All interested parties are notified that the Commander, First Coast Guard District, has received
an application from the Maine Department of Transportation for approval of the location and
plans for the replacement of a fixed highway bridge over a waterway between Canada and the
United States.
WATERWAY AND LOCATION: St. John River, 232 miles above the mouth of the
waterway, between Madawaska, Aroostook County, Maine and the City of Edmundston,
Province of New Brunswick, Canada.
CHARACTER OF WORK: Replace the existing Madawaska International Highway Bridge
(#2399) on a diagonal alignment approximately 50 feet west of the existing bridge abutment in
Edmundston and approximately 1,400 feet west of the existing bridge abutment in Madawaska.
The bridge construction and demolition will be completed from temporary work trestles which
will almost span the entire waterway. The existing bridge superstructure, abutments, and
temporary trestles will be removed in their entirety and in water piers will be removed to below
the mudline. A bridge protection system and bridge lighting will not be required on the new
bridge as navigation is minimal on the waterway. The piers will meet AASHTO design
standards.
MINIMUM NAVIGATIONAL CLEARANCES:
Existing Proposed
Horizontal (normal to axis of the channel) 228 feet (69.49m) 212.7 feet (64.83m)
Vertical (above OHW)
34 feet (10.36m)
59 feet (17.98m)
Vertical (above OLW)
38 feet (11.58) 63 feet (19.20m)
ENVIRONMENTAL CONSIDERATION:
The General Services Administration (GSA) and Federal Highway Administration (FHWA) are
the lead Federal agencies under the National Environmental Policy Act (NEPA) and acts on
behalf of the U.S. Coast Guard for all environmental control laws. The GSA and FHWA
completed a Final Supplemental Environmental Impact Statement dated August, 2019 and a
Commander (dpb) First Coast Guard District
1 South Street Battery Park Building
New York, NY 10004-1466
2
Record of Decision dated February 13, 2020. Environmental documents can be reviewed at the
below link.
https://www.maine.gov/mdot/projects/madawaska/internationalbrg/
The Coast Guard concurs with the GSA and FHWA determination that the proposed action will
not have a significant impact for the purposes of the National Environmental Policy Act and that
a Record of Decision ROD was completed. A Water Quality Certification from the Maine
Department of Environmental Protection in accordance with Section 401 of the Clean Water Act,
as amended, certifying that reasonable assurance has been furnished that the project will be
conducted in compliance with water quality standards of Maine has been applied for. The
applicant has made a determination that the project is consistent with the State of Maine’s coastal
management program. The State of Maine has yet to concur on WQC determinations and is
expected in May of 2020.
The project is not considered an encroachment on the 100-year floodplain. The 100-year flood
elevation is Elevation +468.8 and lowest steel member is elevation +504.9 (NAVD 1988).
The decision as to whether to grant approval of the location and plans for the proposed action
rests primarily upon the effect it has on navigation.
SOLICITATION OF COMMENTS:
Mariners are requested to comment on navigational safety issues including need for bridge
protective systems, extent of nighttime navigation, and need for bridge lighting. We will
forward comments of an environmental nature such as those regarding wildlife refuges, water
fowl refuges, public parks, historic sites, wetlands, floodplain issues, air, water quality, etc. to
GSA and FHWA for appropriate handling.
Interested parties are requested to express their views, in writing, on the proposed bridge project,
giving sufficient detail to establish a clear understanding of their reasons for support of, or
opposition to, the proposed work. Comments will be received for the record at the Office of the
Commander (dpb), First Coast Guard District, 1 South Street, Battery Park Building, New York,
NY 10004-1466 through April 27, 2020. These comments will be public information and made
part of the case record.
Map of location and plans attached.
FOR THE DISTRICT COMMANDER
//s//
C. J. Bisignano
Supervisory Bridge Management Specialist
U.S. Coast Guard
By direction
This is a web-searchable copy and is not the official, signed version; however, other than the
signature being omitted, it is a duplicate of the official version.
Project Location
Canada
MAINE
Atlantic Ocean
VICINITY MAP
NOTE:
The proposed project area does not include any
archaelogical historical or wildlife and waterfowl refuge sites.
February 21, 2020
t t ..
,eS1teo!t
.l
STATE OF MAINE
� �� <P,,,
l,j � "L
.,,,,,,'i.
Ru,, PiN
':� flf,.o\S -
Existing Canadi Port of Entry
'iMrFng Bridge rro Be
tonr?e s a
r:r
Twin
Paper
I I Existing U.S. Land Port of Entry
l?ue Qu
Madawaska
PROJECT LOCATION MAP
500 0 500
�-,- I Scale of Feet
/000 JOO O JOO ■ ■-
200
■ ■ ■ -
Scale of Meters
DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399 WIN
021736.00 BRIDGE PLANS MADA W ASKA-EDMUNDSTON
INTERNATIONAL BRIDGE ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME.
AROOSTOOK COUNTY AND EDMUNDSTON, MADAWASKA COUNTY, NEW BRUNSWICK, CANADA LOCATION 8c VICINITY MAP
SHEET NUMBER
1 OF 6
NOTES: I. Conceptual plans utilized to obtain Coast Guard bridge permit.
2. No bridge protection system is required and the piers meet AASHTO standards. / 3. The U.S. Coast Guard is not responsible for approving fill and riprop locations and quantities.
POR 6 TAX MAP 4 EASTERN-
�NE
RAILWAY C
�
Approximate Ordinary
� High Water
"� ....
(£ Brg. Abut I,. (£ Brg. Pier I Sta. l03•55.00
, (Bock Tangent).:::::::::. I Sta. /06•55.00
February 21, 2020
(£ Brg. Pier 2
2.3' (0.70ml Approx. Water Depth
(£ Brg. Pier 3 I Sta. l09+70.00 I Sta. !l2•85.00
1826.00'
315.00' (96.0lm)
20/0 CY (/536.Bm'J Fill
r U.S. Shoreline (Ordinary Low Water)
..:---..�
PLAN
100 0 100 200 - ---- - -
Scale of Feet
20 0 2040 �--• I I
Scale of Meters
STATE OF MAINE
DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399
WIN
021736.00 BRIDGE PLANS
ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,
MADAWASKA COUNTY, NEW BRUNSWICK, CANADA
-...,,.,..___"------ Her Majesty
Canadian Shoreline (Ordinary Low Water)
MADA WASKA-EDMUNDSTON INTERNATIONAL BRIDGE
BRIDGE PLAN
The Queen
Datum, NAVD88
SHEET NUMBER
2 OF 6
NOTES:
I. Conceptual plans uti/lzed to obtain Coast Guard bridge permit.
2. 0/00 � 100 year flood elevation.
3. The U.S. Coast Guard rs not responsible for approving ff/I and rlprop locations and quontftfes.
!£. Brg. Abut. I I Sta. l03•55.00
(Bock Tangent) 300.00' (91.44ml
.------- ......
February 21, 2020
/
!£. Brg. Pier I !£. Brg. Pier 2 !£. Brg. Pier 3 I Sta. l06•55.00 I Sta. l09'70.00 I sto. ll2•85.00
315.00' 315.00' 315.00'
!£. Brg. Pier 4
1 Sta. ll6+00.00
315.00'
!£. Brg. Pier 5 !£. Brg. Abut 2
ISta. ll9'15.00 1 Sta. 121•8!.00
· (Ahead 266.00' Tangent)
----------------.i---------------<-------------�-------(96.0/mJ (96.0lmJ
_I OLW EL. 441.3 = ------'i"
(96.01ml
I (96.0lmJ
Novlgotlonol Opening Envelope After Construction. 212.740' (64.84ml Min. Width Normal to Channel
I
� ros., CY ,,.,,_,-\_ 200 CY 0536.Bm'' 19/0 CY 0460.3m'J of FIii of FIii of FIii
(8/.08 m)
ILawest Steel Member El. -504.9 I
2400 CY (/834.9m'J of Ff//
(Elevation View Is shcNvn perpendicular to the structure and opproxlmotely 45" to the channel)
..._ :.::.: I. (Zf,t...:,
PLAN
/00 0 /00 200 - ---- - -
Scale of Feet
20 0 20 40 �-• I I
Scale of Meters
STATE OF MAINE
DEPARTMENT OF TRANSPORTATION BRIDGE NO, 2399
WIN
021736.00 BRIDGE PLANS
ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,
MADAWASKA COUNTY, NEW BRUNSWICK, CANADA
MADA W ASKA-EDMUNDSTON
INTERNATIONAL BRIDGE
BRIDGE ELEVATION
Datum: NAVDBB
SHEET NUMBER
3 OF 6
1.61' (0.5/mJ
Steel Bridge Ra/1/ng (3 Bar Trafflc/Blcycle RartlnqJ
February 21, 2020
6.00' Shoulder 12.00' Lane (l.83m! (3.66ml
Variable Depth Welded Steel Plate Girder (Typ.)
Ii. Roadway
45.25' 03.79ml
12.00' Lane (3.66ml
STATE OF MAINE
6.00' Shoulder 6.00' Sidewalk (l.83m! (l.83m!
IX
NOTES:
I. Conceptual plans ut/1/zed to obtain Coast Guord bridge permit.
1.58' W.48m!
Steel Bridge Ralllng
I(4 Bar Traffic/Pedestrian Ralllng!
====��
4 0 4
�--- I Scale of Feet
I 0
�-Scale of Meters
DEF ARTMENT OF TRANSPORTATION BRIDGE NO. 2399
WIN
021736.00 BRIDGE PLANS MADA W ASKA-EDMUNDSTON
INTERNATIONAL BRIDGE ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME.
AROOSTOOK COUNTY AND EDMUNDSTON, MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TYPICAL SECTIONS
I
I
SHEET NUMBER
4 OF 6
NOTES: I. Conceptual plans utilized for informational use only.
February 21, 2020
/
. . .. .. . .
1 ···;�.�··. (10.61m) (Typ.) ,i ,,
(/\:ft 1 §'
' ' ' ' ' '
,', ' ' ',
',,:--' '' ' '
'' '
', � Umits of Temporary < Access Roods
PLAN
100 0 100 200 - ---- - -
Scole of Feet
20 0 2040 �--• I I
Scale of Meters
' '' '
STATE OF MAINE
DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399
' ' '
1/
WIN
021736.00 BRIDGE PLANS
ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA ME
✓, <
ernatlona/ Bridge , , ', (To Be Re=edi
�,
,. ·:•
, ��:
2.CY (0.6ml Diameter ' , ' , \ ' Steel Pipe Piles, ' , ' ,
Anticipated rTyp) ', �, �
\
MADA WASKA-EDMUNDSTON INTERNATIONAL BRIDGE
Datum, NAVD88
SHEET NUMBER
AROOSTOOK COUNTY AND EDMUNDSTON ' .
MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TEMPORARY TRESTLE PLAN 5
OF 6
/, , United I Canada, ,
States ,
8•00
Novlgotionol Opening Envelope During Construction. 22.00' (6.7ml Min. Width Normal to Channel, 35.00' 00.67ml along skew, and 11.00' (3.35ml Min. Clearance of OHW.
/O+QO /2+(}0
NOTES:
410 -+-----+-----+-----+--------l-----+-----+------+--'----+---------1-----+---+----+-----+---------1- 410
460 460
450 450
440 440
430 430
/
5+QO
Temporary PIie rTyp.J PROFILE Existing Streombed
ELEVATION
TEMPORARY TRESTLE AT PROPOSED BRIDGE
O+QO
Temporary Work Trestle
/+()Q 2+QO
Horlz. 75 O
�-.-, Vert. 37.5 0
75
I 37.5
Scale of Feet
Horlz. 15 O
�;-, Vert. 7.5 0
15 30
I I 7.5 /5
Scale of Meters
, , United I Canada • •
States ,
150
I 75
3+QO 4•00 5+QO
Novigotlonol Opening Envelope During Construction. 22.00' (6.7ml Min. Width Normal to Channel, 35.00' (10.67ml along sk/31,V, and 11.00' (3.35) Min. Clearance otOHW.
6+QO 7•00 8•00
460-+------+------+----+--+-----+-+------+- ----+ ----+-----+--------+-460
460 460
450
"'C [,!-oHW-E 450
440 _ -�_di=- 440
430 430
O+QO 6+QO
Temporary PIie rTyp.J PROFILE Existing Streombed
ELEVATION
TEMPORARY TRESTLE AT EXISTING BRIDGE
Horiz. 75 O
�-e-J Vert. 37.5 0
75
I 37.5
Scale of Feet
Horiz. 15 O
�;-, Vert. 7.5 0
15
I 7.5
Scale of Meters
150
I 75
30
I 15
8•00
l2+QO
February 21, 2020
I. Conceptual plans ut//ized for informational use only.
STATE OF MAINE
nRPARTMENT OF TRANSPORTATION
WIN
021736.00 MADA W ASKA-EDMUNDST0N
INTERNATIONAL BRIDGE
SHEET NUMBER
2. Temporary structures will not beon the waterway of the some time.
BRIDGE NO. 2399 BRIDGE PLANS
ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,
MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TEMPORARY STRUCTURES
PROFILES
6 OF 6