proposed state route 241/91 tolled express lane ......proposed state route 241/91 tolled express...

8
Transportation Corridor Agencies t .. Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact Statement Public Hearing – November 29, 2016 Intérpretes de español disponibles Project EA#1200020097

Upload: others

Post on 30-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies t ..

Proposed State Route 241/91 Tolled Express Lanes Connector

Draft Supplemental Environmental Impact Report/ Environmental Impact Statement

Public Hearing – November 29, 2016

Intérpretes de español disponibles Project EA#1200020097

Page 2: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Regional Location

Intérpretes de español disponibles

Page 3: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies

EXISTING OCTA EXPRESS LANES

FUTURE RCTC EXPRESS LANES

Project Area Map

PROJECT AREA

WINDY RIDGE TOLL PLAZA

WINDY RIDGE WILDLIFE UNDERCROSSING

GYPSUM CANYON RD

Villa Park

Orange

Yorba Linda

Anaheim

Brea Chino Hills State Park

Placentia

Corona

Norco

Eastvale Riverside

LAKEVIEW AVE

TUSTIN AVE

WEIR CANYON RD

GREEN RIVER RD

LINCO

LN AV

E

SERF

AS CL

UBMA

PLE S

T

MAIN

ST

McKINLEY ST

RIVERSIDE COUNTY

ORANGE COUNTY

IMPERIAL HWY

COAL

CANY

ONUN

DERC

ROSS

ING

15

15

Page 4: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies T• ,·,

Project at a Glance

• Project Limits: Located at the junction of SR-241 and SR-91, spanning 8.7 miles, within the cities of Anaheim and Yorba Linda

• Estimated Total Project Cost: $180 million

• Schedule: Anticipated to begin construction in mid-2018 and be completed by/open late 2020

• Toll Rates: 241/91 Express Lanes Connector will have separate toll that will change to maintain “free flow” commute

• Electronic Tolling: Travel on 241/91 Express Connector will require a FasTrak transponder

Intérpretes de español disponibles

Page 5: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies T• ,·,

Project Benefits

• Reduces traffic congestion by offering additional choice for drivers through the congested corridor

• Increases regional throughput by 7% within 91 corridor

• Enhances safety by reducing need to weave across multiple lanes

• Improves access between time-saving toll lanes in Orange and Riverside Counties

• Implements dynamically-priced toll-to-toll connector to control vehicle flow

• Completes link to 91 Express Lanes currently being extended east to I-15 by Riverside County Transportation Commission

Intérpretes de español disponibles

Page 6: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies --·

Environmental Process

CEQA NEPA

Supplemental EIR

Notice of Preparation of EIR

Responsible Agency Letters

Public and Agency Review (60 Days)

State Clearinghouse Review and Distribution

Public Hearing (November 29, 2016)

Final EIR Findings

Review of Responses by Agencies

Agency (Caltrans) Decision

File Notice of Determination with State Clearinghouse

Draft Environmental Impact Report/Environmental Impact Statement

Publication of Notice of Availability/Notice of Public Hearing

Supplemental EIS

Notice of Intent to Prepare EIS

Cooperating/Participating Agency Letters

Coordination Plan

EPA Filing, Federal Register Publication and Distribution

Final EIS Findings and Record of Decision (ROD)/Agency (Caltrans) Decision

Publish Notice of Availability of Final EIS/ROD

Public and Agency Review; EPA Filing; Federal Register Notice

We are here

Page 7: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies T• ,·,

Project Purpose

• Implement build-out of the Express Connector, approved in 1994

• Attain compatibility with SR-91 mainline and SR-91 Express Lanes

• Improve traffic flow and operations by reducing weaving across multiple general purpose lanes between the 91 Express Lanes and the SR-241 general purpose lane connectors

• Enhance efficiency of the tolled system, thereby reducing congestion on the non-tolled system on SR-91

Intérpretes de español disponibles

Page 8: Proposed State Route 241/91 Tolled Express Lane ......Proposed State Route 241/91 Tolled Express Lanes Connector Draft Supplemental Environmental Impact Report/ Environmental Impact

Transportation Corridor Agencies T• ,·,

Project Need

• Demand exceeds capacity on the northbound SR-241 connector to the eastbound SR-91 and on the westbound SR-91 connector to the southbound SR-241

• Northbound vehicles on SR-241 cannot access the eastbound SR-91 Express Lanes

• Westbound 91 Express Lanes motorists cannot access southbound SR-241

• Weaving between the general purpose connectors and the median lanes degrades the level of service due to increased vehicle density. In addition, weaving contributes to sideswipe accidents