Page 1: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Roland Antoni, Senior Manager, Information Technology Mercedes-Benz Trucks, Daimler AG

Holger Herrmann, Chief Product Owner, SAP

Future Material Requirement Planning at Mercedes-

Benz Trucks with SAP HANA Platform Architecture

Public

Page 2: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 2Customer© 2016 SAP SE or an SAP affiliate company. All rights reserved.

Key Business

Innovations

S/4HANA

Page 3: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 3Customer

New Trends in Value Chain, Segment of ONE

Trigger done by technological change Digitization of Customer Experience

Segment of ONE

Filling / Subscribe

Personalized

coupon

Route planning

Personalized

communication

Simple order from

the App

Sharing experiences

Navigating in the Store Delivery commitment

Delivery reliability

Sales experience

Service

An integrated digitization as

a necessary consequence

Lot Size ONE

Production Line 1

Production Line 2

Production Line 3

Production orders,

Delivery notes,

Goods issues,

Goods receipts

for each ordercrash point

Page 4: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 4Customer© 2016 SAP SE or an SAP affiliate company. All rights reserved.

Simplifications are the enabler

for throughput increase of 10 up to 25

0

200

400

600

800

0 20 40 60 80 100

Thro

ughput

(ite

ms/s

ec)

# Parallel Processes

SAP Business Suite on SAP HANA

Negative stock not allowed

No database locks any more

Automotive scenario test

case

Reporting point backflush

with transfer posting of 100

items each

60% common parts

large OEM back-flush requirement (example)

Parallel postings of large material documents

Page 5: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 5Customer

Live Manufacturing Planning with the MRP Run

Sales Production

Inventory

Purchase Request Production RequestTransfer Request

Flexible MRP Run

Purchase

Analyze the current

situation based on real-

time information and

focus on single

shortages

Time

Live Supply, Demand @ Inventory

MRP Controller

Page 6: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler Trucks

Roland Antoni

Future Material Requirement Planning at Mercedes-Benz

Trucks with SAP HANA Platform Architecture

June16th, 2016

Page 7: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

Mercedes-Benz Trucks

- Management of a global production network

SAP Automotive Forum, 2016 7

Germany(Wörth)

Turkey(Aksaray)

Brazil(Sao Bernardo,

Juiz de Fora)

Marocco

(Casablanca)

Argentina

(Buenos Aires)

Columbia

(Bogota)

Malaysia

(Pekan)

South Africa

(East-London)

Saudi-Arabia

(Jeddah)

Fuso

(Japan)

Foton

(China)

Sisu

(Finland)

Bharat-Benz

(India)

Taiwan

(Chungli)

CKD PartnerMBT Network

MBTV

(Russia)

Kamaz

(Russia)

France

(Molsheim)

Algeria

(Rouiba)

Wörth Plant

Source: Wörth Plant Presentation , Jan. 2016

Page 8: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Future MRP @ Mercedes-Benz Trucks

Page 9: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

Why actually HANA?

SAP Automotive Forum, 2016 9

yesterday

Future

2016

2010

BR

DETR

MRP on HANA

@ MB Trucks

POC

Material Requirement Planning

@ MB Trucks Global Network

SET

UP

GO

today

futureAnything the mind can conceive and believe, the mind can achieve.

Page 10: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

What is MRP @ MB Trucks all about?

SAP Automotive Forum, 2016 10

BM

SAA SAA SAA

SNR SNR SNR

SNR SNR

01 02 03 04 …05

BOMProduction Program (12 Months)

DELIVERY ON CALL (12 Months)

MRP

Material On StockBill of Material Explosion

Per Day On 3 Months

Material Requirement Planning at

MB Trucks Global Network

Future

Page 11: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

Where we actually are?

SAP Automotive Forum, 2016 11

500 Orders by day

x 6.000 parts

≈1.000.000.000 requirement points per year

and 30.000.000 dependent requirements

for 100 days planning

in 1/2 hour!

1.000.000.000

(1 year)

30.000.000

(100 days)

ECC: 24 hour roughly estimated?

2014

Future

Material Requirement Planning

@ MB Trucks Global Network

MRP on HANA

@ MB Trucks2016

GO FOR

Page 12: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

What is our motivation for this?

SAP Automotive Forum, 2016 12

today

• 3 historically grown legacy systems w/ partially different processing algorithms

• Limited order related MRP only for <34 days (need for 100 days)

• Partially inconsistent requirements due to a multi level explosion (e.g. inhouse parts)

• Limited know-how and support for current legacy systems

• Missing scalability by current system landscape

• Standardized order related MRP based on classic BOM

• Scalable planning horizon up to 100 days

• Improved process for MRP Monitoring (KPI oriented MRP cockpit)

• Drill-down per KPI up to level of document/movement for back tracing

• Real-time monitoring for our brooker (e.g. order related days of supply)

• Ad-hoc reporting on real-time data (stocks vs. demands)

• Scalable MRP Standard Explosion for MB Trucks in a glance

Proof of Concept „SAP MRP on SAP HANA @ MB Trucks“ done.

GO – for Implementation Project…

Our

future

Future

SETUP – for Project done.

Page 13: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Outlook @ Mercedes-Benz Trucks

Page 14: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

Outlook for MB Trucks

SAP Automotive Forum, 2016 14

Outlook

Realtime in Industrie 4.0

Backbone for our Poduction Network

Page 15: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Daimler AG

Thank You!

SAP Automotive Forum, 2016 15

Anything the mind can conceive and believe, the mind can achieve.

Page 16: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 16Customer© 2016 SAP SE or an SAP affiliate company. All rights reserved.

Outlook

S/4HANA

Page 17: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 17Customer

SAP S/4HANA – Synergies & collaboration in 3 dimensions

Innovation in business processes

Throughput in inventory

management and valuation

MRP on HANA

ATP

Rebate processing

Innovation in Architecture

Throughput

Scalability

Principle of one

SAP Fiori

TCO reduction

Innovative Cross Industry Business

Processes for: Automotive; Aerospace & Defense; Engineering,

Construction & Operations; Industrial Machinery &

Constructions; High Tech

Processes:

˗ Just in Time / Just in Sequence Processing

˗ Advanced Batch Management

˗ Lean Manufacturing and Logistics with Kanban

˗ Material Interchangeabilities and Succession

˗ Automated Credit Memo Processing

˗ Scheduling Agreement Processing

˗ Vehicle Management System

˗ Build-to-Order Optimization

˗ Automated Earned Value Management

˗ And many more

Page 18: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 18Customer

Live Capacity Planning with PP/DS in S/4HANA

Sales Production

Inventory

Purchase Request Production RequestTransfer Request

Flexible MRP Run

Purchase

Analyze the current

material and capacity

situation based on real-

time information and

comprehensive planning

features in

PP/DS@S/4HANA

Time

Live Supply, Demand, Inventory @ Capacity

MRP Controller

Page 19: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 19Customer© 2016 SAP SE or an SAP affiliate company. All rights reserved.

Outlook

Mercedes Benz

Trucks

Page 20: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

Roland Antoni,

Senior Manager, Information Technology

Mercedes-Benz Trucks CoC Logistics

and Shopfloor, Daimler AG

Holger Herrmann,

Chief Product Owner, SAP

Future Material Requirement Planningat Mercedes-Benz Trucks with SAPHANA Platform Architecture

Page 21: Public Future Material Requirement Planning at Mercedes ... · PDF file16.06.2016 · Future Material Requirement Planning at Mercedes- ... Proof of Concept „SAP MRP on SAP HANA

© 2016 SAP SE or an SAP affiliate company. All rights reserved. 21Customer

© 2016 SAP SE or an SAP affiliate company. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company.

SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate

company) in Germany and other countries. Please see http://global12.sap.com/corporate-en/legal/copyright/index.epx for additional trademark information and notices.

Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors.

National product specifications may vary.

These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP SE or its

affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP SE or SAP affiliate company products and

services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as

constituting an additional warranty.

In particular, SAP SE or its affiliated companies have no obligation to pursue any course of business outlined in this document or any related presentation, or to develop

or release any functionality mentioned therein. This document, or any related presentation, and SAP SE’s or its affiliated companies’ strategy and possible future

developments, products, and/or platform directions and functionality are all subject to change and may be changed by SAP SE or its affiliated companies at any time

for any reason without notice. The information in this document is not a commitment, promise, or legal obligation to deliver any material, code, or functionality. All forward-

looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place

undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.