public procurement guidance for practitioners · pdf filepublic procurement - guidance for...

Download PUBLIC PROCUREMENT GUIDANCE FOR PRACTITIONERS · PDF filePublic Procurement - Guidance for practitioners on the ... 3.2 Follow tendering instructions ... of procedures for the award

If you can't read please download the document

Upload: buitram

Post on 06-Feb-2018

229 views

Category:

Documents


1 download

TRANSCRIPT

  • on the avoidance of the most common errors in projects funded by the European Structural and Investment Funds

    PUBLIC PROCUREMENT GUIDANCE FOR PRACTITIONERS

  • Europe Direct is a service to help you find answers

    to your questions about the European Union.

    Freephone number (*):

    00 800 6 7 8 9 10 11

    (*) The information given is free, as are most calls (though some operators, phone boxes or hotels may charge you).

    European Commission, Directorate-General for Regional and Urban policy Competence centre Administrative Capacity Building; Solidarity Fund Pascal Boijmans Avenue de Beaulieu 1 1160 Brussels BELGIUM E-mail: [email protected] Internet: http://ec.europa.eu/regional_policy/index_en.cfm Print ISBN 978-92-79-50323-8 doi:10.2776/578383 KN-02-15-15-570-EN-C PDF ISBN 978-92-79-51749-5 doi: 10.2776/7059 KN-02-15-758-EN-N European Union, 2015 Reproduction is authorised provided the source is acknowledged. Luxembourg: Publications Office of the European Union, 2015 Printed in Luxembourg

    http://europa.eu.int/citizensrights/signpost/about/index_en.htm#note1#note1http://ec.europa.eu/regional_policy/index_en.cfm

  • Public Procurement -

    Guidance for practitioners on the

    avoidance of the most common errors

    in projects funded by the European

    Structural and Investment Funds

    This document has been drawn up by the Commission Services in consultation with the

    European Investment Bank.

  • Guidance for practitioners

    on the avoidance of the most

    common errors in public procurement

    of projects funded by the European

    Structural and Investment Funds

  • DISCLAIMER

    This document contains guidance on how to avoid errors frequently seen in public procurement for projects co-financed by the European Structural and Investment Funds. It is intended to facilitate the implementation of operational programmes and to encourage good practice. It is not legally binding but aims to provide general recommendations and to reflect best practice. The concepts, ideas and solutions proposed in the guidance are without prejudice to national legislation and should be read and may be adapted taking into account the national legal framework. This guidance is without prejudice to the interpretation that the Commission may in the future give to any provision of the applicable legislation.

  • Table of Contents

    Table of Contents ............................................................................................................................ 4

    Glossary of acronyms .................................................................................................................... 6

    Foreword ............................................................................................................................................. 7

    How to use this guidance.............................................................................................................. 8

    1. Preparation and planning ................................................................................................... 11

    1.1 Preliminary scoping ....................................................................................................................................... 11

    1.2 Contract/project management ................................................................................................................. 15

    1.3 Developing the business case .................................................................................................................. 17

    1.4 Selecting the procedure............................................................................................................................... 17

    1.5 Thresholds and advertising ....................................................................................................................... 21

    1.6 Operational requirements to launch a tender ................................................................................. 22

    2. Publication ............................................................................................................................... 26

    2.1 Publication of EU Notices ........................................................................................................................... 26

    2.2 Procedures and timetables ........................................................................................................................ 27

    2.2.1 Minimum time limits ............................................................................................................ 27

    2.2.2 Accelerated procedure......................................................................................................... 29

    2.3 Tender documents.......................................................................................................................................... 30

    2.3.1 Setting up selection criteria ................................................................................................. 30

    2.3.2 Setting up Pre-Qualification Questionnaire (PQQ) .............................................................. 31

    2.3.3 Setting up award criteria and their weightings .................................................................... 31

    2.3.4 Pricing schedule ................................................................................................................... 32

    2.3.5 The contract ......................................................................................................................... 32

    2.4 Specification and standards...................................................................................................................... 33

    2.4.1 Specification drafting ........................................................................................................... 33

    2.4.2 Standards to be used when drafting specifications ............................................................. 34

    2.4.3 Social, ethical and environmental criteria ........................................................................... 35

    2.4.4 Variants ................................................................................................................................ 35

    2.5 Obtaining and submitting tenders ......................................................................................................... 36

    2.6 Complaints, remedies and liability......................................................................................................... 36

    3. Submission of tenders and selection of tenderers ................................................... 41

    3.1 Delivery of the tender according to instructions ............................................................................ 41

    3.2 Follow tendering instructions ................................................................................................................... 41

  • 3.3 Safe custody of tender documents ....................................................................................................... 42

    3.4 Opening ceremony ......................................................................................................................................... 42

    4. Evaluation of tenders .......................................................................................................... 44

    4.1 Lowest price ...................................................................................................................................................... 44

    4.2 Most economically advantageous tender (MEAT) .......................................................................... 44

    4.3 Dealing with abnormally low tenders .................................................................................................. 45

    4.4 Clarifications ..................................................................................................................................................... 45

    4.5 Post tender negotiations ............................................................................................................................. 45

    4.6 Evaluation Committee decision ............................................................................................................... 46

    5. Award ......................................................................................................................................... 48

    5.1 Award notice ..................................................................................................................................................... 48

    5.2 Standstill period and informing the tenderers ................................................................................ 48

    6. Contract implementation .................................................................................................... 50

    6.1 Supplier/contractor relationship .............................................................................................................. 50

    6.2 Contract modifications................................................................................................................................. 50

    6.3 Closing the contract ...................................................................................................................................... 50

    TOOLKITS ........................................................................................