Page 2: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Location: In western coastal belt 27km south to the capital city, Colombo Along the Galle road

• Main ‘’A’’ routes – AA 02 (Colombo – Galle - Wellawaya) AA 08 (Panadura – Ratnapura) AB 27 (Old Colombo – Galle rd, Panadura)

• Current operations: In 3 main categoriesI. Local bus routes terminating at PanaduraII. Long distance bus routes terminating at PanaduraIII. Bus routes heading through Panadura to/from Colombo

Page 3: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 4: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Current bus routes under operations.• Local Bus routes

Page 5: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Long distance and outer city bus routes

Page 6: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Bus routes heading from/to Colombo through Panadura (as a transit point)

Page 7: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Key processes• Access• Loading• Unloading• Boarding• Alighting• Transfer

Page 8: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Boarding points

100 RoutePanadura - Colombo

462 Route &Mahabellana

450/5 RoutePanadura - Horana450 RoutePanadura - Ratnapura400/7 Route

Panadura - Kalutara

183 RoutePanadura - Nugegoda

Panadura – Railway station

17 RoutePanadura - Kandy

Aluthgama/ Mathugama/ Kalutara & Long distance buses

Page 9: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 10: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Alighting points

100 /183 RoutesColombo /Nugegoda

450 /(450/5) RoutesRatnapura /Horana

CTB buses/ Long distance buses

Kalutara/ Aluthgama/ Mathugama & Long distance buses

Page 11: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Waiting Points - Buses

A

B

Page 12: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Other Facilities• ATM facilities• Shopping mall• Taxi services• Over Head bridge with

escalator• Sanitary facilities

Page 13: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Major Issues Related To the Current Facility

-PANADURA BUS TERMINAL-

Page 14: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

RELATED ISSUES

AccessibilityConnectivity

Supporting facilities

Communication

Safety

Organization of bus terminal

Organization of

functions

Page 15: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Allocated space for the private bus stand is

currently not enough, so that some private

buses are not operating at the CTB stand.

Page 16: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

–No proper place is allocated for Expressway buses.

Even though these buses are in good condition,

parking and other facilities provided by the bus

stand is not enough.

Page 17: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Ergonomics• Allocated space for the width of a queue is

not sufficient when comparing with the

international standards. A person with luggage will be uncomfortable with the provide space.

Page 18: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Lack of seating facilities in CTB bus stand

where travellers should wait long hours

standing inside it while in private stand

there is no sufficient and comfortable seats

for the purpose.

Page 19: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No facilities for differently abled people.

Both infrastructure and types of buses does

not cater the needs of these people.

Page 20: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Green concept• No proper way of disposing waste and drainage system.• Environmental pollution

Page 21: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Functionality of the bus terminal–Most of the buses are not operated according to

scheduled time tables.

• Some buses are parked idly until the next

turn

Page 22: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Unloading of passengers by some buses are

done outside the bus stand which cause

congestion and accidents

• Passengers have to move through moving

buses in order to access buses.

Page 23: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Accessibility• Railway station is situated far from both CTB

and Private bus terminals( app 500m).

Page 24: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Although there is a bus service operating

towards the railway station during peak

hours, existing facility is not enough.

Page 25: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• CTB and Private stands are in two different

locations and operate separately.

Page 26: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Connectivity–Railway station is situated about 500m away from both CTB

and private bus stands, so that the passengers have to switch

to another mode of transport in order to connect these two

services.

- There is a special bus service from railway station to bus

stands to overcome the inconvenience.

Page 27: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Supporting facilities• Although sanitary facilities and proper

drainage systems are available, they are not in usable conditions due to lack of maintenance.

Page 28: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Whole environment is full of unhygienic

things like dirt, garbage and stray dogs.

Page 29: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No specific place to dispose the waste materials

dumped inside and surrounding of the bus

stand.

• No proper shelter, during rainy days the inner

areas can be seen flooded in the CTB bus stand.

Page 30: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No medical facilities are available at the

stand, even though stand is situated close

proximity to medical institutes in the town

like Panadura General hospital.

Page 31: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No specific places to meet and greet. And

also waiting places are not sufficient.

Page 32: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Technological Implementations.

–No real time information service in both CTB and

private bus services.

–No new technological implications can be seen.

–Speakers which are used to communicate between

time keeping is a hindrance to passengers

–No sign boards to direct passengers

Page 33: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Communication Systems / Methods• No clear announcements in private stand.

• Announcements are given in only Sinhala

medium in CTB stand.

Page 34: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No proper display of information about bus

routes and scheduled time.

• Although a few information displays are

available, their font sizes are hard to visible.

Page 35: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Name boards containing route numbers and

the destination are not displayed for the

convenience of passengers and other users.

- A person who is visiting the bus terminal for

the first time will find difficult due to this.

Page 36: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Safety• Passengers are not alighted at specifically

allocated places by some buses. So

accidents can happen

Page 37: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• No pedestrian crossing in front of private stand.

Page 38: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Private bus terminal is situated in a four-way

junction. It is very dangerous for the users

specially differently abled people.

- The time allocated for crossings is not

enough.

Page 39: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Lack of proper maintenance of hazardous

and electrical equipment like wires.

Page 40: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

SUGGESTIONS…

Page 41: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 42: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Bus berth

Page 43: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

Dimensions of bus station• Platform length

•Space should be allocated for infrastructure and the transition area•Station length should be sufficient to allow buses to safely and efficiently merge in to the traffic lane

length of longest bus * maximum number of buses expected to serve

Page 44: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Platform widthto minimize conflicts between boarding and alighting passengers

• Platform heightthere are 3 types of platforms

standard curb level or near level boarding raised platform

Page 45: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 46: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Space for services

service standards should be developed based on pedestrian space personal comfort degree of internal mobility

standards are presented in terms of average area per person average inter-personal space

Page 47: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

• Determining required passenger waiting area

Page 48: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 49: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

TECHNOLOGY IMPROVEMENTS•Implementing ticket vending machine and modifying fare collection

•Introducing high technology buses

•Implementing digital displays

•Introducing online booking

Page 50: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

EFFICIENCY IMPROVEMENTS

• Merging CTB and private bus stand• Provision for short term pick ups and drop offs• Park and ride facilities for daily commuters• Implementing three lanes in front of the bus stand in order to reduce the traffic• The bus stop in front of the bus stand should be developed in to near side bus stop• Taxi service should be introduced with separate parking facilities

Page 51: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

SAFETY & SECURITY IMPROVEMENTS

• Implementing surveillance cameras• Availability of security services• Direction paths should be properly lighted and illumination

should be between 2 – 5 foot-candles• Providing back up power for safety lighting, communication

operations and safety sensitive equipment• Increasing night time security • Designing bus stand to ensuring clear visibility• Implementing active warning system for pedestrians

Page 52: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

•Hazards, treats and vulnerability analysis should be done in order to increase the safety•Seating materials should be selected to discourages as sleeping facilities, and designed for ease of installation and repair•Implementing emergency evacuation procedure•Providing escape routes•Pedestrian circulation routes through bus stops and passenger waiting areas should not be blocked from view by walls or other structures

Page 53: Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Page 54: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

ENVIRONMENT

Drainage system should be repaired and maintained Trash cans should be placed in necessary spots and disposed dailyEnvironmentally sustainable materials and practicesReducing noise and vibrationsFollowing the green concept

Page 55: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

ASTHETIC & CULTURAL ELEMENTS

Landscaping, street-scaping and public art should be implemented

Low maintenance plantsIrrigation systemTraditional architectural elements of the area should be consideredcultural, archeological and historical values of the area should be considered

Page 56: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

SOCIAL INCLUSIVENESS

Low floor buses should be introduced and it will help differently abled people to travel easilyStation infrastructure should be made according to the height of the busesProviding rest rooms for bus drivers and conductors especially in long distance buses

Page 57: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

INFORMATION

Passenger information about procedures should be includedStatic - Permanent signs, maps and direction pathsvariable - printed information about routes and

servicesreal time - information which provides current

information and emergency conditionsAnnouncements about bus arrival and departure should be providedProvide information in all three languages

Page 58: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

PASSENGER WAITING AREA

More waiting and seating facilitiesImplementing weather shelters and it must be designed considering passenger safety, passenger comfort, functional similarity and ease of maintenanceProviding wi-fi facilities, news paper boxes

Page 59: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

PASSENGER FRIENDLY ATMOSPHERE

Improving sanitary facilities and cleaning regularlyThere should be an on call doctor to provide medical facilitiesBus stand should be maintained properly (at least once a week)Implementing special station markings with directional paths for different station functions

Page 60: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

WORK WITH CONSTRAINTS• Land

Land should be purchased from public• Funds

To construct facilities Sri Lankan firms should be usedGovernment can fund for the projectPrivate investments

• TimeNight time constructions

Page 61: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

FINAL DESIGN

Sawtooth or angle berthMerging CTB & private stands

Page 62: Proposal for redesigning Panadura Bus Terminal- Sri Lanka

REFERENCES• Bus stop design standards and guidelines,draft april 2015, prepared by the city of