puma by night - avlby+night.pdf · all informations about test beds run time / efficiency / data...
TRANSCRIPT
![Page 1: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/1.jpg)
AVL Italy Application
Confidential
PUMA BY NIGHT
Ideal method in order to cover the unmanned hours and increase run time
![Page 2: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/2.jpg)
| | 21 September 2015 | 2Confidential
IT’S NIGHT
PEOPLE IS MISSING
TEST BED’S ARE CLOSED
NOTHING IS POSSIBLE TO DO
……… OR NOT
![Page 3: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/3.jpg)
| | 21 September 2015 | 3Confidential
AVAILABILITY VS CAPABILITY
JUST TWO SIMPLE QUESTIONS:
FIRST
� What are the most huge reasons why we are not able to use our Test
Bed’s at the maximum of the capability ?
SECOND
� What is the final effect, on my target, using Test Bed’s not at the
maximum of the capability ?
![Page 4: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/4.jpg)
| | 21 September 2015 | 4Confidential
Allocation UtilisationTechnical
AvailabilityOperational Availability
Project Availability Runtime
Valid Runtime
Productive Runtime
Value Added RuntimeCapacity
� Lack of Work orders� Lack of Resources
� Off Shft Times
� Holidays
AVAILABILITY VS CAPABILITY (FIRST)
Based on the Efficiency Monitoring, we have a clear picture related to the
Down Time Reasons Split, and generally the answer to the FIRST Question
is:
![Page 5: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/5.jpg)
| | 21 September 2015 | 5Confidential
AVAILABILITY VS CAPABILITY (SECOND)
OperatorTest Engineer
BUT IS IT ALWAYS EFFICENT ?
INTERACTION
Work Order definition
Interaction between uman resources, from different departments, is the
common and necessary approach.
CorrectUnderstanging
Post Processing
Time to Answer
Waiting for Direction
Data Quality
Many different Tasks
Many different reasons for new interactions
Solution:
Work on ONE SINGLE SHIFT all togheter
![Page 6: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/6.jpg)
| | 21 September 2015 | 6Confidential
AVAILABILITY VS CAPABILITY (SECOND)
� 8760 h/y available using H24 h/d # 365 d/y
� Percentage usage: 100 %
� 1 Shift - 1760 h/y available on one shift # no weekend # no holiday
� Percentage usage: 20.09 %
� 2 Shift - 3520 h/y available on double shift # no weekend # no holiday
� Percentage usage: 40.2 %
� 3 Shift - 5280 h/y available using H24 h/d # no weekend # no holiday
� Percentage usage: 60.3 %
WHAT WE LOSE
![Page 7: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/7.jpg)
| | 21 September 2015 | 7Confidential
� 1760 h/y available on one shift # no weekend # no holiday
� Percentage usage: 20.09 %
IN OTHER WORDS THE EFFECT IS:
AVAILABILITY VS CAPABILITY (SECOND)
In order to cover the same amount of hours from 1 Shift to 3 Shift I need:
N°5 Test Bed’s / n°5 Operator’s / n°5 …….. Times the time
![Page 8: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/8.jpg)
| | 21 September 2015 | 8Confidential
PUMA BY NIGHT
SCOPE OF APPLICATION:
COVER UNMANNED HOURS AND INCREASE RUN TIMEUSING REMOT ACCESS
Preconditions:
Automation System: Puma Open 1.3x, 1.4x, Puma Open Suite
Post Processing SW: Concerto 4.X, ( PUC )
![Page 9: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/9.jpg)
| | 21 September 2015 | 9Confidential
PUMA BY NIGHT
THREE DIFFERENT PHASES
REQUEST DO FEEDBACK
![Page 10: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/10.jpg)
| | 21 September 2015 | 10Confidential
PHASE 1 - REQUEST
REQUEST
SELECTION OF THE TESTS & PRIORITY USING WEB SITE
PUMA BY NIGHT
TEST DURATION ESTIMATION
Test Engineer
6.00 p.m. 9.00 a.m.
User:
Password:
Login
SEND REQUEST
PC , TABLET or SMARTPHONE
EASY FOR REMOTE REQUESTS
1
2 3
Work in progress
![Page 11: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/11.jpg)
| | 21 September 2015 | 11Confidential
PHASE 1 - REQUEST
REQUEST
SELECTION OF THE TESTS USING WEB SITE
PUMA BY NIGHT
TEST DURATION ESTIMATION
Test Engineer
6.00 p.m. 9.00 a.m.
User:
Password:
Login
SEND REQUEST
TEXT FILE WILL BE SENT
AUTOMATICALLY TO THE TEST
BED SERVER
SEND REQUEST
File in format «.ini»
1
2 3
![Page 12: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/12.jpg)
| | 21 September 2015 | 12Confidential
PHASE 2 - DO
PUMA TEST RUN via BSQ / SSQ & SCRIPTING
PUMA WILL READ THE TEXT
FILE
DO
File in format «.ini»
Operator
![Page 13: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/13.jpg)
| | 21 September 2015 | 13Confidential
PHASE 2 - DO
PUMA TEST RUN via BSQ / SSQ & SCRIPTING
� EXECUTION OF THE TEST’S
REQUESTED BASED ON
THE PRIORITY DEFINED
DO
� Specific SCRIPT on BSQ/SSQ
Operator
![Page 14: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/14.jpg)
| | 21 September 2015 | 14Confidential
PHASE 2 - DO
PUMA TEST RUN via BSQ / SSQ & SCRIPTINGDO
Operator
![Page 15: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/15.jpg)
| | 21 September 2015 | 15Confidential
PHASE 2 - DO
IN OUR EXAMPLEDO
Operator
1) FULL LOAD CURVE in Stationary mode N/A
2) CUSTOM: TRANSIENT CYCLE using N/A
3) RDE: Dynamic Cycle using ISACA. Vehicle Simulation on specific Road Simulated
B. Automatic identification of Stationary points to be
optimized
C. Optimization in Stationary mode
![Page 16: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/16.jpg)
| | 21 September 2015 | 16Confidential
PHASE 3 - FEEDBACK
PUMA TEST RUN via BSQ / SSQ & SCRIPTING
� AT THE END OF TEST RUN,
PUMA WILL OPEN
CONCERTO IN AUTOMATIC
WAY VIA SCRIPTING
FEEDBACK
� Specific SCRIPT on BSQ/SSQ
Test Engineer
![Page 17: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/17.jpg)
| | 21 September 2015 | 17Confidential
PHASE 3 - FEEDBACK
CONCERTO via SCRIPT & CUSTOM LAYOUTFEEDBACK
� CONCERTO WILL
PERFOMRM
AUTOMATICALLY
POSTPROCESSING DATA
USING SCRIPT
Test Engineer
![Page 18: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/18.jpg)
| | 21 September 2015 | 18Confidential
PHASE 3 - FEEDBACK
CONCERTO via SCRIPT & CUSTOM LAYOUTFEEDBACK
� CONCERTO WILL EXPORT
AUTOMATICALLY ALL
REPORTS / GRAPHICS INTO
THE SERVER
Test Engineer
SCRIPT
![Page 19: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/19.jpg)
| | 21 September 2015 | 19Confidential
PHASE 3 - FEEDBACK
CONCERTO via SCRIPT & CUSTOM LAYOUTFEEDBACK
Test Engineer
� CONCERTO WILL OPEN OUTLOOK
& SEND, AUTOMATICALLY VIA
E-MAIL, MANY DIFFERENT
INFORMATIONS TO MANY
DIFFERENT ACTORS
SCRIPT
![Page 20: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/20.jpg)
| | 21 September 2015 | 20Confidential
PHASE 3 - FEEDBACK
CONCERTO via SCRIPTFEEDBACK
� ALL RESULTS DATA WILL BE SENT
AUTOMAICALLY BY E-MAIL TO THE
ENGINE ENGINEER
Test Engineer
![Page 21: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/21.jpg)
| | 21 September 2015 | 21Confidential
PHASE 3 - FEEDBACK
CONCERTO via SCRIPTFEEDBACK
� ALL INFORMATIONS ABOUT TEST
BEDS RUN TIME / EFFICIENCY /
DATA QUALITY / ALARMS / others..
WILL BE SENT, AUTOMATICALLY BY E-MAIL TO THE RESPONSIBLE
OF DEPT.
Test Engineer
Info TEST
TEST ESEGUITO CORRETTAMENTE
![Page 22: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/22.jpg)
| | 21 September 2015 | 22Confidential
PHASE 3 - FEEDBACK
WHERE THE REQUEST WAS BORN………
NOW ENDS
FEEDBACK
Test Engineer
FINALLY….
![Page 23: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/23.jpg)
| | 21 September 2015 | 23Confidential
IT’S NIGHT
SOMETHING IT’S POSSIBLE TO DO !PUMA BY NIGHT
![Page 24: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/24.jpg)
| | 21 September 2015 | 24Confidential
COVER UNMANNED HOURS MEANS
Reduce Develop Time
Reduce Costs
Increase Efficiency
![Page 25: Puma by night - AVLby+night.pdf · all informations about test beds run time / efficiency / data quality / alarms / others.. will be sent, automatically by e-mail to the responsible](https://reader033.vdocuments.us/reader033/viewer/2022042918/5f5ef47e3520cd0d8a040210/html5/thumbnails/25.jpg)
| | 21 September 2015 | 25Confidential
THANKS FOR YOUR ATTENTION
G. REINAUDO