PUBLIC-PRIVATE PARTNERSHIPS
2015 NC/SC Joint Construction Law Conference: Change in Delivery
September 18, 2015
2
![Page 3: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/3.jpg)
P3 | Introduction
What is a Public-Private Partnership?
• It means different things to different people
• There is no set structure
• Common thread is the provision of a public good with substantial, medium to long-term private sector participation
3
![Page 4: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/4.jpg)
P3 | Introduction
What is a Public-Private Partnership?
• It is nothing more or less than a series of contracts –though usually fairly complex
• Perhaps best described as a project delivery method
• Significant limitations when contracting with public sector for the long term - educational process is important
4
![Page 5: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/5.jpg)
P3 | Overview
Are P3’s new? - No
• Postal system of the Roman empire
• Concession agreements in France in the 15th
century – bridges, river crossings, mills
• 19th century European rail system
5
![Page 6: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/6.jpg)
P3 | OverviewIf not new, then why do they seem new?
• Reversion to public projects after WWI and WWII
• Role and size of State increases – interstate highway system, heavy investment in higher education
6
![Page 7: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/7.jpg)
P3 | OverviewIf not new, then why do they seem new?
• Significant interest in privatization during 1980’s
• Privatization results have been mixed – questions re value proposition
7
![Page 8: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/8.jpg)
P3 | OverviewIf not new, then why do they seem new?
• Acute need for infrastructure improvements
• Lack of appetite to increase revenue (taxes, utility bills)
• Desire to shift risk and cost (and some measure of reward) to private sector, but remain accountable to electorate
8
![Page 9: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/9.jpg)
P3 | OverviewWhat is the sell?
• Government receives what it wants, where it wants, without encumbering debt capacity or staff resources
• Fee for service model attractive to decision-makers, as is risk sharing in era of smaller government
• Private sector incentivized for early/under budget
9
![Page 10: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/10.jpg)
P3 | Overview
What are Public-Private Partnerships Used For?
• Depends on the sector: Higher Education – parking, housing, and energy
10
![Page 11: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/11.jpg)
P3 | Overview
What are Public-Private Partnerships Used For?
• Depends on the sector:
• Water and Sewer – concession agreements, long term leases and management contracts
11
![Page 12: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/12.jpg)
P3 | Overview
What are Public-Private Partnerships Typically Used For?
• Depends on the sector:
• Transportation – toll toads, availability payments
12
![Page 13: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/13.jpg)
P3 | Overview
What are Public-Private Partnerships Typically Used For?
• General Governmental – runs the gamut
13
![Page 14: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/14.jpg)
P3 | Overview
How are they set up?
• Elements of a construction contract + elements of public finance + government law limitations
• The structure of a P3 can be as simple as a design-build procurement to as complicated as a design, build, operate, finance and maintain arrangement spanning 60 or more years
14
![Page 15: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/15.jpg)
P3 | Structure
• Structure is informed by programmatic goals
• P3 works best when aligning interests to achieve strategic goals
• At its worst when used as a short-term cost savings
15
![Page 16: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/16.jpg)
P3 | Structure
Basics
• Private Sector Will Obtain Some Measure of Control
• Long term ground/base lease of site
• Management/Concession agreement
16
![Page 17: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/17.jpg)
P3 | Structure
Basics
• Public Sector Will Retain Some Measure of Control
• Long term agreements will address:• Construction• Stabilization• Operation• Termination
17
![Page 18: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/18.jpg)
P3 | Structure
Who is involved?Design-build procurement • Owner & Design-Builder
Design, build, operate, finance and maintain • Owner • Contractor/ Builder • Engineer/Designer • O&M Contractor• Finance Partner
18
![Page 19: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/19.jpg)
P3 | Structure
How are they set up?• Owner is usually Public entity or quasi-
governmental entity
Joint Venture provides service(s) • Design• Construction• Operations & maintenance
Who provides Financing?19
![Page 20: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/20.jpg)
P3 | Structure
• Alignment of interests is critical.
• Too rich for the developer and public constituency will let you know
• Insufficient incentives for the private sector can doom project performance
20
![Page 21: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/21.jpg)
P3 | Structure
• Need for clear understanding of commitment and opportunity cost
• Need for clear understanding of roles and responsibilities
• Nothing is free – and opportunity cost is the expense and it is hard to quantify
21
![Page 22: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/22.jpg)
P3 | Structure
Considerations
• Ownership – ground lease/license/usufruct• Fee subordination?
• Financing – cost of capital/equity investors
22
![Page 23: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/23.jpg)
P3 | Structure
Considerations
• Term – 40? 60? 100?
• Maintenance – repair and replace reserves
• Termination – fully depreciated asset? return to graded parcel ?
23
![Page 24: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/24.jpg)
P3 | StructureWhat has been the experience?
• Results have been mixed - Contract design is critical
24
![Page 25: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/25.jpg)
P3 | Examples
Student Housing
• University owns land on campus and desires student housing in that location but prefers to not issue approx. $100m of debt to deliver project
• Engages in RFQ/RFP process
25
![Page 26: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/26.jpg)
P3 | Examples
Student Housing
• Structure set forth in RFP
• Design, build, finance, operate and maintain procurement
• Structure is memorialized in master lease agreement with supplemental leases for each component
26
![Page 27: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/27.jpg)
P3 | Examples
Student Housing
• Master and supplemental agreements cover:• Ground lease• Development agreement with detailed
construction specs and requirements• Operating & maintenance standards• Revenue sharing arrangement• Termination
27
![Page 28: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/28.jpg)
P3 | Examples
Student Housing
• Financial arrangement:• Market ground lease (State law requirement)• Developer responsible for operation,
maintenance, and capital reserve• Escalating share of net income to University• Project reverts to University at end of term
28
![Page 29: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/29.jpg)
P3 | Examples
Parking Garage
City plans several parking decks as part of redevelopment project. Is approached by group seeking for P3 for decks.
• Group proposes to build, operate and finance decks, if City will maintain them.
29
![Page 30: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/30.jpg)
P3 | Examples
Parking Garage
• Group proposes long term (30< years) arrangement
• City is able to repurpose existing City personnel to meet maintenance requirement.
30
![Page 31: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/31.jpg)
P3 | Examples
Toll Roads
• Connector 2000
• California SR91
• Indiana Toll Road
31
![Page 32: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/32.jpg)
P3 | Political Process
To enter in a long term P3 contract will require action by a governmental body. This will involve politics.
32
![Page 33: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/33.jpg)
P3 | Ability to Contract
State government has plenary authority, while local government is more limited, despite home rule.
• In SC, no ability to joint venture
• Cannot make equity investment in private company [railroads]
• Term of contract – governmental v. proprietary
33
![Page 34: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/34.jpg)
P3 | Ability to Contract
Common commercial terms void as against public policy:
• Non-substitution provision for essential service
• Non-compete provision for essential service
• No Indemnification by public body
34
![Page 35: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/35.jpg)
P3 | Procurement
In South Carolina, Title 11, Chapter 35 of the South Carolina Code allows for design, build operate, finance and maintain procurements – or public-private partnerships
RFQ/RFP Process
35
![Page 36: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/36.jpg)
P3 | Procurement
Common public procurement requirements:
• Payment and performance bonds
• Expensive insurance requirements
36
![Page 37: PUBLIC-PRIVATE PARTNERSHIPS · PUBLIC-PRIVATE PARTNERSHIPS 2015 NC/SC Joint Construction Law Conference: Change in Delivery September 18, 2015 2](https://reader034.vdocuments.us/reader034/viewer/2022050211/5f5de264ab97f6553976074c/html5/thumbnails/37.jpg)
P3 | Conclusion
Public Private Partnerships:
• Popular concept in era of smaller government
• Demands multidisciplinary team
• Devil is in the details
37