pue is just the beginning -...
TRANSCRIPT
PUE is just the beginning 2
Marketplaces Payments
Ecommerce
Platform &
Developer
Networks
Our Portfolio
PUE is just the beginning 3
The Future of Commerce
2008 = $325B 2013=$10T
Yesterday Tomorrow
Online
6%
Web-
influenced
offline 37%
Online
+
Offline Offline
Today
Online
4%
Offline
96%
Source: Forrester Source: Forrester, Euromonitor and Economist
Intelligence Unit
Source: Economist Intelligence Unit
PUE is just the beginning 4
The eBay marketplace alone has more
than 100 million active users
Topaz Data Center, South Jordan, Utah
These transactions are
powered by the
most efficient
and innovative
data centers in
the world
Downloads of eBay mobile apps
have topped 100 million
Phoenix-1 Best Practices
• Best practices reduce operating expenses
• Blanking panel program
• Return air management
• Hot/cold aisle containment
• Operational best practices
• UPS module rotation
• Lowering cooling tower setpoint
• Lighting control
• Result: 19% PUE reduction
• $300,000 rebate awarded 11/2010 by APS for efficiency projects
• Achieved during 50% IT growth
PUE is just the beginning 5
Phoenix-1 Hartman loop
• Hartman Loop
• Install Variable Frequency Drives on the primary chilled water and condenser water
pumps, and additional monitoring on secondary pumps and cooling tower fans.
• Install Hartman loop controller (provided by Armstrong) and integrate into the existing
BMS system.
PUE is just the beginning 6
Phoenix-1 Hartman loop
• The Hartman loop controller analyzes data received from the BMS, then sends the BMS
suggested operating conditions which the BMS implements.
• Number of chillers to operate
• Pump speeds
• Project cost
• $724,950 ($246,815 w/rebate)
• Est. ROI 2.5 years (0.8 w/rebate)
• Results
• Chiller system load decrease 232kW
• PUE decrease from av. 1.629 to 1.576
• Expected savings
• 4,784,274 kWh Annual (+-5%)
• 0.31 kW/Ton (0.83 to 0.52)
• $310,978 Annual cost savings
PUE is just the beginning 7
1.5
1.52
1.54
1.56
1.58
1.6
1.62
1.64
1.66
1.68
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
1/1
5/20
12 0
:01:
00 A
M
1/1
5/20
12 3
:00:
00 A
M
1/1
5/20
12 6
:00:
00 A
M
1/1
5/20
12 9
:00:
00 A
M
1/1
5/20
12 1
2:00
:00
PM
1/1
5/20
12 3
:00:
00 P
M
1/1
5/20
12 6
:00:
00 P
M
1/1
5/20
12 9
:00:
00 P
M
1/1
6/20
12 0
:01:
00 A
M
1/1
6/20
12 3
:00:
00 A
M
1/1
6/20
12 6
:00:
00 A
M
1/1
6/20
12 9
:00:
00 A
M
1/1
6/20
12 1
2:00
:00
PM
1/1
6/20
12 3
:00:
00 P
M
1/1
6/20
12 6
:00:
00 P
M
1/1
6/20
12 9
:00:
00 P
M
1/1
7/20
12 0
:01:
00 A
M
1/1
7/20
12 3
:00:
00 A
M
1/1
9/20
12 9
:00:
00 P
M
1/2
0/20
12 0
:01:
00 A
M
1/2
0/20
12 3
:00:
00 A
M
1/2
0/20
12 6
:00:
00 A
M
1/2
0/20
12 9
:00:
00 A
M
1/2
0/20
12 1
2:00
:00
PM
1/2
0/20
12 3
:00:
00 P
M
1/2
0/20
12 6
:00:
00 P
M
1/2
0/20
12 9
:00:
00 P
M
1/2
1/20
12 0
:01:
00 A
M
1/2
1/20
12 3
:00:
00 A
M
1/2
1/20
12 6
:00:
00 A
M
1/2
1/20
12 9
:00:
00 A
M
1/2
1/20
12 1
2:00
:00
PM
1/2
1/20
12 3
:00:
00 P
M
1/2
1/20
12 6
:00:
00 P
M
1/2
1/20
12 9
:00:
00 P
M
kW
Total Load vs. PUE
Total Load (kW)
PUE
IT Rack density
• Rack level
• eBay rack design 30” wide, 48U high with 6 x 2U cut
outs on the side, supports up to 3500lbs
• Optimized power strips 2-4 (208V, 400V) supporting
17kW to 28kW
• Real time wireless monitoring outlets, assets and
environmentals
• Hardware level
• TCO density cost analysis: 28kW racks more efficient
than 14kW racks
• Hadoop: 48 servers, 24TB per node, up to 16kW
• Everything else: 96 servers, up to 28kW
• Time to deploy
• Rack and roll allows hardware cache on demand
• Containerized delivery allows 20 rack deployments
PUE is just the beginning 8
Phoenix Project Mercury
• Concurrently maintainable Tier 2+
• 8000 ft2 first floor white space
• 8000 ft2 roof IT containers
• Dual loop water
• 55°F chilled water loop
• 87°F hot water loop
• IT density scalable to 40kW
• IT capacity expandable to 12 MW
• 4MW day one, then 2MW
increments
• UPS / Generator on one power path,
straight utility on the other
PUE is just the beginning 9
White space
• In Row cooling units and rear door
coolers provide up to 40kW rack
density
• Under floor piping to racks:
• 55°F chilled water loop
• 87°F hot water loop
• Gordon grid hot aisle containment
• 400V bus duct
PUE is just the beginning 10
Roof top containers
• Roof rated to 1,000,000 lbs
• Weeks to connect and commission
• Space to support up to 11 containers
• Power to support up to 6MW
PUE is just the beginning 11
HP PODs
DELL MDCs
August 2011
January 2012 August 2012
Site
• No Measurements
Site
• PUE (L3, HC) = 1.26 (min)
• PUE (L3, HC) = 1.35 (avg)
Site
• PUE (L3, HC) = 1.12 (min)
• PUE (L3, HC) = 1.534 (avg)
Dell MDC
• pPUE (L3, HC) = 1.040 (min)
• pPUE (L3, HC) = 1.043 (avg)
• pPUE (L3, HC) = 1.044 (max)
Dell MDC
• pPUE (L3, HC) = 1.018 (min)
• pPUE (L3, HC) = 1.039 (avg)
Dell and HP Containers
• pPUE (L3, HC) = 1.016-1.027 (min)
• pPUE (L3, HC) = 1.034-1.128 (avg)
White space
• pPUE (L3, HC) = 1.349 (min)
• pPUE (L3, HC) = 1.417 (avg)
1920 servers, 20 racks, 520kW
max 119°F outdoor high
30-35% site load, 3 containers,
<80°F outdoor high
40-50% site load, 4 containers,
max 113° outdoor high
Phoenix-2 PUE
PUE is just the beginning 12
http://www.thegreengrid.org/en/Global/Content/white-papers/WP45-CaseStudyBreakingNewGroundonDataCenterEfficiency