Business CTQ Customer CTQ Internal CTQ Project CTQ
Basic for
selecting
project
Company profit
Cost of the productshould be less
Saving (Low
COPQ)
1 To improve C-S Yield
See attached
pareto Chart
2 To reduce Power consumption at SMS
Productivity
( Down time)
1 To reduce instances of elbow jamming
2 To reduce problem in main hoist brake
3 To reduce down time at Grinder
4
To improve MTTR & MTBF of 100 T A, 100 T
B, 40 T A
5
To improve life of water cooled panels at
EAF-2
6 To reduce down time at EAF 1
7
To reduce down time due to elbow cleaning
at EAF-2
Product quality should
be goodQuality
1
To improve As Cast percentage of
J4,304,IRSM44-97,JT
2
To reduce problem of lamination in 204Cu
from 16% to 8%
3 To improve free opening of Ladles at SMS-2
CTQ
-
8/14/2019 projects selection.ppt
2/6
PPC & Raw materials :
out of scope
-
8/14/2019 projects selection.ppt
3/6
Loss in operational consumables & Si rate due to increase scrap
consumption in 300 series: out of scope.
If we increase C-S yield then automatically other TEPs will be improved.
Operational cons:
out of scope
-
8/14/2019 projects selection.ppt
4/6
Loss in operational consumables & Si rate due to increase scrap
consumption in 300 series: out of scope.
If we increase C-S yield then automatically other TEPs will be improved.
Operational cons:
out of scope
-
8/14/2019 projects selection.ppt
5/6
PPC & Raw materials :
out of scope
-
8/14/2019 projects selection.ppt
6/6
SMS- Improvement InitiativesProjectStart
Date
TargetComple
tion
dateS NO Project Definition Team Leader
Methodo
logy
selected
Area CategoryProject
CTQ
1 To improve C-S Yield Alok Jain(Leader) JQI SMS-1 Yield Yield 27/8/2011 Feb.12
2 To reduce down time at EAF Rajesh Girdhar(Leader)PIP EAF-1 Productivity
Down
time 27/8/2011 Nov.11
3 To reduce instances of elbow jamming Ajay Gupta(Leader)PIP EAF-1 Productivity
Down
time 27/8/2011 Nov.11
4 To reduce problem in main hoist brake Sunil Agg(Leader)PIP Crane Productivity
Down
time 27/8/2011 Nov.11
5 To reduce down time at Grinder S.S. Mishra (Leader)PIP
Grind
erProductivity
Down
time 27/8/2011 Nov.11
6 To reduce Power consumption at SMS Mr. I.S RaswanJQI SMS Cost Saving Power
27/8/2011 Feb.12
7 To improve As Cast percentage of J4,304,IRSM44-97,JT Mr. Kalicharan MallaJQI SMS Quality
As
Cast 27/8/2011 Feb.12
8 To improve life of water cooled panels at EAF-2 Mr.Balram SharmaPIP SMS-2 Productivity
Down
Time 27/8/2011 Nov.11
9 To reduce problem of lamination in 204Cu from 16% to 8% Mr. A.D Kulshresta
JQI SMS-2 QualityLamin
ation27/8/2011 Feb.12
10 To improve MTTR & MTBF of 100 T A, 100 T B, 40 T A Mr. Ashwani GuptaPIP SMS-2 Productivity
Down
Time 27/8/2011 Nov.11
11 To reduce down time due to elbow cleaning at EAF-2 Mr. Balram SharmaPIP SMS-2 Productivity
Down
Time 27/8/2011 Nov.11
12 To improve free opening of Ladles at SMS-2 Mr. Dinesh Gosain
JQI SMS-2 Quality
% Free
Openin
g 27/8/2011 Feb.12