Rogu e Va l l ey OR 99
Co r r i d o r P l a n U p d a t e
J a ck so n Coun t y Com m i ssi o n er s
B r i e f i n gJ a n u a r y 28 , 20 14
-
8/13/2019 Proposed Highway 99 updates
2/13
OR 99 Rogu e Va l l ey Co r r i d o r
1. History
Began in 2010:
Initiated to evaluate the OR 99 corridor from South
Medford to North Ashland (out to 2034):
Mobility, Safety, Livability, and Multi-modal goals;
Several pauses for additional analysiss;
2. Public Involvement
Technical Advisory (Jackson Co., Talent, Ashland, Phoenix,Medford, RVTD, RVCOG, and ODOT)
Citizen Advisory
Open Houses (4 open houses in Talent and Phoenix)
-
8/13/2019 Proposed Highway 99 updates
3/13
Co r r i d o r P l a n n i n g A r ea
-
8/13/2019 Proposed Highway 99 updates
4/13
15,600
14,900
18,000
18,600
LEGEND
12,800
12,200
15,100
16,100
14,300
13,600
16,800
18,500
4,800
4,600
5,800
6,100
7,700
7,300
8,700
9,500
14,300
13,700
17,50018,000
15,800
15,000
18,000
18,100
7,200
6,800
8,400
9,300
4,800
4,600
6,200
6,200
8,300
7,900
10,000
10,900
9,200
8,800
11,000
10,900
8,200
7,800
10,000
9,800
8,800
8,400
9,300
9,400
18,200
16,600
18,700
19,900
2010 Volume (vehicles)
2012 Volume (vehicles)
2007 Volume (vehicles)
2004 Volume (vehicles)
-
8/13/2019 Proposed Highway 99 updates
5/13
I d eas an d Con cep t s Developed from feedback at TAC and CAC meetings and
requests for additional analysis from various agencies;
Concepts identified and presented:
Improved lighting;
Better access to transit facilities;
Charlotte Ann Rd to Coleman Creek Culvert Implement a 5-lane Cross-section and Add Bike
Lanes and Sidewalks;
Coleman Creek Crossing - Add Bicycle and Pedestrian
Facilities;
Phoenix South End of Couplet to South City Limits -
Implement a 3-lane Cross-section and Add BikeLanes and Sidewalks;
Phoenix South City Limits to Talent Implement a 3-
lane Cross-section and Widen Shoulders;
Enhanced Bear Creek Greenway Connections and
improved signage
-
8/13/2019 Proposed Highway 99 updates
6/13
Cha r l o t t e An n Rd t o Co l em an Cr eek Cu l v er t I m p l em en t a 5 -
l a n e r est r i p ed sect i o n a n d a d d B i k e L a n e s a n d Si d ew a l k s
14'Median
Intermittent
Sidewalk
12'Travel Lane
14-18'Travel Lane
14-16'Travel Lane
Intermittent
Sidewalk
66-72' Pavement Width (Existing)
EXISTING 5-LANE CROSS-SECTION
70' Right of Way
12'Travel Lane
70-foot ROW in manysections;
Paved width is 66 to 72 feet;
5 travel lanes ;
Sidewalks are outside ROW;
Volume too high for 3-lane(est. future 17,000 to 22,000vpd);
Restriping is more feasible;
Minimal ROW needed for
additional sidewalkimprovements;
12'Median
6'Sidewalk
5'Bike Lane
11-12'Travel Lane
11-12'Travel Lane
11-12'Travel Lane
6'Sidewalk
5'Bike Lane
66-72' Pavement Width
OPTION A - 5-LANE RESTRIPED CROSS-SECTION
70-100' Existing Rightof Way
11-12'Travel Lane
-
8/13/2019 Proposed Highway 99 updates
7/13
Charlotte Ann Road to Coleman Creek
Concept(s): Concept 3A Lane restriping - $3.5 million;
Concept 3B Widening to full standard - $9.7 million;
Concept 34 Lane Reduction with sidewalks in ROW - $7.3 million;
Recommendation:
Option A
12'Median
6'Sidewalk
5'Bike Lane
11-12'Travel Lane
11-12'Travel Lane
11-12'Travel Lane
6'Sidewalk
5'Bike Lane
66-72' Pavement Width
OPTION A - 5-LANE RESTRIPED CROSS-SECTION
70-100' Existing Right of Way
11-12'Travel Lane
-
8/13/2019 Proposed Highway 99 updates
8/13
Co l em an Cr eek Cr o ssi n g - Add B i cy cl e an d Pedest r i a n Faci l i t i e s
O p t i o n A
Culvert that carries Coleman Creekunder OR 99 is 75 feet wide
Currently supports approximately 70
feet of roadway structure
Could modify 70-foot structure to include: 6-foot sidewalks on both sides
5-foot bike lanes on both sides
11-foot travel lanes (same as FVI) 4-foot painted or raise median
OPTION A: COLEMAN CREEK CROSSING
11'TravelLane
11'TravelLane
5'Bike Lane
6'Sidewalk
5'Bike Lane
6'Sidewalk
11'TravelLane
58' Paved Surface
70' Minimum Right of Way Required
11'TravelLane4'
EXISTING COLEMAN CREEK CROSSING
14'TravelLane
12'TravelLane
14'TravelLane
2'Sidewalk
2'Sidewalk
14'TravelLane
66' Paved Surface
70' Minimum Right of Way Required
12'TravelLane
-
8/13/2019 Proposed Highway 99 updates
9/13
OPTION B: COLEMAN CREEK CROSSING
11'Travel Lane
11'Travel Lane
10'Path
10'Path
12'Travel Lane
50' Paved Surface
70' Minimum Right of Way Required
12'Travel Lane4'
Co l em an Cr eek Cr o ssi n g - Add B i cy cl e an d Pedest r i a n
Fac i l i t i es Op t i on B
Culvert that carries Coleman Creek under OR 99
is 75 feet wide
Currently supports approximately 70 feet of
roadway structure
Could modify 70-foot structure to include: 10-foot multi-use path on both sides
11- to 12-foot travel lanes (similar to FVI)
4-foot painted or raise median
EXISTING COLEMAN CREEK CROSSING
14'TravelLane
12'TravelLane
14'TravelLane
2'Sidewalk
2'Sidewalk
14'TravelLane
66' Paved Surface
70' Minimum Right of Way Required
12'TravelLane
-
8/13/2019 Proposed Highway 99 updates
10/13
Phoen i x Sou t h End o f Coup l e t t o Sou t h Ci t y L i m i t s - I m p l em en t
a l a n e r ed u ct i o n a n d a d d B i k e L a n e s a n d Si d ew a l k
75-foot ROW available
Paved width is 50 to 52 feet
4 travel lanes
No sidewalks or bike lanes
Entire cross section within existing ROW Could modify existing to include:
6-foot bike lanes on both sides
12-foot travel lanes and 14-foot center
lane
Add sidewalks on both sides (could
include landscape buffers within ROW)
2'
Shoulder
2'11-12'
Travel Lane
12'Travel Lane
12'Travel Lane
11-12'Travel Lane
50-52' Paved Surface
EXISTING 4-LANE CROSS-SECTION
Shoulder
75' Right of Way Available
12'TravelLane12'TravelLane 6'Bike Lane6'Sidewalk 6'Bike Lane 6'Sidewalk14'Center Lane
50'Paved Surface
3 LANE CROSS-SECTION-
64' MinimumRight of Way Required
-
8/13/2019 Proposed Highway 99 updates
11/13
7'Shoulder
7'Shoulder
12'Travel Lane
14'Left-TurnLa ne
12'Travel Lane
52' Paved Surface
POTENTIAL RURAL INTERSECTION OR 3-LANE CROSS-SECTION
70' Minimum Right of Way Available
Phoen i x Sou t h Ci t y L i m i t s t o T a l en t I m p l em en t a L a n e Redu ct i o n
a n d W i d en Shou l d er s
70-foot minimum ROW available
Paved width is 50 to 52 feet
4 travel lanes, no shoulders
No change in paved surface
Could modify to a 2-lane cross section:
10-foot shoulders both sides
12-foot travel lanes and 8-foot median
Could modify to a 3-lane cross section:
7-foot shoulders both sides
12-foot travel lanes and 14-foot center lane
2'
Shoulder
2'12'
Travel Lane
12'TravelLane
12'TravelLane
12'TravelLane
52' Paved Surface
EXISTING 4-LANE RURAL CROSS-SECTION
Shoulder
70' Minimum Right of Way Available
Wider shoulders (7-10 feet) accommodate bicyclists
or pedestrians and allow vehicles to pull off the
roadway, if necessary
3-lane cross-section has lower predicted crash ratethan 4-lane cross-section
-
8/13/2019 Proposed Highway 99 updates
12/13
Enh an ced Bea r Cr eek G r eenw ay Conn ect i o n s an d
S ignage
Location of new trail connection
Location of enhanced trail signage
OR Highway 99
Bear Creek GreenwayStreet connection to Bear Creek Greenway
New trail connection to Bear Creek Greenway
-
8/13/2019 Proposed Highway 99 updates