proposed stock pile yard phase 1 site: myra falls …...oct 26, 2017 · 3.1. foundation design...
TRANSCRIPT
-
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
DRAWING INDEX:
SHEET 2 OF 10 - NOTES
SHEET 3 OF 10 - PLAN VIEW 1:1000
SHEET 4 OF 10 - PLAN VIEW 1:1000 WITH SECTION
REFERENCE
SHEET 5 OF 10 - PLAN VIEW 1:500
SHEET 6 OF 10 - FUEL STORAGE PAD PLAN VIEW
SHEET 7 OF 10 - SECTIONS G AND H
SHEET 8 OF 10 - S/W FILL RETAINING WALL VIEWS,
SECTIONS A AND B
SHEET 9 OF 10 - SECTIONS C, D, AND E
SHEET 10 OF 10 - SECTION F AND DETAILS 1, 2, 3
AND 4
SHEET 11 OF 11 - CONCRETE BLOCK
(INTERLOCKING) WALL LAYDOWN
PATTERN
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED FOR:
nyrstar
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
1SHEET: OF 11
DWG No:
635-8-STOCKPILEPH1GA- 001
NOT TO SCALE
SITE
-
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED FOR:
nyrstar
2SHEET: OF 11
DWG No:
635-8-STOCKPILEPH1GA- 002
NOTES:
1. REFERENCED CODES
1.1. BC BUILDING CODE 2012
1.2. HEALTH SAFETY AND RECLAMATION CODE FOR MINES IN BRITISH COLUMBIA, 2017
1.3. BRITISH COLUMBIA MINES ACT, 1996
2. STRUCTURE:
2.1. CONCRETE BLOCKS TO BE NO.1 GRADE STANDARD SIZED BLOCKS AS INDICATED IN DRAWING
DETAILS.
2.2. ALL STEEL TO BE CSA G40.21 350A STEEL UNLESS OTHERWISE NOTED.
2.3. ALL GALVANIZED COMPONENTS TO ADHERE TO ASTM A123.
3. GEOTECHNICAL:
3.1. FOUNDATION DESIGN REFERENCES THE CANADIAN FOUNDATION ENGINEERING MANUAL.
SUBSURFACE INFORMATION HAS BEEN GATHERED FROM SITE OBSERVATIONS OF SOIL
EXPOSURES IN EXPOSED CUTS AND MACHINE DUG TEST PITS. FIELD CONDITIONS MAY VARY
FROM THOSE ENCOUNTERED. IF, UPON EXCAVATION, FIELD CONDITIONS VARY FROM THOSE
ENCOUNTERED, THEN CHANGES TO THE FOUNDATION DESIGN OR INSTALLATION MAY BE
REQUIRED.
3.2. SEE THE GEOTECHNICAL REPORT PREPARED BY ONSITE ENGINEERING LTD (OEL) FOR,
COMPLETED OCTOBER 2017. THE REPORT PREPARED BY OEL DETAILS COMPACTION
REQUIREMENTS FOR TYPICAL EQUIPMENT SIZES AND MATERIAL TYPES, MAXIMUM SUBGRADE
ELEVATION TOLERANCES, AND ACCEPTABLE MATERIAL GRADATIONS.
4. FIELD REVIEWS:
4.1. A PROFESSIONAL ENGINEER OR THEIR DESIGNATE IS REQUIRED TO INSPECT THE FOLLOWING
ACTIVITIES AND/OR CONSTRUCTION ELEMENTS PRIOR TO PROVIDING RECORD DRAWINGS:
FOUNDATION SUBGRADE SOILS FOLLOWING EXCAVATION
PREPARED SUBGRADE IMMEDIATELY PRIOR TO PLACING THE HDPE LINER AND
ASSOCIATED GEOTEXTILE
LAYOUT AND PLACEMENT OF GEOGRID PRIOR TO BACK FILL
OTHER SITE INSPECTIONS AT THE DISCRETION OF THE PROFESSIONAL
5. INSTALLATION NOTES:
5.1. NOTE THAT WHERE EXCAVATION SPECIFICATIONS ON THESE DRAWINGS CONFLICT WITH
WORKSAFEBC REGULATIONS, WORKSAFEBC REGULATIONS ARE TO GOVERN.
5.2. CONTRACTOR MUST NOT DISTURB THE LYNX CONVEYOR FOOTINGS OR BEARING SOILS.
5.3. CONTRACTOR MUST NOT DISTURB FUEL TANK FOUNDATION SOILS TO PREVENT
DIFFERENTIAL SETTLEMENT OF THE FUEL TANKS.
5.4. CONTRACTOR TO FIELD FIT CULVERT AROUND LIME SILOS TO PREVENT SILO FOUNDATION
DISTURBANCE WHILE MAINTAINING MINIMUM SPECIFIED GRADE. DO NOT EXCEED
MANUFACTURES BEND RADIUS SPECIFICATIONS DURING FIELD FIT ACTIVITIES. CULVERT
MUST DISCHARGE INTO PRE-EXISTING CONTACT WATER DITCH.
5.5. RAIN GUN INSTALLATION TO BE FIELD FIT ONCE THE CONTRACTOR CONFIRMS THE LOCATION
OF A SUITABLE TIE IN LOCATION AFTER INITIAL EXCAVATION HAS TAKEN PLACE.
5.6. THE CONSTRUCTION SITE IS AN HISTORIC MILL SITE AND DOCUMENTATION OF PRE-EXISITNG
UTILITIES AND STRUCTURES IS LIMITED. CONTRACTOR TO EXPECT UNIDENTIFIED UTILITIES
DURING EXCAVATION.
6. DATA COLLECTION METHODOLOGY
THE DESIGN IS BASED ON FIELD INSPECTIONS AND A REVIEW BY AN OEL AND NYRSTAR
REPRESENTATIVE COMBINED WITH LIDAR AND ORTHOGRAPHIC DATA PROVIDED BY NYRSTAR IN
JUNE 2017. NO INDEPENDENT SURVEY BY OEL WAS COMPLETED FOR THIS WORK SITE.
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
-
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
3SHEET: OF 11
003
DWG No:
635-8-STOCKPILEPH1GA-
PLAN VIEW
SCALE 1:1000
-10 50100 20 30 40
MILL
L
Y
N
X
C
O
N
V
E
Y
O
R
FUEL BAY
COARSE
ORE BIN
FUTURE SPILL WAY
M
I
L
L
S
H
O
P
LIME SILOS
FUEL
STORAGE
CONVEYOR
FOOTING (TYP.)
-
PLAN VIEW
SCALE 1:1000
-10 50100 20 30 40
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
4SHEET: OF 11
DWG No:
635-8-STOCKPILEPH1GA- 004
EXISTING
ROAD EDGES
FUTURE CLOSURE
SPILL WAY BY OTHERS
B
0
8
A
0
8
APPROXIMATE LOCATION
OF EXISTING POWER
LINES
D
0
9
E
0
9
MILL
FUEL BAY
COARSE
ORE BIN
PROPOSED 600mm HDPE
CULVERT. FIELD FIT TO AVOID
INTERFERENCE WITH SILOS.
EXISTING ROAD EDGES
EXISTING DITCH
TIE TO EXISTING LYNX
CRUSHER DISCHARGE
HOPPER
EXISTING CONTACT
WATER DITCH TO
SUPER POND
FUTURE SPILL WAY
C
0
9
ELRUS 36"-42" PORTABLE BELT
FEEDER OR EQUIVALENT
ELRUS 2442
JAW CRUSHER
OR EQUIVALENT
M
I
L
L
S
H
O
P
LIME SILOS
F
1
0
FUEL
STORAGE
H
0
7
G
0
7
L
Y
N
X
C
O
N
V
E
Y
O
R
APPROXIMATE EXTENT OF
CUT/FILL SLOPE
APPROXIMATE EXTENT
OF CUT / FILL SLOPE
-
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
5SHEET: OF 11
DWG No:
635-8-STOCKPILEPH1GA- 005
WORK POINT AND DRAINAGE PLAN VIEW
SCALE 1:500
-5 2550 10 15 20
FUTURE SPILL WAY
S
L
O
P
E
-
2
%
S
L
O
P
E
-
2
%
S
L
O
P
E
-
9
%
FRENCH
DRAIN
4
m
600mm HDPE
CULVERT
PROPOSED CONCRETE
BLOCK (INTERLOCKING)
WALL
APPROXIMATE
CONVEYOR FOOTING
LOCATION
23.1m
3
3
.
6
m
4
2
.
0
m
2
1
.
8
m
5
3
.0
m
WP9
WP10
WP6
WP1
WP2
WP3
WP4
WP5
ELEVATIONS SHOWN HAVE AN
ARBITRARY DATUM AND SHOULD ONLY
BE USED TO ESTABLISH RELATIVE
ELEVATION FOR CONSTRUCTION
PURPOSES. ELEVATIONS ARE AT
FINISHED GRADE.
*WORKPOINTS AT CULVERT ARE
LOCATED AT THE CULVERT INVERTS.
WP N E ELEV
WP1 2933.96 2030.05 3396.52
WP2 2967.58 2004.92 3397.35
WP3 2978.47 2021.95 3396.93
WP4 2969.10 2044.07 3396.27
WP5 2953.38 2058.71 3395.83
*WP6 2959.25 2080.64 3392.01
WP9 2955.78 2100.58 3391.81
WP10 2982.17 2023.22 3399.10
WP11 2943.58 2044.09 3392.66
WP12 2952.53 2056.06 3392.66
EXISTING DITCH
WP11
WP12
FUEL STORAGE
PAD. SEE SHEET
6 FOR DETAILS.
TORO TG101 RAIN GUN
MOUNTED ON 8m UTILITY POLE
DUST CONTROL
RADIUS (R=40 TYP.)
-
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
SHEET: OF 116
DWG No:
635-8-STOCKPILEPH1GA- 006
FUEL STORAGE PAD PLAN VIEW
SCALE 1:200
0-2 642 8 10
PROPOSED CONCRETE
BLOCK (INTERLOCKING)
WALL
1
5
m
6
.
7
5
m
1
9
.
2
0
m
WP11
WP12
3
m
PROPOSED CONCRETE BLOCK
(INTERLOCKING) TIE-BACK
EXISTING FUEL
STORAGE TANKS
3m HIGH ROCK FENCE,
DESIGN BY OTHERS
(GEOBRUGG RIGID POST
100KJ OR APPROVED
EQUIVALENT)
1
.
2
0
m
M
I
N
I
M
U
M
C
L
E
A
R
A
N
C
E
-
3390
3392
3394
3396
3398
3400
3390
3392
3394
3396
3398
3400
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
SHEET: OF 117
DWG No:
635-8-STOCKPILEPH1GA- 007
H
04
SECTION
FUEL TANK WALL PROFILE
-2.5 12.52.50 5.0 7.5 10.0
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL
SCALE 1:250
EXISTING GROUND
G
04
SECTION
FUEL TANK WALL
-2.5 12.52.50 5.0 7.5 10.0
SCALE 1:250
APPROXIMATE LIMIT
OF EXCAVATION
HDPE LINER. SEE
DETAIL 1 ON SHEET 10.
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL
STOCK PILE SITE
FINISHED SURFACE
EXISTING GROUND
SLOPE -2%
HDPE LINER ANCHOR. SEE
DETAIL 3 ON SHEET 10.
FRENCH DRAIN
EXISTING FUEL
STORAGE TANK
PROPOSED CONCRETE BLOCK
(INTERLOCKING) TIE-BACK
(NOT IN PLANE)
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WING WALL
(NOT IN PLANE)
3m HIGH ROCK FENCE
3m HIGH ROCK FENCE, DESIGN BY OTHERS
STOCK PILE SITE
FINISHED SURFACE
SLOPE -2%
EXISTING FUEL
STORAGE TANKS
HDPE LINER
APPROXIMATE LIMIT OF
EXCAVATION
DESIGNED FINISHED
SURFACE
ARMTEC 7XT GEOGRID
(OR APPROVED EQUIVALENT)
1.5
1
-
3390
3392
3394
3396
3398
3400
3392
3394
3396
3398
3400
3402
3390
3392
3394
3396
3400
3402
3398
3390
3392
3394
3396
3400
3402
3398
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
SHEET: OF 118
DWG No:
635-8-STOCKPILEPH1GA- 008
B
04
SECTION
FRENCH DRAIN SECTION
-2.5 12.52.50 5.0 7.5 10.0
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL
FUTURE SPILL WAY
(BY OTHERS)
SCALE 1:250
STOCK PILE SITE
FINISHED SURFACE
EXISTING GROUND
SLOPE -2%
HDPE LINER
APPROXIMATE LIMIT OF
EXCAVATION
DESIGNED FINISHED
SURFACE
HDPE LINER. SEE
DETAIL 1 ON SHEET 10.
HDPE LINER ANCHOR. SEE
DETAIL 3 ON SHEET 10.
A
04
SECTION
NORTH WEST WALL
-2.5 12.52.50 5.0 7.5 10.0
SCALE 1:250
FUTURE SPILL WAY
(BY OTHERS)
APPROXIMATE LIMIT
OF EXCAVATION
HDPE LINER. SEE
DETAIL 1 ON SHEET 10.
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL
STOCK PILE SITE
FINISHED SURFACE
EXISTING GROUND
SLOPE -2%
HDPE LINER ANCHOR. SEE
DETAIL 3 ON SHEET 10.
FRENCH DRAIN. SEE
DETAIL 2 ON SHEET 10.
FRENCH DRAIN. SEE
DETAIL 2 ON SHEET 10.
ACCESS ROAD
ACCESS ROAD
LYNX CONVEYOR STRUT FILL DETAIL ELEVATION VIEW
SCALE 1:200
0-2 642 8 10
LYNX CONVEYOR STRUT FILL DETAIL PROFILE VIEW
SCALE 1:200
0-2 642 8 10
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL (NOT IN PLANE)
LYNX CONVEYOR FOOTING (NOT IN
PLANE), ELEVATION APPROXIMATE
EXISTING
GROUND
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL (NOT IN PLANE)
LYNX CONVEYOR FOOTING
APPROXIMATE LOCATION
BACKFILL AND COMPACT EVENLY AROUND POST
IN MAXIMUM 0.15m DEEP LIFTS COMPACTED TO
AT LEAST 95% OF THE STANDARD PROCTOR
MAXIMUM DRY DENSITY. MATERIAL WITHIN 0.5m
OF THE POST MUST BE SAND. COAT ALL STEEL
WITH BITUMINOUS PAINT PRIOR TO BACKFILLING.
APPROXIMATE LIMIT
OF EXCAVATION
STOCK PILE SITE
FINISHED SURFACE
0.50m
0.50m
SLO
PE
-2%
**COMPACTED COMMON FILL
ARMTEC 7XT GEOGRID
(OR APPROVED EQUIVALENT)
3.00m
ARMTEC 7XT GEOGRID. GEOGRID TO EXTEND 3m
BEHIND WALL. BACKFILL WITH COMPACTED
COMMON FILL TO AT LEAST 95% OF THE STANDARD
PROCTOR MAXIMUM DRY DENSITY.
BACKFILL AND COMPACT EVENLY AROUND
POST IN MAXIMUM 0.15m DEEP LIFTS
COMPACTED TO AT LEAST 95% OF THE
STANDARD PROCTOR MAXIMUM DRY
DENSITY. MATERIAL WITHIN 0.5m OF THE
POST MUST BE SAND. COAT ALL STEEL WITH
BITUMINOUS PAINT PRIOR TO BACKFILLING.
0.50m
1 HIGH ROW OF BLOCKS MAY BE
REQUIRED ALONG TOE OF FILL
TO MAINTAIN MAINTENANCE
ROAD ACCESS
**COMPACTED
COMMON FILL
1.5
1
1.5
1
1.5
1
-
3390
3392
3394
3396
3398
3400
3386
3388
3390
3392
3394
3396
3392
3394
3396
3398
3400
3402
3404
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
DWG No:
635-8-STOCKPILEPH1GA- 009
HDPE LINER
APPROXIMATE LIMIT OF
EXCAVATION
DESIGNED FINISHED
SURFACE
E
04
SECTION
ROAD PROFILE
-2.5 12.52.50 5.0 7.5 10.0
SCALE 1:250
SLO
PE
-9%
FINISHED ROAD SURFACE
EXISTING GROUND
D
04
SECTION
CULVERT PROFILE
-2.5 12.52.50 5.0 7.5 10.0
SCALE 1:250
FUTURE SPILL WAY
(BY OTHERS)
APPROXIMATE LIMIT
OF EXCAVATION
PROPOSED ROAD
RUNNING SURFACE
EXISTING GROUND
SLOPE MIN. -2%
600mm HDPE CULVERT, ADS N-12
WT OR APPROVED EQUIVALENT
COMPACTED LEVELLING
COURSE (MIN. 0.15m DEEP)
FRENCH DRAIN. SEE
DETAIL 2 ON SHEET 10.
OUTLET TO BE FIELD FIT TO ACHIEVE
MINIMUM 2% SLOPE AND NOT TO
INTERFERE WITH LIME SILOS.
C
04
SECTION
SOUTH WEST WALL
-2.5 12.52.50 5.0 7.5 10.0
SCALE 1:250
SLOPE -2%
PROPOSED CONCRETE BLOCK
(INTERLOCKING) WALL
STOCK PILE SITE
FINISHED SURFACE
EXISTING GROUND
APPROXIMATE LIMIT
OF EXCAVATION
HDPE LINER. SEE
DETAIL 1 ON SHEET 10.
**COMPACTED COMMON FILL
HDPE LINER ANCHOR. SEE
DETAIL 3 ON SHEET 10.
FRENCH DRAIN. SEE
DETAIL 2 ON SHEET 10.
CULVERT INLET. SEE
DETAIL 4 ON SHEET 10.
**COMPACTED COMMON FILL
GRANULAR FILL TO BE
COMPACTED TO AT LEAST 95%
OF THE STANDARD PROCTOR
MAXIMUM DRY DENSITY.
SHEET: OF 119
ARMTEC 7XT GEOGRID. GEOGRID TO EXTEND 3m
BEHIND WALL. BACKFILL WITH COMPACTED
COMMON FILL TO AT LEAST 95% OF THE STANDARD
PROCTOR MAXIMUM DRY DENSITY.
ARMTEC 7XT GEOGRID
(OR APPROVED EQUIVALENT)
1.5
1
1.5
1
-
3394
3395
3396
3397
3398
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
SHEET: OF 1110
DWG No:
635-8-STOCKPILEPH1GA- 010
2
8/9
DETAIL
FRENCH DRAIN
-0.5 0 0.5 1 21.5 2.5
SCALE 1:50
0.3
m
0.3
m
ARMTEC 140 NON-WOVEN GEOTEXTILE
OR APPROVED EQUIVALENT
ARMTEC 140 NON-WOVEN GEOTEXTILE
OR APPROVED EQUIVALENT
NILEX 60mil HDPE LINER OR
APPROVED EQUIVALENT
WELL **COMPACTED SAND
APPROXIMATE LIMIT
OF EXCAVATION
STOCK PILE
RUNNING SURFACE
1
08
DETAIL
HDPE LINER INSTALLATION
-0.5 0 0.5 1 21.5 2.5
SCALE 1:50
DESIGNED FINISHED
SURFACE
HDPE LINER
APPROXIMATE LIMIT OF
EXCAVATION
ARMTEC 140 GEOTEXTILE
(OR APPROVED EQUIVALENT)
3
08
DETAIL
BERM ANCHOR
-0.5 0 0.5 1 21.5 2.5
SCALE 1:50
1m1m
0.46m
NILEX 60mil HDPE LINER OR
APPROVED EQUIVALENT. SEE
DETAIL 1 ON THIS SHEET FOR
INSTALLATION DETAILS.
ARMTEC 140 NON-WOVEN
GEOTEXTILE OR APPROVED
EQUIVALENT
NILEX HDPE LINER ANCHOR
OR APPROVED EQUIVALENT
STOCK PILE
RUNNING SURFACE
APPROXIMATE LIMIT OF EXCAVATION
WELL **COMPACTED SAND
**COMPACTED
COMMON FILL
BERM
0.1
5m
COMPACTED ROAD FILL
NILEX 60mil HDPE LINER OR APPROVED
EQUIVALENT. SEE DETAIL 1 ON THIS
SHEET FOR INSTALLATION DETAILS.
ARMTEC 140 NON-WOVEN
GEOTEXTILE OR APPROVED
EQUIVALENT
NILEX HDPE LINER ANCHOR
OR APPROVED EQUIVALENT
STOCK PILE SITE
FINISHED SURFACE
APPROXIMATE LIMIT OF EXCAVATION
WELL **COMPACTED SAND
COMPACTED ROAD FILL
FILL WITH 1" TO 6" ROCK
F
04
SECTION
ROAD SECTION
-1 0 1 2 43 5
SCALE 1:100
4m
STOCK PILE SITE
FINISHED SURFACE
APPROXIMATE LIMIT
OF EXCAVATION
HDPE LINER. SEE
DETAIL 1 ON THIS SHEET.
HDPE LINER ANCHOR. SEE
DETAIL 2 ON THIS SHEET.
FRENCH DRAIN. SEE
DETAIL 2 ON THIS SHEET.
EXISTING GROUND
MIN. 0.15m
4
09
DETAIL
CULVERT INLET
-0.5 0 0.5 1 21.5 2.5
SCALE 1:50
ARMTEC 140 NON-WOVEN
GEOTEXTILE OR APPROVED
EQUIVALENT
NILEX 60mil HDPE LINER OR APPROVED
EQUIVALENT. SEE DETAIL 1 ON THIS
SHEET FOR INSTALLATION DETAILS.
600mm HDPE CULVERT
ROAD RUNNING SURFACE
MIN. 0.15m DEEP
FRENCH DRAIN
WELL **COMPACTED SAND
COMPACTED
LEVELLING
COURSE MIN.
0.15m DEEP
APPROXIMATE LIMIT OF EXCAVATION
0.77m
0.65m
MINIMUM COVER
0.3m
SLOPE -2%SLOPE -
2%
COMMON FILL
2m
1m
ROAD OR COMMON FILL
**COMPACTED
COMMON FILL
**COMPACTED COMMON FILL
GRANULAR FILL TO BE
COMPACTED TO AT LEAST 95%
OF THE STANDARD PROCTOR
MAXIMUM DRY DENSITY.
90% PARENT MATERIAL
COMPACTION (TYP.).
-
CAUTION:
DRAWING SCALE MAY BE
DISTORTED WITH PRINTING.
INTENDED TO BE PRINTED ON
11"X17" PAPER.
PREPARED FOR:
nyrstar
SEAL OF B.C. P.ENG.
PROPOSED STOCK PILE YARD
PHASE 1
SITE: MYRA FALLS MINE
DESIGN BY: MIKE PAQUIN, EIT
DESIGN DATE: AUGUST 2, 2017
REVIEWED BY: JEREMY ARAKI, P.ENG
DRAWN BY: TODD FORBES
SITE VISIT: MIKE PAQUIN, EIT
SITE VISIT DATES: MAY 11, 2017
FILE NAME: STOCKPILEPH1GA.DWG
SCALE: AS NOTED
REVISION NUMBER: 3
REVISION DATE: OCTOBER 23, 2017
ALL MEASUREMENTS IN m UNLESS OTHERWISE NOTED.
PREPARED BY:
COASTAL OPERATIONS
1040 CEDAR STREET
CAMPBELL RIVER, BC, V9W 7E2
PH.: 250-287-9174 FAX: 866-235-6943
SHEET: OF 1111
DWG No:
635-8-STOCKPILEPH1GA- 011
CONCRETE BLOCK (INTERLOCKING)
WALL LAYER 1 (BASE LAYER) PLAN VIEW
SCALE 1:100
-1 0 1 2 43 5 -1 0 1 2 43 5
-1 0 1 2 43 5 -1 0 1 2 43 5
21.75m
42
m
21.75m
42
m
21.75m
42
m
21.75m
42
m
NOTE: FINISH OFF ENDS OF WALL
USING HALF SIZE CONCRETE BLOCKS
(INTERLOCKING). QTY. 2 REQUIRED
FOR THIS LAYER.
NOTE: FINISH OFF ENDS OF WALL
USING HALF SIZE CONCRETE BLOCKS
(INTERLOCKING). QTY. 2 REQUIRED
FOR THIS LAYER.
CONCRETE BLOCK (INTERLOCKING)
WALL LAYER 2 PLAN VIEW
SCALE 1:100
CONCRETE BLOCK (INTERLOCKING)
WALL LAYER 4 (TOP LAYER) PLAN VIEW
SCALE 1:100
CONCRETE BLOCK (INTERLOCKING)
WALL LAYER 3 PLAN VIEW
SCALE 1:100
2017-10-26T19:18:40-0700Jeremy Araki
2017-10-26T19:18:00-0700Jeremy Araki
2017-10-26T19:18:19-0700Jeremy Araki
2017-10-26T19:17:05-0700Jeremy Araki
2017-10-26T19:18:52-0700Jeremy Araki
2017-10-26T19:17:22-0700Jeremy Araki
2017-10-26T19:16:51-0700Jeremy Araki
2017-10-26T19:16:39-0700Jeremy Araki
2017-10-26T19:16:24-0700Jeremy Araki
2017-10-26T19:16:12-0700Jeremy Araki