prototyping the future - calit2 · lead systems engineer ... energy display on tv. testing: ......

17
Prototyping the Future Calit2 Proof-of-Concept Services November 14, 2013 Dr. Arthur Zhang Technical Director California Plug Load Research Center California Institute for Telecommunications and Information Technology, Irvine

Upload: hoangdung

Post on 25-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Prototyping the Future

Calit2 Proof-of-Concept ServicesNovember 14, 2013

Dr. Arthur ZhangTechnical Director

California Plug Load Research CenterCalifornia Institute for Telecommunications and Information Technology, Irvine

Calit2 Technical Staff Team

DirectorG.P. Li, Ph.D.

TechnologyTechnical DirectorArthur Zhang, Ph.D.

Engineering Lab ManagerMinfeng Wang, Ph.D.

Lead Systems EngineerJieping Guo, Ph.D.

Lead Interface DeveloperSergio Gago Masague, Ph.D.

Micro- System Engineer Rongwei Mao, Ph.D.

Software Development Manager Joseph Nunn

BehaviorProject Manager, Social SciencesJoy Pixley, Ph.D.

PolicyAssistant DirectorStuart Ross, Ph.D.

OutreachDirector of OutreachShellie Nazarenus

AdministrationExecutive Assistant to the DirectorAndrea Bell-WheelansAdministrative AssistantMelissa Valdez

Calit2 Faculty Leadership

Psychology and Social Behavior

TestingBench-top testsSIMLabsData Analysis and Reports

Software DevelopmentUser InterfaceWeb serviceMobile applications

Calit2 Technical Functional GroupsElectronics Prototyping

DesignFabrication/IntegrationIndustrial Design

Consumer studySurvey designUsability feedback

PROTOTYPING: MEMS Microswitches

Conventional device

MEMtronic switch

Laminate device

UCI switch

• Smart and economiccold chain managementwith ultra low powerRFID sensor tags• 2009 2011 ARRA NSFphase II (MaxwellSensors Inc. & UCIrvine)

Transportation OR/ICUCentrifugation Filtering RFID Screening

Blood bagRFID Reader Sensor RFID Tag

PROTOTYPING: RFID Sensor Tags

PROTOTYPING:Intelligent Sleep—CalPlug’s 5W5s Solution for 200 Million Set-Top Boxes

PROTOTYPING:

SCE Smart Meter Energy Display on TV

TESTING: Bench Top Power/Durability Test

SWM

AC Power Source

Output Input

STB

Break-Out Box

TV Set

Power Analyzer Computer

Output Input

• Chroma 61601: AC Power Source• Voltech PM1000+: Power Analyzer• Voltech Breakout Box: To insulate

electronic equipment avoiding EMI and simplify connection

Coax Cable

Output Input

HDMI

Vout

Vin

Iout

Iin

USB

Power CableSignal CableI/V Connection

TESTING: Bench Top Test Systems

PurposeTo bridge the gap between bench-top tests and large scale market trials

SIM Living Room SIM Office

TESTING: SIM-Labs

• A web-based resource-planning system tailored for INRF operation

• Delivered June 2013: Core module + 2 extension modules

WEB SERVICE: ERP for INRF

• Efficient, on-demand designs always have tradeoffs in system response time

• “Frustration threshold” study• How to reduce consumer

perceived “Delay”?

CONSUMER STUDY: Frustration threshold

Behavior Study in SIM Living Room

Data Acquisition/Analysis

US Weekly Time Spent Hours: Min

0

20

40

60

80

100

120

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Clic

k In

terv

al (M

in)

Number of Subjects

CONSUMER STUDY: Consumer Attention

• Target demographics• Survey questions design• Delivery instrument• Data collection• Analysis and report

CONSUMER STUDY: PC Power Management

Please join us in our future endeavors!

[email protected]

Thank You!