Montréal-Ouest Interchange Reconstruction
Public Information Meeting
December 3, 2015
2
Project description
Division into sectors
Works on Montréal-Ouest Interchange
Closure of R-138 / A-20 access ramps
Detours
Circulation on rue Saint-Jacques and the surrounding area
Mitigation measures
Presentation Outline
3
Project Description
Montréal-Ouest
Turcot Interchange De La Vérendrye
Angrignon
Turcot Yard
4
Project Description
145 km of road, 9 km of municipal network and 56 structures
6,7 km of new bike paths
31,5 hectares of green space, equivalent of 39 soccer fields
5
Project Description
Component 1: work in conventional mode (preparatory lots)
Component 2: work in Design-Build (D-B) mode
Component 3: maintenance work on existing structures
Railway works under the responsability of CN
6
General Schedule
2011-2017: works in conventional mode by the MTQ
27 février 2015: signature of the Design-Build contract with KPH Turcot
2015-2020: work in Design-Build mode
7
Turcot Project – Sectors
West Sector Center Sector
East Sector
South Sector
8
Works on Montréal-Ouest Interchange
Existing interchange
Reconstruction of the interchange
Futur interchange
9
Works on Montréal-Ouest Interchange
Overpass on boulevard de Sainte-Anne-de-Bellevue above autoroute 20
10
Works on Montréal-Ouest Interchange
Works completed so far
Contraflow lane on boulevard de Sainte-Anne-de-Bellevue
Closure of boulevard Angrignon for 4 weeks
Commissioning of the deviation of boulevard Angrignon
Closure of avenue Saint-Pierre entry and a section of boulevard
Montréal-Toronto
11
Works on Montréal-Ouest Interchange
Next steps
Closure of R-138 / H-20 access ramps
Dismantling of railway tunnel
Relocation of rail corridor
New structure
Temporary configuration of boulevard Angrignon
12
Temporary Exit
Construction of a temporary exit on rue Notre-Dame Ouest to maintain
traffic flow
Temporary exit
Closure
A-20 eastbound
Movement towards exit
13
Closure of Avenue Saint-Pierre Entry
Closed since November 24, 2015 until 2019
Closure of a section of boulevard Montreal-Toronto
Detour via Notre-Dame Ouest street and A-20 eastbound on Angrignon
blvd.
Detour A-20 eastbound
14
Closure of R-138 / A-20 Access Ramps
Closure of R-138 / A-20 access ramps and commissioning of temporary
exit : night of December 12 to 13, 2015
Beginning of works around the railway tunnel in preparation for
dismantling (winter 2016)
Closures
Detour H-20 West towards Sainte-Anne-de-Bellevue Blvd.
Temporary exit
New structure
15
Closure of R-138 / A-20 Access Ramps
Establishment of different detours
Detour A-20 westbound
Optional itinerary via rue Saint-Jacques
Detour A-20 eastbound
Detour R-138 westbound
Temporary exit
New structure
16
Temporary lights Lane assignment
Reprogrammation of traffic lights
Closures
Optional itinerary via Saint-Jacques
Temporary configuration
New structure
Closure of R-138 / A-20 Access Ramps
Optional itinerary via rue Saint-Jacques
17
Mitigation Measures
Temporary exit to access rue Saint-Jacques / boul. Angrignon
Reorganization of three intersections with temporary traffic lights
City of Montréal-Ouest:
Intersection Saint-Jacques / Avon / Westminster
Intersection Saint-Jacques / Ronald (near Milton)
LaSalle sector:
Intersection Saint-Patrick / Clément
18
Mitigation Measures
Reorganization of two intersections with temporary traffic lights in
Montréal-Ouest:
Intersection of rues Saint-Jacques / Avon /
Westminster
Intersection of rues Saint-Jacques /
Ronald (near Milton)
19
One way on Avenue Easton
The implementation of a
new traffic light at the
intersection of rues Saint-
Jacques / Avon /
Westminster involves
managing traffic
movements
This new configuration
allows to create more
fluidity in the area and
ensure that all movements
are safe
20
Mitigation Measures
Reprogramming of 27 traffic lights
Modification of 4 existing traffic lights
Police assistance during rush hours for the first weeks
Coordination with Cities and Boroughs
Meeting with businesses
21
Questions