proposed elevations - 1015

6
145.14 144.88 144.86 144.87 145.49 145.25 144.96 144.85 144.78 145.31 145.46 145.50 145.31 144.89 144.84 144.75 144.98 145.17 144.78 144.80 144.61 144.56 144.38 144.43 145.28 145.29 145.09 144.86 144.71 144.57 144.55 145.20 145.01 144.76 145.19 145.38 145.37 145.10 144.98 144.84 144.69 144.60 145.32 145.12 144.88 144.66 144.82 144.96 144.82 144.95 145.09 144.83 144.84 145.13 145.15 145.19 144.70 144.63 144.68 144.61 144.61 144.61 TWL145.58 S.CH High Street West Cross Street FFL145.12 F/FC2.48 FFL145.12 S.CH F/FC2.49 FFL145.12 Conc Ht1.8m 144.84 P P P F/FC2.61 FFL145.10 F/FC2.56 FFL145.11 F/C3.76 145.18 145.62 Dp Riser Shop Signage Shop Signage 145.20 RS Kerb Kerb ACU F/H 2.00 F/H 2.02 144.85 RS Tarmac Paving Paving Paving Tac Ledge Ht0.52 Racking F/S0.52 F/H2.32 Col F/S0.51 F/H2.36 F/H1.94 F/H 2.15 F/C 2.86 BT THL144.87 Timber Decking area Conc Wood C Desk Conc Carpet Carpet Carpet Ledge Carpet F/C2.62 Elevation 3 Elevation 2 Elevation 1 C Section 1 Section 2 Section 2 P Desk C F/H 1.92 144.73 F/FC2.48 FFL145.12 Wood 145.12 145.23 145.19 145.06 ST ST IC CL145.25 145.17 145.34 Stone wall P/R Ht1.4m P/R Ht1.4m Paving TP 145.18 Entrance mat Cladded wall line surveyed in SuperDrug ADJACENT PROPERTY CURRENTLY SUPERDRUG Surface change Surface change Understair Room Sloping ceiling Roller shutter F/H 2.06 F/FC2.54 TTL TTL TTL FIRE EXIT UP UP UP Surface change F/H 1.98 F/H 1.97 Section 1 EXISTING GROUND FLOOR PLAN 148.21 148.25 Cross Street Kerb Kerb WSL149.33 WHL150.21 Parapet148.63 Parapet148.60 TWL148.46 FFL148.33 F/S0.38 F/H1.78 F/S0.38 F/H1.82 FFL148.15 Carpet FFL148.15 Carpet F/S0.94 F/H1.68 F/S0.78 F/H1.50 F/H 2.02 F/C2.30 F/U1.90 F/C2.11 F/C2.90 F/C3.51 P P P P P F/U3.00 F/C3.53 Worktop Wall Ht2.5m F/C2.30 F/C2.30 F/C3.53 F/C3.49 F/C3.49 TWL148.46 Section 2 Section 2 Section 1 Section 1 High Street West Vinyl Vinyl P Elevation 3 Elevation 2 Elevation 1 Ledge 148.28 drainer FLAT ROOF AREA (Limited access) FLAT ROOF AREA (Limited access) F/H2.02 F/H2.00 F/H2.00 UP DOWN FFL148.15 SCL151.47 SCL150.58 SCL150.46 EXISTING FIRST FLOOR PLAN Shown for context purposes only Flat ceiling F/C2.91 Flat ceiling Ceiling trap Sloping ceiling Sloping ceiling Notes: PRODUCTION DRAWINGS Drawn By: Do not scale from this drawing. Dimensions to be checked on site Drawing Number: Scale: Date: Revision: On Behalf Of: Optical Superstores Drawn By: Title: Project: Amendments: Rev Init. Date Description latypus Limited Design & Project Management Services P Ingledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL Tel: 07899 896 934 Fax: (01629) 581374 6GN +44 (0) 115 933 0800 (CZ +44 (0) 115 982 6071 CAD Department, Business Development, Cirrus House, 10 Experian Way, Nottingham NOTTS NG2 1EP 5RGEUCXGTU 1PNKPG YYYURGEUCXGTUEQO 'ÄOCKN .[PPG 5GKIPQV N[PPGUGKIPQV"URGEUCXGTUEQO GLOSSOP New Store Specsavers Opticians 41 High Street West Glossop Derbyshire SK13 8AZ Existing Ground & First Floor Plans JS 1:50 1:100@A3 13/07/2016 1485/1010 - 0 s c a l e i n m e t r e s (for floor plans, sections and elevations) 5 4 1 2 3 7KLV GUDZLQJ LV WKH SURSHUW\ RI 6SHFVDYHUV 2SWLFDO 6XSHUVWRUHV ZKR UHWDLQ WKH VROH FRS\ULJKW RI LWV FRQWHQWV LW PD\ QRW EH UHSURGXFHG LQ SDUW RU LQ ZKROH ZLWKRXW ZULWWHQ SHUPLVVLRQ - - - - Frame Numbers Retail Area Total Areas Schedules: 0

Upload: others

Post on 09-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

145.14

144.88

144.86

144.87

145.49

145.25

144.96

144.85

144.78

145.31

145.46

145.50

145.31

144.89

144.84

144.75

144.98

145.17

144.78

144.80

144.61

144.56

144.38

144.43

145.28

145.29

145.09

144.86

144.71

144.57

144.55

145.20

145.01144.76

145.19

145.38

145.37

145.10

144.98

144.84

144.69

144.60

145.32

145.12

144.88

144.66

144.82

144.96

144.82

144.95

145.09

144.83

144.84

145.13

145.15

145.19

144.70

144.63

144.68

144.61144.61

144.61

TWL145.58

S.CH

High Street West

Cro

ss S

tre

et

FFL145.12

F/FC2.48

FFL145.12

S.CH

F/FC2.49

FFL145.12

Conc

Ht1.8m

144.84

P

P

P

F/FC2.61

FFL145.10

F/FC2.56

FFL145.11

F/C3.76

145.18

145.62

Dp

Riser

Shop Signage

Shop S

ignage

145.20

RS

Kerb

Kerb

ACU

F/H

2.0

0

F/H

2.02

144.85

RS

Tarmac

Paving

Paving

Paving

Tac

Ledge

Ht0.52

Racking

F/S

0.52

F/H

2.32

Col

F/S0.51

F/H2.36

F/H1.94

F/H

2.15

F/C 2.86

BT

THL144.87

Timber Decking area

Conc

Wood

C

Desk

Conc

Carpet

Carpet

Carpet

Ledge

Carpet

F/C2.62

Elevation 3

Ele

va

tio

n 2

Elevation 1

C

Se

ctio

n 1

Section 2 Section 2

P

Desk

C

F/H

1.92

144.73

F/FC2.48

FFL145.12

Wood

145.12

145.23

145.19

145.06

ST

ST

IC

CL145.25

145.17

145.34

Stone wall

P/R Ht1.4m

P/R

Ht1.4m

Paving

TP

145.18

Entrance

mat

Cladded wall line surveyed inSuperDrug

ADJACENT PROPERTY

CURRENTLY SUPERDRUG

Surface change

Surface change

Understair Room

Sloping ceiling

Roller shutterF/H 2.06

F/FC2.54

T

T

L

T

T

L

T

T

L

FIRE

EXIT

UP

UP

UP

Surface change

F/H 1.98 F/H 1.97

Se

ctio

n 1

EXISTING GROUND FLOOR PLAN

148.21

148.25

Cro

ss S

tre

et

Kerb

Kerb

WSL149.33

WHL150.21

Parapet148.63

Parapet148.60

TWL148.46

FFL148.33

F/S0.38

F/H1.78

F/S0.38

F/H1.82

FFL148.15

Carpet

FFL148.15

Carpet

F/S0.94

F/H1.68

F/S0.78

F/H1.50

F/H

2.02

F/C2.30

F/U1.90

F/C2.11

F/C2.90

F/C3.51

P

P

P

P

P

F/U3.00

F/C3.53

Worktop

Wall Ht2.5m

F/C2.30

F/C2.30

F/C3.53

F/C3.49

F/C3.49

TWL148.46

Section 2

Section 2

Se

ctio

n 1

Se

ctio

n 1

High Street West

Vinyl

Vinyl

P

Elevation 3

Ele

va

tio

n 2

Elevation 1

Ledge

148.28

drainer

FLAT ROOF AREA

(Limited access)

FLAT ROOF AREA

(Limited access)

F/H2.02

F/H2.00

F/H2.00

UP

DOWN

FFL148.15

SCL151.47

SCL150.58

SCL150.46

EXISTING FIRST FLOOR PLAN

Shown for context purposesonly

Flat ceiling

F/C2.91

Flat ceiling

Ceiling

trap

Sloping

ceiling

Sloping ceiling

Notes:

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street West

Glossop

Derbyshire

SK13 8AZ

Existing Ground & First

Floor Plans

JS 1:50

1:100@A3

13/07/2016

1485/1010 -

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

-- - -

Frame Numbers

Retail Area

Total Areas

Schedules:

0

High Street

REAR YARD

Shop Entrance

Datum 143.000m

Datum 143.000m

153.00

150.52

150.44

P P

P

RECEPTION AREA

CORRIDOR

KITCHEN

signage

Shop

FCL147.60

150.45

FCL147.67 FCL147.67

148.25

148.60

FFL145.12 FFL145.12 FFL145.12

FFL145.12

145.06

145.22

FFL148.15

Window

Window

144.61

SECTION 1

Datum 143.000mDatum 143.000m

RECEPTION AREA

Cross Street

SUPERDRUG STORE

FFL148.15

FFL145.12

FCL147.60

145.13

153.00

SECTION 2

Notes:

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street West

Glossop

Derbyshire

SK13 8AZ

Existing Sections

JS 1:50@A1

1:100@A3

13/07/2016

1485/1011 -

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

-- - -

Fire Alarm System

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Emergency lighting

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Frame Numbers

Retail Area

Total Areas

Schedules:

0

Cro

ss S

tre

et

Fire

Exit

Fire

Exit

5339

Accessories

5340

700V

1200V LED

10000

CL teach

Till

ST

FIELDS

PRE-TEST/FUNDUS

CL Sign

Collections sign

ST

Tr

Tr

Tr

Acc

HC Sign

pa

tte

rn

ed

w

allp

ap

er

TEST ROOM 1

TEST ROOM 2

700V 700V

144.88

144.86

145.31

145.31

144.89

144.84

144.75

144.98

145.17

144.78

144.80

144.61

144.56

145.28

145.29

145.09

144.57

144.55

145.20

145.01

144.76

145.19

145.38

145.37

145.10

144.69

144.60

145.32

145.12

144.88

144.66

144.82

144.96

144.84

145.13

145.15

145.19

144.70

144.63

144.68

144.61144.61

144.61

TWL145.58

S.CH

S.CH

Conc

Ht1.8m

144.84

145.18

Dp

145.20

Kerb

144.85

RS

Tarmac

Paving

Paving

Paving

Tac

BT

THL144.87

Timber Decking area

145.12

145.23

145.19

145.06

ST

ST

IC

CL145.25

145.17

145.34

Stone wall

P/R Ht1.4m

P/R

Ht1.4m

Paving

TP

144.73

UP

144.71144.84

144.86 144.98

145.09

Riser

Kerb

RS

144.82

144.95

High Street West

PROPOSED GROUND FLOOR PLAN

Se

ctio

n 1

Elevation 3

Elevation 1

Se

ctio

n 1

F/S

0.52

F/H

2.32

Mirror could be a bespoke wider mirror

UP

Col

DG01

DG02

DG03

DG04

DG05

DG06

DG07

2400 (T

ES

T R

OO

M 2)

Service rear roller shutter andcheck for full operation

3300 (TEST ROOM 2)

3300 (T

ES

T R

OO

M 1)

2400(TEST ROOM 1 )

1500 (F

IE

LD

S)

1400

(P

RE

- T

ES

T

/F

UN

DU

S)

1850 (FIELDS)

HALF

HEIGHT

WALL

HALF

HEIGHT

WALL

(New entrance mat)

D

ipad x 2

binned

printer

D

C

D

C

D

C

D

C

D

D

standing

height ibars

Adj.

cup'd

600

(hard flooring - Expona Commercial)

(carpet - Tessera

TCT4760 prism)

C

D

C

C

D D

CHAIR

PROTECT

RAIL

Gravity

(carpet - Thai - colour

9900074)

C

D

C

C

D

D

CHAIR

PROTECT

RAIL

Gravity

(carpet - Thai - colour

9900074)

D

C

Pumped

Adj.

cup'd

1200

C

D

C

D

CHAIR

PROTECT

RAIL

CHAIR

PROTECT RAIL

CHAIR

PROTECT RAIL

CHAIR PROTECT RAIL

C

D

C

D

CHAIR

PROTECT

RAIL

CHAIR

PROTECT

RAIL

CHAIR

PROTECT

RAIL

CHAIR

PROTECT

RAIL

O/D HEATER

and change locks. Five keys required. Install externallighting to fire exit to the rear on a PIR sensor

(Existing floor finish

to be retained)

Install external lighting to fire exit tonew side door on a PIR sensor

GF access to electrics to the front ofthe store is to be enclosed in a firerated cupboard, fit a hazard sign to thenew door and ensure the door is firerated. The distribution board is to beretained as per the initial site meetingreport.

Engage structural engineer toinvestigate external L/H flank wallwhere new door is proposed. Installlintel and new door as per strucutraldesings.

Engage structural engineer toinvestigate external L/H flank wallwhere new door is proposed. Installlintel and new door as per strucutraldesings.

The measured survey has not

identified which areas of

perimeter are lined and which

are solid. Therefore the line of

new dry lining is shown

indicatively on the same

perimeter line.

Note: An access hatch in this

face of the pier may need to be

retained

If possible the new dry lining to

this pier should allow for the

footprint to be reduced in size

Wifi

D

Wifi

D

Install new data point above

suspended ceiling for for new

wireless access routers

Install new data point above

suspended ceiling for for new

wireless access routers

H

Allow for 2no water heaters to

feed the store. Locations to be

agreed at PCM. 1no to provide

hot water to all test rooms, CLT

and 1no to service staffroom

and WC's.

RE

PA

IR

A

ND

M

AK

E G

OO

D A

NY

D

AM

AG

E T

O W

ALLS

AN

D S

OF

FIT

S A

ND

D

EC

OR

AT

E A

LL R

ET

AIL A

RE

AS

IN

CLU

DIN

G T

ES

T R

OO

MS

1 &

2, D

IS

PE

NS

IN

G A

RE

A,

FIE

LD

S/F

UN

DU

S &

P

RE

-T

ES

T A

RE

A, W

AIT

IN

G A

RE

A,

CU

ST

OM

ER

C

OR

RID

OR

S, IN

S

PE

CA

VE

RS

S

TA

ND

AR

D

SP

EC

IF

IC

AT

IO

N (W

ALLS

IN

G

RE

EN

T

IM

BE

R W

OR

K IN

SILV

ER

)

MECHANICAL VENTILATION TO BE

INSTALLED BY SPECIALIST A/C

CONTRACTOR REFER TO A/C

CONTRACTORS DRAWINGS FOR DETAILS

AIR CONDITIONING & VENTILATION

STRUCTURAL ALTERATIONS

ELECTRICAL INSTALLATIONS

PLUMBING REQUIREMENTS

EMERGENCY PROVISIONS

WORKS APPLICABLE TO GROUND FLOOR

TEST ROOMS 1& 2 & CL TEACH & TO FIRST

FLOOR W.C. & STAFF ROOM

- ALL FIRE EXIT SIGNAGE TO BE IN

ACCORDANCE WITH B.S 5499 PART 1.

- ALL EMERGENCY LIGHTING TO BE IN

ACCORDANCE WITH B.S 5266 PART 1.

- ALL AUTOMATIC FIRE DETECTION TO BE

IN ACCORDANCE WITH B.S 5839 PART 1

(2013).

- ALL SAFETY GLAZING TO COMPLY WITH

B.S 6206 AND B.S 6262.

- ALL WORK TO COMPLY IN ACCORDANCE

WITH THE APPLICABLE LOCAL

REGULATIONS, STANDARDS AND

PUBLICATIONS.

ANY STRUCTURAL ALTERATIONS, NEW

LOAD BEARING ELEMENTS AND REMOVAL

OF WALLS ETC., TO BE CARRIED OUT IN

STRICT ACCORDANCE WITH STRUCTURAL

ENGINEERS DETAILS AND CALCULATION

SHEETS.

DEMOLITION & STRIP-OUT

REMOVE ALL WALLS WHERE NECESSARY

AS INDICATED ON PLAN AND CART AWAY

DEBRIS FROM SITE.

CONTRACTOR TO ALLOW FOR MAKING

GOOD OF ALL AREAS PRIOR TO

REDECORATION.

NOTES - SPECSAVERS DRAWINGS TO BE READ IN CONJUNCTION WITH THE SCHEDULE OF WORKS

PROVIDE AND INSTALL ALL NEW

ELECTRICAL FITTINGS AS SPECIFIED ON

LEGEND, AND TO COMPLY WITH THE '17TH

EDITION OF THE INSTITUTE OF

ELECTRICAL ENGINEERS REGULATIONS',

THE LOCAL ELECTRICITY BOARD

REQUIREMENTS AND ALL RELEVANT

BRITISH STANDARDS,CODES OF

PRACTICE,CIBSE PUBLICATION'S AND

APPROVED DOCUMENT L2B.

CONTRACTOR TO PROVIDE THE

RELEVANT CERTIFICATION UPON

COMPLETION. ALLOW FOR FINAL

LOCATION OF MULTIPOINT HEATERS TO

BE DIRECTED ON SITE.

UNSWITCHED FUSED SPUR WITH

INDICATOR LIGHT SHOULD ONLY BE

INSTALLED IF SANIFLOW PUMP IS

REQUIRED.

PARTITION OR WALL REMOVED

EXISTING PARTITION OR WALL

PROPOSED PARTITIONING

PROPOSED PARTITIONING WITH

COMPLIANT SOUND INSULATION

PROPOSED HALF HEIGHT

PARTITIONING (1450mm HIGH)

HALF

HEIGHT

WALL

WALL LEGEND

PROPOSED PARTITIONING WITH

HEARCARE COMPLIANT SOUND

INSULATION

DOOR REF. NUMBER

INDICATED ON DOOR SCHEDULE

OTHER SYMBOLS

DR:

SUSPENDED CEILING HEIGHT

INDICATED ON CEILING LAYOUT

2400mm

D F T

D F T

F T

D F T

D F T

D

COMMUNICATION SOCKET Mounted slightly above plinth (105mm AFFL)

COMMUNICATION SOCKET Mounted at low level (400mm AFFL)

COMMUNICATION SOCKET Mounted below worktop level (600mm AFFL)

COMMUNICATION SOCKET Mounted in trunking (1290mm AFFL)

COMMUNICATION SOCKET Mounted at high level (1840mm AFFL)

COMMUNICATION FITTINGS

DATA TELFAX

HEATER

O/D HEATER

H

SWITCHED SOCKET Mounted slightly above plinth

(105mm AFFL)

SWITCHED SOCKET Mounted at low level (400mm AFFL)

SWITCHED SOCKET Mounted in trunking below worktop

level (600mm AFFL)

SWITCHED SOCKET Mounted in trunking (1290mm AFFL)

SWITCHED SOCKET Mounted at high level (1840mm

AFFL)

POWER FITTINGS

SINGLE DESCRIPTIONDOUBLE

CLEAN SWITCHED SOCKET Mounted slightly above plinth

(105mm AFFL)

CLEAN SWITCHED SOCKET Mounted at low level

(400mm AFFL)

CLEAN SWITCHED SOCKET Mounted below worktop level

(600mm AFFL)

CLEAN SWITCHED SOCKET Mounted in trunking

(1290mm AFFL)

CLEAN SWITCHED SOCKET Mounted at high level

(1840mm AFFL)

C

C

C

C

C

C

CLEAN SWITCHED SOCKET Mounted in trunking

(1290mm AFFL)

CLEAN SWITCHED SOCKET Mounted at high level

(1840mm AFFL)

TT

HIGH LEVEL MULTI-POINT WATER HEATER

WALL HEATER

OVER DOOR HEATER

SWITCHED FUSED SPUR WITH INDICATOR LIGHT

UN-SWITCHED FUSED SPUR WITH INDICATOR LIGHT

KLICK SOCKET MOUNTED ON CEILING

SWITCHED SOCKET Mounted at ceiling level

C

C

C

SWITCHED SOCKET Mounted below worktop level

(600mm AFFL)

CLEAN SWITCHED SOCKET Mounted in trunking below

worktop level (600mm AFFL)

CC

ELECTROMAGNETIC DOOR HOLD OPEN DEVISE

FLOOR BOX

Mounted within 400mm of serviced fitting

Mounted within 400mm of serviced fitting

CO-AXIAL/ SCART

CABLE/SOCKET

Cro

ss S

tre

et

Ke

rb

Kerb

F/S0.94

F/H1.68

F/S0.78

F/H1.50

Worktop

Worktop

148.21

148.25

TWL148.46

TWL148.46

Parapet148.63

Parapet148.60

UP

WS

L149.33

WH

L150.21

DOWN

SCL151.47

Ledge

148.28

PROPOSED FIRST FLOOR PLAN

F/S0.38

F/H1.78

F/S0.38

F/H1.82

DF01

DF02

DF03 DF04

HE

AT

ER

HE

AT

ER

(vinyl)

(vinyl)(vinyl)

(Existing floor finish

to be retained)

Gravity

Gravity

Re-laminate vanity unit top as per initialsite visit report

Retain existing first floor WC's, deepclean, replace WC seats and sealaround base of sanitary ware withsilicone

Retain existing kitchen and deep clean,test all servies and replace siliconesealant

D

D

CC

HU

B

D

D

T

15u data

cabinet

iharmony

cube

Note: positions of cabinets to beagreed with PM

H

Allow for 2no water heaters to feed thestore. Locations to be agreed at PCM. 1noto provide hot water to all test rooms, CLTand 1no to service staffroom and WC's.

RE

PA

IR

A

ND

M

AK

E G

OO

D A

NY

D

AM

AG

E T

O W

ALLS

AN

D S

OF

FIT

S A

ND

D

EC

OR

AT

E A

LL A

NC

ILLA

RY

AR

EA

S IN

CLU

DIN

G T

HE

S

TA

IR

S T

O T

HE

F

IR

ST

FLO

OR

S

TA

FF

R

OO

M A

ND

W

.C

, IN

S

PE

CA

VE

RS

ST

AN

DA

RD

S

PE

CIF

IC

AT

IO

N (W

ALLS

IN

M

AG

NO

LIA

TIM

BE

R W

OR

K IN

W

HIT

E)

Notes:

Access Statement

These layouts have been drawn in accordance with the agreedAccessibility Statement Version 9.

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street West

Glossop

Derbyshire

SK13 8AZ

Proposed Ground & First Floor Plans -

General Arrangement, Power

& Communications

JS 1:50@A1

1:100@A3

13/07/2016

1485/1012 -

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

-- - -

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

Fire Alarm System

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Emergency lighting

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Frame Numbers

Retail Area

Total Areas

Schedules:

1080

DOOR SPECIFICATION HARDWARE

DOOR SCHEDULE - TO BE READ IN CONJUNCTION WITH SPEC. MANUAL

Existing entrance doors - to be redecorated in basalt grey

DG02

WHITE

DOOR

FINISH

NO. 826 mm 926 mm 30 min 60 min SNGL DBLE

DOOR

WIDTH

FIRE

RATING

VISION

PANELS

DIGI

LOCK

DOOR

CLOSE

FIRE

DOOR

HOLD

OPEN

GREY SILVERBEECH

NOTES

DOOR SPECIFICATION HARDWARE

WHITE

DOOR

FINISH

NO. 826 mm 926 mm 30 min 60 min SNGL DBLE

DOOR

WIDTH

FIRE

RATING

VISION

PANELS

DIGI

LOCK

DOOR

CLOSE

FIRE

DOOR

HOLD

OPEN

GREY SILVERBEECH

NOTES

DG01

DG03

DF02

DG04

DG05

DF01

DF03

DF04

New door size to suit - decorated in silver to Specsavers standard specification.

Install new SSA ironmongery to Specsavers standard specification including

mortice lock.

New door - decorated in white to Specsavers standard specification. Install

standard fire escape push bar fire escape ironmongery to Specsavers standard

specification. No external locking devices, external steel plate. . As the door is

external the frame and door are to be paint grade hardwood. Finish in grey.

Existing door - to be retained and decorated in silver to Specsavers standard

specification. Check existing ironmongery and change locks - note: 5 No. keys

will be required.

Existing door - to be redecorated in white to Specsavers standard specification.

Install new vision panel and ancillary ironmongery to Specsavers standard

specification.

Existing door - to be redecorated in white to Specsavers standard specification.

Install new ancillary ironmongery to Specsavers standard specification.

DG06

Existing door - to be redecorated in white to Specsavers standard ancillary

specification. Install new vision panels if required. Install magnetic hold open

devise linked to fire alarm to automatically release on activation of alarm and

new ancillary ironmongery to Specsavers standard specification.

BASALT

GREY

New door - decorated in silver to Specsavers standard specification. Install new

SSA ironmongery to Specsavers standard specification including digi lock.

Install spur above ceiling for future hold open device as per the initial site

meeting report

DG07

New doors - decorated in silver to Specsavers standard specification. Install

new SSA ironmongery to Specsavers standard specification.

Existing door - to be redecorated in white to Specsavers standard specification.

Install new ancillary ironmongery to Specsavers standard specification including

indicator bolt.

BASALT

GREY

Cro

ss S

tre

et

Fire

Exit

Fire

Exit

Accessories

700V

1200V LED

CL teach

Till

ST

FIELDS

PRE-TEST/FUNDUS

CL Sign

Collections sign

ST

Tr

Tr

Tr

Acc

HC Sign

pa

tte

rn

ed

w

allp

ap

er

TEST ROOM 1

TEST ROOM 2

700V 700V

UP

High Street West

PROPOSED GROUND FLOOR PLAN

Se

ctio

n 1

Elevation 3

Elevation 1

Se

ctio

n 1

UP

DG01

DG02

DG03

DG04

DG05

DG06

DG07

HALF

HEIGHT

WALL

HALF

HEIGHT

WALL

D

2400

D

2400

D

D

Install bagged insulation on top

of the suspended ceiling

Install bagged insulation on top

of the suspended ceiling

Install a water cut off

solenoid valve to last man

out switch. Location of

switch to be agreed with the

store Director

last person

out switch on

fish key

F

BG

BG

BG

S

S

Note: Install relay to fire alarm

system that will shut down the

AC in case of fire

2400

S

S

S

S

RE

PA

IR

A

ND

M

AK

E G

OO

D A

NY

D

AM

AG

E T

O W

ALLS

AN

D S

OF

FIT

S A

ND

D

EC

OR

AT

E A

LL R

ET

AIL A

RE

AS

IN

CLU

DIN

G T

ES

T R

OO

MS

1 &

2, D

IS

PE

NS

IN

G A

RE

A,

FIE

LD

S/F

UN

DU

S &

P

RE

-T

ES

T A

RE

A, W

AIT

IN

G A

RE

A,

CU

ST

OM

ER

C

OR

RID

OR

S, IN

S

PE

CA

VE

RS

S

TA

ND

AR

D

SP

EC

IF

IC

AT

IO

N (W

ALLS

IN

G

RE

EN

T

IM

BE

R W

OR

K IN

SILV

ER

)

AC 1

AC 2

AC 3

AC 4

Ø100

Ø100

CU 4

CU 3CU 2

CU 1

100mm in-line extract

mounted fan

PARTITION OR WALL REMOVED

EXISTING PARTITION OR WALL

PROPOSED PARTITIONING

PROPOSED PARTITIONING WITH

COMPLIANT SOUND INSULATION

PROPOSED HALF HEIGHT

PARTITIONING (1450mm HIGH)

HALF

HEIGHT

WALL

WALL LEGEND

PROPOSED PARTITIONING WITH

HEARCARE COMPLIANT SOUND

INSULATION

S RIS

H

F

BG

A

ILLUMINATED DIRECTIONAL

EXIT SIGNAGE

EXIT SIGNAGE

DIRECTIONAL EXIT SIGNAGE

ILLUMINATED EXIT SIGNAGE

DISABLED WC ALARM PULL CORD

Also provide visual alarm indicator to

reception area

MAINS LINKED & OPERATED

SMOKE DETECTOR

SMOKE DETECTOR WITH VOID

PROTECTION

MAINS LINKED & OPERATED

HEAT DETECTOR

VISUAL FLASHING ALERT LINKED

TO FIRE ALARM

FIRE ALARM PANEL

EMERGENCY BREAK GLASS

POINT

FIRE/EMERGENCY FITTINGS

FIRE ALARM SOUNDER

VISUAL ALARM INDICATOR FOR

EMERGENCY PULL CORD

DOOR REF. NUMBER

INDICATED ON DOOR SCHEDULE

OTHER SYMBOLS

DR:

SUSPENDED CEILING HEIGHT

INDICATED ON CEILING LAYOUT

2400mm

MECHANICAL VENTILATION TO BE

INSTALLED BY SPECIALIST A/C

CONTRACTOR REFER TO A/C

CONTRACTORS DRAWINGS FOR DETAILS

AIR CONDITIONING & VENTILATION

STRUCTURAL ALTERATIONS

ELECTRICAL INSTALLATIONS

PLUMBING REQUIREMENTS

EMERGENCY PROVISIONS

WORKS APPLICABLE TO GROUND FLOOR

TEST ROOMS 1& 2 & CL TEACH & TO FIRST

FLOOR W.C. & STAFF ROOM

- ALL FIRE EXIT SIGNAGE TO BE IN

ACCORDANCE WITH B.S 5499 PART 1.

- ALL EMERGENCY LIGHTING TO BE IN

ACCORDANCE WITH B.S 5266 PART 1.

- ALL AUTOMATIC FIRE DETECTION TO BE

IN ACCORDANCE WITH B.S 5839 PART 1

(2013).

- ALL SAFETY GLAZING TO COMPLY WITH

B.S 6206 AND B.S 6262.

- ALL WORK TO COMPLY IN ACCORDANCE

WITH THE APPLICABLE LOCAL

REGULATIONS, STANDARDS AND

PUBLICATIONS.

ANY STRUCTURAL ALTERATIONS, NEW

LOAD BEARING ELEMENTS AND REMOVAL

OF WALLS ETC., TO BE CARRIED OUT IN

STRICT ACCORDANCE WITH STRUCTURAL

ENGINEERS DETAILS AND CALCULATION

SHEETS.

DEMOLITION & STRIP-OUT

REMOVE ALL WALLS WHERE NECESSARY

AS INDICATED ON PLAN AND CART AWAY

DEBRIS FROM SITE.

CONTRACTOR TO ALLOW FOR MAKING

GOOD OF ALL AREAS PRIOR TO

REDECORATION.

NOTES - SPECSAVERS DRAWINGS TO BE READ IN CONJUNCTION WITH THE SCHEDULE OF WORKS

PROVIDE AND INSTALL ALL NEW

ELECTRICAL FITTINGS AS SPECIFIED ON

LEGEND, AND TO COMPLY WITH THE '17TH

EDITION OF THE INSTITUTE OF

ELECTRICAL ENGINEERS REGULATIONS',

THE LOCAL ELECTRICITY BOARD

REQUIREMENTS AND ALL RELEVANT

BRITISH STANDARDS,CODES OF

PRACTICE,CIBSE PUBLICATION'S AND

APPROVED DOCUMENT L2B.

CONTRACTOR TO PROVIDE THE

RELEVANT CERTIFICATION UPON

COMPLETION. ALLOW FOR FINAL

LOCATION OF MULTIPOINT HEATERS TO

BE DIRECTED ON SITE.

UNSWITCHED FUSED SPUR WITH

INDICATOR LIGHT SHOULD ONLY BE

INSTALLED IF SANIFLOW PUMP IS

REQUIRED.

FR WALL LEGEND

30min fire rated partition

60min fire rated partition

90min fire rated partition

Cro

ss S

tre

et

Ke

rb

Worktop

Worktop

UP

DOWN

Ceiling

trap

Sloping ceiling

PROPOSED FIRST FLOOR PLAN

DF01

DF02

DF03 DF04

(vinyl)

(vinyl)(vinyl)

H

S

S

S

RE

PA

IR

A

ND

M

AK

E G

OO

D A

NY

D

AM

AG

E T

O W

ALLS

AN

D S

OF

FIT

S A

ND

D

EC

OR

AT

E A

LL A

NC

ILLA

RY

AR

EA

S IN

CLU

DIN

G T

HE

S

TA

IR

S T

O T

HE

F

IR

ST

FLO

OR

S

TA

FF

R

OO

M A

ND

W

.C

, IN

S

PE

CA

VE

RS

ST

AN

DA

RD

S

PE

CIF

IC

AT

IO

N (W

ALLS

IN

M

AG

NO

LIA

TIM

BE

R W

OR

K IN

W

HIT

E)

Notes:

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street West

Glossop

Derbyshire

SK13 8AZ

Proposed Ground & First Floor Plans -

Ceiling, Lighting & Fire Layout

JS 1:50@A1

1:100@A3

13/07/2016

1485/1013 A

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

Air conditioning and ventilation added to the drawingsA J.S. 22.07.16

Fire Alarm System

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Emergency lighting

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Sales Area

Other Areas

42

SPKR

T

3000 Lumen Square ACELED LED Colour 3000K

White

D0270JA-W-XSS27

1000 Lumen Pendant MiniCombo LED LED Colour3000K Remote gear (2m

lead) Clear refractor /Silverfinish

S1600JA-XSS28

2x36W 1200MDIFFUSED BATTENE4604J

2x36W 1200M DIFFUSEDBATTEN + EM LIGHTEE4604J

38W 2D WALLMOUNTED MAXI DOT

E59903J:XSS14

38W 2D WALL MOUNTEDMAXI DOT EMERGENCY

EE59903J:XSS14

MIDI DOT16W 2D

E59900J:XSS14

DIMMABLE SWITCHA7609

3000 Lumen F3 LED LEDColour 3000K 3hEmergency White

DE0270JA-W-XSS27

3000 Lumen F3 LED LEDColour 3000K Dimmable

(Switch-Dim) WhiteD0270GA-W-XSS27

2000 Lumen F3 LED LEDColour 3000K 3hEmergency White

DE0270JA-W-XSS32

D

2000 Lumen F3 LEDLED Colour 3000K

White

D0270JA-W-XSS32

Recessed Illuminated (Non-maintained) ExitSign (LED) Double sided arrow down legend

For store front entranceE2150J

W9021JA-W-XSS26

3000 Lumen F3 LEDLED Colour 3000K

White

EE59900J:XSS14

MIDI DOT16W 2D

EMERGENCY

26W TC-T DIMMABLEWALL MOUNTED

UPLIGHTER

U3743/XSI03

ILLUMINATEDNON-MAINTAINED

EXIT SIGNAGE 8W T5E2013/D

Frame Numbers

Retail Area

Total Areas

Schedules:

1080

Datum 144.000m Datum 144.000m

Stone

Stone

Cross Street

outline of removed signage

V

145.20

153.00

gutter

gutter

Acu

148.63

150.53

148.47

148.60

145.19

145.07

144.84

149.18

147.48

150.52

150.44

148.25

149.63

148.56

148.53

cladding

EXISTING ELEVATION 2

Glazing

Glazing

Glazing

Datum 144.000m

Datum 144.000m

Stone

Stone

outline of removed signage

Superdrug

Bracket

Bracket

Weatherboard

gutter

Rwp

Sign

145.20

144.98

144.85

148.25

147.48

153.00

Riser

Door

Door Door

148.47

150.41

150.38

148.30

149.93

conc

conc

conc

147.41

149.93

150.17

145.12

152.96

cladding

cladding

EXISTING ELEVATION 1

Glazing

Glazing

Glazing

GlazingGlazing

Glazing

Glazing

Glazing Glazing

Datum 143.000m Datum 143.000m

Adjacent property (restricted visibility)

StoneStone

Stone Stone

144.65

144.68

144.43

144.45144.44

147.11

150.31

150.35

148.60

153.01

152.94

150.44

147.52

145.07

144.84

145.58

147.20

144.84

145.19

146.66

148.52

149.08

148.56

Door

Door

Door

Stone wall

Stone wall

Alarm

Light

Sign

Acu

Rwp

Svp

gutter

gutter

AcuAcu

Alarm

Alarm

Light

149.11

150.09

Wood decking area

147.18

146.95

conc

conc

conc

conc

146.53

147.70

P/R Ht1.40m

EXISTING ELEVATION 3

Roller shutter housing

Step up

Notes:

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street West

Glossop

Derbyshire

SK13 8AZ

Existing Elevations

JS 1:50@A1

1:100@A3

13/07/2016

1485/1014 -

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

-- - -

Fire Alarm System

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Emergency lighting

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Frame Numbers

Retail Area

Total Areas

Schedules:

1080

Stone

Stone

Cross Street

V

145.20

153.00

gutter

gutter

Acu

148.63

150.53

148.47

148.60

145.19

145.07

144.84

149.18

147.48

150.52

150.44

148.25

149.63

148.56

148.53

cladding

Glazing

Remove existing fasciaboards over shopfrontand re-line in new plyand decorate greenready for new signageby Hawes. Note exitingfascia boards appearfibreous so refer toasbestos report beforeworks commence

Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report

PROPOSED SIGNAGE & SIDE ELEVATION 2

specsavers.com specsavers.com specsavers.com specsavers.com specsaver

specsavers.com specsavers.com specsavers.com specsavers.com specsaver

Two rows of

manifestation

stickers

Install bomb blast filmto all front elevationwindows inc first floor.Install barrier internallyto first floor windows toas they are at low level.All as per the initial sitevisit report

New opening

Stone

Stone

Superdrug

Bracket

Weatherboard

gutter

Rwp

Sign

145.20

144.98

144.85

148.25

147.48

153.00

Riser

Door

Door Door

148.47

150.41

150.38

148.30

149.93

conc

conc

conc

147.41

149.93

150.17

145.12

152.96

cladding

cladding

Glazing

Glazing

GlazingGlazing

Glazing

New specification overheadilluminated conservation styleprojecting sign fixed to masonry.Allow for fused spur to the frontof the store for the projection sign

600mm high non illuminated newspecification conservation stylelogo set on standard new greenfascia with non illuminatedlettering to the latest specification

Remove existing fascia boards overshopfront and re-line in new ply anddecorate green ready for new signageby Hawes. Note exiting fascia boardsappear fibreous so refer to asbestosreport before works commence

Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report

Retain and make good existingshopfront, re-spray in basaltgrey. Decorate rendered onpilasters in grey also

PROPOSED ELEVATION 1

Make good existing stallriserand repair / replace anydamaged tiles. Investigatepossibility of spraying tiles greyto match shopfront and discusswith PM before undertaking

specsavers.com specsavers.com specsavers.co

specsavers.com specsavers.com specsavers.co

specsavers.com specsave

specsavers.com specsave

specsavers.com specsavers.com specsavers.com specsavers.com specs

specsavers.com specsavers.com specsavers.com specsavers.com specs

Two rows of manifestation

stickers

Install bomb blast film to all frontelevation windows inc first floor. Installbarrier internally to first floor windowsto as they are at low level. All as perthe initial site visit report

Adjacent property (restricted visibility)

StoneStone

Stone Stone

144.65

144.68

144.43

144.45144.44

147.11

150.31

150.35

148.60

153.01

152.94

150.44

147.52

145.07

144.84

145.58

147.20

144.84

145.19

146.66

148.52

149.08

148.56

Door

Door

Door

Stone wall

Stone wall

Alarm

LightSign

Acu

Rwp

Svp

gutter

gutter

AcuAcu

Alarm

Alarm

Light

149.11

150.09

Wood decking area

147.18

146.95

conc

conc

conc

conc

146.53

147.70

P/R Ht1.40m

Roller shutter housing

Step up

Asses roof condition and patch repair ifneeded as per initial site visit report,see item 22 of the report

Investigate rear yard for possibledrainage access and advise PM as perinitial site visit report. No costs for anyworks relating to this are to be allowedin tender returns

PROPOSED ELEVATION 3

CU 2CU 3

CU 4

CU 1

Notes:

PRODUCTION DRAWINGS

Drawn By:

Do not scale from this drawing. Dimensions to be checked on site

Drawing Number:

Scale: Date:

Revision:

On Behalf Of:

Optical Superstores

Drawn By:

Title:

Project:

Amendments:

Rev Init. Date Description

latypus LimitedDesign & Project Management Services

PIngledene House, 26 Imperial Road, Matlock Derbyshire, DE4 3NL

Tel: 07899 896 934 Fax: (01629) 581374

+44 (0) 115 933 0800

+44 (0) 115 982 6071

CAD Department,

Business Development,

Cirrus House,

10 Experian Way,

Nottingham

NOTTS NG2 1EP

GLOSSOP

New Store

Specsavers Opticians

41 High Street

Glossop

Derbyshire

SK13 8AZ

Proposed Elevations

JS 1:50@A1

1:100@A3

13/07/2016

1485/1015 A

0

s c a l e i n m e t r e s (for floor plans, sections and elevations)

541 2 3

© This drawing is the property of Specsavers Optical Superstores who retain the sole copyright of its contents & it may not be reproduced in part or in whole without written permission

Rear elevation showing position of proposed air

conditioning condensers added to the drawing. Light on

rear wall relocated to suit

A J.S. 22.07.16

Fire Alarm System

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer, during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Emergency lighting

Note: The installers must satisfy themselves that the finalinstallation complies with all relevant regulations and agree anyrequired adjustments to the proposed installation with the PM/Building Control/ Fire Officer during the contract. Any variationsundertaken to ensure the proposed installation fully complies withall relevant regulations must be shown on the As Built plansfollowing contract completion.

Frame Numbers

Retail Area

Total Areas

Schedules:

1080