Page 1: Purchase Order for Project-based Procurement _Scenario Overiew

Purchase Order for Project-based Procurement

SAP Best Practices for Engineering, Construction, and Operations(India)

SAP Best Practices

Page 2: Purchase Order for Project-based Procurement _Scenario Overiew

© SAP 2010 / Page 2

Scenario Overview – 1 PO for Project-based Procurement

Purpose

This scenario describes the typical processes used in the construction industry to generate and process purchase orders (POs). These POs are used to procure materials, subcontracted services with retentions and equipments with the aspect of progress tracking.

Benefits Transparent view of created outstanding orders, commitments and delivery Standardized invoice handling by using retentions Progress tracking option based on POs for equipments

Purpose and Benefits:

Page 3: Purchase Order for Project-based Procurement _Scenario Overiew

© SAP 2010 / Page 3

Scenario Overview – 2PO for Project-based Procurement

Enhancement Package 4 for SAP ERP 6.0

Purchaser Purchasing Manager Project Manager Site Material Manager Account Payable Accountant Taxation Clerk

Transforming purchase requisitions (PRs) into purchase orders (POs)for materials, subcontracted services and equipments, create POs directly without using master records, create Blanket PO

Create goods receipt and service entry Invoice receiving and handling from suppliers Handle PO with retention payment terms Handle PO with down payment PO monitoring and progress tracking Vendor Evaluation

Company Roles Involved in Process Flows:

SAP Applications Required:

Key Process Flows Covered:

Page 4: Purchase Order for Project-based Procurement _Scenario Overiew

© SAP 2010 / Page 4

Scenario Overview – 3.1PO for Project-based Procurement

The purchasing agent monitors the material requirements generated from a specific project. The WBS element is released by the project manager, the purchase agent decides to start the procurement process. He converts the PRs in project into varies kinds of POs:

standard PO for material with master record

standard PO with retention payment term

standard PO for services

standard PO with down payment

Besides, he also create standard PO for materials without master records and Blanket PO for fuel products.

In order to monitoring the procurement process, the purchasing agent set up progress tracking for certain critical PO.

After delivering the materials or perform the service as described in the respective PO’s, the job site manager will then perform goods receipt of the materials and record all time worked by the subcontractors in Service entry Sheet associated with the planned service PO.

Detailed Process Description 1 :

Page 5: Purchase Order for Project-based Procurement _Scenario Overiew

© SAP 2010 / Page 5

Scenario Overview – 3.2PO for Project-based Procurement

Base on goods receipt, the accounting clerk will then enter an invoices for materials with or without material master records. He also enter invoices for services based on the time record in the service entry sheet. Invoice for blanket PO can be entered without goods receipt. Because no goods receipt is required in this case.

One service related invoice will be booked with 90% payment and 10% retention. Once certain special condition fulfilled, the retention amount will be paid at the retention due date.

Once the invoices have been entered into the system the accounting clerk can then execute the payment run. This can be done for multiple vendors at one time or it can be executed for a single vendor.

The Project Manager can monitor the whole procurement process and display the costs that were posted to project during the goods receipt and service entry sheet transactions.

Based on feedback from the site manager, the purchasing agent will evaluate vendor by certain criteria for example, price, quality, on-time delivery, services and log them in the system. The Purchasing agent can also print out an evaluation sheet for selected vendors.

Detailed Process Description 2 :

Page 6: Purchase Order for Project-based Procurement _Scenario Overiew

Process Flow Diagram

Purchase Order for Project-based Procurement

Ev

en

t

Display Project-Oriented Purchase

Requisition

Create PO for Service

Create PO with Retention

PO = Purchase Order

Create PO with Material

Quotations needed from

vendors

Pu

rch

ase

rP

roje

ct

Man

ager Project Setup

for Engineering and

Construction(439)

Project Budgeting for Engineering

and Construction

(440)

Project Planning for Engineering

and Construction

(441)

Create PO with Down Payment

Approve/Release PO (Optional)

Perform Goods Receipt of Materials

Enter Invoice

Acc

ou

nts

P

ayab

le

Acc

ou

nta

nt

Sit

e M

ater

ial

Man

ager

Pu

rch

ase

r M

anag

er

PO with Retention

PO for Services

PO with Down Payment

Review and Release Blocked

InvoicesExecute

Payment Run

Record Hours Worked via

Service Entry Sheet

Create PO without Material Master Record

Create Blanket PO

Create Down Payment Request

Post Down Payment

Progress Tracking

Down Payment Clearing

Project Status Review

Tax

atio

n C

lerk

Updating Bank Challan Number for TDS Payment

Withholding tax Remittance

Challan

PO for Services

Vendor TDS Certificate Print

PO for Services

Page 7: Purchase Order for Project-based Procurement _Scenario Overiew

Process Flow Diagram

Purchase Order for Project-based Procurement

Ev

en

t

Evaluation VendorsPrint Vendor

Evaluation Sheet

PO = Purchase Order

Compare Vendor Evaluations

Vendor Evaluation

Pu

rch

aser

Page 8: Purchase Order for Project-based Procurement _Scenario Overiew

Legend

Symbol Description Usage Comments

Band: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band can also identify an organization unit or group, rather than a specific role.

The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.

Role band contains tasks common to that role.

External Events: Contains events that start or end the scenario, or influence the course of events in the scenario.

Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to documents involved in the process flow.

Connects two tasks in a scenario process or a non-step event

Business Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenario

Does not correspond to a task step in the document

Unit Process: Identifies a task that is covered in a step-by-step manner in the scenario

Corresponds to a task step in the document

Process Reference: If the scenario references another scenario in total, put the scenario number and name here.

Corresponds to a task step in the document

Sub-Process Reference: If the scenario references another scenario in part, put the scenario number, name, and the step numbers from that scenario here

Corresponds to a task step in the document

Process Decision: Identifies a decision / branching point, signifying a choice to be made by the end user. Lines represent different choices emerging from different parts of the diamond.

Does not usually correspond to a task step in the document; Reflects a choice to be made after step execution

Symbol Description Usage Comments

To next / From last Diagram: Leads to the next / previous page of the Diagram

Flow chart continues on the next / previous page

Hardcopy / Document: Identifies a printed document, report, or form

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Financial Actuals: Indicates a financial posting document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Budget Planning: Indicates a budget planning document

Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow lines

Manual Process: Covers a task that is manually done

Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the process flow.

Existing Version / Data: This block covers data that feeds in from an external process

Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any incoming flow lines

System Pass / Fail Decision: This block covers an automatic decision made by the software

Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed.

<F

unct

ion>

Ext

erna

l to

SA

P

Business Activity /

Event

Unit Process

Process Reference

Sub-Process

Reference

Process

Decision

Diagram Connection

Hardcopy / Document

Financial Actuals

Budget Planning

Manual Proces

s

Existing Version /

Data

System Pass/F

ail Decisio

n