    Business CTQ Customer CTQ Internal CTQ Project CTQ

    Basic for

    selecting

    project

    Company profit

    Cost of the productshould be less

    Saving (Low

    COPQ)

    1 To improve C-S Yield

    See attached

    pareto Chart

    2 To reduce Power consumption at SMS

    Productivity

    ( Down time)

    1 To reduce instances of elbow jamming

    2 To reduce problem in main hoist brake

    3 To reduce down time at Grinder

    4

    To improve MTTR & MTBF of 100 T A, 100 T

    B, 40 T A

    5

    To improve life of water cooled panels at

    EAF-2

    6 To reduce down time at EAF 1

    7

    To reduce down time due to elbow cleaning

    at EAF-2

    Product quality should

    be goodQuality

    1

    To improve As Cast percentage of

    J4,304,IRSM44-97,JT

    2

    To reduce problem of lamination in 204Cu

    from 16% to 8%

    3 To improve free opening of Ladles at SMS-2

    CTQ

  • 8/14/2019 projects selection.ppt

    2/6

    PPC & Raw materials :

    out of scope

  • 8/14/2019 projects selection.ppt

    3/6

    Loss in operational consumables & Si rate due to increase scrap

    consumption in 300 series: out of scope.

    If we increase C-S yield then automatically other TEPs will be improved.

    Operational cons:

    out of scope

  • 8/14/2019 projects selection.ppt

    4/6

    Loss in operational consumables & Si rate due to increase scrap

    consumption in 300 series: out of scope.

    If we increase C-S yield then automatically other TEPs will be improved.

    Operational cons:

    out of scope

  • 8/14/2019 projects selection.ppt

    5/6

    PPC & Raw materials :

    out of scope

  • 8/14/2019 projects selection.ppt

    6/6

    SMS- Improvement InitiativesProjectStart

    Date

    TargetComple

    tion

    dateS NO Project Definition Team Leader

    Methodo

    logy

    selected

    Area CategoryProject

    CTQ

    1 To improve C-S Yield Alok Jain(Leader) JQI SMS-1 Yield Yield 27/8/2011 Feb.12

    2 To reduce down time at EAF Rajesh Girdhar(Leader)PIP EAF-1 Productivity

    Down

    time 27/8/2011 Nov.11

    3 To reduce instances of elbow jamming Ajay Gupta(Leader)PIP EAF-1 Productivity

    Down

    time 27/8/2011 Nov.11

    4 To reduce problem in main hoist brake Sunil Agg(Leader)PIP Crane Productivity

    Down

    time 27/8/2011 Nov.11

    5 To reduce down time at Grinder S.S. Mishra (Leader)PIP

    Grind

    erProductivity

    Down

    time 27/8/2011 Nov.11

    6 To reduce Power consumption at SMS Mr. I.S RaswanJQI SMS Cost Saving Power

    27/8/2011 Feb.12

    7 To improve As Cast percentage of J4,304,IRSM44-97,JT Mr. Kalicharan MallaJQI SMS Quality

    As

    Cast 27/8/2011 Feb.12

    8 To improve life of water cooled panels at EAF-2 Mr.Balram SharmaPIP SMS-2 Productivity

    Down

    Time 27/8/2011 Nov.11

    9 To reduce problem of lamination in 204Cu from 16% to 8% Mr. A.D Kulshresta

    JQI SMS-2 QualityLamin

    ation27/8/2011 Feb.12

    10 To improve MTTR & MTBF of 100 T A, 100 T B, 40 T A Mr. Ashwani GuptaPIP SMS-2 Productivity

    Down

    Time 27/8/2011 Nov.11

    11 To reduce down time due to elbow cleaning at EAF-2 Mr. Balram SharmaPIP SMS-2 Productivity

    Down

    Time 27/8/2011 Nov.11

    12 To improve free opening of Ladles at SMS-2 Mr. Dinesh Gosain

    JQI SMS-2 Quality

    % Free

    Openin

    g 27/8/2011 Feb.12