providence intermodal transportation center

30
PROVIDENCE INTERMODAL TRANSPORTATION CENTER "THE HUB" FALL 2018

Upload: others

Post on 30-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

PROVIDENCE INTERMODAL TRANSPORTATION CENTER

"THE HUB"

FALL 2018

Page 2: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

5

Digital Site Tour – Current View

Train Station

State House

Page 3: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

6

Gaspee St

State Boiler House

State House Parking

Digital Site Tour – Road Improvements

Page 4: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

8

Digital Site Tour – State Parcels

Gaspee North

Parcel

State Parcels

Page 5: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

10

Project Site

PITC Conceptual Plan

Train Station

State House

Page 6: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 7: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

Key Design Drivers • Restore State House Lawn• Maintain historic sightlines for State House• Elevation of Amtrak Plaza and pedestrian access• Passenger Experience• Future flexibility for RIPTA• Aesthetic and functional transit hub to spur adjacent

investment

Page 8: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

Examples

Page 9: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 10: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 11: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 12: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

Confidential and proprietary information.

Page 13: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 14: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

4 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

1” = 200’

OVERVIEW SITE PLAN: CONCOURSE LEVEL

2

1

3

4

5

9

10 8

LEGEND

1 Exchange Street Ext. / PITC South Ramp

2 Amtrak Platform

3 PITC Passenger Hall

4 PITC Busway

5 PITC / State House Shared Boiler Plant

6 Amtrak Northeast Corridor

7 Planted buffer

8 Underground Parking Garage

9 PITC North Ramp

10 Rhode Island State House Sub-basement

6

7

Page 15: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

14 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

1” = 50’

TRANSVERSE SECTION

Gaspee Street (Relocated)

Restored State House Lawn

PITC Park

Passenger HallBuswayUnderground Parking Garage Busway Amtrak NortheastCorridor

Page 16: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

15 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

1” = 75’

LONGITUDINAL SECTION

PITC ParkNorth PedestrianEntrance Pavilion

State Street South Pedestrian Entrance with Connection to Amtrak

Passenger HallBusway Busway

Provideence Amtrak Station

Page 17: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

10 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

FLOOR PLAN: CONCOURSE LEVEL

1” = 75’

Public Circulation / Waiting

Leasable Retail

RIPTA

Intercity Carriers

PITC Operations & Building Services

LEGEND

1 Busway

2 Passenger Hall

3 RIPTA Customer Service Desk

4 RIPTA Waiting Area

5 Public Restrooms

6 Intercity Waiting Area

7 Intercity Ticketing

8 Security Desk

9 RIPTA Back of House Offices

10 Trash Room

11 Underground Parking Garage

12 PITC / State House Shared Boiler Plant

2

1

3

4

5

6

7

811

12

10

9

Page 18: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

11 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

1” = 75’

CIRCULATION DIAGRAM: CONCOURSE LEVEL

PASSENGER CIRCULATION

Passenger Entrance/Exit

Curbside Passenger Loading Zone

Climate-Controlled Public Circulation

Vertical Circulation

BUS CIRCULATION

North-bound Through Buses

South-bound Through Buses

North-bound Terminating Buses

South-bound Terminating Buses

BUS BERTHING

40’ City Bus

45’ Intercity Bus

Through Bus Berthing Zone

Future Berthing for 60’ Articulated Buses

Berth Used for Off-Hours Deliveries

Passenger Gate

LEGEND

1 South Ramp

2 Bus Maintenence Parking Space

3 Operations and Emergency Parking (15 spaces)

4 Emergency Egress Walkway

5 North Ramp

2

1

3

4

5

Page 19: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

13 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

PITC AXONOMETRIC

Page 20: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

12 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

SITE AXONOMETRIC

Page 21: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

6 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

OPEN SPACE PLAN

1” = 100’

LEGEND

1 Berm

2 Public Seating

3 Fountain

4 Planters

5 Paved Plaza

6 PITC South Pedestrian Entrance with Connection to Amtrak

7 Clerestory Window with Green Roof

8 Pedestrian and Cycle Paths

9 Planted Buffer at Level of PITC Passenger Hall

10 PITC North Pedestrian Entrance Pavilion

11 Paved Plaza

12 Underground Parking Garage

21

3

45

8

11

12

10

9

6

7

7

7

7

Page 22: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 23: PROVIDENCE INTERMODAL TRANSPORTATION CENTER
Page 24: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

9 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

FLOOR PLAN: GROUND LEVEL

1” = 75’

LEGEND

1 Public Seating

2 Amtrak Station Entrance (Existing)

3 Reconfiguration of Amtrak Station TBD

4 Combined PITC & Amtrak Entrance

5 Bicycle Parking

6 Pedestrian Access to PITC

7 PITC North Pedestrian Entrance

8 Bicycle Parking

9 Parking Garage Pedestrian Entrance

2

1

3

4

5

89

6

7

Page 25: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

1 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

1” = 200’

OVERVIEW SITE PLAN: CURRENT CONDITION

OVERVIEW SITE PLAN: AFTER INTERVENTION

SMITH STREETSMITH STREET

STA

TE S

T. (

RE

LOC

ATE

D)

STA

TE S

T.

GA

SP

EE

STR

EE

T (R

ELO

CA

TED

)

GA

SP

EE

STR

EE

T

FRA

NC

IS S

TRE

ET

FRA

NC

IS S

TRE

ET

EXC

HA

NG

E STR

EET

EXC

HA

NG

E STR

EET

Page 26: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

8 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

PROJECT DATA

1” = 150’

PITC Park117,130 SF

NewLandscaping 62,200 SF

Plaza31,300 SF

S. Entrance & Amtrak Connection6,670 SF

Berm15,560 SF

N. Entrance Pavillion4,700 SF

Garage32,300 SF

Retail1500 SF

Kiosk500 SF

RIPTA B.O.H.2,100 SF

N. Ramp Access12,250 SF

N. Ramp16,720 SF

S. Ramp14,460

Climate Controlled Passenger Hall58,600 SF

PITC (Including Passenger Hall)138,100 SF

Kiosk500 SF

Public Restrooms1000 SF

Security400 SF

Trash Room150 SF

Intercity Ticketing600 SF

Leasable Retail9000 SF

RIPTA Customer Service625 SF

Boiler Plant8050 SF

Page 27: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

16 PITC DRAFT RFP DRAWINGS - 4/27/18 WORKac

SITE AXONOMETRIC WITH PHASE 2 DEVELOPMENT

New Office Building

South Pedestrian Entrance Pavilion

Public Seating

PITC Plaza

North Pedestiran Entrance Pavilion

Public Park

Page 28: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

1 PITC DRAFT RFP DRAWINGS - 5/14/18 WORKac

OVERVIEW SITE PLAN: DEVELOPMENT PARCELS

1” = 250’

1

3100,000 SF

2180,000 SF

4200,000 SF

5200,000 SF

6150,000 SF

7200,000 SF

SMITH STREET

STA

TE S

T. (

RE

LOC

ATE

D)

GA

SP

EE

STR

EE

T (R

ELO

CA

TED

)

FRA

NC

IS S

TRE

ET

EXCHANGE STREET

Page 29: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

Greater Kennedy Plaza

Page 30: PROVIDENCE INTERMODAL TRANSPORTATION CENTER

Replaces an antiquated bus hub with a state of the art facility that connects multiplemodes of public transportation at a single location.

Connects regional to local transit, creating a modern and efficient mass transitsystem, attracting employers and employees from out of state.

Addresses design concerns of State House lawn and Station Park location by placingPITC infrastructure underground.

Replaces controversial existing surface parking on State House lawn withunderground, secure facility directly connected to State House.

Unique opportunity to amortize the costs of required upgrades to the State HouseHVAC systems and implement cost efficiencies through integrated system.

Well designed and well located mass transit facility will act as a catalyst for attractingprivate investment to the surrounding area, including private development on State-owned land.

Benefits of our Proposal