public information centre - peel region€¦ · alton village streetscaping main street south and...
TRANSCRIPT
![Page 1: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/1.jpg)
Alton Village StreetscapingMain Street South and Queen Street East
“Phase 2”
PUBLIC INFORMATION CENTRE
Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School
19681 Main StreetAlton, Ontario
![Page 2: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/2.jpg)
Alton Village StreetscapingMain Street South and Queen Street East
“Phase 2”
PUBLIC INFORMATION CENTRE
Date: June 6, 2018Time: 6:30 p.m. to 8:30 p.m.Location: Alton Public School
19681 Main StreetAlton, Ontario
![Page 3: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/3.jpg)
Project Area – Phase 2
Shaw’s CreekPROJECT
AREA
Main Street South
![Page 4: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/4.jpg)
Summary of the Works
• Implement urban cross section through Alton Village: • 1.8m sidewalks• Coloured impressed concrete splash pads• 4.0m lanes with ‘sharrows’ for bicycle traffic through Village, and 1.5m
separate bicycle lanes from Beechgrove to start of Village area• Street beautification including:
• Rest areas with benches, waste receptacles and bicycle racks• Landscaping and planting features• Decorative lighting
• Stormwater management improvements including permeable pavers, CB shields, oil‐grit separators and new sewers
• Community parkette at Main and Queen intersection• Traffic calming gateway features north of Beechgrove Sideroad and at
McClellan Road
![Page 5: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/5.jpg)
Chosen Finishes / Features
Bridge/Culvert Concrete Formliners Bridge/Culvert Railings
Benches and Waste Receptacles Coloured Impressed Concrete Splash Pads
Streetlights
![Page 6: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/6.jpg)
Summary of the Works
![Page 7: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/7.jpg)
Summary of the Works
![Page 8: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/8.jpg)
Summary of the Works
![Page 9: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/9.jpg)
Conceptual RenderingMain Street Gateway Feature (Without Monument)
![Page 10: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/10.jpg)
Conceptual RenderingMain Street Gateway Feature (With Monument)
![Page 11: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/11.jpg)
Conceptual RenderingMain St. at McLellan Road (Looking North)
![Page 12: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/12.jpg)
Conceptual RenderingMain St. at McLellan Road (Looking South)
![Page 13: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/13.jpg)
Conceptual Rendering – Main St. (North of Station St.)
![Page 14: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/14.jpg)
Conceptual Drawing – Retaining Wall
![Page 15: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/15.jpg)
Conceptual Rendering – Main / Queen Intersection
![Page 16: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/16.jpg)
Conceptual Rendering ‐ Queen St. Looking West
![Page 17: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/17.jpg)
Timing – Phase Two
• Main Street South is anticipated to remain open, with lane restrictions
• Construction start date Spring 2019
• Expected construction completion in late 2019
![Page 18: PUBLIC INFORMATION CENTRE - Peel Region€¦ · Alton Village Streetscaping Main Street South and Queen Street East “Phase 2” PUBLIC INFORMATION CENTRE Date: June 6, 2018 Time:](https://reader033.vdocuments.us/reader033/viewer/2022052803/5f240fdcc1a08579fe645ab5/html5/thumbnails/18.jpg)
YOUR INPUT IS IMPORTANT
Please complete a Comment Sheet before leaving
By Mail Mr. Serguei Kabanov, C.E.T.Region of PeelTransportation Division10 Peel Centre DriveSuite B, 4th FloorBrampton, ON L6T 4B9
Mr. David O’Sullivan, P.Eng.R.V. Anderson Associates Limited2001 Sheppard Avenue EastSuite 300Toronto, ON M2J 4Z8
OR
By Phone 905‐791‐7800, ext. 8754 416‐497‐8600, ext. 1245
By Fax 905‐791‐1442 416‐497‐0342
By E‐mail Serguei. [email protected] [email protected]
THANK YOU FOR ATTENDING
These presentation boards are also available for viewing at http://www.peelregion.ca/news/notices/2017/notice‐171004.htm