psb dump replacement: strategy & status
DESCRIPTION
LIU-PSB. PSB dump Replacement: strategy & status. LIU-PSB Meeting 90 A. Sarri ó, F. Loprete, A. Perillo-Marcone 22 th November 2012. Pump BT-VPI23A. BT-BHZ 10. Pump BT-VPI23A. passage. EQUIPMENT TO BE DISMANTLED. DUMP. BTM-BHZ 10. BT-BHZ 10. BTM-BHZ 10. BTY-BVT 101. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/1.jpg)
PSB DUMP REPLACEMENT: STRATEGY & STATUS
LIU-PSB Meeting 90A. Sarrió, F. Loprete, A. Perillo-Marcone
22th November 2012
LIU-PSB
![Page 2: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/2.jpg)
Pump BT-VPI23A
Pump BT-VPI23A
passage
BT-BHZ 10
![Page 3: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/3.jpg)
BT-BHZ 10BTM-
BHZ 10 BTM-BHZ 10BTY-BVT
101
EQUIPMENT TO BE DISMANTLED DUMP
![Page 4: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/4.jpg)
EQUIPMENT TO BE DISMANTLED
Elements to be disposed of and replacedEquipment to be temporarily dismantled
![Page 5: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/5.jpg)
STRATEGY: STEPS
‘Plug’ against
radiation
![Page 6: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/6.jpg)
STRATEGY: STEPS
Blocking system
‘Plug’ against
radiation
Clamping tool
![Page 7: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/7.jpg)
Clamping system to pull the old beam pipe + dump core
![Page 8: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/8.jpg)
STRATEGY: STEPS
Saw Container dump
Container beam pipe
Frame and adjustable support for
winch
Blocking system
‘Plug’ against
radiation
Clamping tool
![Page 9: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/9.jpg)
System to cut the beam pipe
![Page 10: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/10.jpg)
System to pull the beam pipe-dump core assembly: winch
![Page 11: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/11.jpg)
The necessary equipment will be brought through the shaft by crane Length: 2.6m to 2.9m
Width: 1.5mSWL PR: 10t
![Page 12: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/12.jpg)
BACK-UP
![Page 13: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/13.jpg)
Most outer shielding block must be blocked
![Page 14: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/14.jpg)
Shielded container for dump core
![Page 15: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/15.jpg)
Lifting support
![Page 16: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/16.jpg)
Adjustable height table
![Page 17: PSB dump Replacement: strategy & status](https://reader035.vdocuments.us/reader035/viewer/2022062315/56815ed2550346895dcd6589/html5/thumbnails/17.jpg)