proton-‐induced background studies for e+, e-‐ fluxesekptalk/crams/050215/1_crams… ·...
TRANSCRIPT
Proton-‐induced background studies for e+, e-‐ fluxes
• Mo8va8on: for various samples: flux, efficiency (ex. trigger) we have to evaluate systema8cs (or subtract) events, caused by interac8on of protons with detector’s materials.
• Proton data used: B620_dev [0.5,10], [10, 200] GV, cube simula8on
• Proton flux (unmodulated) from Siarhei • Electron + positron from PRL 113, 22102 (2014) • Electron acceptance • Cuts from Stefan
Proton and lepton fluxes Differen'al fluxes Par'cle rate per bin for protons
Count rate and acceptance for leptons
Proton acceptance 6 x 1.95 x 1.95 x π [sr m2]
Lepton selec8on (cuts from Stefan) Total number of protons equivalent to 219081 s (2.5 days) of data taking
Reconstructed EnergyE and rigidity vs. Primary momentum
Proton contamina8on es8ma8on
TRD only cuts but in “lepton” stream, expect x 2 more background
To do next
• Es8mate background for Trigger sample: – Selec8on cuts applied on MC lepton sample, evaluate acceptance for this selec8on
• Use this approach to adjust TRD-‐only based analysis cuts and es8mate residual background: – MC lepton simula8on data will be used for acceptance evalua8on, Trigger efficiency, etc.
– MC proton simula8on will be used to es8mate residual background a_er all cuts
B620_B800 data streams
TrkAcceptCut(…, id_inner,…, “+ECAL_TOP +ECAL_BOT”);
EcalTrkShowerMatchCut(…, id_inner, 3.6, 7.2,…)
EcalEnergyCut(…,350,…EnergyD)
… previous common cuts;
TrkAcceptCut(…, id_inner,…, “+ECAL_TOP +ECAL_BOT”, REVERSE);
ECAL Lepton stream (e+/e-‐ and interacted protons)
ECAL MIP stream MIP protons
TRD only stream (do not save any data from ECAL) Out-‐of ECAL geometry e+/e-‐ and protons
B620_B800 processing status: • New containers for MC data were introduced:
– MCGene – containg general informa8on about MC run: total number of triggers, nominal and real momentum ranges
– MCPartInfo – MCEventg content for primary par8cles, sensi8ve volumes crossing, secondaries above ECAL
• Number of slots varies from 20 to 200, preproduc8on/produc8on of pass6 is on-‐going
• In case of > 200 jobs the bolle-‐neck is copying speed to EKP • For now ~ 50000/70289 files were produced, 36000 copied to EKP • Streams will occupy:
– ECAL MIP 1.80 TB – ECAL Lepton 2.06 TB – TRD only 3.84 TB – RTI 0.13 TB TOTAL: 7.83 TB
TRD online status • Switch no new machines ams-‐vobox01, ams-‐vobox02:
– 3 8mes (problem with creden8als?), recovered in 5-‐6 hours automa8cally
– 25 Jan morning problem with SCDB files, processing stopped, processing goes to infinite loops (reason last SCDB file was corrupted). Now fixed
– DB migra8on to ams-‐vobox01 – Old version of so_ware s8ll runs on: phams01, phams02, amsvobox01, amsvobox02
• TRD tube occupancy online scripts were started • TRDGain3 data was produced (8ll and checked 8ll Jan 23 for
now). Ready for next produc8on round. See next slides.. – Some small issue appeared (2 calibra8on files at the beginning of the flight were missed). Problem fixed.
2014 Q3
2013 Q4
Refill #45 Refill #44 Refill #43
2014 Q1
Refill #46
TRDGain3 20 Sep 2014 – 5 Dec 2014 29 Sep: layers L2,L3,L4,L5,L6,L8,L9 switched off
01 Oct: layer L6 switched on
Refill #43 Refill #42 Refill #44
28 Nov: TRK nominal