pt terminal teluk lamong the first green port in … · microsoft powerpoint - day 2, session 8 -...

19
PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN INDONESIA RAYA TAMBAK OSOWILANGUN KM 12 SURABAYA 60191 www.teluklamong.co.id [email protected]

Upload: others

Post on 18-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

PT TERMINAL TELUK LAMONGTHE FIRST GREEN PORT IN INDONESIA

RAYA TAMBAK OSOWILANGUN KM 12 SURABAYA 60191www.teluklamong.co.id

[email protected]

Page 2: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Presentation Outline:1. Terminal Teluk Lamong as a sustainable and

green port.2. Automation as a key to increase productivity and

efficiency.

Page 3: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

WHY WASTELUK LAMONG

BUILT

Page 4: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

LIQUID BULK (TON)

CONTAINER (BOX) DRY BULK (TON)

GENERAL CARGO (TON)

COMPARISON OF GOODS DISTRIBUTION AND CAPACITYIN TANJUNG PERAK (2008 – 2012)GOODS

Page 5: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Green TRIPLE BOTTOM LINE (THREE PILLARS OF SUSTAINABILITY)

Bussiness Sustainability

Page 6: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Green PT TERMINAL TELUK LAMONG AS GREEN TERMINAL

RESULT (COMPLIANCE)

AMDAL RKL-RPL

AIRQuality check

AirAmbient

WATER IPLC

HAZARDOUS WASTE TPS B3, RF

EFFORT(BEST PRACTICE & TECHNOLOGY)

ENVIRONMENTAL MNGMNT. SYSTEM

ISO 14001Pollution Alert

SystemOil Spill Response

ENERGYISO 50001,Cold Iron,

Benchmarking

EMISSION ISO 14064, CDM/ Carbon Trade

WATER Water Utilization

HAZARDOUSWASTE

Reuse & Reduce, Hazardous Waste,

Benchmarking

3R WASTE TPS 3RBenchmarking

BIODIVERSITYBiodiversity

Inventory, in situ, ex situ, Publication

BIODIVERSITYSocial Mapping/ CAP, GKPM, CSR

Award

Page 7: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

THE FIRST GREEN PORT IN INDONESIA

Page 8: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

ECO FRIENDLY TECHNOLOGY CNG Truck Using Electrical Equipment Build CNG Power Plant Light Emitting Diode (LED) Lighting Solar Cell

MATERIAL RECYCLE Applying Exhaust Gas for Air

Conditioner

ENVIRONMENTALLY AWARENESS Mangroove Plantation Not using fossil energy Supporting environmental activities

WASTE MANAGEMENT SYSTEM Waste management System Incinerator Oil Water Separator Oil Spillage Respond

Green PT TERMINAL TELUK LAMONG AS GREEN TERMINAL

Gas Powerplant

MangrovePlantation

ElectricalEquipment

Page 9: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

TERMINALINFRASTRUCTURE

SUPRASTRUCTURE

Page 10: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Facility ULTIMATE PHASE OF PT TERMINAL TELUK LAMONG

Page 11: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

TRANSPORTATIONINTEGRATION

CONCEPT

Page 12: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

STA. BENTENG

STA. SIDOTOPO

STA. PS. TURI

STA. KALIMAS

STA. TANDES

JALUR KA KE GUBENG

STA. KANDANGAN

STA. INDRO GRESIK

JALUR KA KE SEMEN GRESIK

JALUR UTARA KA KE JAKARTA

1

JALUR KA EXISTING

2

DepoOsowilangunDevelopment

Area

DepoMargomulyo /

GregesDevelopment

AreaDepo KalianakDevelopment

Area

Depo TanjungBatu

DevelopmentArea

PelabuhanTanjung PerakDevelopment

Area

Depo Terminal Teluk Lamong Development

Area

CONTAINERDEPOT

INTEGRATION INTERMODA & CONTAINER DEPOT

Page 13: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

TOLLROADS

INTEGRATION TOLL ROADS

Page 14: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

AUTOMATIONAS

PRODUCTIVITY SOLUTION

Page 15: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Benefits1. To increase terminal productivity at a

constant level of quality.2. To increase the level of safety.3. To increase the level of efficiency and the

accuracy.

Page 16: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

ASC Automated Stacking Crane

Automated Stacking Crane specifications:1. Twice RTG Productivity2. 1 Person can operate 3-4 ASC at the same time.3. Electricity-Powered and environmentally

friendly.4. SWL 40 Tons under the spreader.5. 270 meters per minute gantry speed.6. Controlled from the tower, there’s no operator

inside the ASC. (for safety reasons)

Page 17: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

DockingStation Automated Lift On/Off System

Page 18: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

CTIV Full Automated CTT Systems

Page 19: PT TERMINAL TELUK LAMONG THE FIRST GREEN PORT IN … · Microsoft PowerPoint - Day 2, Session 8 - Agung Kresno Sarwono.pptx Author: User Created Date: 6/26/2015 2:51:17 PM

Thank You