March 26, 2020 PUBLIC NOTICE (1-178) Subject: PROPOSED REPLACEMENT OF MADAWASKA INTERNATIONAL BRIDGE (#2399) ACROSS ST. JOHN RIVER BETWEEN THE TOWNS OF MADAWASKA, AROOSTOOK COUNTY, MAINE AND EDMUNDSTON, PROVINCE OF NEW BRUNSWICK, CANADA All interested parties are notified that the Commander, First Coast Guard District, has received an application from the Maine Department of Transportation for approval of the location and plans for the replacement of a fixed highway bridge over a waterway between Canada and the United States. WATERWAY AND LOCATION: St. John River, 232 miles above the mouth of the waterway, between Madawaska, Aroostook County, Maine and the City of Edmundston, Province of New Brunswick, Canada. CHARACTER OF WORK: Replace the existing Madawaska International Highway Bridge (#2399) on a diagonal alignment approximately 50 feet west of the existing bridge abutment in Edmundston and approximately 1,400 feet west of the existing bridge abutment in Madawaska. The bridge construction and demolition will be completed from temporary work trestles which will almost span the entire waterway. The existing bridge superstructure, abutments, and temporary trestles will be removed in their entirety and in water piers will be removed to below the mudline. A bridge protection system and bridge lighting will not be required on the new bridge as navigation is minimal on the waterway. The piers will meet AASHTO design standards. MINIMUM NAVIGATIONAL CLEARANCES: Existing Proposed Horizontal (normal to axis of the channel) 228 feet (69.49m) 212.7 feet (64.83m) Vertical (above OHW) 34 feet (10.36m) 59 feet (17.98m) Vertical (above OLW) 38 feet (11.58) 63 feet (19.20m) ENVIRONMENTAL CONSIDERATION: The General Services Administration (GSA) and Federal Highway Administration (FHWA) are the lead Federal agencies under the National Environmental Policy Act (NEPA) and acts on behalf of the U.S. Coast Guard for all environmental control laws. The GSA and FHWA completed a Final Supplemental Environmental Impact Statement dated August, 2019 and a Commander (dpb) First Coast Guard District 1 South Street Battery Park Building New York, NY 10004-1466

Upload: others

Post on 23-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

March 26, 2020

PUBLIC NOTICE (1-178)

Subject: PROPOSED REPLACEMENT OF MADAWASKA INTERNATIONAL BRIDGE

(#2399) ACROSS ST. JOHN RIVER BETWEEN THE TOWNS OF MADAWASKA,

AROOSTOOK COUNTY, MAINE AND EDMUNDSTON, PROVINCE OF NEW

BRUNSWICK, CANADA

All interested parties are notified that the Commander, First Coast Guard District, has received

an application from the Maine Department of Transportation for approval of the location and

plans for the replacement of a fixed highway bridge over a waterway between Canada and the

United States.

WATERWAY AND LOCATION: St. John River, 232 miles above the mouth of the

waterway, between Madawaska, Aroostook County, Maine and the City of Edmundston,

Province of New Brunswick, Canada.

CHARACTER OF WORK: Replace the existing Madawaska International Highway Bridge

(#2399) on a diagonal alignment approximately 50 feet west of the existing bridge abutment in

Edmundston and approximately 1,400 feet west of the existing bridge abutment in Madawaska.

The bridge construction and demolition will be completed from temporary work trestles which

will almost span the entire waterway. The existing bridge superstructure, abutments, and

temporary trestles will be removed in their entirety and in water piers will be removed to below

the mudline. A bridge protection system and bridge lighting will not be required on the new

bridge as navigation is minimal on the waterway. The piers will meet AASHTO design

standards.

MINIMUM NAVIGATIONAL CLEARANCES:

Existing Proposed

Horizontal (normal to axis of the channel) 228 feet (69.49m) 212.7 feet (64.83m)

Vertical (above OHW)

34 feet (10.36m)

59 feet (17.98m)

Vertical (above OLW)

38 feet (11.58) 63 feet (19.20m)

ENVIRONMENTAL CONSIDERATION:

The General Services Administration (GSA) and Federal Highway Administration (FHWA) are

the lead Federal agencies under the National Environmental Policy Act (NEPA) and acts on

behalf of the U.S. Coast Guard for all environmental control laws. The GSA and FHWA

completed a Final Supplemental Environmental Impact Statement dated August, 2019 and a

Commander (dpb) First Coast Guard District

1 South Street Battery Park Building

New York, NY 10004-1466

Page 2: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

2

Record of Decision dated February 13, 2020. Environmental documents can be reviewed at the

below link.

https://www.maine.gov/mdot/projects/madawaska/internationalbrg/

The Coast Guard concurs with the GSA and FHWA determination that the proposed action will

not have a significant impact for the purposes of the National Environmental Policy Act and that

a Record of Decision ROD was completed. A Water Quality Certification from the Maine

Department of Environmental Protection in accordance with Section 401 of the Clean Water Act,

as amended, certifying that reasonable assurance has been furnished that the project will be

conducted in compliance with water quality standards of Maine has been applied for. The

applicant has made a determination that the project is consistent with the State of Maine’s coastal

management program. The State of Maine has yet to concur on WQC determinations and is

expected in May of 2020.

The project is not considered an encroachment on the 100-year floodplain. The 100-year flood

elevation is Elevation +468.8 and lowest steel member is elevation +504.9 (NAVD 1988).

The decision as to whether to grant approval of the location and plans for the proposed action

rests primarily upon the effect it has on navigation.

SOLICITATION OF COMMENTS:

Mariners are requested to comment on navigational safety issues including need for bridge

protective systems, extent of nighttime navigation, and need for bridge lighting. We will

forward comments of an environmental nature such as those regarding wildlife refuges, water

fowl refuges, public parks, historic sites, wetlands, floodplain issues, air, water quality, etc. to

GSA and FHWA for appropriate handling.

Interested parties are requested to express their views, in writing, on the proposed bridge project,

giving sufficient detail to establish a clear understanding of their reasons for support of, or

opposition to, the proposed work. Comments will be received for the record at the Office of the

Commander (dpb), First Coast Guard District, 1 South Street, Battery Park Building, New York,

NY 10004-1466 through April 27, 2020. These comments will be public information and made

part of the case record.

Map of location and plans attached.

FOR THE DISTRICT COMMANDER

//s//

C. J. Bisignano

Supervisory Bridge Management Specialist

U.S. Coast Guard

By direction

This is a web-searchable copy and is not the official, signed version; however, other than the

signature being omitted, it is a duplicate of the official version.

Page 3: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

Project Location

Canada

MAINE

Atlantic Ocean

VICINITY MAP

NOTE:

The proposed project area does not include any

archaelogical historical or wildlife and waterfowl refuge sites.

February 21, 2020

t t ..

,eS1teo!t

.l

STATE OF MAINE

� �� <P,,,

l,j � "L

.,,,,,,'i.

Ru,, PiN

':� flf,.o\S -

Existing Canadi Port of Entry

'iMrFng Bridge rro Be

tonr?e s a

r:r

Twin

Paper

I I Existing U.S. Land Port of Entry

l?ue Qu

Madawaska

PROJECT LOCATION MAP

500 0 500

�-,- I Scale of Feet

/000 JOO O JOO ■ ■-

200

■ ■ ■ -

Scale of Meters

DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399 WIN

021736.00 BRIDGE PLANS MADA W ASKA-EDMUNDSTON

INTERNATIONAL BRIDGE ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME.

AROOSTOOK COUNTY AND EDMUNDSTON, MADAWASKA COUNTY, NEW BRUNSWICK, CANADA LOCATION 8c VICINITY MAP

SHEET NUMBER

1 OF 6

Page 4: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

NOTES: I. Conceptual plans utilized to obtain Coast Guard bridge permit.

2. No bridge protection system is required and the piers meet AASHTO standards. / 3. The U.S. Coast Guard is not responsible for approving fill and riprop locations and quantities.

POR 6 TAX MAP 4 EASTERN-

�NE

RAILWAY C

Approximate Ordinary

� High Water

"­� ....

(£ Brg. Abut I,. (£ Brg. Pier I Sta. l03•55.00

, (Bock Tangent).:::::::::. I Sta. /06•55.00

February 21, 2020

(£ Brg. Pier 2

2.3' (0.70ml Approx. Water Depth

(£ Brg. Pier 3 I Sta. l09+70.00 I Sta. !l2•85.00

1826.00'

315.00' (96.0lm)

20/0 CY (/536.Bm'J Fill

r U.S. Shoreline (Ordinary Low Water)

..:---..�

PLAN

100 0 100 200 - ---- - -

Scale of Feet

20 0 2040 �--• I I

Scale of Meters

STATE OF MAINE

DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399

WIN

021736.00 BRIDGE PLANS

ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,

MADAWASKA COUNTY, NEW BRUNSWICK, CANADA

-...,,.,..___"------ Her Majesty

Canadian Shoreline (Ordinary Low Water)

MADA WASKA-EDMUNDSTON INTERNATIONAL BRIDGE

BRIDGE PLAN

The Queen

Datum, NAVD88

SHEET NUMBER

2 OF 6

Page 5: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

NOTES:

I. Conceptual plans uti/lzed to obtain Coast Guard bridge permit.

2. 0/00 � 100 year flood elevation.

3. The U.S. Coast Guard rs not responsible for approving ff/I and rlprop locations and quontftfes.

!£. Brg. Abut. I I Sta. l03•55.00

(Bock Tangent) 300.00' (91.44ml

.------- ......

February 21, 2020

/

!£. Brg. Pier I !£. Brg. Pier 2 !£. Brg. Pier 3 I Sta. l06•55.00 I Sta. l09'70.00 I sto. ll2•85.00

315.00' 315.00' 315.00'

!£. Brg. Pier 4

1 Sta. ll6+00.00

315.00'

!£. Brg. Pier 5 !£. Brg. Abut 2

ISta. ll9'15.00 1 Sta. 121•8!.00

· (Ahead 266.00' Tangent)

----------------.i---------------<-------------�-------(96.0/mJ (96.0lmJ

_I OLW EL. 441.3 = ------'i"

(96.01ml

I (96.0lmJ

Novlgotlonol Opening Envelope After Construction. 212.740' (64.84ml Min. Width Normal to Channel

I

� ros., CY ,,.,,_,-\_ 200 CY 0536.Bm'' 19/0 CY 0460.3m'J of FIii of FIii of FIii

(8/.08 m)

ILawest Steel Member El. -504.9 I

2400 CY (/834.9m'J of Ff//

(Elevation View Is shcNvn perpendicular to the structure and opproxlmotely 45" to the channel)

..._ :.::.: I. (Zf,t...:,

PLAN

/00 0 /00 200 - ---- - -

Scale of Feet

20 0 20 40 �-• I I

Scale of Meters

STATE OF MAINE

DEPARTMENT OF TRANSPORTATION BRIDGE NO, 2399

WIN

021736.00 BRIDGE PLANS

ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,

MADAWASKA COUNTY, NEW BRUNSWICK, CANADA

MADA W ASKA-EDMUNDSTON

INTERNATIONAL BRIDGE

BRIDGE ELEVATION

Datum: NAVDBB

SHEET NUMBER

3 OF 6

Page 6: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

1.61' (0.5/mJ

Steel Bridge Ra/1/ng (3 Bar Trafflc/Blcycle RartlnqJ

February 21, 2020

6.00' Shoulder 12.00' Lane (l.83m! (3.66ml

Variable Depth Welded Steel Plate Girder (Typ.)

Ii. Roadway

45.25' 03.79ml

12.00' Lane (3.66ml

STATE OF MAINE

6.00' Shoulder 6.00' Sidewalk (l.83m! (l.83m!

IX

NOTES:

I. Conceptual plans ut/1/zed to obtain Coast Guord bridge permit.

1.58' W.48m!

Steel Bridge Ralllng

I(4 Bar Traffic/Pedestrian Ralllng!

====��

4 0 4

�--- I Scale of Feet

I 0

�-Scale of Meters

DEF ARTMENT OF TRANSPORTATION BRIDGE NO. 2399

WIN

021736.00 BRIDGE PLANS MADA W ASKA-EDMUNDSTON

INTERNATIONAL BRIDGE ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME.

AROOSTOOK COUNTY AND EDMUNDSTON, MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TYPICAL SECTIONS

I

I

SHEET NUMBER

4 OF 6

Page 7: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

NOTES: I. Conceptual plans utilized for informational use only.

February 21, 2020

/

. . .. .. . .

1 ···;�.�··. (10.61m) (Typ.) ,i ,,

(/\:ft 1 §'

' ' ' ' ' '

,', ' ' ',

',,:--' '' ' '

'' '

', � Umits of Temporary < Access Roods

PLAN

100 0 100 200 - ---- - -

Scole of Feet

20 0 2040 �--• I I

Scale of Meters

' '' '

STATE OF MAINE

DEPARTMENT OF TRANSPORTATION BRIDGE NO. 2399

' ' '

1/

WIN

021736.00 BRIDGE PLANS

ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA ME

✓, <

ernatlona/ Bridge , , ', (To Be Re=edi

�,

,. ·:•

, ��:

2.CY (0.6ml Diameter ' , ' , \ ' Steel Pipe Piles, ' , ' ,

Anticipated rTyp) ', �, �

\

MADA WASKA-EDMUNDSTON INTERNATIONAL BRIDGE

Datum, NAVD88

SHEET NUMBER

AROOSTOOK COUNTY AND EDMUNDSTON ' .

MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TEMPORARY TRESTLE PLAN 5

OF 6

Page 8: PUBLIC NOTICE (1-178) · march 26, 2020 public notice (1-178) subject: proposed replacement of madawaska international bridge (#2399) across st. john river between the towns of madawaska,

/, , United I Canada, ,

States ,

8•00

Novlgotionol Opening Envelope During Construction. 22.00' (6.7ml Min. Width Normal to Channel, 35.00' 00.67ml along skew, and 11.00' (3.35ml Min. Clearance of OHW.

/O+QO /2+(}0

NOTES:

410 -+-----+-----+-----+--------l-----+-----+------+--'----+---------1-----+---+----+-----+---------1- 410

460 460

450 450

440 440

430 430

/

5+QO

Temporary PIie rTyp.J PROFILE Existing Streombed

ELEVATION

TEMPORARY TRESTLE AT PROPOSED BRIDGE

O+QO

Temporary Work Trestle

/+()Q 2+QO

Horlz. 75 O

�-.-, Vert. 37.5 0

75

I 37.5

Scale of Feet

Horlz. 15 O

�;-, Vert. 7.5 0

15 30

I I 7.5 /5

Scale of Meters

, , United I Canada • •

States ,

150

I 75

3+QO 4•00 5+QO

Novigotlonol Opening Envelope During Construction. 22.00' (6.7ml Min. Width Normal to Channel, 35.00' (10.67ml along sk/31,V, and 11.00' (3.35) Min. Clearance otOHW.

6+QO 7•00 8•00

460-+------+------+----+--+-----+-+------+- ----+ ----+-----+--------+-460

460 460

450

"'C [,!-oHW-E 450

440 _ -�_di=- 440

430 430

O+QO 6+QO

Temporary PIie rTyp.J PROFILE Existing Streombed

ELEVATION

TEMPORARY TRESTLE AT EXISTING BRIDGE

Horiz. 75 O

�-e-J Vert. 37.5 0

75

I 37.5

Scale of Feet

Horiz. 15 O

�;-, Vert. 7.5 0

15

I 7.5

Scale of Meters

150

I 75

30

I 15

8•00

l2+QO

February 21, 2020

I. Conceptual plans ut//ized for informational use only.

STATE OF MAINE

nRPARTMENT OF TRANSPORTATION

WIN

021736.00 MADA W ASKA-EDMUNDST0N

INTERNATIONAL BRIDGE

SHEET NUMBER

2. Temporary structures will not beon the waterway of the some time.

BRIDGE NO. 2399 BRIDGE PLANS

ST. JOHN RIVER, MILE POINT 232.0 BETWEEN MADAWASKA, ME. AROOSTOOK COUNTY AND EDMUNDSTON,

MADAWASKA COUNTY, NEW BRUNSWICK, CANADA TEMPORARY STRUCTURES

PROFILES

6 OF 6