQ I Y Y WEB 24Hrs MS NA NA

Microsof

t Win Nil

Official Website I Y Y WEB 24Hrs Cyber

Soft NA NA

ASP,

HTML Win Oracle

Electricity Theft Eradication Database S N Y WEB 250 NA NA NA Java Win,

Linux Oracle

Billing Engine (Revenue Assurance Module) I Y Y WEB 250 NA NA NA Java Win,

Linux Oracle

Page 204: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 204

CESU, Odisha Page 204 Release Date: 27th February 2016

Ap

plicati

on

Na

me &

fun

cti

on

al d

esc

rip

tio

n

Th

ird

Pa

rty T

oo

ls

An

y r

un

tim

e lic

en

ses

ex,

Testi

ng

to

ols

To

tal F

TE

s

Lo

cati

on

of

Reso

urc

es

Do

cu

men

tati

on

Av

ailab

le

(Y/N

)

Nu

mb

er

of

Co

ncu

rren

t

Users

(H

igh

:10

0+

, M

ed

:10

-

100, L

ow

:<10)

Co

mm

en

ts

A M N O P Q R S

NRBS- SBM Billing System Nil N NA IT N Med Nil

EBSYS- Non-SBM Billing System Nil N NA IT N Med Nil

Fixed Asset Information System (Both Online & Offline)

Nil N NA IT N Low Nil

Consumer Billing and Payment Information Nil N NA IT N Med Nil

Cash Collection Management System (Both Online & Offline)

Nil N NA IT N Med Nil

Billing and Payment information to the high value consumers through e-Mail and SMS

Nil N NA IT N Med Nil

New Service Connection Management System Nil N NA IT N Med Nil

Advanced Complaint Handling Procedure Nil N NA IT N Med Nil

KYC (Know Your Consumer) Data Entry Nil N NA IT N Med Nil

Management Information System (MIS) Nil N NA IT N Med Nil

Meter Testing & MRT Squad Operation Management Nil N NA IT N Med Nil

Load Monitoring System (schedule vs. Drawal) Nil N NA IT N Med Nil

CWTT (Consumer wise Transformer Tagging) Nil N NA IT N Med Nil

Page 205: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 205

CESU, Odisha Page 205 Release Date: 27th February 2016

Mi-Power software for Consumer-Indexing based energy audit.

Nil N NA IT N High Nil

ASD Software - Additional Security Deposit Calculation and Notifications

Nil N NA IT N Med Nil

Software workflow for requisition of meters for 3-phase consumers from requisition to installation process handling

Nil N NA IT N Med Nil

Human Resource Information System. Nil N NA IT N Med Nil

Tally Software Nil N NA IT N High Nil

Capacity Building Management System Nil N NA IT N Med Nil

Collaboration with SREI Sahaj e-Village Limited for Bill Collection in remote areas operated by OCAC. (IT Integration provided at division level)

Nil N NA IT N Med Nil

Online Bill Payment through web via <www.orissaonline.gov.in> (OCAC/ OeSL) (IT Integration provided at division level)

Nil N NA IT N Med Nil

Bill Payment through via ECS (Direct Debit) (IT Integration provided at division level)

Nil N NA IT N Med Nil

Single Sign On (SSO) Nil N NA IT N High Nil

Interfacing Tools. Nil N NA IT N Med Nil

Reports, Statistics and Data Analysis Nil N NA IT N Med Nil

Email Service Nil N NA IT N High Nil

File Transfer Protocol – Secured Platform for data file

movement between Divisions, Circles and HQ Nil N NA IT N

Med Nil

Official Website Nil N NA IT N High Nil

Electricity Theft Eradication Database Nil

N NA IT N Low Nil

Page 206: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 206

CESU, Odisha Page 206 Release Date: 27th February 2016

Technical evaluation – Existing IT Solution

The summary of evaluation performed during IT system review is presented below in a pictorial form. The application and platform details

should be mentioned and suitably rated (as per the details mentioned below the table). All the below mentioned applications and platforms

need to be integrated with the new proposed system by the Supplier:

Table 26: Technical Evaluation of Existing IT Applications A

pp

licati

on

Pla

tfo

rm

Fu

ncti

on

ality

Tech

no

log

y

Usab

ilit

y

Main

tain

-ab

ilit

y

Inte

gra

tio

n

wit

h

oth

er

syste

ms

Rem

ark

NRBS- SBM Billing System FoxPrp √ √ √ √ √ √

EBSYS- Non-SBM Billing System FoxPrp √ √ √ √ √ √

Fixed Asset Information System

(Both Online & Offline)

Oracle,ASP, Access

√ √ √ √ √ √

Consumer Billing and Payment Information Oracle,ASP,JSP

√ √ √ √ √ √

Cash Collection Management System

(Both Online & Offline)

Oracle, VB, Access

√ √ √ √ √ √

Billing and Payment information to the high value consumers through e-Mail and SMS

Oracle, Java, FoxPro

√ √ √ √ √ √

Advanced Complaint Handling Procedure Oracle, JSP, Java

√ √ √ √ √ √

KYC (Know Your Consumer) Data Entry FoxPro √ √ √ √ √ √

Page 207: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 207

CESU, Odisha Page 207 Release Date: 27th February 2016

Management Information System (MIS) Oracle, ASP, Java

√ √ √ √ √ √

Meter Testing & MRT Squad Operation Management Oracle, ASP, Java

√ √ √ √ √ √

Load Monitoring System (schedule vs. Drawal) Oracle, ASP, Java

√ √ √ √ √ √

CWTT (Consumer wise Transformer Tagging) FoxPro √ √ √ √ √ √

Mi-Power software for Consumer-Indexing based energy audit.

Oracle, VB, Java

√ √ √ √ √ √

ASD Software - Additional Security Deposit Calculation and

Notifications

Oracle, ASP √ √ √ √ √ √

Software workflow for requisition of meters for 3-phase

consumers from requisition to installation process handling

Oracle,Java √ √ √ √ √ √

Human Resource Information System. Oracle, Java √ √ √ √ √ √

Tally Software Tally DB √ √ √ √ √ √

Capacity Building Management System Oracle,Java √ √ √ √ √ √

Collaboration with SREI Sahaj e-Village Limited for Bill

Collection in remote areas operated by OCAC.

(IT Integration provided at division level)

Dot Net, Oracle √ √ √ √ √ √

Online Bill Payment through web via

<www.orissaonline.gov.in> (OCAC/ OeSL)

(IT Integration provided at division level)

Dot Net, Oracle √ √ √ √ √ √

Bill Payment through via ECS (Direct Debit)

(IT Integration provided at division level)

FoxPro, Access √ √ √ √ √ √

Single Sign On (SSO) Oracle, Java √ √ √ √ √ √

Interfacing Tools. Oracle, Java √ √ √ √ √ √

Page 208: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 208

CESU, Odisha Page 208 Release Date: 27th February 2016

Reports, Statistics and Data Analysis Oracle, Java √ √ √ √ √ √

Email Service Google √ √ √ √ √ √

File Transfer Protocol – Secured Platform for data file

movement between Divisions, Circles and HQ

Linux √ √ √ √ √ √

Official Website HTML √ √ √ √ √ √

Electricity Theft Eradication Database Oracle, Java √ √ √ √ √ √

√ Meets Expectation √√ Meets Current and Future Expectations √√√ Exceeds Expectations

x Below expectation x x Poor x x x Very poor / Functionality not available

Page 209: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 209

CESU, Odisha Page 209 Release Date: 27th February 2016

Existing Hardware

Table 27: Details of existing Hardware to be Upgraded or Integrated with new system H

ard

ware

(S

erv

er/

P

C/

Sto

rag

e D

evic

es/

UP

S/

Netw

ork

ing

eq

uip

men

ts (S

wit

ch

es,

Ro

ute

rs)/

Pri

nte

rs e

tc.)

Nu

mb

er/

Un

it

Make

Mo

del

Mem

ory

(R

AM

) (C

ap

acit

y a

nd

Typ

e)

Sto

rag

e (

HD

D)

(Cap

acit

y a

nd

Typ

e)

Pro

cesso

r (N

os &

typ

e)

Typ

e/ IO

S R

ele

as

e

Nu

mb

er

of

Po

rts

Typ

e o

f P

ort

s

Yea

r o

f P

urc

ha

se

Sh

ari

ng

w

ith

o

ther

ap

plicati

on

s

or

for

exclu

siv

e u

se

Servers

IBM X3400 2 IBM X3400 4 GB 130 GB 1, Intel

XEON NA

6 2 NIC,

4 USB

2008

IBM X3550 M2 1 IBM X3550 4 GB 278 GB 1, Intel

XEON NA

6 2 NIC,

4 USB 2009

DELL PowerEdge 2 DELL R-910 32 GB 1.6 TB 1, Intel

XEON NA

10 4 NIC

6 USB 2014

WorkStation PC

Page 210: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 210

CESU, Odisha Page 210 Release Date: 27th February 2016

Hard

ware

(S

erv

er/

P

C/

Sto

rag

e D

evic

es/

UP

S/

Netw

ork

ing

eq

uip

men

ts (S

wit

ch

es,

Ro

ute

rs)/

Pri

nte

rs e

tc.)

Nu

mb

er/

Un

it

Make

Mo

del

Mem

ory

(R

AM

) (C

ap

acit

y a

nd

Typ

e)

Sto

rag

e (

HD

D)

(Cap

acit

y a

nd

Typ

e)

Pro

cesso

r (N

os &

typ

e)

Typ

e/ IO

S R

ele

as

e

Nu

mb

er

of

Po

rts

Typ

e o

f P

ort

s

Yea

r o

f P

urc

ha

se

Sh

ari

ng

w

ith

o

ther

ap

plicati

on

s

or

for

exclu

siv

e u

se

IBM IBM 512 MB 40 GB P3 NA 3 1 NIC

2 USB 2000

DELL DELL OptiPlex 1 GB 160 GB Core i3 NA 11 1 NIC

10 USB 2011-12

ACER ACER 512 MB 40 GB P3 NA 3 1 NIC

2 USB 2000

Lenovo Lenovo 1 GB 166 GB Intel Core

2 Duo NA

5 1 NIC

4 USB 2008-9

Compaq Compaq 512 MB 40 GB P4 NA 3 1 NIC

2 USB 2000

Storage & Backup

Devices

EMC(2)AX4 Clarion 1 AX4 Clarion NA 1.3 TB NA NA NA NA 2009

Page 211: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 211

CESU, Odisha Page 211 Release Date: 27th February 2016

Hard

ware

(S

erv

er/

P

C/

Sto

rag

e D

evic

es/

UP

S/

Netw

ork

ing

eq

uip

men

ts (S

wit

ch

es,

Ro

ute

rs)/

Pri

nte

rs e

tc.)

Nu

mb

er/

Un

it

Make

Mo

del

Mem

ory

(R

AM

) (C

ap

acit

y a

nd

Typ

e)

Sto

rag

e (

HD

D)

(Cap

acit

y a

nd

Typ

e)

Pro

cesso

r (N

os &

typ

e)

Typ

e/ IO

S R

ele

as

e

Nu

mb

er

of

Po

rts

Typ

e o

f P

ort

s

Yea

r o

f P

urc

ha

se

Sh

ari

ng

w

ith

o

ther

ap

plicati

on

s

or

for

exclu

siv

e u

se

UPS & Battery

System

Liebert Emerson 6 Kva 1 Liebert Emerso

n NA NA NA NA

NA NA NA

Emerson 2 Kva 20 Emerson NA NA NA NA NA NA NA

Printers

Lipi 6306 & T6050 14 Lipi 6306

T6050

2007-08

Wep P-1000 5 Wep P-1000 2007-08

Machines

KIOSK NIL

IDMS along with NIL

Page 212: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 212

CESU, Odisha Page 212 Release Date: 27th February 2016

Hard

ware

(S

erv

er/

P

C/

Sto

rag

e D

evic

es/

UP

S/

Netw

ork

ing

eq

uip

men

ts (S

wit

ch

es,

Ro

ute

rs)/

Pri

nte

rs e

tc.)

Nu

mb

er/

Un

it

Make

Mo

del

Mem

ory

(R

AM

) (C

ap

acit

y a

nd

Typ

e)

Sto

rag

e (

HD

D)

(Cap

acit

y a

nd

Typ

e)

Pro

cesso

r (N

os &

typ

e)

Typ

e/ IO

S R

ele

as

e

Nu

mb

er

of

Po

rts

Typ

e o

f P

ort

s

Yea

r o

f P

urc

ha

se

Sh

ari

ng

w

ith

o

ther

ap

plicati

on

s

or

for

exclu

siv

e u

se

Automatic Token

Dispenser Machine

Cash/ Cheque

Collection KIOSK

NIL

Spot Billing Machine

with Printer

Analogic 200 Analogic Micro

PSD 16 MB Nil

1 RJ 45 2011

Billing System

VisionTek

(LinkWell) 500

VisionTe

k 93 POS

256

RAM,

2 GB

(data

Card)

ARM 9

2

3

RJ 45

USB 2012-13 Billing System

Server Racks (42 U) 1 APW

Rack 1 NA NA NA NA

NA

NA 2009

Page 213: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 213

CESU, Odisha Page 213 Release Date: 27th February 2016

Hard

ware

(S

erv

er/

P

C/

Sto

rag

e D

evic

es/

UP

S/

Netw

ork

ing

eq

uip

men

ts (S

wit

ch

es,

Ro

ute

rs)/

Pri

nte

rs e

tc.)

Nu

mb

er/

Un

it

Make

Mo

del

Mem

ory

(R

AM

) (C

ap

acit

y a

nd

Typ

e)

Sto

rag

e (

HD

D)

(Cap

acit

y a

nd

Typ

e)

Pro

cesso

r (N

os &

typ

e)

Typ

e/ IO

S R

ele

as

e

Nu

mb

er

of

Po

rts

Typ

e o

f P

ort

s

Yea

r o

f P

urc

ha

se

Sh

ari

ng

w

ith

o

ther

ap

plicati

on

s

or

for

exclu

siv

e u

se

Switches

DLink (Layer 3) 1 DLink DGS

3610

V10.3

(5p1)

24 2012

DLink (Layer 2) 2 DLink DGS

3100 3.60.28

24 2012

Routers 1 CISCO 1841

Modular 12.4

2 2009

Firewall 1 SonicWa

ll

NSA

2400 5.8.1.13-10

6 2009

Cable/Optical Fiber Nil

KVM Switch 1 DLink NA NA 8 2009

Page 214: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 214

CESU, Odisha Page 214 Release Date: 27th February 2016

Appendix I – List of Manuals/Business Processes to be converted (data-entry) into electronic form

The following manuals/business processes need to be converted into electronic form

Details will be provided during the preparation of ‘To Be document’ with the Selected ITIA.

Table 28: List of Manuals/ Business Process to be converted into Electronic Form in CESU

Name of the application/ business process that requires data migration into the proposed applications

Type (Standalone application/ Integrated application/ Manual Business Process)

If Integrated, what are the other applications integrated with this?

Database (Access, SQL etc.)

Data Format (Access Table, Paper forms, Excel Sheets etc.)

Quantity per period (e.g. number of bills generated per month etc.)

Volume of Data (1000 records, 5000 pages etc)

Data mirroring/ replication needed?

Comments

MIS

Energy Audit

Billing

Metering

Collection

New Connection / Disconnection

Enforcement And Respective Assessment

Meter Data Acquisition

Asset Management / Maintenance Management

Web Self Service

Page 215: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 215

CESU, Odisha Page 215 Release Date: 27th February 2016

Appendix J – Review of Current Business Processes

1. AMR & Meter Data Acquisition and Energy Audit System:

While Input / output (exchange) meters are being installed at all locations and it is nearing

completion, meters for energy audit purpose are available only at selected locations.

Readings from these are downloaded manually and processed using primitive tools like

Excel or manually for the purpose of energy audit and identifying high loss area. Current

process is too cumbersome and granularity is not up to desired level.

2. New Connection: With respect to process being followed, this can be divided into two

broad categories:

a. Single phase connection in Bhubaneswar: Prospective consumer (applicant)

approaches Customer Care Center & call center located at Power House Square,

Bhubaneswar. The Application Form are registered by Customer Care Center

executive in new connection service module provided by M/s Phoenix IT Solutions

Ltd. Applicant will be asked to submit required documents and an

acknowledgement No. is given to the applicant for subsequent follow up.

Required documents include an agreement between utility and applicant.

Applicant is also required to provide neighboring consumer numbers. These

documents would be scrutinized by CESU officers for completeness. If the

documents are in order (if document are incomplete then either consumer has to

complete it or the request gets rejected) then based on address at which

connection is required, respective JE is sent the New Application file. Such

dispatches are done once a day by M/s Phoenix IT Solutions Ltd.

Concern JE does the field survey and sends his recommendations. These

recommendations would contain details like -

1. Availability of LT network and/or augmentation, if required

2. Any details gathered from field for existence of earlier connections for same

premises.

In case LT network is available then commercial officer in concerned sub-division

will ascertain pending of any earlier dues on same premises. Applicant is required

to clear earlier dues, if any. After file is cleared by both JE (for technical feasibility)

and commercial officer then it is sent back to Customer Care Center. Customer

Care Center generated demand note and inform to the consumer to pay it at the

collection window situated within Customer Care Center. The breakup details of

demand note charges are available in new connection service module. Customer

Care Center also manages inventory of single phase meters and services lines for

cases cleared for energization. Meter, service line and requisite material is issued

for installation and energization of connection. After energization, physical file is

sent to divisional office for entering details in billing system. Consumer No. is

generated by billing system and same is recorded on file. The completed file is

again sent back to Customer Care Center to capture the energization details and

consumer No. in new connection service module.

Page 216: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 216

CESU, Odisha Page 216 Release Date: 27th February 2016

In case existing network is to be augmented then cost is borne by utility. However,

if network is to be laid only for one new applicant then cost of network is to be

borne by applicant.

During all intermediate stages of requests, M/s Phoenix IT Solutions Ltd.,

manually tracks the status of the request and updates the system so that it can be

informed to consumer.

b. Three phase connection and single phase connection in Cuttack: The process is

similar to single phase connection at Bhubaneswar, except that complete

processing is done in respective divisional office and demand note charges are

collected manually (not in system) and manual receipt is given to consumer.

Applicable network augmentation charges are collected from applicant before

augmenting the network, if such charges are payable by consumer.

3. Disconnection & Dismantling:

Disconnection is a process of discontinuing the electric supply to the premise. This is

done by disconnecting the supply from pole and removing the meter and service line.

This also amounts to termination of agreement between consumer and utility.

The consumer applies for the disconnection with an application for the request at the

Customer care center (for single phase cases in Bhubaneswar). The disconnection case

is registered checking that there should not be any dues on the consumer. If any, would

be settled before disconnection. The meter is removed and details entered in billing

system to stop subsequent billing. Final bill is generated manually after getting reading on

the date of removal.

After settlement of dues of final bill, consumer has to give separate request for refund of

security deposit.

4. Customer Indexing, Asset Management, Maintenance Management and Network

Analysis

Currently customer indexing is more on the basis of geography and route for reaching to

consumer for reading, billing and collection. Assets management and network analysis is

manual and mostly triggers from consumer requests for new connection and load

enhancement.

5. Centralized Customer Care Services and customer call center applications:

In addition to new connection requests, Customer Care Center/ call center registers all

kinds of consumer requests (supply as well as commercial complaints & requests from

single phase consumers of Bhubaneswar. Currently, it has four seats and service is

provided on 24x7 basis. The cash collection timing is 8 AM to 8 PM.

Page 217: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 217

CESU, Odisha Page 217 Release Date: 27th February 2016

Complaint is followed up with respective offices for resolution. Below mentioned types of

complaints are managed by the Customer care Center:

a. Reading/ billing/ collection complaints

b. Meter related complaints (slow/ fast/faulty/burnt meter)

c. Attribute change (Load reduction/ category change/ name change)

d. Reconnection (After disconnection due to non-payment)

e. Supply Interruption

f. Voltage Problem

g. Power Theft in neighborhood etc.

While the request registration, follow up and status update is done by call center

executive, actual processing of such requests/ complaint is outside the system. Only

status is maintained in call center.

6. Management Information System (MIS):

The billing and collection data are collected from divisions and migrated to Centralised

Database at CESU HQ IT Center and various in-house built tools are used to generate

MIS reports.

7. Identity and Access Management System:

Presently no centralized User Access control is implemented. Active Directory and role

based policies are required to be strengthened. The domain and e-mail services are

provided by Google whereas website is hosted by Cybersoft and regular updation are

done at HQ IT Center.

8. System Security Requirement, Antivirus and Firewall System:

Currently Sonic UTM firewall is implemented and QuickHeal antivirus license for 200+

clients are in place. It is required to be strengthened and re-implemented for proposed

data centers, servers and end user devices.

Processes like security policy and its implementation are in building up stage.

9. Development of Commercial Database of Consumers:

The activity will require migration of consumer database, call center open requests,

security deposit data, transaction data in files i.e. payment and requests being processed,

meters issued but not installed, etc. Since there is distinct possibility of Franchisee Towns

directly coming under CESU control, need for migration of data for remaining town may

arise any time during the project life cycle, which is five years from go live.

10. Metering:

Electricity supply to any consumer is to be given through correct metering.

Page 218: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 218

CESU, Odisha Page 218 Release Date: 27th February 2016

Since Single phase consumers are billed through SBM, metering data for single phase

consumers is first downloaded in SBM. Consumers are grouped based on geographical

area and routes. On average, in one SBM around 1000 consumer records are uploaded.

Reading gets downloaded at the time of billing data download from SBM.

For non-SBM cases, which are around 15K for two towns, previous month reading data is

printed in hard copy for specific cases. Otherwise reading is taken through CMRI and

same is uploaded in system for billing

11. Billing:

Bills are generated by the CESU on monthly basis. Spot Billing Machine (SBM) is used

for single phase consumers whereas for three phase consumers, billing is done at

Division offices.

SBM (Spot Billing Machine) Consumers

In the consumer premises Meter Reader punches the current month’s reading into the

SBM machine and spot bill is generated. At the end of the billing cycle data is uploaded

into Divisional billing system for month-end processing along with collection and other

data. MIS gets generated and the data also gets reflected under consumer account in the

website. However, especially at Bhubaneswar, Cuttack and Paradeep, SBM billing data is

uploaded on daily basis into Divisional billing system and Centralised web server for Web

display and SMS / eMail to consumers regarding their current Billing.

Non-SBM Consumers

Currently Meter reading is brought in through CMRI device or manually and Reading is

then punched in the divisional billing system for bill generation. Bills are generated in

Division offices using common billing software. After verification of the bills, printing is

done and distributed to consumers. Subsequently, billing data is uploaded in the

Centralised web server for Web display and SMS / eMail to consumers regarding their

current Billing.

12. Collection: Payment is made by the consumers through any of the methods mentioned

below and Collection information is sent to the consumers through SMS and eMail.

a. Collection Centers (Computerised Online)

b. Collection Centers (Computerised Offline)

c. Collection Centers (Manual)

d. Collection through Web

e. ECS Collection

f. Manual Collection by meter readers

g. Collection through ATP Machines

h. Collection Drop Boxes

Collection through Website:

In this method, consumers pay the bills online in CESU’s website through Odisha

government Payment Gateway (OdishaOnline). In this regard, OdishaOnline Server and

Page 219: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 219

CESU, Odisha Page 219 Release Date: 27th February 2016

CESU Centralised Servers are integrated for required consumer information, Billing

information and payment information exchange. Collection details can be viewed and

downloaded from the website by the concerned officers at division level using their login

credentials.

Cash Collection Centers (Offline):

In this method, consumers pay the bills at the cash collection center and system

generated offline receipts are issued to the consumers from the stand-alone systems due

to unavailability of network.

Cash Collection Centers (Online):

In this method, the payment transactions are made in the Centralised Server and System

generated online receipts are issued to the consumers at the cash collection centers.

Once the payment is received then the divisional billing system is updated and it also

instantly reflects in the consumer data online.

ECS Collection:

ECS functionality is currently available only for domestic consumers. To opt for this

option, first consumer has to register for ECS option and provide his / her bank details

and specify limit for due amount. These details are validated (one time) and ECS option

is activated. In this method, CESU presents the bill to the bank via RBI; the amount is

debited from the consumer’s bank account and credited directly to CESU’s bank account.

All successful ECS transaction cases are intimated by RBI to CESU and the same are

updated in the Divisional billing system.

For Manual collections, DC sheets and the used Money Receipt Books are returned to

the Division office where the DC sheets are digitised after due verification and updated in

the Divisional billing system.

The Processed data is finally submitted to the corporate head office after the month-end

processing. MIS gets generated and the data also gets reflected under consumer account

in the website.

13. Document Management System:

Presently all consumer related documents are stored in physical hardcopy file. Only on

need basis documents are scanned selectively. In the proposed process documents are

required to be scanned as part of in-line process at the stage where it is received/

generated to completely eliminate physical movement of file for processing purpose.

14. Web Self Service & Mail / Messaging System:

Website: CESU Website is maintained by CESU HQ IT staff. Initially it was developed

by Cyber Wizard Technologies.

Mail / Messaging System: For the E-mail the Google services are subscribed and

domain name is hosted on cloud under agreement with Google.

Page 220: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 220

CESU, Odisha Page 220 Release Date: 27th February 2016

15. Enterprise Management System and Network Management System:

Automated proactive monitoring of IT systems and communication network is not

implemented. It is presently performed manually by the IT Staff.

16. Data Warehouse System with MIS application:

There is no data Warehouse System. However, locally build Oracle 10g R2 based system

is operational to meet the requirements of MIS and analysis of consumer related data.

The data in soft form is available since 2005.

Page 221: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 221

CESU, Odisha Page 221 Release Date: 27th February 2016

Number of Consumer & Asset Information in CESU

Following is the consumer related information of the Utility and the Project Areas proposed in the scope of work for the previous financial year.

Table 29: Consumer Information for Utility and Project Areas

Consumer

Information (Last

Financial Year)

UTILITY

Number of

Metered

Consumers

Estimated Number

of Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total Sales Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 1,206,359 315,553 1064.69 654.6 1719.29 1,845,260 652.3497 541.7083

LT Commercial 90,684 25,379 398.32 100 498.32 352,563 327.4706 301.1357

LT Industry 8,646 640 104.68 7.81 112.49 146,105 81.1064 84.258

LT Agriculture 4,689 6,016 3.6 23.6 27.2 52,703 4.0483 3.2013

LT Others 7,340 4,018 77.02 47.81 124.83 67,834 79.1312 61.5796

HT Railways 5 0 244.36 0.00 244.36 53,000 155.60 121.62

HT Industrial 404 8 1486.59 6.81 1493.4 579,513 830.7552 837.5554

HT Commercial 458 16 273.17 12.66 285.83 146,097 174.6809 172.5077

HT Others 481 63 146.04 11.28 157.32 76,923 87.6831 77.6036

Total 1,319,066 351,693 3798.47 864.57 4663.04 3,319,998 2392.83 2201.1681

Page 222: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 222

CESU, Odisha Page 222 Release Date: 27th February 2016

Metering, Consumer Indexing and Asset Mapping Information

Following is the metering status of Utility and the Project Areas proposed in the work as on Last Financial Year

Table 30: Metering Information for Utility and Project Areas

Project Area

Consumers

UTILITY

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 138,264 202,775 13,775 354,814

LT Commercial No. 0 0 0 0 28,712 29,911 2,689 61,312

LT Industry No. 0 0 0 0 2,536 132 32 2,700

LT Agriculture No. 0 0 0 0 104 37 259 400

LT Others No. 0 0 0 0 2,111 1,216 481 3,808

HT Railways No. 0 0 0 0 3 0 0 3

HT Industrial No. 0 0 0 0 222 0 5 227

HT Commercial No. 0 0 0 0 994 0 7 1,001

HT Others No. 0 0 0 0 824 0 45 869

Total 138,264 202,775 13,775 354,814

Page 223: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 223

CESU, Odisha Page 223 Release Date: 27th February 2016

Following is the status of consumer indexing & asset mapping in the Utility & Project Areas proposed in the work as on Last financial Year

Table 31: Consumer Indexing and Asset Mapping Information for Utility and Project Areas

Project Area Name:

UTILITY, Cuttack, Bhubaneswar, Puri, Khordha,

Jatni, Dhenkanal, Angul, Talcher, Kendrapara,

Pattamundai, Jagatsinghpur, Paradeep.

% of

Indexing

completed

Number of

Consumers

Covered

Date of

survey

completed

Specify File,

Formats of the

Output (e.g.

XML, CSV etc.)

Specify consumers/

assets covered (e.g.

HT, LT, poles, lines,

switches etc.)

Consumer Indexing

HT

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

LT

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

Asset Mapping

66 kV System

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

33 kV System

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

11 kV System

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

LT System

GIS Based % Nil Nil Nil Nil

Non-GIS Based % Nil Nil Nil Nil

Page 224: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 224

CESU, Odisha Page 224 Release Date: 27th February 2016

Assets (Last Financial Year) Utility

Total Number of EHV Sub-stations feeding the Project Area

Numbers 29

Total Number of Power Transformers Numbers 82

Total Capacity of Power Transformers MVA 3480.5

Total Number 66/33 kV Feeders Numbers 121

Total Length of 66/33 kV Feeders (Overhead) kM 2900.08

Total Length of 66/33 kV Feeders (Under-ground) kM

Total Number of 66/11 kV and 33/11 kV Sub-stations feeding the Project Area

Numbers 191

Total Number of Power Transformers Numbers 445

Total Capacity of Power Transformers MVA 1894.43

Total Number 11 kV Feeders Numbers 652

Number of Metered 11 kV Feeders Numbers 540

Total Length of 11 kV Feeders (Overhead) kM 25158.94

Total Length of 11 kV Feeders (Under-ground) kM 3.75

Total Length of LT Lines (Overhead) kM 39891.07

Total Length of LT Lines (Under-ground) kM

Total Number of Distribution Transformers Numbers 48184

Number of Metered Distribution Transformers Numbers 13334

Total Capacity of Distribution Transformers MVA 2688.96

Page 225: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 225

CESU, Odisha Page 225 Release Date: 27th February 2016

Assets (Last Financial Year) Unit Cuttack Bhubaneswar

Puri Khordha Jatni Dhenkanal

Total Number of EHV Sub-stations feeding the Project Area

Numbers 3 4 1 1 1 1

Total Number of Power Transformers Numbers 9 11 3 3 3 3

Total Capacity of Power Transformers MVA 386 627.00 103 120 120 120

Total Number 66/33 kV Feeders Numbers 48 67 10 4 6 4

Total Length of 66/33 kV Feeders (Overhead)

kM 122.75 221.595 10 7 35 28

Total Length of 66/33 kV Feeders (Under-ground)

kM 3.25 0.4 1 0 0 0

Total Number of 66/11 kV and 33/11 kV Sub-stations feeding the Project Area

Numbers 22 30 4 2 2 1

Total Number of Power Transformers Numbers 48 67 10 4 6 4

Total Capacity of Power Transformers MVA 395.15 579.3 80 41 24.75 24.15

Total Number 11 kV Feeders Numbers 91 127 16 7 6 7

Number of Metered 11 kV Feeders Numbers 45 79 16 2 5 7

Total Length of 11 kV Feeders (Overhead) kM 479.75 1367.05 115.08 133.6 32.5 73.3

Total Length of 11 kV Feeders (Under-ground)

kM 3.75 6.55 0.3 0 0 0.2

Total Length of LT Lines (Overhead) kM 1053.09 2501.476 324 83 57 114

Total Length of LT Lines (Under-ground) kM 0 0 0 0 0 0

Total Number of Distribution Transformers Numbers 2238 5,074 582 139 69 165

Number of Metered Distribution Transformers

Numbers 246 1235 208 31 5 0

Total Capacity of Distribution Transformers MVA 489 755.291 80.506 14.81 10.09 24.073

Page 226: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 226

CESU, Odisha Page 226 Release Date: 27th February 2016

Assets (Last Financial Year) Unit Angul Talcher Kendrapara Pattamundai Jagatsinghpur Paradeep

Total Number of EHV Sub-stations feeding the Project Area

Numbers 1 1 1 1 1 1

Total Number of Power Transformers Numbers 2 3 1 3 3 3

Total Capacity of Power Transformers MVA 80 80 40 52.5 60 52.50

Total Number 66/33 kV Feeders Numbers 7 4 5 2 4 3

Total Length of 66/33 kV Feeders (Overhead)

kM 10 11 2 2.1 5 15.6

Total Length of 66/33 kV Feeders (Under-ground)

kM 0.4 0.3 4

Total Number of 66/11 kV and 33/11 kV Sub-stations feeding the Project Area

Numbers 3 1 1 1 1 1

Total Number of Power Transformers Numbers 7 4 5 2 4 3

Total Capacity of Power Transformers MVA 32.25 24.15 29.15 8.15 20.65 17.6

Total Number 11 kV Feeders Numbers 7 3 5 2 4 1

Number of Metered 11 kV Feeders Numbers 6 3 5 2 4 1

Total Length of 11 kV Feeders (Overhead) kM 72.00 40 28 48.9 68.75 45.1

Total Length of 11 kV Feeders (Under-ground)

kM 0.65 0.5 0.3 0.25 1

Total Length of LT Lines (Overhead) kM 253 90.75 199.01 136.3 134 51.2

Total Length of LT Lines (Under-ground) kM 0.3

Total Number of Distribution Transformers Numbers 201 163 132 71 145 88

Number of Metered Distribution Transformers

Numbers 0 23 0 0 48 0

Total Capacity of Distribution Transformers MVA 23.5 12.8 13.424 6.774 10.909 7.225

Page 227: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 227

CESU, Odisha Page 227 Release Date: 27th February 2016

Project Area Name: Cuttack

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated Number

of Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 67,893 5,747 150.425433 41.03432 191.46 1686385.18 88.53518 79.46178

LT Commercial 13,068 1,011 43.56131 12.08456 55.646 482841.53 37.16933 33.00472

LT Industry 997 21 15.274723 0.664329 15.939 226042.46 10.79263 9.949651

LT Agriculture 9 21 0.190809 0.190122 0.3809 2164 0.043489 0.034207

LT Others 375 118 1.069904 0.571037 1.6409 10277.56 1.364871 0.803908

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 106 1 48.6689609 2.378745 51.048 233123.158 35.85014 32.44375

HT Commercial 482 6 40.1627605 2.577246 42.74 263900.789 29.66414 28.67055

HT Others 364 33 31.4913923 10.33307 41.824 248351.24 26.1363 22.38253

Total 83,294 6,958 330.85 69.83 400.7 3,153,086 229.56 206.75

Page 228: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 228

CESU, Odisha Page 228 Release Date: 27th February 2016

Consumer Metering Information

Project Area

Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 34,079 33,814 5,747 73,640

LT Commercial No. 0 0 0 0 6,983 6,085 1,011 14,079

LT Industry No. 0 0 0 0 997 0 21 1,018

LT Agriculture No. 0 0 0 0 8 1 21 30

LT Others No. 0 0 0 0 149 226 118 493

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 106 0 1 107

HT Commercial No. 0 0 0 0 482 0 6 488

HT Others No. 0 0 0 0 364 0 33 397

43,168 40,126 6,958 90,252

Page 229: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 229

CESU, Odisha Page 229 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered with AMR Meters

Metered

with AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 10 0 38 48

Import Points at 33kV feeders

other than 33/11 kV SS No. 0 0 0 0 10 0 0 10

Export Points at 33kV feeders No. 0 0 0 0 0 0 1 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 48 0 43 91

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 0 0 4 4

Distribution Transformers No. 0 0 0 0 246 0 1,992 2,238

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

314 0 2,078 2,392

Page 230: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 230

CESU, Odisha Page 230 Release Date: 27th February 2016

Project Area Name: Bhubaneswar

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 188,694 1,159 417.740 38.305 456.04 1,419,082.0 192.383 189.722

LT Commercial 28,006 294 151.930 12.096 164.03 567,567.2 108.680 108.154

LT Industry 890 0 19.035 0.465 19.5 30,921.2 13.970 13.635

LT Agriculture 59 10 0.540 0.100 0.64 749.0 0.090 0.040

LT Others 1,443 87 19.699 7.506 27.206 24,789.5 14.636 13.289

HT Railways 0 0 0.000 0.000 0 0.0 0.000 0.000

HT Industrial 62 0 46.615 0.210 46.825 20,373.4 26.772 26.206

HT Commercial 466 1 208.272 6.401 214.67 578,444.4 135.382 137.227

HT Others 414 10 111.325 11.577 122.9 203,330.7 68.313 66.530

Total 220,034 1,561 975.156 76.661 1,052 2,845,257 560.226 554.803

Page 231: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 231

CESU, Odisha Page 231 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers Metered with

AMR Meters

Metered

with AMR

Compatib

le Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetere

d Total

GSM/ GPRS/

EDGE CDMA

LPR/Othe

rs

LT Domestic No. 69,162 119,532 1,159 189,853

LT Commercial No. 13,470 14,536 294 28,300

LT Industry No. 887 3 0 890

LT Agriculture No. 59 0 10 69

LT Others No. 874 569 87 1,530

HT Railways No. 0 0 0 0

HT Industrial No. 62 0 0 62

HT Commercial No. 466 0 1 467

HT Others No. 414 0 10 424

85,394 134,640 1,561 221,595

Page 232: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 232

CESU, Odisha Page 232 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered with AMR Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Ot

hers

Import Points above 33kV level No. 0 0 0 0

Export Points above 33kV level No. 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 36 0 31 67

Import Points at 33kV feeders

other than 33/11 kV SS No.

0 0 0 0

Export Points at 33kV feeders No. 2 0 0 2

11 kV feeders at 33/11 kV SS No. 79 0 48 127

Import Points at 11kV feeders No. 11 0 3 14

Export Points at 11kV feeders No. 1 0 8 9

Distribution Transformers No. 1,235 0 3,839 5,074

Import Points at LT feeders No. 0 0 0 0

Export Points at LT feeders No. 0 0 0 0

1,364 3,929 5,293

Page 233: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 233

CESU, Odisha Page 233 Release Date: 27th February 2016

Project Area Name: Puri

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 30,810 90 26.228 20.389 46.617 40998.6 20.05 13.76

LT Commercial 5,999 8 20.538 6.311 26.849 19791.4 18.68 16.09

LT Industry 75 0.61 0.01 0.62 899.0 0.43 0.38

LT Agriculture 4 5 0.07 0.07 38.5 0.01 0.01

LT Others 443 29 5.148 3.17 8.318 3825.9 5.59 3.79

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 1 0 0.6 0.6 111 0.38 0.50

HT Commercial 23 0 8.79 0.23 9.02 4321 5.76 5.56

HT Others 9 0 1.31 0.04 1.35 1750 0.92 0.71

Total 37,364 132 63.294 30.150 93.444 71,735 51.82 40.81

Page 234: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 234

CESU, Odisha Page 234 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 7,486 23,324 90 30,900

LT Commercial No. 0 0 0 0 1,505 4,494 8 6,007

LT Industry No. 0 0 0 0 75 0 0 75

LT Agriculture No. 0 0 0 0 4 0 5 9

LT Others No. 0 0 0 0 242 201 29 472

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 1 0 0 1

HT Commercial No. 0 0 0 0 23 0 0 23

HT Others No. 0 0 0 0 9 0 0 9

9,345 28,019 132 37,496

Page 235: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 235

CESU, Odisha Page 235 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 3 0 0 3

Import Points at 33kV feeders other

than 33/11 kV SS No. 0 0 0 0 0 0 0 0

Export Points at 33kV feeders No. 0 0 0 0 1 0 0 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 16 0 0 16

Import Points at 11kV feeders No. 0 0 0 0 0 0 1 1

Export Points at 11kV feeders No. 0 0 0 0 0 0 3 3

Distribution Transformers No. 0 0 0 0 208 0 374 582

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

228 0 378 606

Page 236: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 236

CESU, Odisha Page 236 Release Date: 27th February 2016

Project Area Name: Khordha

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 5488 1665 8.507 3.746 12.253 11250 5.51 4.40

LT Commercial 1126 103 1.679 0.516 2.195 1723 1.40 1.14

LT Industry 0 0 0 0 0 0 0 0

LT Agriculture 0 0 0 0 0 0 0 0

LT Others 150 11 3.004 0.835 3.839 1908 2.26 1.69

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 0 0 0 0 0 0 0 0

HT Commercial 0 0 0 0 0 0 0 0

HT Others 4 0 0.892 0.892 962 1.36 1.02

Total 6,768 1,779 14.08 5.10 19.18 15,843 10.54 8.25

Page 237: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 237

CESU, Odisha Page 237 Release Date: 27th February 2016

Consumer Metering Information

Project Area

Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 2,607 2,881 1,665 7,153

LT Commercial No. 0 0 0 0 468 658 103 1,229

LT Industry No. 0 0 0 0 0 0 0 0

LT Agriculture No. 0 0 0 0 0 0 0 0

LT Others No. 0 0 0 0 150 0 11 161

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 0 0 0 0

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 4 0 0 4

3,229 3,539 1,779 8,547

Page 238: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 238

CESU, Odisha Page 238 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level

No. 0 0 0 0 0 0 0 0

Export Points above 33kV level

No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 1 0 3 4

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 2

0 0 2

Export Points at 33kV feeders No. 0 0 0 0 1 0 0 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 2 0 5 7

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 1 0 2 3

Distribution Transformers No. 0 0 0 0 31 0 108 139

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

38 0 118 156

Page 239: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 239

CESU, Odisha Page 239 Release Date: 27th February 2016

Project Area Name: Jatni

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 5,294 907 9.025 1.941 10.966 9089 4.68 3.64

LT Commercial 699 38 0.844 0.103 0.947 761 0.95 0.51

LT Industry 0 0 0 0 0 0 0 0

LT Agriculture 0 0 0 0 0 0 0 0

LT Others 187 2 3.519 0.006 3.525 3371 2.61 2.38

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 0 0 0 0 0 0 0 0

HT Commercial 0 0 0 0 0 0 0 0

HT Others 9 2 13.032 0.504 13.536 4386 8.37 8.14

Total 6,189 949 26.42 2.55 28.97 17,607 16.61 14.67

Page 240: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 240

CESU, Odisha Page 240 Release Date: 27th February 2016

Consumer Metering Information

Project Area

Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 2,113 3,181 907 6,201

LT Commercial No. 0 0 0 0 219 480 38 737

LT Industry No. 0 0 0 0 0 0 0 0

LT Agriculture No. 0 0 0 0 0 0 0 0

LT Others No. 0 0 0 0 187 0 2 189

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 0 0 0 0

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 9 0 2 11

2,528 3,661 949 7,138

Page 241: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 241

CESU, Odisha Page 241 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with

AMR

Meters

Metered

with AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level

No. 0 0 0 0 0 0 0 0

Export Points above 33kV level

No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS

No. 0 0 0 0 1

0 5 6

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 1

0 1 2

Export Points at 33kV feeders

No. 0 0 0 0 0 0 0 0

11 kV feeders at 33/11 kV SS

No. 0 0 0 0 5 0 1 6

Import Points at 11kV feeders

No. 0 0 0 0 0 0 1 1

Export Points at 11kV feeders

No. 0 0 0 0 0 0 4 4

Distribution Transformers No. 0 0 0 0 5 0 64 69

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Page 242: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 242

CESU, Odisha Page 242 Release Date: 27th February 2016

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

12 0 76 88

Page 243: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 243

CESU, Odisha Page 243 Release Date: 27th February 2016

Project Area Name: Dhenkanal

Project Area Consumer

Information

(Last Financial Year)

Number of Metered Consumers

Estimated Number of Unmetered Consumers

Metered Sales

Assessed Energy Sales

Total Sales

Connected Load

Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 11,985 427 11.492 12.764 24.256 20143.5 11.102 8.571

LT Commercial 1,771 37 1.696 1.850 3.546 2274.0 1.609 1.242

LT Industry 500 0.48 0.514 0.994 6917.5 0.445 0.344

LT Agriculture 36 0.035 0.037 0.072 60.0 0.031 0.023

LT Others 53 44 0.052 0.087 0.139 0.7 0.078 0.063

HT Railways 1 14.637 15.676 30.313 8100 20.406 13.7594

HT Industrial 11 6.22 6.663 12.883 5393 7.547 7.1415

HT Commercial 6 3.455 3.700 7.155 2997 4.195 3.9692

HT Others 7 4.144 4.439 8.583 4453 5.031 4.7584

Total 14,370 508 42.211 45.730 87.941 50,339 50.445 39.872

Page 244: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 244

CESU, Odisha Page 244 Release Date: 27th February 2016

Project Area Consumers Metered

with AMR Meters

Metered with AMR

Compatible Meters

Metered with Static Meters

Metered with Electro-

magnetic Meters & Others

Unmetered Total

GSM/ GPRS/ EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 3,716 8,269 427 12,412

LT Commercial No. 0 0 0 0 539 1,232 37 1,808

LT Industry No. 0 0 0 0 410 90 0 500

LT Agriculture No. 0 0 0 0 6 30 0 36

LT Others No. 0 0 0 0 42 11 44 97

HT Railways No. 0 0 0 0 1 0 0 1

HT Industrial No. 0 0 0 0 11 0 0 11

HT Commercial No. 0 0 0 0 6 0 0 6

HT Others No. 0 0 0 0 7 0 0 7

4,738 9,632 508 14,878

Page 245: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 245

CESU, Odisha Page 245 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 3 3

Import Points at 33kV feeders

other than 33/11 kV SS No. 0 0 0 0

1 0 1

Export Points at 33kV feeders No. 0 0 0 0 0 0 0

11 kV feeders at 33/11 kV SS No. 0 0 0 0 6 1 7

Import Points at 11kV feeders No. 0 0 0 0 3 0 3

Export Points at 11kV feeders No. 0 0 0 0 0 4 4

Distribution Transformers No. 0 0 0 0 165 165

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

10 0 173 183

Page 246: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 246

CESU, Odisha Page 246 Release Date: 27th February 2016

Project Area Name: Angul

Project Area Consumer

Information

(Last Financial Year)

Number of

Metered

Consumers

Estimated Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 8,767 1,492 17.878 3.576 21.454 17298.0 9.024 7.318

LT Commercial 2,634 433 10.139 0.965 11.104 11702.0 7.122 6.179

LT Industry 72 2 0.92 0.92 6424.0 0.614 0.592

LT Agriculture 7 10 0.01 0.05 0.06 2513.0 0.010 0.005

LT Others 40 170 1.22 0.0921 1.3121 2016.0 0.899 0.714

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 21 2.366 2.366 2000 1.4912 1.4352

HT Commercial 13 1.045 1.045 1068 0.8175 0.7521

HT Others 8 0.406 0.48 0.886 0.8901 0.3717

Total 11,562 2,107 33.98 5.16 39.15 43,021 20.868 17.367

Page 247: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 247

CESU, Odisha Page 247 Release Date: 27th February 2016

Consumer Metering Information

Project Area

Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 7,231 1,536 1,492 10,259

LT Commercial No. 0 0 0 0 2,375 259 433 3,067

LT Industry No. 0 0 0 0 72 0 2 74

LT Agriculture No. 0 0 0 0 7 0 10 17

LT Others No. 0 0 0 0 40 0 170 210

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 21 0 0 21

HT Commercial No. 0 0 0 0 13 0 0 13

HT Others No. 0 0 0 0 8 0 0 8

9,767 1,795 2,107 13,669

Page 248: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 248

CESU, Odisha Page 248 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered with AMR Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/ GPRS/

EDGE CDMA LPR/Others

Import Points above 33kV level

No. 0 0 0 0 0 0 0 0

Export Points above 33kV level

No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 0 0 7 7

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 2 0 0 2

Export Points at 33kV feeders No. 0 0 0 0 0 0 1 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 6 0 1 7

Import Points at 11kV feeders No. 0 0 0 0 0 0 2 2

Export Points at 11kV feeders No. 0 0 0 0 2 0 10 12

Distribution Transformers No. 0 0 0 0 0 0 201 201

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

10 0 222 232

Page 249: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 249

CESU, Odisha Page 249 Release Date: 27th February 2016

Project Area Name: Talcher

Project Area Consumer

Information

(Last Financial Year)

Number of

Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 4,260 292 4.723 4.482 9.2046 6,403.0 4.2355 2.3287

LT Commercial 1,582 30 4.680 0.812 5.492 3,966.0 3.6635 2.917

LT Industry 15 1 0.092 0.013 0.1049 137.0 0.0597 0.0586

LT Agriculture 1 8 0.011 0.011 0.023 13.5 0.0015 0.0014

LT Others 177 3 1.449 0.804 2.2534 719.5 1.0084 0.4323

HT Railways 1 0.964 0.9639 110.0 0.5479 0.5416

HT Industrial 2 2.234 2.234 2,389.0 1.4578 2.5039

HT Commercial 0 0 0 0 0 0 0 0

HT Others 3 0.449 0.4487 352.2 0.4082 0.2222

Total 6,041 334 14.60 6.12 20.72 14,090 11.383 9.006

Page 250: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 250

CESU, Odisha Page 250 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 1,278 2,982 292 4,552

LT Commercial No. 0 0 0 0 475 1,107 30 1,612

LT Industry No. 0 0 0 0 3 12 1 16

LT Agriculture No. 0 0 0 0 1 0 8 9

LT Others No. 0 0 0 0 54 123 3 180

HT Railways No. 0 0 0 0 1 0 0 1

HT Industrial No. 0 0 0 0 2 0 0 2

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 3 0 0 3

1,817 4,224 334 6,375

Page 251: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 251

CESU, Odisha Page 251 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered

with AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level

No. 0 0 0 0 0 0 0 0

Export Points above 33kV level

No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 2 0 2 4

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 2

0 0 2

Export Points at 33kV feeders No. 0 0 0 0 0 0 1 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 3 0 0 3

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 3 0 2 5

Distribution Transformers No. 0 0 0 0 23 0 140 163

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

33 0 145 178

Page 252: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 252

CESU, Odisha Page 252 Release Date: 27th February 2016

Project Area Name: Kendrapara

Project Area Consumer

Information

(Last Financial Year)

Number of

Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 5,393 1,084 7.152 2.099 9.251 9,681.5 4.3200 2.8100

LT Commercial 1,825 583 3.818 1.453 5.271 3,988.4 3.5800 2.9500

LT Industry 70 7 1.128 0.173 1.301 1,190.5 0.8200 1.1400

LT Agriculture 8 7 0.001 0.008 0.009 62.0

LT Others 11 4 0.196 0.200 0.396 151.0 0.4500 0.3800

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 12 4 2.001 0.041 2.042 748.0 1.4000 1.6600

HT Commercial 0 0 0 0 0 0 0 0

HT Others 0 0 0 0 0 0 0 0

Total 7,319 1,689 14.30 3.97 18.27 15,821 10.570 8.940

Page 253: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 253

CESU, Odisha Page 253 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unme

tered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 3,593 1,800 1,084 6,477

LT Commercial No. 0 0 0 0 1,621 204 583 2,408

LT Industry No. 0 0 0 0 63 7 7 77

LT Agriculture No. 0 0 0 0 8 0 7 15

LT Others No. 0 0 0 0 7 4 4 15

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 12 0 4 16

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 0 0 0 0

5,304 2,015 1,689 9,008

Page 254: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 254

CESU, Odisha Page 254 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered

with AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level

No. 0 0 0 0 0

0 0 0

Export Points above 33kV level

No. 0 0 0 0 0

0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 1 0 4 5

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 0

0 0 0

Export Points at 33kV feeders No. 0 0 0 0 0 0 0 0

11 kV feeders at 33/11 kV SS No. 0 0 0 0 5 0 0 5

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 0 0 3 3

Distribution Transformers No. 0 0 0 0 0 0 132 132

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

6 0 139 145

Page 255: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 255

CESU, Odisha Page 255 Release Date: 27th February 2016

Project Area Name: Pattamundai

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated

Number of

Unmetered

Consumers

Metered

Sales

Assessed

Energy

Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 4,770 493 4.053 1.205 5.26 6636.5 1.5 1.010

LT Commercial 524 102 1.705 0.239 1.94 1210 1.5 1.060

LT Industry 21 1 0.148 0.90 0.16 198.5 0.1 0.090

LT Agriculture 6 189 0.045 0.05 623 0.0 0.004

LT Others 22 9 0.289 0.224 0.51 233 0.4 0.290

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 0 0 0 0 0 0 0 0

HT Commercial 0 0 0 0 0 0 0 0

HT Others 0 0 0 0 0 0 0 0

Total 5,343 794 6.20 2.61 7.92 8,901 3.503 2.454

Page 256: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 256

CESU, Odisha Page 256 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 1,777 2,993 493 5,263

LT Commercial No. 0 0 0 0 162 362 102 626

LT Industry No. 0 0 0 0 1 20 1 22

LT Agriculture No. 0 0 0 0 0 6 189 195

LT Others No. 0 0 0 0 4 18 9 31

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 0 0 0 0

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 0 0 0 0

1,944 3,399 794 6,137

Page 257: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 257

CESU, Odisha Page 257 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 1 0 2 3

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 1 0 0 1

Export Points at 33kV feeders No. 0 0 0 0 0 0 0 0

11 kV feeders at 33/11 kV SS No. 0 0 0 0 2 0 0 2

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 0 0 6 6

Distribution Transformers No. 0 0 0 0 0 0 69 69

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

4 0 77 81

Page 258: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 258

CESU, Odisha Page 258 Release Date: 27th February 2016

Project Area Name: Jagatsinghpur

Project Area Consumer

Information

(Last Financial Year)

Number of Metered Consumers

Estimated Number of Unmetered Consumers

Metered Sales

Assessed Energy Sales

Total Sales

Connected Load

Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 4,717 214 10.780 0.380 11.160 6488.0 4.620 2.155

LT Commercial 979 14 3.890 0.010 3.900 2713.0 2.453 2.253

LT Industry 21 0 0.300 0 0.300 145.0 0.232 0.215

LT Agriculture 10 9 0.540 0 0.540 20.0 0.004 0.007

LT Others 420 1 0.660 0.110 0.770 586.0 0.471 0.410

HT Railways 0 0 0 0 0 0 0 0

HT Industrial 0 0 0 0 0 0 0 0

HT Commercial 0 0 0 0 0 0 0 0

HT Others 0 0 0 0 0 0 0 0

Total 6,147 238 16.170 0.500 16.670 9,952 7.780 5.040

Page 259: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 259

CESU, Odisha Page 259 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 2,974 1,743 214 4,931

LT Commercial No. 0 0 0 0 627 352 14 993

LT Industry No. 0 0 0 0 21 0 0 21

LT Agriculture No. 0 0 0 0 10 0 9 19

LT Others No. 0 0 0 0 356 64 1 421

HT Railways No. 0 0 0 0 0 0 0 0

HT Industrial No. 0 0 0 0 0 0 0 0

HT Commercial No. 0 0 0 0 0 0 0 0

HT Others No. 0 0 0 0 0 0 0 0

3,988 2,159 238 6,385

Page 260: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 260

CESU, Odisha Page 260 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metered with AMR Meters

Metered with

AMR

Compatible

Meters

Metered

with Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 1 0 0 1

Import Points at 33kV feeders

other than 33/11 kV SS No. 0 0 0 0 0 0 0 0

Export Points at 33kV feeders No. 0 0 0 0 0 0 0 0

11 kV feeders at 33/11 kV SS No. 0 0 0 0 4 0 0 4

Import Points at 11kV feeders No. 0 0 0 0 0 0 0 0

Export Points at 11kV feeders No. 0 0 0 0 0 0 7 7

Distribution Transformers No. 0 0 0 0 48 0 97 145

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

53 0 104 157

Page 261: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 261

CESU, Odisha Page 261 Release Date: 27th February 2016

Project Area Name: Paradeep

Project Area Consumer

Information

(Last Financial Year)

Number of Metered

Consumers

Estimated Number

of Unmetered

Consumers

Metered Sales Assessed

Energy Sales

Total

Sales

Connected

Load Billing Collection

No. No. MUs MUs MUs kW Rs. Cr. Rs. Cr.

LT Domestic 2,968 205 5.05 0.598 5.648 4893 2.38 2.19

LT Commercial 410 36 1.308 0.3 1.608 1310 0.99 0.98

LT Industry 7 0.13 0.125 148

LT Agriculture 1 2

LT Others 6 3 0.164 0.09 0.254 164 0.23 0.23

HT Railways 1 0.892 0.892 300 0.47 0.47

HT Industrial 7 9.72 9.72 175 2.38 2.27

HT Commercial 4 7.65 7.65 360 1.94 1.85

HT Others 6 4.648 4.648 60 9.76 9.76

Total 3,410 244 29.56 0.99 30.55 7,412 18.15 17.75

Page 262: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 262

CESU, Odisha Page 262 Release Date: 27th February 2016

Consumer Metering Information

Project Area Consumers

Metered

with AMR

Meters

Metered with

AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmetered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

LT Domestic No. 0 0 0 0 2248 720 205 3,173

LT Commercial No. 0 0 0 0 268 142 36 446

LT Industry No. 0 0 0 0 7 0 0 7

LT Agriculture No. 0 0 0 0 1 0 0 1

LT Others No. 0 0 0 0 6 0 3 9

HT Railways No. 0 0 0 0 1 0 0 1

HT Industrial No. 0 0 0 0 7 0 0 7

HT Commercial No. 0 0 0 0 4 0 0 4

HT Others No. 0 0 0 0 6 0 0 6

2,548 862 244 3,654

Page 263: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 263

CESU, Odisha Page 263 Release Date: 27th February 2016

Asset Metering Information

Project Area Assets

Metere

d with

AMR

Meters

Metered

with AMR

Compatible

Meters

Metered

with

Static

Meters

Metered

with

Electro-

magnetic

Meters &

Others

Unmet

ered Total

GSM/

GPRS/

EDGE

CDMA LPR/Others

Import Points above 33kV level No. 0 0 0 0 0 0 0 0

Export Points above 33kV level No. 0 0 0 0 0 0 0 0

33 kV Feeder at 33/11 kV SS No. 0 0 0 0 1 0 2 3

Import Points at 33kV feeders other than 33/11 kV SS

No. 0 0 0 0 1 0 1 2

Export Points at 33kV feeders No. 0 0 0 0 1 0 0 1

11 kV feeders at 33/11 kV SS No. 0 0 0 0 0 0 1 1

Import Points at 11kV feeders No. 0 0 0 0 0 0 3 3

Export Points at 11kV feeders No. 0 0 0 0 0 0 2 2

Distribution Transformers No. 0 0 0 0 0 0 88 88

Import Points at LT feeders No. 0 0 0 0 0 0 0 0

Export Points at LT feeders No. 0 0 0 0 0 0 0 0

3 0 97 100

Page 264: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 264

CESU, Odisha Page 264 Release Date: 27th February 2016

Appendix K – Website Table 32: Detail of existing Website in CESU

Particulars Facility Available/Not Available

URL of the Website www.cescoorissa.com /

www.cesuodisha.com

Major facilities being provided to the

consumers/suppliers/employees/other stakeholders

through website

Log in Yes, only for employees.

Registration User Registration Form Is Available

Forgot password/ change password Change Password Only

Complain registration & status Yes

Contact us Yes

Privacy policy

Business associate

Consumer Related (Illustrative)

Application form submission for new connection Yes

Application form submission for disconnection No

Registration of complaint against outages Yes

Registration of complaint against corruption Yes

Online bill payment Yes

View bill summary Yes

Other 1

….

Supplier Related (Illustrative)

Tender information Yes

Tendering or Bid submission Yes

Online payment

Other 1

Other 2

….

Employees Related (Illustrative)

Payroll System

Leave balance

Expense Claim

Other 1

Other 2

Page 265: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 265

CESU, Odisha Page 265 Release Date: 27th February 2016

Particulars Facility Available/Not Available

…..

Other Stakeholder (Illustrative)

Projects Yes

AT&C Loss Status Yes

Other commercial & financial information Yes

Other 1

Other 2

…..

….

Security Features

Page 266: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 266

CESU, Odisha Page 266 Release Date: 27th February 2016

Appendix L: List of Goods and related services

List of Goods and related services: This section contains indicative list of goods and services to be delivered as per approved DPR. The delivered system should comply with performance level mentioned in the clause 9 of section G1 of SRS and meet the SLA

Attached as per BOM appendix L

Note: Bidder must provide 3 years Annual Technical Support Pack after go-live for all the Server Operating Systems. Bidder must include any extra software/OS/Database licenses required for DR Site as per the licensing policy of the offered solution.

Page 267: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 267

CESU, Odisha Page 267 Release Date: 27th February 2016

Appendix M – Estimated Manpower Requirement SI to deploy manpower, as per requirement as per Clause 7.0 of Section G.5 of SRS document keeping in view of project completion time. In addition to this following is the list of minimum number of resources required to be deployed by the bidder under various roles: Table 33: Estimated Manpower Requirement

Roles Dedicated Resources Shared Resources

Number Man months Number Man months

System Integrator 15 270 60 1080

GIS Service Provider 8

(Other than Field

Survey)

144 65 1170

Meter Data

Acquisition Service

Provider

10 180 60 1080

Network Service

Provider

10 180 40

720

Necessary resources for FMS shall be provided by the System Integrator in accordance with the clause 7.0 of Section G5 of SRS Document.

Handholding Support

Handholding support for application related operations at Division and Sub Division level shall be provided by the selected vendor for which at least one person per Division and Sub Division shall be deputed till the completion of the project.

Page 268: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 268

CESU, Odisha Page 268 Release Date: 27th February 2016

Appendix N – Expected Implementation Schedule

The bidder is expected to complete the implementation of Data Center at Bhubaneswar, Customer Care Center at Bhubaneswar and pilot projects at Bhubaneswar for CESU within 12 months from the date of issue of LOI to successful bidder by the CESU. Pilot is the first project area (consisting of the data centre) that goes live in a utility. The bidder is expected to complete the Utility-wide (CESU) implementation for all the other identified project areas with-in 18 (eighteen) calendar months, from the date of issue of LOI to successful bidder by the CESU.

Facilities Management Services post successful completion of acceptance tests shall be provided for a period of five years from the date of completion of go-line in all project areas.

Bidder shall submit a detail Gantt chart as per along with the following implementation schedule. Bidders shall drill down these activities into sub/sub-sub activity in the chart. The chart shall also detail out time and resource effort required to execute each activity. The detailed bar charts for all the work activity shall however, be discussed and agreed to by the successful Bidder with the owner before start of the execution of work.

Table 34: Expected Implementation Schedule

Activity/ Sub Activity Start

Date Weekly Plan

End

Date

W1 W2 W3 W4 W5 …

1

Mobilization at site with establishment of

site office, requisite resource

deployment etc.

2

System Design (Pre-Implementation

Plan, Testing and Development) and

Approval from the owner

3

Field Survey for Consumer Indexing &

Asset mapping & GIS System

Implementation

4 Establishment of Data Center

5 Implementation of AMR System

6

Establishment of First Customer care

center (First Customer care center after

completion of work at all sub divisions

under the requisite town, for town wise

establishment of CC Center) -

7

Creation of IT Infrastructure at Other

Utility offices viz. Division, Circle etc. (In

a phased manner for associated

completed sub division wise) -

Page 269: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 269

CESU, Odisha Page 269 Release Date: 27th February 2016

8

Integration of entire IT infrastructures

created at data center, Sub division

offices, Customer care centers,

Electrical sub stations and other utility

offices on a GIS platform with

Acceptance / Performance test

9 Facility Management Services (FMS)

Page 270: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 270

CESU, Odisha Page 270 Release Date: 27th February 2016

Appendix O: Spot Billing Machine Specification

Attached separately as an document file

Page 271: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 271

CESU, Odisha Page 271 Release Date: 27th February 2016

Appendix P: Map of CESU of Odisha

Attached separately as a pdf file

Page 272: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 272

CESU, Odisha Page 272 Release Date: 27th February 2016

Appendix Q: Formats for Price Bids

Attached separately as an Excel file

Page 273: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 273

CESU, Odisha Page 273 Release Date: 27th February 2016

Appendix R: Proposed Interface Scheme v2.4

Attached separately as a pdf file

Page 274: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 274

CESU, Odisha Page 274 Release Date: 27th February 2016

Appendix S: CESU Offices Locations for Network Connectivity

Attached separately as an excel file

Page 275: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 275

CESU, Odisha Page 275 Release Date: 27th February 2016

Appendix T: Additional Clarifications

Attached separately as an excel file

Page 276: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 276

CESU, Odisha Page 276 Release Date: 27th February 2016

Appendix U –No Deviation Certificate

No Deviation Certificate

To: Senior General Manager (IT), Central Electricity Supply Utility of Odisha, 8th Floor, IDCO Towers, Janpath, Bhubaneswar -751 022 Odisha Dear Sir, We, the undersigned, hereby declare that while responding to your RFP Notice No. ………………

dated ……………., our bid response DOES NOT DEVIATE from the RFP, SRS and their

amendment/corrigendum issued till the date of bid submission.

Name: In the capacity of:

Signed:

Duly authorized to sign the Bid for and on behalf of:

Date:

Page 277: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 277

CESU, Odisha Page 277 Release Date: 27th February 2016

Appendix V - Abbreviations

The abbreviations mentioned in the document has been expanded hereunder: Appendix T

Abbreviation Meaning

AMR Automated Meter Reading

B/W Black & White

BDS Bid Data Sheet

BG Bank Guarantee

CEO Chief Executive Officer

CIO Chief Information Officer

CST Central Sales Tax

CTI Computer Telephony Integration

CV Curriculum Vitae

DNS Domain Name Server

EMS Enterprise Management System

ExW Ex-Works

FMS Facility Management Services

FoB Freight on Board

GCC General Conditions of Contract

GIS Geographical Information System

GIS Geographical Information System

GoI Government of India

GPS Geographic Positioning System

GSP GIS Solution Provider

HQ Head Quarter

HT High Tension

ICB International Competitive Bidding

INR Indian Rupee

IP Internet Protocol

IPR Intellectual Property Rights

IST Indian Standard Time

IT Information Technology

ITB Instructions to Bidders

ITC IT Consultant

ITIA IT Implementation Agency

LAN Local Area Network

Page 278: Purchaser: CESU of Odisha Central Electricity Supply ...117.239.112.120/itcc13/RFP_RAPDRP_CESU_ITIA_V1.pdfCentral Electricity Supply Utility of Odisha for ... Download of RFP / Bid

RFP (Identification No. CESU/ITCC/R-APDRP/07) for Appointment of IT

Implementation Agency under R-APDRP SCHEME for CESU, Odisha P a g e | 278

CESU, Odisha Page 278 Release Date: 27th February 2016

Abbreviation Meaning

LDAP Lightweight Directory Access Protocol

LoI Letter of Intend

LP Lowest Prize

LT Low Tension

MBC Metering Billing Collection

MD Managing Director

MDASP Meter Data Acquisition Solution Provider

MoP Ministry of Power

MTR Motor Transport Receipt

NIT Notice Inviting Tender

NSP Network Solution Provider

OEM Original Equipment Manufacturer

OS Operating System

PC Personal Computer

PFC Power Finance Corporation

R-APDRP Restructured Accelerated Power Development Reforms Programme

RFP Request for Proposal

RFQ Request for Qualification

SAN Storage Area Network

SCC Special Conditions of Contract

SI System Integrator

SLA Service Level Agreement

SRS System Requirement Specifications

T/O Turnover

TS Technical Section

UPS Uninterrupted Power Supply

VAT Value Added Tax

VPN Virtual Private Network

WAN Wide Area Network