PSZ 19:16 (Pind. 1/07)
UNIVERSITI TEKNOLOGI MALAYSIA
NOTES: * If the thesis is CONFIDENTAL or RESTRICTED, please attach with the letter from the organization with period and reasons for confidentiality or restriction.
DECLARATION OF THESIS AND COPYRIGHT
Author’s full name : SAMANEH ZOLFAGHARIAN
Date of birth : 10.06.1983
Title : AUTOMATED SAFETY PLANNING ON CONSTRUCTION
SITE
Academic Session : 2010/2011 (II)
I declare that this thesis is classified as:
CONFIDENTIAL (Contains confidential information under the Official Secret Act 1972)*
RESTRICTED (Contains restricted information as specified by organization)
OPEN ACCESS I agree that my thesis to be published as online open access (full text)
I acknowledged that Universiti Teknologi Malaysia reserves the right as follows:
1. The thesis is the property of Universiti Teknologi Malaysia. 2. The Library of Universiti Teknologi Malaysia has the right to make copies for the
purpose of research only. 3. The Library has the right to make copies of the thesis for academic exchange.
Certified by:
SIGNATURE SIGNATURE OF SUPERVISOR
E14294104 Assoc. Prof. Aziruddin Ressang (NEW IC NO. /PASSPORT NO.) (NAME OF SUPERVISOR)
Date: May 2011 Date: May 2011
√
19 May 2011
Librarian
Perpustakaan Sultanah Zanariah
UTM, Skudai
Johor
Sir,
CLASSIFICATION OF THESIS AS RESTRICTED
AUTOMATED SAFETY PLANNING ON CONSTRUCTION SITE
SAMANEH ZOLFAGHARIAN
Please be informed that the above mentioned thesis entitled " AUTOMATED SAFETY PLANNING ON CONSTRUCTION SITE " be classified as RESTRICTED for a period of three (3) years from the date of this letter. The reason for this classification is
(i) The information and data are confidential as requested by the respondents’ companies.
Thank you.
Sincerely yours,
Assoc. Prof. Aziruddin Ressang
Faculty of Civil Engineering
Univesity Teknologi Malaysia (UTM)
Skudai, Johor
(0167124248)
2
“We hereby declare that we have read this project report and in our opinion this
project report is sufficient in terms of scope and quality for the award of the degree
of Master of Science (Construction Management)”
Signature : …………………………………………
Name of Supervisor I : …………………………………………
Date : …………………………………………
Signature : …………………………………………
Name of Supervisor II : …………………………………………
Date : …………………………………………
Assoc. Prof. Aziruddin Ressang
May 2011
Assist. Prof. Dr. Javier Irizarry
May 2011
AUTOMATED SAFETY PLANNING ON CONSTRUCTION SITE
SAMANEH ZOLFAGHARIAN
A project report submitted in partial fulfillment of the
requirements for the award of the degree of
Master of Science (Construction Management)
Faculty of Civil Engineering
Universiti Teknologi Malaysia
MAY 2011
ii
“I declare that this project report entitled “Automated Safety Planning on
Construction Site” is the result of my own research except as cited in the references.
The project report has not been accepted for any degree and is not concurrently
submitted in candidature of any other degree”
Signature : …………………………………………
Name : …………………………………………
Date : …………………………………………
Samaneh Zolfagharian
May 2011
iii
This is dedicated to my loving, caring, understanding and supporting
husband, Mehdi. Thank you for being a pillar of my strength. This dissertation is
also dedicated to my family. A special feeling of gratitude goes to my loving parents
whose words of encouragement and full support over the years has helped to finish
this important chapter of my life. You are the most precious thing I have in this
world. I love you dearly.
ACKNOWLEDGEMENT
I would like to deeply and sincerely thank my dear supervisor Assoc. Prof.
Aziruddin Ressang for his leadership, professionalism, guidance, understanding,
enthusiasm and continued optimism. His guidance helped me during the research and
writing of this thesis. I could not have imagined having a better supervisor and
mentor for my master study. For everything you have done for me, Assoc. Prof.
Aziruddin, I thank you.
I would also like to extend my special gratitude to my co-supervisor,
Assistant Professor Dr. Javier Irizarry from Georgia Institute of Technology, for his
support, guidance, motivation, patience, and immense knowledge throughout this
project. It was such a pleasure to have an opportunity to pursue my Master's research
under his supervision. Without his offer to accomplish this research, I would not
have been able to finish my study.
I believe that a good marriage and a strong family is a joy forever, and it
makes a successful journey worthwhile. My husband, Mehdi, has many strengths and
I love him. Throughout my studies, he has expressed unconditional love for me, as
well as an unwavering belief in my ability to succeed. When I feel loved and
supported by him, I can weather any crisis and truly enjoy success.
I would also like to thank my family and my best friends for the support, love
and encouragement they provided me through my entire life.
v
ABSTRACT
Construction industry is considered as a dangerous industry because a large
percentage of fatal accidents are recorded in it. It is reported that poor-safety
awareness of project managers is one of the root causes of construction accidents.
Thus, developing a program for promoting the knowledge of construction managers
is crucial. This research developed an automated safety-planning prototype that can
be used to mitigate occurrence of accidents on construction sites. To achieve this
aim, frequency and severity of the common construction hazards were collected by
distributing an online questionnaire among 300 construction safety managers, safety
experts, and safety officers. Then, level of risks related to each hazard was calculated
based on the relevant risk matrix. Ten interviews with expert panels were conducted
to establish a relationship between hazards and construction activities and also to
determine the most common construction activities in residential building within
Malaysia. The results of this study reveal that the riskiest hazards on construction
sites are lack of appropriate attitudes, lack of awareness of safety regulations, poor
safety awareness in a project manager, and lack of knowledge. The results of this
stage were implemented in developing the prototype. The prototype extracts current
construction activities from schedules in Microsoft Project in order of their risks.
Moreover, safety regulations and hazards related to each activity could be reported
both in manual and automatic mode. The result of the prototype evaluation
demonstrates that the prototype is innovative, efficient, and helpful in preventing
construction accidents by promoting the project mangers’ knowledge.
vi
ABSTRAK
Industri pembinaan merupakan antara industri yang mempunyai pelbagai
aktiviti merbahaya. Adalah di lapurkan kurang nya kesadaran tentang keselamatan
di kalangan pengurus projek adalah salah satu punca utama kemalangan di tapak
bina. Oleh itu adalah penting untuk membuat program keselamatan yang dapat di
guna kan oleh pengurus projek bagi mengurangkan kamalangan yang boleh berlaku.
Tujuan penyelidikan ini ini adalah untuk menghasilkan prototaip perancangan
keselamatan yang otomatik yang boleh di gunakan untuk mengurangkan kemalangan
di tapak bina. Untuk mencapai tujuan kajian ini, kekerapan dan keseriusan risiko
pembinaan di kumpulkan melalui kaji selidik ke atas 300 pengurus projek, pegawai
keselamatan pekerjaan dan pakar keselamatan pekerjan. Data-data kemudiannya
dianalisis menggunakan kaedah Analisis Kekerapan , Analisis Indeks Purata dan
Matrik Risiko. Hasil kajian menunjukkan risiko yang paling tinggi di tapak bina
adalah sikap kurang mengambil berat, kurang kesadaran dan kurang pengetahuan
tentang peraturan keselamatan. Prototaip yang di hasilkan dapat menyenaraikan
aktiviti projek dari jadual Microsoft Project dan menyenaraikan risiko yang
berkaitan. Hasil penilaian prototaip ini menunjukan ianya satu yang inovatif, cekap
dan dapat membantu pengurus projek meningkatkan keselamatan di tapak bina.
vii
TABLE OF CONTENTS
CHAPTER TITLE PAGE
DECLARATION ii
DEDICATION iii
ACKNOWLEDGEMENT iv
ABTRACT v
ABSTRAK vi
TABLE OF CONTENTS vii
LIST OF TABLES xi
LIST OF FIGURES xii
LIST OF ABBREVIATIONS xiv
LIST OF APPENDICES xv
1 INTRODUCTION 1
1.1 Background of the study 1
1.2 Statement of the Problem 2
1.3 Aim and Objectives of the Study 3
1.4 Scope of the Study 3
1.5 Methodology 4
1.5.1 Selecting Specific Research 6
1.5.2 Literature Review 6
1.5.3 Determining the Research Methods 6
1.5.3.1 Input Stage 6
1.5.3.2 Design Stage 7
1.5.3.3 Evaluation Stage 7
1.5.3.4 Output Stage 7
1.5.3.5 Cognitive Work Analysis 7
1.5.3.6 Discussion and Conclusion 7
2 LITERATURE REVIEW 8
2.1 Background 8
viii
2.2 Definition of Hazard and Risk 9
2.3 Theories of Accident Causation 10
2.3.1 Domino Theory 10
2.3.2 Epidemiological Theory 11
2.4 Critical Causes of Accidents on Construction Sites 12
2.5 Factors Affecting Safety Performance 15
2.6 Managing Safety on Construction Sites 16
2.7 The Importance of Safety Planning at the Design
Stage
17
2.8 Summary of Previous Works 18
3 RESEARCH METHODOLOGY 21
3.1 Introduction 21
3.2 Research Process 21
3.2.1 Conceptualization 22
3.2.2 Literature Review 22
3.2.3 Data Gathering 23
3.2.3.1 Step 1: Literature Review 24
3.2.3.2 Step 2: Questionnaire 24
3.2.3.3 Step 3: Semi-Structured Interview 25
3.2.4 Data Analysis 26
3.2.4.1 Risk Assessment Analysis 27
3.2.4.2 Risk Calculation Method 29
3.2.5 Prototype Design 30
3.2.6 Review and Conclusion 31
4 COGNITIVE WORK ANALYSIS 32
4.1 Introduction 32
4.2 Cognitive Work Analysis Background 32
4.3 Cognitive Work Analysis Methods 33
4.4 Framework for Conducting CWA 34
4.4.1 Phase 1 – Work Domain Analysis 34
4.4.2 Phase 2 – Control Task Analysis 38
4.4.3 Phase 3 – Strategies Analysis (StrA) 40
ix
4.4.4 Phase 4 – Social Organization and
Cooperation Analysis
40
4.4.5 Phase 5 – Worker Competencies Analysis
(WCA)
40
4.5 CWA And Construction 41
4.6 Methodology 42
4.7 Results 43
4.7.1 Work Domain Analysis 43
4.7.2 Control Task Analysis 46
4.7.3 Strategies Analysis 48
4.7.4 Social Organization and Cooperation
Analysis
50
4.7.5 Competencies Analysis 52
5 ANALYSIS AND RESULTS 54
5.1 Introduction 54
5.2 Respondents Profile 54
5.3 Analysis and Result 57
5.4 Safety Risk Assessment 57
5.5 Linking hazards to activity 61
5.6 Evaluation 67
6 AUTOMATED SAFETY PLANNING 69
6.1 Principles 69
6.2 Input 70
6.3 Prototype Process 72
6.4 Output 73
6.5 Model Performance and On-Site Experiment 74
7 CONCLUSION AND RECOMMENDATIONS 77
7.1 Conclusion 77
7.1.1 Objective 1 77
7.1.2 Objective 2 78
x
7.1.3 Objective 3 78
7.1.4 Objective 4 79
7.1.5 Objective 5 79
7.2 Recommendations 80
REFERENCES 81
APPENDIX A 88
xi
LIST OF TABLES
TABLE NO. TITLE PAGE
2.1 Holistic Outline of the Critical Hazards and Causes of
Accidents on Construction Sites
14
3.1 Likert Scale Used to Determine the Level of Frequency
and Severity
25
3.2 Risk Matrix of Construction Hazards_ adopted from (Jeong
et al., 2010)
29
3.3 Comparison of Project Management Software Packages
used in Construction_ adopted from (Liberatore et al.,
2001)
30
4.1 The Phases of CWA and the Types of Boundaries or
Constraints_ adopted from (Naikar, 2005)
34
4.2 Descriptions of Levels of Abstraction_ adopted from
(Daniel, 2009)
35
4.3 Construction Safety and CWA Phases 41
4.4 Respondents’ Years of Experience 42
5.1 Respondents’ Years of Experience 56
5.2 Average Number of Employee in Respondents’
Organization or Firm
56
5.3 Average Number of Employee in Respondents’
Organization or Firm
56
5.4 Evaluation of Risks related to Causes of Construction
Accidents
59
5.5 Earthwork and related Hazards on Construction Site 62
5.6 Concreting and related Hazards on Construction Site 63
5.7 Reinforcing and related Hazards on Construction Site 64
5.8 Masonry and related Hazards on Construction Site 65
5.9 Form working and related Hazards on Construction Site 66
xii
LIST OF FIGURE
FIGURE NO. TITLE PAGE
1.1 System Development Life Cycle_ adopted from:
(Gaudsmith, 2011)
4
1.2 Methodology of the Research 5
2.1 Number and Rate of Fatal Injury to Workers 1999-2009_
adopted from (HSE, 2010)
9
2.2 An Accident is Caused by the Action of Preceding
Factors_ adopted from (Heinrich, 1950)
10
2.3 The Removal of the Central Factor Makes the Action of
Preceding Factor Ineffective_ adopted from (Heinrich,
1950)
11
2.4 The Model of Epidemiological Theory of Accident
Causation_ adopted from (Mausner and Bahn, 1974)
12
2.5 Time/Safety in Xuence Curve_ adopted from (Szymberski,
1997)
18
2.6 Overview of the Sources and Goals of Safety 19
2.7 Detection Zones_ adopted from (Lee et al., 2009) 20
3.1 Research Design and Procedure (simplified from
Figure1.2)
22
3.2 Data Collection Procedure 23
3.3 Risk-Based Technology Methods 27
3.4 Safety Impact Assessment Procedures 28
4.1 Means-ends links_ adopted from (Daniel, 2009) 37
4.2 Decision-ladder showing leaps and shunts_ adopted from
(Daniel, 2009)
39
4.3 Abstraction Hierarchy 45
4.4 Control Task Analysis 47
4.5 Strategic Analysis 49
4.6 Social Organization and Cooperation Analysis 51
4.7 Competencies Analysis 53
xiii
5.1 Achieved Responses from Different Countries 55
6.1 Schematic Model of the Safety-Planning prototype 71
6.2 Algorithm of the Safety-Planning prototype 73
6.3 Prototype Interface in MS Project 75
6.4 Automatic Mode 75
6.5 Manual Mode 76
xiv
LIST OF ABBREVIATIONS
HSE - Health and Safety Executive
CCOHS - Canadian Centre for Occupational Health and Safety
SPSS - Statistical Package for Social Science
RBTs - Risk-Based Technologies
PM - Project Management
MS - Microsoft Project
VBA - Visual Basic for Application®
CWA - Cognitive Work Analysis
WDA - Work Domain Analysis
AH - Abstraction Hierarchy
ConTA - Control Task Analysis
DL - Decision Ladder
STRA - Strategies Analysis
SOCA - Social Organization and Cooperation Analysis
WCA - Worker Competencies Analysis
SRK - Skill, Rule, and Knowledge
SBB - Skill-Based Behavior
RBB - Rule-Based Behavior
KBB - Knowledge-Based Behavior
FOC - Frequency of Occurring
SD - Standards Deviation
SEV - Severity of the effects of accident or consequences
xv
TABLE OF APPENDICES
APPENDIX TITLE PAGE
A Questionnaire on Identifying the Frequency and
Severity of safety Hazards on Construction sites
88
1
CHAPTER 1
INTRODUCTION
1.1 Background of the Study
Construction is often the largest source of employment in any country (Bust
et al., 2008). It has been well documented that a large number of accidents have been
recorded in this industry (Bust et al., 2008; Camino et al., 2008; Gregory and Simon,
2006a; Wang et al., 2006). In modern society, the construction industry has been
defined as a dangerous industry (Liao and Perng, 2008; Niza et al., 2008). In Korea,
the construction industry accounted for less than 10% of gross domestic product in
2007, while its occupational fatalities accounted for 20% of total fatalities (Kim et
al., 2010). In Taiwan, occupational fatalities accounted for 0.29 deaths per thousand
construction employees in 2005, which was a much higher than fatality rate than that
of all other industries (Cheng et al., 2010). In Hong Kong, the construction accident
rate was approximately 68.1 per 1000 workers, which is high compared to other
industries (Ling et al., 2008).
The first essential step to mitigate construction accidents and manage safety
is safety planning, which consists of identifying all probable hazards and safety
measures. As such, this safety planning should be executed before conducting each
construction activity in order to identify required safety measures. It is possible to
improve safety planning into safety risk management by determining safety hazards,
2
classifying risks, controlling the risks and monitoring implementation (Chantawit et
al., 2005).
It is critical to identify hazards that threaten workers (Yi and Langford,
2006). One of the most critical factors in serious and mortal accidents is a lack of
understanding about risk and hazards on a construction site (Dejus, 2007a). While
risks cannot be removed entirely, they should be effectively identified and assessed
(Smith, 1999). In order to manage and control construction hazards, consideration
should be given to the prevention of hazardous events and efforts to limit the severity
of occurred hazards (Gregory and Simon, 2006a).
1.2 Statement of the Problem
Construction safety accidents have serious financial and humanitarian
impacts (Dorji et al., 2006) such as “wasted cost”, “reduced productivity”, “declining
company reputation”, and a “negative psychological impact on workers” (Mohamed,
1999; Tam et al., 2004). Meanwhile, excessive or unnecessary safety measures in
order to mitigate construction safety accidents may also result in both delays in
schedule and costs overruns (Yi and Langford, 2006).
Poor safety management is considered one cause of construction accidents.
The construction manager, as a key project member, should know the most
hazardous and risky conditions to mitigate accidents, optimize cost and time, and
promote quality of production (Chantawit et al., 2005). Management needs a reliable
database to provide comprehensive safety measures and hazards. Such a system will
enable managers to be aware of real-time hazards and risks in order to promote safe
performance on their construction sites. However, there unfortunately is no pattern
for construction managers to follow to ensure safety on projects (Dejus, 2007a).
3
1.3 Aim and Objectives of the Study
The aim of this study is to propose a prototype for automated safety planning
to mitigate occurrence of accidents in the construction industry. To achieve this aim,
the following objectives have been identified:
i. To investigate the frequency and severity of construction safety
hazards;
ii. To determine risks of construction safety hazards;
iii. To establish a relationship between safety hazards and common
construction activities;
iv. To investigate the application of cognitive work analysis in
construction safety domain; and
v. To develop a prototype for automated safety planning in construction
projects.
1.4 Scope of the Study
To achieve the objectives of this study, the following scopes of work are
considered:
i. This study considers five common construction activities related to Malaysian
residential buildings;
ii. This study is limited to the design stage of the system development life cycle,
namely prototyping and feedback.
iii. The system development life cycle is the process of developing information
systems through investigation, analysis, design, testing, implementation, and
maintenance (Bosworth and Kabay, 2002). This study is limited to investigate
first stage which includes gathering required information and data, and also
4
design stage which contains flowcharting, prototyping, and also customer
acceptance (see Figure 1.1).
Figure 1.1 System Development Life Cycle_ adopted from: (Gaudsmith, 2011)
1.5 Methodology
To fulfill the research aims and objectives, the following procedures and
methods will be employed (see Figure 1.2):
6
1.5.1 Selecting Specific Research
The selection of topics was accomplished by investigating recent research
trends and also through discussions and interviews with members of the construction
industry. The findings of this stage were used to establish a new research direction,
and ensure that the results of the research area would help improve construction
safety.
1.5.2 Literature Review
Literature reviews were carried out to acquire the principal knowledge of the
research topic. The sources involved in the literature reviews were published books,
journals, and conference papers.
1.5.3 Determining the Research Methods
The research methods were determined by the constraints of a tight schedule,
availability information on the research topic, efficiency of programming, and the
time required for collection of data for analysis.
The initial work made the research objectives attainable. The following
methods of investigating the problems are discussed in more detail.
1.5.3.1 Input Stage
The formation of the components of the construction objectives were defined
after questionnaires, interviews, and discussions with workers, then the relationships
between the elements were generated.
7
1.5.3.2 Design Stage
The main function of the design stage is the automation of safety on a
construction site.
1.5.3.3 Evaluation Stage
In the evaluation and selection stage, the prototyped application was assessed.
1.5.3.4 Output Stage
The final automated prototype was generated.
1.5.4 Cognitive Work Analysis
This section of the research process was explained in chapter 4.
1.5.5 Discussion and Conclusion
The analysis of the results was proof of the feasibility and efficiency of the
proposed program.