public works department enc office, lucknow …
TRANSCRIPT
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
1CONT
2689/20062006 Munni Devi Dependen
tReg.
AppointmentHCL 23-09-08
CD-1,(TT), Agra
AGR 7 CPending
2CONT
1044/20072007 Chandra Bhan W/C Rag. Pay
fixationHCL 17-01-07 CD-1,(TT),
AgraAGR 7 C
Pending
3CONT
1524/20082008 Radha Kishan Contractor HCL 03-07-08 CD-1,(TT),
AgraAGR 7
Pending
4CONT
1475/20082008 Rishika
MaheshwariContractor HCL 03-07-08 CD-1,(TT),
AgraAGR 7
Pending
5 CONT 818/2009 2009 Somesh
Chandra MateFor
appointment of Mate
HCA 29-04-09 PD, AgraAGR
7 Pending
6 CONT 880/2009 2009 Gaurav Kumar Mate
For appointment
of MateHCA 04-05-09 PD, Agra
AGR7 Pending
7 CONT 57/2010 2010 Gaurav Kumar Mate
For appointment
of MateHCA 23-12-09 PD, Agra
AGR7 Pending
8 Cont 4396/2011 2011 Tara Chandra Compensation HCA 17-10-2011 17-10-11 CD-2, Agra AGR 2 - Pending
9 CONT 241/2011 2011
Mohd. Zuber Alam V/s
Ravindra Singh, P.Sec
EE(Retd)Reg.
Increment of arrear
PST 12-06-12 PD, Firozabad AGR 13 A Pending
10 CONT 3093/2011 2011
Fazal Dad Khan V/s T.Ram,
ENCAmin For Salary of
D/Man HCA 16-08-11 PD, Firozabad AGR 7 D
Section Pending
11 CONT 2210/2013 2013 Prabhakar
Sharma AEAgainst order
8.05.13HCL 12.11.13 19.02.14 26-02-14 PD, Mathura
* AGR 13AE
Section
Pending
12 CONT 5919/2013 2013 Dr. Narayan
Singh Contractor Payment HCA 11.11.13 03.02.14 06-02-14 PD, Mathura AGR 7Gen
Section
Pending
13 CONT 144/2014 2014 Madan Mohan
Sharma AEService matter
HCA 15.07.14 22.07.12 14-02-14 17.02.14 PD, Mathura AGR 13AE
Section
Pending
14 Cont 4824/2014 2014 Vipin Kumar
Mirtak Asrit
For appointment
HCA 27-10-14 PD, Etah * AGR 7Vad
Section
Pending
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 1
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
15 CONT 428/2014 2014
Ramesh Chandra V/s Sri
Kishan Singh Atoria
SE Service matter PST Not Required 21.07.15 CD-3,
Mainpuri AGR Pending
16 CONT 238/2014 2014 Kaushalendra
Pratap Singh AE Reg. Promotion PST 23.08.14 29-08-14 CD-1,
Mathura AGR
Writ SESB 1220/2014
filed judgement reserved
17CONT 621/2014 2014
Purshottam Lal V/s Smt. Chitra Swaroop & Oth
W/Munshi4000-6000 pay scale
HCL 14.03.16 29.03.16 04-04-16 CD-1, mathura AGR 7 Vad Pending
18 CONT 7413/2015 2015
Chandrabhan V/s Kishan
Singh AtoriaAE(Retd) For Pension HCA 18-02-16 PD, Agra AGR 4
AE Sectio
nPending
19CONT 584/2016 2016
Vivekanand Sharma V/s Aradhana
Shukla & Oth
EEAgainst
SuspensionHCL 20.05.16 24.05.16 24.05.16 26-05-16 CD-1,
Mathura AGR 13B
Section
Pending
20 CONT 2351/2016 2016 Brij Pal Gupta AE GPF Payment HCA 04.07.16 08.07.16 13-07-16 PD, Mainpuri AGR 4
AE Sectio
nPending
21 CONT 564/2016 2016
Vivekanand Sharma V/s
Smt. Aradhana Shukla & oth
EE Againt Suspention PST 20.05.16 24.05.16 24.05.16 26-05-16 CD-1, Agra AGR 13 B Pending
22 CONT 122/2016 2016
Bal Mukund Agarwal V/s Anuradha
Shukla, P.Sec
AE(Retd)
to compliance PST order in 1488/13 dt 27.11.15
PST CD, Mainpuri AGR 13 B Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 2
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 1082/2010 2010 Dinesh
Chandra DependentFor service of
dependentHCL 19.05.10 20.05.10 21.05.10 24-05-10 CD-1,
Pratapgarh ALD 7C
Section
Pending
2 CONT 1220/2010 2010 Lalti Devi Beldar
From appointment
date to regular and all consequental
benefits
HCL 05.07.10 05.07.10 15.07.10 26-07-10 CD-1, Pratapgarh ALD 7
C Sectio
nPending
3 CONT 1228/2010 2010 Rakesh Kumar
Maurya & Oth Mate
From appointment
date to regular and all consequental
benefits
HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7
C Sectio
nPending
4 CONT 1219/2010 2010 Chintamani
Pandey Chaukidar
From appointment
date to regular and all consequental
benefits
HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7
C Sectio
nPending
5 CONT 1172/2010 2010 Dasharath Lal &
Oth Beldar
Ignoring of ceiling limit to
payment of arrears
HCL 05.07.10 05.07.10 14.07.10 26-07-10 CD-1, Pratapgarh ALD 7
C Sectio
nPending
6 CONT 1406/2010 2010 Heera Lal Beldar
From appointment
date to regular and all consequental
benefits
HCL 02.08.10 02.08.10 05.08.10 12-08-10 CD-1, Pratapgarh ALD 7
C Sectio
nPending
7 CONT 1371/2010 2010 Ram Das Beldar
Retiral benefits &
pensionHCL 02.08.10 03.08.10 04.08.10 08-06-10 CD-1,
Pratapgarh ALD 7C
Section
Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 3
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
8 340/2011 2011 Chottan & OthPrivate Person
Reg. Construction
of bridge throgh
petitioner's land
HCA 07-03-11 CD-1, Allahabad ALD 7 SALO Pending
9 CONT 2486/2012 2012 Sanjeev kumar Beldar Adjustment HCA 25-07-12 PD,
Allahabad ALD 7C
Section
Pending
10CONT
2904/20122012
SIPAHI LAL V/s ANIL KUMAR
D.M.HCA
N.H. DIV-1 ALD
ALD Pending
11 CONT 2880/2013 2013 Raj Dulare
DubeyChaukidar
(Retd)
Retiral benefits &
pensionHCA 31.01.14 03.02.14 03.02.14 05-02-14 CD-1,
Pratapgarh ALD 7SSO(E-
3)Pending
12CONT/32013011318/2013
CONT 311/2013 2013 Samar Bahadur
Singh & 8 Oth MateGPF
deductionHCL 02.03.13 04.03.13 08.03.13 08-03-13 CD-1,
Pratapgah ALD 7C
Section
Last Listed 12.11.14
1332013111185/2013
CONT 86/2013 2013
Rameshwar Prasad Patel
BeldarGPF
deductionHCL 12.02.13 20.02.13 21.02.13 21-02-13 CD-1,
Pratapgah ALD 7C
Section
Last Listed 12.11.14
14 CONT 3083/2013 2013
Rijwan Ahmad Khan V/s Rajneesh
Dubey & Smt. Chitra
Swaroop(HOD)
ClerkDiploma Holder
PromptionHCA 22-09-13 CD-1,
Allahabad ALD 7 Pending
15 184/2013 CONT 67/2013 2013 Bharat Singh Mate
GPF deduction
HCL 16.02.13 18.02.13 19.02.13 19-02-13 CD-1, Pratapgah ALD 7
C Sectio
nPending
16 CONT 1798/2014 2014 Sant Lal Contractor
Payment of K.M 2001-02
HCA 26-04-14CD-
4(Kumbh), Allahabad
ALD 7Gen
Section
Payment 18.01.15
173201411595/2014
CONT 1596/2014 2014
Ram Sewak Patel S/o Lt. Kashi Prasad
Beldar
From appointment
date to regular and all consequental
benefits
HCL 12.08.14 30.08.14 15.09.14 03-09-14 CD-1 Pratapgarh ALD 7
C Sectio
n
Last Listed 05.09.14
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 4
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
183201411692/2014
CONT 1732/2014 2014
Komal V/s Chitra Swaroop,
ENCBeldar
From appointment
date to regular and all consequental
benefits
HCL 17.09.14 18.09.14 20.10.14 18-09-14 CD-1 Pratapgarh ALD 7
C Sectio
n
Last Listed 09.10.14
193201411411/2014
CONT-1004/2014 2014
Ram Pal S/o Teja Waheed
Bux Beldar HCL 16.06.14 21.07.14 21-08-14 PD Fathepur ALD 7
C Sectio
n
Last Listed 18.09.14
20CONT
214/2014 2014
Awadesh Kumar Tripathi V/s Dr. Rajnish Dubey, P.Sec
PST PD, Fatehpur ALD Pending
21 CONT 381/2015 2015
D.K. Verma V/s Kishan Singh
AtoriaAE Vacate of stay
on increment PST 13.04.15 03.06.15 30.07.15 03-08-15CD-4,
(Kumbh), Allahanad
ALD 13 AE Pending
22CONT
3146/20152015 M/s Pratiksha
Construction ContractorReg Payment
of interestHCA 17.06.15 03-08-15 20.05.15
CD-4, (Kumbh)
AllahabadALD 7
Gen Sectio
nPending
23CONT
3148/20152015 Arvind Kumar
Pandey ContractorReg Payment
of interestHCA 17.06.15 03-08-15 20.05.15
CD-4, (Kumbh)
AllahabadALD 7
Gen Sectio
nPending
243201511942/2015
CONT 1368/2015 2015 Ram Saran HCL CD-1,
Pratapgarah ALD Pending
25CONT 7193/2015
2015Mohd. Shamim
SiddiquiW/Agent Reg. Arrear HCL 25-01-16 CD-1,
Allahabad ALD 7 Pending
26CONT 80/2015 2015
Rahul Upadhayay
Contractor reg. Payment HCL 29.09.15 20-11-15 NH-1, Allahabad ALD 7 Pending
27 CONT 3146/2015 2015 M/s Pratiksha
Construction ContractorReg.Payment of intererst
HCA 17.06.15 03-08-15 20.05.15CD-
4(Kumbh) Allahabad
ALD 7Gen
Section
Pending
28 CONT 3148/2015 2015 Arvind Kumar
Pandey ContractorReg.Payment of intererst
HCA 17.06.15 03-08-15 20.05.15CD-
4(Kumbh) Allahabad
ALD 7 Pending
29 CONT 262/2016 2016
Geeta Srivastava
Retired & Deceasesd Employee
Reg. Payment & arrear
HCA 20.02.16 09-03-16CD-4,
(Kumbh) Allahabad
ALD 7C
Section
Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 5
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
303201611609/2016
CONT 1296/2016 2016 Shiv Shankar S/o
Ram Saran YadavReg.
RepostingHCL 05.08.16 10-08-16 PD
Pratapgarh ALD 7 Vad Pending
31 CONT 2960/2016 2016 Shailendra
Tripathi AEReg.
PromotionHCA 06-08-16
CD-4, (Kumbh)
AllahabadALD 12 A Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 6
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 4617/2012 2012 RAJENDRA
PRASAD UDC Transfer HCL 23.11.11 23.11.11 29-08-12 CD-5, Azamgarh AZM 7 SSO(E-
3)Pending
2 Cont 3568/2012 2012
M/s Kapleshwari Construction
Contractor From Tender HCA 26.09.12 26.09.12 10-01-12 PD, Ballia AZM 7 Pending
3 Cont 137/2012 2012
Suresh Chandra Jaiswal
JEPayment of
ACPPST 07.08.12 14-08-12 11-10-12 PD,
Azamgarh * AZM 7compliance
report filed in PST
4 Cont 2311/2012 2012 Sushila Devi
Private Person
Information RTI
HCA 19.07.12 22.07.12 23-07-12 PD, Azamgarh AZM COMP
LAINTPending
5 CONT 2022/2014 2014
Deendyal V/sSurendra Verma EE
Bridge on Hathiya nala pahuch marg
HCA 06-05-14 CD-5, Azamgarh AZM Compansatio
n paid
6 CONT 7220/2015 2015
Manmohan Pandey V/s Kishn Singh Atoria P.Sec
W/Super (Retd)
HCA 05-02-16 02.05.16 PD Ballia AZM 7order
14.08.15 in 10287/2014
7 CONT 2064/2016 2016
Harikesh V/s V.K. Singh &
OthMate
For Regularisaatio
nHCL 03.12.16 06.12.16 06-12-16 CD,
Azamgarh AZM 8 A Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 7
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 247/2010 2010 Ramlal Singh JE Reg.
promotion PST 10.08.10 19.08.10 27.08.10 09-09-10 01.11.2010 15.04.11CD-1,
Shahjahanpur
BLY 4D
Section
Pending
2 CONT 2367/2010 2010
Chandra Prakash
Srivastava
Amin (Retd) Reg.Pay HCL 13-01-11
Cd-1, Shahjahanp
urBLY 7
C Sectio
n
Last Listed 15.03.11
3CONT
292/20122012
V.K. ARORA V/s KUMAR
ARVIND SINGH DEO & SMT CHTRA
SWROOP E-IN-C
PST PD BLY BLY 6 Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 8
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 761/2009 2009 Rajesh Kumar
& Oths.
Computer Operator (Contract)
For Appointment HCL 26-05-09 PD, Rae
Bareli CZ 7 Last Listed 06.03.13
2 CONT 1211/2010 2010
Chandhas Shukla & 7 Oth
V/s Sri Ravindra Singh
& 5 oth
Chukidar Regualrisation HCL21/07/2010
¼fj0½ 05-01-11
CD-1, Lucknow CZ 7 C
SectionLast Listed 29.05.13
3 CONT 410/2010 2010 Mahendra Kr.
TiwariExecutive Engineer
Against recovery PST 17-01-11 PD, Rae
Bareli CZ Pending
4 Cont 156/2010 2010 Mahaveer
Prasad EE (Retd)Against
reversionPST Stay order
31.10.12TDCU(E/Main), Lucknow CZ Pending
5 CONT 168/2010 2010 K.C.Hajela AE
For adjusted TI
PST CD-1, Unnao CZ 6 Pending
6 Cont 3181/2011 2011 S.C. Tripathi JE Promotion HCL 31.08.12 NA CD-2,
Lucknow CZ 4D
Section
Last Listed 12.12.11
7 CONT 2598/2011 2011 Jai Prakash
SinghLand
Owner Land dispute HCL 06-01-11 PD, Rae Bareli CZ Pending
8CONT
1311/20112011
SYED HASAN AKHATAR &
OTHJE 14-09-12 HCL
SSO(E-2)/ E.Maint-1, Lucknow
CZ4 Last Listed
11.09.14
9 CONT 599/2011 2011 Shiv Bahadur Mate Regularaigat
ion HCL 09-05-11 PD, Rae Bareli CZ 7 Last Listed
31.05.11
10 CONT 2862/2011 2011
Indra Dev Singh V/s Ravindra Singh, P.Sec
JEReg.
Promotion of AE
HCL 5.13 04-01-12 CD-1, Sitapur CZ 4 D
Section Pending
1132012111137/2012
CONT 2746/2012 2012
Abid Husain V/s Sri Arvind Singh
Dev. P.SecHCL Not
RequiredENC Office,
Lucknow CZ 4 SE EST. Pending
12 CONT 16/2015 2012 Pushplata
Pandey LO (Retd)Reg.
Retirement benefits
PST 17.01.201308.11.2013
CD-4 lucknow CZ 4 B Pending
13 Cont 1825/2012 2012 Babu Ram V/s
G.K. Singh, EE Beldar Pension HCL 21.08.12 29.08.12 03-09-12 22.02.13 06.03.13 CD, Sitapur CZ 7C
Section
Last Listed 13.03.13
14CONT
29051/2012
2012 Salik Ram & oth HCL 08-01-13 PD,
Lucknow * CZ Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 9
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
15 CONT 76/2012 2012 Shanti Saran
Shukla UGC For A.C.P. PST 06-06-12PD,
Lakhimpur Kheri
CZ 7 Pending
16CONT
179/20122012
ARUN KUMAR JAYANT V/S KUMAR A.S.
DEV
PST PD UNNAO CZ Pending
17CONT
115/20122012
C.P.S. GAHARWAR V/s KUMAR
ARVIND SINGH
PSTCD-2
LUCKNOWCZ Pending
18 CONT 160/2012 2012 Devendra Singh AE (Retd)
Reg. Retirenmental
benefitsPST 27-06-13 CD-1,
Lucknow CZ 4 AE Pending
19CONT
2905/20122012
HARI HAR PANDEY V/s
Chitra Swaroop ENC
HCL CD-2, Lucknow CZ Pending
20 CONT 1618/2013 2013 Suresh Kumar
Tiwari L.O(Retd) HCL 19-09-13 CD-2, Lucknow CZ 4
B Sectio
n
Last Listed 02.02.15
2132013111065/2013
CONT 2085/2013 2013
Mool Chand Goyal & 8 Oth V/s Dr. Rajnish
Dubey
AEAgainst order 18.09.12 of
HCLHCL 08.10.13 08.10.13 12-12-13 CD-2,
Lucknow * CZ 4AE
Section
Last Listed 18.09.14
22 CONT 341/2013 2013 Jyoti Bhushan
Agrawal
Reg. Retirenmental
benefitsPST 15-04-15 CD-1,
Lucknow CZ 8 A Pending
2332013111205/2013
CONT 2175/2013 2013 Ram Newal
Prasad Yadav HCL 28-01-14 CD-2, Lucknow * CZ Last Listed
19.03.13
24CONT
441/20142014
P.N. SINGH V/s SV/s SRI KISHAN CHAND
AATORIYA
PSTCD-1
LUCKNOWCZ 3
A SECTI
ONPending
25CONT
394/20142014
HARBHAJAN SINGH V/s SRI KISHAN SINGH
AATORIYA
PSTCD-1
LUCKNOWCZ 4
A SECTI
ONPending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 10
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
26CONT
167/20142014 K.P.S.
KUSHWAHA AE(RET)Pay scale
3000-4500PST 07-08-14
TEP ELE. DIV-1 LUCKNOW
CZ 4 Pending
27 CONT 417/2014 2014
Virendra Pal V/s Mannilal EE, CD-1,
Hardoi
Beldar Reg. Recovery HCL 22.02.14 07.03.14 14.03.14 15-03-14 20.02.14 07.03.14 CD-1, Hardoi CZ 7
C Sectio
n
Last Listed 20.02.14
28CONT
416/20142014
V.K. SINGHAL V/s SRI KISHAN CHAND
AATORIYA
Reg. Retirenmental
benefitsPST
CD-1 LUCKNOW
CZ 8A
SECTION
Pending
293201411582/2014
CONT 1536/2014 2014
Dinesh Chandra
Agarwal S/o Lt. D.D. Agarwal
HCL 29.08.2014 CD-2 Lucknow * CZ 3
A Sectio
n
Last Listed 23.01.15
303201411670/2014
CONT 1249/2014 2014
Vandana Jain W/o Lt. Kuldeep
Jain V/s Hari Bansh Singh,
CE HQ-2, Upppwd
Appoinment HCLCD-2
LUCKNOWCZ 7
C Sectio
n
Last Listed 15.04.15
31 3201411936/2014
CONT 2270/2014 2014
SRI NATH MAURYA V/s A.K. GUPTA
(H.O.D.)
HCLCD-2
LUCKNOWCZ Pending
323201411183/2014
Cont 153/2014 2014
Ravi Prakash Shukla V/s ENC Chitra
swaroop
HelperReg. Scale of
electricianHCL 04.03.14 Not
Required 05.03.2014 CD-2, Lucknow * CZ 7 Last Listed
05.03.14
33CONT
373/20142014
JITENDRA SINGH V/s
KISHAN SINGH AATORIYA
SE PROMOTION PSTCD-1
LUCKNOWCZ Pending
34CONT
374/20142014
JITENDRA SINGH V/s
KISHAN SINGH AATORIYA
SE PROMOTION PSTCD-1
LUCKNOWCZ Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 11
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
35CONT
375/20142014
JITENDRA SINGH V/s
KISHAN SINGH AATORIYA
SE PROMOTION PSTCD-1
LUCKNOWCZ Pending
36CONT
376/20142014
JITENDRA SINGH V/s
KISHAN SINGH AATORIYA
SE PROMOTION PSTCD-1
LUCKNOWCZ Pending
37CONT
377/20142014
JITENDRA SINGH V/s V/s SRI KISHAN
CHAND AATORIYA
SE PROMOTION PSTCD-1
LUCKNOWCZ Pending
38CONT
338/20142014
RAMESH CHANDRA V/s
DR. RAJNEESH
DUBE
SE PROMOTION PST Stay oder 07.04.15
CD-1 LUCKNOW
CZ Pending
39CONT
447/20142014
Kulbhushan Kumar Kapoor
V/s Kishan Singh Atoria,
P.Sec
EE(Retd)Reitral
benefitsPST 12-05-15
CD-1 LUCKNOW
CZ 3 A Pending
40CONT
650/20152015 Abdul Qawi
Khan EE(Retd)Higher pay
scaleHCL 19-05-15
Nh-3, Lucknow
CZ 8 A Section Pending
41 3201511233/2015
CONT 124/2015 2015
Devendra Kumar Jain
SEReg.
retirementHCL 11-05-15 CD-2,
Lucknow CZ 6A
Section
Pending
42 3201511244/2015
CONT 213/2015 2015
Awadhesh Kumar
ChaudharyHCL CD-2,
Lucknow CZ Last listed 03.04.15
43 3201511313/2015
CONT 354/2015 2015
Farooq Ahmad S/o Late Noor Mohammad
Private Person
Construction of road
HCL 01.04.15 01.04.15 10.04.15 10-04-15 CD-2, Lucknow CZ 11 Last listed
13.04.15
44 3201511395/2015
CONT 589/2015 2015
Keshav Lal V/s Kishan Singh Atoria P.Sec.
HCL CD-2, Lucknow CZ Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 12
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
45 CONT 12/2015 2015
Kashi Ram V/s Kishan Singh Atoria , P.Sec
EE ACP Benefit PST 20-05-15 CD-1, Lucknow CZ 8 A Pending
46 CONT 61/2015 2015
Suraj Bhan Shukla
Heavey Machine Operator
Challenge of order
02.07.14 of PST
HCL 30.09.14TY, DCU
(E/M), PWD, Lucknow
CZ 7 Pending
473201511881/2015
CONT 942/2015
2015 Mohan Singh HCL PD, Hardoi CZ Pending
48 32015111339/2015
CONT 2194/2015 2015
Mahima Dayal Singh S/o Late
Indra Dev SinghHCL CD-2,
Lucknow CZ Pending
49 32016116/2016
CONT 2380/2015 2015
Ramesh Chandra S/o
Late Prvat Singh
HCL CD-2, Lucknow CZ Pending
50 CONT 2519/2015 2015
Lal Mohammad V/s A.K. Gupta
HCL 21-01-16 PD, Kheri CZ Pending
513201611318/2016
CONT 260/2016 2016
Narendra Singh S/o Aniruddha
SinghHCL 04-04-16 CD-2 Hardoi CZ Pending
523201611248/2016
CONT 197/2016 2016 Durga Prasad
AgarwalJE(T) HCL 31-03-16 CD-2,
Lucknow CZ4
Pending
533201611261/2016
CONT 208/2016 2016 Anil Kumar HCL CD-2,
Lucknow CZ Pending
54 320161199/2016
CONT 2513/2016
2016 Eklavya Kumar S/o Mohan Lal
EE HCL 03-04-16 CD-2 Lucknow * CZ 6
A Sectio
nPending
553201611460/2016
CONT 564/2016 2016 Vivekanand
SharmaHCL CD-2,
Lucknow CZ Pending
563201611527/2016
CONT 1273/2016 2016 Pramod Kumar
Sharma HCL CD-2, Lucknow CZ 7
C Sectio
nPending
573201611529/2016
CONT 1000/2016 2016 Avinash Bajpai HCL 27.06.16 05-07-16 PD, hardoi CZ 7 Vad Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 13
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
583201611679/2016
CONT 856/2016 2016
Shamshuddin S/o Safat
MohammadHCL CD-2
Lucknow* CZ Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 14
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 1892/2010 2010 Bajrangi & Oth W/agent
HCL06-01-11 PD,
Sultanpur FZD 7C
Section
Last Listed 02.12.11
2 CONT 10/2010 2010 N.K. Srivastava EE For Promotion PST 06.03.10 01.05.10 03.05.10 03-05-10 05.05.10 PD,
Barabanki FZD 6 A Pending
3 CONT 1237/2010 2010 Nawal Kishor
Srivastava EE (Retd) For Promotion PST 25.08.10 26.09.10 28.09.10 28-09-10 PD, Barabanki FZD 6 A Pending
4 CONT 1655/2010 2010
VIKAS CHANDRA
SRIVASTAVA V/s R.K.GARG
AND ANOTHER
JE(Retd) Reg. Pension HCL 06-09-14 CD-2 Faizabad FZD 7
C Sectio
nPending
5 CONT 930/2011 2011 Sant Bahadur
SinghTractor Driver
Service matter
HCL13.07.11 13-07-11
PD, Ambedkar
NagarFZD 7 Vad Pending
6 CONT 205/2011 2011 Krishan Dev
Upadhyay Mate Compansation service HCL 13.02.11 11.03.11 16.03.11 25-03-11 CD-3,
Siltanpur FZD 7 C Pending
7 CONT 1572/2012 2012 Jitendra Pratap
singh EERecal of
judgment 21.9.12
HCL Not Required
CD-2, Faizabad FZD 3
A Sectio
nPending
8 CONT 2172/2012 2012 Bhagwat Saran JE(Retd)
Time bond scale/Arrear,
Inquiry of Irregularity
HCA 18.07.12 21.07.12 25-07-12CD,
Ambedkar Nagar
FZD 4 D Section Pending
9 CONT 1915/2012 2012
DAYA SHANKAR
SINGHContractor
Payment of Bill
HCL 28.09.12 10-09-12PD,
Sultanpur/ PD, Amethi
FZD 7 Gen. Section
CA filed payment release
10 CONT 2045/2012 2012 Ganpalt S/o
Ram Das AppointmentHCL
06.10.12 09-10-12 CD-1, Bahraich
FZD7
C Sectio
n
Lst Listed 11.10.12
11 CONT 324/2013 2013 Walli Ur
RahmanPrivate Person
Encrochment HCL 16.02.13 23.02.13 05.03.13 11-03-13 CD-2, Gonda FZD 2 SALO Pending
12 CONT 346/2013 2013
Suresh Chandra Jaiswal
JEMedical
reimbursement
PST 18-11-13 PD, Sultanpur FZD 6
D Sectio
n
Ca Filed 18.11.13
1332013111236/2013
CONT 2065/2013 2013 Ram Singar HCL 22-10-13 PD,
Sultanpur FZD Last Listed 07.11.14
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 15
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1432013111030/2013
CONT 732/2013 2013 Babu Ram Dependent
Reg. Appointment
HCL 16.10.13 02.11.13 10-07-14 CD-3, Sultanpur * FZD 7
C Sectio
nPending
15 CONT 99/2013 2013
Jagdish Narayan Yadav
V/s Rajnish Dubey & Chitra
swaroop
JEAgainst
PunishmentPST Not
RequiredPD,
Balrampur FZD
4
Pending
16CONT
268/20142014
NARENDRA PRASAD
SINGH V/s STATE
AE(RET)Against
PunishmentPST 26.08.14 20.05.15 20-05-15 02.01.14 19.05.15
CD-2 GONDA
FZD 6A
SECTION
Pending
17CONT
247/20142014
TAHIR HUSAIN ABDI V/s Dr.
Rajnesh Dubey P. Sec.
EEReg.
PromotionPST 22-08-16 17.08.15
PD, Ambedkar
NagarFZD 8 A Pending
183201411761/2014
CONT 91/2014 2014
Bhagwati Prasad
SrivastavaJE(T)
Against Judg. 25.09.13 WP 6423/ss/06
HCL 27-10-14Complianc
ePD, Gonda FZD
4
Pending
193201411568/2014
CONT 1108/2014 2014
Sunil Kumar Singh S/o Vinay
Pratap Singh
Related to Inspection
HouseHCL 01-08-14 PD
Barabanki FZD 7 C Pending
203201411440/2014
CONT 1242/2014 2014
Shyam Prakash Singh S/o Brij Nath Singh
Mate HCL 02-08-14 PD Sultanpur FZD 7 Pending
21 CONT 2646/2014 2014 Bhagwan
Prasad SharmaPrivate Person
HCL 19-01-15 PD, Sultanpur FZD Pending
22320141155/2014
CONT 72/2014 2014 Panchu Beldar(Retd)
For pention benefits after
retirementHCL 03-10-14 PD, Amethi FZD 7
Gen Sectio
nPending
233201411372/2014
CONT 900/2014 2014 Rama Shankar
Lal Sharma HCL 02-08-14 PD, Sultanour FZD Pending
24 CONT 406/2014 2014 Ram Naresh
Gupta JE(Retd) Pay Fixation PST 30.02.15 05.01.2015 CD Ambedkar FZD 4 D Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 16
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
25 CONT 93/2014 2014 Srinath Yadav AE
Reg Promotion of
EEPST 16-12-14 Ty, NH,
Sultanpur FZD 8 AEagainst order 14.10.13 in
CP 163/2011
263201511699/2015
CONT 1058/2015 2015
Siya Ram V/s Rajeev Swami
SEMate HCL 20.07.15 22.07.15 27-07-15 CD-3,
Sultanpur FZD 7 C Pending
27 CONT 1742/2015 2015
Mumtaz Ahmad
W/Agent HCL 20.07.15 22.07.15 25-07-15 27.07.15 CD-3, Sultanpur FZD 7 Pending
28 CONT 2573/2015 2015 Kalyan Singh
Private Person
Reg. Jamuria Pul
HCL 09-02-16 CD-3, Barabanki FZD 2
C Sectio
nPending
29 CONT 378/2016 2016 Kalyan Singh
Private Person
Related to Jamuriaya Pul
HCL 30-04-16 CD-3, Barabanki FZD 2
C Sectio
nPending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 17
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 2768/2005 2005 B/L/ Srivastava JE(Retd)
Retiring benefits Non
Compliance of order dt 30.11.04
HCA 03.12.05 05.12.05 06-12-05PD, Sant Kabeer Nagar
GKP 13 CNot listed
after 21.03.07
2 CONT 359/2007 2007 C.D. Ray AE Miscellaneous PST 30-04-08
PD Siddharth
NagarGKP 13 Pending
3 CONT 2778/2008 2008 Mahangu
Punrikshit vetanman
HCA 25-05-10 CD(Build), Gorakhpur GKP 7 HQ-2 Pending
4 CONT 321/2008 2008
Mewa Lal v/s (kapil dev or R
dubeyPST PD, Deoriya GKP 13 A Pending
5 CONT 118/2008 2008 Divakar Dwivedi Contractor Reg.Order dt
19.09.07 HCA 28-02-08 PD, Deoriya GKP 7 C Pending
6 CONT 4481/2009 2009 M/s Aadi Shakti
Trading Co. Contractor Reg.Order dt 12.12.06 HCA 07-01-10 PD, Deoriya GKP 7 Gen Pending
7 CONT 4482/2009 2009 Raj Kumar
Pandey Contractor Reg.Order dt 1.02.08 HCA 07-01-10 PD, Deoriya GKP 7 Gen Pending
8 CONT 3786/2010 2010 V.M. Verma JE(Retd)
Retiring benefits Non
Compliance of order dt 06.04.10
HCA 03.09.11 05.09.11 06-09-00PD, Sant Kabeer Nagar
GKP 13 C Pending
9CONT
5623/20112011 Phool Chand Farmer Pratikar ke
Bhugtan HCAComplianc
eCD(Build), Gorakhpur GKP 4 HQ-2 Pending
10 CONT 136/2011 2011 Santosh Kumar
Saran EE Reg. order 10.01.11 PST 20.07.12 11.09.12 PD, Deoriya GKP 13 A Pending
11CONT
1542/20112011 Yudishdar Mani
Tiwari JE Reg. order 24.05.10 HCL 08/911 14.07.11 PD, Deoriya GKP 4 D Pending
12CONT
5544/20112011 Ram Karan
SinghPravadhik sahayak
Reg. order 24.05.10 HCL 13-12-11 09.07.12 PD, Deoriya GKP 7 C Pending
13CONT
763/20112011 Saleem
Store keeper
Reg. order 23.11.07 HCL 19-04-12 20.04.12 PD, Deoriya GKP 7 C Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 18
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1432012111019/2012
CONT 2380/2012 2012
Karam Dev V/s Chitra Swaroop,
ENCCleaner
For Appointment
HCL 21-11-12 09.11.12 PD, Basti * GKP 7 C Section Pending
15CONT
1944/20122012
HARI RAM GUPTA V/S KUMAR A.S.
DEV
HCACD
MAHARAJ GANJ
GKP Pending
16CONT
78/20122012
HARIHAR PRASAD V/s RAVINDRA
SINGH
PSTPD,
GorakhpurGKP Pending
17 CONT 3061/2012 2012 Salim
Store keeper (Retd)
Against order dt 23.11.07 HCL 24-01-13 12.12.12 24.01.13 PD, Deoria GKP 7 C
Section Pending
18 CONT 414/2013 2013 Jagdesh Roller
Driver PST 28.07.2014 12.07.13 PD Sant Kabir Nagar GKP 7 C Pending
19CONT
305/20132013
G.C. UPADHYAY
V/s DR. RAJNEESH DUBE, SMT.
CHITRA SWAROOP
EE(Ret) PST E/M GKP GKP Pending
20CONT
258/20132013 C.D. Ray EE(Retd)
Service Matter
PST 23-09-13PD,
Siddarth Nagar
GKP 13 Pending
21CW/1517/2014
CONT 253/2014
2014 Ram Karan Singh Retd. Emp.
Arrear of Intrest
HCA 25-04-14 PD, Deoria GKP Pending
223201411410/2014
CONT 1002/2014
2014Ram Naresh & 38 Oth V/s Dr. Rajnish Dubey
Mirtak Asrit
HCLPD, Sant Kabeer Nagar
GKP Last Listed 14.05.14
23 CONT 922/2014 2014
M/S MAA AMBEY
TRADERS V/s DR.
RAJNEESH DUBE P.SEC.
PWD
Contractor HCL 07-07-14 17.07.14 CD(Build), Gorakhpur GKP 7 HQ-2 Last Listed
24.07.14
24 CONT 384/2014 2014 A. K. Sharma SE Promotion PST Not
RequiredCD(Build), Gorakhpur GKP 13 A Pending
25 CONT 891/2014 2014 Manish Kumar AE
Reg. Suspention
HCA 25-03-14 PD, Siddarth Nagar GKP 7 Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 19
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
26CONT
47/20142014 Umesh
Chandra Jadiya AE(Retd)Against
PunishmentPST 04.04.14 05.05.14 01-08-14
CD, Bansi SDR
GKP 13 A Pending
27 CONT 675/2014 2014 Balinder Rai
Driver (Retd)
GPF payment HCA 04-03-14 PD, Deoria GKP 7C
Section
Pending
28CONT
02/20152015 Shashi Prakash
Roller Driver
PSTPD,
Siddarth Nagar
GKP 7 Pending
29CONT 374/2016 2016
Sumitra (AE, Expired) V/s Sri
Kishan Singh Atoria & Oth
AE Reg. Payment HCA 12.02.16 CD-2(PP) Gorakhpur GKP Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 20
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 29/2011 2011 Shiv shankar
Lal EE For Promotion PST 17.01.12 22.02.12 22-02-12 16.03.11 31.12.12 PD Banda JHS 3 A
2 Cont 1398/2012 2012 Mool Chand
Dubey Farmer Compansation HCA 02-05-12 Disposed PD, Banda JHS 2Gen
Section
07.07.2015
3 CONT 192/2012 2012 Pradeep
Rastogi AE PST PD, Jhansi * JHS 6 Pending
4 48/2012Cont
4216/2012 2012 Suraj Singh Bhadauria
Store keeper (Retd)
Recovery HCL 06.11.12 08.11.12 08-11-12 16.01.12 19.03.12 CD-3, Orai JHS 7C
Section
Pending
5 Cont 5540/2012 2012
Rajdhar Singh V/s Ramesh
Chandra Pateria
EEReitral
benefitsHCA 17-01-13 PD, Lalitpur JHS 7
C Sectio
n15.07.2015
6 CONT 2217/2013 2013 Shanti Nandan
Sharma JE Salary HCA 15-07-13 15.07.13 PD, Hamirpur JHS 6 Compl
aint15.07.2015
7 CONT 274/2013 2013 Emamanul
Singh M.Driver
Misprint of retirenment
date in service book
PST Stay order CD-3, Jhansi JHS 6 Pending
8CONT
290/20132013
SHIV SHANKAR LAL
V/s P.SEC.PST 26.04.13 21.06.13 12.06.13 21-06-13 27.4.15 CD-2 BANDA JHS Last Listed
26.12.2014
9 CONT 166/2014 2014 Satya Dev
Gupta JE(Retd) Retiremental claim PST 28.05.14 05-08-14 CD-2(PP),
Orai JHS4
D 31.07.2015
10 CONT 315/2014 2014 Ravi Das Rahi EE Reg.order
05.09.14 PST 21.11.14 26.05.15 27-05-15 05.10.15 25.05.15 CD-1, Banda JHS 6 A
11 CONT 175/2014 2014 Ajay Kumar EE ACR PST 17.07.14 24.07.14 29.07.14 PD Orai JHS 8 A
12 CONT 218/2015 2015 Rajiv Kumar
Saxena JE PST 13.07.15 04.08.15 10-08-15 26.11.15 CD-1, Banda JHS 6 A 16.03.2016
133201611532/2016
CONT 865/2016 2016 Mani Ram HCL PD, Gonda JHS Pending
14 CONT 2234/2016 2016
Ram Prakash V/s Pratap Narayan
SrivastavaMate
For non compiance of
order HCA 21.08.16 14-07-16 PD, Orai JHS 7
C Sectio
nPending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 21
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1CONT
6071/20102010
RAJENDRA KR.TRIPATHI
& OTHHCA PD, Kanpur
N * KNP Pending
2Cont
170/20102010 Rajendra Singh
Saini AE(Retd) Reg. Recovery PST 10.09.13 26-09-13 27.02.09 PD, Kanpur KNP 13 A Pending
3CONT
41/20102010 Mahesh Chand
Gupta JE Reg. Recovery PST 15-07-13 15.07.13 NH, Kanpur KNP 13Compl
aintPending
4 CONT 3375/2012 2012
Mrigrndra Kumar Anil V/s
SRI A.K. BARANWAL, SEC, PWD
AEAgainst
recoveryHCA 08.06.12 18.07.12 21-09-12 13.08.12
PD, Knapur N/ CD-1(PP), Kanpur
KNP 13 PMGSY Pending
5Cont
996/2012, 966/2012
2012 Ram Chandra FarmerNon
compliance of order
HCA 04.04.12 04.04.12 05-04-12 CD, Aurraiya KNP 6Gen
section
Pending
6 Cont 912/2012 2012 Satish Chandra Beldar Regularisation HCL Not
RequiredFinal
16.05.12CD-3,
Etawah KNP 7C
Section
Pending
7 Cont 193/2012 2012 Satya Prakash D/W Regularisation HCA 14.03.12 15.03.12 15-03-12 16.08.12 27.11.12 CD-3,
Etawah KNP 7D
Section
Pending
8 Cont 2962/2012 2012 Om Prakash
Yadav Contractor Payment HCA 25.08.12 27.08.12 30-08-12 PD, Fatehgarh KNP 7
Gen Sectio
nPending
9 Cont 2842/2012 2012 Usha Awasthi mate
Service matter
HCA 28-08-12 27.08.09CD-1,
Ramabai Nagar
KNP 7C
Section
Pending
10 CONT 2319/2012 2012
Ram Swaroop V/s Kunwar Arvind Singh
Beldar Regularisation HCL 06.11.12 06.11.12 06-11-12 08.11.12Not
RequiredCD-3,
Etawah KNP 7C
Section
Lst Listed 21.01.13
11CONT 5213/2012
2012Ashok Kumar
SrivastavaMate
Service Matter
HCA 31.12.12 22-04-13 23.07.12
CD-1, Ramabai Nagar/ Kanpur
KNP 7C
Section
Pending
12CONT
354/20132013
EKLAVYA KUMAR V/s DR
RAJNEESH DUBE
EEService Matter
PST 18-07-14 PD, Fatehgarh KNP 13 Pending
13 CONT 138/2013 2013 F.K. Rao EE Pay Fixation PST 14-06-13 PD, Kanpur
Nagar KNP 13 A Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 22
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
14 CONT 131/2013 2013 Fateh Chandra JE Pay Fixation PST 24.04.13 20.05.13 15-09-15 15.09.15 PD, Kanpur
Nagar KNP 4 DSERB
1099/2013 filed
15 CP 500/2013 2013 Jagdish
Narayan Yadav JE IInd ACP PST 07.08.13 29.08.13 24-09-13 25.04.14 PD, Kannauj KNP 6 Vad3 Pending
16 CONT 2601/2014 2014 Pushpa Devi Peon
For Salary & other benefits
HCA 12-02-15Complianc
eE/M, Kanpur KNP 7
17 CONT 927/2014 2014 Jabir Ali Mate
Against order 22591/08
HCA 29-04-14 PD, Kanpur (N) KNP 7
18 3201511410/2015
CONT 597/2015 2015 Jai Singh & Oth Mate
Minimum Pay Scale
HCL 26-02-15 PD, Kannauj KNP 7 VADS.Appeal 193/2015
filed
19 3201511334/2015
CONT 342/2015 2015 Pradeep Kumar W/Agent HCL PD, Etawah KNP 7 Pending
20CONT
369/20152015 Jagdish
Narayan Yadav JE(Retd) Reg. ACP PST 23-12-15 PD, Kannauj KNP 6 VAD Pending
21 CONT 249/2015 2015 Rajendra
Prasad Sharma EE(Retd) PST 20-11-15 PD, Etawah KNP 4 A Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 23
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 1860/2010 2010 Bhudev Mate Higher pay
scale PST 03.10.10 06.10.10 08-10-10 PD, Moradabad MBD 7 Pending
2CONT 2911/2012
2012Sitaram
VishwakarmaSr.Clerk For Claim HCA 01-08-13 PD, Bijnor MBD 7
Complaint
Pending
3 CONT 23/2012 2012 Abid Husain AE
Against Recovery
PST 12.06.12 08.07.12 09.07.12 09-07-12 PD, Rampur MBD 6A
Section
Pending
4CONT
2911/20132013
SITA RAM VISWAKARMA
V/s DR. RAJNEESH
DUBE
HCA 01-08-13 PD Bijnor MBD Pending
5 CONT 627/2014 2014 Nawab Kazim
Ali Khan MLA Encrochment HCA 22.02.14 26-02-14 PD, Rampur MBD 5 Gen section Pending
6 CONT 869/2014 2014 Nikhat Aara Ex-Steno
Against recovery
HCA 25.03.14 29-03-14 PD, Rampur MBD 5B
Section
Pending
7 CONT 2600/2014 2014 Ameeran
Begam FarmerNon Z-A Land compansation
HCA 12.05.14 22-05-15 PD, Rampur MBD 5 Gen section Pending
8 CONT 2553/2015 2015
Gulam Umar Khan
FarmerFor re-stay on
contruction on land
HCA 02.06.15 14-07-15 PD Rampur MBD 5Gen
Section
Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 24
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1CONT
2494/20092009
Manoj Kumar V/s Kapil Dev,
P.Sec
Pay scale 4000-6000
HCL 11-02-11 PD, Meerut MRT 7C
Section
Pending
2 CONT 1574/2010 2010 Navneet Yadav Contractor Collection of
Toll Tax HCA 30..04.10 14.05.10 17.05.10 21-05-10PD,
Bulandshahar
MRT 7Gen
sectionPending
3CONT
2263/20112011
HARIMOHAN SAXENA &
OTH
Steno (Retd)
Reg. Salary & pension arrear
HCA 13.05.11 22.06.11 27.06.11 06-07-11 15.03.13Complianc
ePD, Meerut MRT 7
B Sectio
nPending
4CONT
5380/20112011 Mahesh Chand
Saxena JE(Retd)Reg. Payment
of GPF GIM HCA 16.12.11 30.12.11 06-01-12 18.11.11 PD, Meerut MRT 4
D Sectio
n
order 19.07.11 in
396/11
5CONT
2546/20112011 Rishipal Singh W/agent
Pay scale 4000-6000
HCL 26.11.11 28.11.11 08-12-11 28.02.12 PD, Meerut MRT 7C
Section
Pending
6 CONT 63/2012 2012 Champat Singh Mate (Retd) Reg. payment PST 25.04.12 02.05.12 08.05.12 27-07-12 04.05.11 27.07.12
PD, Bulandshah
arMRT 7
C Sectio
nPending
7Cont
1521/20122012 Mohd. Khalid Cleaner
Service benefit
HCA 28.04.12 04.05.12 05//8/2012 08.05.12CD-2, Buland Shahar
MRT 7C
Section
Pending
8 CONT 287/2012 2012 Jagdish Prasad AE(Retd) Reg. Payment PST 20.02.13 25.02.13 30.05.13 07-08-13 10.05.12
CD-2, Bulandshah
arMRT AE Pending
9 CONT 202/2014 2014
CHAMPAT SINGH V/s
STATE OF UPMate(Ret)
Reg. pension but 10 yr
service not complete
PST 14.07.14 28.07.14 03-09-14 17.12.13 03.9.14 CD-2 , Bulandshahar MRT 7
C Sectio
nPending
10 CONT 18/2015 2015 Jai Gopal Singh AE Complaint PST 10.04.15 10.05.15 Not
Required 19.07.16 PD Baghpat MRT 6 Compl Pending
11 CONT 6719/2015 2015 Horam Singh
Pradhan Sahayak (Retd)
Pay scale 4000-6000
HCA 17.12.15 29.12.15 30.12.15 06-01-16 30.10.15 06.01.16 PMGSY, Meerut MRT 7
order 26.05.15 in 31434/2015
is compianced on 30.09.15
12 CONT 177/2015 2015
Mohd. Shamim Siddiqui V/s Rameshwar singh, EE
Sr.Assist. Reg. Pension PST 06-07-15PD,
Muzaffer Nagar
MRT 6 Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 25
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
13CONT 636/2016 2016 Ram Kishan Farmer HCA 07.04.16 12.04.16 18.04.16 22-04-16
PD, Bulandshah
arMRT Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 26
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 10000/2006 CONT 2603/2006 2006 Nanhe Singh &
Oth W/agentReg. Pay
scale 4000-6000
HCL 03.06.07 03.07.07 03-07-07 NH, Gaziabad NH 7 C
Section Pending
2 CONT 2997/2006 2006 Maya Devi Dependent For
Appointment HCA 10.12.07 02.01.08 03-01-08 NH, Gaziabad NH 7 C
Section Pending
3 CONT 2842/2009 2009 Nanhe Singh &
Oth W/agentReg. Pay
scale 4000-6000
HCL 07.01.10 14.01.10 29-01-10 NH, Gaziabad NH 7 C
Section Pending
4 CONT 592/2014 2014 Uma shankar Contractor Lambit deyak HCL 28.04.14
01.05.2014
NH kanpur NH 7A
Section
Last Listed 01.05.14
5 CONT 353/2015 2015 Mohsin Nisar EE Reg. order of
PSt 14.12.12 PST 01.10.15 01.10.15 01.10.15 NH, Gaziabad NH 6 A Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 27
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
1 CONT 550/2005 2005
Surya Kant Pathak V/s
Umesh Kumar Mittal, IAS
FarmerLand
compansationHCA 25.03.05 13.04.05 15-04-05 CD(PP),
Mirzapur VNS Pending
2 CONT 3408/2009 2009 Nand Lal Farmer
Reg. Construction
of roadHCA 19-11-09 CD,
Chandauli VNS 7 Gen Pending
3 ONT 2603/2010 2010
M/s A.K. Construction Co. V/s A.K. Sinha, SE
Contractor Reg. Contract HCA 26.06.10 26-07-10 CD(PP), Mirzapur VNS 7 Pending
4CONT
2058/20102010 Gyan Chand
PathakSelection
gradeHCA 08-07-10 PD,
Varanasi VNS 7C
Section
Pending
5CONT
2705/20102010
Ram Govind Uppadyay V/s R.C. Bhardwaj EE 18 Cir, ALD
Truck Driver
Grade-1 Pay Scale
HCA 04-08-10 NH, Gazipur VNS 7 Pending
6CONT
994/20102010
VANDANA OIL CARRIER &
OTHContractor Tender HCA PD,
Varanasi VNS 7 Pending
7CONT
2542/20102010 Brijendra Singh Farmer
Non Compliance
HCA 24.07.10 26.07.10 29-07-10 PD, Gazipur VNS 2 C Pending
8CONT
2264/20112011 GHANSHYAM
SINGH & OTH StenoSelection
gradeHCA 06-07-11 PD,
Varanasi * VNS 7B
Section
Pending
9 CONT 125/2011 2011
Tileshwar Nath V/s Ravindra
Singh
Against punishment PST 20.08.15 PD, Bhadohi VNS 2 Pending
10 CONT 4085/2011 2011
LaLLAN PRASAD V/S Hemraj Singh
Reg. Pay sclae HCA 14-10-11 PD, Bhadohi VNS Pending
11 CONT 1281/2011 2011 Kalicharan &
Oth W/agentSelection
gradeHCA 30-08-11 PD,
Varanasi VNS 7C
Section
Last listed 14.02.12
12CONT
1702/20112011 Keshawa Singh
Yadav & Oth Cleaner
Non Compliance of
order 18.01.11
HCA 13.05.11 13.05.11 30-05-11 18.01.11 PD, Gazipur VNS 7 C Pending
13 CONT 307/2012 2012
Satendra Narayan Singh
StenoSelection
gradeHCA 13-03-12 PD,
Varanasi * VNS 7C
Section
Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 28
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
14CONT
4563/20122012
RAMESH CHANDRA V/s
KUMAR ARVIND
SINGH DEO
HCAPD MIRZA
PURVNS 13 Pending
15CONT
772/20122012
LALLAN PRASAD
JAISWAL V/S SRI BHARAT SINGH(CE)
ContractorPayment of
billsHCA 23-03-12
PD SANT R NAGAR
VNS 7 Pending
16CONT
3813/20122012
MUNNA RAM V/s CHITRA SWAROOP
ENGINEER IN CHIEF PUBLIC
WORKS DEPTT
HCA PD GAZIPUR VNS Pending
17 CONT 5140/2012 2012 Naim Farmer Reg. road
construction HCA 02-01-13 CD, Chandauli VNS 7 Gen Pending
18 CONT 192/2012 2012 Yogendra Lal Mate GPF
Deduction HCL 18-10-12 CD, Chandauli VNS 7 Gen Pending
19CONT
186/20132013
RAJENDRA KUMAR
DWIVEDI V/S R.M.
SRIVASTAVA
HCLPD SANT R
NAGARVNS Last listed
06.02.13
20CONT
1879/20132013
Lallan Prasad Dubey V/s P.K.
PandeyReg. Pay Scale HCA 16-04-13 PD, Bhadohi VNS 2 Pending
21CONT
3416/20132013 Deo Nath Singh JE
Non Compliance of
order 07.03.23
HCA 06-09-13 PD, Gazipur VNS 13 C Pending
22 CONT 2710/2014 2014
M/S DEEPAK CONSTRUCTI
ONContractor
Interest on bill
HCA 02-02-15 25.04.14 PD, Varanasi VNS 7 Vad 2 Pending
23 CONT 882/2015 2014 Dilip Kumar
Upadhayay MateTo add
services of mate
HCA 15-04-15 PD, Varanasi VNS 7 C Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 29
DATE OF SENDING TO GOVT.
DATE OF APPROVAL OF GOVT.
(1). (2). (3). (4). (5). (6). (7). (8). (8A). (9). (10). (11). (12). (13). (14). (15). (16). (17). (18).
ENC OFFICE SECTIO
N
REMARKDATE OF CA FILING
DATE OF ORDER BY
COURT (INTERIM/
FINAL)
DATE OF SUBMITTING compliance REPORT TO THE GOVT.
AGAINST THE ORDER
DIVISION ZONE GOVT. SECTION
PETITIONER NAME POST SUBJECT OF
WRITCOURT
DATE OF RECEIVING
WRIT BY DIVISION
PARAWISE NARRATIVE
PUBLIC WORKS DEPARTMENTENC OFFICE, LUCKNOW
CONTEMPT PETITION REPORTZONE : DATE : 01.04.2017
S.No NOTICE NO. WRIT NO YEAR
24CONT 2457/2014
2014Ramji Lal V/s Kishan Singh Atoria P.Sec
AE(Retd)Retiremental
duesHCL 12-01-15 CD,
Chandauli VNS 4B
Section
Pending
25CONT 830/2014 2014
Jairam V/s Ram Kewal Prasad
EE, PD
GPF deduction
HCL 27-05-14 CD, Chandauli VNS 7
B Sectio
nPending
26 CONT 6870/2015 2015
Prabha Devi Santosh Kumar
ShuklaReg. Pension HCA 12-01-16 PD, Bhadohi VNS Pending
27 CONT 459/2015 2015
Kashiram V/s kishan Singh
Atoria
Review 33/2015 &
Claim 700/2008
PST 21-12-15 PD, Varanasi VNS 13 C 03.02.2017
28 CONT 6567/2015 2015
Subhas Rai V/s Arvind Kumar
GuptaHCA 18-01-16 PD,
Varanasi VNS 7 C Pending
29 CONT 7197/2015 2015
Sankatha Sharma
Farmer Cost of Nali HCA 11-02-16 PD, Varanasi VNS 7
C Sectio
nPending
30CONT 2673/2015
2015 Vimal Kumar Mishra
Reg. Promotion
HCA 08-01-16 PD, Varanasi VNS 2 Pending
31 CONT 882/2015 2015 Dilip Upadhyay Mate
For Including Mate service
HCA 15-04-14 PD, Varanasi VNS 7
C Sectio
nPending
32 CONT 4252/2016 2016 Shayam Sunder
PandeyPrivate Person
Encrochment HCA 03-10-16 PD, Varanasi VNS Pending
Report SC PST CONT 01.04.2017-1CONT Pend 01.04.17 30