PT MEDCO POWER INDONESIA

Upload: buibao

Post on 09-May-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

PT MEDCO POWER INDONESIA

Page 2: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

BUSINESS OVERVIEW

2

BUSINESS OVERVIEW

POWER PLANT SERVICES

Operations & Maintenance

Services

INDEPENDENT POWER

PRODUCER

Renewable Energy Electricity GenerationHydro & Geothermal

Thermal Energy Electricity

Generation

Page 3: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

3

MPI Portfolio

IPP Fuel Type MW

MEB Combine Cycle Gas 85

DEB Combine Cycle Gas 85

TM 2500 Gas 20

ELB Simple Cycle Gas 76

EPE Gas 12

MPE Gas 12

Singa  Gas 7

TOTAL CAPACITY 297

OPERATING ASSETS

O&M Services

Coal Fired TJBPS Coal 1320

Geothermal Sarulla Geothermal 330

MEB‐PLN Batam scattered Gas 500

Total Capacity 2150

IPP COD MW

ELB Combined Cycle 2020 40

4 Mini Hydro 2017 ‐ 2019 40

Sarulla Geothermal 2017 ‐ 2018 330

Ijen Geothermal 2021 ‐ 2022 110

CCPP Riau 2021 275

TOTAL 795

COMMITTED PROJECTS

300 MW Operating Asset  + 795 MW asset under construction 2150 MW 3rd party O&M business

Page 4: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

MPI Working Area

4

4

MEB Gas 85 MWBatam Island2004

DEB Gas 85 MWBatam Island2006

TM2500 Gas 20 MWBatam Island2007

ELB Gas 76 MW Batam Island2015

Sarulla Geothermal 330 MWNorth Sumatera2016-2018

EPE Gas 12 MW South Sumatera2006

MPE Gas 12 MW South Sumatera2008

Singa Gas 7 MW South Sumatera2010

BJI Mini Hydro 9 MWWest Java2016

PPP Mini Hydro 9 MWWest Java2017

SHB Mini Hydro 13 MW West Java2019

TJBPS Coal 1320 MW (O&M)Central Java2006

Ijen Geothermal 110 MW East Java2020-2021NES Mini Hydro 8 MW

West Sumatera2019

Sarulla Geothermal 330 MW (O&M)North Sumatera2016

TM2500 Gas 50 MW (O&M)Lombok2016

TM2500 Gas 25 MW (O&M)Nias Island2016

TM2500 Gas 100 MW (O&M)Pontianak2016

TM2500 Gas 75 MW(O&M)Paya Pasir2016

TM2500 Gas 75 MW (O&M)Duri2016

TM2500 Gas 100 MW (O&M)Lampung2016

TM2500 Gas 50 & 25 MW (O&M)Bangka - Belitung2016

Riau CCPP 275 MWRiau2021

Own & operate by MPI

3rd party power plant operate by MPI

Page 5: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

OPERATING ASSETS - IPP

Mitra Energi Batam (MEB)Panaran, Batam

PPA to 2034Natural‐gas‐fueled CombinedCycle (Rolls‐Royce Aero‐Derivative RB211) Cap 85MW

Dalle Energy Batam (DEB)Panaran, Batam

PPA to 2025Natural‐gas‐fueled CombinedCycle (Rolls‐Royce Aero‐Derivative RB211.) Total Cap 85MW

TM 2500 Panaran, Batam

Back up unitNatural‐gas‐fueled General Electrics’ Truck Mounted Derivative. Cap 20 MW

Energi Prima ElektrikaPrabumulih, S. Sumatra

PPA to 2026Natural‐gas‐fueled Wartsilla 18V 34 SG Gas Engine. Cap 12 MW

Multidaya Prima ElektrindoSako, S. Sumatra

PPA to 2028Natural‐gas‐fueled Wartsilla18V 34 SG Gas Engine. Cap 12MW

SingaPalembang, S. Sumatra

PPA to 2017Natural‐gas‐fueled TurbomachGas  TurbineCap 7 MW

ELBTanjung Uncang, Batam

PPA to 2036Natural‐gas‐fueled Simple Cycle (GE Frame 6 B). Total Cap 76 MW

Page 6: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

UNDER CONSTRUCTION PROJECTS

Sarulla – Geothermal 330 MW

North Sumatera

• In process of commissioning unit 1 110 MW

• COD expected in 2017 – 2018

Ijen – Geothermal 110 MW

East Java

• In process of slim hole drilling

• COD expected in 2021-2022

Riau – Gas Fired Combined Cycle 275 MW

Riau

• PPA negotiation process, expected signing by Q1 2017

• COD expected in 2021

BJI – Mini Hydro 9 MW

West Java

• Construction progress: 86%

• COD expected in 2017

Page 7: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

General Investor Concern

Resiko Proyek dan Investor Return (IRR) :

• Required return (IRR Proyek) tergantung dari besarnya resiko. Semakin besar

resiko suatu proyek maka akan semakin besar pula profit yang diharapkan

proyek tersebut.

• Untuk mendapatkan harga yang lebih ekonomis, adalah bagaimana kita bisa

menurunkan resiko tersebut.

• Kemudahan perizinan

• Kemudahan pengadaan tanah

Page 8: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

Resiko Pembangkit Listrik Tenaga Gas

IPP Location Gas Volume GSA Expired PPA Expired

MEB Batam 13.2 mmscfd 2019 2034

DEB Batam 14.5 mmscfd 2019 2025

ELB Batam 24 mmscfd 2019 2036

MPE South Sumatera 2 mmscfd 2018 2028

EPE South Sumatera 2 mmscfd 2019 2026

• Mismatch antara periode GSA (Gas Supply Agreement ) dan PPA (Power Purchase Agreement)

• Sampel untuk beberapa kasus di anak perusahaan PT Medco Power Indonesia :

Page 9: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

• Setelah Pengeboran eksplorasi selesai baru diketahui feasibility dari proyek, antara lain :

• Besaran Reserve / Cadangan Panas Bumi• Biaya Produksi• Resource Parameter : Fluid pH, Temperature & H2S

Resiko Geothermal

Resiko Eksplorasi / Sub ‐ Surface 

Resiko  Sumber Daya Manusia

• Sebagai negara dengan potensial reserve terbesar di dunia, kita memiliki sedikit expert/expertise di bidang geothermal

• Di negara lain ternyata expert/expertise yang ada juga sangat terbatas

Page 10: PT MEDCO POWER INDONESIA file• Biaya Produksi • Resource Parameter : Fluid pH, Temperature & H2S Resiko Geothermal Resiko Eksplorasi / Sub

THANK YOU