Public Notice U.S. Army Corps In Reply to Application Number Of Engineers CENAB-OP-RMN (Chesapeake Ave. Marine Terminal, LLC) Baltimore District 2014-60042-M02 PN 14-23 Comment Period: April 4, 2014 – May 5, 2014 THE PURPOSE OF THIS PUBLIC NOTICE IS TO SOLICIT COMMENTS FROM THE PUBLIC ABOUT THE WORK DESCRIBED BELOW. AT THIS TIME, NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT A PERMIT WILL BE ISSUED. The Baltimore District has received an application for a Department of the Army Permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344), as described below. APPLICANT: Chesapeake Avenue Marine Terminal, LLC c/o Mr. Jesse Lindsay Whitney Bailey Cox & Magnani, LLC 849 Fairmount Avenue Baltimore, Maryland 21286 LOCATION AND WATERWAY: Patapsco River, at 1999 Chesapeake Avenue, Baltimore City, Maryland. WORK: To improve a barge berthing area by constructing 480 linear feet of steel sheet pile bulkheading to extend a maximum of 6.5 feet channelward of an existing bulkhead and to place approximately 1,800 cubic yards of granular fill material landward of the bulkhead; to construct a 152-foot long, 20-foot wide (maximum) pile-supported loading/unloading platform, two, 36-foot long, 36 foot wide pile-supported crane platforms, and one barge breasting dolphin; and to replace in-kind five timber dolphins. The work is to extend a maximum of 23 feet channelward of the approximate mean high water shoreline. The purpose of the project is to rehabilitate and upgrade marine terminal to continue operations at the facility. All work is to be completed in accordance with the enclosed plans. If you have any questions concerning this matter, please contact Mr. Jon Romeo at (410) 962-6079 or at [email protected]. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, and, in general, the needs and welfare of the people.

Upload: others

Post on 24-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

Public Notice U.S. Army Corps In Reply to Application Number Of Engineers CENAB-OP-RMN (Chesapeake Ave. Marine Terminal, LLC) Baltimore District 2014-60042-M02 PN 14-23 Comment Period: April 4, 2014 – May 5, 2014 THE PURPOSE OF THIS PUBLIC NOTICE IS TO SOLICIT COMMENTS FROM THE PUBLIC ABOUT THE WORK DESCRIBED BELOW. AT THIS TIME, NO DECISION HAS BEEN MADE AS TO WHETHER OR NOT A PERMIT WILL BE ISSUED. The Baltimore District has received an application for a Department of the Army Permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and Section 404 of the Clean Water Act (33 U.S.C. 1344), as described below. APPLICANT: Chesapeake Avenue Marine Terminal, LLC c/o Mr. Jesse Lindsay Whitney Bailey Cox & Magnani, LLC 849 Fairmount Avenue Baltimore, Maryland 21286 LOCATION AND WATERWAY: Patapsco River, at 1999 Chesapeake Avenue, Baltimore City, Maryland. WORK: To improve a barge berthing area by constructing 480 linear feet of steel sheet pile bulkheading to extend a maximum of 6.5 feet channelward of an existing bulkhead and to place approximately 1,800 cubic yards of granular fill material landward of the bulkhead; to construct a 152-foot long, 20-foot wide (maximum) pile-supported loading/unloading platform, two, 36-foot long, 36 foot wide pile-supported crane platforms, and one barge breasting dolphin; and to replace in-kind five timber dolphins. The work is to extend a maximum of 23 feet channelward of the approximate mean high water shoreline. The purpose of the project is to rehabilitate and upgrade marine terminal to continue operations at the facility. All work is to be completed in accordance with the enclosed plans. If you have any questions concerning this matter, please contact Mr. Jon Romeo at (410) 962-6079 or at [email protected]. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, and, in general, the needs and welfare of the people.

Page 2: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

2

An evaluation of the work described above on the public interest will include application of the Clean Water Act Section 404 (b)(1) Guidelines promulgated by the Administrator, U.S. Environmental Protection Agency, under authority of Section 404 of the Clean Water Act. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written comments concerning the work described above related to the factors listed above or other pertinent factors must be received by the District Engineer, U.S. Army Corps of Engineers, Baltimore District, [ATTN: Mr. Jon Romeo, CENAB-OP-RMN] P.O. Box 1715, Baltimore, Maryland 21203-1715, within the comment period specified above. ESSENTIAL FISH HABITAT (EFH) ASSESSMENT: The Magnuson-Steven Fishery Conservation Act (MSFCA), as amended by the Sustainable Fisheries Act of 1996 (Public Law 104-267), requires all Federal agencies to consult with the National Marine Fisheries Service on all actions, or proposed actions, permitted, funded, or undertaken by the agency that may adversely affect EFH. The EFH designations within the Northeast Region (Maine to Virginia), dated March 1, 1999 include EFH for a number of species in various life stages. This waterway has EFH listed for juvenile and adult windowpane flounder (Scopthalmus aquosus), summer flounder (Paralicthys dentatus), and bluefish (Pomatomus saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia (Rachycentron canadum), and red drum (Scianeops occelatus). These are managed species under the MSFCA. A preliminary assessment indicates that the proposed work would not have a substantial adverse effect on either managed species or prey species. Therefore, no EFH conservation measures have been developed. As the evaluation of this application continues, additional information may become available which could modify this preliminary determination. SECTION 401 WATER QUALITY CERTIFICATION: The applicant is required to obtain a water quality certification from the Maryland Department of the Environment in accordance with Section 401 of the Clean Water Act. Any written comments concerning the work described above which relate to water quality certification must be received by the Wetlands and Waterways Program, Maryland Department of the Environment, Montgomery Park Business Center, 1800 Washington Boulevard, Suite 430, Baltimore, Maryland 21230-1708 within the comment period as specified above to receive consideration. The Section 401 certifying agency has a statutory limit of one year from the date of this public notice to make its decision. COASTAL ZONE MANAGEMENT PROGRAMS: The applicant has certified in this application that the proposed activity complies with and will be conducted in a manner

Page 3: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

3

consistent with the Maryland Coastal Zone Management (CZM) Program. By this public notice, we are requesting the State concurrence or objection to the applicant’s consistency statement. Public comments relating to consistency must be received by the Wetlands and Waterways Program, Maryland Department of the Environment, Montgomery Park Business Center, 1800 Washington Boulevard, Suite 430, Baltimore, Maryland 21230-1708 within the comment period specified above to receive consideration. MDE has a statutory limit of 6 months to concur or object to the applicant’s consistency determination. The applicant must obtain any State or local government permits which may be required. A preliminary review of this application indicates that the proposed work will not affect listed species or their critical habitat pursuant to Section 7 of the Endangered Species Act as amended. As the evaluation of this application continues, additional information may become available which could modify this preliminary determination. Review of the latest published version of the National Register of Historic Places indicates that no registered properties listed as eligible for inclusion therein are located at the site of the proposed work. Currently unknown archeological, scientific, prehistoric, or historical data may be lost or destroyed by the work to be accomplished under the requested permit. Any person who has an interest which may be adversely affected by the issuance of this permit may request a public hearing. The request, which must be in writing, must be received by the District Engineer, US Army Corps of Engineers, Baltimore District, [ATTN : Mr. Jon Romeo CENAB-OP-RMN], P.O. Box 1715, Baltimore, Maryland 21203-1715, within the comment period specified above to receive consideration. Also, the request must clearly state forth the interest which may be adversely affected by this activity and the manner in which the interest may be adversely affected. It is requested that you communicate the foregoing information concerning the proposed work to any persons known by you to be interested and not being known to this office, who did not receive a copy of this notice. FOR THE DISTRICT ENGINEER: Joseph P. DaVia Chief, Maryland Section Northern

Page 4: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

<.:: Q)

L: Q) Ul

::::>

~

0 N

WHITNEY BAILEY COX & MAGNANI, LLC 849 Fairmount Ave SUllo 100 Baltimore, MD 21286

Tel. 410-512-4500 Fax. 410-324-4100 www.wbcm.com

WBCM

\.SITE

I ' I I \ J , __ ./

VICINITY MAP FEB. 2014

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL SK-0

SCALE: 1 "=2,000' WBCM 2014

Page 5: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

;:: Q)

L: Q) UJ

::J

,,_ 0 l'i

Mc\-IENRY CI-IANNEL

fORi

P:: ~~ r.t~ CJ@ (._)(.!) ~fn 0.:~ ~~ tE

----II I I_....

1r=__-\ '"~.PILENE~W __,

~ {-~~ ' ~ I ~ '

' ' ' ' \ \

---

\

\

\

\

\

) I

I I

I I

' r \ :x:..J \ \ 1-w o:Z oz z~

\ ..JU 0(/)

~~

' -......u 5~ o:o

\ Gjw :X:~ UID -......~

\ wo ~(.) a..<

\ ~~ ww :X:~ (.)<(

\

\

I

' 1950 USAGE I PIER HEAD LINE~

I

I I

I I I

':--.... . ·. -~. ·. ·--=--· · ... J ) ·~

--

I I I I I I I I

\I

WHITNEY BAllf.;""Y COX & MAGNANI, LLC 84B Fairmount Ave. SU!te 100 Baltimore, MD 21286

Tal. 410-512-4500 Fax. 410-324-4100

OVERAll. SITE PLAN FEB. 2014 www .wbcm.com

WBCM WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL SK-1

SCALE: 1 "=400' ~~~~~~~~~~~~~~~--------------------~1~3~0~3~3~1~0~0_j

1°: 013\130331 00\Drawings\ 14-Ml\_Permi\ 1 :\033 i 00-02_SK ··1 .dwg

~-

0 ARCHITECTURE ENGINEERING CONSTRUCTION

WBCM 2014

Page 6: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 () ()

;.=: Q)

C: Q)

"' =>r---

E 0.

(j) n

s~g; o&l<e $:0~ . --' (.) X<Cz wr-o wwu >:2:o O~z :2:(.)<( Ww a:o

'I­(.)<( Zw o_. (.)(.)

x~ ~<( >0 Q<C ::;;CL w 0::

WHITNEY BAILEY COX & MAGNANI, LLC 649 Fa1rmount Ave. Sutte 100 Baltimore, MD 21286

Tel. 410-512-4500 Fax. 410-324-4100 www wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

.>i

. _J

~ u

x

\~

~~~~~ w

r<hl Z· o~o~ ::J; ....J~O~ '-" <('>-0' ;:; l;j~~; I :::;;, ' f- " ·' 0:: '"'-X" w -....x,.._w .. m ~ ~~ ~ .. ,. "

-' IS! '({ '-"

Q \ j>,: w f-

0 w 23 L5"' u Iu z x :J~ ~ U.J

:::J;s: x mow

. ..J xw wm

-' w > '({ <..?

·~"" CL

w ' ·~ ' 0:: ·LL

-' w w f­Vl

X w

I' t:i .o -' :m -'

~ ' :::;;

I x w

\

i ~

' ' I-"

' '

1 00' CRITICAL AREA BUFFER

\._- - -MACADAM

~I I EX ~:R BE"'"'" ""' O::' L m :::i EX. SEVEN PILE ?!' ~ TIMBER CLUSTER ':] ;j_ DOLPHIN, (TYP. OF S)

xw uJ:::;;

DEMOUTION PLAN FEB. 2014

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL SK-2

SCALE: 1 "=80'

Page 7: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

"' Q)

' t

I I

I I

1950 USACE I _LPIER ~INE ----~-------

I _I

~ __..--

-- -- NEW CRANE ON PILE SUPPORTED CONCRETE MAT

NEW STEEL SHEETPILE BULKH

' '

' ' \950 USACE _2uLK~E-

--r- MHW=EL.1.92' I (MHW LINE SAME

AS BULKHEAD '"''- 1-L-.--

' \ \ ' ' l

\ \ \ ·~ \ ' L I I I

\ \ ' ~

' \ '

I I

I

I CHESAPEAK: AVENUE. . .

MARINE TERMINALS, LLC··. ·.··I· .' 0 . ', I I ..... ·1·1

I . ~~~11 IiI· .. ::II

' ' CONCRETE PLATFORM

\

\

\

\

' ' CRANE ON PILE SUPPORTED CONCRETE MAT

\

)

I

il Er-----~~--------------------~-L----------------~~~~----------~----------~ ~ WHITNEYBAILEYCOX&MAGNANI,LLC OVERALL BERTHING PLAN

'"" 0 N

649 Fairmount Av.e. Suite100 Baltimore, MD 21286 Tel. 410-512-4500 Fax. 410-324-4100

www.wbcm.com

WBCM WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

FEB. 2014

SK-3

SCALE: 1 "=200' ~~~~~~~~~~~~~~~---------------------L1~3~0~3~3~1~0~0~

P:\2013\ 130331 00\Drawings\ 14-MI\_Permit Set\ 130331 00-·04._SK-3.dwg © WBCM 2014

ARCHITECTURE ENGINEERING CONSTRUCTION

Page 8: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

() N

""' ()

WH!TNEY BAILEY COX & MAGNANI, L: .. C B49Fa,rmountAvs Swts100 Baltimore, MD21286

Tel. 410-512-4500 Fax. 410-324-4100 www.wbcm.corn

WBCM

·--------------~:------------------

\

\ \

\

\ \

\

SOUNDINGS PLAN FEB. 2014 WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL SK-4

ARCHITECTURE ENGINEERING CONSTRUCTION SCALE: 1 "= 1 00' ~~~~~~~~~~~~~~~--------------------~1~3~0~3_3~1~0~0~

f":\7013\ 1:50:3:51 DO\Drawings\ 14·-MI\_Permit Set\ 1 :50:\:ll OO··OS_SK-4.dwg © WBCM 2014

Page 9: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

Feb 04, 2014 - l:37pm

" / N 0

"' /

"' 0

"' '-" 0 0 / <::;' 0

" :s· "" if> / _,. I s: ;;-iu

"' 3 "" (/)

"' / ~

"' 0

"' (....;

~

~:E z

;OJ ~() rn

~~ z

~ ~~ (J) 0~ I ::;o fTI

(f)

0 )> r fTl

.......... ::

II co 0

---'

:::0 ()~ :I: :::0 rrtO U>z l>-t '"'0

~~ A :::I: rrl)>

CD ~. fl1);! s:::::::i )>0 ::;oZ _, z­rr~S::::

'"'0 -1 :::0 fTI~ :::orr! s::::s:::: ~rrl ·~

~ ~ '!/ ~ 5 0

\:! .. ~ I F "

'"'0 :;;o 0

~ (/)

8 tD 1"'1

~ z G')

""0

~

I I

I i I

User: eficca

NEW BREASTING DOLPHIN WI SEAGUARD FENDER SEE DETAIL A/SK-15------.

NEW CRANE ON PILE SUPPORTED CONCRETE MAT, SEE SK-7--------.

EX. STEEL DOLPHIN WITH SEAGUARD FENDER, TYP.\

~56'-0"

I MHW = EL. 1.92' (MHW LINE SAME

I AS BULKHEAD LINE)~ ~

:\''cl ..\~ I ~

I I I

9

I ~0~~-mOlJm o~;=s: m:Cmo -i--i< >z~m ;=~ro> C/l:;!mZ :!::lJ;uO CllQO;u ;;:;-nE!:H

PA TAPSCO RIVER (SUBMERGED LAND)

400'-0" BARGE

300'-0" BARGE

200'-0" BARGE

36'-0" I 138'-0"

ALL-THREAD REBAR TIE-ROD, TYP.

I CHESAPEAKEAVEJ-·.·.­'-. MARINE TERMINALS, LLC

I I

I CRANE ON PILE SUPPORTED CONCRETE MAT, SEE SK-9

! 150T CRAWLER I CRANE, TYP.

NEW 10'x10'x5'-0" DEEP I PILE SUPPORTED LANDSIDE MOORING

• • DOLPHIN----

/ SASOL . L-1 TERMINAL

I . /I

I

/

I I

I I

I

~

(f)

A !

Ul

--'(]lC/lr m~ -i J> ll<> mO ro ;om iii ~ ~

2S I' - I

~~~ I I I, I I .I

'1 fTl CD

N 0 __, ~

s-rr .. -.J! •

...... _ l

Page 10: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

"' 0 c

2 "' C:

" U)

:::0

E 0 v· N

aJ

v ·-· 0

'" "' N

LJ Q)

LL

\

.4 \

2 0:: 0 LL

~ _J

0.... (9

b z I 0

N <( 1.{) 0

_J

z :::J --P:: (9

~fS' z 0 <(

~~ 0 _J

CJ5J \.)\!i Y)f5 ((~ ~~

b I

N

to I

00 ..--

to I

~

.:f"l b

I

i--N ..-

/

0.:

/

~ b N

(9' zo.... i=~ (/) -<(~ LUI 0::0.... al_l

.Q ><o LU

T

0

IOQ 0 0

OCI'v'Ml3NN'v'H:> ')(\iV'J u6-~0Z:

-·---LU '_j

,···· 0:: . t-0 ____ w<C

UJUJ II

~:J X:::J UJCO

1----------1 . m~:::::::::::::::::::

' - --mm:::::::::::~~::~ ~=::::::::::::::::::

W::2: zo:: <Co O::LL Ot-$::5 wo.... z

0::0.: <(~ co -w=­o::C/) 0~ <(I.{) w!::::­o::o IO 1-;"o:: _l' _~LU

<Ci=

~ I

(9~ zz

I

J:::::::i ... T-----~

UJ co

WHITNEY BAILEY COX & MAGNANI, LLC 849 Fa1rmount Ave. Suite 100 Baltimore, MD 21286

TeL .qo-512-4500 Fax. 410-324-4100 www.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

x UJ

b N

LOADING PLATFORM DATE: PILING PLAN FEB. 2014

WATERFRONT REHABIUTATION/IMPROVEMENT DRAWING NO.

FOR CHESAPEAKE AVE. MARINE TERMINAL SK-6

SCALE: 1 "=20' WBCM NO. 13033100

P:\20 13\130331 00\Drowings\ 14·-MI\ __ Permit Set\ 1303:\1 00·-07 __ SI<-6.dwg © WBCM 2014

Page 11: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

:;::

" t:

" (f)

:::)

" 0 N

"' 0

zz Q<( -a.. 1-(/) u wLL o::O 0

i~

I ~ 0:: 0 . 1-. <(

o....~ Wa_ 1-w o::z ~~ §;u (/)W

wl­~w -o:: a..u s:z wo zu

WHITNEY BAILE:.l' COX & MAGNANI, LLC 849 Fmrmount Ave. Suite 100 Baltimore, MD 21286

Tel. 410.512-4500 Fax. 41Q-324-4100 www.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

q9~-0" MAX.

0:: <(

---W ---------·co ~ w a: 0 (/) = 0:: . ti:i<e wo oo_ ww ~beL <(~ II 0.."<""")- W. (/)~ wu·l- o::o -~ a.. - IQ ---:--->< :::>--- z w -----·1- 0::--. · wco a..oz I I

~ ~u~ j~ ~~~ }_<(1-

------~53~---- ---->~~ w~w zU:co

0 I

(<')

0 I

Ln

(o I

(o

<>-----+--+

+ 0 ~---1----+-

' = e tO ----...,..-:---- --~

0 0

I

Ln

i/~7 - 9 1-1-___;!------t------,-'--,-t,---.. -__..J ...... ·--:::..-~(<')~--t--'-

---------w ::::!z

.. o-.s .. o-.o ~ .. 9-.L .. 9-.L .. o-.£ a.. <C

~ ------1-~ --------- wo ---- W<(

--------

WESTERN CRANE PLATFORM PIUNG PLAN

---

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

IW (f)0

FEB. 2014

SK-7

SCALE: 1 "= 1 0' ~ 13033100 ~~~~~~~~~~~~--~~~~~~~~------------------------------J---~~~--~ P:\201 :S\ 130331 00\Drowings\ 14·-MI\.Yermit Set\ 1:\0331 00--0B .... SK--l.dwg © WBCM 2014

Page 12: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

<;:: QJ

i.: QJ

"' =>

"' 0

''"

--------

zz O<C -o.. 1-C/) (.)LL

~0 15

WHITNEY BAILEY COX & MAGNAN1, LLC 849 Fa•rmount Ave. Suite 100 Battimore, MD 21286

Tel 410-512-4500 Fax 410-324-4100 www.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

0.. . <(0..

(.)~ w -~--~ w<C o::w (.)CD z 0 (.)

19'-0" MAX.

CHANNEL WARD

-'14'-6"±

w z ~

ou wo:: t-o O::LL 01-0..<(

~~ C/)W wt­....Jw -o:: 0..(.)

sz wo zu

~ 0

1-0 zc:o -w Oz 0..<( C/)0:: :::l(.)

00::

~t2

WESTERN CRANE PLATFORM TOP PLAN

w z <(

zo:: oo 1-0:: ow Ln....! ..-s ~~ Z(.)

o---<t:S wo I....! ~w ....!CO ::l­eo x w

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

SCALE: 1 "= 1 0'

FEB. 2014

SK-8

Page 13: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

"" (l)

Q::

~Q ct~ C)Ql (.JC!l ~Bj Cl~ ~0_ [{

:2 0:: 0 LL

~ a_ <.9 z 0 <( 0 ...J

(j): wo ...J _I •

-00.. a_..-~ 21-6 11

w . :2 a_ u -_zw 0:: ,, a..oz 0 NU:J LL ~IO

f-><f-::::> o<C ~3::2

w...J f-a_ ~os o::w swo oz

...J...J a_~ W::::!W g,u ZLLCO

(j)UJ wf-...JW -a: _a..u sz wo zu

~ <.9n.: ~~ (j) -<(~ WI a:: a.. CO...J .o

><o w

':2 ~0 oo uco s:o:: wO zLL

0 <( a_

WHITNEY BAILEY COX & MAGNANI, LLC 849 Fairmount Ave. Su1ta 100 Baltimore, MD 21286

TaL 41Q-512-4500 Fax. 41Q-324·4100 www.wbcm.com

WBCM

r I I

3'-0"

36'-0"

231-0"±

CHANNEL WARD

7'-0"

0

0

0

0

61-0 11 7'-6" 91-0 11

<) 0 <( w I "" ~

I

...J 0+

~ ::::> co

"" x I

t-----~

<)

0

N ~ :J ..-

·W 0 ....lz <C w -- ~ w II ...J I s:s:w~ II:2...J :2:2<(::::>

~(])CO

~--0 <(

':2 w ~ <( I 0 w :J

(o a_ I

~ ;::.....

0 0 I

to (Y')

(o n.: I

~ ;::.....

w ...J 0:: 0:: f-w <( w co I w (j) 0:: ...JO Oa.. W<( <(~ ww w -f-I o::o (j)~ IO s...J f-O::

I I w::::> ...Jw zco ....!_ <(f----

-·-----

u co ::::> --s:~--~---------

1

WU X z w

EASTERN CRANE PLATFORM PIUNG PLAN FEB. 2014

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL SK-9

SCALE: 1"=10'

Page 14: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

/ /

z . on_ ~--~ 0 . Nl-

$;~ W....J zo

36 1-0 11

2'-6"-~+----------=---=---------l

231-0"±

CHANNEL WARD

LU z

(f) ~ :::JI-0:2 0~0::::0 <COOO O:::::CLu..CO

t--------

0 u u

;.::: <l>

[ Q.

CD

"'

" () N

0 I

0 C')

0 _I

0 \. I

Co C')

C')~--~r-----------------------~~~---~.-----L

2 0::: 0 u.. I­<( _J (L

C) z 0 <( 0 _J

~ C) . zn_ i=~ (/) . <(~ WI O::::CL CO....J .o ><o LU

WHITNEY BAILEY COX & MAGNANt, lLG B49 Fmrrnount Avo. Swte 100 Baltimore, MD 212B6

Tel 41()-512-4500 Fax. 410-324~4100 www wbcm.com

WBCM

20~-9"MAX.

CHANNEL WARD

0 <( w I :-:.:::

. ....J X::J wco

r------------- -, I I I I

I I I ~~ I ~~ ~

W<( z () S2

I ><S ~~co

EASTERN CRANE PlATFORM TOP PLAN

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

ZLU oz ~--~ ~(.) ..-0:::: S;LU w....J z$: ~ (.)

FEB. 2014

SK-10 ARCHITECTURE ENGINEERING CONSTRUCTION SCALE: 1 "= 1 0'

~~~~~~~~~~~~L--~~------------------~~1~3~0~3~3~10~0~ P:\2013\ 130331 00\Drowings\ 1 4-- MI\_Perrnit Set\ 130.:\31 CJO- I 1 ___ SK -1 O.dwg © WBCM 2014

Page 15: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

"" "' i.:

"' <f)

::J

...,.

0 N

11.. <( (.)

2 0::: 0 LL

~ 11.. UJ z

0 (? 1(.)

C.o 0 (\') UJ

~ 0 11.. 11.. :::1 (/)

UJ ...J 0:::

~ (.) <( CD C) z 0 0::: 1-(/)

wo :::!r;, 11.. ,;J --!-=::.j.....J!=;:;---1

...J WUJ 1-z

::i~ 11..0::: ...JLIJ wo wz 1-UJ C/)U..

UJ C)

I<( I-(/)

UJO _::I ...Js:<( w (/) :::!<(

~~0:::0::: ll..w I-I

CI)ILIJUJ w~ S;ll..CDO W...J

...JCDz I :::I UJO::l (!)CD zoo:::~

o9u.i ...JL!JoZ (' __J...J~:::J <(:::! . 0 s:u..~::l UJ(f) = UJ 0 2 ZUJ ~:::!os: :::iii: T"""(l_

~wiO. 0<( 1-....Jil.. :::J> = 11..-w>- 2I ~O:::S:CDI- ·I-

Xo... UJ UJ'

Oi

UJ ...J 0::: ,;J-+---

.-+-------+------..·~ C.o

I

~ UJ ...J 0::: ,;J-+---

C.o I

~ w ...J 0::: ,;J -+---

0 I

"' [>· +I (<)

UJUJ Z(.) UJ I'-

O<C 0 _j 1-LL

~ UJ (1)0:::

:::1 C) (f)

0::: <( CD UJ 0::: 0 <( UJ O:::o IO f-;-o::: ...JUJ __J_ <CI-

WHITNEY BAILEY COX & MAGNANI, LLC B49 Fa1rmount Ave. SUit9100 Baltimore. MD 21206

Tel. 410..512-4500 Fax. 410-324-4100 www.wbcm.com

WBCM

0 I

0 '¢

UJ ...J 0::

UJ UJ :::!z 11.. 0..1-11..<( --11.. 1-2 ..--x...J UJO &...J LIJ<( = <( IUJ ~s: C/)0

.. 0-.9 ~

CRANE PLATFORM SECTION

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

...J (.)

...J <(

~ ~ UJ <( ...J ...J 11.. :::1 z tu (? UJ (.9 I (/)

...J UJ UJ 1-(/)

>< UJ

b I

z Qll 1-ro ()'-. w (f)w

...J () (/)

FEB. 2014

SK-11 ...,.· 0 ARCHITECTURE ENGINEERING CONSTRUCTION SCALE: 1 /8"=1 '-0" ~~~~~~~~~~~~~~~---------------------L1~3~0~3~3~1~0~0~

P:\2013\13033100\Drowings\14-MI\ .... Permit Set\130.33100-12_SK-11.dwg © WBCM 2014

Page 16: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

~ / N s "" -:::::-

"" 0 '-"

"" 0 0 / ";' 0

" " u:) Ul

-:::::-

""" I s: ? I "1] m

3 ;:.:

lf)

" / ~

C' 0 ~ u ~

0 0 I

,_,., I Ul

"' I

N Q.

" cO

Feb 26, 2014 - 9:13am User: gfolinos

I

~ -<

':E c :;) m

i

~OJ z

iO~ -j • ~~~ 0 n _, e 6 8 z 3

(f)

0 )> r [T1

~ co

:: II __. -

I 0

__.:E (.NOJ

.,=e 0~ :::Of"T1

0~ :r: :;:o rrlO U>z >-! -u ~:;:o :Arrl f"T1~

CD ~. [11~ s::~ )>0 ;oZ _, z-rr~S:::::: -u -! :;:o rrlO :::0< S::f"T1 -::s::::: zf"T1 >z r-!

:;: X ~ z ~

"' " rn -< 0 )I

"' ~ G) z

~ F (")

~ v ("')

~~ Ui ::r:: rr1

~ ~ co c ~ ::r:: ~ 0

(/)

§ 0 z

r STRONG BACK

CUT 1'-0" MIN. BELOW

STONE SURFACE \

0 I STONE ~ SURFACE ---

ALL-THREAD REBAR TIE ROD

0 I

GEOTEXTILE [o ...-

FABRIC

SHEET PILE DEADMAN

I 40 1-0 11

GRANULA~ BACKFILL

EXIST. SHEET PILE WALL___/'

6'-6" MAX. CHANNEL WARD STRONG BACK

1'-8" CHANNELWARD

ll SHEET CUT 1'-0" MIN. ll SHEET PILE BELOW STONE PILE

SURFACE~ I BENT PLATE r BENT PLATE b STONE SHT. PILE CAP SHT. PILE CA I

N SURFACE

EL. +4.0' ~ t .U I Jll EL. +4.0'

gMHW Ill sz MHW r\SL-THREAD ~MLW ~MLW

EBAR TIE ROD b

I

~ GEOTEXTILE [o ..... FABRIC

SHEET PILE I I/ SHEET PILE BULKHEAD SHEET PILE BULKHEAD

DEADMAN

I I I 401-0 11

EXISTING GRANULA~ EXISTING BACKFILL

MUDLIN7 MUDLIN7 EXIST. SHEET PILE WALL ___/'

EL. EL.

\7-27.01 s 'V -27.0

1 s .

@1 8 ~1 i §~I N I I CD @j ~~~~~~-~ (f) 01 'T] 0 A ~rTJ~ I ~ ~f':l --~.z

GJI N zo o__. "_p,..

SECTION SECTION SCALE: 1 /8" = 1 '-0" SCALE: 1 /8" = 1'-0"

Page 17: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 0 (.)

;;: <ll

E Q.

OJ n

20'-9" MAX. CHANNELWARD

PRECAST CONC. SLAB WITH TOPPING LOADING PLATFORM

ll PILE fl. PILE ll P LE 2'-6" 8'-3 1/2" 8'-3 1/2"

EX. STONE

GRADE \ EL. 8.25' SLOPE

' \l·E$:::=·· ·:=: . ·:f2·~ .. ~E~ EX. HP WALER _/'·

STRUT BEAM, TYP.

EX. STEEL SHEET / PILE WALL_/

EL. -28.0'

l

STEEL GIRDER, TYP.

EX. HP I BATTER PILE

u SECTION

SCALE: 1 /8" = 1' -0"

1'-8" ~EX. STEEL DOLPHIN WITH ~ RUBBER SAUSAGE SJ EL. 8_0, FENDER BEYOND

.. ~

sz MHW

uMLW

18"0x1/2" WALL PIPE PILE FILLED WITH CONC. 1 0'-0" BELOW MUDLINE, TYP.

(

EXISITNG MUDLINE

WHITNEY BAILEY COX & MAGNANI, LLC 849 Fa1rmount Ave. Su1te 100 Baltimore, MD 21286

Tel. 410-512-4500 Fax. 410-324-4100

SECTION - LOADING PLATfORM FEB. 2014 www.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

SCALE: 1 /8"=1 '-0"

SK-13

Page 18: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

w _f

0:

Co I

M

""

0.. <( (.)

0 <( w I ~ _f

::> co (j z 0 (.)

<..9 ~~ . CL 0:: oa.o

BOLL. (.)~I-r-<o::i CI)IO.. <et-a O~z w -o::coo-a_<(<( q = _f 0 00 00 CJ) _J +

0::: w 0 0::: <..9 _f

w

~11•~11• w I-CJ)

~ <( w co I-:::J a:: I-CJ) _J

w w I-(f)

~0 -<( O..w I-I w~ W_! I::> CfJCO

Ow zz i=::::i CfJO -::> [iS~

:f t ·.'~ ww· . ::! o~--

_f

w

o: ~ ~ ; ""-----l+...__..--------+------------=-~------r------------~

o-,£

s:w w oo (.) __~<( wLJ.. <(

LL. coO:: 0:: .=> :::J z(J) (f)

~w _z w oo z _, I- 0 ...-(/) I-I-

CJ) :::J 0

- 0 00 0 _, 0 a:: ...... <(

w!:!:! 0:::1-IO:: I-<( _jco _!W <CO::

.. o-.s~

w ==! z 0 Q.. <( b I-~ "'¢ wo W<( IW (1)0

I- _I w_~

w<C I$: CJ)w

• _f 1-­CJ)CL x w

I>

: 0 I

z 0 II

~ : co u ...........

w ,......

(f) w _f

<3 (/)

i...:

" "' :::0

~r-~~--~--~------~~~ WHITNEYBAilEYCOX&MAGNANI LLC LOADING PLAJFQRU SECTION DATE:

849 Fa.rmount ~ve. Suite 100 Baltimore, MD 2,1286 M 1eL410·512-4500F~~~;:;:',~~ FEB. 2014 ~ w 8 c M WATERFRONT REHABILITATION/IMPROVEMENT DRAWING NO. ~ FOR CHESAPEAKE AVE. MARINE TERMINAL S K -1 4 .n ARCHITECTURE ENGINEERING CONSTRUCTION ~~~~~~~~~~~~~~~~~S~C:A~L=E:~1~/~8~"~1·~ ~O~" ______ LwisicQMiN~o~.~J

P:\20 13\13033100\Drow,ngs\14-MI\ .... Permit Set\l:so:n100-·· 1,, 130331 00 ~ _SI<-14.dwg © WBCM 2014

Page 19: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u ;;: Q)

E Cl.

OJ n

;: 0 N

WHITNEY BAILEY COX & MAGNANI, LLC 849 F-a1rmount Ave. Swte 100 Baltimore, MD 21286

Tel. 410-512-4500 Fax. 410-324-4100 www.wbcm.com

WBCM

__J 0 <(• I

tJ II

0 -:.r ........_

z ~ w

_J <( a... () (/)

"' "

'J " "'

" z 00

"' " 0 W<(

-q'J I- 1--CL 0 O:::w

" Nl- Oz

" :s:~ 8:~ W-1 ::Jo

"' zo C/) •

"' wo -IZ

'J 0::0 ()

"' "

NEW BREASTING DOLPHIN DETAIL

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

SCALE: 1 I 4"= 1 '-0"

FEB. 2014

SK-15

Page 20: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

........-------------------·-··-----------

1i.. DOLPHIN PARALLEL TO BERTHING LINE

1"0 GALV. BOLT W/ O.G. WASHER& NUT COUNTERSUNKFLUSHIN PILE MIN. OF 2'-0" FROM TOP (TYP. OF 3)

CUT HOLE IN BACK OF FENDER FOR 1 "0 BOLT

1" GALVANIZED WIRE ROPE

0 u u

<;:: Q)

PLAN DETAIL SCALE: 1" = 1 '-0"

Er--------------------------,-------------------------------.----------~ n. m r'")

"" 0 N

WH!1NEY BAILEY COX & MAGNANI, LLC 849 Fairmount Ava. SUite 100 Baltimore, MD 21286

Tel 410-512-4500 Fax. 41Q-.324-4100 www.wbcm.com

WBCM

NEW 7 -PILE TIMBER DOLPHIN

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

FEB. 2014

SK-16

SCALE: 1 "= 1 '-0" ~~~~~~~~~~~~~~~------------------~~1~3~0~3~3~10~0~

P:\20L3\13033100\Drawings\14-MI\ .. Per11it Set\I.7>ClJ:~,100 17 ... SK·-16.dwg © WBCM 2014

.q' 0

Page 21: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

<;:: .,

E Q_

(J)

n

,~

0 N

rr. WHITE PVC PILE CAP

ELEV. 14.0'

[

10 GAGE COPPER CAP, TYP.

ELEV. 11.0' ~---------F= ~==t===~==4 -----------------------

0 I

N

0 I

"'

~==== =~= ====~

,/

I

'f

WRAP WITH 7 TURNS 6x19 1"0 IWRC GALV. WIRE ROPE DRAW TIGHT. STAPLE EACH TURN TO EACH PILE

M.L.W. ELEV. 0.0'

TIMBER PI~E. sO· / ~ LONG MIN. 8 0 TIP _/ .

WHITNEY BAILEY COX & MAGNANI, LLC B49 Fairmount Ave. Swte 100 Baltimore, MD 21286

Tel. 41D-512-4500 Fax. 410-324·4100 www.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

ELEVATION DETAIL SCALE: 1 /2" = 1 '-0"

NEW 7 -PILE TIMBER DOLPHIN

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL

SCALE: 1/2"=1'-0"

FEB. 2014

SK-17

Page 22: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 0 0

;;:: v

IMPACT SUMMARY FACT SHEET

[r-----------------------.---------------------------~--------~ 0. n -+

-+ 0 N

" 0

WHil NEY BAILEY COX & MAGNANI, LLC 849 Fa1rmount Ave. Suite 100 Baltimore, MD 21286

Te1.410-5i2-4500 Fax. 41G-324-4100 WNW.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

IMPACT SUMMARY FACT SHEET DEC. 201 3

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL EXHIBIT A

~~~~~~~~~~~~~~----------------~------~1~3~0~3~3~1~0~0~ P:\20 13\130331 00\Drawings\ 14-·MI\_Permil Set\t:XHIBIT . .Adwg © WBCM 2013

Page 23: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

0 u u

~

E [}_

CJl

"'

0

L5 I ::.:: ....J :::> CD

. ..J L1J UJ ....J llJ-1- Q_ •n 1-:~ lli w:r zu: l_

-::2; (.!)0:: ~0 OLL <(1-

S::i ::::Q_

wl9 z~

0

c3 ....J z :::>

I X w

WHITNEY BAILEY COX & MAGNANI, LLC 849 Fairmount Ave. SUite 100 Baltimore, MD 21286

Tel. 41Q-512-4500 Fax. 410-324·4100 WNW.wbcm.com

WBCM ARCHITECTURE ENGINEERING CONSTRUCTION

1-W wz ~::; LL 0 Co

'

.. o-,gs

1- -wZ LlJ<( :r::2; cno

<( L1J 0

....J' ....Ji!! <(I-

' ' "

L.

-

1 I I

.. ..

\REMOVE AND R:PLACE

0

7 PILE TIMBER CLUSTER DOLPHIN. (TYP. OF 5) SEE DETAILS NSK-16 & B/SK-17

-

IMPACT SUMMARY FACT SHEET FEB. 2014

WATERFRONT REHABILITATION/IMPROVEMENT FOR CHESAPEAKE AVE. MARINE TERMINAL EXHIBIT A1

SCALE: 1 "=80' ~ 13033100 ~~~~~~~~~~~~~~~~~~~~----------------------------------------~----~~--~--~ P:\2013\ 130331 00\Drawings\ 14-MI\_._Permi\ Set\EXHIBIT_A 1.dwg © WBCM 2014

Page 24: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

en 0 t::

0 0,

/

(j z -z f-­Cf)I

><(0... >W...J wo:::O zr:oo

' ' \ ' \. \ ·- \

~-r-~----~~~~_L----~~~ ~ 849Fa"mo~~:~:~;y:;:;';~c~,~m':.~~~;1 ;'a~ IMPACT SUMMARY FACT SHEET DATE: reL 410-512-4500 Fax 410-324-4100 FEB. 2 Q 1 4

0

w 8 CwwwM.wbcm.oom WATERFRONT REHABILITATION/IMPROVEMENT DRAWING NQ. ~ FOR CHESAPEAKE AVE. MARINE TERMINAL EXHIBIT A2 N ARCHITECTURE ENGINEERING CONSTf~UCTION ~~~~~~~~W'C~~~~~~----~S~C=A~LE=:~1 _"::4~o_· ______ _jLW~B~C~M~N~O~.~J

Co\'" U\ UOO" 00\Cco•. "'" \ H-"\_Cocm" >d \"' "" '_R """ 1 3 0 3 31 00 © WBCM 2014

Page 25: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia

"' 0

" :,:0 0 0,

E 0

IXl 0 ,.,.,

"" 0 N

IMPACT SUMMARY FACT SHEET

LOADING/UNLOADING PLATFORM

(2) CRANE PLATFORM

EXISTING PIER FOOTPRINT REMOVED

NEW STEEL SHEET PILE BULKHEAD

AREA -

AREA -

AREA -NET AREA -

LENGTH =

2,033 SQ.-FT.

1,307 SQ.-FT.

3,340 SQ.-FT.

2,200 SQ.-FT. 1 I 140 SQ.-FT.

480 LINEAR FT.

DATE: IMPACT SUMMARY FACT SHEET DEC. 2013 WHITNEY BAILEY COX & MAGNANI, U.C

849 Fa1rmount Ava. Suite 100 Baltimore, MD 21286 Tel. 410-512-4500 Fax. 41D-324-4100

www.wbcm.com WATERFRONT REHABILITATION/IMPROVEMENT DRAWING NO. w B c M FOR CHESAPEAKE AVE. MARINE TERMINAL EXHIBIT A3 ~ ARCHITECTURE ENGINEERING CONSTRUCTION WBCM NO. ~ 13033100 ~~~--~--~--~--~-=~--------------------------~~~~~

P: \2013\130331 00\Drowlflgs\ 14-MI\_Perrni\ Set\ EXHIBIT _A3.dwg © WBCM 2013

Page 26: Public Notice - United States Army...saltatrix); egg, larva, juvenile and adult life stages of king mackerel (Scomberomorus cavalla), Spanish mackerel (Scomberomorus maculatus), cobia