promos audit report cs-ase-02
TRANSCRIPT
Tool Audit Report for ProMOS DV34Remarks
Date: 16 Apr 2013
Tool ID: CS-ASE-02
Serial Number: #0875
Software version: 1.A.1400.1
PC version: TC – 3.5.0.2 IC – 3.5.0.0
Main Unit:
2 X Asyst Isoports with wafer mapper Able to initialize Loadports
1 X Brooks Robot with Aluminum end effectors Able to initialize Robot (SN: 0501-11985)
1 X Brooks Robot controller
2 X Flip stations Able to initialize Flip Stations
Emergency Rinse installed
Aero ionizer bar and controller at the Robot handling area No error observed
ECO unit
2 X ETEL ECO linear unit Initialization of ECO module failed
2 sets of ECO grippers
PSL1 Able to initialize PSL1
1 X Chuck
1 X Spindle unit
1 X Elevating unit
1 X Med 1 dispenser set
1 X Med 2 dispenser set
1 X DI dispenser set
1 X N2 dispenser set
2 X Quad ionizers
Chuck N2 with MFC
Dry N2 with MFC
PSL2 Able to initialize PSL2PSL2 Able to initialize PSL2
1 X Chuck
1 X Spindle unit
1 X Elevating unit
1 X Med 1 dispenser set
1 X Med 2 dispenser set
1 X DI dispenser set
1 X N2 dispenser set
2 X Quad ionizers
Chuck N2 with MFC
Dry N2 with MFC
PSR1 Able to initialize PSR1
1 X Chuck
1 X Spindle unit
1 X Elevating unit
1 X Med 1 dispenser set
1 X Med 2 dispenser set
1 X DI dispenser set
1 X N2 dispenser set
2 X Quad ionizers
Chuck N2 with MFC
Dry N2 with MFC
PSR2 Able to initialize PSR2
1 X Chuck
1 X Spindle unit
1 X Elevating unit
1 X Med 1 dispenser set
1 X Med 2 dispenser set
1 X DI dispenser set
1 X N2 dispenser set
2 X Quad ionizers
Chuck N2 with MFCChuck N2 with MFC
Dry N2 with MFC
CHC1 CHC 1 function not tested. No DIW available
Current Application: PolyEtch at 25°C
1 X Levitronix pump for Main Tank with controller
1 X Inline heater for Main Tank Both Mix and Main Tank Filter housings
1 X Trebor pump for Mix Tank have turned Brownish.
1 X Inline heater Mix Tank
Cooler installed
2 X Buffer Tanks and pumps
2 X Paddle Wheels
No analyzer installed
CHC2 CHC 2 function not tested. No DIW available
Current Application: BHF at 25°C
1 X Levitronix pump for Main Tank with controller
1 X Inline heater for Main Tank
1 X Trebor pump for Mix Tank
1 X Inline heater Mix Tank
Cooler installed
2 X Buffer Tanks and pumps
1 X Paddle Wheel
No analyzer installed
PDB
Power requirements 208VAC with Transformer and Power meter
External Module and Additional materials
1 X Camera rack No power to Camera Module
Overall Summary / Problems encountered
CS-ASE-02 was installed in ProMOS around June 2005.
CHC1 Buffer Tank B and Filter Housings have turned brownish.
Exhaust units need to change as it was catered for both Acid and Alkaline.
Tool not recommended for onsite refurbishment.
Parts needed / Parts to be changed
No Quantity Price
1 4
2 1 set
3 SCR149815 Implementation of DICO2 1
4 2311030-00 4
5 Labor Hours 40
6 200
7 150
8
9
10
11
Total
2310403-00
Part Number Description
no part number
Filter housing
Exhaust unit and tubes
NC Chuck
Decommissioning
Labor Hours
Labor Hours
Installation up to Tier 2
Implementation of SCR149815