PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato 1 LIU - PSB Ho-H- Injection Meeting

Upload: chavez

Post on 23-Feb-2016

45 views

Category:

Documents


0 download

DESCRIPTION

PSB H 0 -H - Injection: Sectorisation Analysis. C.Pasquino, J. Hansen, P.Chiggiato. Why re-sectorising this sector?. At the moment the sector valves are foreseen to be positioned right before and right after the stripping foils;. Foil. A different sectorisation would allow: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 1

PSB H0-H- Injection: Sectorisation Analysis

C.Pasquino, J. Hansen, P.Chiggiato

Page 2: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 2

Why re-sectorising this sector?At the moment the sector valves are foreseen to be positioned right before and right after the stripping foils; A different sectorisation would allow:

- Less radiation for TE/VSC during pumping and leak detection.

- More space for installation of stripping foils.

- Positioning of the sector valves away from a radioactive area;

- Less problems to find space for pumping and venting.

- A bigger sector might help in controlling the initial phase of the pump down and venting, preventing a sudden rupture of the graphite foils (experimental test are ongoing…)

Foil

Dump

Page 3: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 3

Several Case Study (1)Option1

Option2

Option3

1. Reference case study, always for 1 ring.

2. Sector valve at the third manifold to the left of the injection zone and after the stripping foil.

3. Sector valve at the third manifold to the left of the injection and at the third to the right.

= Sector Valve

Page 4: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 4

Several Case Study (2)

Option 4

Option 5

4. Sector valve at the first manifold to the left of the injection and after the dump. With double SIPs between BSW 1&2.

5. Sector valve at the first manifold to the left and at the first manifold on the right, With double SIPs between 1&2 and 3&4.

The pump down curve for all the options has been studied: for case 1 , 4 and 5, the pressure profile along the beam pipe will be presented as well.

Page 5: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 5

Pump down studies: option 1The pump down of a sector is divided in two stages:1. A fix TMP group takes care of

the pump down from atmospheric pressure down to 1*10-6 mbar;

2. At 1*10-6 mbar the sputter ion pump are flashed and switched on.

The time from atmospheric pressure to 1*10-3 mbar is not included and it will depend on the experimental results from the stripping foils test (ongoing).If we consider that at 1*10-7 mbar a first low intensity beam can be sent 5 to 6 hours after the end of the intervention including the leak detections.

0 2 4 6 8 1010-8

10-7

10-6

10-5

10-4

10-3

P (m

bar)

t (h)

Stripping foil Sector

SIP ON

TMP ON

SIP Connections

TMP &

Page 6: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 6

Pump down studies: option 2

TMP gate

SIP SIP SIP

Option 2

0 2 4 6 8 1010-8

10-7

10-6

10-5

10-4

10-3

Option 1

P (m

bar)

t (h)

Option 2

The intervention time is about 2 hours more than option 1.

Page 7: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 7

Pump down studies: option 3

TMP gate

SIP SIP SIP

Option 2

0 2 4 6 8 1010-8

10-7

10-6

10-5

10-4

10-3

Option 1

P (m

bar)

t (h)

Option 3SIP SIP

Option 3

The intervention time is the same as option 2.

Page 8: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 8

Pump down studies: option 4

TMP gate

2X SIP

Option 2

0 2 4 6 8 1010-8

10-7

10-6

10-5

10-4

10-3

Option 1

P (m

bar)

t (h)

Option 4

Option 3

Option 4 The intervention time is the same as option 2.

Page 9: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 9

Pump down studies: option 5

TMP gate

SIP

Option 2

0 2 4 6 8 1010-8

10-7

10-6

10-5

10-4

10-3

Option 1

P (m

bar)

t (h)

Option 5

Option 3

SIP

The intervention time is about 30

minutes more than option 1.

Option 4 Option 5

2X 2X

Page 10: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 10

Pressure Profile studies : Option 1

The pressure profiles have been studied for these

options after pump down with sector

valves open.

SIP SIP SIP SIP SIPSIP SIP

Position (m)

Read Pressure Point

0

0 2 4 6 8 10 12 14 16 18 20 2210-10

10-9

10-8

P (m

bar)

Position (m)

24 h 100 h -RT 100 h-50C (transient) 100 h -50C (steady state) 1000 h -50C (steady state)

Pressure distribution - Sector Valves as option 1

Page 11: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 11

Pressure Profile studies : Option 4

The pressure profiles have been studied for these

options after pump down with sector

valves open, considering the

displacement of 1 of the SIP upstream.

SIP SIP SIP2XSIP SIP

SIP SIP

Position (m)

Read Pressure Point

0

0 2 4 6 8 10 12 14 16 18 20 2210-10

10-9

10-8

P (m

bar)

Position (m)

24 h 100 h -RT 100 h-50C (transient) 100 h -50C (steady state) 1000 h -50C (steady state)

Option 4

Page 12: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 12

Pressure Profile studies : Option 5

SIP SIP SIP SIP SIPSIP SIP

Position (m)

Read Pressure Point

0

0 2 4 6 8 10 12 14 16 18 20 2210-10

10-9

10-8

P (m

bar)

Position (m)

24 h 100 h -RT 100 h-50C (transient) 100 h -50C (steady state) 1000 h -50C (steady state)

Pressure distribution - Sector Valves as option 5 - doubling SIP

The sputter ion pumps must be displaced where the sector

valves are: there is space to install a

further pump upstream, but no

space for replacing the downstream one.

Page 13: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 13

Pressure Profile studies : Option 1, 4 and 5, comparisons

Position (m)

Read Pressure Point

0

No sublimators taken into account!!

0 2 4 6 8 10 12 14 16 18 20 2210-10

10-9

10-8

P (m

bar)

Position (m)

Option 1 Option 4 Option 5 *2

100 h of pumpdown - 50 C - steady state

Page 14: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 14

Intervention probability• Option 1: high risk for the foil integrity and foil mechanical

assembly, high risk for MTV mechanical assembly (high intervention dose).

• Option 3 and 5: same as option 1, more stainless steel surface and dumps and we lose the dump conditioning every time the system is vented to air equal longer time to achieve nominal beam. (less personal dose for pumping and leak detection).

• Option 2 and 4: same as for option 1. More stainless steel surface, but not critical. More space in injector zone (less personal dose for pumping and leak detection) and no loss of the dump conditioning.

Page 15: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 15

Conclusions

• The displacement of these sector valves would allow for a safer intervention scenarios.

• It would create a bigger vacuum sectors, which might improve the initial phase of the venting and pumping of the stripping foil mechanism.

• Option 5 allows for doubling the SIP connected on both sides of the stripping foil mechanism, we can maintain the same level of vacuum in the stripping foil, but higher pressure down stream. The dump region will be vented at each intervention and there is a risk it will take longer before we can inject nominal beam.

• Option 4 gives a longer intervention time, but the dump would be protected from venting so shorter time to go to nominal beam and we will accumulate less personal dose.

Page 16: PSB H 0 -H -  Injection: Sectorisation Analysis

LIU - PSB Ho-H- Injection Meeting 16

Stripping foil venting – pumpdown testbench

- Injection during pumpdown to slow down the descent in pressure in its initial phase;

- Injection at known different fluxes, checking the foil integrity;

Flowmeter (venting phase)

Injection(Pumpdown phase)

Thanks to Remy et Yves for assembling the foils!!