property information summary - central square 2
TRANSCRIPT
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
1/11
DEVELOPER : Mount Anvil Limited
LOCAL :London Borough of Islington
AUTHORITY
TENURE : 125 year lease (Lease commences Aug/Sep 2011)
BUILDING : Full 10 YEAR NHBC Guarantee
INSURANCE
ESTIMATED: Summer/Autumn 2011
COMPLETIONDEVELOPMENT : A selection of 170 apartments
24 x Studios
85 x 1 bed Apartments
51 x 2 bed Apartments
9 x 3 bed Apartments
1 x 4 bed Apartments
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
CENTRAL SQUARECLERKENWELL
London EC1
CENTRAL SQUARECLERKENWELL
London EC1
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
2/11
LOCATION :
Barbican and Old StreetUnderground stations are ashort walk away. Taxis areplentiful on Goswell Road, a
minutes walk up the street Farringdon station provides
Thames link services toGatwick airport and Lutonairport. With the addition ofCrossrail (expected 2017) thestation will also provide adirect link to Heathrow and
London City airports
Kings Cross St. Pancras, a five minutes tube journey away, providesinternational rail services to Europe.
Paddington station, a 24 minute tube journey, provides an express rail linkto Heathrow airport.
London City Airport is a 30 minute tube journey from Old Street/Barbican.
City Airport can be reached via the DLR and Underground networks
Londons new bike hire scheme is up and running with bikes availablefrom special docking stations with one located opposite this development
Excellent transport links to shopping, fine dining, caf & coffee shops,convenience & food stores, gym etc.
Central Square occupies a prime position in one of Londons most thrivingneighborhoods with good access to the City and the West End
A short walk from two Underground stations providing access to four ofLondons Underground lines
Many of the apartments offer views over the stunning gardens with theirwater features, creating a peaceful environment and an escape from busycity life
Close to vibrant areas of Clerkenwell, Hoxton Square, Angel Islington and
The City
The local area offers a good selection of cafes, bars and restaurants
Central Square is an ideal location for Londons major universities as wellas many of Londons well known tourist attractions
CAR PARKING : Total 57 car parking spaces
Secure basement parking available for purchase at 40,000, one ata time for selected apartments only
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
Tube times (from Old St. / Barbican)
Kings Cross St.Pancras
5 mins
Bank 4 mins
Covent Garden 14 mins
London Bridge 6 mins
Oxford Circus 14 mins
Canary Wharf 20 mins
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
3/11
LOCAL AMENITIES LOCAL
ATTRACTIONS A superb choice of cafs, bars, restaurants and nightclubs The BarbicanCentre
Shopping districts Smithfields Market
Theatres and art galleries Museum of London
Health and leisure facilities London SymphonyOrchestra
Universities St Pauls Cathedral
SECURITY
24 hour concierge
Wall mounted audio visual entry phone
CCTV
Mains supply heat & smoke detectors with battery back-up
Secure fob activated entry gates
Residential lobbys accessed from central gardens
10 year warranty cover under NHBC buildmark scheme
ESTIMATED GROUND : 1 bed & 2 bed 350 per annum
RENT 3 bed 400 per annum
ESTIMATED SERVICE : 3.65 per sq ft per annum
CHARGE including building insurance, concierge service,maintenance of lifts,
cleaning of all common areas, power and light to commonareas and CCTV
COUNCIL TAX : Band H (for properties worth more than 320,000) isapproximately 2,543.38 per annum. (For revaluation by councilevery year)
STAMP DUTY :
Purchase Price Stamp Duty Rate
Over 125,000 to250,000
1% of the Purchase Price
Over 250,000 to500,000
3% of the Purchase Price
Over 500,000 to1,000,000 4% of the Purchase Price
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
CENTRAL SQUARECLERKENWELL
London EC1
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
4/11
Over 1,000,000 5% of the Purchase Price
TERMS OF PAYMENT
1. Non-refundable booking fee of SGD4,000 is payable as option fee
2. 10% down payment against the gross purchase price is payable within 21
days upon exchange of contracts
3. Balance of 90% payable upon completion
INCENTIVES1. Legal Fees ABSORBED during exhibition with recommended solicitor
(worth up to 1,500!)
2. FREE Furnishing Pack by In-Style worth up to 11,000
Marketing By
Nurul Hamdani, S.S
Phone : +6285795498432
Email : [email protected]
THIS OUR Photo
Awards
Design for Flooding
AND MORE
Current Contents
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
CENTRAL SQUARECLERKENWELL
London EC1
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
5/11
Blog Center
Book Center
Download Center
New Products
Products Guide
Classic Home
Calendar
Competitions
Conferences
Events & Exhibits
Architecture Forum
Architects Directory
Library & Archive
Web Directory
Jobs & Marketplace
About ArchWeek
Search
Subscribe & Contribute
Newsletter Free
QUIZ
Reskinning Awards
continuedThe above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
6/11
355 11th's new skin not only prevents solar gain and provides passive
cooling of the interior while meeting heritage-listed building planning
constraints, it also gives the building a facelift, transforming it from a
mundane, run-down structure to an aesthetically attractive modernbuilding. Because of its natural ventilation and lighting and thermal
buffer, among some other green features, the building is extremely
energy-efficient and has received Gold-level LEED certification. The re-
skinning methods used on 355 11th are both low-tech and cost-
effective, and could be replicated on a global scale.
Sparkasse Vorderpfalz
Category: Large Commercial
Location: Ludwigshafen, Germany
Developer/ Owner: Sparkasse Vorderpfalz
Architects/ Engineers: Egon Wei (1974), Thiemo Ebbert/ imagine
envelope (2009)
Date Constructed: 2008-2009
Sparkasse Vorderpfalz is a German regional bank with its headquarters
in Ludwigshafen on the River Rhine. The building, constructed in 1974
and comprising a three-story base and nine-story office tower, is
located on the most prominent square in the city center and is a feature
of the city's skyline.
By 2006, problems of weather penetration and poor insulation, as wellas an outmoded appearance, led the bank to initiate a refurbishment of
the building's facade and its heating and cooling services. A condition
of the project was that the retrofitting had to be carried out "without
staining the carpet" the building's interior had been recently
renovated, and the bank insisted that the work should cause minimal
disruption to its operations.
The architects' solution was to take advantage of the existing service
platforms on the outside of the tower section of the building to fit aThe above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
7/11
new skin of laminated glass mounted on a steel frame. This created a
weatherproof envelope and a cavity between the new facade and the
original exterior of the building within which the retrofitting work could
proceed without interrupting the building's occupants. Venetian blinds
are mounted inside the cavity to reduce solar gain while at the same
time deflecting some of the sunlight into the building to reduce theneed for electric lighting. The cavity is also used to mount a distributed
system of small HVAC systems that allow for local environmental
control.
The aluminum corner sections of the tower were removed, cleaned,
recoated, insulated and replaced. The base section has also been clad
with an extra laminated glass skin, with additional measures to ensure
proper thermal insulation and weatherproofing.
The new skin has enabled the use of a number of smart building
systems. In summer, the cavity created by the new skin is opened at
the top, allowing the natural updraft to drag used air from the building.
In winter, the cavity is opened at the bottom so that air can be warmed
by the sun before entering the heating systems. Furthermore, the
temperature in each section of the cavity on the four sides of the
building is constantly monitored, and warm air can be moved from one
section to another as required.
In addition, the decentralized HVAC system means that fresh air is
brought in and conditioned only when and where it is needed,
eliminating the need for transporting air within the building. Occupants
can control the temperature and lighting of their individual offices and
sensors switch equipment off when there is no one present.
The better thermal insulation provided by the new skin, the intelligent
HVAC systems and the daylight-deflecting sun blinds have led to an
almost 65 percent improvement in the building's energy performance.
Furthermore, the refurbishment has significantly improved the
occupants' control of their individual environments and their overall
comfort inside the building. The energy savings and improved
maintenance means that the investment in the re-skinning should pay
back within 13 years. The refurbished building has been certified as a
Green Building by the German Energy Agency, one of only around 160
such certified buildings in Europe.
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
8/11
The original building's design and materials are common to many
buildings constructed in Europe in the 1960s and '70s, and therefore
the Sparkasse Vorderpfalz re-skinning process could be reproduced on
a wide scale. Perhaps the most significant aspect of the project interms of reproducibility is the fact that it was completed with minimal
disruption for the occupants. The expense and lost work time that
conventional recladding methods cause is a major deterrent for many
organizations when they contemplate improving the energy efficiency
of their buildings.
Eichhorster Weg
Category: Large Residential
Location: Berlin, Germany
Developer/ Owner: Gesobau AG (State of Berlin)
Architects/ Engineers: Oswald Mathias Ungers (1964), DAHM
Architekten + Ingenieure
Date Constructed: 2008-2009
Eichhorster Weg 32-44 is a 538-apartment complex in Berlin's
Mrkisches Viertel district. Part of a showpiece 1960s housing
development, the apartments were aging and no longer met social
demands, nor modern energy-efficiency requirements. In 2007,
Eichhorster Weg's builder and owner, the Gesobau housing company
owned by the State of Berlin, decided to refurbish the apartments. Its
aims were to reduce carbon dioxide emissions from the buildings in line
with the German Energy Conservation Directive, halve primary energy
consumption, create a more appropriate set of living spaces and
enhance the neighborhood.
Key to improving energy efficiency was the re-skinning of the buildings
with a composite insulation system and the installation of double-
glazed plastic windows. Further efficiencies were achieved by
refurbishing all internal heating systems, including the replacement of
radiators and pipes, the insulation of pipes and the installation of
thermostat valves.The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
9/11
The energy-efficiency gains from the re-skinning of the apartments in
Eichhorster Weg and elsewhere in the Mrkisches Viertel development
meant that the old natural gas district heating system would have
excess capacity. For this reason, and to reduce CO2 emissions fromheating, Gesobau is working with the local energy company
Fernheizwerk Mrkisches Viertel to replace the old system with a
combined-heat-and-power, biomass-fed district heating plant. The plant
will use wood fuel from renewable sources, and will produce 5
megawatts to feed into the local power grid in addition to the 30-
megawatt output to serve Mrkisches Viertel's housing requirements.
The lower fuel costs from the energy-efficiency measures has enabled
Gesobau to increase the rents of the apartments while increasing thenet payments of the tenants only slightly. The rent increase helps to
pay for the investment in the refurbishment while giving tenants
greatly improved living conditions for a small increase in outlays.
Gesobau expects a payback on investment of 14 years.
Now House
Category: Small Residential
Location: Toronto, Canada
Developer/ Owner: Now House Project
Architects/ Engineers: Lorraine Gauthier/ Work Worth Doing
Date Constructed: 2008-2009
Now House is a process for retrofitting older houses to turn them into
net-zero-energy homes. The first application was to a 60-year-old
wartime house in Toronto, which is similar in layout and footprint to a
million other houses in Canada where the process could be replicated.
University of Technology Tower
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
10/11
Category: Future of Re-Skinning
Location: Sydney, Australia
Developer/ Owner: University of Technology, Sydney
Architects/ Engineers: Laboratory for Visionary Architecture (LAVA)
Date Constructed: Proposal
Built in 1979 and a beacon for the university, the University of
Technology Tower nevertheless is widely denigrated as ugly, outdated
and energy-inefficient. However, while the overall UTS campus is
undergoing a transformation with major refurbishing and new buildings
scheduled for completion by 2020, the tower is not included in the plan.
LAVA has proposed an innovative new skin that would provide a cost-effective means to rejuvenate the building's aesthetics and
simultaneously improve its overall environmental performance. The
proposed skin is a three-dimensional lightweight, high performance,
composite mesh textile.
The winners of the 2010 Re-Skinning Awards were selected by an
international jury of nine leading environmentalists, engineers,
architects, designers and academics: Thomas Auer, partner and
managing director of Transsolar GmbH building energy design
consultancy; Andrew Bowerbank, president of the EC3 Initiative for a
low-carbon economy; George Baird, dean, Faculty of Architecture,
Landscape, and Design, and professor of architecture, University of
Toronto, and partner, Baird Sampson Neuert Architects; Stefan
Behnisch, partner, Behnisch Architekten; Fiona Cousins, principal and
leader of sustainability team, Arup, New York City; Judith DiMaio, dean,
School of Architecture & Design, NYIT; Rick Huijbregts, director of real
estate solutions for emerging markets, Cisco Canada; Edward Mazria,
founder and executive director, Architecture 2030; William McDonough,
founding principal, William McDonough + Partners, and cofounder and
principal, McDonough Braungart Design Chemistry (MBDC). >>>
Discuss this article in the Architecture Forum...
Zerofootprint is an enterprise with a mission to apply technology,
design thinking, and risk management to the massive reduction of our
environmental footprint. Zerofootprint operates both in the for-profitThe above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract
-
8/7/2019 Property Information Summary - CENTRAL SQUARE 2
11/11
and non-profit domains through two entities: Zerofootprint Software
and Zerofootprint Foundation.
This article is excerpted from Zerofootprint Re-Skinning Awards 2010,copyright 2010, with permission of the publisher, Zerofootprint.
The above summary is intended as a guide only and no responsibility is accepted by the developer or SQFT
Global Properties Singapore Pte Ltd for any errors or omissions and the above information and marketing
material does not constitute or form part of any offer, representation or contract