OverviewThirty three (34) years of  project management which includes :• Contracting and engineering design • Construction and installation,• Pre-commissioning, commissioning • Safety HSE management • I & E management

• 29 years of which were in the oil, gas and shipping industry and EPC projects that include the following:  QHSSE management, conceptual, feasibility and risk and safety assessment studies, FEED and detailed safety and process control design engineering, procurement, planning, organizing, QA /QC, construction, offshore installation, modification, upgrades, pre-commissioning, start-up and commissioning, drilling operations coordination.

• Experienced production operator and maintenance of international projects and gas plant operations for onshore & offshore oil and gas facilities. Said facilities cover FPSO, gas plant, terminal, oil refinery, petrochemical and oil gathering station operations, and offshore topsides with accommodation platforms.

Page 3: Psm Cv Presentation Aug 16, 2012

Overview Continued

• Led and organized a team of people of various nationalities, including multi-discipline engineers (mech., piping, elec., civil, structural, instr. and process), who worked on different projects in FEED, detailed design, contract administration, construction and commissioning activities; assured the flow and completion of work schedule in these projects; monitored expenditures, organizational targets, delivery schedules; and ensured that such projects were implemented with strict compliance for safety, quality and environment  standards.

• Lecturer/ Trainer /Resource Speaker/ facilitator for international and local events, conferences and workshops for oil and gas topics including EPCM project management, FPSO and Floating LNG risk assessment, HAZID/HAZOP studies, instrumentation and electrical control, I&E safety, project controls, safety systems, leadership and QC management training.

Page 4: Psm Cv Presentation Aug 16, 2012

PositionSenior Project Engineer/ HSSE/ I&E /Commissioning

Engineer

Special Skills:

My personal attributes includes the following:

Excellent interpersonal skills, team-building and communication skills coupled with pragmatism/ flexibility to build good relationship with clients and people of different cultures and discipline; have a sense of urgency; goal and task oriented; posses leadership, initiative and strong motivation; very resourceful, high moral values and dedication to the work and to the project in particular .. Proactive and common sense approach to decision making and time management. Always organized, able to take the lead in tough situations, sensitive to the needs of others, and doing the best quality and safety to deliver multi-tasks on time within the budget.

Page 5: Psm Cv Presentation Aug 16, 2012

Contact InformationHome Address:

14 Kalantiao St.,  Novaliches, Caloocan City, PhilippinesHome Tel./ Fax No. +632 753 8227/+6327538227

CP +63 921 485 0490 Angola HP tel no. +244 919 158 468

E mail: [email protected] or [email protected], website: http://ph.linkedin.com/in/patrickmuga skypeID: psmuga9

Page 6: Psm Cv Presentation Aug 16, 2012

Projects Successfully Completed• Saudi Arabia : Maintenance, construction and commissioning in Aramco and

SCECO modification projects. Secured several contracts from Aramco.• Libya; Zueitina Oil Company- Zella and Fidda facilities- Natural Gas Plant Projects.• Malaysia; PETRONAS / Conoco-Phillips-West Natuna-Duyong gas tie-in Project,

Exxon Mobil Nigeria - YOHO Topsides Project and EPMI Larut A Topsides project(800 million Dollar project), Shell SSB & SSPC Technical Integrity IR Project (350 Million USD project)

• Singapore; Shell Malampaya oil and gas production topsides Project (Upstream cost 2 billion USD)

• Myanmar; Premier  Oil ,Yetagun Topsides -Oil and Gas Production Platform Project.• Indonesia; Conoco- Phillips – Wellhead Platform and FPSO Belanak Project.• Vietnam; JVPC (Japan Vietnam Petroleum Corp.) Topsides Oil and gas platform

Randong I Project. • Azerbaijan; AIOC, BP (British Petroleum), Central and West Azeri Topsides and

drilling offshore platform Project. • China;  Bayer Polymers Petrochemical Facilities INFRA II Project (polycarbonate &

polyurethane production). • Angola: Chevron onshore Malongo terminal facilities Kerosene Tank  Project, Esso

FPSO (Kiz A and B) offshore multi-discipline brown field maintenance support projects, Sonangol SNLPP Block 3 offshore Fire and Gas system upgrade, and PAC F4 /F1 Infill project, Chevron Block 14 BBLT offshore flotation water  treatment project, and Sonangol Refinaria De Luanda onshore Refinery Boiler Upgrades Project.

• Philippines: NIDO Petroleum Oil production facility (AQ Vantage Rig Tindalo 1 offshore facility)

Page 7: Psm Cv Presentation Aug 16, 2012

Career Summary and Capabilities: Project and Contract Management:Fifteen (15) years managing, facilitating, coordinating and assisting project team and contract administration for brown field and capital projects. Monitor and evaluate subcontract administrators on

the following : • Prepare and review technical bid specifications and proposals, CTR’s, vendor data, resources,

and liaise with clients, designers, PMT, vendors and subcontractors.• Budget control, Close-out of Subcontractor commercial issues.• Identify back charges and ensure notification to affected parties.• Identification of insurance claims. Issue of Field or Site Instructions. • Input to management of change, schedule change, and progress evaluations.• Ensure full understanding, implementation and full compliance with prevailing company and

country pertinent rules and regulations.• Provide weekly status on contractual issues to senior management, and recommend innovation

to improve operation and minimize cost without compromising safety, productivity and environmental standards.

• Management of Change reviewer/originator and owner for related I & E and multi-discipline offshore production platforms and FPSO projects. 

• Coordinate capital shut-ins related to projects, Health, Environment and Safety, Maintain communication with Asset Development engineers and other FE on activities, 

• Evaluate and Prepare for Drilling Rigs (Primary owners are the Support Engineers, and as assigned to Project Engineers) – support well hookup efforts, Support development and maintenance of project queue for annual budget planning. 

• Manage offshore field crews and construction representatives coordination.• Support Asset Development Plan updates, Evaluate opportunities for the capitalization of work• Work directly with field engineers, operations personnel to fully frame opportunity and scope

projects

Page 8: Psm Cv Presentation Aug 16, 2012

Career Summary and Capabilities continued:

Project safety, pre-commissioning and Commissioning:

Management/Supervision of up to 300 multi-discipline / multi-cultural Engineers and Technicians with experience on construction, pre-commissioning and commissioning of instrumentation and control systems, including supervision of engineers; safety management, mechanical alignments, motor and transformer tests, hydro testing, leak testing, pigging, cleaning, flushing, blowing, flooding, re-instatement, preservation, vendor equipment, start-up and testing, etc., QA/QC, procedure development, operations supervision, maintenance coordination, punch listing for pipe specifications, equipment and vessel completion, drawings, operator training.

Commissioning/HSE Management experience includes the following:

• Preparing monthly/weekly reports and continuous progress monitoring of projects;• Interaction and coordination amongst various stakeholders, managers, clients, contractors, third

party consultants and government agencies;• Conduct frequent site visits to monitor method of execution, safety and progress of project

works as well as decision-making and authority that includes contracting issues, safety, quality assurance, management of change, and schedule. Familiar with ExxonMobil, PETRONAS, Total, Chevron and Shell project process roadmap for value assurance and governance.

• Develop plans for safety talks, tool box talks and development of site HSE Procedure and guideline, and Communicate HSE policies, guidelines and standards to all staff through presentation.

• Prepare and supervise pre-commissioning and commissioning procedures.

Page 9: Psm Cv Presentation Aug 16, 2012

Career Summary and Capabilities continued: Instrumentation and electrical Design and HSE Engineering Mentor

• Manage, prepare and ensure specifications and design basis for instrument and control systems applicable codes and standards

• Supervise Contractors to validate integrated control and safety system architecture and design, ensuring that it meets legislation, codes standards and client requirements.

• Ensure instrumentation and data communications system specifications and technical requisitions correctly define client requirements to meet project design objectives for control performance and reliability and that test inspection and other requirements are appropriately defined.

• Complete instrument and control design work and deliverables in accordance with schedule and budget. - Ensure design interfaces are correctly managed with other disciplines in the Project Management Team

• Supervise /coach junior engineers including development of National staff . Participate in safety and risk studies including HAZID, and HAZOP.

• Provided lecture and training pertaining to safety, risk assessment, instrumentation, project management to local engineers and technicians for 25 years.

Page 10: Psm Cv Presentation Aug 16, 2012

Achievements:• Received certificate of Appreciation from Top link Event organizers(JB Malaysia) for the successful

presentation of “Measuring, monitoring and improving project performance” as a guest speaker for the Successful Project Management conference held at Corus Hotel KL Malaysia, Sept.27,2010

• Received certificate of Appreciation from Red Carpet Events Pte Ltd.(Singapore) for the successful presentation as a guest speaker for the World round Shape FPSO Platform for Offshore Oil and Gas Conference 2010 (22 April 2010). Topics presented was Risk Assessment and Hazop on an FPSO, and Reducing Hazards and Operability problems.

• Received commendation from MCCI Azerbaijan Piping superintendents for delivering on time more than 700 hydro test packages (as Hydro test mechanical completions supervisor/coordinator)

• Received commendation Petronas CARIGALI HUC, Operations and SARKU management for the successful first gas project completion held last August 8, 2002 (West Natuna- Duyong gas Tie- in Project) witnessed by both Indonesia and Malaysia Head of state . A fast tract project completed on time , with simultaneous production and construction activities.

• Received certificate of Appreciation from Malaysian Shipyard Engineering (MSE) and Esso Production Malaysia Inc. (EPMI)- Larut-A CPP) Project Management, acknowledging the contribution for the participation, dedication and tireless efforts (as Lead commissioning engineer) in achieving high standards of quality and promoting the maintenance of safety throughout the project execution up to the successful scheduled load-out. Completed 81% onshore pre-commissioning and commissioning of the Topsides Platform. One of the most satisfying aspects of the Larut development is that it was the safest project in ExxonMobil’s history in Malaysia. Over 4.6 million work hours were completed over a four year period without a single employee or contractor Lost Time Injury.

• Received commendation for preparing technical proposals which includes preparation and implementation of Almutawa Company Policy, maintenance standard manual, safety and Loss prevention Manual, QC manual, and securing several awarded contracts from Aramco and Sceco for oil & gas refinery maintenance; during the three years as senior E&I, safety & contracts engineer.

• Philippine Asst. Electrical Engineering. Board exam. result released 1984 with 82.4 % board rating.

Page 11: Psm Cv Presentation Aug 16, 2012

Educational Attainment:

College Degree : BS Electrical Engineering. Cebu Institute of Technology University, 1979  Graduate.                          : BS Electronics and Comm. Eng'g, Cebu Institute of Technology University, 1988                             Graduate                          : Masters in Eng’g CIT, 1983 , (undergraduate)

Professional Licensure : Registered Electrical Engineer. Philippine Registration No. 0025580

• Past Member IEEE ( Institute of Electrical and Electronic Engrs.) member no. 3963485 • Professional Drivers license - Philippines, Malaysia, Indonesia and Libya • Holder of Petronas Malaysia Offshore safety passport• Member-Consultant, Society of Industry Leaders • ISNetworld ID No. 01541922• Member LinkedIn: http://ph.linkedin.com/in/patrickmuga• Instrumentation, Automation, and Electrical Systems Network

Page 12: Psm Cv Presentation Aug 16, 2012

CABGOC Angola Training:

•   Alarm Management and Active factory, CABGOC Malongo, 13 Aug,2012—Subsea Module 1 to 5,  11 Aug 2012—Contractor HES Management, 30 July 2012—5Y Incident Investigation Course, CABGOC,16 July 2012—OE Certification: Leadership Roles and Behavior, CABGOC Malongo 20June 2012—MOC for Facilities and Operations Workshop (ETC) 14 June 2012—HES Risk Management-Integrated Risk Prioritization Matrix, 9 June 2012—FE Process  Safety Training 12 June 2012—Process Safety Management 12 June 2012—Wellnomics  Assessment Reference Point Completion 26 May 2012—RU 214 Reliability for Leaders (ETC) 3 May 2012—CSOC Behavioral Survey 1May 2012—RU 222 Asset Integrity Management for  operations, maintenance and Inspection, 29 Dec.2012—SIS 101 Safety Instrumented System, 19 Dec 2011—Managing Process safety in OE 11 Dec 2012—Offshore Water Injection Quality and Facilities Overview, 5 Nov 2011—Management of Change Training 10 Nov, 2012—Abz Environmental Management Mod 1, 28 Oct 2011—Petroleum Geology and Exploration Process, 27 Oct 2011—Drilling and Well Completions , 26 Oct 2011—CSOC Certification Module 0, 25 Oct. 2011

• CPDEP Concepts; Module 1, 18 Oct 2011 

Page 13: Psm Cv Presentation Aug 16, 2012

Training-continued:•   Electrical Safe Work Practice, Chevron (SOP 43) and defensive driving,  Angola, August 1- 3, 2011•   H2S training, Business Conduct Code Ethics Code, CABGOC Cabinda Angola, 19 July 2011•   Essentials for Enterp. Excellence, Safe Start,  Weatherford Office Makati, Philippines, 27 Oct, 2010•   BOSIET, HUET and H2S  Training, CTSI  Philippines, (OPITO accredited) Oct 20 to Oct.22. 2010•   Successful Project Mang't. in Energy, Power and Utilities Industry,  Malaysia, 27.Sept-30Sept 2010•   Project Management on line Training, PRW Malaysia  Jan. 2010•   Fire and Gas systems mapping and survey SSB,Lutong Malaysia Oct, 2009•   Contracts administration and Management, Ranhill Worley, Malaysia Sept.17, 2009.•   Offshore Oil and Gas HSE Training, ( HSEMS OHSAS 18001) Philip. Mar 30 to April 3, 2009•  Safety training : LNG safety, pigging , PTW, H2S, Risk assessment, Habitat & accident investigation•  H2S Training, Boat transfer compliance, Swing rope compliance, Chevron, Angola  14 Nov.2007•  HUET and sea survival training, Sonangol training center, Luanda Angola, Jan 2007.•  INTOOLS Basic operations training,  Bayer Integrated site, Shanghai  China, Nov-27, 2005•  Primavera P3 (Computer aided Construction Project management) Manila, 14 Feb,2005•  Construction  Project  Mg't  (Planning,  organizing,  Sched. and control) 21 Feb.,01•  AutoCAD  14  Computer Operations, Visual basic IT Power Module•  Programmable Logic Controllers (PLC) Allen Bradley 5/15, Zueitina Oil Co. Libya 1996•  Electrical Energy Efficiency, U.P. ( University of the Philippines) Q.C.July, 1994•   Maintenance  Management  Course,  Counseling U.P.  Feb.  1989,  •   Security Systems, SENELCO,  Madrid Spain, April 1986