pumping station design: not the same ball game owea_gjones 5 13 2010 2003 version.pdf · pumping...

22
Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown and Caldwell

Upload: vandung

Post on 06-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Pumping Station Design: Not The Same Ball GameOWEA – May 13, 2010Garr Jones, PE – Brown and Caldwell

Page 2: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

What has Changed?

Page 3: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

What is Needed in Design?

Improved and more complete definition of operating conditionsMore attention to specification requirements to eliminate marginal pump selections Strengthened requirements for mechanical and hydraulic design Greater attention to installation details to conform to equipment physical, hydraulic and mechanical limitations

Page 4: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Typical Manufacturer’s Curve – before …..

ANSI/HI 9.6.3

Page 5: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

What is a POR?Preferred Operating RegionAs defined in ANSI/HI 9.6.3

For most pump designs, this region defines the portion of the machine’s head/capacity curveWhere service life will be optimized

Page 6: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Preferred Operating Region

For Specific Speeds ≥ 4500:– 70 percent to 120 percent of BEP Flow

For Specific Speeds > 4500– 80 percent to 115 percent of BEP Flow

Page 7: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

What is an AOR?Allowable Operating Region As defined by ANSI/HI 9.6.3

Established by the pump manufacturer

The region on the machine’s head/capacity curve wherecontinued or frequent operation will likely result in diminished service life and poor operation

Page 8: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

How a Pump Works – II

POR

AOR

AOR

Don’tGo here

DonDon’’t  Even Think t  Even Think about itabout it

70%

Tread very lightly here

Manufacturer’s minimum safe flow

120%

Page 9: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Bad Things Begin to Happenin the AOR……

POR

Increasing radial thrust

Increasing vibration

Increasing inletsurging

Increasingdischarge recirculation

Increasing cavitation

Increasing suction recirculation

Page 10: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Piping Requirements

ANSI/HI 9.6.6

Page 11: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Basic Necessities

Eliminate stress and strain at equipment connections Carry unbalanced hydraulic thrust to the structure  Support valves, but NEVER anchor at a valveMinimum 5 pipe diameters straight run after last flow disturbing fitting and pump

Avoid stress risers at all pipe supports and anchors All valves and appurtenances MUST be accessible for maintenance, removal/replacement

Page 12: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Poor Alignment Results in Unacceptable Forces

A single flexible coupling will not solve the problem

System Side Pump

Page 13: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Misalignment angular and parallel

Page 14: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Equipment Connection Fitting

Page 15: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Station Pipe Supports

Page 16: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Station Valve Supports

Page 17: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

ANSI/HI 9.8Pump Intakes

Page 18: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

More Often than Not ….

IT IS…THE INTAKE, STUPID!

Page 19: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Features of a Good Pump Intake

The pumped fluid must approach THE PUMP OR PUMP INTAKE symmetricallyNo high energy currentsMinimal entrained air Sufficient NPSH margin Intake level must be high enough to prime the pump Sufficient submergence to avoid vortex development

Page 20: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

ANSI/HI 9.8Pump Intake Design

All Types of Intakes Establishes Geometry and Physical Relationships Clear and Solids‐Bearing Liquids Physical Model Tests Required Large Pumps and Stations Designs That Do Not Conform to Standard

Page 21: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

Discuss?

Page 22: Pumping Station Design: Not The Same Ball Game OWEA_GJones 5 13 2010 2003 version.pdf · Pumping Station Design: Not The Same Ball Game OWEA – May 13, 2010 Garr Jones, PE – Brown

That’s All Folks!

THANK YOU