publisher sample - marketresearch · a) market forecasts feed of forecast data into market models:...

17
Timetric http://www.marketresearch.com/Timetric-v3917/ Publisher Sample Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST Fridays: 5:30am - 5:30pm EST Email: [email protected] MarketResearch.com

Upload: others

Post on 12-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

 

 

 

Timetric

http://www.marketresearch.com/Timetric-v3917/

Publisher Sample

Phone: 800.298.5699 (US) or +1.240.747.3093 or +1.240.747.3093 (Int'l) Hours: Monday - Thursday: 5:30am - 6:30pm EST

Fridays: 5:30am - 5:30pm EST

Email: [email protected] MarketResearch.com

Page 2: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

Construction in Oman – Key Trends and

Opportunities to 2018

Report Code: CN0220MR

Published: November 2014

www.timetric.com

John Carpenter House

7 Carmelite Street

London

EC4Y 0BS

UK

Tel: +44 (0)20 7936 6400

Fax: +44 (0)20 7336 6813

Page 3: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

Construction in Oman – Key Trends and Opportunities to 2018 Page 1

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

Summary

This report is the result of extensive market and company research covering the Omani construction

industry. It provides detailed analysis of both review and forecast construction industry values, at both

market and category levels, and also offers project profile analyses.

‘Construction in Oman – Key Trends and Opportunities to 2018’ provides a top-level overview and

detailed market, category and company-specific insights into the operating environment for

construction contractors. It is an essential tool for companies active across the Omani construction

value chain, and for new competitors considering entering the industry.

Synopsis

This report provides detailed market analysis, information and insights into Omani construction

industry including:

Omani construction industry's growth prospects by market, project type and type of construction

activity

Analysis of equipment, material and service costs across each project type within Oman

Critical insight into the impact of industry trends and issues, and the risks and opportunities they

present to participants in the Omani construction industry

Analyzing the profiles of the leading operators in Omani construction industry.

Data highlights of the largest construction projects in Oman

Reasons to Buy

Identify and evaluate market opportunities using our standardized valuation and forecasting

methodologies

Assess market growth potential at a micro-level with over 600 time-series data forecasts

Understand the latest industry and market trends

Formulate and validate business strategies using Timetric's critical and actionable insight

Assess business risks, including cost, regulatory and competitive pressures

Evaluate competitive risk and success factors

Page 4: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

EXECUTIVE SUMMARY

Construction in Oman – Key Trends and Opportunities to 2018 Page 2

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

1 EXECUTIVE SUMMARY

The Omani construction industry increased in value at a compound annual growth rate (CAGR) of

XX.XX% during the review period (2009−2013), to value OMRXX.XX billion (US$XX.XX billion) in

2013. Industry expansion was supported by government initiatives to transform the country from an oil-

based economy to one more reliant on manufacturing and services. This resulted in significant

investments in infrastructure development, which positively affected other markets in the industry.

Industry growth is expected to continue over the forecast period (2014–2018) as a result of the

government’s focus on developing physical and social infrastructure in the country, and an anticipated

global economic recovery. Consequently, the industry is expected to post a forecast-period CAGR of

XX.XX% to value OMRXX.XX billion (US$XX.XX billion) in 2018.

Figure 1: Growth Matrix for Construction Output in Oman (%), 2009–2018

Note: Bubble size represents market output value in US$ million

Source: Timetric analysis © Timetric

0%

5%

10%

15%

20%

25%

0% 5% 10% 15% 20%

CA

GR

2013–2018

CAGR 2009–2013

Infrastructure Residential Commercial Institutional Industrial

Page 5: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

MARKET DATA ANALYSIS

Construction in Oman – Key Trends and Opportunities to 2018 Page 3

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

2 MARKET DATA ANALYSIS

2.1 Construction Output and Value Add

2.1.1 Construction output by project type

Table 1: Omani Construction Output by Project Type (OMR Million), 2009–2013

Project Type 2009 2010 2011 2012 2013 2013 (US$ Million)

Infrastructure construction

Residential construction

Commercial construction

Institutional construction

Industrial construction

Source: Timetric analysis © Timetric

Table 2: Omani Construction Output by Project Type (OMR Million), 2013–2018

Project Type 2013 2014 2015 2016 2017 2018

Infrastructure construction

Residential construction

Commercial construction

Institutional construction

Industrial construction

Source: Timetric analysis © Timetric

Figure 2: Omani Construction Output by Project Type (OMR Million), 2009–2018

Source: Timetric analysis © Timetric

0

2,000

4,000

6,000

8,000

10,000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Co

nstr

ucti

on O

utp

ut

(OM

R M

illio

n)

Infrastructure Residential Commercial Institutional Industrial

Page 6: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

MARKET DATA ANALYSIS

Construction in Oman – Key Trends and Opportunities to 2018 Page 4

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

2.1.2 Construction output by cost type

Table 3: Omani Construction Output by Cost Type (OMR Million), 2009–2013

Cost Type 2009 2010 2011 2012 2013 2013 (US$ Million)

Materials

Construction services

Equipment

Total

Source: Timetric analysis © Timetric

Table 4: Omani Construction Output by Cost Type (OMR Million), 2013–2018

Cost Type 2013 2014 2015 2016 2017 2018

Materials

Construction services

Equipment

Total

Source: Timetric analysis © Timetric

Figure 3: Omani Construction Output by Cost Type (OMR Million), 2009–2018

Source: Timetric analysis © Timetric

0

2,000

4,000

6,000

8,000

10,000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Co

nstr

ucti

on O

utp

ut

(OM

R M

illio

n)

Materials Construction Services Equipment

Page 7: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

MARKET DATA ANALYSIS

Construction in Oman – Key Trends and Opportunities to 2018 Page 5

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

2.1.3 Construction output by activity type

Table 5: Omani Construction Output by Activity Type (OMR Million), 2009–2013

Activity Type 2009 2010 2011 2012 2013 2013 (US$ Million)

New construction

Repair and maintenance

Refurbishment

Demolition

Source: Timetric analysis © Timetric

Table 6: Omani Construction Output by Activity Type (OMR Million), 2013–2018

Activity Type 2013 2014 2015 2016 2017 2018

New construction

Repair and maintenance

Refurbishment

Demolition

Source: Timetric analysis © Timetric

Figure 4: Omani Construction Output by Activity Type (OMR Million), 2009–2018

Source: Timetric analysis © Timetric

0

2,000

4,000

6,000

8,000

10,000

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Co

nstr

ucti

on O

utp

ut

(OM

R M

illio

n)

New Construction Repair and Maintenance Refurbishment Demolition

Page 8: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

MARKET DATA ANALYSIS

Construction in Oman – Key Trends and Opportunities to 2018 Page 6

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

2.1.4 Construction value add by project type

Table 7: Omani Construction Value Add by Project Type (OMR Million), 2009–2013

Project Type 2009 2010 2011 2012 2013 2013 (US$ Million)

Infrastructure construction

Residential construction

Commercial construction

Institutional construction

Industrial construction

Source: Timetric analysis © Timetric

Table 8: Omani Construction Value Add by Project Type (OMR Million), 2013–2018

Project Type 2013 2014 2015 2016 2017 2018

Infrastructure construction

Residential construction

Commercial construction

Institutional construction

Industrial construction

Source: Timetric analysis © Timetric

Figure 5: Omani Construction Value Add by Project Type (OMR Million), 2009–2018

Source: Timetric analysis © Timetric

0

500

1,000

1,500

2,000

2,500

3,000

3,500

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Co

nstr

ucti

on V

alu

e A

dd

(O

MR

Millio

n)

Infrastructure Residential Commercial Institutional Industrial

Page 9: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

APPENDIX

Construction in Oman – Key Trends and Opportunities to 2018 Page 7

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

Summary Methodology

All Timetric reports are rigorously sourced and created according to a comprehensive, four-stage

methodology:

1) Market Study

A) Standardization

Market definitions are specified using recognized industry classifications. The same definition is

used for every country.

Annual average currency exchange rates are collected for the latest complete year. These are then

applied across both historical and forecast data to remove exchange rate fluctuations.

B) Internal audit

Review of in-house databases to gather existing data:

o Historic market databases and reports

o Company database

o Construction magazine portfolio

o Construction projects database

C) Trend monitoring and primary research

Review of the latest construction company and project trends

Biannual surveys using expert panels compiled from across the construction value chain:

o Construction contractors

o Equipment and material manufacturers and suppliers

o Architects and designers

o Project owners and financiers

o Project advisors

2) Research

A) Sources

Collection of the latest market-specific data from a wide variety of respected industry sources:

o Government statistics

o Industry associations

o Company filings

o Broker reports

o International organizations

B) Expert opinion

Collation of opinion taken from Timetric journalist interviews of leading industry figures

Analysis of third-party opinion and forecasts:

o Broker reports

o Industry associations

o Construction media

o Official government sources

Page 10: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

APPENDIX

Construction in Oman – Key Trends and Opportunities to 2018 Page 8

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

C) Data consolidation and verification

Consolidation of data and opinion to create historical datasets

Creation of models to benchmark data across sectors and geographies

3) Analysis

A) Market forecasts

Feed of forecast data into market models:

o Macroeconomic indicators

o Industry-specific drivers

Analysis of the Timetric Construction Projects Database to identify trends by sector:

o Latest project announcements

o Financing shortfalls

o Project cancelations and postponements

B) Report writing

Analysis of market data

Discussion of company and industry trends and issues

Integration of survey results

Annual review of financial deal and construction project trends

4) Quality Control

A) Templates

Detailed process manuals

Standardized report templates and accompanying style guides

Complex forecasting tools used to ensure that forecast methodologies are applied consistently

Quality-control checklists

B) Quality control

Competitor review

Senior-level quality control

Randomized spot checks on data integrity

Benchmark checks across databases

Market data cross-checked for consistency, with accumulated data from:

o Timetric Construction Projects Database

o Company filings

Page 11: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

APPENDIX

Construction in Oman – Key Trends and Opportunities to 2018 Page 9

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

Methodology

Timetric’s dedicated research and analysis teams consist of experienced professionals, with an

industry background in marketing, market research, consulting and advanced statistical expertise.

Timetric adheres to the Codes of Practice of the Market Research Society (www.mrs.org.uk) and the

Society of Competitive Intelligence Professionals (www.scip.org).

All Timetric databases are continuously updated and revised.

Related Reports

Construction in Bahrain – Key Trends and Opportunities to 2018

Construction in Algeria – Key Trends and Opportunities to 2018

Construction in the UAE – Key Trends and Opportunities to 2017

Construction in Saudi Arabia – Key Trends and Opportunities to 2017

Construction in Kuwait – Key Trends and Opportunities to 2017

Construction in Qatar – Key Trends and Opportunities to 2017

Page 12: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

TABLE OF CONTENTS

Construction in Oman – Key Trends and Opportunities to 2018 Page 10

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

TABLE OF CONTENTS

1 Executive Summary ................................................................................................ 1

2 Market Overview ..................................................................................................... 9

2.1 Key Trends and Issues ........................................................................................................................... 9

2.2 Benchmarking by Market Size and Growth ........................................................................................... 10

3 Commercial Construction ...................................................................................... 11

3.1 Performance Outlook ............................................................................................................................ 11

3.2 Key Trends and Issues ......................................................................................................................... 11

3.3 Data and Project Highlights ................................................................................................................... 12

4 Industrial Construction ........................................................................................... 13

4.1 Performance Outlook ............................................................................................................................ 13

4.2 Key Trends and Issues ......................................................................................................................... 13

4.3 Data and Project Highlights ................................................................................................................... 14

5 Infrastructure Construction .................................................................................... 15

5.1 Performance Outlook ............................................................................................................................ 15

5.2 Key Trends and Issues ......................................................................................................................... 15

5.3 Data and Project Highlights ................................................................................................................... 16

6 Institutional Construction ....................................................................................... 17

6.1 Performance Outlook ............................................................................................................................ 17

6.2 Key Trends and Issues ......................................................................................................................... 17

6.3 Data and Project Highlights ................................................................................................................... 18

7 Residential Construction ....................................................................................... 19

7.1 Performance Outlook ............................................................................................................................ 19

7.2 Key Trends and Issues ......................................................................................................................... 19

7.3 Data and Project Highlights ................................................................................................................... 21

8 Company Profile: Galfar Engineering & Contracting SAOG ................................... 22

8.1 Galfar Engineering & Contracting SAOG – Company Overview ............................................................ 22

8.2 Galfar Engineering & Contracting SAOG – Business Description .......................................................... 23

8.3 Galfar Engineering & Contracting SAOG – Main Products and Services ............................................... 23

8.4 Galfar Engineering & Contracting SAOG – History ................................................................................ 24

8.5 Galfar Engineering & Contracting SAOG – Company Information ......................................................... 25

8.5.1 Galfar Engineering & Contracting SAOG – key competitors ............................................................................ 25

8.5.2 Galfar Engineering & Contracting SAOG – key employees ............................................................................. 25

9 Company Profile: Douglas OHI LLC ...................................................................... 26

9.1 Douglas OHI LLC – Company Overview ............................................................................................... 26

9.2 Douglas OHI LLC – Main Services ........................................................................................................ 26

9.3 Douglas OHI LLC – Company Information ............................................................................................ 27

9.3.1 Douglas OHI LLC – key competitors ................................................................................................................ 27

9.3.2 Douglas OHI LLC – key employees ................................................................................................................. 27

Page 13: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

TABLE OF CONTENTS

Construction in Oman – Key Trends and Opportunities to 2018 Page 11

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

10 Company Profile: Carillion Alawi LLC .................................................................... 28

10.1 Carillion Alawi LLC – Company Overview ............................................................................................. 28

10.2 Carillion Alawi LLC – Main Services ...................................................................................................... 28

10.3 Carillion Alawi LLC – Company Information .......................................................................................... 29

10.3.1 Carillion Alawi LLC – key competitors .............................................................................................................. 29

10.3.2 Carillion Alawi LLC – key employees ............................................................................................................... 29

11 Company Profile: Bahwan Engineering Company LLC ......................................... 30

11.1 Bahwan Engineering Company LLC – Company Overview ................................................................... 30

11.2 Bahwan Engineering Company LLC – Main Services ........................................................................... 31

11.3 Bahwan Engineering Company LLC – Company Information ................................................................ 31

11.3.1 Bahwan Engineering Company LLC – key competitors ................................................................................... 31

11.3.2 Bahwan Engineering Company LLC – key employee ...................................................................................... 31

12 Company Profile: Suhail Bahwan Group Holding LLC ........................................... 32

12.1 Suhail Bahwan Group Holding LLC – Company Overview .................................................................... 32

12.2 Suhail Bahwan Group Holding LLC – Main Services ............................................................................. 32

12.3 Suhail Bahwan Group Holding LLC – History ........................................................................................ 33

12.4 Suhail Bahwan Group Holding LLC – Company Information ................................................................. 33

12.4.1 Suhail Bahwan Group Holding LLC – key competitors .................................................................................... 33

12.4.2 Suhail Bahwan Group Holding LLC – key employees ..................................................................................... 33

13 Market Data Analysis ............................................................................................. 34

13.1 Construction Output and Value Add ...................................................................................................... 34

13.1.1 Construction output by project type .................................................................................................................. 34

13.1.2 Construction output by cost type ...................................................................................................................... 35

13.1.3 Construction output by activity type.................................................................................................................. 36

13.1.4 Construction value add by project type ............................................................................................................ 37

13.2 Commercial Construction ...................................................................................................................... 38

13.2.1 Commercial construction output by project type .............................................................................................. 38

13.2.2 Commercial construction output by cost type .................................................................................................. 39

13.2.3 Commercial construction output by activity type .............................................................................................. 40

13.2.4 Commercial construction value add by project type ......................................................................................... 41

13.3 Industrial Construction .......................................................................................................................... 42

13.3.1 Industrial construction output by project type ................................................................................................... 42

13.3.2 Industrial construction output by cost type ....................................................................................................... 43

13.3.3 Industrial construction output by activity type ................................................................................................... 44

13.3.4 Industrial construction value add by project type ............................................................................................. 45

13.4 Infrastructure Construction .................................................................................................................... 46

13.4.1 Infrastructure construction output by project type ............................................................................................ 46

13.4.2 Infrastructure construction output by cost type ................................................................................................ 47

13.4.3 Infrastructure construction output by activity type ............................................................................................ 48

13.4.4 Infrastructure construction value add by project type....................................................................................... 49

13.5 Institutional Construction ....................................................................................................................... 50

13.5.1 Institutional construction output by project type ............................................................................................... 50

Page 14: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

TABLE OF CONTENTS

Construction in Oman – Key Trends and Opportunities to 2018 Page 12

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

13.5.2 Institutional construction output by cost type ................................................................................................... 51

13.5.3 Institutional construction output by activity type ............................................................................................... 52

13.5.4 Institutional construction value add by project type .......................................................................................... 53

13.6 Residential Construction ....................................................................................................................... 54

13.6.1 Residential construction output by project type ................................................................................................ 54

13.6.2 Residential construction output by cost type .................................................................................................... 55

13.6.3 Residential construction output by activity type ............................................................................................... 56

13.6.4 Residential construction value add by project type .......................................................................................... 57

14 Appendix ............................................................................................................... 58

14.1 What is this Report About?.................................................................................................................... 58

14.2 Definitions ............................................................................................................................................. 58

14.3 Summary Methodology ......................................................................................................................... 62

14.4 Methodology ......................................................................................................................................... 64

14.5 Contact Timetric .................................................................................................................................... 64

14.6 About Timetric ....................................................................................................................................... 64

14.7 Timetric’s Services ................................................................................................................................ 64

14.8 Disclaimer ............................................................................................................................................. 66

Page 15: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

LIST OF TABLES

Construction in Oman – Key Trends and Opportunities to 2018 Page 13

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

LIST OF TABLES

Table 1: Benchmarking with Other Major Construction Industries ........................................................................................................... 10 Table 2: Commercial Construction Project 1 – MAF – Mall of Oman – Bausher ..................................................................................... 12 Table 3: Commercial Construction Project 2 – OMRAN – Muscat City Hotels – Oman .......................................................................... 12 Table 4: Commercial Construction Project 3 – MoT/QDREIC – Ras Al Hadd Resort Development – Oman .......................................... 12 Table 5: Industrial Construction Project 1 – SA – Sohar Aluminum Plant Expansion – Al Batinah .......................................................... 14 Table 6: Industrial Construction Project 2 – Orpic – Liwa Plastics Complex – Oman .............................................................................. 14 Table 7: Industrial Construction Project 3 – SAIL/OOC – Sohar Gas Based Steel Plant – Oman ........................................................... 14 Table 8: Infrastructure Construction Project 1 – MoTC – National Railway Network – Oman ................................................................. 16 Table 9: Infrastructure Construction Project 2 – MoTC – Batinah Expressway – Oman.......................................................................... 16 Table 10: Infrastructure Construction Project 3 – MOTC – Bidbid to Sur Road Development – Oman ................................................... 16 Table 11: Institutional Construction Project 1 – MoH – Sultan Qaboos Medical City Complex – Al Batinah ........................................... 18 Table 12: Institutional Construction Project 2 – MoH – Batinah Medical Complex – Oman ..................................................................... 18 Table 13: Institutional Construction Project 3 – AMG – Salalah International Medical City – Oman ....................................................... 18 Table 14: Residential Construction Project 1 – MM – Quriyat Housing Development – Oman ............................................................... 21 Table 15: Residential Construction Project 2 – PDO – Ras Al Hamra Residential Development – Oman .............................................. 21 Table 16: Residential Construction Project 3 – Renaissance – Duqm Special Economic Zone Workers Village – Oman ...................... 21 Table 17: Galfar Engineering & Contracting SAOG, Key Facts ............................................................................................................... 22 Table 18: Galfar Engineering & Contracting SAOG, Main Products and Services .................................................................................. 23 Table 19: Galfar Engineering & Contracting SAOG, History .................................................................................................................... 24 Table 20: Galfar Engineering & Contracting SAOG, Key Employees ...................................................................................................... 25 Table 21: Douglas OHI LLC, Key Facts ................................................................................................................................................... 26 Table 22: Douglas OHI LLC, Main Services ............................................................................................................................................ 26 Table 23: Douglas OHI LLC, Key Employees .......................................................................................................................................... 27 Table 24: Carillion Alawi LLC, Key Facts ................................................................................................................................................. 28 Table 25: Carillion Alawi LLC, Main Services .......................................................................................................................................... 28 Table 26: Carillion Alawi LLC, Key Employees ........................................................................................................................................ 29 Table 27: Bahwan Engineering Company LLC, Key Facts ...................................................................................................................... 30 Table 28: Bahwan Engineering Company LLC, Main Services ............................................................................................................... 31 Table 29: Bahwan Engineering Company LLC, Key Employee ............................................................................................................... 31 Table 30: Suhail Bahwan Group Holding LLC, Key Facts ....................................................................................................................... 32 Table 31: Suhail Bahwan Group Holding LLC, Main Services ................................................................................................................. 32 Table 32: Suhail Bahwan Group Holding LLC, History ............................................................................................................................ 33 Table 33: Suhail Bahwan Group Holding LLC, Key Employees .............................................................................................................. 33 Table 34: Omani Construction Output by Project Type (OMR Million), 2009–2013 ................................................................................. 34 Table 35: Omani Construction Output by Project Type (OMR Million), 2013–2018 ................................................................................. 34 Table 36: Omani Construction Output by Cost Type (OMR Million), 2009–2013 .................................................................................... 35 Table 37: Omani Construction Output by Cost Type (OMR Million), 2013–2018 .................................................................................... 35 Table 38: Omani Construction Output by Activity Type (OMR Million), 2009–2013 ................................................................................ 36 Table 39: Omani Construction Output by Activity Type (OMR Million), 2013–2018 ................................................................................ 36 Table 40: Omani Construction Value Add by Project Type (OMR Million), 2009–2013 ........................................................................... 37 Table 41: Omani Construction Value Add by Project Type (OMR Million), 2013–2018 ........................................................................... 37 Table 42: Omani Commercial Construction Output by Project Type (OMR Million), 2009–2013 ............................................................. 38 Table 43: Omani Commercial Construction Output by Project Type (OMR Million), 2013–2018 ............................................................. 38 Table 44: Omani Commercial Construction Output by Cost Type (OMR Million), 2009–2013 ................................................................ 39 Table 45: Omani Commercial Construction Output by Cost Type (OMR Million), 2013–2018 ................................................................ 39 Table 46: Omani Commercial Construction Output by Activity Type (OMR Million), 2009–2013 ............................................................ 40 Table 47: Omani Commercial Construction Output by Activity Type (OMR Million), 2013–2018 ............................................................ 40 Table 48: Omani Commercial Construction Value Add by Project Type (OMR Million), 2009–2013 ....................................................... 41 Table 49: Omani Commercial Construction Value Add by Project Type (OMR Million), 2013–2018 ....................................................... 41 Table 50: Omani Industrial Construction Output by Project Type (OMR Million), 2009–2013 ................................................................. 42 Table 51: Omani Industrial Construction Output by Project Type (OMR Million), 2013–2018 ................................................................. 42 Table 52: Omani Industrial Construction Output by Cost Type (OMR Million), 2009–2013 ..................................................................... 43 Table 53: Omani Industrial Construction Output by Cost Type (OMR Million), 2013–2018 ..................................................................... 43 Table 54: Omani Industrial Construction Output by Activity Type (OMR Million), 2009–2013 ................................................................. 44 Table 55: Omani Industrial Construction Output by Activity Type (OMR Million), 2013–2018 ................................................................. 44 Table 56: Omani Industrial Construction Value Add by Project Type (OMR Million), 2009–2013 ........................................................... 45 Table 57: Omani Industrial Construction Value Add by Project Type (OMR Million), 2013–2018 ........................................................... 45 Table 58: Omani Infrastructure Construction Output by Project Type (OMR Million), 2009–2013 ........................................................... 46

Page 16: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

LIST OF TABLES

Construction in Oman – Key Trends and Opportunities to 2018 Page 14

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

Table 59: Omani Infrastructure Construction Output by Project Type (OMR Million), 2013–2018 ........................................................... 46 Table 60: Omani Infrastructure Construction Output by Cost Type (OMR Million), 2009–2013 .............................................................. 47 Table 61: Omani Infrastructure Construction Output by Cost Type (OMR Million), 2013–2018 .............................................................. 47 Table 62: Omani Infrastructure Construction Output by Activity Type (OMR Million), 2009–2013 .......................................................... 48 Table 63: Omani Infrastructure Construction Output by Activity Type (OMR Million), 2013–2018 .......................................................... 48 Table 64: Omani Infrastructure Construction Value Add by Project Type (OMR Million), 2009–2013 ..................................................... 49 Table 65: Omani Infrastructure Construction Value Add by Project Type (OMR Million), 2013–2018 ..................................................... 49 Table 66: Omani Institutional Construction Output by Project Type (OMR Million), 2009–2013 .............................................................. 50 Table 67: Omani Institutional Construction Output by Project Type (OMR Million), 2013–2018 .............................................................. 50 Table 68: Omani Institutional Construction Output by Cost Type (OMR Million), 2009–2013 ................................................................. 51 Table 69: Omani Institutional Construction Output by Cost Type (OMR Million), 2013–2018 ................................................................. 51 Table 70: Omani Institutional Construction Output by Activity Type (OMR Million), 2009–2013 ............................................................. 52 Table 71: Omani Institutional Construction Output by Activity Type (OMR Million), 2013–2018 ............................................................. 52 Table 72: Omani Institutional Construction Value Add by Project Type (OMR Million), 2009–2013 ........................................................ 53 Table 73: Omani Institutional Construction Value Add by Project Type (OMR Million), 2013–2018 ........................................................ 53 Table 74: Omani Residential Construction Output by Project Type (OMR Million), 2009–2013 .............................................................. 54 Table 75: Omani Residential Construction Output by Project Type (OMR Million), 2013–2018 .............................................................. 54 Table 76: Omani Residential Construction Output by Cost Type (OMR Million), 2009–2013 .................................................................. 55 Table 77: Omani Residential Construction Output by Cost Type (OMR Million), 2013–2018 .................................................................. 55 Table 78: Omani Residential Construction Output by Activity Type (OMR Million), 2009–2013 .............................................................. 56 Table 79: Omani Residential Construction Output by Activity Type (OMR Million), 2013–2018 .............................................................. 56 Table 80: Omani Residential Construction Value Add by Project Type (OMR Million), 2009–2013 ........................................................ 57 Table 81: Omani Residential Construction Value Add by Project Type (OMR Million), 2013–2018 ........................................................ 57 Table 82: Timetric Construction Market Definitions ................................................................................................................................. 59

Page 17: Publisher Sample - MarketResearch · A) Market forecasts Feed of forecast data into market models: o Macroeconomic indicators o Industry-specific drivers Analysis of the Timetric

LIST OF FIGURES

Construction in Oman – Key Trends and Opportunities to 2018 Page 15

© Timetric. This product is licensed and is not to be photocopied Published: November 2014

LIST OF FIGURES

Figure 1: Growth Matrix for Construction Output in Oman (%), 2009–2018 .............................................................................................. 2 Figure 2: Benchmarking with Other Major Construction Industries (%), 2009–2018 ............................................................................... 10 Figure 3: Omani Commercial Construction Output (US$ Million), 2009–2018......................................................................................... 12 Figure 4: Omani Industrial Construction Output (US$ Million), 2009–2018 ............................................................................................. 14 Figure 5: Omani Infrastructure Construction Output (US$ Million), 2009–2018 ....................................................................................... 16 Figure 6: Omani Institutional Construction Output (US$ Million), 2009–2018 .......................................................................................... 18 Figure 7: Omani Residential Construction Output (US$ Million), 2009–2018 .......................................................................................... 21 Figure 8: Omani Construction Output by Project Type (OMR Million), 2009–2018 ................................................................................. 34 Figure 9: Omani Construction Output by Cost Type (OMR Million), 2009–2018 ..................................................................................... 35 Figure 10: Omani Construction Output by Activity Type (OMR Million), 2009–2018 ............................................................................... 36 Figure 11: Omani Construction Value Add by Project Type (OMR Million), 2009–2018 .......................................................................... 37 Figure 12: Omani Commercial Construction Output by Project Type (OMR Million), 2009–2018 ........................................................... 38 Figure 13: Omani Commercial Construction Output by Cost Type (OMR Million), 2009–2018 ............................................................... 39 Figure 14: Omani Commercial Construction Output by Activity Type (OMR Million), 2009–2018 ........................................................... 40 Figure 15: Omani Commercial Construction Value Add by Project Type (OMR Million), 2009–2018 ...................................................... 41 Figure 16: Omani Industrial Construction Output by Project Type (OMR Million), 2009–2018 ................................................................ 42 Figure 17: Omani Industrial Construction Output by Cost Type (OMR Million), 2009–2018 .................................................................... 43 Figure 18: Omani Industrial Construction Output by Activity Type (OMR Million), 2009–2018 ................................................................ 44 Figure 19: Omani Industrial Construction Value Add by Project Type (OMR Million), 2009–2018 .......................................................... 45 Figure 20: Omani Infrastructure Construction Output by Project Type (OMR Million), 2009–2018 ......................................................... 46 Figure 21: Omani Infrastructure Construction Output by Cost Type (OMR Million), 2009–2018 ............................................................. 47 Figure 22: Omani Infrastructure Construction Output by Activity Type (OMR Million), 2009–2018 ......................................................... 48 Figure 23: Omani Infrastructure Construction Value Add by Project Type (OMR Million), 2009–2018 .................................................... 49 Figure 24: Omani Institutional Construction Output by Project Type (OMR Million), 2009–2018 ............................................................ 50 Figure 25: Omani Institutional Construction Output by Cost Type (OMR Million), 2009–2018 ................................................................ 51 Figure 26: Omani Institutional Construction Output by Activity Type (OMR Million), 2009–2018 ............................................................ 52 Figure 27: Omani Institutional Construction Value Add by Project Type (OMR Million), 2009–2018 ....................................................... 53 Figure 28: Omani Residential Construction Output by Project Type (OMR Million), 2009–2018 ............................................................. 54 Figure 29: Omani Residential Construction Output by Cost Type (OMR Million), 2009–2018 ................................................................. 55 Figure 30: Omani Residential Construction Output by Activity Type (OMR Million), 2009–2018 ............................................................. 56 Figure 31: Omani Residential Construction Value Add by Project Type (OMR Million), 2009–2018 ....................................................... 57