ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe Tekelec's present plans to develop and make available to its customers certain products, features and functionality. Tekelec is only obligated to provide those deliverables specifically included in a written agreement signed by Tekelec and customer. Training documentation Notes 1

Upload: harvey-goodwin

Post on 17-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

ProTraq NSP on IXP Title Release 1.0

Date issued April 2007

Document reference & release version TR-IAS-01-06 - Ed1.0

These presentation materials describe Tekelec's present plans to develop and make available to its customers certain products, features and functionality. Tekelec is only obligated to provide those deliverables specifically included in a written agreement signed by Tekelec and customer.

Training documentation

Notes

1

Page 2: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Class outline

• This class is intended to provide you with an full MOP about ProTraq NSP on IXP.

• Class outline includes the following sections :

Requirements to use ProTraq NSP on IXP

General Points

Analyze the current DFP configuration Adding a DFP Operation

Operate ProTraq NSP

Apply a ProTraq configuration to an IXP session

Apply the IXP configuration to validate the ProTraq activation

A new DFP Storage to apply.

Training documentation ‘06 | 2

Notes

2

Page 3: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Requirements to use ProTraq NSP on IXP

Training documentation ‘06 | 3

Notes

3

Page 4: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

General Points

• The IXP Data Flow Processing Chain is composed of multiple DFP Processes :

a process DFP Building (using MSUs/PDUs to build xDRs) a process DFP Operation (OPTIONAL)

a process DFP Storage (to store xDRs and KPIs to the Oracle Database)

• DFP Operation is mandatory for the usage ProTraq NSP • If the session you want to use as source for a ProTraq configuration is NOT using a DFP Operation : Need to add it manually

• This DFP Operation must have the same name as the session

If the DFP Operation has been created with the help of the IXP configuration assistant, the DFP Operation will have the same name as the session.

Training documentation ‘06 | 4

Notes

4

Page 5: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Analyze the current DFP configuration

• Head to the IXP > Configure > Distribution menu Here it is possible to find out the chaining of the different DFP processes Locate your chaining of DFP and check if there is a DFP Operation between the DFP Building and the DFP Storage

Here we have a Building followed by a Storage : a DFP Operation should be added in between, its name being the same as the session name

If there was a DFP Operation with the same name as the session name, you could jump to the next section of the MOP.

Training documentation ‘06 | 5

Notes

5

Page 6: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (1/8)

• Head to the IXP > Configure > Data flow processings

menu Hit the + button to add a new DFP

Training documentation ‘06 | 6

Notes

6

Page 7: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (2/8)

• Configure the new DFP Operation

Name must be the same as the session created by this DFP chain In our example the session name is My_MAP_TDR

User information : a comment to describe the DFP Operation Active : checked, else it will not do anything

DFP type will be Operation, of course.

Hit the Next button to continue

Training documentation ‘06 | 7

Notes

7

Page 8: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (3/8)

• Choose the Input stream (xDR)

It must be the Output stream from the DFP Building of your DFP chain Input filters are not mandatory

Hit the Next button

Training documentation ‘06 | 8

Notes

8

Page 9: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (4/8)

• Enter an Output stream name

It will be used in input of the DFP Storage of your current DFP chain For this example we used the name My_MAP_TDR_Operation_out

Output format is not mandatory

Hit the Next Button to complete the DFP Operation configuration

Training documentation ‘06 | 9

Notes

9

Page 10: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (5/8)

• Modify the DFP Storage

Output of the DFP Operation should be used as input of the DFP Storage

Hit the DFP Storage name to enter its configuration menu

Training documentation ‘06 | 10

Notes

10

Page 11: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (6/8)

• Enter the Inputs tab

Check the output stream of the DFP Operation previously created In this example, it is My_MAP_TDR_Operation_out

Hit the Accept Button to complete the DFP Operation configuration

Training documentation ‘06 | 11

Notes

11

Page 12: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (7/8)

• Go back to the Distribution menu

Affect an IXP server to the DFP Operation

Hit the Accept Button to complete the DFP Operation configuration

Training documentation ‘06 | 12

Notes

12

Page 13: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Adding a DFP Operation (8/8)

• Apply the changes

Confirm with the OK button

Training documentation ‘06 | 13

Notes

13

Page 14: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Operate

ProTraq NSP

Training documentation ‘06 | 14

Notes

14

Page 15: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Apply a ProTraq configuration to an IXP session (1/2)

• Head to ProTraq NSP and select the configuration you want to use

Add the xDR session created by IXP in the list so to apply the configuration

In our example it will be My_MAP_TDR

Training documentation ‘06 | 15

Notes

15

Page 16: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Apply a ProTraq configuration to an IXP session (2/2)

• Activate the configuration so that it will be ready to produce statistic results

Training documentation ‘06 | 16

Notes

16

Page 17: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

Apply the IXP configuration To validate the ProTraq activation

Training documentation ‘06 | 17

Notes

17

Page 18: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

A new DFP storage to apply (1/2)

• Head to the Distribution menu of IXP

The activation of the ProTraq configuration created a new DFP storage dedicated store the procuced KPIs.

Affect an IXP server

Hit the Accept Button to complete the new DFP Storage configuration

Training documentation ‘06 | 18

Notes

18

Page 19: ProTraq NSP on IXP Title Release 1.0 Date issued April 2007 Document reference & release version TR-IAS-01-06 - Ed1.0 These presentation materials describe

A new DFP storage to apply (2/2)

• Apply the changes

Confirm with the OK button