  • 8/18/2019 Proposed Design Concept

    1/20

    Bus Drop-OffCommunityEntrance

    Main Entrance

    KEY PROGRAM ELEMENTS

    BUILDING ADDITIONSMusic - AMedia Center - BGymnasium - C

    SITE IMPROVEMENTS

    TRAFFIC PATTERNS PARKINGSeparation of Bus , Parent andStudent Parking & CirculationScreened Service w/ Loading Dock

    PARKINGExisting 410 Total Spaces

    Proposed 535 Total SpacesIncreased parkingHC 10 SpacesStaff 160 SpacesStudent 315 SpacesVisitors 35 Spaces Admini str ator s 15 Spaces

    ADA / OCR Accessibil ity to all Site Faci li ties

    GENERAL IMPROVEMENTSUpgrade Track and Tennis CourtsReplace BleachersPavement ResurfacingBuilding Access

    PROPOSED DESIGN CONCEPT – Site Plan

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    Service

    Teacher Parking

    Parent Drop-Off

    Teacher Parking

    FOLLY BROOK BLVD

    Admini str ator and Visitor Parking

    Student Parking

    StudentParking

    WOLCOTT HILL ROAD

    JAY STREET

    CHURCHSTREET

    NORTH

    A

    B

    C

    Emergency Access

    WESTWAY

    WINTERGREENLANE

    HAROLD STREET

    WOLCOTT HILL ROADWELLS ROAD - 175

    Future CRExpansion

  • 8/18/2019 Proposed Design Concept

    2/20

    KEY PROGRAM ELEMENTSFLOOR LEVEL - 100

    BUILDING ADDITIONSMusicMedia Center Gymnasium

    MUSICElectronic MusicRecording Studio

    ART & TECHNOLOGYShared Graphics LabShared Lecture Space & Gallery

    PHYSICAL EDUACATION Accessibili ty to all Site Faci lit ies

    Title IX – Impacts Locker & Team Rooms

    SPECIAL EDUCATION Address Program Deficiencies ADA / OCR

    BUSINESSMulti Purpose SpacesTechnology in All Classrooms

    ADMINISTRATIONGuidance & Admin Offices

    CAFETERIA

    COMMUNITYENTRANCE

    MAINENTRANCE

    ARTCOURTYARD

    POOL

    COURTYARD

    ACADEMICWING

    MEDIACENTER

    GYM - B

    GYM - A

    TECHNOLOGYEd & ART

    GUIDANCE

    AUDITORIUM

    MUSIC

    ADMIN

    LOBBY

    READINGCOURTYARD

    FCS

    SOCIALSTUDIES

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Plan – Level 100 / 200

    SP. EDUCATION & BUSINESS

    SERVICE

    STUDENTENTRANCE

  • 8/18/2019 Proposed Design Concept

    3/20

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    STUDENT ENTRANCE

    MAIN ENTRANCE

    COMMUNITY ENTRANCE

  • 8/18/2019 Proposed Design Concept

    4/20

    CAFETERIA

    COMMUNITYENTRANCE

    MAINENTRANCE

    ART & CAFECOURTYARD

    POOL

    COURTYARD

    BUSINESS

    MEDIACENTER

    GYM - B

    GYM - A

    TECHNOLOGYEd & ART

    GUIDANCE

    AUDITORIUM

    MUSIC

    ADMIN

    LOBBY

    READINGCOURTYARD

    FCS

    SOCIALSTUDIES

    SP EDUCATION

    KEY PROGRAM ELEMENTS

    PHYSICAL EDUCATION Address Program Deficiencies ADA / OCRTitle IXStorage

    SERVICE

    PROPOSED DESIGN CONCEPT – Building Plan – Level 100 PE

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    STUDENTENTRANCE

    ACADEMICWING

    LOCKER RM

  • 8/18/2019 Proposed Design Concept

    5/20

    Natural LightExpanded Seating Acc ess ibl e & Safe

    Community Access

    PROPOSED DESIGN CONCEPT – Gymnasium

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

  • 8/18/2019 Proposed Design Concept

    6/20

    AUDITORIUMCAFETERIA

    COMMUNITYENTRANCE

    MAINENTRANCE

    ARTCOURTYARD

    GREENROOM

    POOL

    S

    COURTYARD

    ACADEMICWING

    MEDIA CTR

    GYM - B

    GYM - A

    TECHNOLOGYEd & ART

    GUIDANCE

    STAGE

    MUSIC

    ADMIN

    MEZZANINE125 SEATS

    STAGE

    LOBBY

    FCS

    KEY PROGRAM ELEMENTS

    AUDITORIUMMezzanineStage DepthGreen Room (Shared Space)Seating Capacity 825 - 850

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Plan – Level 100 Auditorium

    SP. EDUCATION & BUSINESS

  • 8/18/2019 Proposed Design Concept

    7/20

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Community Lobby

  • 8/18/2019 Proposed Design Concept

    8/20

    Acoust ical Curt ainsMezzanine SeatingStage Accessibility

    PROPOSED DESIGN CONCEPT – Auditorium view from Stage

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

  • 8/18/2019 Proposed Design Concept

    9/20

    CAFETERIA

    COMMUNITYENTRANCE

    MAINENTRANCE

    ART & CAFECOURTYARD

    POOL

    COURTYARD

    MEDIACENTER

    GYM - B

    GYM - A

    TECHNOLOGYEd & ART

    GUIDANCE

    AUDITORIUM

    MUSIC

    ADMIN

    LOBBY

    READINGCOURTYARD

    FCS

    SOCIALSTUDIES

    KEY PROGRAM ELEMENTS

    ART COURTYARD AND STUDENT ACCESSSeparation of Vehicular TrafficNew Service & Loading DockSafe Access ADA / OCRIntegration & Sharing of Classrooms

    SERVICE

    STUDENTENTRANCE

    PROPOSED DESIGN CONCEPT – Building Plan

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    ACADEMICWING

    SP. EDUCATION & BUSINESS

  • 8/18/2019 Proposed Design Concept

    10/20

    Natural LightSeparation o f TrafficStudent Friendly

    PROPOSED DESIGN CONCEPT – Student Entrance & Art Courtyard

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

  • 8/18/2019 Proposed Design Concept

    11/20

    CAFETERIA

    COMMUNITYENTRANCE

    MAINENTRANCE

    ART & CAFECOURTYARD

    POOL

    COURTYARD

    MEDIACENTER

    GYM - B

    TECHNOLOGYEd & ART

    GUIDANCE

    AUDITORIUM

    MUSIC

    ADMINISTRATION

    LOBBY

    FCS

    SERVICE

    CENTRALSTAIR

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Plan – Level 100 thru 500STUDENTPARKING

    ENTRANCE

    KEY PROGRAM ELEMENTS

    CIRCULATIONNatural LightStudent Friendly SpaceClear Simple Circulation

    Security & Admin istrative Presence

    ACADEMICWING

    SP. EDUCATION & BUSINESS

  • 8/18/2019 Proposed Design Concept

    12/20

    Natural LightStudent FriendlySimplified CirculationSecurity & Control

    PROPOSED DESIGN CONCEPT – Central Stair view from Cafeteria

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

  • 8/18/2019 Proposed Design Concept

    13/20

    COMMUNITYENTRANCE

    MAINENTRANCE

    COURTYARD

    MEDIACENTER

    GYM - A

    MUSIC

    READINGCOURTYARD

    WORLDLANGUAGE

    SP ED

    ENGLISH

    EXISTINGBUILDING

    KEY PROGRAM ELEMENTS

    ENGLISHLarger ClassroomsShared workroomFlexible Instructional Spaces

    WORLD LANGUAGENew Language LabDedicated Storage

    SWING SPACE – 6 Classrooms

    WR

    S

    S

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Plan – Level 300 Classrooms

  • 8/18/2019 Proposed Design Concept

    14/20

    COMMUNITYENTRANCE

    MAINENTRANCE

    ARTCOURTYARD

    COURTYARD

    MEDIACENTER

    MUSIC

    READINGCOURTYARD

    SCIENCEPhotovoltaic Array

    Green Roof

    GreenHouse

    GREEN ROOF

    PHOTOVOLTAIC ARRAY

    KEY PROGRAM ELEMENTS

    SCIENCEClab-RoomsShared Storage & Prep RoomsGreenhouse - ghGreen Roof Access to Sustainable Systems

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Plan – Level 400 Science

    Biology

    Botany

    Physics

    BiologyBiology

    Biology

    IntegratedScience

    IS Lab

    IS

    ISPhysics

  • 8/18/2019 Proposed Design Concept

    15/20

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Science Clabroom Images

    PHYSICSCLAB-ROOM

    GREEN HOUSE ENVIRONMENTAL SCIENCEBOTANY CLAB-ROOM

    PHOTOVOLTAICPANELS

    GREEN ROOF

    WHS - EXISTING SCIENCE LABORATORY

  • 8/18/2019 Proposed Design Concept

    16/20

    MECHANICALROOM

    MAINENTRANCE

    EXISTINGBUILDING

    FOOTPRINT

    PHYSICAL ED ADDITION

    MEDIA CTR ADDITION

    MUSIC ADDITION

    EXISTINGSTORAGE

    MAINTENANCE

    ELEC RM

    MECHANICALROOM - POOL

    NEWSTORAGE

    PHYS EDSTRENGTHTRAINING

    NEWMECHANICALSYSTEMSPLANT

    KEY PROGRAM ELEMENTSBASEMENT & LOWER LEVELS

    MPE & FP SystemsNew Boiler PlantNew Emergency Generator Additional StorageNew Building Infrastructure

    ENERGY CONSERVATIONHigh Efficiency Boiler sCo- GenerationBuilding Envelope - InsulationNew Windows & Door s

    Building Envelope and Energy Efficient Infrastructure…85Alternative Energy…………………………………………………….15

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Infrastructure & Systems

  • 8/18/2019 Proposed Design Concept

    17/20

    Building Envelope and Energy Efficient Infrastructure……85 - ApproximatelyAlternative Energy…………………………………………………….….15 - Approximately

    OPTIONS EVALUATED 2008 – PRESENT

    Geothermal technology (sometimes called ground source heating and cooling or geoexchange) is a simple,well proven, reliable and safe technology that uses the earth's renewable energy to provide high-efficiencyheating and cooling. In winter, the system draws heat from the ground and transfers it to your home. Insummer, it extracts heat from your home and transfers it to the ground. Hardware consists only of a heatpump connected to a water source such as a well or a series of small-diameter pipes buried underground.Well water or a water-based solution circulating through the pipes carries heat between the ground and theheat pump. The network of pipes can be hidden under your lawn, a garden, even your driveway.

    Co-Generation - Gas engine CHP plants use a reciprocating gas engine which is generally morecompetitive than a gas turbine up to about 5 MW. The gaseous fuel used is normally natural gas . Theseplants are generally manufactured as fully packaged units that can be installed within a plantroom orexternal plant compound with simple connections to the site's gas supply and electrical distribution andheating systems.

    A fuel cellis an electrochemical device that combines hydrogen fuel and oxygen from the air to produceelectricity, and useable heat and water. Fuel cells produce Direct Current (DC) electricity without theconventional combustion reaction. Carbonate fuel cell power plants can utilize many fuel sources, including:

    Natural gas - Industrial and municipal wastewater treatment gas - Propane - Coal gas

    Photovoltaics(PV) is a method of generating electrical power by converting solar radiation into directcurrent electricity using semiconductors that exhibit the photovoltaic effect . Photovoltaic power generationemploys solar panels composed of a number of solar cells containing a photovoltaic material. Materialspresently used for photovoltaics include monocrystalline silicon , polycrystalline silicon , amorphous silicon ,cadmium telluride , and copper indium gallium selenide /sulfide.

    GEO-THERMAL

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Building Energy Systems

    CO-GENERATION

    FUEL CELL

    PHOTOVOLTAICS

  • 8/18/2019 Proposed Design Concept

    18/20

    PHASE ONEJuly 2013 - August 2014Site

    North Parking Building

    New GymnasiumStrength Training Boys & Girls Locker Rooms

    Team Rooms / Storage / Lobby New Entrance Canopy New Media CenterNew Band Room & StorageBoiler Plant

    Renovations

    Addition

    Boiler

    Plant

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Construction Phase One

  • 8/18/2019 Proposed Design Concept

    19/20

    PHASE TWOJune 2014 - August 2014Site

    South Parking Building

    Chemistry Labs – 500 LevelGym Lobby & OfficesChorus Rehearsal RoomFCS & HealthClassrooms / Swing Space - 300 LevelClassrooms - 100 LevelTechnology EducationBoiler Plant

    LEVEL 500

    LEVEL 300

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Construction Phase Two

  • 8/18/2019 Proposed Design Concept

    20/20

    PHASE THREESeptember 2014 - December 2014

    BuildingMain Entry Canopy – 200 LevelScience Labs – Level 400Classrooms – Level 400

    PHASE FOURJanuary 2015 - May 2015

    Building Auditorium – 100 Level

    PHASE FOURJanuary 2015 - May 2015

    Building Auditorium – Mezzanine

    PHASE FOUR

    January 2015 - May 2015

    Building Auditorium – 100 LevelClassrooms – 300 Level

    WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”

    PROPOSED DESIGN CONCEPT – Construction Phase Two