promotion: policy and process overview april 2013

58
Promotion: Policy and Process Overview April 2013

Upload: tatyana-ruiz

Post on 31-Dec-2015

36 views

Category:

Documents


0 download

DESCRIPTION

Promotion: Policy and Process Overview April 2013. Agenda. NYC DOE Promotion Policy Promotion Criteria Changes Common Core Aligned NYS Assessments and Student Promotion Early Preparation for June Promotion Decisions Promotion Portfolios Core Course Outcomes and Class Performance - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Promotion: Policy and Process Overview  April 2013

Promotion: Policy and Process Overview

April 2013

Page 2: Promotion: Policy and Process Overview  April 2013

Agenda• NYC DOE Promotion Policy

• Promotion Criteria Changes

• Common Core Aligned NYS Assessments and Student Promotion

• Early Preparation for June Promotion Decisions

• Promotion Portfolios• Core Course Outcomes and Class Performance

• Promotion Process

• Promotion Data Freeze• June Decisions• August Decisions

• Parent Appeals/Grade Changes

• Additional Resources

Page 3: Promotion: Policy and Process Overview  April 2013

Overview

Chancellor’s Regulation A-501 outlines promotion standards for New York City public school students in grades Pre-K through 12, as well as procedures for implementing the promotion policy.

Page 4: Promotion: Policy and Process Overview  April 2013

Promotion Policy: Grades Pre-Kindergarten–2Grade(s) Criteria

(ATS Criteria Code) Promotion Standard1,2

Pre-K3 Exempt (EXM)

Students are exempt from the NYC DOE Promotion Policy.

Kindergarten Lower Grade(LGR)

Principals, in consultation with a child’s teacher and parent, make promotion decisions based on whether students have demonstrated progress toward meeting the Primary Literacy Standards and the New York Learning Standards for Mathematics.

1 and 2 Lower Grade(LGR)

Principals make promotion decisions based on whether students have demonstrated progress toward meeting the Primary Literacy Standards and the New York Learning Standards for Mathematics.

1 This policy applies to all grade pre-K–2 students, including English Language Learners and Students with Disabilities. 2 For ELL’s, the decision to promote or retain shall include consideration of the student’s language development; limited English proficiency may not be the basis for retention (Chancellor’s Regulation A-501, p. 4).3 Given the reasons for exempting these students from the promotion policy, a positive outcome is expected in June. Students may be retained with valid reasons and documentation provided by the school.

Page 5: Promotion: Policy and Process Overview  April 2013

Promotion Policy: Grades 3-8

Grade(s) Criteria(ATS Criteria Code)

Promotion Standard

3-7 Standard(STD)

Students must achieve a Level 2* or above on both ELA AND Mathematics tests to be promoted to the next grade.

8 Standard(STD)

Students must achieve a Level 2* or above on both the ELA AND Mathematics tests AND attain passing grades in all four core courses (English, mathematics, science, and social studies) to be promoted to the next grade.

*A promotional cut score of “met” can be used to satisfy students’ promotion requirements.

Page 6: Promotion: Policy and Process Overview  April 2013

Promotion Policy: English Language Learners• Promotion criteria for ELLs is determined by two factors:

• Number of years enrolled in a United States School System (USSS) (reflected on UYRE)

• Status as a Student with Interrupted Formal Education (SIFE).

Page 7: Promotion: Policy and Process Overview  April 2013

7

Business Rules for Calculating Months Enrolled in a US School System• Rules from NYSED Student Information Repository System (SIRS)

Guidance:• One day of enrollment within a month equals one month of enrollment. • Months of enrollment in Pre-K or ungraded elementary are to be

counted. • For students that complete a school year and return the following fall,

summer months are counted in their total enrollment in US schools. • A student’s enrollment will not reset to zero when they discharge to a

non-US school for more than a calendar year.• Their enrollment will stop accruing when they discharge and

resume when/if they re-enroll.

Page 8: Promotion: Policy and Process Overview  April 2013

8

ATS Calculates months of enrollment in NYC DOE.

Schools can add additional months of enrollment in US school systems

Total years enrolled in a

US school system

For students in red, schools need to complete ELPC

Page 9: Promotion: Policy and Process Overview  April 2013

Promotion Policy: ELLs Grades 3-7ELL Information Criteria

(ATS Criteria Code)Promotion Standards1

Enrolled in an USSS for fewer than 2 years

Exempt (EXM)

Students are exempt from the NYC DOE Promotion Policy.

Enrolled in an USSS for at least 2 but fewer than 6 years OR SIFE

Multiple(MLT)

Promotion decisions are based on multiple measures. Students must:• Attain satisfactory progress in English as a Second Language (ESL)

literacy development in alignment with New York State Learning Standards for English Language Arts as evidenced by student work, teacher observation and assessments/grades; or achieve a satisfactory level of proficiency in English as evidenced by the New York State English as a Second Language Achievement Test (NYSESLAT); or achieve a Level 2* or above on the ELA test

AND• Meet New York State Learning Standards for Mathematics taught either

in the student’s native language or using ESL methodologies; or attain satisfactory progress in Mathematics taught using ESL methodologies as evidenced by student work, teacher observation and assessments/grades; or achieve a Level 2* or above on the math test.

Enrolled in an USSS for at least 6 years

Standard(STD)

Students are promoted if they achieve a Level 2* or above on the ELA AND Mathematics test.

*A promotional cut score of “met” can be used to satisfy students’ promotion requirements.

Page 10: Promotion: Policy and Process Overview  April 2013

Promotion Policy: ELLs Grade 8ELL Information Criteria

(ATS Criteria Code)Promotion Standards1

Enrolled in an USSS for less than 1 year

Exempt(EXM)

Students are exempt from the NYC DOE Promotion Policy.

Enrolled in an USSS for at least 1 but fewer than 2 years OR SIFE

Multiple(ML8)

Students are promoted if they pass their core courses (ELA, math, science and social studies).

Enrolled in an USSS school for at least 2 but fewer than 4 years

Multiple(MT8)

Students are promoted if they:(1) Pass all core courses(ELA, math, science and social studies),(2) Achieve expected gains on the NYSESLAT or ELA test, and (3) Achieve a Level 2* or above on the mathematics test.

Enrolled in an USSS school for at least 4 years

Standard(STD)

Students are promoted if they:(1) Pass their core courses, (2) Achieve a Level 2* or above on the ELA and mathematics

test.

*A promotional cut score of “met” can be used to satisfy students’ promotion requirements.

Page 11: Promotion: Policy and Process Overview  April 2013

Defining Gains for Grade 8 ELLsJune• NYSESLAT and State ELA results will not be finalized in time to make

June promotion decisions.• To determine if grade 8 ELLs enrolled 2 to four years, have made gains

in ELA schools will administer a promotion portfolio.• The grade 8 Promotion Portfolio Manual contains special direction for

determining performance comparable to expected ELA gains based on the student’s ELA promotion portfolio [performance

August• ELA Gains (from the NYSESLAT and State ELA exams) will be calculated

centrally and loaded into ATS for August promotion decisions.

Page 12: Promotion: Policy and Process Overview  April 2013

Promotion Policy: Students with IEPsStudents with IEPs

Grades K-2 (LGR)

Grades 3-8

Promotion decisions for all grade K–2

students, including students with IEPs, follow the general Promotion Policy

guidelines for grades K–2.1

Standard Promotion Criteria (STD) Modified Promotion Criteria (MOD)

No Promotion Criteria (NON)2

If a student’s IEP indicates that he/she is held to standard promotion criteria (or if the student’s IEP does

not indicate any promotion criteria), the standard promotion criteria for

the student’s current grade level will be used to make the promotion

decision.

If a student’s IEP indicates that he/she is held to modified promotion

criteria1, the promotion criteria in the IEP will be

used to make a promotion decision.

Students who participate in NYSAA (do not participate in

State tests) are exempt from the NYC

DOE Promotion Policy.

Testing modifications are different from modified promotion criteria. If a student has testing modifications, he/she could have either standard OR modified promotion criteria.

1Subject to relevant deadlines for establishing promotion criteria.2 Given the reasons for exempting these students from the promotion policy, a positive outcome is expected in June. Students may be retained with valid reasons and documentation provided by the school.

Page 13: Promotion: Policy and Process Overview  April 2013

Deadlines for Establishing Promotion Criteria

• The deadlines to establish promotion criteria for students with IEPs in order for it to apply to 2012-2013 promotion decisions are1:• January 31, 2013: For students with existing IEPs.• May 20, 2013: For students initially referred to special education

and students with an existing IEP who are new to the NYC DOE.

• The Promotion Criteria Guidelines for Students with Disabilities in Grades 3–8 provides information on how promotion criteria should be determined, applied, and evaluated.

1These deadlines are based on the date of the IEP conference. Promotion criteria established after this date will be in effect for the 2013-14 school year.

Page 14: Promotion: Policy and Process Overview  April 2013

14

Promotion Criteria Discrepancies• Schools were asked to review the Promotion Criteria Report (RPCR

) report to ensure students’ promotion criteria were accurately reflected in ATS. • When incorrect, schools were asked to update applicable

source systems (E.g. SESIS, CAP, UYRE)• Early May: Schools should review RPCR to ensure the accuracy of

promotion criteria for promotion decisions.• If students promotion criteria is incorrect, schools should note

the discrepancy, confirm the correct promotion criteria in the applicable source system (SESIS, CAP, UYRE) and escalate the request for a change of promotion criteria to their network.

Page 15: Promotion: Policy and Process Overview  April 2013

15

Promotion Criteria Overrides• The CFN can help schools collect

and process promotion criteria overrides.

Criteria Change Requests Should Include:• Subject Line: Promotion Changes DBN E.g.

Promotion Changes 27Q124• Attach tracker containing this information:

• Student Name (s)• NYC ID(s)• Current criteria and what the criteria

should be changed to.

Page 16: Promotion: Policy and Process Overview  April 2013

Special FlagsOA: OveragePR: Previously RetainedSpec Ed: Special EdIEP CRI: Promotion Criteria from CAPLEP Flag: ELL Status

Types of Promotion

Criteria

Page 17: Promotion: Policy and Process Overview  April 2013

Common Core Aligned NYS Assessments and Student Promotion• In past years, promotion decisions for students with standard criteria were

based on students’ state test performance levels (e.g. 1, 2, 3 or 4). • Due to the changes in the tests, it is not possible to estimate students’

performance levels this year. • Instead we will determine promotional cut scores based on student’s raw

scores.• Raw scores are the total number of questions the student answered correctly

out of the total number tested.• Standard promotion criteria students with raw scores in the lowest 10%

(approximately) will be recommended for retention and summer school.• We expect this number to be similar to last year.

• While the overall performance levels on the 2013 tests may be lower, the raw score required to meet promotion standards will be comparable to the 2012 tests.

Page 18: Promotion: Policy and Process Overview  April 2013

Common Core Aligned NYS Assessments and Student Promotion• As in year’s past, promotional cut scores will be calculated centrally

and loaded into ATS.• School will be able to view promotional cut scores and other

promotion related student performance data on RASP.• A promotional cut score of “met” can be used to satisfy students’

promotion requirements.

Page 19: Promotion: Policy and Process Overview  April 2013

Release of Final NYS Test Results• NYS test results are expected in late August• The release of NYS test results will not impact promotion

decisions, as promotional cut scores will be used to make promotion decisions for the 2012-2013 SY• A decision to promote a student in June, based on the

promotional cut scores, will not be reversed if a student did not achieve a Level 2 on the NYS test(s).

Page 20: Promotion: Policy and Process Overview  April 2013

Agenda• NYC DOE Promotion Policy

• Promotion Criteria Changes

• Common Core Aligned NYS Assessments and Student Promotion

• Early Preparation for June Promotion Decisions

• Promotion Portfolios• Core Course Outcomes and Class Performance

• Promotion Process

• Promotion Data Freeze• June Decisions• August Decisions

• Parent Appeals/Grade Changes

• Additional Resources

Page 21: Promotion: Policy and Process Overview  April 2013

Promotion Portfolios

• A promotion portfolio is a collection of specific exercises that indicate whether a student in grade 3-8 is performing comparable to Proficiency Level 2 on the NYS ELA and/or mathematics exams. • They are not samples of

student work collected over the course of the year.

Portfolio ComponentsELA

• Leveled Text (reading accuracy)• Standard Reading Passage (reading

comprehension)• Independent Writing Activity (writing

process, expression, mechanics)• ELA Class Work (one piece of class work)

Mathematics• Mathematical Inventory• Standard Math Problems• Mathematics Class Work (one piece of

class work)

Overall Portfolio Scores• High Level 2: Eligible for promotion in

June• Level 2: Eligible for promotion in August• Level 1

Page 22: Promotion: Policy and Process Overview  April 2013

Who Must Receive a Promotion Portfolio• Students who do not meet the NYS test promotion standard

• Students whose cut score indicates they did not meet in ELA and/or math

• Are missing a cut score (for one or both exams)• Grade 8 ELLs enrolled in a US schools system for at least two

years, but no more than four years (MT8)• Used to determine ELA gains in the absence of NYS ELA

and NYSESLAT results in June.

Page 23: Promotion: Policy and Process Overview  April 2013

Students Recommended for Promotion Portfolios• This year, students recommended for a promotion portfolio

will appear in red on PPSC.• The recommendation is intended to:

• Help schools administer and prepare promotion portfolios in a timely and targeted manner.

• Strategically balance the promotion portfolio workflow and reduce the amount of portfolios that need to be prepared. between the release of promotion cut scores and the deadline for principals to enter promotion decisions (3 days).

Page 24: Promotion: Policy and Process Overview  April 2013

Students Recommended for Promotion Portfolios• Who is recommended for a promotion portfolio?

• Students who scored and Level 1 or Level 2 on the 2012 NYS exams• Students who were promoted on the basis of a promotion portfolio for

the 2011-2012 SY (Appeal Code 1)• Portfolio recommendations are not exhaustive.

• Note: Grade 3 students who have never taken the NYS exams and new admits will likely not be flagged as recommended using the above rationale.

• Schools should administer additional promotion portfolios to students who they feel will not meet their promotion standards on the NYS exams based on academic performance throughout the year.

Page 25: Promotion: Policy and Process Overview  April 2013

Printing the Promotion Portfolio Summary Sheet• Schools will print the

Promotion Portfolio Summary Sheet from ATS (PPSC) to record student’s scores on the promotion portfolio.

• The summary sheet will be scanned into ATS (UPSC) to populate promotion portfolio data.

Page 26: Promotion: Policy and Process Overview  April 2013

Enter ‘Y’ to Print Portfolio Scan Sheet

Page 27: Promotion: Policy and Process Overview  April 2013

Individual Portfolio Component Scores

Portfolio Status

Page 28: Promotion: Policy and Process Overview  April 2013

Steps to Prepare a Promotion Portfolio (Teacher)For June Promotion Decisions 1. Access materials needed from the Promotion section of the Principals’ Portal.

Teachers will need to download two documents for the applicable grades: • Promotion Portfolio Manual • Promotion Portfolio Blackline Masters

2. Print the student’s Promotion Portfolio Summary Sheet from ATS (PPSC).3. Indicate whether the portfolio is being completed for ELA and/or math.4. Administer the portfolio components using the Manual and relevant sheets from

the Blackline Masters.5. Score student responses for each component and calculate overall score for the

promotion portfolio and record results on the Promotion Portfolio Summary Sheet.6. Use the checklist included in the Blackline Masters to assemble the promotion

portfolio.

For August Promotion Decisions 7. Add the August Update Sheet and relevant evidence as outlined in the Manual.

(This sheet is not scanned. Staple the sheet to the student’ portfolio)

Page 29: Promotion: Policy and Process Overview  April 2013

Steps to Prepare a Promotion Portfolio (Principal)For June Promotion Decisions 1. Ensure that all necessary evidence is included in the promotion portfolio

• Use checklist provided from the Blackline Masters.2. Review the evidence submitted and make a final determination on the promotion portfolio

score (Level 1, Level 2, or High Level 2) and sign and date the bottom of the Promotion Portfolio Summary Sheet.

3. Scan Promotion Portfolio Summary Sheet into ATS to populate portfolio results in ATS (UPSC).

4. Deliver only portfolios of students who score High Level 2 and High Level 1 (for ELLs with MT8 Criteria) for students whom you are recommending for promotion.

For August Promotion Decisions 5. Review the August Update Sheet and make a final determination on the portfolio score

(Level 1 or Level 2), and sign and date the bottom of the August Update Sheet.• If the overall portfolio score has changed, you can update the score on UPSC.

Example: Student work over summer school shows student has moved from Level 1 to Level 2.

6. Deliver only portfolios of students who score Level 2 and for whom you are recommending promotion to community superintendents.

Page 30: Promotion: Policy and Process Overview  April 2013

Promotion Portfolios

• Principals should only submit high quality, complete promotion portfolios for review• All components should be included • The classwork items should reflect the student’s best work

• It is recommended that the student work sample is from one of the school’s Common Core units

• Superintendents review promotion portfolios and may confirm or change the score of the promotion portfolio in ATS. • Once superintendents review a promotion portfolio score in ATS,

schools will be prevented from printing a new Portfolio Summary Sheet (PPSC) or changing promotion portfolio scores (UPSC).

Page 31: Promotion: Policy and Process Overview  April 2013

TG8C: Core Course Outcomes and Class Performance

Grades 3-7 •Schools will enter ELA/ESL and math performance in ATS for ELLs with multiple (MLT) criteria.

Grade 8•Starting June 3, core course outcomes that are finalized in STARS will transfer to ATS to populate the TG8C function. •Schools will also be able to manually update TG8C to reflect grade 8 students performance in their core courses.

Page 32: Promotion: Policy and Process Overview  April 2013

Enter Core Course Outcomes (‘P’ or ‘F’)

Page 33: Promotion: Policy and Process Overview  April 2013

33

Promotion Data Freeze• June 1: ATS will ‘freeze’ the DBN (promotion DBN) of all

students. • Schools will be responsible for making promotion decisions for all

students on their register at this time. • New registrants (not including transfers) will be added to schools’

promotion screens on an ongoing basis.

• June 10-12: Once a principal decision is entered, all pieces of promotion data will freeze for the remainder of the promotion process (through August promotion decisions).

Page 34: Promotion: Policy and Process Overview  April 2013

June Promotion Decision Timeline: Grades K-8Date1 Action Step

May 7 –June 7 • Schools prepare standardized promotion portfolios and enter all promotion portfolio scores into ATS.

• Principals submit only High Level 2 and High Level 1 (for ELLs with MT8 criteria) promotion portfolios to superintendents for students who are being recommended for promotion.

June 3-June 7 Grade 8: Ensure core course outcomes are entered in TG8C.Grades 3-7: Ensure ELA/ESL and math class performance information is entered in TG8C.

June 10 Anticipated release of promotional cut scores in ATS.

June 10-12 Principals enter promotion decisions for ALL students in ATS (PDEC).

June 10-12 Schools administer promotion portfolios to students who were not previously administered one and who did not meet a promotional cut score in ELA and/or math and require one for promotion. If the portfolio is a High Level 2, they may recommend the student for promotion and should submit the portfolio to the superintendent for review.

June 12-14 Superintendents enter June promotion decisions in ATS. Once a final decision is entered, it will enable school to begin printing June decisions letters and summer school letters.

June 17-26 Schools print standardized June decisions letter(for students who were not promoted) from ATS and send letters home to families.

1Dates are general time frames and may be updated as events relating to promotion decisions are finalized.

Page 35: Promotion: Policy and Process Overview  April 2013

RASP: Overall ELA and Math Performance

• RASP contains all subject related performance points, that are used to determine recommended promotion decisions.• Cut scores• NYS test results• NYC summer test results• ELA Gains

• For ELLs only. Based on NYSESLAT and NYS ELA results• ESL/Math Course Performance

• Only applicable to ELL’s in grades 3-7 with multiple (MLT) criteria

Page 36: Promotion: Policy and Process Overview  April 2013

Overall ELA and Math Performance (Determine Recommended Decision on PDEC)

Page 37: Promotion: Policy and Process Overview  April 2013

PDEC: Principal Decisions for Grades K-8• Principals will enter promotion decisions for students in grades K-8 on

PDEC• Principals will not be able to enter promotion decisions until:

• Core course outcomes are entered for all grade 8 students• All students who require a promotion portfolio have received a promotion

portfolio and the results are entered in ATS• Discharged students will continue to appear on promotion screens

(Students will appear in blue on PCOMM or green on WebConnect)• Schools should enter promotion decisions for these students based on the

available data. • The decision will be used as a starting point to determine placement, if the

student re-enrolls.• There is no recommended decision for discharged students

• Promotion portfolios are not required for discharged students

Page 38: Promotion: Policy and Process Overview  April 2013

Overall ELA and Math Performance

(From RASP)

Core Course Summary (From

TG8C)

Overage and/or previously retained

students are displayed in red

Page 39: Promotion: Policy and Process Overview  April 2013

Recommended Decision and

Principal Decision

If disagreeing with recommended decision, enter appeal reason code:1. Portfolio (Valid Scores Required)2. Overage/Previously Retained (August

Only-Comment Required) 3. Principal Discretion to Retain

(Comment Required)

Portfolio Scores and

Appeals

Type ‘D’ to display student biographical info

Type ‘C’ to enter a comment for a promotion appeal

Page 40: Promotion: Policy and Process Overview  April 2013
Page 41: Promotion: Policy and Process Overview  April 2013

Final Promotion Decision

Letter # and Letter

Status

Page 42: Promotion: Policy and Process Overview  April 2013

JUPL: June Letter Printing Screen

• Schools will release English versions of June retention letters (and summer school letters) from ATS printers using this function in ATS.• Schools can complete multiple releases of the letters as needed.• Summer school letters cannot be printed until a promotion

decision is entered.• Schools can back-pack the letters home to families.

Page 43: Promotion: Policy and Process Overview  April 2013

Select which letters to print (New, all or by ID)

Update Mailing Date or Principal Name

(To Be Displayed on Letters)

Sort by Grade Level or Official Class

Page 44: Promotion: Policy and Process Overview  April 2013

Sample June Decision Letter

Parent’s Preferred Written Language

Letter version

Information about the June promotion decision and additional opportunities for the

child to meet promotion standards

Page 45: Promotion: Policy and Process Overview  April 2013

ATS Printers• Schools may print June decision letters on any DFS certified ATS

printer: • Lexmark T630, T640, T650, X646, X736, X466, X656.

• Ensure legal paper is loaded in printers and the default tray is adjusted to accommodate legal paper.

• Additional information about releasing printing jobs is available on ATS Print.

Page 46: Promotion: Policy and Process Overview  April 2013

Translation• If a family’s preferred written language is a language other than

English, schools should download and print the corresponding translated version of the letter from the Promotion page.

• Parent’s preferred written language is located in the top right corner of the letter.• The letter number is located in the bottom right corner of the

English and translated letters.• The June letter key will assist schools in matching English and

translated version of the letters.

• Schools should send both the English and translated version of June decision letters home to families.

Page 47: Promotion: Policy and Process Overview  April 2013

47

Student Participation in Commencement Ceremonies1

• Elementary school: If a student does not meet promotion requirements in June, the principal and parent can decide together if the student should participate in a moving up or graduation ceremony.

• Schools should obtain written consent from parents explicitly stating they understand participation in June graduation or stepping up ceremonies does not mean their child will be promoted.

• Middle school and High School Students: Students may not participate in their school’s moving up or graduation ceremony if they have not met promotion/graduation requirements.

1Especially important for students in articulating grade (5th and 8th) and high school seniors.

Page 48: Promotion: Policy and Process Overview  April 2013

Overage and/or Previously Retained Provision• In August, principals may recommend

promotion for students in grades 3-8 who are overage and/or previously retained who have not yet met their promotion standards.

• OA/PR students will appear in red on the August PDEC

• To recommend promotion, principals must provide information and evidence of how the students have demonstrated gains on multiple measures of assessment (e.g. standardized assessment scores, classroom assessments, completed student assignments, and teacher observations)

Grade Level

Norm Age

Overage1 Previously Retained In

Grade

8 14 16 8, 7 or 6

7 13 15 7, 6 or 5

6 12 14 6, 5 or 4

5 11 13 5, 4 or 3

4 10 12 4, 3 or 2

3 9 11 3, 2 or 1

1Must turn this age by December 31st of the current school year.

Definitions• Overage: Student is two or more years overage for

his/her grade level by December 31 of current school year.

• Previously Retained: Student was retained in his/her current, or prior two grade levels.

Page 49: Promotion: Policy and Process Overview  April 2013

August Promotion Decision Timeline: Grades 3-81

Date2 Action Step

July 29- August 1 • Grade 8: Ensure summer school core course outcomes are entered in TG8C.• Grades 3-7: Ensure ELA/ESL and math class performance information is entered in TG8C.• Teachers complete the “August Update: Promotion Review Summary Sheet and add to

students’ promotion portfolios.

August 5-7 NYC Summer tests administered. (August 5: Math, August 6:ELA, August 7: Makeup)

August 8 NYC Summer test results are available for schools to view in ATS (RASP).

August 8-9 Principals enter August promotion decisions in ATS (PDEC).

August 8-9 Principals submit only Level 2 promotion portfolios to superintendents for students who did not meet their New York State test promotion standard but whom the principal is recommending for promotion.

August 12-13 Superintendents enter final August promotion decisions in ATS.

August 19-23 Final August promotion decision letters are printed and mailed to families by Central.

August 26-30 Principals and superintendents begin to hear parent appeals to final August promotion decisions.

1 Pre-K-2 Promotion decisions are only made in June.2Dates are general time frames and may be updated as events relating to promotion decisions are finalized.

Page 50: Promotion: Policy and Process Overview  April 2013

Parent Appeals• To appeal a promotion decision, parents should submit an appeal in

writing to the principal within three days of receiving the August decision letter1.

• All parent appeals are addressed first by the principal and then the superintendent (when necessary).• When necessary, the principal submits the promotion portfolio to the

superintendent, who:• All appeals are reviewed and evaluated based on the student's

promotion criteria• Appeals will be addressed beginning the week of August 27.

1Parents should not be turned away if their appeal is received outside the designated timeframe or is not submitted in writing.

Page 51: Promotion: Policy and Process Overview  April 2013

51

Parent Appeals/Grade Level Changes• Appeals that will result in a change of grade level should be entered

in ATS using the RQSA functions.• Grade level changes will be escalated to the superintendent for review

and a final determination.• When entering requests schools should provide detailed rationale in

alignment with Chancellor’s Regulation A-501.• RQSA (GRC): Request change of grade level for students in non-

articulating grades• RQSA (PAT): Request change of grade level for students in articulating

grades • RQSD: View Action Request Status

Page 52: Promotion: Policy and Process Overview  April 2013

8 (GRC): Request change of grade level for students in non-articulating grades9 (PAT): Request change of grade level for students in articulating grades

Page 53: Promotion: Policy and Process Overview  April 2013

Enter rationale for requesting appeal/grade change. Provide detailed information in alignment with Chancellor’s Regulation A-501

Enter requested grade level and effective date

Page 54: Promotion: Policy and Process Overview  April 2013

Enter rationale for requesting appeal/grade change. Provide detailed information in alignment with Chancellor’s Regulation A-501

List Notice Information (if available)

Page 55: Promotion: Policy and Process Overview  April 2013
Page 56: Promotion: Policy and Process Overview  April 2013

ATS Rollover and PromotionDate1 Action Step

May- June Schools set official classes and enter list notices for the 2013-2014 school year.

Mid-July ATS Rollover: ATS transitions from 2012-2013 to 2013-2014 school year. All students are grade bumped forward one grade (regardless of promotion decisions).

August 8- 13 Final August Promotion Decisions are made.

Late August ATS Pullback. All students in grades 3-8 whose final August decision is retain, will have their grade bump/list notice cancelled. They will be placed back into their 2012-2013 grade level.

After ATS Pullback

All appeals that result in a grade level change or requests to change a student’s grade level are entered in ATS on an individual basis using the RQSA functions.

1 Dates are general time frames and may be updated as events relating to promotion decisions are finalized.

Page 57: Promotion: Policy and Process Overview  April 2013

Next Steps for CFN’s• Turnkey trainings to all schools by Friday May 24, 2013

• Make sure every school receives training (especially new principals)• This PowerPoint will be available on the

Network Promotion/Summer School Resource Page• A similar presentation will also be available on the Principals’ Portal

• Support schools in completing the promotion process (policy question, criteria corrections, decision completion in ATS)

Page 58: Promotion: Policy and Process Overview  April 2013

Additional Resources• ATS Wiki: https://wiki.nycenet.edu/display/ATSWiki/Student+Promotion+Functions+-+PROM • Chancellor’s Regulation A-501: http://

intranet.nycboe.net/NR/rdonlyres/104C8E7D-0537-4B90-BB2A-04D6D8A116E7/0/NYSImpactonPromotion2013.pdf

• Common Core Aligned NYS Assessments and Student Promotion: http://intranet.nycboe.net/NR/rdonlyres/104C8E7D-0537-4B90-BB2A-04D6D8A116E7/0/NYSImpactonPromotion2013.pdf

• June Letters: http://intranet.nycboe.net/NR/exeres/9766462F-9D12-4AD7-802C-3A247778ECFA,frameless.htm?NRMODE=Published

• June Promotion Page: http://intranet.nycboe.net/DOEPortal/Principals/SchoolSupport/SchoolOperations/Promotion/JunePromotion/default.htm

• Network Promotion/Summer School Page: https://portal.nycenet.edu/SchoolSupport/NetworksResources/operations/PromotionSummerSchool/default.htm

• Promotion Portfolios: http://intranet.nycboe.net/DOEPortal/Principals/SchoolSupport/SchoolOperations/Promotion/JunePromotion/Promotion+Portfolio+Manuals+and+Blackline+Masters.htm