Alexandria Effluent Reuse is a key of minimizing expected climatic changes impacts through: 1- Minimize sea water soil intrusion problem. 2- Preventing flooding problems and sea pollution from pumping the mixed lake maryout water and disposed wastewater from Qalaa drain, Noubaria Drain and West treatment plant outfall. 3- Improve climatic condition of the west desert of Alexandria. The overall goal of the effluent reuse project is to catalyze change towards more sustainable urban water management in the "City of the FutureTRANSCRIPT
![Page 1: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/1.jpg)
Presented by Dr. Helaly Abdel Hady Helaly
Chef of Industrial wastewater, Sludge and Reuse sector.
Alexandria Sanitary Drainage Company. Alexandria – EGYPT.
Home (tell) : 00203 381 5799 , Mobile: 002-0105201367
e-mail : [email protected]
![Page 2: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/2.jpg)
Alexandria Effluent
Reuse is a key of minimizing expected
climatic changes impacts.
Presented by Dr. H.A.Helaly
![Page 3: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/3.jpg)
1- Minimize sea water soil intrusion problem.
2- Preventing flooding problems and sea pollution from
pumping the mixed lake maryout water and disposed
wastewater from Qalaa drain, Noubaria Drain and West
treatment plant outfall.
3- Improve climatic condition of the west desert of Alexandria.
Alexandria Effluent Reuse is a key of minimizing
expected climatic changes impacts.
![Page 4: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/4.jpg)
Alexandria wastewater system in the Future.
Complete reuse of wastewater effluent in arid areas of the
western desert. And be used as an effective tool to fight
desertification and solve Lake Maryout pollution problems.
Switching to Decentralization management .
Achieving balance in restoring costs of operation and
maintenance, through using appropriate technologies and
environmentally friendly methods in wastewater treatment.
![Page 5: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/5.jpg)
The overall goal of the effluent reuse project is to
catalyze change towards more sustainable urban
water management in the
"City of the Future”.
project Proposed Alexandria effluent reuse
![Page 6: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/6.jpg)
Factors affecting the wastewater system
in the future
![Page 7: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/7.jpg)
Factors affecting the wastewater system in the future
1. Population growth, city expansion and wastewater flows
2. Wastewater composition, industrial discharges and the enforced effluent standards
3. Demand for effluent (industrial, urban and agricultural reuse; location, required qualities and potential quantities)
4. Intrusion of saline water into the sewer system
![Page 8: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/8.jpg)
0
500000
1000000
1500000
2000000
2500000
3000000
2006 2012 2017 2022 2027 2032 2037
Year
Wa
st
wa
ter
da
ily
ra
te
Produced
S.T.P capacity
Wastewater production and STP’s capacity (Master plan 2037)
![Page 9: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/9.jpg)
Alexandria city is expected to face the following challenges:
• Water Demand Increase (population, economic, industrial and social activities).
• Semi-arid zone (little rain fall 150-200 mm/year).
• Limited groundwater Potential (Fresh, 3 million m3/year).
• Down stream main irrigation system.
• Water quality degradation (44% Industrial Activities of which 60% is petro-
chemical Activities)
• Climate Change (sea rise, 19 km2, 1.5 million person , 30 million US$ …..)
Therefore, it is important to en light “ Effluent Reuse”
![Page 10: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/10.jpg)
Quala Drain
92,358
East Treatment Plant
607,000
432,236
Sea Locks
82,200
Semouha Drain
19,152
Gonet Zohra
Drain
131,616
Evapotranspiration
169,344
West Treatment
Plant
410,325
El-Mex Pumping
Station
7,993,945
QUALA
915,790
Omoum Drain
4,200,000
Nubaria Canal
2,530,000
Underground water
24,974
Amlak Drain
65,664
Lake
Mayout
The Main drains in Alexandria are:
• El Qalaa which receives the effluent of ETP.
• West Noubaria and El Omoum drain dispose into the Mediterranean through Lake Maryout.
receives pollution
loads from rural areas
Final Disposal points of Alexandria wastewater
![Page 11: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/11.jpg)
Alexandria effluent Reuse Definition:
Is the optimum use of Alexandria treated effluent
through appropriate technologies and the best
management practices to achieve best outcomes in
terms of environmental basis and public health .
![Page 12: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/12.jpg)
Alexandria Wastewater system
![Page 13: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/13.jpg)
Proposed locations for Alexandria Wastewater Reuse (WRc Study)
Ref: Alexandria Effluent and Sludge Reuse Study – Water Research center-WRc.
![Page 14: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/14.jpg)
![Page 15: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/15.jpg)
Wastewater Reuse in AlexandriaWasetwater
Reuse in Alexandria
![Page 16: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/16.jpg)
![Page 17: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/17.jpg)
Wastewater Reuse in AlexandriaWasetwater
Reuse in Alexandria
Cost Analysis
![Page 18: Proposed wastewater reuse project in alexandria](https://reader034.vdocuments.us/reader034/viewer/2022050721/557c9f7ad8b42ab4218b4b25/html5/thumbnails/18.jpg)