8/18/2019 Proposed Design Concept
1/20
Bus Drop-OffCommunityEntrance
Main Entrance
KEY PROGRAM ELEMENTS
BUILDING ADDITIONSMusic - AMedia Center - BGymnasium - C
SITE IMPROVEMENTS
TRAFFIC PATTERNS PARKINGSeparation of Bus , Parent andStudent Parking & CirculationScreened Service w/ Loading Dock
PARKINGExisting 410 Total Spaces
Proposed 535 Total SpacesIncreased parkingHC 10 SpacesStaff 160 SpacesStudent 315 SpacesVisitors 35 Spaces Admini str ator s 15 Spaces
ADA / OCR Accessibil ity to all Site Faci li ties
GENERAL IMPROVEMENTSUpgrade Track and Tennis CourtsReplace BleachersPavement ResurfacingBuilding Access
PROPOSED DESIGN CONCEPT – Site Plan
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
Service
Teacher Parking
Parent Drop-Off
Teacher Parking
FOLLY BROOK BLVD
Admini str ator and Visitor Parking
Student Parking
StudentParking
WOLCOTT HILL ROAD
JAY STREET
CHURCHSTREET
NORTH
A
B
C
Emergency Access
WESTWAY
WINTERGREENLANE
HAROLD STREET
WOLCOTT HILL ROADWELLS ROAD - 175
Future CRExpansion
-
8/18/2019 Proposed Design Concept
2/20
KEY PROGRAM ELEMENTSFLOOR LEVEL - 100
BUILDING ADDITIONSMusicMedia Center Gymnasium
MUSICElectronic MusicRecording Studio
ART & TECHNOLOGYShared Graphics LabShared Lecture Space & Gallery
PHYSICAL EDUACATION Accessibili ty to all Site Faci lit ies
Title IX – Impacts Locker & Team Rooms
SPECIAL EDUCATION Address Program Deficiencies ADA / OCR
BUSINESSMulti Purpose SpacesTechnology in All Classrooms
ADMINISTRATIONGuidance & Admin Offices
CAFETERIA
COMMUNITYENTRANCE
MAINENTRANCE
ARTCOURTYARD
POOL
COURTYARD
ACADEMICWING
MEDIACENTER
GYM - B
GYM - A
TECHNOLOGYEd & ART
GUIDANCE
AUDITORIUM
MUSIC
ADMIN
LOBBY
READINGCOURTYARD
FCS
SOCIALSTUDIES
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Plan – Level 100 / 200
SP. EDUCATION & BUSINESS
SERVICE
STUDENTENTRANCE
-
8/18/2019 Proposed Design Concept
3/20
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
STUDENT ENTRANCE
MAIN ENTRANCE
COMMUNITY ENTRANCE
-
8/18/2019 Proposed Design Concept
4/20
CAFETERIA
COMMUNITYENTRANCE
MAINENTRANCE
ART & CAFECOURTYARD
POOL
COURTYARD
BUSINESS
MEDIACENTER
GYM - B
GYM - A
TECHNOLOGYEd & ART
GUIDANCE
AUDITORIUM
MUSIC
ADMIN
LOBBY
READINGCOURTYARD
FCS
SOCIALSTUDIES
SP EDUCATION
KEY PROGRAM ELEMENTS
PHYSICAL EDUCATION Address Program Deficiencies ADA / OCRTitle IXStorage
SERVICE
PROPOSED DESIGN CONCEPT – Building Plan – Level 100 PE
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
STUDENTENTRANCE
ACADEMICWING
LOCKER RM
-
8/18/2019 Proposed Design Concept
5/20
Natural LightExpanded Seating Acc ess ibl e & Safe
Community Access
PROPOSED DESIGN CONCEPT – Gymnasium
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
-
8/18/2019 Proposed Design Concept
6/20
AUDITORIUMCAFETERIA
COMMUNITYENTRANCE
MAINENTRANCE
ARTCOURTYARD
GREENROOM
POOL
S
COURTYARD
ACADEMICWING
MEDIA CTR
GYM - B
GYM - A
TECHNOLOGYEd & ART
GUIDANCE
STAGE
MUSIC
ADMIN
MEZZANINE125 SEATS
STAGE
LOBBY
FCS
KEY PROGRAM ELEMENTS
AUDITORIUMMezzanineStage DepthGreen Room (Shared Space)Seating Capacity 825 - 850
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Plan – Level 100 Auditorium
SP. EDUCATION & BUSINESS
-
8/18/2019 Proposed Design Concept
7/20
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Community Lobby
-
8/18/2019 Proposed Design Concept
8/20
Acoust ical Curt ainsMezzanine SeatingStage Accessibility
PROPOSED DESIGN CONCEPT – Auditorium view from Stage
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
-
8/18/2019 Proposed Design Concept
9/20
CAFETERIA
COMMUNITYENTRANCE
MAINENTRANCE
ART & CAFECOURTYARD
POOL
COURTYARD
MEDIACENTER
GYM - B
GYM - A
TECHNOLOGYEd & ART
GUIDANCE
AUDITORIUM
MUSIC
ADMIN
LOBBY
READINGCOURTYARD
FCS
SOCIALSTUDIES
KEY PROGRAM ELEMENTS
ART COURTYARD AND STUDENT ACCESSSeparation of Vehicular TrafficNew Service & Loading DockSafe Access ADA / OCRIntegration & Sharing of Classrooms
SERVICE
STUDENTENTRANCE
PROPOSED DESIGN CONCEPT – Building Plan
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
ACADEMICWING
SP. EDUCATION & BUSINESS
-
8/18/2019 Proposed Design Concept
10/20
Natural LightSeparation o f TrafficStudent Friendly
PROPOSED DESIGN CONCEPT – Student Entrance & Art Courtyard
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
-
8/18/2019 Proposed Design Concept
11/20
CAFETERIA
COMMUNITYENTRANCE
MAINENTRANCE
ART & CAFECOURTYARD
POOL
COURTYARD
MEDIACENTER
GYM - B
TECHNOLOGYEd & ART
GUIDANCE
AUDITORIUM
MUSIC
ADMINISTRATION
LOBBY
FCS
SERVICE
CENTRALSTAIR
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Plan – Level 100 thru 500STUDENTPARKING
ENTRANCE
KEY PROGRAM ELEMENTS
CIRCULATIONNatural LightStudent Friendly SpaceClear Simple Circulation
Security & Admin istrative Presence
ACADEMICWING
SP. EDUCATION & BUSINESS
-
8/18/2019 Proposed Design Concept
12/20
Natural LightStudent FriendlySimplified CirculationSecurity & Control
PROPOSED DESIGN CONCEPT – Central Stair view from Cafeteria
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
-
8/18/2019 Proposed Design Concept
13/20
COMMUNITYENTRANCE
MAINENTRANCE
COURTYARD
MEDIACENTER
GYM - A
MUSIC
READINGCOURTYARD
WORLDLANGUAGE
SP ED
ENGLISH
EXISTINGBUILDING
KEY PROGRAM ELEMENTS
ENGLISHLarger ClassroomsShared workroomFlexible Instructional Spaces
WORLD LANGUAGENew Language LabDedicated Storage
SWING SPACE – 6 Classrooms
WR
S
S
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Plan – Level 300 Classrooms
-
8/18/2019 Proposed Design Concept
14/20
COMMUNITYENTRANCE
MAINENTRANCE
ARTCOURTYARD
COURTYARD
MEDIACENTER
MUSIC
READINGCOURTYARD
SCIENCEPhotovoltaic Array
Green Roof
GreenHouse
GREEN ROOF
PHOTOVOLTAIC ARRAY
KEY PROGRAM ELEMENTS
SCIENCEClab-RoomsShared Storage & Prep RoomsGreenhouse - ghGreen Roof Access to Sustainable Systems
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Plan – Level 400 Science
Biology
Botany
Physics
BiologyBiology
Biology
IntegratedScience
IS Lab
IS
ISPhysics
-
8/18/2019 Proposed Design Concept
15/20
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Science Clabroom Images
PHYSICSCLAB-ROOM
GREEN HOUSE ENVIRONMENTAL SCIENCEBOTANY CLAB-ROOM
PHOTOVOLTAICPANELS
GREEN ROOF
WHS - EXISTING SCIENCE LABORATORY
-
8/18/2019 Proposed Design Concept
16/20
MECHANICALROOM
MAINENTRANCE
EXISTINGBUILDING
FOOTPRINT
PHYSICAL ED ADDITION
MEDIA CTR ADDITION
MUSIC ADDITION
EXISTINGSTORAGE
MAINTENANCE
ELEC RM
MECHANICALROOM - POOL
NEWSTORAGE
PHYS EDSTRENGTHTRAINING
NEWMECHANICALSYSTEMSPLANT
KEY PROGRAM ELEMENTSBASEMENT & LOWER LEVELS
MPE & FP SystemsNew Boiler PlantNew Emergency Generator Additional StorageNew Building Infrastructure
ENERGY CONSERVATIONHigh Efficiency Boiler sCo- GenerationBuilding Envelope - InsulationNew Windows & Door s
Building Envelope and Energy Efficient Infrastructure…85Alternative Energy…………………………………………………….15
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Infrastructure & Systems
-
8/18/2019 Proposed Design Concept
17/20
Building Envelope and Energy Efficient Infrastructure……85 - ApproximatelyAlternative Energy…………………………………………………….….15 - Approximately
OPTIONS EVALUATED 2008 – PRESENT
Geothermal technology (sometimes called ground source heating and cooling or geoexchange) is a simple,well proven, reliable and safe technology that uses the earth's renewable energy to provide high-efficiencyheating and cooling. In winter, the system draws heat from the ground and transfers it to your home. Insummer, it extracts heat from your home and transfers it to the ground. Hardware consists only of a heatpump connected to a water source such as a well or a series of small-diameter pipes buried underground.Well water or a water-based solution circulating through the pipes carries heat between the ground and theheat pump. The network of pipes can be hidden under your lawn, a garden, even your driveway.
Co-Generation - Gas engine CHP plants use a reciprocating gas engine which is generally morecompetitive than a gas turbine up to about 5 MW. The gaseous fuel used is normally natural gas . Theseplants are generally manufactured as fully packaged units that can be installed within a plantroom orexternal plant compound with simple connections to the site's gas supply and electrical distribution andheating systems.
A fuel cellis an electrochemical device that combines hydrogen fuel and oxygen from the air to produceelectricity, and useable heat and water. Fuel cells produce Direct Current (DC) electricity without theconventional combustion reaction. Carbonate fuel cell power plants can utilize many fuel sources, including:
Natural gas - Industrial and municipal wastewater treatment gas - Propane - Coal gas
Photovoltaics(PV) is a method of generating electrical power by converting solar radiation into directcurrent electricity using semiconductors that exhibit the photovoltaic effect . Photovoltaic power generationemploys solar panels composed of a number of solar cells containing a photovoltaic material. Materialspresently used for photovoltaics include monocrystalline silicon , polycrystalline silicon , amorphous silicon ,cadmium telluride , and copper indium gallium selenide /sulfide.
GEO-THERMAL
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Building Energy Systems
CO-GENERATION
FUEL CELL
PHOTOVOLTAICS
-
8/18/2019 Proposed Design Concept
18/20
PHASE ONEJuly 2013 - August 2014Site
North Parking Building
New GymnasiumStrength Training Boys & Girls Locker Rooms
Team Rooms / Storage / Lobby New Entrance Canopy New Media CenterNew Band Room & StorageBoiler Plant
Renovations
Addition
Boiler
Plant
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Construction Phase One
-
8/18/2019 Proposed Design Concept
19/20
PHASE TWOJune 2014 - August 2014Site
South Parking Building
Chemistry Labs – 500 LevelGym Lobby & OfficesChorus Rehearsal RoomFCS & HealthClassrooms / Swing Space - 300 LevelClassrooms - 100 LevelTechnology EducationBoiler Plant
LEVEL 500
LEVEL 300
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Construction Phase Two
-
8/18/2019 Proposed Design Concept
20/20
PHASE THREESeptember 2014 - December 2014
BuildingMain Entry Canopy – 200 LevelScience Labs – Level 400Classrooms – Level 400
PHASE FOURJanuary 2015 - May 2015
Building Auditorium – 100 Level
PHASE FOURJanuary 2015 - May 2015
Building Auditorium – Mezzanine
PHASE FOUR
January 2015 - May 2015
Building Auditorium – 100 LevelClassrooms – 300 Level
WETHERSFIELD HIGH SCHOOL - Additions and Renovations – “As New ”
PROPOSED DESIGN CONCEPT – Construction Phase Two