projects 'fi ~~~] ( a govt. of india undertaking) pdil · 2018-12-03 · projects &...
TRANSCRIPT
Projects & Development India Limited ( A Govt. of India Undertaking)[ 'fi ~ ~~]
Post Box No.125,A-14, Sector-1 , Noida - 201301 ,PDIL Dist. Gautambudh Nagar , Uttar Pradesh Phone - 0120-2529842/43/47/51/53/54
Fax - 01202529801/254 1493 GSTIN No: 09AABCP1722G1ZP CIN :U74140UP1978G01 028629
INVITATION TO BID
E: Open Vendor
ITB Number ====.....1
Type of Bid
11/PNMI\II/E/4703/2018-19/101043
Two Part bid
Type of Opening Public Opening
Date of Issue 03.12.2018
Bid Closing Date 17-12-2018 Time : 11:00 :00AM
Tech. Bid Opening Date 18-12-2018 Time : 11:00:00AM
Price Bid Opening Date & Time TO BE INTIMATED LATER
Venue of Bid Opening POlL, NOIDA
Earnest money Deposit N.A.
ITenure/Periodicity of Contract ONE YEAR FROM 01.01.2019 TO 31.12.2019
i
Projects & Development India Limited (POlL) is a Govt . of India Undertaking under the adm inistrative control of the
Dept. of Fertil izers , Ministry of Chemicals & Fertilizers. POlL invites bid for the under mentioned job, subject to
the terms and conditions enclosed.
SL. No. Material/HSN Code/ SAC Code
Description Quantity Unit
10 995469
Group Medical Insurance Policy for POlL 1 AU
For
(P.
ent India Ltd.
Addl . General Manager (MM)
11/PNMM/E/4703/2018-19/101043
Page 1 of 15
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees
including their dependent family members.
LIST OF CONTENTS
Sl. No. DESCRIPTION
1. Annexure I : Pre-Qualification Criteria
2. Annexure II : Instruction to Bidders
3. Annexure III : General Terms & Conditions
4. Anneuxre IV : Check List
5. Annexure V : Schedule of Rate
6. Annexure VI : Format of details of payment
7. Annexure VII : Declaration
8. Annexure VIII : Scope of work
9. Annexure IX : List of Employees
11/PNMM/E/4703/2018-19/101043
Page 2 of 15
ANNEXURE-I
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
PRE-QUALIFICATION CRITERIA (PQC)
1. The Bidder (Insurance firm) must be registered with IRDA (Insurance Regulatory &
Development Authority). 2. The Bidder (Insurance firm) must have served at least one organization for a
minimum of four hundred (400) employees during the last 3 years.
The Bidder (Insurance firm) must provide relevant documents, in support of above qualification criteria along with their Bid.
3. The Bidder (Insurance firm) must have executed, during the last seven (07) years from the
date of issue of Invitation to Bid (ITB), as per the value of work (premium amount) mentioned below:
Three similar works each of value not less than Rs. 36 lakh
OR
Two similar works each of value not less than Rs. 45 lakh
OR One similar work of value not less than Rs. 72 lakh
To meet the above criteria, the bidders are required to submit copy of Policy documents towards proof of Value of work. Note: Similar work means providing Group Medical insurance service to different organizations/Institutions/Corporate Sectors/Companies.
4. Average Annual Turnover/Net Premium during the last 03 (three) financial years, i.e. 2015-16, 2016-17 and 2017-18 should be at least Rs. 27 lakh. The bidders are required to submit Audited Financial Reports towards proof of Annual Turnover/Net Premium during the last 03 years.
5. The Bidder (Insurance firm) should have “solvency ratio” equal to or more than the
prescribed limit by IRDA for Financial year 2017-18. In confirmation to this requirement, Bidder shall submit the documentary evidence in support of the Solvency ratio.
11/PNMM/E/4703/2018-19/101043
Page 3 of 15
ANNEXURE-II
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
INSTRUCTION TO BIDDERS
1.0 A bidder who meets the Pre-Qualification Criteria (PQC) as per ITB and intents to quote against
this ITB may download the bidding document from PDIL website http://pdilin.com OR Central Public Procurement Portal https://eprocure.gov.in/cppp and submit the Bid complete in all respect as per terms & conditions of contract on or before the bid closing date and time.
2.0 Submission of Bids: Bids shall be submitted as detailed below:
2.1 Bidders to submit the bids online through the Central Public Procurement Portal for e-
Procurement at https://eprocure.gov.in/eprocure/app) 1) Possession of valid Digital Signature Certificate (DSC) and enrollment/registration of the
contractors/bidders on the e-procurement / e-tender portal is a prerequisite for e-tendering.
2) Bidder should do the enrollment in the e-procurement site using the “Click here to Enroll” option available on the home page. Portal enrollment is generally free of charge. During enrollment/registration, the bidders should provide the correct/true information including valid email_id. All the correspondence shall be made directly with the contractors/bidders through email_id provided.
3) Bidder need to login to the site thro’ their user ID/ password chosen during
enrollment/registration.
4) Then the Digital Signature Certificate (Class II or class III Certificates with signing key usage) issued by SIFY / TCS / nCode / eMudra or any Certifying Authority recognized by CCA India on eToken / SmartCard, should be registered.
5) The DSC that is registered only should be used by the bidder and should ensure safety of
the same.
6) Contractor/Bidder may go through the ITB / tenders published on the site and download the required ITB documents/schedules for the tenders he/she is interested.
7) After downloading / getting the ITB / Tender document/schedules, the Bidder should go thro’
them carefully and then submit the documents as asked, otherwise bid will be rejected.
8) If there are any clarifications, this may be obtained online thro’ the tender site, or thro’ the contact details. Bidder should take into account the corrigendum published before submitting the bids online.
9) Bidder then logs in to the site through the secured log in by giving the user id/ password
chosen during enrolment/registration and then by giving the password of the eToken / SmartCard to access DSC.
10) Bidder selects the tender which he/she is interested in by using the search option & then moves it to the ‘my tenders’ folder.
11) From my tender folder, he / she selects the tender to view all the details indicated.
11/PNMM/E/4703/2018-19/101043
Page 4 of 15
12) It is construed that the bidder has read all the terms and conditions before submitting their offer. Bidder should go through the tender schedules carefully and upload the documents as asked; otherwise, the bid will be rejected.
13) Bidder, in advance, should get ready the bid documents to be submitted as indicated in the
tender document/schedule and generally, they can be in PDF/xls/rar/zip/dwf formats. If there is more than one document, they can be clubbed together and can be provided in the requested format. Each document to be uploaded through online for the tenders should be less than 2 MB. If any document is more than 2MB, it can be reduced through zip/rar and the same can be uploaded, permitted. Bidder Bid documents may be scanned with 100 dpi with black and white option. However of the file size is less than 1 MB the transaction uploading time will be very fast.
14) If there are any clarifications, this may be obtained through the sits, or during the pre-bid
meeting if any. Bidder should take into account the corrigendum published from time to time before submitting the online bids.
15) The Bidders can update well in advance, the documents such as certificates, annual report
details etc., under My Space option and these can be selected as per tender requirements and then send along with bid documents during bid submission. this will facilitate the bid submission process faster by reducing upload time of bids.
16) Bidder should submit the Tender Fee/ EMD as specified in the tender. The original should
be posted/couriered/given in person to the Tender Inviting Authority, within the bid submission due date & time for the tender. Scanned copy of the instrument should be uploaded as part of the offer.
17) While submitting the bids online, the bidder reads the terms & conditions and accepts the
same to proceed further to submit the bid packets.
18) The bidder has to select the payment option as offline to pay the Tender FEE / EMD as applicable and enter details of the instruments.
19) The details of the DD / any other accepted instrument, physically sent, should tally with the
details available in the scanned copy and the data entered during bid submission time. Otherwise submitted bid will not be acceptable.
20) The bidder has to digitally sign and upload the required bid documents one by one as
indicated. Bidders to note that the very act of using DSC for downloading the bids and uploading their offers shall be deemed to be a confirmation that they have read all sections and pages of the bid document including General conditions of contract without any exception and have understood the entire document and are clear about the requirements of the tender requirements.
21) The bidder has to upload the relevant files required as indicated in the cover content. In
case of any irrelevant files, the bid will be rejected.
22) If the price bid format is provided in a spread sheet file like BoQ_xxxx.xls, the rates offered should be entered in the allotted space only and uploaded after filling the relevant columns. the Price Bid / BOQ template must not be modified / replaced by the bidder; else the bid submitted is liable to be rejected for the tender.
23) The bidders are requested to submit the bids through online e-tendering system to the
Tender Inviting Authority (TIA) well before the bid submission end date & time (as per
11/PNMM/E/4703/2018-19/101043
Page 5 of 15
Server System Clock). The TIA will not be held responsible for any sort of delay or the difficulties faced during the submission of bids online by the bidders at the eleventh hour.
24) After the bid submission (i.e after Clicking “Freeze Bid Submission” in the portal), the
acknowledgement number, given by the system should be printed by the bidder and kept as a record of evidence for online submission of bid for the particular tender and will also act as an entry pass to participate in the bid opening date.
25) The time settings fixed in the server side & displayed at the top of the tender site, will be
valid for all actions of requesting, bid submission, bid opening etc., in the e-tender system. the bidders should follow this time during bid submission.
26) All the data being entered by the bidders would be encrypted using PKI encryption
techniques to ensure the secrecy of the data. The data entered will not viewable by unauthorized persons during id submission & not be viewable by any one until the time of bid opening.
27) Any bid document that is uploaded to the server is subjected to symmetric encryption using a system generated symmetric key. Further this key is subjected to asymmetric encryption using buyers/bid openers public keys. Overall, the uploaded tender documents become readable only after the tender opening by the authorized bid openers.
28) The confidentiality of the bids is maintained since the secured Socket Layer 128
confidentiality technology is used. Date storage encryption of sensitive fields is done.
29) The bidder should logout of the tendering system using the normal logout option available at the top right hand corner and not by selecting the (X) exit option in the browser.
30) For any queries regarding e-tendering process, the bidders are requested to contact as
provided in the tender document. Parallel for any further queries, the bidders are asked to contact over phone: 1-800-233-7315 or send a mail over to [email protected].
2.2 Bidders are required to submit their bids under three envelopes as detailed below:
Envelope (A) : Not Applicable.
Envelope-B: Un-priced Technical and Commercial Bid which comprises the following documents: a. Documents in support of ‘Pre-Qualification Criteria” as per Annexure-I, attached. b. Complete ITB documents duly signed & stamped in each page with
“Deviations”/”Exception” sheet (if any) and all Annexure duly filled in. c. Price Confirmation Copy - A copy of Priced offer (Annexure-V), keeping price blank
(hiding the price) and in place indicating "Quoted" or "√ ", as a confirmation of price quoted against the enquired item and all applicable Taxes & Duties, shall be submitted.
d. Copy of Check List as Annexure-IV enclosed, duly filled by the bidder making all the points
clear and not leaving any voids. e. Photo copy of PAN card.
f. GSTN of your company and HSN / SAC Code for the item / service against which bid is
invited.
11/PNMM/E/4703/2018-19/101043
Page 6 of 15
g. Any other document as per the requirement specified in the ITB
Envelope-C: Price Bid Price Schedule as per Annexure-V with quoted rates in Rs. and Taxes & Duties, as applicable, signed and stamped.
3.0 Opening of Bids
Bid opening will be Public. Envelope A and B only will be opened on Technical Bid Opening Date. Price Bids (Envelope C) of only those bidders will be opened which will be considered technically and commercially acceptable.
4.0 Evaluation of Bids
Bids shall be evaluated for Pre-Qualification Criteria (PQC) first and Techno-Commercial Bid Evaluation shall be carried out, only for those Bids which shall meet the Pre-Qualification Criteria (PQC).
Bids shall be scrutinized on Techno-Commercial parameters. Bids having unacceptable deviation may be rejected at this stage. However, clarifications shall be sought from bidder for any shortcoming found in their Bid at this stage.
The PRICE BID shall be opened only of those bidders who will be technically and commercially
suitable.
5.0 Price Evaluation Criteria Price Evaluation of Bids shall be done considering the quoted prices by the bidder in the Price
Schedule/Schedule of Rates i.e. Annexure-V along with taxes and duties, on overall lowest bidder considering the input Tax credit benefit to PDIL.
In case of any discrepancy, unit rate shall prevail for calculation to arrive at the total price. In case a bidder does not fill up any amount and leaves it blank or writing ‘N/A’ or put ‘-‘ against
any item of Price Schedule, it shall be deemed that cost of such item (s) is included in other item by the bidder elsewhere in the quoted price.
Incomplete Price Schedule may result into rejection of bid.
6.0 Earnest Money Deposit (EMD) : Not Applicable.
7.0 Validity of Bids: Prices quoted should remain valid for our acceptance for a minimum period of 90 days from the date of opening of technical bids. PDIL will not allow any revision in prices within validity period after sealed tender are opened.
8.0 If at any later date, it is found that documents, information and data submitted by the Bidder in the Bid, and based on which the Bidder has been considered eligible or successful or has been awarded the Contract is incorrect or false to the extent that had the correct or true information been made available to the OWNER at the time of Bid evaluation, the bid would have been declared ineligible or unsuccessful, the Bidder shall be forthwith disqualified or, as the case may be, the contract awarded based on such incorrect or false information shall be cancelled and the EMD/PBG/Security Deposit shall be liable to be forfeited.
11/PNMM/E/4703/2018-19/101043
Page 7 of 15
9.0 Bidders are required to carefully go through the entire scope of ENQUIRY, terms and conditions, and other requirements before quoting. They should feel free to contact PDIL before submission of bid if they have any query on it. Once the bid is submitted, PDIL will presume that the bidder has understood thoroughly the Scope of Supply along with terms & conditions and all these are acceptable to them.
10.0 Bids shall be typed or written in indelible ink and must be free from corrections / erasing / overwriting etc. Any changes made must be authenticated with initial by the Bidder.
11.0 Bid shall be ideally in conformity to the Scope of supply/work along with all Terms & conditions, stipulated in the ENQUIRY. PDIL shall appreciate to receive a Bid having no deviation. However, under unavoidable circumstance, a Bidder may submit Deviations in a separate sheet, which PDIL at its own liberty may accept or reject. Deviations found elsewhere inside the Bid document shall not be considered. Deviations including condition(s), if any, found in the Price bid shall liable for rejection of a Bid in totality.
12.0 PDIL reserves the right to reject any or all the bids without assigning any reason whatsoever and does not bind itself to accept the lowest or any other bid. All bids in which any of the prescribed conditions are to be fulfilled or are incomplete in any respect are liable to be rejected. PDIL is at liberty to take any of the following actions in case of this ITB:
a) to cancel the tender without reference to the bidders. b) to postpone the due date and time.
13.0 Bidders shall not be entitled to claim any costs, charges, expenses or incidentals for or in connection with the preparation and submission of their bids even though Project & development of India Limited may withdraw the enquiry/tender or reject all bids.
14.0 SITE VISIT: Deleted 15.0 Bids submitted thro’ FAX and e-mail will not be accepted. No request from any bidder to PDIL
to collect the bid from airlines, cargo agents etc. shall be entertained by PDIL. 16.0 PDIL reserve the rights to assess bidder’s capability and capacity to perform the contract. 17.0 Bids must be submitted on or before the closing date and time well in advance. Bids received
late are liable for rejection & no complaint shall be entertained in this regard for any reason whatsoever.
18.0 To know more about PDIL, please visit our website http://www.pdilin.com
11/PNMM/E/4703/2018-19/101043
Page 8 of 15
ANNEXURE III
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
GENERAL CONDITIONS OF CONTRACT (GCC)
1.0 Scope of Contract
The Scope of Contract/ Purchase Order (P.O), shall be as per ‘Technical Specification’/ ‘Scope of Work’ and/or ‘Schedule of Rate’, attached to the ITB, unless & otherwise it is modified, at subsequent stage of bidding.
2.0 Firm Price Price to be quoted shall be firm and subject to no escalation whatsoever during the
contractual completion period including extended period, if any, except for any statutory variations i.e. change in the rate of tax & duty and/or inclusion of any new tax & duty.
Bid with variable price will not be accepted.
3.0 Price Basis The Per employee Per Annum Premium per age group category rates (in the nature of family
floater) as quoted in Schedule of Rates (Annexure-V) of ITB shall be firm and subject to no escalation till the execution of the Contract Period.
4.0 Taxes and duties 4.1 Goods & Service Tax (GST): GST shall be paid EXTRA as applicable as per GST law. Bidder
shall clearly indicate the present applicable rate of GST in Percentage (%) along with corresponding HSN / SAC Code and enclose a copy of GST registration certificate along with the unpriced offer.
PDIL shall avail Input Credit against payment of GST. Same will also be considered while
evaluating the price bid. Relevant necessary documents shall be provided by the Contractor to enable PDIL avail the above credit set off.
Bidders have to ensure that they should file the Tax return on time to avail input Tax credit, else the same shall be deducted from EMD/Security Deposit/Running Bills.
4.2 Statutory variation in taxes and duties including imposition of any new tax & duty, within the
scheduled Completion period, as per P.O, shall be paid at actual on production of documentary evidence.
4.2.1 In case of delay in execution, if there is any increase in the rate of tax & duty and/or there is
imposition of any new tax/ duty by statutory authorities, PDIL shall restrict the payment of taxes & duties, as prevalent on the scheduled delivery/ completion period only, as mentioned in the P.O and amendment(s) there to.
4.2.2 If there is any decrease in applicable rate of taxes & duties &/or there is any withdrawal of any
tax & duty by statutory authorities, during the completion period including extended/amended period of P.O, shall accrue to PDIL’s a/c.
11/PNMM/E/4703/2018-19/101043
Page 9 of 15
5.0 Effective date of Contract/ P.O: 01.01.2019.
6.0 Period of Contract: One (01) Year from the effective date of Contract.
7.0 Payment Terms :
Payment of Premium shall be made on Annual Basis. Annual Premium shall be paid in the start of the coverage period.
7.1 Tax deduction at source
Income tax, as applicable as per income tax act, shall be deducted at source from the Contractor’s bills and a certificate towards this deduction shall be issued to the Contractor.
8.0 Security Deposit: Not Applicable
9.0 Price reduction clause: Not Applicable.
10.0 Insurance: Not Applicable.
11.0 Statutory obligation and Safety Rules (For AMC/ ARC) : Deleted
12.0 Termination If the service provider breaches any terms of the contract including failure to perform service
in time, it will amount to failure on the part of service provider. In this situation, PDIL reserve the right to terminate the contract at any time by giving 15 days notice and the service provider shall refund the existing part of the insurance premium on pro rata basis except for the employee, for whom the claim has already been lodged.
13.0 Force Majeure The act of God, epidemic, wars, revolution, and official strike shall be treated as force majeure
condition. In event of occurrence of such condition neither party shall be responsible for delay in performance provided that it is notified within 07 days of its occurrence. The Contractor shall provide justification by documentation countersigned by the local chamber of commerce.
14.0 Arbitration All cases of dispute arising during execution of contract shall be resolved by mutual
discussion of parties operating the Contract. In the event of failure to do so, matter will be settled as per Arbitration and Conciliation Act, 1996, as amended from time to time.
However, wherever applicable, in case of settlement of commercial disputes between PSEs inter SE and PSE(s) and Government Department(s), the same shall be settled through Permanent Machinery of Arbitrators (PMA) setup in the Department of Public Enterprises (DPEs) as per the following Clause:
“In the event of any dispute or difference relating to the Interpretation and application of the provisions of the contracts, such dispute or difference shall be referred by either party for Arbitration to the sole Arbitrator in the Department of Public Enterprises to be nominated by the Secretary to the Government of India in-charge of the Department of Public Enterprises. The Arbitration and Conciliation Act, 1996 shall not be applicable to arbitration under this clause. The award of the Arbitrator shall be binding upon the parties to the dispute, provided, however, any party aggrieved by such award may make a further reference for setting aside or revision of the award to the Law Secretary, Department of Legal Affairs, Ministry of Law & Justice, Government of India. Upon such reference the dispute shall be decided by the Law
11/PNMM/E/4703/2018-19/101043
Page 10 of 15
Secretary or the Special Secretary/Additional Secretary, when so authorized by the Law Secretary, whose decision shall bind the Parties finally and conclusively. The Parties to the dispute will share equally the cost of arbitration as intimated by the Arbitrator”.
The performance under this contract, shall not stop for any reason, whatsoever, during the said dispute / proceedings, unless the service provider is specifically directed by PDIL to desist from working in this behalf.
15.0 Jurisdiction The Order shall be deemed to have been entered into at Noida and all cases of action in
relation to the order shall, therefore, be deemed to have been assigned within the jurisdiction of Gautam Budh Nagar (UP) and venue of arbitration shall be Noida.
11/PNMM/E/4703/2018-19/101043
Page 11 of 15
ANNEXURE-IV
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
CHECK LIST
(BIDDER MUST CONFIRM POINT BY POINT AND STRIKE OUT WHICHEVER IS NOT APPLICABLE)
NAME OF BIDDER: OFFER NO.:
Signature Of Bidder:_____________________
SL. NO.
DESCRIPTION ITB REQUIREMENT BIDDER’S CONFIRMATION/ ACCEPTANCE/ COMMENTS
1.0 Price Basis: The Per employee Per Annum Premium per age group category Rates shall be firm and subject to no escalation till the execution of the Contract Period.
TO CONFIRM
2.0 Present applicable rate of GST (in %) is indicated separately in the Price Schedule, in the space provided for.
TO CONFIRM
4.0 Period of Contract: One (01) Year from the effective date of Contract.
TO ACCEPT
5.0 Validity: Shall be 90 days from date of opening of Technical Bid. TO CONFIRM 6.0
DOCUMENTS (DULY SIGNED BY AUTORISED SIGNATORY & STAMPED) TO BE FURNISHED WITH ENVELOPE-1:
6.1. Relevant documents (copy duly signed and stamped) in support of Bidder’s Pre-Qualification Criteria (PQC)’ indicated in Annexure-I of ITB.
TO FURNISH
6.2 Complete ITB documents duly signed & stamped on each page as a token of acceptance of all terms and conditions of ITB.
TO FURNISH
6.3 Price Confirmation Copy: A copy of Priced offer (Annexure-V), keeping price blank (hiding the price) and in place indicating "Quoted" or "√ ", as a confirmation of price quoted against the enquired item and all applicable Taxes & Duties
TO FURNISH
6.4 Documentary evidence in support of the “solvency ratio” equal to or more than the prescribed limit by IRDA for the Financial year 2017-18 in confirmation to the requirement of PQC
TO FURNISH
7.0 Photocopy of PAN Card
TO FURNISH 8.0 Format of Details for payment, all the details duly filled in
(Annexure-VII). TO FURNISH
9.0 Copy of GST Registration Certificate
TO INDICATE 10.0 Address of IT counter where the bidder files Income Tax.
TO INDICATE
11.0 Name, Designation, Telephone Nos., Fax No. & e-mail of Contact Person for this Enquiry.
12. Whether the Company is registered as M S E (Micro & Small Enterprises) if ‘Yes’, indicate the registration No. and enclose a copy of Registration Certificate. ( YES / NO.)
12a. Whether the M S E Company is owned by SC / ST ( YES / NO.)
It is confirmed that in case any of the terms and conditions mentioned in this summary are at variance with those indicated anywhere else in our offer; the condition indicated in this summary shall prevail.
11/PNMM/E/4703/2018-19/101043
Page 12 of 15
Annexure-V
SCHEDULE OF RATES
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members. A. Mediclaim for Serving Regular Employees of the company along with their dependents :
(Table -1(a)
Sl. No. (I)
Employees Category Age-wise (in years)
(II)
No. of employees (Tentative)
(III)
Per employee Per annum Premium (#) for Rs. Two Lakh sum assured (in the nature of family floater)
(IV)
Total (Rs.)
(V)=(IV)x(III) Rs.(In figure) In Words
1. 0-18 2. 19-25 3. 26-30 27 4. 31-35 104 5. 36-40 83 6. 41-45 26 7. 46-50 27 8. 51-55 36 9. 56-60 31 10. 61-65 11. 66-70 12. 71-75 13. 76-80 14. Above 80
Total A 334 GST Extra @ …..%
Contd…...2/-
11/PNMM/E/4703/2018-19/101043
Page 13 of 15
B. Mediclaim for Retired Employees and their spouse: (Table -1(b)
Sl. No.
(I)
Retired employees Category rank-wise (above 60 Years)
(II)
Sum assured (Rs.) (III)
No. of retired employees (Tentative)
(IV)
Per employee Per annum Premium (V)
Total (Rs.)
(VI)=(V)x(IV) Rs.(In figure) In Words
1. Workman 2 Lakh 2. Jr. Officer to DGM 3 Lakh 75
3. AGM to GM 4 Lakh 44
4. Directors 5 Lakh 1 TOTAL B 120
GST Extra @ …..%
# Bidder should provide Per employee Per Annum Premium per age group category to arrive at total contract value at the time of finalization of contract and also for each Addition / Deletion of employee during the contract period. This Per employee Per Annum Premium shall remain constant/firm during the validity of the Contract i.e. from 1.1.2019 to 31.12.2019.
Note:
i. Bidders are required to quote the rate as per above format indicating present applicable rate of GST in percentage. ii. The quotation/price bid does not include any brokerage/agency/consultancy charges. iii. Quoted rate towards premium Per employee Per Annum Per age group category shall be considered to arrive at total contract value in the
Purchase Order (P.O.). However, for each Addition/Deletion of employee during the contract period, the Per employee Per Annum Premium shall remain constant during the validity of contract.
iv. Bidders are required to quote against each category (Age-wise) as indicated in the SOR format above, even though the No. of employees in any of the categories, is mentioned, as ‘0’ (Zero).
v. An unpriced copy of this “Schedule of Rates” hiding the price and with indication of price quote as “Quoted” / “√” against each head duly signed & stamped must be submitted along with un-priced techno-commercial bid (Part-II) as price confirmation.
Signature of Authorized Representative Name: …………………………………
Place: ……………. Designation: …………………………..
Date: ………….. Seal of the Company: ………………
11/PNMM/E/4703/2018-19/101043
Page 14 of 15
ANNEXURE-VI
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
FORMAT OF DETAILS FOR PAYMENT
Bidders are required to submit the following details on the company's letter head for online transfer to amount to their account: 1 Contractor Name / Company Name Address: Phone No. E-mail lD 2.a) Name of the Bank b) Address of the Branch Telephone No. c) 9 Digit Code number of the Bank and Branch appearing on
the MICR cheque issued by the Bank
d) 11 Digit NEFT/IFSC Code of the Bank Branch e) Account Type (SB/CC/CA) f) Account Type (SB/CC/CA) g) Permanent Account Number (PAN) Under Income Tax Act. h) GST Registration Number i) Name of Authorized Signatory j) Contact Person Name We hereby declare that the particulars given above are correct and complete Authorized signatory of the bidder Title………………………………… Designation……………………… Date:………………………………
11/PNMM/E/4703/2018-19/101043
Page 15 of 15
Annexure-VII
Sub.: Group Medical Insurance Policy for PDIL’s Serving & Retired employees including their dependent family members.
(Self Declaration on Bidder’s Letter Head as per below performa)
DECLARATION
To , Projects and Development India Ltd. Noida – 201301 Subject : ITB No. ……………………………………..Dt. ……………….. Sir , We hereby declare that M/s …………………………… is neither put on Holiday nor Black-listed by any Government / PSU / Private firm or Financial Institution . Signature Name : Designation : Seal of the Bidder.
(c) Surgeon, anaesthetist, Medical Practitioner, consultants, specialist fees.
(d) Anaesthesia, Blood, Oxygen, Operation Theatre Charges, Surgical Appliances, Medical,
Drugs, Diagnostic Material and X–ray, Dialysis, Chemotherapy, Radiotherapy, Cost of pacemaker Artificial Lambs & Cost of Organs and similar expenses. The pre and post hospitalization reimbursement shall be for 30 and 60 days respectively.
13. Any claim exceeding the sum insured / assured may be paid through the ‘company floater’ scheme
subject to prior approval from PDIL and availability of limit. The insurer shall pay from the company floater scheme 100% on expenses above Rs.2 lakhs to 3 lakhs per family without bearing any cost by the respective employee. However, on exceeding expenses above Rs.3 Lakhs, insurer shall pay from the company floater scheme only 90% upon each approval & balance 10% to be borne by respective employee except on the death of an employee for which the floater amount is used. The company floater is not applicable to retired/Ex-employees.
14. Midterm inclusion:- Employees retiring / joining during the tenure of the contract shall be covered in this policy. In the event of death of an employee while in service, spouse of the deceased employee shall also be
covered in this policy as midterm inclusion. Premium in respect of this inclusion shall be paid on pro-rata basis from the date of coverage.
Parents, Spouse and new born children wholly dependents upon employee (who are covered in the
current mediclaim policy) and whose premium have been paid by PDIL during current year shall also be included as Midterm inclusion.
The intimation for midterm inclusion shall be given on monthly basis in 1st week of the month and the
insurer shall provide such new entrant with the policy and membership card within 10 days of intimation.
15. Midterm exclusion:- Employees leaving the organisation during the currency of the scheme shall be expunged from the policy and the insurer shall refund the premium amount in r/o such expunctions in to to provided there is no claim against such excluded policy holder. Also, the insurer shall block the mediclaim membership / card within 48 hours of being intimated by PDIL.
16. MEMBERSHIP CARD: The underwriter shall arrange to issue membership card to each employee/
ex-employee. These cards shall be sent directly by post / courier to all employees at their given addresses within 15 days of issuing of policy.
Validity of Membership Card shall be for the entire duration of the policy coverage. 17. Insurance Co. shall provide a statement of employee wise mediclaim settled in respect of employees/
ex-employee at the end of each month in soft copy to GM (HR) Corporate Office Noida.
18. The tenure of contract with the insurer shall be for one year effective from 01.01.2019 to 31.12.2019 & Premium shall be paid on annual basis and accordingly policy may be issued
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
34 01‐Jan‐19 31‐Dec‐19 39201 Sanjay Kumar SinhaAGM & HOD (CSR) E7 05‐Jun‐1963 55 years6months26 days
51‐55 Self M 200000 Noida Office
35 01‐Jan‐19 31‐Dec‐19 39412Sandeep Kumar Puthal
Addl.General Manager(DBT & CSR)
E7 15‐Jul‐1963 55 years5months16 days
51‐55 Self M 200000 Noida Office
36 01‐Jan‐19 31‐Dec‐19 50174 Kamal BhasinSr. Officer (Reception)
E1 19‐Nov‐1963 55 years1months12 days
51‐55 Self F 200000 Noida Office
37 01‐Jan‐19 31‐Dec‐19 39127Bishwajit Kumar Das
Asst.Chief Technologist (CRD)
E2 09‐Dec‐1963 55 years0months22 days
51‐55 Self M 200000 Noida Office
38 01‐Jan‐19 31‐Dec‐19 60090J C Joshi
SR.RECORD KEEPER (MECH.)
W6 31‐Dec‐1963 55 years0months0 days
51‐55Self
M 200000Vadodara Office
39 01‐Jan‐19 31‐Dec‐19 39277 Hakeem KhanMANAGER (DESIGN‐CIVIL)
E4 01‐Jul‐1964 54 years5months30 days
51‐55 Self M 200000Vadodara Office
40 01‐Jan‐19 31‐Dec‐19 39186 Sunita MhadnakAsst. Manager Establishment
E2 20‐Jul‐1964 54 years5months11 days
51‐55 Self F 200000Mumbai INS & NDT
41 01‐Jan‐19 31‐Dec‐19 50227 Renuka Mittal DGM(VIG.) E6 02‐Aug‐1964 54 years4months29 days
51‐55 Self F 200000 Noida Office
42 01‐Jan‐19 31‐Dec‐19 39115 Pawan KumarADDL. GENERAL MANAGER & HOD(MS)
E7 11‐Sep‐1964 54 years3months20 days
51‐55 Self M 200000 Noida Office
43 01‐Jan‐19 31‐Dec‐19 50875Shankarlal Samadani
AGM (FINANCE ‐ CORPORATE)
E7 02‐Oct‐1964 54 years2months29 days
51‐55 Self M 200000 Noida Office
44 01‐Jan‐19 31‐Dec‐19 60070 M A NerlekarAsst. Manager (Admin)
E2 3‐Oct‐64 54 years2months28 days
51‐55 Self M 200000Vadodara Office
45 01‐Jan‐19 31‐Dec‐19 39107Rajeev Ranjan Kumar
Additional General Manager (PM)
E7 16‐Jan‐64 54 years11months15 days
51‐55 Self M 200000 Noida Office
46 01‐Jan‐19 31‐Dec‐19 50163 Narain SinghASSISTANT MANAGER (FINANCE)
E2 06‐Feb‐1964 54 years10months25 days
51‐55 Self M 200000 Noida Office
47 01‐Jan‐19 31‐Dec‐19 50195Abraham Varughese
ASSISTANT MANAGER (DESIGN‐INSTT.)
E2 27‐May‐1965 53 years7months4 days
51‐55 Self M 200000 Noida Office
48 01‐Jan‐19 31‐Dec‐19 39304 Vikas GaurAdditional General Manager (BD)
E7 13‐May‐1965 53 years7months18 days
51‐55 Self M 200000 Noida Office
49 01‐Jan‐19 31‐Dec‐19 50159 Mool Chand OFF. ASST.‐I W5 03‐Jun‐1965 53 years6months28 days
51‐55 Self M 200000 Noida Office
50 01‐Jan‐19 31‐Dec‐19 39189Prakash Chandra Mishra
AGM(INSP.) E7 05‐Aug‐1965 53 years4months26 days
51‐55 Self M 200000Chennai INS & NDT
51 01‐Jan‐19 31‐Dec‐19 50196 Brijesh AGM(CIVIL) E7 20‐Aug‐1965 53 years4months11 days
51‐55 Self M 200000 Noida Office
52 01‐Jan‐19 31‐Dec‐19 50156 Kirpal Singh OFF. ASST.‐I W5 02‐Oct‐1965 53 years2months29 days
51‐55 Self M 200000 Noida Office
53 01‐Jan‐19 31‐Dec‐19 39229Niral Kumar Runda
MANAGER(VIGILANCE)
E4 29‐Oct‐1965 53 years2months2 days
51‐55 Self M 200000 Noida Office
54 01‐Jan‐19 31‐Dec‐19 50178Kumar Anil Dhawan
Dy. Manager (Mechanical)
E3 06‐Feb‐1965 53 years10months25 days
51‐55 Self M 200000 Noida Office
55 01‐Jan‐19 31‐Dec‐19 39293 Birendra PrakashDy.General Manager(Process)
E6 04‐Dec‐1965 53 years0months27 days
51‐55 Self M 200000 Noida Office
56 01‐Jan‐19 31‐Dec‐19 39260 Sukumar PandeySR.OFFICER (GM'S SECTT.)
E1 28‐Jun‐1966 52 years6months3 days
51‐55 Self M 200000Vadodara Office
57 01‐Jan‐19 31‐Dec‐19 60078Jagruti K Amin
Asst.Manager (Design‐Elect.)
E2 28‐Sep‐1966 52 years3months3 days
51‐55 Self F 200000Vadodara Office
58 01‐Jan‐19 31‐Dec‐19 39303 Sudhir BirlaAddl. GM(Corp. Planning)
E7 10‐Sep‐1966 52 years3months21 days
51‐55 Self M 200000 Noida Office
59 01‐Jan‐19 31‐Dec‐19 39305Sanjay Kumar Srivastava
AGM(Corporate Communications)
E7 24‐Oct‐1966 52 years2months7 days
51‐55 Self M 200000Noida INS & NDT
60 01‐Jan‐19 31‐Dec‐19 39191Md Abul Kalam Anwar
AGM(ELECT.‐INSP.) E7 05‐Jan‐1966 52 years11months26 days
51‐55 Self M 200000Noida INS & NDT
61 01‐Jan‐19 31‐Dec‐19 39244 Anil Kumar Singh Asst. Manager(SS) E2 01‐Dec‐1966 52 years0months30 days
51‐55 Self M 200000 Noida Office
62 01‐Jan‐19 31‐Dec‐19 60080R M Shah
Asst.Manager (Design‐PE)
E2 08‐Dec‐1966 52 years0months23 days
51‐55 Self M 200000Vadodara Office
63 01‐Jan‐19 31‐Dec‐19 60075Urvashi Manoj Jadh
ASST.CHIEF ENGINEER(CIVIL)
E2 17‐Mar‐1967 51 years9months14 days
51‐55 Self F 200000Vadodara Office
64 01‐Jan‐19 31‐Dec‐19 50931Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
E7 25‐May‐1967 51 years7months6 days
51‐55 Self M 200000 Noida Office
65 01‐Jan‐19 31‐Dec‐19 50180 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
E2 29‐May‐1967 51 years7months2 days
51‐55 Self M 200000 Noida Office
66 01‐Jan‐19 31‐Dec‐19 39208 Bijay KumarDy.Chief Technologist
E3 10‐Feb‐1967 51 years10months21 days
51‐55 Self M 200000 Sindri Office
67 01‐Jan‐19 31‐Dec‐19 39203 Baban Kumar Operator Gr‐I W5 02‐Dec‐1967 51 years0months29 days
51‐55 Self M 200000Noida INS & NDT
Page 2 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
68 01‐Jan‐19 31‐Dec‐19 50239 Ujjwal Peter Tudu AGM(CIVIL) E7 04‐Jun‐1968 50 years6months27 days
46‐50 Self M 200000 Noida Office
69 01‐Jan‐19 31‐Dec‐19 39230 R B MeenaDy.Manager(Design.‐Elect.)
E3 18‐Jun‐1968 50 years6months13 days
46‐50 Self M 200000Vadodara Office
70 01‐Jan‐19 31‐Dec‐19 39316Sanjay Kumar Tripathi
General Manager (INSTR.)
E8 07‐Aug‐1968 50 years4months24 days
46‐50 Self M 200000 Noida Office
71 01‐Jan‐19 31‐Dec‐19 60079Sunita Rajesh Ram
ASST.MANAGER DESIGN (ELECT.)
E2 23‐Feb‐1968 50 years10months8 days
46‐50 Self F 200000Vadodara Office
72 01‐Jan‐19 31‐Dec‐19 50481Sanjeev Kumar Nangia
AGM (BD) E7 04‐Jul‐1969 49 years5months27 days
46‐50 Self M 200000 Noida Office
73 01‐Jan‐19 31‐Dec‐19 39283Santanu Chatterjee
Asstt.Manager (Finance)
E2 18‐Aug‐1969 49 years4months13 days
46‐50 Self M 200000 Sindri Office
74 01‐Jan‐19 31‐Dec‐19 39368Mahendra B Dhandre
Dy G.M. (PROJECTS) E6 11‐Sep‐1969 49 years3months20 days
46‐50 Self M 200000Vadodara Office
75 01‐Jan‐19 31‐Dec‐19 50463 Sanjeev KumarDY.GENERAL MANAGER(ELECT.)
E6 01‐Jan‐1969 49 years11months30 days
46‐50 Self M 200000 Noida Office
76 01‐Jan‐19 31‐Dec‐19 39220Bhukhal Chandra Mahato
Sr. Officer (NDT) E1 07‐Dec‐1969 49 years0months24 days
46‐50 Self M 200000Noida INS & NDT
77 01‐Jan‐19 31‐Dec‐19 50465Sanjoy Kumar Brnwal
DGM(ELECT.) E6 08‐Dec‐1969 49 years0months23 days
46‐50 Self M 200000 Noida Office
78 01‐Jan‐19 31‐Dec‐19 50392 Rajesh I Upadhyay ADDL.G.M. (CIVIL) E7 19‐Mar‐1970 48 years9months12 days
46‐50 Self M 200000Vadodara Office
79 01‐Jan‐19 31‐Dec‐19 50241 Shalini Katiyar AGM(ELECT.) E7 04‐May‐1970 48 years7months27 days
46‐50 Self F 200000 Noida Office
80 01‐Jan‐19 31‐Dec‐19 51009Iswar Chandra Sahu
ASSISTANT CHIEF ENGINEER (CIVIL)
E2 05‐May‐1970 48 years7months26 days
46‐50 Self M 200000 Noida Office
81 01‐Jan‐19 31‐Dec‐19 50426 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
E1 08‐Jun‐1970 48 years6months23 days
46‐50 Self F 200000 Noida Office
82 01‐Jan‐19 31‐Dec‐19 50333 Amarendra Kumar AGM(Mech) E7 18‐Sep‐1970 48 years3months13 days
46‐50 Self M 200000 Noida Office
83 01‐Jan‐19 31‐Dec‐19 50468 Leena Bansal DGM(MM) E6 16‐Nov‐1970 48 years1months15 days
46‐50 Self F 200000 Noida Office
84 01‐Jan‐19 31‐Dec‐19 50383 D K KaramataADDL.GENERAL MANAGER (CIVIL)
E7 18‐Nov‐1970 48 years1months13 days
46‐50 Self M 200000Vadodara Office
85 01‐Jan‐19 31‐Dec‐19 50362Dinesh Kumar Sant
Deputy General Manager & HOD (PM & MS)
E6 30‐Jan‐1970 48 years11months1 days
46‐50 Self M 200000 Noida Office
86 01‐Jan‐19 31‐Dec‐19 50179 Manish Sethi Dy. Manager (Pers.) E3 30‐Dec‐1970 48 years0months1 days
46‐50 Self M 200000 Noida Office
87 01‐Jan‐19 31‐Dec‐19 50339Praveen Kumar Yadav
ADDL.GENERAL MANAGER(MECH.)
E7 03‐Apr‐1971 47 years8months28 days
46‐50 Self M 200000 Noida Office
88 01‐Jan‐19 31‐Dec‐19 50438 Syam Kumar P Dy. GM (Insp.) E6 06‐Apr‐1971 47 years8months25 days
46‐50 Self M 200000Mumbai INS & NDT
89 01‐Jan‐19 31‐Dec‐19 50461Rajeev Kumar Varshney
Dy.GM (Electrical) E6 09‐Apr‐1971 47 years8months22 days
46‐50 Self M 200000 Noida Office
90 01‐Jan‐19 31‐Dec‐19 50444 Debabrata Maji Dy.GM (Mech) E6 15‐Oct‐1971 47 years2months16 days
46‐50 Self M 200000 Noida Office
91 01‐Jan‐19 31‐Dec‐19 39363Thummanapalli Venkanna
Deputy GM (Insp.) E6 15‐Jan‐1971 47 years11months16 days
46‐50 Self M 200000Hydrabad INS & NDT
92 01‐Jan‐19 31‐Dec‐19 50512 Anjali Thakur DGM(MM) E6 03‐Dec‐1971 47 years0months28 days
46‐50 Self F 200000 Noida Office
93 01‐Jan‐19 31‐Dec‐19 50464Chandrama Prasad
DGM (Insp.) E6 03‐Apr‐1972 46 years8months28 days
46‐50 Self M 200000Kolkota INS & NDT
94 01‐Jan‐19 31‐Dec‐19 60123 Mukesh KumarDY GENERAL MANAGER (FINANCE)
E6 2‐Oct‐72 46 years2months29 days
46‐50 Self M 200000Vadodara Office
95 01‐Jan‐19 31‐Dec‐19 50441 Ragunath B Dy.GM (Insp.) E6 10‐Jun‐1973 45 years6months21 days
41‐45 Self M 200000Chennai INS & NDT
96 01‐Jan‐19 31‐Dec‐19 50486 Manisha NarangAGM & HOD(Planning‐MR & Process)
E7 01‐Feb‐1973 45 years10months30 days
41‐45 Self F 200000 Noida Office
97 01‐Jan‐19 31‐Dec‐19 39374Rajendra Babu Srinivasan
ADDL.GM(INSP.) E7 02‐Feb‐1973 45 years10months29 days
41‐45 Self M 200000Noida INS & NDT
98 01‐Jan‐19 31‐Dec‐19 50933 Ritu AgarwalDY. GENERAL MANAGER(INSTT.)
E6 11‐Dec‐1973 45 years0months20 days
41‐45 Self F 200000 Noida Office
99 01‐Jan‐19 31‐Dec‐19 50867Rajeev Ranjan Kumar
Chief Engg(Mechanical)
E5 31‐Dec‐1973 45 years0months0 days
41‐45 Self M 200000 Noida OfficePage 3 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
100 01‐Jan‐19 31‐Dec‐19 50490 Anupama DGM (COMPUTERS) E6 25‐Apr‐1974 44 years8months6 days
41‐45 Self F 200000 Noida Office
101 01‐Jan‐19 31‐Dec‐19 60184 Vinay PrabhakarCHIEF ENGINEER (PROCESS)
E5 01‐Apr‐1974 44 years8months30 days
41‐45 Self M 200000Vadodara Office
102 01‐Jan‐19 31‐Dec‐19 50876Bishwamitra Singh
Dy. GM(finance) E6 02‐May‐1974 44 years7months29 days
41‐45 Self M 200000 Noida Office
103 01‐Jan‐19 31‐Dec‐19 51073Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
E4 16‐May‐1974 44 years7months15 days
41‐45 Self M 200000 Noida Office
104 01‐Jan‐19 31‐Dec‐19 50981Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
E5 27‐Apr‐1975 43 years8months4 days
41‐45 Self M 200000 Noida Office
105 01‐Jan‐19 31‐Dec‐19 51067 Sheela Kumari Designer (Civil) E0 10‐May‐1975 43 years7months21 days
41‐45 Self F 200000 Noida Office
106 01‐Jan‐19 31‐Dec‐19 50535 Manoj Kumar JhaDY.CHIEF ENGINEER(INSP.)
E3 10‐Nov‐1975 43 years1months21 days
41‐45 Self M 200000Hydrabad INS & NDT
107 01‐Jan‐19 31‐Dec‐19 51036Sandip Kumar Sarkar
Chief Engineer (Civil) E5 24‐Jan‐1975 43 years11months7 days
41‐45 Self M 200000 Noida Office
108 01‐Jan‐19 31‐Dec‐19 50934 Nitin KumarDY.CHIEF ENGINEER(COMP.)
E3 02‐Mar‐1976 42 years9months29 days
41‐45 Self M 200000 Noida Office
109 01‐Jan‐19 31‐Dec‐19 60167Bhoopendra Kumar Marskole
Dy CHIEF ENGR. (MECH.)
E3 16‐Jun‐1976 42 years6months15 days
41‐45 Self M 200000Vadodara Office
110 01‐Jan‐19 31‐Dec‐19 50995 Awanesh Kumar DESIGNER(CIVIL) E0 21‐Jun‐1976 42 years6months10 days
41‐45 Self M 200000 Noida Office
111 01‐Jan‐19 31‐Dec‐19 51037 Ashish VaidyaCHIEF ENGINEER(PROCESS)
E5 12‐Aug‐1976 42 years4months19 days
41‐45 Self M 200000 Noida Office
112 01‐Jan‐19 31‐Dec‐19 50935 Shashi PrakashDY.CHIEF ENGINEER(MS)
E3 15‐Jan‐1976 42 years11months16 days
41‐45 Self M 200000 Noida Office
113 01‐Jan‐19 31‐Dec‐19 50784 Rajeev Kumar Addl.CE(INSP) E4 19‐Feb‐1976 42 years10months12 days
41‐45 Self M 200000Mumbai INS & NDT
114 01‐Jan‐19 31‐Dec‐19 50870Dilip Kumar Chaturvedi
CHIEF ENGINEER (MECH.)
E5 08‐Aug‐1977 41 years4months23 days
41‐45 Self M 200000 Noida Office
115 01‐Jan‐19 31‐Dec‐19 51068 Sudhakar SharmaSr. Designer (Electrical)
E1 23‐Sep‐1977 41 years3months8 days
41‐45 Self M 200000 Noida Office
116 01‐Jan‐19 31‐Dec‐19 60116Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) E4 17‐Oct‐1977 41 years2months14 days
41‐45 Self M 200000Vadodara Office
117 01‐Jan‐19 31‐Dec‐19 50834 Amit KumarADDL.CHIEF ENGINEER(PM)
E4 12‐Nov‐1977 41 years1months19 days
41‐45 Self M 200000 Noida Office
118 01‐Jan‐19 31‐Dec‐19 50786 Namita SaikiaAddl. Chief Engineer (Mechanical)
E4 21‐Jan‐1977 41 years11months10 days
41‐45 Self F 200000 Noida Office
119 01‐Jan‐19 31‐Dec‐19 50691Rajeev Kumar Ranjan
Dy GM (Instt.) E6 07‐Feb‐1977 41 years10months24 days
41‐45 Self M 200000 Noida Office
120 01‐Jan‐19 31‐Dec‐19 60163 Surajit Maity DESIGNER (MECH.) E0 10‐Feb‐1977 41 years10months21 days
41‐45 Self M 200000Vadodara Office
121 01‐Jan‐19 31‐Dec‐19 60196 AmarjeetASST.CHIEF ENGR.(MECH‐CONSTN.)
E2 01‐Apr‐1978 40 years8months30 days
36‐40 Self M 200000Vadodara Office
122 01‐Jan‐19 31‐Dec‐19 51057 Nikesh ManikkaraChief Engg. (Mech.‐Const.)
E5 10‐Apr‐1978 40 years8months21 days
36‐40 Self M 200000 Noida Office
123 01‐Jan‐19 31‐Dec‐19 50789 Nadeem QureshiChief Engineer(Instrumentation
E5 20‐Jun‐1978 40 years6months11 days
36‐40 Self M 200000 Noida Office
124 01‐Jan‐19 31‐Dec‐19 50886Kulwinder Kaur Jhalli
ADDL. CHIEF ENGINEER(PLANNING)
E4 20‐Jul‐1978 40 years5months11 days
36‐40 Self F 200000 Noida Office
125 01‐Jan‐19 31‐Dec‐19 60201 SahabuddinCHIEF ENGINEER (PE)
E5 2‐Sep‐78 40 years3months29 days
36‐40 Self M 200000Vadodara Office
126 01‐Jan‐19 31‐Dec‐19 50781 Rahul S BhisikarAddl. Chief Engineer (Process)
E4 07‐Oct‐1978 40 years2months24 days
36‐40 Self M 200000 Noida Office
127 01‐Jan‐19 31‐Dec‐19 51046Sanjeev Prabhakar
DESIGNER(CIVIL) E0 14‐Feb‐1978 40 years10months17 days
36‐40 Self M 200000 Noida Office
128 01‐Jan‐19 31‐Dec‐19 60194 Koushik BiswasADDL. C.E. (MECH. PIPING)
E4 12‐Dec‐1978 40 years0months19 days
36‐40 Self M 200000Vadodara Office
129 01‐Jan‐19 31‐Dec‐19 50871 Rabindra BeheraADDL. CHIEF ENGINEER (INSP.)
E4 04‐Mar‐1979 39 years9months27 days
36‐40 Self M 200000Baroda INS & NDT
130 01‐Jan‐19 31‐Dec‐19 50839 Brajesh KumarAddl. Chief Engineer (Mechanical)
E4 16‐Mar‐1979 39 years9months15 days
36‐40 Self M 200000 Noida Office
131 01‐Jan‐19 31‐Dec‐19 50817 Santosh AnandAddl. Chief Engineer (Civil)
E4 20‐Apr‐1979 39 years8months11 days
36‐40 Self M 200000 Noida OfficePage 4 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
132 01‐Jan‐19 31‐Dec‐19 51087 Arun KumarSR. DRAFTSMAN(CIVIL 3D MODELLER)
W6 28‐May‐79 39 years7months3 days
36‐40 Self M 200000 Noida Office
133 01‐Jan‐19 31‐Dec‐19 39397 Anoop KumarDy. Chief Engineer(Elect.)
E3 01‐Jun‐1979 39 years6months30 days
36‐40 Self M 200000 Noida Office
134 01‐Jan‐19 31‐Dec‐19 51041 Srikanth Gedala Manager (P&A) E4 01‐Aug‐1979 39 years4months30 days
36‐40 Self M 200000Vadodara Office
135 01‐Jan‐19 31‐Dec‐19 51090Saima Shireen
Deputy Chief Engineer(Civil)
E3 01‐Aug‐1979 39 years4months30 days
36‐40 Self F 200000 Noida Office
136 01‐Jan‐19 31‐Dec‐19 50893Dilip Kumar Sahoo
Addl. Chief Engineer(Insp.)
E4 05‐Oct‐1979 39 years2months26 days
36‐40 Self M 200000Kolkota INS & NDT
137 01‐Jan‐19 31‐Dec‐19 60096Ashish Mahendrabhai Shah
Dy.CE (Inspection) E3 05‐Oct‐1979 39 years2months26 days
36‐40 Self M 200000Baroda INS & NDT
138 01‐Jan‐19 31‐Dec‐19 60204 Sanjib KarmakarSr.DRAFTSMAN (MECH.‐PIPING)
W6 21‐Nov‐79 39 years1months10 days
36‐40 Self M 200000Vadodara Office
139 01‐Jan‐19 31‐Dec‐19 51070 Ramesh HanraSr. Designer (Mechanical ‐Piping)
E1 07‐Jan‐1979 39 years11months24 days
36‐40 Self M 200000 Noida Office
140 01‐Jan‐19 31‐Dec‐19 39403Basant John Mundu
Dy.Manager (BD) E3 15‐Mar‐1980 38 years9months16 days
36‐40 Self M 200000 Sindri Office
141 01‐Jan‐19 31‐Dec‐19 39411Bibhuti Bhusan Nayak
Dy.Manager(P&A) E3 09‐Apr‐1980 38 years8months22 days
36‐40 Self M 200000 Sindri Office
142 01‐Jan‐19 31‐Dec‐19 60176 J SudhersonADDL. CHIEF ENGINEER (MECH. ‐ PIPING)
E4 13‐May‐1980 38 years7months18 days
36‐40 Self M 200000Vadodara Office
143 01‐Jan‐19 31‐Dec‐19 51042Makesh Gopalakrishnan
ADDL. CHIEF ENGINEER (PM)
E4 28‐Jul‐1980 38 years5months3 days
36‐40 Self M 200000Chennai INS & NDT
144 01‐Jan‐19 31‐Dec‐19 51000Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
E4 05‐Jul‐1980 38 years5months26 days
36‐40 Self M 200000 Noida Office
145 01‐Jan‐19 31‐Dec‐19 50805Ashok Kumar Malik
Addl. Chief Engineer(INSP.)
E4 17‐Jul‐1980 38 years5months14 days
36‐40 Self M 200000Noida INS & NDT
146 01‐Jan‐19 31‐Dec‐19 50814Jitendra Kumar Singh
Addl. Chief Engineer E4 25‐Aug‐1980 38 years4months6 days
36‐40 Self M 200000 Noida Office
147 01‐Jan‐19 31‐Dec‐19 51001 Anil PanchalSR.DRAFTSMAN(MECH.)
W6 30‐Sep‐1980 38 years3months1 days
36‐40 Self M 200000 Noida Office
148 01‐Jan‐19 31‐Dec‐19 60136 Mukesh KumarDY CHIEF ENGR. (MECH.)
E3 20‐Oct‐1980 38 years2months11 days
36‐40 Self M 200000Vadodara Office
149 01‐Jan‐19 31‐Dec‐19 50937 SupriyaDy. Chief Engineer(Comp.)
E3 03‐Nov‐1980 38 years1months28 days
36‐40 Self F 200000 Noida Office
150 01‐Jan‐19 31‐Dec‐19 60172 Rajesh KumarASST.CHIEF ENGINEER (MECHANICAL)
E2 11‐Nov‐1980 38 years1months20 days
36‐40 Self M 200000Vadodara Office
151 01‐Jan‐19 31‐Dec‐19 50791Sanjiv Kumar Mishra
Addl.CE (Mechanical)
E4 10‐Feb‐1980 38 years10months21 days
36‐40 Self M 200000 Noida Office
152 01‐Jan‐19 31‐Dec‐19 60206 Neeraj Mishra Dy.Manager (BD) E3 27‐Mar‐81 37 years9months4 days
36‐40 Self M 200000Vadodara Office
153 01‐Jan‐19 31‐Dec‐19 39398Deepak Kumar Mishra
Dy.Chief Technologist (CRD)
E3 17‐Mar‐1981 37 years9months14 days
36‐40 Self M 200000 Sindri Office
154 01‐Jan‐19 31‐Dec‐19 50928Rakesh Kumar Verm
Dy. Chief Engineer(Mech.)
E3 11‐04‐1981 37 years8months20 days
36‐40 Self M 200000 Noida Office
155 01‐Jan‐19 31‐Dec‐19 60202Ganesan Kaliappan
ADDL. CHIEF ENGR. (P.M.)
E4 24‐May‐81 37 years7months7 days
36‐40 Self M 200000Vadodara Office
156 01‐Jan‐19 31‐Dec‐19 50914 Suneeta KumariDy. Chief Engineer(Process)
E3 25‐May‐1981 37 years7months6 days
36‐40 Self F 200000 Noida Office
157 01‐Jan‐19 31‐Dec‐19 39394Rustam Kumar Singh
Addl.Chief Engineer E4 04‐May‐1981 37 years7months27 days
36‐40 Self M 200000 Sindri Office
158 01‐Jan‐19 31‐Dec‐19 60114 Sandeep KumarDY CHIEF ENGR.(INSTN.)
E3 11‐May‐1981 37 years7months20 days
36‐40 Self M 200000Vadodara Office
159 01‐Jan‐19 31‐Dec‐19 50842Manas Kumar Senapati
Manager (MM) E4 27‐Jun‐1981 37 years6months4 days
36‐40 Self M 200000 Noida Office
160 01‐Jan‐19 31‐Dec‐19 50783 Swai Asaf AliADDL. CHIEF ENGINEER (INSP.)
E4 29‐Jun‐1981 37 years6months2 days
36‐40 Self M 200000Mumbai INS & NDT
161 01‐Jan‐19 31‐Dec‐19 50836 Abhishek SharmaAddl. Chief Engineer (Mechanical)
E4 12‐Aug‐1981 37 years4months19 days
36‐40 Self M 200000 Noida Office
162 01‐Jan‐19 31‐Dec‐19 60164 Sunil KumarASST.CHIEF ENGINEER (MECH.)
E2 12‐Aug‐1981 37 years4months19 days
36‐40 Self M 200000Vadodara Office
163 01‐Jan‐19 31‐Dec‐19 60103 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
E4 16‐Aug‐1981 37 years4months15 days
36‐40 Self M 200000Vadodara Office
Page 5 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
164 01‐Jan‐19 31‐Dec‐19 50779 Pratish Kanti BasuADDL.CHIEF ENGINEER(PROCESS)
E4 21‐Aug‐1981 37 years4months10 days
36‐40 Self M 200000 Noida Office
165 01‐Jan‐19 31‐Dec‐19 51066 Neeraj BaswanAddl.Chief Engineer (Mechanical‐ P.V.)
E4 21‐Aug‐1981 37 years4months10 days
36‐40 Self M 200000 Noida Office
166 01‐Jan‐19 31‐Dec‐19 50906 Deepan KumarDy. Chief Engineer (Insp.)
E3 04‐Oct‐1981 37 years2months27 days
36‐40 Self M 200000Kolkota INS & NDT
167 01‐Jan‐19 31‐Dec‐19 50860 Rupanshu JauhariAddl. Chief Engineer(Mechanical)
E4 01‐Jan‐1981 37 years11months30 days
36‐40 Self M 200000 Noida Office
168 01‐Jan‐19 31‐Dec‐19 50780Kumar Anand Goyal
Manager (BD) E4 09‐Jan‐1981 37 years11months22 days
36‐40 Self M 200000 Noida Office
169 01‐Jan‐19 31‐Dec‐19 50778 Kavita SinghAddl. Chief Engineer(Elec.)
E4 14‐Jan‐1981 37 years11months17 days
36‐40 Self F 200000 Noida Office
170 01‐Jan‐19 31‐Dec‐19 60197 Ram KumarSR. DESIGNER (ELECT.)
E1 21‐Jan‐1981 37 years11months10 days
36‐40 Self M 200000Vadodara Office
171 01‐Jan‐19 31‐Dec‐19 50822Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
E4 27‐Feb‐1981 37 years10months4 days
36‐40 Self M 200000 Noida Office
172 01‐Jan‐19 31‐Dec‐19 51055 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
E4 11‐Feb‐1981 37 years10months20 days
36‐40 Self M 200000 Noida Office
173 01‐Jan‐19 31‐Dec‐19 39396 Santosh KumarADDL. CHIEF ENGR.(INSP.)
E4 01‐Dec‐1981 37 years0months30 days
36‐40 Self M 200000Chennai INS & NDT
174 01‐Jan‐19 31‐Dec‐19 51006Kailash Prasad Joshi
Dy. Chief Engineer(PM)
E3 15‐Dec‐1981 37 years0months16 days
36‐40 Self M 200000 Noida Office
175 01‐Jan‐19 31‐Dec‐19 51074 Anupam Singh Dy. Manager (BD) E3 9‐Mar‐82 36 years9months22 days
36‐40 Self M 200000 Noida Office
176 01‐Jan‐19 31‐Dec‐19 50890Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
E4 01‐Apr‐1982 36 years8months30 days
36‐40 Self M 200000Noida INS & NDT
177 01‐Jan‐19 31‐Dec‐19 50942Yesh Kumar Gautam
Dy. Chief Engineer(Mech.)
E3 10‐Apr‐1982 36 years8months21 days
36‐40 Self M 200000 Noida Office
178 01‐Jan‐19 31‐Dec‐19 51005Shiv Narayan Mohapatra
Dy. Chief Engineer (MR)
E3 28‐May‐1982 36 years7months3 days
36‐40 Self M 200000 Noida Office
179 01‐Jan‐19 31‐Dec‐19 39417 Amit MajumdarSr.Technician (Mechanical)
W6 07‐May‐1982 36 years7months24 days
36‐40 Self M 200000 Noida Office
180 01‐Jan‐19 31‐Dec‐19 39414 Vijay Govind RaoAsstt.CE (Catalyst Store)
E2 01‐Jul‐1982 36 years5months30 days
36‐40 Self M 200000 Sindri Office
181 01‐Jan‐19 31‐Dec‐19 60113 Subhash C SinghADDL.C.E. (INDL.ENGG.)
E4 02‐Jul‐1982 36 years5months29 days
36‐40 Self M 200000Vadodara Office
182 01‐Jan‐19 31‐Dec‐19 60132Ajaypalsinh N Sisodiya
DY.MANAGER (MM) E3 05‐Jul‐1982 36 years5months26 days
36‐40 Self M 200000Vadodara Office
183 01‐Jan‐19 31‐Dec‐19 60166 Mukesh KumarDy CHIEF ENGR. (CIVIL)
E3 15‐Jul‐82 36 years5months16 days
36‐40 Self M 200000Vadodara Office
184 01‐Jan‐19 31‐Dec‐19 50831 Anish KumarAddl. Chief Engineer (Mechanical)
E4 19‐Jul‐1982 36 years5months12 days
36‐40 Self M 200000 Noida Office
185 01‐Jan‐19 31‐Dec‐19 60120 Arunkumar GuptaADDL. CHIEF ENGR. (Mech.)
E4 20‐Jul‐1982 36 years5months11 days
36‐40 Self M 200000Vadodara Office
186 01‐Jan‐19 31‐Dec‐19 50824 Jai Raman DESIGNER(INST.) E0 23‐Aug‐1982 36 years4months8 days
36‐40 Self M 200000 Noida Office
187 01‐Jan‐19 31‐Dec‐19 50846Dheerendra Kumar Verma
Addl. Chief Engineer (Insp.)
E4 29‐Aug‐1982 36 years4months2 days
36‐40 Self M 200000Noida INS & NDT
188 01‐Jan‐19 31‐Dec‐19 50835 Hitesh Pundir Addl. CE(PM) E4 18‐Aug‐1982 36 years4months13 days
36‐40 Self M 200000 Noida Office
189 01‐Jan‐19 31‐Dec‐19 51051 Tarun KumarAsst Manager (Finance)
E2 25‐Sep‐1982 36 years3months6 days
36‐40 Self M 200000 Noida Office
190 01‐Jan‐19 31‐Dec‐19 60179Urjit Ashokkumar Parikh
ASST.CHIEF ENGINEER (MECH.‐INSPECTION)
E2 09‐Sep‐1982 36 years3months22 days
36‐40 Self M 200000Baroda INS & NDT
191 01‐Jan‐19 31‐Dec‐19 50962 Mahatab Alam Dy. Manager(MM) E3 18‐Sep‐1982 36 years3months13 days
36‐40 Self M 200000 Noida Office
192 01‐Jan‐19 31‐Dec‐19 50820 Rakesh KumarAddl. Chief Engineer (Mechanical)
E4 26‐Oct‐1982 36 years2months5 days
36‐40 Self M 200000 Noida Office
193 01‐Jan‐19 31‐Dec‐19 50894 Rajesh KumarAddl. Chief Engineer (Insp.)
E4 8‐Oct‐82 36 years2months23 days
36‐40 Self M 200000Kolkota INS & NDT
194 01‐Jan‐19 31‐Dec‐19 51075 Ranjana SharmaDY. CHIEF ENGINEER(CHEMICAL)
E3 10‐Oct‐82 36 years2months21 days
36‐40 Self F 200000 Noida Office
195 01‐Jan‐19 31‐Dec‐19 50941 Bhag SinghDy. Chief Engineer(Mech.)
E3 24‐Nov‐1982 36 years1months7 days
36‐40 Self M 200000 Noida Office
Page 6 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
196 01‐Jan‐19 31‐Dec‐19 50798Bikash Bhanu Adhikari
DY. CHIEF ENGINEER(INSP.)
E3 21‐Nov‐1982 36 years1months10 days
36‐40 Self M 200000Noida INS & NDT
197 01‐Jan‐19 31‐Dec‐19 50855 Sushil KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 1‐Jan‐82 36 years11months30 days
36‐40 Self M 200000 Noida Office
198 01‐Jan‐19 31‐Dec‐19 50905 Shiv KumarDy. Chief Engineer (Insp.)
E3 01‐Jan‐1982 36 years11months30 days
36‐40 Self M 200000Noida INS & NDT
199 01‐Jan‐19 31‐Dec‐19 50819 Bipin Bihari DasADDL. CH.ENGR(INSP.)
E4 28‐Jan‐1982 36 years11months3 days
36‐40 Self M 200000Kolkota INS & NDT
200 01‐Jan‐19 31‐Dec‐19 50997Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
E2 04‐Jan‐1982 36 years11months27 days
36‐40 Self M 200000 Noida Office
201 01‐Jan‐19 31‐Dec‐19 60175 Balbir SinghASST.CHIEF ENGINEER (COMPUTER)
E2 14‐Jan‐1982 36 years11months17 days
36‐40 Self M 200000Vadodara Office
202 01‐Jan‐19 31‐Dec‐19 60138 Kr Shashi BhushanDY CHIEF ENGR. (MECH.)
E3 04‐Dec‐1982 36 years0months27 days
36‐40 Self M 200000Vadodara Office
203 01‐Jan‐19 31‐Dec‐19 60208 Bhupesh KumarDy CHIEF ENGINEER (CIVIL)
E3 17‐Dec‐82 36 years0months14 days
36‐40 Self M 200000 Noida Office
204 01‐Jan‐19 31‐Dec‐19 50898Arun Kumar Tomar
Asst Chief Engineer (Mechanical)
E2 26‐Mar‐1983 35 years9months5 days
31‐35 Self M 200000 Noida Office
205 01‐Jan‐19 31‐Dec‐19 51077Amit Kant Varshney
Asst. Manager (MM) E2 27‐Mar‐83 35 years9months4 days
31‐35 Self M 200000 Noida Office
206 01‐Jan‐19 31‐Dec‐19 50873 Darshan Kumar MANAGER(P & A) E4 01‐Mar‐1983 35 years9months30 days
31‐35 Self M 200000 Noida Office
207 01‐Jan‐19 31‐Dec‐19 51007 Pawan KumarDy. Chief Engineer(PM)
E3 8‐Mar‐83 35 years9months23 days
31‐35 Self M 200000 Noida Office
208 01‐Jan‐19 31‐Dec‐19 60200 Ravi BholaSr. Draftsman‐1 (Mech‐PV)
W6 10‐Apr‐1983 35 years8months21 days
31‐35 Self M 200000 Noida Office
209 01‐Jan‐19 31‐Dec‐19 50883Digvijay Kumar Verma
ADDL. CHIEF ENGINEER (PLANNING)
E4 18‐Apr‐1983 35 years8months13 days
31‐35 Self M 200000 Noida Office
210 01‐Jan‐19 31‐Dec‐19 50844Anantshree Pandey
Addl. Chief Engineer (Electrical)
E4 31‐May‐1983 35 years7months0 days
31‐35 Self M 200000 Noida Office
211 01‐Jan‐19 31‐Dec‐19 50797 Rajeev MishraAddl. Chief Engineer(Mechanical)
E4 22‐Jun‐1983 35 years6months9 days
31‐35 Self M 200000 Noida Office
212 01‐Jan‐19 31‐Dec‐19 50818Rawindra Nath Satyarthy
Addl. Chief Engineer (Civil)
E4 05‐Jun‐1983 35 years6months26 days
31‐35 Self M 200000 Noida Office
213 01‐Jan‐19 31‐Dec‐19 60109Abhishek Shrivastava
ADDL. CHIEF ENGR. (Mech.)
E4 24‐Jul‐1983 35 years5months7 days
31‐35 Self M 200000Vadodara Office
214 01‐Jan‐19 31‐Dec‐19 39400 Sarika LalDy. Chief Technologist
E3 09‐Jul‐1983 35 years5months22 days
31‐35 Self F 200000 Noida Office
215 01‐Jan‐19 31‐Dec‐19 50852Raghvendra Kumar Tiwari
ADDL. CHIEF ENGINEER (MECHANICAL)
E4 12‐Jul‐1983 35 years5months19 days
31‐35 Self M 200000 Noida Office
216 01‐Jan‐19 31‐Dec‐19 50851 Kailash RawatDy. Chief Engineer (Insp. & NDT)
E3 15‐Jul‐1983 35 years5months16 days
31‐35 Self M 200000Kolkota INS & NDT
217 01‐Jan‐19 31‐Dec‐19 39399Gyanlata Deshmukh
Dy.Chief Technologist (Env.Engg)
E3 16‐Jul‐1983 35 years5months15 days
31‐35 Self F 200000 Sindri Office
218 01‐Jan‐19 31‐Dec‐19 50823 Inder MohanASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 04‐Aug‐1983 35 years4months27 days
31‐35 Self M 200000 Noida Office
219 01‐Jan‐19 31‐Dec‐19 60099Nageswara Rao Are
ADDL. CHIEF ENGR.(PROCESS)
E4 04‐Aug‐1983 35 years4months27 days
31‐35 Self M 200000Vadodara Office
220 01‐Jan‐19 31‐Dec‐19 51088Ganesh Ch
Asst. Chief Engineer (Civil)
E2 12‐Aug‐83 35 years4months19 days
31‐35 Self M 200000 Noida Office
221 01‐Jan‐19 31‐Dec‐19 50996 Vikas BhariaASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 24‐Sep‐1983 35 years3months7 days
31‐35 Self M 200000 Noida Office
222 01‐Jan‐19 31‐Dec‐19 50801 Abhijit MahataAddl. Chief Engineer (Mech.)
E4 15‐Nov‐1983 35 years1months16 days
31‐35 Self M 200000 Noida Office
223 01‐Jan‐19 31‐Dec‐19 50830Dharmdeo Ravidas
Addl. Chief Engineer (Mechanical)
E4 05‐Jan‐1983 35 years11months26 days
31‐35 Self M 200000 Noida Office
224 01‐Jan‐19 31‐Dec‐19 60101Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
E4 10‐Jan‐1983 35 years11months21 days
31‐35 Self M 200000Vadodara Office
225 01‐Jan‐19 31‐Dec‐19 39418Muralidhar Pradhan
Sr.Technician Instrument
W5 16‐Feb‐1983 35 years10months15 days
31‐35 Self M 200000 Sindri Office
226 01‐Jan‐19 31‐Dec‐19 50950 Ranveer Kumar Dy. Manager(MM) E3 01‐Dec‐1983 35 years0months30 days
31‐35 Self M 200000 Noida Office
Page 7 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
227 01‐Jan‐19 31‐Dec‐19 39413 Krishan Swaroop DY MANAGER (MM) E3 08‐Dec‐1983 35 years0months23 days
31‐35 Self M 200000Vadodara Office
228 01‐Jan‐19 31‐Dec‐19 50925 Devendra ShuklaDy. Chief Engineer(Mech.)
E3 17‐Mar‐1984 34 years9months14 days
31‐35 Self M 200000 Noida Office
229 01‐Jan‐19 31‐Dec‐19 60168Niladri Shekhar Kar
Dy. Chief Engineer(Mech.)
E3 28‐Apr‐1984 34 years8months3 days
31‐35 Self M 200000 Noida Office
230 01‐Jan‐19 31‐Dec‐19 39415 Vikrant DimaniaAssistant Manager (Accounts)
E2 02‐Jun‐1984 34 years6months29 days
31‐35 Self M 200000Vadodara Office
231 01‐Jan‐19 31‐Dec‐19 60177 Prashant MohanDy. Chief Engineer (Mech. Mach)
E3 05‐Jun‐1984 34 years6months26 days
31‐35 Self M 200000 Noida Office
232 01‐Jan‐19 31‐Dec‐19 60094 Nitin Singh YadavAddl.Chief Engineer (Piping)
E4 25‐Jul‐1984 34 years5months6 days
31‐35 Self M 200000 Noida Office
233 01‐Jan‐19 31‐Dec‐19 50812 Hemendra SainiAddl. Chief Engineer(Instt.)
E4 28‐Jul‐1984 34 years5months3 days
31‐35 Self M 200000 Noida Office
234 01‐Jan‐19 31‐Dec‐19 60198 Anil KumarSR.DRAFTSMAN (MECH. ‐ PIPING)
W6 02‐Jul‐1984 34 years5months29 days
31‐35 Self M 200000Vadodara Office
235 01‐Jan‐19 31‐Dec‐19 50944Akhilesh Kumar Shah
Dy. Chief Engineer (Insp.)
E3 11‐Jul‐1984 34 years5months20 days
31‐35 Self M 200000Chennai INS & NDT
236 01‐Jan‐19 31‐Dec‐19 51043 Ashima PalASSISTANT MANAGER (P&A)
E2 22‐Sep‐1984 34 years3months9 days
31‐35 Self F 200000 Noida Office
237 01‐Jan‐19 31‐Dec‐19 51014 Rupesh KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 28‐Sep‐1984 34 years3months3 days
31‐35 Self M 200000 Noida Office
238 01‐Jan‐19 31‐Dec‐19 50920 Minakshi Shahi Dy. Manager (BD) E3 18‐Sep‐1984 34 years3months13 days
31‐35 Self F 200000 Noida Office
239 01‐Jan‐19 31‐Dec‐19 50865Jay Prakash Verma
Dy. Chief Engineer(Comp.)
E3 03‐Oct‐1984 34 years2months28 days
31‐35 Self M 200000 Noida Office
240 01‐Jan‐19 31‐Dec‐19 50799Amit Kumar Gupta
ADDL. CHIEF ENGINEER (MECH.)
E4 12‐Oct‐1984 34 years2months19 days
31‐35 Self M 200000 Noida Office
241 01‐Jan‐19 31‐Dec‐19 51039 Gulshan SachdevaASSISTANT CHIEF ENGINEER (MECH.‐INSP.)
E2 15‐Oct‐1984 34 years2months16 days
31‐35 Self M 200000Noida INS & NDT
242 01‐Jan‐19 31‐Dec‐19 50807Tanzin Norbu Negi
MANAGER (MATERIALS MANAGEMENT)
E4 22‐Nov‐1984 34 years1months9 days
31‐35 Self M 200000 Noida Office
243 01‐Jan‐19 31‐Dec‐19 50967 Vikram PatodiaDy. Chief Engineer (Civil)
E3 17‐Nov‐1984 34 years1months14 days
31‐35 Self M 200000 Noida Office
244 01‐Jan‐19 31‐Dec‐19 51038 Ankit AroraASSISTANT CHIEF ENGINEER (INSPECTION)
E2 26‐Dec‐1984 34 years0months5 days
31‐35 Self M 200000Noida INS & NDT
245 01‐Jan‐19 31‐Dec‐19 50891Sumit Chandra Samant
Asst Chief Engineer(Comp)
E2 06‐Dec‐1984 34 years0months25 days
31‐35 Self M 200000 Noida Office
246 01‐Jan‐19 31‐Dec‐19 50980Pradeep Narayan Singh
Dy. Chief Engineer(MS)
E3 10‐Dec‐1984 34 years0months21 days
31‐35 Self M 200000 Noida Office
247 01‐Jan‐19 31‐Dec‐19 39407 Akosh ChhokerAsst.Chief Technologist
E2 17‐Dec‐1984 34 years0months14 days
31‐35 Self M 200000 Sindri Office
248 01‐Jan‐19 31‐Dec‐19 51012Ashwani Kumar Mittal
Designer(Mech.) E0 25‐May‐1985 33 years7months6 days
31‐35 Self M 200000 Noida Office
249 01‐Jan‐19 31‐Dec‐19 51025 Abhishek JoshiASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 20‐May‐1985 33 years7months11 days
31‐35 Self M 200000 Noida Office
250 01‐Jan‐19 31‐Dec‐19 50816Yogendra Kumar Bhargava
Addl. Chief Engineer (PM)
E4 01‐Jul‐1985 33 years5months30 days
31‐35 Self M 200000 Noida Office
251 01‐Jan‐19 31‐Dec‐19 50924Sohit Kumar Khandelwal
Dy. Chief Engineer(Mech.)
E3 01‐Jul‐1985 33 years5months30 days
31‐35 Self M 200000 Noida Office
252 01‐Jan‐19 31‐Dec‐19 51085 Subeen MathurAsst. Chief Engineer(Planning)
E2 1‐Jul‐85 33 years5months30 days
31‐35 Self M 200000 Noida Office
253 01‐Jan‐19 31‐Dec‐19 51059 Nishant KumarAsst Chief Engineer (NDT)
E2 10‐07‐1985 33 years5months21 days
31‐35 Self M 200000Noida INS & NDT
254 01‐Jan‐19 31‐Dec‐19 50904 Alok SiddhuDy. Chief Engineer(Mech.)
E3 07‐Sep‐1985 33 years3months24 days
31‐35 Self M 200000 Noida Office
255 01‐Jan‐19 31‐Dec‐19 51071Hemant Singh Bisht
Asst Chief Engineer (Elect.‐Insp.)
E2 11‐Sep‐1985 33 years3months20 days
31‐35 Self M 200000Kolkota INS & NDT
256 01‐Jan‐19 31‐Dec‐19 60125Satyendra Kumar Verma
DY CHIEF ENGR.(COMPUTER)
E3 02‐Oct‐1985 33 years2months29 days
31‐35 Self M 200000Vadodara Office
257 01‐Jan‐19 31‐Dec‐19 51063Jagannath Selvaraj
Asst Chief Engineer(ERP)
E2 29‐Oct‐1985 33 years2months2 days
31‐35 Self M 200000 Noida Office
258 01‐Jan‐19 31‐Dec‐19 60121Tejaskumar J Vesuwala
DESIGNER (CIVIL) E0 14‐Oct‐1985 33 years2months17 days
31‐35 Self M 200000Vadodara Office
Page 8 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
259 01‐Jan‐19 31‐Dec‐19 50977George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
E3 18‐Oct‐1985 33 years2months13 days
31‐35 Self M 200000 Noida Office
260 01‐Jan‐19 31‐Dec‐19 50945Amanpreet Kaur Saini
Dy. Chief Engineer (Instt.)
E3 13‐Nov‐1985 33 years1months18 days
31‐35 Self F 200000 Noida Office
261 01‐Jan‐19 31‐Dec‐19 60126 Vandana ParasharDY CHIEF ENGR.(ELECT.)
E3 25‐Jan‐1985 33 years11months6 days
31‐35 Self F 200000Vadodara Office
262 01‐Jan‐19 31‐Dec‐19 50955 Bobby KumarDy. Chief Engineer.(Elect.)
E3 02‐Jan‐1985 33 years11months29 days
31‐35 Self M 200000 Noida Office
263 01‐Jan‐19 31‐Dec‐19 60146 Mrudul G PatilDY CHIEF ENGR.(INSTN.)
E3 10‐Jan‐1985 33 years11months21 days
31‐35 Self M 200000Vadodara Office
264 01‐Jan‐19 31‐Dec‐19 51076 Ankur Saxena Dy. Manager (BD) E3 13‐Jan‐85 33 years11months18 days
31‐35 Self M 200000 Noida Office
265 01‐Jan‐19 31‐Dec‐19 50804 Sushil KumarDy. Chief Engineer (Insp.)
E3 30‐Jan‐85 33 years11months1 days
31‐35 Self M 200000Mumbai INS & NDT
266 01‐Jan‐19 31‐Dec‐19 60142 Qamar AhmadDY CHIEF ENGR.(ELECT.)
E3 31‐Jan‐1985 33 years11months0 days
31‐35 Self M 200000Vadodara Office
267 01‐Jan‐19 31‐Dec‐19 50926Saiyad Avsaru Ul Haq Hasmi
DY.CHIEF ENGINEER(MECH.)
E3 01‐Feb‐1985 33 years10months30 days
31‐35 Self M 200000 Noida Office
268 01‐Jan‐19 31‐Dec‐19 50954 Harish KumarDy. Chief Engineer(Mech.)
E3 08‐Feb‐1985 33 years10months23 days
31‐35 Self M 200000 Noida Office
269 01‐Jan‐19 31‐Dec‐19 60158 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
E2 05‐Dec‐1985 33 years0months26 days
31‐35 Self M 200000Vadodara Office
270 01‐Jan‐19 31‐Dec‐19 51081 Poonam Singh Sr. Officer(C‐P&A) E1 12‐03‐1986 32 years9months19 days
31‐35 Self F 200000 Noida Office
271 01‐Jan‐19 31‐Dec‐19 51002 Vishwendra SinghASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 18‐Mar‐1986 32 years9months13 days
31‐35 Self M 200000 Noida Office
272 01‐Jan‐19 31‐Dec‐19 50946 Umakant VohraAsst. Chief Engineer(Mech.)
E2 22‐Apr‐1986 32 years8months9 days
31‐35 Self M 200000 Noida Office
273 01‐Jan‐19 31‐Dec‐19 50927 Shubhra Sharma DY.MANAGER(BD) E3 03‐Apr‐1986 32 years8months28 days
31‐35 Self F 200000 Noida Office
274 01‐Jan‐19 31‐Dec‐19 39406 Naga Raju BattiAsst.Chief Technologist (CRD)
E2 03‐May‐1986 32 years7months28 days
31‐35 Self M 200000 Sindri Office
275 01‐Jan‐19 31‐Dec‐19 50929 Sumit ChauhanDy. Chief Engineer(Mech.)
E3 06‐May‐1986 32 years7months25 days
31‐35 Self M 200000 Noida Office
276 01‐Jan‐19 31‐Dec‐19 60187Anilchowdary Jagarlamudi
ASST. CHIEF ENGR. (PE)
E2 17‐May‐1986 32 years7months14 days
31‐35 Self M 200000Vadodara Office
277 01‐Jan‐19 31‐Dec‐19 50986Deepak Kumar Gupta
ASSISTANT CHIEF ENGINEER (ELECTRICAL)
E2 29‐Jun‐1986 32 years6months2 days
31‐35 Self M 200000 Noida Office
278 01‐Jan‐19 31‐Dec‐19 39405Prashant Kumar Singh
Assistant Chief Technologist
E1 03‐Jul‐1986 32 years5months28 days
31‐35 Self M 200000 Sindri Office
279 01‐Jan‐19 31‐Dec‐19 50921 Shikhar SrivastavaDy. Chief Engineer.(Elect.)
E3 05‐Jul‐1986 32 years5months26 days
31‐35 Self M 200000 Noida Office
280 01‐Jan‐19 31‐Dec‐19 60162 Anand Prakash ASST. CE (MECH.) E2 06‐Jul‐1986 32 years5months25 days
31‐35 Self M 200000Vadodara Office
281 01‐Jan‐19 31‐Dec‐19 50989 Amit Kumar Singh
ASST.CHIEF ENGINEER (INSTRUMENTATION)
E2 30‐Aug‐1986 32 years4months1 days
31‐35 Self M 200000 Noida Office
282 01‐Jan‐19 31‐Dec‐19 50866 Vishal ShuklaAddl. Chief Engineer(Instt.)
E4 15‐Sep‐1986 32 years3months16 days
31‐35 Self M 200000 Noida Office
283 01‐Jan‐19 31‐Dec‐19 60199Kishu Mayank Sinha
ASST. CHIEF ENGR. (P.M.)
E2 17‐Sep‐1986 32 years3months14 days
31‐35 Self M 200000Vadodara Office
284 01‐Jan‐19 31‐Dec‐19 50902 Saumitra KishoreDy. Chief Engineer.(Elect.)
E3 21‐Nov‐1986 32 years1months10 days
31‐35 Self M 200000 Noida Office
285 01‐Jan‐19 31‐Dec‐19 51082Ch Surya Kumar Nalla
Asst. Chief Engineer(Inst.‐Insp.)
E2 27‐Jan‐86 32 years11months4 days
31‐35 Self M 200000Mumbai INS & NDT
286 01‐Jan‐19 31‐Dec‐19 60127Riteshkumar Pandey
DY.CHIEF ENGINEER (ELECT.)
E3 01‐Jan‐1986 32 years11months30 days
31‐35 Self M 200000 Noida Office
287 01‐Jan‐19 31‐Dec‐19 51004 Avinash SinghASSISTANT CHIEF ENGINEER (MECHANICAL)
E2 03‐Jan‐1986 32 years11months28 days
31‐35 Self M 200000 Noida Office
288 01‐Jan‐19 31‐Dec‐19 39409Manoj Kumar Mahato
Sr. Operator W6 04‐Jan‐1986 32 years11months27 days
31‐35 Self M 200000 Sindri Office
289 01‐Jan‐19 31‐Dec‐19 51040Marzia Firdaus Rizvi
Dy. Chief Engineer(MS)
E3 28‐Feb‐1986 32 years10months3 days
31‐35 Self F 200000 Noida Office
290 01‐Jan‐19 31‐Dec‐19 60118 Urvi J Patel DESIGNER (CIVIL) E0 18‐Feb‐1986 32 years10months13 days
31‐35 Self F 200000Vadodara Office
Page 9 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
291 01‐Jan‐19 31‐Dec‐19 51078 Vishal RathiSr. Engineer(Mechanical)
E1 5‐Dec‐86 32 years0months26 days
31‐35 Self M 200000 Noida Office
292 01‐Jan‐19 31‐Dec‐19 60148Ganesh Krishnamurthy
DY CHIEF ENGR.(CIVIL)
E3 22‐Mar‐1987 31 years9months9 days
31‐35 Self M 200000Vadodara Office
293 01‐Jan‐19 31‐Dec‐19 51035 Sumit KumarASSISTANT CHIEF ENGINEER (MS)
E2 28‐Mar‐1987 31 years9months3 days
31‐35 Self M 200000 Noida Office
294 01‐Jan‐19 31‐Dec‐19 39421 Niladri Mukherjee Sr. Officer (MM) E1 20‐Apr‐87 31 years8months11 days
31‐35 Self M 200000 Noida Office
295 01‐Jan‐19 31‐Dec‐19 39410Shashi Shankar Tiwari
Asst. Chief Technologist
E2 30‐Apr‐1987 31 years8months1 days
31‐35 Self M 200000 Noida Office
296 01‐Jan‐19 31‐Dec‐19 50982 Arvind KumarDy. Chief Engineer(Mech.)
E3 01‐Jun‐1987 31 years6months30 days
31‐35 Self M 200000 Noida Office
297 01‐Jan‐19 31‐Dec‐19 51060Bhupendra Kumar Chandrakar
Asst Chief Engineer (Mechanical ‐Piping)
E2 14‐Jun‐1987 31 years6months17 days
31‐35 Self M 200000 Noida Office
298 01‐Jan‐19 31‐Dec‐19 51061 Abhilesh KumarAsst. Chief Engineer(Mechanical ‐Const.)
E2 01‐Jul‐1987 31 years5months30 days
31‐35 Self M 200000 Noida Office
299 01‐Jan‐19 31‐Dec‐19 60156Prashant P Dhakate
Dy CHIEF ENGR. (MECH.)
E3 31‐Jul‐1987 31 years5months0 days
31‐35 Self M 200000Vadodara Office
300 01‐Jan‐19 31‐Dec‐19 50971 Harish KumarDy Chief Engineer (Instt.)
E3 22‐Aug‐87 31 years4months9 days
31‐35 Self M 200000 Noida Office
301 01‐Jan‐19 31‐Dec‐19 50899 Yogendra Kumar Desinger (Mech). E0 11‐Aug‐1987 31 years4months20 days
31‐35 Self M 200000 Noida Office
302 01‐Jan‐19 31‐Dec‐19 39423B Venkata Harinath
Sr. Engineer (EIA I) E1 15‐Oct‐87 31 years2months16 days
31‐35 Self M 200000 Sindri Office
303 01‐Jan‐19 31‐Dec‐19 51080 Amita Rawat Sr. Officer (Finance) E1 09‐11‐1987 31 years1months22 days
31‐35 Self F 200000 Noida Office
304 01‐Jan‐19 31‐Dec‐19 51022 Abhishek GuptaAsst Chief Engineer(Mechanical)
E2 11‐Nov‐1987 31 years1months20 days
31‐35 Self M 200000 Noida Office
305 01‐Jan‐19 31‐Dec‐19 50943 Nazrul IslamDy. Chief Engineer(Mech.)
E3 20‐Jan‐1987 31 years11months11 days
31‐35 Self M 200000 Noida Office
306 01‐Jan‐19 31‐Dec‐19 50948 Abhimanyu SinghDy. Chief Engineer(Mech.)
E3 03‐Feb‐1987 31 years10months28 days
31‐35 Self M 200000 Noida Office
307 01‐Jan‐19 31‐Dec‐19 50892 Gurnam SinghSr Engineer(Mechanical)
E1 21‐Dec‐1987 31 years0months10 days
31‐35 Self M 200000 Noida Office
308 01‐Jan‐19 31‐Dec‐19 51064 Ali Imran NaqviAsst Chief Engineer(Mechanical‐Machinery
E2 22‐Apr‐1988 30 years8months9 days
26‐30 Self M 200000 Noida Office
309 01‐Jan‐19 31‐Dec‐19 51028Vipin Kumar Sachan
Asst Chief Engineer(Process)
E2 06‐Apr‐1988 30 years8months25 days
26‐30 Self M 200000 Noida Office
310 01‐Jan‐19 31‐Dec‐19 50987 Neeraj YadavASSISTANT CHIEF ENGINEER (MECH.)
E2 12‐Apr‐1988 30 years8months19 days
26‐30 Self M 200000 Noida Office
311 01‐Jan‐19 31‐Dec‐19 51072 Binod KumarSr. Engineer (Process)
E1 5‐Jun‐88 30 years6months26 days
26‐30 Self M 200000 Noida Office
312 01‐Jan‐19 31‐Dec‐19 39419 Kultar ChandSr.Tchnician Mechnicial
W6 13‐Jun‐1988 30 years6months18 days
26‐30 Self M 200000 Sindri Office
313 01‐Jan‐19 31‐Dec‐19 51083 Bilal KhanSR.DRAFTSMAN MECHANICAL PIPING 3D MODELR
W6 20‐Jul‐88 30 years5months11 days
26‐30 Self M 200000 Noida Office
314 01‐Jan‐19 31‐Dec‐19 60189 Uday PrakashASST.CHIEF ENGR. (MECH.)
E2 20‐Jul‐1988 30 years5months11 days
26‐30 Self M 200000Vadodara Office
315 01‐Jan‐19 31‐Dec‐19 50985 Ashish AroraASSISTANT CHIEF ENGINEER (INSTT.)
E2 08‐Oct‐1988 30 years2months23 days
26‐30 Self M 200000 Noida Office
316 01‐Jan‐19 31‐Dec‐19 39422 Gautam SinhaSr. Engineer (EIA1‐LAB)
E1 25‐Nov‐88 30 years1months6 days
26‐30 Self M 200000 Sindri Office
317 01‐Jan‐19 31‐Dec‐19 51079Sumit Kumar Kaushik
Sr. Engineer(Process)
E1 29‐Nov‐88 30 years1months2 days
26‐30 Self M 200000 Noida Office
318 01‐Jan‐19 31‐Dec‐19 60192Sujeet Kumar Choudhary
ASST.CHIEF ENGR.(PROCESS)
E2 05‐Jan‐1988 30 years11months26 days
26‐30 Self M 200000Vadodara Office
319 01‐Jan‐19 31‐Dec‐19 51045Devendra Singh Chohan
Asst Chief Engineer(Process)
E2 03‐Mar‐1989 29 years9months28 days
26‐30 Self M 200000 Noida Office
320 01‐Jan‐19 31‐Dec‐19 50978 Sushant GauravDy. Chief Engineer (Instt.)
E3 06‐Mar‐1989 29 years9months25 days
26‐30 Self M 200000 Noida Office
321 01‐Jan‐19 31‐Dec‐19 60209 Neeraj DubeySR. ENGINEER (CIVIL)
E1 9‐Apr‐89 29 years8months22 days
26‐30 Self M 200000Vadodara Office
322 01‐Jan‐19 31‐Dec‐19 51054 CheenuAsst Chief Engineer (Process)
E2 10‐Aug‐1989 29 years4months21 days
26‐30 Self F 200000 Noida Office
Page 10 of 11
Sl.No. PolStartDate PolEndDate
PriBenefEmpCode BenefName DESIGNATION Grade Date of Birth
Age as on 31.12.2018
AGE GROUPRelNa
me BenefSexBasic_Sum_Insur
ed
BenefAreaCode
Employees List as on 30.11.2018
323 01‐Jan‐19 31‐Dec‐19 50991Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
E2 16‐Jan‐1989 29 years11months15 days
26‐30 Self M 200000 Noida Office
324 01‐Jan‐19 31‐Dec‐19 51031 Vivek TiwariASST.CHIEF ENGR. (MECH.)
E2 24‐Dec‐1989 29 years0months7 days
26‐30 Self M 200000Vadodara Office
325 01‐Jan‐19 31‐Dec‐19 51020 VineetaAsst Chief Engineer (Mechanical)
E2 23‐May‐1990 28 years7months8 days
26‐30 Self F 200000 Noida Office
326 01‐Jan‐19 31‐Dec‐19 51019 Ajay Vikram SinghAsst. Chief Engineer(Inspection)
E2 30‐Jun‐1990 28 years6months1 days
26‐30 Self M 200000Noida INS & NDT
327 01‐Jan‐19 31‐Dec‐19 60183 Kishori RamanAsst Chief Engineer(Process)
E2 12‐Sep‐1990 28 years3months19 days
26‐30 Self M 200000 Noida Office
328 01‐Jan‐19 31‐Dec‐19 51026Pushker Mahendra
Asst Chief Engineer(Process)
E2 08‐Jan‐1990 28 years11months23 days
26‐30 Self M 200000 Noida Office
329 01‐Jan‐19 31‐Dec‐19 51023 Anil Kumar RayAsst Chief Engineer(MS)
E2 14‐Mar‐1991 27 years9months17 days
26‐30 Self M 200000 Noida Office
330 01‐Jan‐19 31‐Dec‐19 60190 Nakka Nooka RajuASST. CHIEF ENGR. (PROCESS)
E2 04‐Jun‐1991 27 years6months27 days
26‐30 Self M 200000Vadodara Office
331 01‐Jan‐19 31‐Dec‐19 51024Mambers Kartheek
Asst Chief Engineer (Instt.)
E2 23‐Aug‐1991 27 years4months8 days
26‐30 Self M 200000 Noida Office
332 01‐Jan‐19 31‐Dec‐19 60181 Shailendra SinghASST.CHIEF ENGR.(CIVIL)
E2 12‐Aug‐1991 27 years4months19 days
26‐30 Self M 200000Vadodara Office
333 01‐Jan‐19 31‐Dec‐19 60191 Nikhil GoyalASST. CHIEF ENGR. (MECHANICAL)
E2 05‐Feb‐1991 27 years10months26 days
26‐30 Self M 200000Vadodara Office
334 01‐Jan‐19 31‐Dec‐19 60077Sugandha Sunil Pandit
ASST. MANAGER (DESIGN‐INSTT.)
E2 4‐Aug‐69 49 years4months27 days
46‐50 Self F 200000Vadodara Office
Page 11 of 11
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
1 01‐Jan‐19 31‐Dec‐19 38465 E3 Subrata Banerjee DY.MANAGER(MM) Archana Banerjee 07‐Feb‐1967 51 years10months24 days
51‐55 Spouse F 200000Noida Office
2 01‐Jan‐19 31‐Dec‐19 38465 E3 Subrata Banerjee DY.MANAGER(MM) Nirupama Banerjee 18‐Dec‐1939 79 years0months13 days
76‐80 Mother F 200000Noida Office
3 01‐Jan‐19 31‐Dec‐19 38465 E3 Subrata Banerjee DY.MANAGER(MM) Bhaskar Ch Banerjee 12‐Sep‐1931 87 years3months19 days
Above 80 Father M 200000Noida Office
4 01‐Jan‐19 31‐Dec‐19 38588 E4Bishwa Nath Banerjee
MANAGER (MM) Srimanti Banerjee 16‐Aug‐1967 51 years4months15 days
51‐55 Spouse F 200000Vadodara Office
5 01‐Jan‐19 31‐Dec‐19 38976 E8Mohan Ji Srivastava
General Manager (HR‐Corp.)
Rajni Srivastava 01‐Jun‐1960 58 years6months30 days
56‐60 Spouse F 200000Noida Office
6 01‐Jan‐19 31‐Dec‐19 38976 E8Mohan Ji Srivastava
General Manager (HR‐Corp.)
Sita 12707 84 years2months16 days
Above 80 Mother F 200000Noida Office
7 01‐Jan‐19 31‐Dec‐19 38979 E2Gopinathan Chakkala
ASSISTANT MANAGER P T Premalatha 17‐Apr‐1971 47 years8months14 days
46‐50 Spouse F 200000Chennai INS
& NDT
8 01‐Jan‐19 31‐Dec‐19 38979 E2Gopinathan Chakkala
ASSISTANT MANAGER Devayaniamma 17‐Oct‐1945 73 years2months14 days
71‐75 Mother F 200000Chennai INS
& NDT
9 01‐Jan‐19 31‐Dec‐19 39092 E7 Shiw Person Sinha AGM(INSP & NDT) Priya Suman Sinha 02‐Aug‐1996 22 years4months29 days
19‐25 Daughter F 200000Noida INS &
NDT
10 01‐Jan‐19 31‐Dec‐19 39092 E7 Shiw Person Sinha AGM(INSP & NDT) Reeta Sinha 21‐Apr‐1965 53 years8months10 days
51‐55 Spouse F 200000Noida INS &
NDT
11 01‐Jan‐19 31‐Dec‐19 39106 E8 Ashutosh PrasadGENERAL MANAGER(NOIDA)
Mridula Prasad 15‐Feb‐1965 53 years10months16 days
51‐55 Spouse F 200000Noida Office
12 01‐Jan‐19 31‐Dec‐19 39106 E8 Ashutosh PrasadGENERAL MANAGER(NOIDA)
Savitri Devi 15‐Feb‐1941 77 years10months16 days
76‐80 Mother F 200000Noida Office
13 01‐Jan‐19 31‐Dec‐19 39106 E8 Ashutosh PrasadGENERAL MANAGER(NOIDA)
Y Prasad 20‐Jan‐1935 83 years11months11 days
Above 80 Father M 200000Noida Office
14 01‐Jan‐19 31‐Dec‐19 39107 E7Rajeev Ranjan Kumar
Additional General Manager (PM)
Nishant Kumar 21‐Aug‐1999 19 years4months10 days
19‐25 Son M 200000Noida Office
15 01‐Jan‐19 31‐Dec‐19 39107 E7Rajeev Ranjan Kumar
Additional General Manager (PM)
Madhulika 25‐Dec‐1970 48 years0months6 days
46‐50 Spouse F 200000Noida Office
16 01‐Jan‐19 31‐Dec‐19 39107 E7Rajeev Ranjan Kumar
Additional General Manager (PM)
S Prasad 12‐Jan‐1943 75 years11months19 days
71‐75 Mother F 200000Noida Office
17 01‐Jan‐19 31‐Dec‐19 39107 E7Rajeev Ranjan Kumar
Additional General Manager (PM)
J Prasad 29‐Sep‐1940 78 years3months2 days
76‐80 Father M 200000Noida Office
18 01‐Jan‐19 31‐Dec‐19 39110 E7 S N YadavADDL.G.M. (BD, IE & PM)
Sushmita Yadav 10‐Dec‐1994 24 years0months21 days
19‐25 Daughter F 200000Vadodara Office
19 01‐Jan‐19 31‐Dec‐19 39110 E7 S N YadavADDL.G.M. (BD, IE & PM)
Ashutosh Kr Yadav 27‐Sep‐1997 21 years3months4 days
19‐25 Son M 200000Vadodara Office
20 01‐Jan‐19 31‐Dec‐19 39110 E7 S N YadavADDL.G.M. (BD, IE & PM)
Babita Yadav 12‐Feb‐1973 45 years10months19 days
41‐45 Spouse F 200000Vadodara Office
21 01‐Jan‐19 31‐Dec‐19 39110 E7 S N YadavADDL.G.M. (BD, IE & PM)
Utim Lal Yadav 01‐Jan‐1930 88 years11months30 days
Above 80 Father M 200000Vadodara Office
22 01‐Jan‐19 31‐Dec‐19 39115 E7 Pawan KumarADDL. GENERAL MANAGER & HOD(MS)
Asha Kumar 21‐Feb‐1970 48 years10months10 days
46‐50 Spouse F 200000Noida Office
23 01‐Jan‐19 31‐Dec‐19 39122 E8Chandan Bhattacharyya
GENERAL MANAGER (VADODARA)
Ratnabali Bhattacharyya
17‐Apr‐1967 51 years8months14 days
51‐55 Spouse F 200000Vadodara Office
24 01‐Jan‐19 31‐Dec‐19 39127 E2Bishwajit Kumar Das
Asst.Chief Technologist (CRD)
Niva Das 04‐Jun‐1992 26 years6months27 days
26‐30 Spouse F 200000Noida Office
25 01‐Jan‐19 31‐Dec‐19 39139 E7Madan Murari Sinha
AGM(SSP QC AUDIT) Sushma Sinha 05‐Apr‐1964 54 years8months26 days
51‐55 Spouse F 200000Noida Office
26 01‐Jan‐19 31‐Dec‐19 39142 E8 Ajay Kumar Singh GENERAL MANAGER Anita Rani Sinha 08‐May‐1962 56 years7months23 days
56‐60 Spouse F 200000Sindri Office
27 01‐Jan‐19 31‐Dec‐19 39186 E2 Sunita MhadnakAsst. Manager Establishment
Siddhesh Satish Mhadnak
21‐Sep‐1996 22 years3months10 days
19‐25 Son M 200000Mumbai INS & NDT
28 01‐Jan‐19 31‐Dec‐19 39186 E2 Sunita MhadnakAsst. Manager Establishment
Satish Tukaram Mhadnak
03‐Mar‐1959 59 years9months28 days
56‐60 Spouse M 200000Mumbai INS & NDT
29 01‐Jan‐19 31‐Dec‐19 39189 E7Prakash Chandra Mishra
AGM(INSP.) Aditya Mishra 20‐Oct‐1998 20 years2months11 days
19‐25 Son M 200000Chennai INS
& NDT
Dependants List of Employees as on 30.11.2018
Page 1 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
30 01‐Jan‐19 31‐Dec‐19 39189 E7Prakash Chandra Mishra
AGM(INSP.) Ruby Mishra 05‐Jan‐1972 46 years11months26 days
46‐50 Spouse F 200000Chennai INS
& NDT
31 01‐Jan‐19 31‐Dec‐19 39191 E7Md Abul Kalam Anwar
AGM(ELECT.‐INSP.) Nadia Anwar 28‐Jan‐1994 24 years11months3 days
19‐25 Daughter F 200000Noida INS &
NDT
32 01‐Jan‐19 31‐Dec‐19 39191 E7Md Abul Kalam Anwar
AGM(ELECT.‐INSP.) Shazia Anwar 17‐Mar‐1995 23 years9months14 days
19‐25 Daughter F 200000Noida INS &
NDT
33 01‐Jan‐19 31‐Dec‐19 39191 E7Md Abul Kalam Anwar
AGM(ELECT.‐INSP.) Farhat Jahan 01‐Jan‐1966 52 years11months30 days
51‐55 Spouse F 200000Noida INS &
NDT
34 01‐Jan‐19 31‐Dec‐19 39191 E7Md Abul Kalam Anwar
AGM(ELECT.‐INSP.) Aysha Khatoon 10‐Mar‐1948 70 years9months21 days
66‐70 Mother F 200000Noida INS &
NDT
35 01‐Jan‐19 31‐Dec‐19 39201 E7Sanjay Kumar Sinha
AGM & HOD (CSR) Shanvi Sinha 11‐Oct‐1998 20 years2months20 days
19‐25 Daughter F 200000Noida Office
36 01‐Jan‐19 31‐Dec‐19 39201 E7Sanjay Kumar Sinha
AGM & HOD (CSR) Mamta Kumari 04‐Jan‐1987 31 years11months27 days
31‐35 Spouse F 200000Noida Office
37 01‐Jan‐19 31‐Dec‐19 39201 E7Sanjay Kumar Sinha
AGM & HOD (CSR) Meera Sinha 14‐Sep‐1940 78 years3months17 days
76‐80 Mother F 200000Noida Office
38 01‐Jan‐19 31‐Dec‐19 39202 W5Vijay Chand Paswan
Technician Gr‐I Vinawasani Kumari 23‐Mar‐1994 24 years9months8 days
19‐25 Son M 200000Noida Office
39 01‐Jan‐19 31‐Dec‐19 39202 W5Vijay Chand Paswan
Technician Gr‐I Asha Devi 01‐Jan‐1958 60 years11months30 days
56‐60 Spouse F 200000Noida Office
40 01‐Jan‐19 31‐Dec‐19 39203 W5 Baban Kumar Operator Gr‐I Usha Devi 01‐May‐1973 45 years7months30 days
41‐45 Spouse F 200000Noida INS &
NDT
41 01‐Jan‐19 31‐Dec‐19 39203 W5 Baban Kumar Operator Gr‐I B Devi 25‐Jan‐1951 67 years11months6 days
66‐70 Mother F 200000Noida INS &
NDT
42 01‐Jan‐19 31‐Dec‐19 39208 E3 Bijay Kumar Dy.Chief Technologist Vineet Kumar 09‐Mar‐1996 22 years9months22 days
19‐25 Son M 200000Sindri Office
43 01‐Jan‐19 31‐Dec‐19 39208 E3 Bijay Kumar Dy.Chief Technologist Sangita Rani 01‐Jan‐1970 48 years11months30 days
46‐50 Spouse F 200000Sindri Office
44 01‐Jan‐19 31‐Dec‐19 39220 E1Bhukhal Chandra Mahato
Sr. Officer (NDT) Master Abhijeet 03‐Apr‐2009 9 years8months28 days
0‐18 Son M 200000Noida INS &
NDT
45 01‐Jan‐19 31‐Dec‐19 39220 E1Bhukhal Chandra Mahato
Sr. Officer (NDT)Master Ayush Kumar
14‐Nov‐2011 7 years1months17 days
0‐18 Son M 200000Noida INS &
NDT
46 01‐Jan‐19 31‐Dec‐19 39220 E1Bhukhal Chandra Mahato
Sr. Officer (NDT) Manju Kumari 01‐Mar‐1985 33 years9months30 days
31‐35 Spouse F 200000Noida INS &
NDT
47 01‐Jan‐19 31‐Dec‐19 39220 E1Bhukhal Chandra Mahato
Sr. Officer (NDT) Malati Mahato 01‐Jan‐1945 73 years11months30 days
71‐75 Mother F 200000Noida INS &
NDT
48 01‐Jan‐19 31‐Dec‐19 39229 E4Niral Kumar Runda
MANAGER(VIGILANCE) Nancy Runda 27‐Oct‐2000 18 years2months4 days
0‐18 Daughter F 200000Noida Office
49 01‐Jan‐19 31‐Dec‐19 39229 E4Niral Kumar Runda
MANAGER(VIGILANCE) Nelson Runda 17‐Oct‐1996 22 years2months14 days
19‐25 Son M 200000Noida Office
50 01‐Jan‐19 31‐Dec‐19 39229 E4Niral Kumar Runda
MANAGER(VIGILANCE) Punam Runda 05‐May‐1969 49 years7months26 days
46‐50 Spouse F 200000Noida Office
51 01‐Jan‐19 31‐Dec‐19 39229 E4Niral Kumar Runda
MANAGER(VIGILANCE) Sulata Runda 05‐Mar‐1941 77 years9months26 days
76‐80 Mother F 200000Noida Office
52 01‐Jan‐19 31‐Dec‐19 39230 E3 R B MeenaDy.Manager(Design.‐Elect.)
Keshav Meena 03‐Aug‐2005 13 years4months28 days
0‐18 Son M 200000Vadodara Office
53 01‐Jan‐19 31‐Dec‐19 39230 E3 R B MeenaDy.Manager(Design.‐Elect.)
Pragya Meena 03‐Jan‐1995 23 years11months28 days
19‐25 Daughter F 200000Vadodara Office
54 01‐Jan‐19 31‐Dec‐19 39230 E3 R B MeenaDy.Manager(Design.‐Elect.)
Sunita Meena 26‐Jun‐1975 43 years6months5 days
41‐45 Spouse F 200000Vadodara Office
55 01‐Jan‐19 31‐Dec‐19 39231 E7 N Alagesan AGM(CIVIL) A Ajeetha 11‐Apr‐1996 22 years8months20 days
19‐25 Daughter F 200000Noida Office
56 01‐Jan‐19 31‐Dec‐19 39231 E7 N Alagesan AGM(CIVIL) A Kasikani 18‐Mar‐1970 48 years9months13 days
46‐50 Spouse F 200000Noida Office
57 01‐Jan‐19 31‐Dec‐19 39238 E2Biswanath Chatterjee
Asst. Manager(SS) Rizu Chatterjee 17‐Feb‐1995 23 years10months14 days
19‐25 Son M 200000Sindri Office
58 01‐Jan‐19 31‐Dec‐19 39238 E2Biswanath Chatterjee
Asst. Manager(SS) Runa Chatterjee 02‐Jan‐1969 49 years11months29 days
46‐50 Spouse F 200000Sindri Office
Page 2 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
59 01‐Jan‐19 31‐Dec‐19 39238 E2Biswanath Chatterjee
Asst. Manager(SS) Basanti Chatterjee 11‐Aug‐1939 79 years4months20 days
76‐80 Mother F 200000Sindri Office
60 01‐Jan‐19 31‐Dec‐19 39238 E2Biswanath Chatterjee
Asst. Manager(SS) Bimal Chatterjee 15‐Dec‐1930 88 years0months16 days
Above 80 Father M 200000Sindri Office
61 01‐Jan‐19 31‐Dec‐19 39240 E3 Shekhar Das DY. MANAGER(SS) Tanuja Das 09‐Dec‐1969 49 years0months22 days
46‐50 Spouse F 200000Noida Office
62 01‐Jan‐19 31‐Dec‐19 39243 E3Pradeep Kumar Singh
Dy. Manager(SS) Sheela Singh 11‐Feb‐1959 59 years10months20 days
56‐60 Spouse F 200000Noida INS &
NDT
63 01‐Jan‐19 31‐Dec‐19 39244 E2 Anil Kumar Singh Asst. Manager(SS) Spriha Singh 15‐Sep‐1995 23 years3months16 days
19‐25 Daughter F 200000Noida Office
64 01‐Jan‐19 31‐Dec‐19 39244 E2 Anil Kumar Singh Asst. Manager(SS) Binita Singh 04‐Jul‐1971 47 years5months27 days
46‐50 Spouse F 200000Noida Office
65 01‐Jan‐19 31‐Dec‐19 39244 E2 Anil Kumar Singh Asst. Manager(SS) Damayanti Devi 01‐Jan‐1949 69 years11months30 days
66‐70 Mother F 200000Noida Office
66 01‐Jan‐19 31‐Dec‐19 39244 E2 Anil Kumar Singh Asst. Manager(SS) Shivjee Singh 01‐Jan‐1943 75 years11months30 days
71‐75 Father M 200000Noida Office
67 01‐Jan‐19 31‐Dec‐19 39246 E6Ganesh Choudhary
DGM(MECH.) Garima Kumari 10‐Jan‐1994 24 years11months21 days
19‐25 Daughter F 200000Noida Office
68 01‐Jan‐19 31‐Dec‐19 39246 E6Ganesh Choudhary
DGM(MECH.) Gaytri Choudhary 05‐Sep‐1967 51 years3months26 days
51‐55 Spouse F 200000Noida Office
69 01‐Jan‐19 31‐Dec‐19 39260 E1 Sukumar PandeySR.OFFICER (GM'S SECTT.)
Anirban Pandey 27‐Aug‐2000 18 years4months4 days
0‐18 Son M 200000Vadodara Office
70 01‐Jan‐19 31‐Dec‐19 39260 E1 Sukumar PandeySR.OFFICER (GM'S SECTT.)
Saswati Pandey 25‐May‐1996 22 years7months6 days
19‐25 Daughter F 200000Vadodara Office
71 01‐Jan‐19 31‐Dec‐19 39260 E1 Sukumar PandeySR.OFFICER (GM'S SECTT.)
Etu Pandey 31‐Dec‐1975 43 years0months0 days
41‐45 Spouse F 200000Vadodara Office
72 01‐Jan‐19 31‐Dec‐19 39260 E1 Sukumar PandeySR.OFFICER (GM'S SECTT.)
Himani Pandey 05‐Jun‐1948 70 years6months26 days
66‐70 Mother F 200000Vadodara Office
73 01‐Jan‐19 31‐Dec‐19 39277 E4 Hakeem KhanMANAGER (DESIGN‐CIVIL)
Efat Fatema Khan 23‐Oct‐2001 17 years2months8 days
0‐18 Daughter F 200000Vadodara Office
74 01‐Jan‐19 31‐Dec‐19 39277 E4 Hakeem KhanMANAGER (DESIGN‐CIVIL)
Laique Ahemad Khan
04‐Apr‐1997 21 years8months27 days
19‐25 Son M 200000Vadodara Office
75 01‐Jan‐19 31‐Dec‐19 39277 E4 Hakeem KhanMANAGER (DESIGN‐CIVIL)
Shaista Khan 01‐Dec‐1974 44 years0months30 days
41‐45 Spouse F 200000Vadodara Office
76 01‐Jan‐19 31‐Dec‐19 39277 E4 Hakeem KhanMANAGER (DESIGN‐CIVIL)
Khatoon Bee 15‐Nov‐1955 63 years1months16 days
61‐65 Mother F 200000Vadodara Office
77 01‐Jan‐19 31‐Dec‐19 39279 E7 Gokul Singh AGM(CIVIL) Hemant Shanu 29‐Jun‐1996 22 years6months2 days
19‐25 Son M 200000Noida Office
78 01‐Jan‐19 31‐Dec‐19 39279 E7 Gokul Singh AGM(CIVIL) Sunita Singh 12‐Jun‐1966 52 years6months19 days
51‐55 Spouse F 200000Noida Office
79 01‐Jan‐19 31‐Dec‐19 39279 E7 Gokul Singh AGM(CIVIL) Rama Jadi Devi 16‐Nov‐1942 76 years1months15 days
76‐80 Mother F 200000Noida Office
80 01‐Jan‐19 31‐Dec‐19 39283 E2Santanu Chatterjee
Asstt.Manager (Finance)
Anuradha Chatterjee
04‐Jul‐1970 48 years5months27 days
46‐50 Spouse F 200000Sindri Office
81 01‐Jan‐19 31‐Dec‐19 39293 E6 Birendra PrakashDy.General Manager(Process)
Ritesh Yadav 24‐Mar‐1995 23 years9months7 days
19‐25 Son M 200000Noida Office
82 01‐Jan‐19 31‐Dec‐19 39293 E6 Birendra PrakashDy.General Manager(Process)
Namrata 21‐Jul‐1996 22 years5months10 days
19‐25 Daughter F 200000Noida Office
83 01‐Jan‐19 31‐Dec‐19 39293 E6 Birendra PrakashDy.General Manager(Process)
Sarita 16‐Apr‐1984 34 years8months15 days
31‐35 Spouse F 200000Noida Office
84 01‐Jan‐19 31‐Dec‐19 39303 E7 Sudhir BirlaAddl. GM(Corp. Planning)
Srishti Birla 17‐Mar‐1996 22 years9months14 days
19‐25 Daughter F 200000Noida Office
85 01‐Jan‐19 31‐Dec‐19 39303 E7 Sudhir BirlaAddl. GM(Corp. Planning)
Satish Lal Birla 03‐Jan‐1935 83 years11months28 days
Above 80 Father M 200000Noida Office
86 01‐Jan‐19 31‐Dec‐19 39303 E7 Sudhir BirlaAddl. GM(Corp. Planning)
Raj Birla 04‐Sep‐1937 81 years3months27 days
Above 80 Mother F 200000Noida Office
87 01‐Jan‐19 31‐Dec‐19 39304 E7 Vikas GaurAdditional General Manager (BD)
Avni Gaur 10‐Oct‐1995 23 years2months21 days
19‐25 Daughter F 200000Noida Office
Page 3 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
88 01‐Jan‐19 31‐Dec‐19 39304 E7 Vikas GaurAdditional General Manager (BD)
Chaitanya Gaur 27‐Oct‐1999 19 years2months4 days
19‐25 Daughter F 200000Noida Office
89 01‐Jan‐19 31‐Dec‐19 39304 E7 Vikas GaurAdditional General Manager (BD)
Rashmi Gaur 01‐Jul‐1966 52 years5months30 days
51‐55 Spouse F 200000Noida Office
90 01‐Jan‐19 31‐Dec‐19 39305 E7Sanjay Kumar Srivastava
AGM(Corporate Communications)
Abhiraj Srivastava 19‐Nov‐1997 21 years1months12 days
19‐25 Son M 200000Noida INS &
NDT
91 01‐Jan‐19 31‐Dec‐19 39305 E7Sanjay Kumar Srivastava
AGM(Corporate Communications)
Roopam Srivastava 24‐Sep‐1968 50 years3months7 days
46‐50 Spouse F 200000Noida INS &
NDT
92 01‐Jan‐19 31‐Dec‐19 39316 E8Sanjay Kumar Tripathi
General Manager (INSTR.)
Medha Tripathi 14‐Mar‐2009 9 years9months17 days
0‐18 Daughter F 200000Noida Office
93 01‐Jan‐19 31‐Dec‐19 39316 E8Sanjay Kumar Tripathi
General Manager (INSTR.)
Sonal Tripathi 19‐Nov‐1971 47 years1months12 days
46‐50 Spouse F 200000Noida Office
94 01‐Jan‐19 31‐Dec‐19 39316 E8Sanjay Kumar Tripathi
General Manager (INSTR.)
Munish Prasad Tripathi
16984 72 years5months30 days
71‐75 Father M 200000Noida Office
95 01‐Jan‐19 31‐Dec‐19 39363 E6Thummanapalli Venkanna
Deputy GM (Insp.) T Varun Kumar 18‐Apr‐2003 15 years8months13 days
0‐18 Son M 200000Hydrabad INS & NDT
96 01‐Jan‐19 31‐Dec‐19 39363 E6Thummanapalli Venkanna
Deputy GM (Insp.) T Vinay Kumar 16‐May‐1999 19 years7months15 days
19‐25 Son M 200000Hydrabad INS & NDT
97 01‐Jan‐19 31‐Dec‐19 39363 E6Thummanapalli Venkanna
Deputy GM (Insp.) T Shailaja 10‐Jun‐1976 42 years6months21 days
41‐45 Spouse F 200000Hydrabad INS & NDT
98 01‐Jan‐19 31‐Dec‐19 39363 E6Thummanapalli Venkanna
Deputy GM (Insp.) T Sathyamma 15‐Jan‐1947 71 years11months16 days
71‐75 Mother F 200000Hydrabad INS & NDT
99 01‐Jan‐19 31‐Dec‐19 39368 E6Mahendra B Dhandre
Dy G.M. (PROJECTS) Yashali M Dhandre 01‐Jul‐2004 14 years5months30 days
0‐18 Daughter F 200000Vadodara Office
100 01‐Jan‐19 31‐Dec‐19 39368 E6Mahendra B Dhandre
Dy G.M. (PROJECTS) Pratik M Dhandre 27‐May‐1998 20 years7months4 days
19‐25 Son M 200000Vadodara Office
101 01‐Jan‐19 31‐Dec‐19 39368 E6Mahendra B Dhandre
Dy G.M. (PROJECTS) Dipti M Dhandre 20‐Dec‐1972 46 years0months11 days
46‐50 Spouse F 200000Vadodara Office
102 01‐Jan‐19 31‐Dec‐19 39368 E6Mahendra B Dhandre
Dy G.M. (PROJECTS) Mandatai B Dhandre 01‐Aug‐1950 68 years4months30 days
66‐70 Mother F 200000Vadodara Office
103 01‐Jan‐19 31‐Dec‐19 39368 E6Mahendra B Dhandre
Dy G.M. (PROJECTS) Bhayyaji M Dhandre 14‐Jan‐1943 75 years11months17 days
71‐75 Father M 200000Vadodara Office
104 01‐Jan‐19 31‐Dec‐19 39374 E7Rajendra Babu Srinivasan
ADDL.GM(INSP.) Rithika Rajeswari 31‐Oct‐2005 13 years2months0 days
0‐18 Daughter F 200000Noida INS &
NDT
105 01‐Jan‐19 31‐Dec‐19 39374 E7Rajendra Babu Srinivasan
ADDL.GM(INSP.) Varun Subramanian 12‐Dec‐2008 10 years0months19 days
0‐18 Son M 200000Noida INS &
NDT
106 01‐Jan‐19 31‐Dec‐19 39394 E4Rustam Kumar Singh
Addl.Chief Engineer Adya 41577 5 years2months1 days
0‐18 Daughter F 200000Sindri Office
107 01‐Jan‐19 31‐Dec‐19 39394 E4Rustam Kumar Singh
Addl.Chief Engineer Dolly Ray 13‐Dec‐1980 38 years0months18 days
36‐40 Spouse F 200000Sindri Office
108 01‐Jan‐19 31‐Dec‐19 39394 E4Rustam Kumar Singh
Addl.Chief Engineer Chameli Devi 17958 69 years9months30 days
66‐70 Mother F 200000Sindri Office
109 01‐Jan‐19 31‐Dec‐19 39394 E4Rustam Kumar Singh
Addl.Chief Engineer Umesh Kumar Singh 18784 67 years6months26 days
66‐70 Father M 200000Sindri Office
110 01‐Jan‐19 31‐Dec‐19 39396 E4 Santosh KumarADDL. CHIEF ENGR.(INSP.)
Shiksha Saanvi 05‐Sep‐2010 8 years3months26 days
0‐18 Daughter F 200000Chennai INS
& NDT
111 01‐Jan‐19 31‐Dec‐19 39396 E4 Santosh KumarADDL. CHIEF ENGR.(INSP.)
Nitiksha Saanvi 43060 1 years1months10 days
0‐18 Daughter F 200000Chennai INS
& NDT
112 01‐Jan‐19 31‐Dec‐19 39396 E4 Santosh KumarADDL. CHIEF ENGR.(INSP.)
Neha Rani Burnwal 31‐May‐1987 31 years7months0 days
31‐35 Spouse F 200000Chennai INS
& NDT
113 01‐Jan‐19 31‐Dec‐19 39396 E4 Santosh KumarADDL. CHIEF ENGR.(INSP.)
Vidya Devi 02‐Apr‐1955 63 years8months29 days
61‐65 Mother F 200000Chennai INS
& NDT
114 01‐Jan‐19 31‐Dec‐19 39396 E4 Santosh KumarADDL. CHIEF ENGR.(INSP.)
Krishna Kumar Lal 10‐Jan‐1950 68 years11months21 days
66‐70 Father M 200000Chennai INS
& NDT
115 01‐Jan‐19 31‐Dec‐19 39397 E3 Anoop KumarDy. Chief Engineer(Elect.)
Anuvrat Chauhan 15‐Sep‐2012 6 years3months16 days
0‐18 Son M 200000Noida Office
116 01‐Jan‐19 31‐Dec‐19 39397 E3 Anoop KumarDy. Chief Engineer(Elect.)
Aruna Chauhan 29‐Jan‐1985 33 years11months2 days
31‐35 Spouse F 200000Noida Office
Page 4 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
117 01‐Jan‐19 31‐Dec‐19 39397 E3 Anoop KumarDy. Chief Engineer(Elect.)
Kabutara Devi 10‐May‐1955 63 years7months21 days
61‐65 Mother F 200000Noida Office
118 01‐Jan‐19 31‐Dec‐19 39397 E3 Anoop KumarDy. Chief Engineer(Elect.)
Sudama Prasad Chauhan
22‐May‐1952 66 years7months9 days
66‐70 Father M 200000Noida Office
119 01‐Jan‐19 31‐Dec‐19 39398 E3Deepak Kumar Mishra
Dy.Chief Technologist (CRD)
Aditya Mishra 20‐Oct‐1998 20 years2months11 days
19‐25 Son M 200000Sindri Office
120 01‐Jan‐19 31‐Dec‐19 39398 E3Deepak Kumar Mishra
Dy.Chief Technologist (CRD)
Priyalata Mishra 05‐Nov‐1988 30 years1months26 days
26‐30 Spouse F 200000Sindri Office
121 01‐Jan‐19 31‐Dec‐19 39398 E3Deepak Kumar Mishra
Dy.Chief Technologist (CRD)
Annapurna Mishra 13‐Mar‐1956 62 years9months18 days
61‐65 Mother F 200000Sindri Office
122 01‐Jan‐19 31‐Dec‐19 39399 E3Gyanlata Deshmukh
Dy.Chief Technologist (Env.Engg)
GANTAVYA DESHMU43094 1 years0months6
days0‐18 Son M 200000
Sindri Office
123 01‐Jan‐19 31‐Dec‐19 39399 E3Gyanlata Deshmukh
Dy.Chief Technologist (Env.Engg)
Tameshwar Kumar Deshmukh
05‐Oct‐1978 40 years2months26 days
36‐40 Spouse M 200000Sindri Office
124 01‐Jan‐19 31‐Dec‐19 39399 E3Gyanlata Deshmukh
Dy.Chief Technologist (Env.Engg)
Bhuma Devi Deshmukh
04‐Mar‐1956 62 years9months27 days
61‐65 Mother F 200000Sindri Office
125 01‐Jan‐19 31‐Dec‐19 39399 E3Gyanlata Deshmukh
Dy.Chief Technologist (Env.Engg)
Dushyant Kumar Deshmukh
26‐Feb‐1952 66 years10months5 days
66‐70 Father M 200000Sindri Office
126 01‐Jan‐19 31‐Dec‐19 39400 E3 Sarika Lal Dy. Chief Technologist Gungun 26‐Sep‐2010 8 years3months5 days
0‐18 Daughter F 200000Noida Office
127 01‐Jan‐19 31‐Dec‐19 39400 E3 Sarika Lal Dy. Chief Technologist Vipin Jaiswal 30‐Nov‐1984 34 years1months1 days
31‐35 Spouse M 200000Noida Office
128 01‐Jan‐19 31‐Dec‐19 39400 E3 Sarika Lal Dy. Chief Technologist Vishnumati 08‐Feb‐1953 65 years10months23 days
61‐65 Mother F 200000Noida Office
129 01‐Jan‐19 31‐Dec‐19 39400 E3 Sarika Lal Dy. Chief Technologist B N Jaiswal 31‐Jul‐1949 69 years5months0 days
66‐70 Father M 200000Noida Office
130 01‐Jan‐19 31‐Dec‐19 39403 E3Basant John Mundu
Dy.Manager (BD)Melissa Rebecca Mundu
41477 5 years5months9 days
0‐18 Daughter F 200000Sindri Office
131 01‐Jan‐19 31‐Dec‐19 39403 E3Basant John Mundu
Dy.Manager (BD) Roselina Topno 16‐Oct‐1988 30 years2months15 days
26‐30 Spouse F 200000Sindri Office
132 01‐Jan‐19 31‐Dec‐19 39405 E1Prashant Kumar Singh
Assistant Chief Technologist
Prakruti Singh 08‐May‐2012 6 years7months23 days
0‐18 Daughter F 200000Sindri Office
133 01‐Jan‐19 31‐Dec‐19 39405 E1Prashant Kumar Singh
Assistant Chief Technologist
Tripti Singh 20‐Mar‐1986 32 years9months11 days
31‐35 Spouse F 200000Sindri Office
134 01‐Jan‐19 31‐Dec‐19 39405 E1Prashant Kumar Singh
Assistant Chief Technologist
Usha Singh 11‐Oct‐1964 54 years2months20 days
51‐55 Mother F 200000Sindri Office
135 01‐Jan‐19 31‐Dec‐19 39405 E1Prashant Kumar Singh
Assistant Chief Technologist
Rajendra Prasad Singh
03‐Jul‐1959 59 years5months28 days
56‐60 Father M 200000Sindri Office
136 01‐Jan‐19 31‐Dec‐19 39406 E2 Naga Raju BattiAsst.Chief Technologist (CRD)
Tarun Kaushik Batti 42029 3 years11months6 days
0‐18 Son M 200000Sindri Office
137 01‐Jan‐19 31‐Dec‐19 39406 E2 Naga Raju BattiAsst.Chief Technologist (CRD)
Renuka B 01‐Aug‐1987 31 years4months30 days
31‐35 Spouse F 200000Sindri Office
138 01‐Jan‐19 31‐Dec‐19 39406 E2 Naga Raju BattiAsst.Chief Technologist (CRD)
B Chinnatalli 01‐Jan‐1968 50 years11months30 days
46‐50 Mother F 200000Sindri Office
139 01‐Jan‐19 31‐Dec‐19 39406 E2 Naga Raju BattiAsst.Chief Technologist (CRD)
B Thrimurthulu 01‐Jan‐1961 57 years11months30 days
56‐60 Father M 200000Sindri Office
140 01‐Jan‐19 31‐Dec‐19 39407 E2 Akosh ChhokerAsst.Chief Technologist
Pavitra Chhoker 24‐Jan‐1982 36 years11months7 days
36‐40 Spouse F 200000Sindri Office
141 01‐Jan‐19 31‐Dec‐19 39407 E2 Akosh ChhokerAsst.Chief Technologist
Kusum Chhoker 23‐Mar‐1953 65 years9months8 days
61‐65 Mother F 200000Sindri Office
142 01‐Jan‐19 31‐Dec‐19 39407 E2 Akosh ChhokerAsst.Chief Technologist
Birpal Singh Chhoker 08‐May‐1948 70 years7months23 days
66‐70 Father M 200000Sindri Office
143 01‐Jan‐19 31‐Dec‐19 39409 W6Manoj Kumar Mahato
Sr. Operator Sakshi Kumari 31‐Jan‐2009 9 years11months0 days
0‐18 Daughter F 200000Sindri Office
144 01‐Jan‐19 31‐Dec‐19 39409 W6Manoj Kumar Mahato
Sr. Operator Naman Kumar 42590 2 years4months23 days
0‐18 Son M 200000Sindri Office
145 01‐Jan‐19 31‐Dec‐19 39409 W6Manoj Kumar Mahato
Sr. Operator Pratima Kumari 01‐Apr‐1990 28 years8months30 days
26‐30 Spouse F 200000Sindri Office
Page 5 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
146 01‐Jan‐19 31‐Dec‐19 39409 W6Manoj Kumar Mahato
Sr. Operator Namita Devi 01‐Jan‐1958 60 years11months30 days
56‐60 Mother F 200000Sindri Office
147 01‐Jan‐19 31‐Dec‐19 39409 W6Manoj Kumar Mahato
Sr. Operator Raju Mahato 01‐Jan‐1961 57 years11months30 days
56‐60 Father M 200000Sindri Office
148 01‐Jan‐19 31‐Dec‐19 39410 E2Shashi Shankar Tiwari
Asst. Chief Technologist
Anika Tripathi 42143 3 years7months12 days
0‐18 Daughter F 200000Noida Office
149 01‐Jan‐19 31‐Dec‐19 39410 E2Shashi Shankar Tiwari
Asst. Chief Technologist
Priti Tripathi 11‐Jun‐1988 30 years6months20 days
26‐30 Spouse F 200000Noida Office
150 01‐Jan‐19 31‐Dec‐19 39410 E2Shashi Shankar Tiwari
Asst. Chief Technologist
Seneh Lata Tiwari 01‐Jul‐1955 63 years5months30 days
61‐65 Mother F 200000Noida Office
151 01‐Jan‐19 31‐Dec‐19 39410 E2Shashi Shankar Tiwari
Asst. Chief Technologist
Vinod Kumar Tiwari 01‐Apr‐1957 61 years8months30 days
61‐65 Father M 200000Noida Office
152 01‐Jan‐19 31‐Dec‐19 39411 E3Bibhuti Bhusan Nayak
Dy.Manager(P&A) Knishiv Nayak 14‐Nov‐2011 7 years1months17 days
0‐18 Son M 200000Sindri Office
153 01‐Jan‐19 31‐Dec‐19 39412 E7Sandeep Kumar Puthal
Addl.General Manager(DBT & CSR)
Saurabh Puthal 07‐Dec‐1997 21 years0months24 days
19‐25 Son M 200000Noida Office
154 01‐Jan‐19 31‐Dec‐19 39412 E7Sandeep Kumar Puthal
Addl.General Manager(DBT & CSR)
Sanghamitra Puthal 01‐Jul‐1971 47 years5months30 days
46‐50 Spouse F 200000Noida Office
155 01‐Jan‐19 31‐Dec‐19 39412 E7Sandeep Kumar Puthal
Addl.General Manager(DBT & CSR)
Gita Puthal 30‐Jul‐1944 74 years5months1 days
71‐75 Mother F 200000Noida Office
156 01‐Jan‐19 31‐Dec‐19 39412 E7Sandeep Kumar Puthal
Addl.General Manager(DBT & CSR)
Bhagabat Puthal 18‐Aug‐1936 82 years4months13 days
Above 80 Father M 200000Noida Office
157 01‐Jan‐19 31‐Dec‐19 39413 E3 Krishan Swaroop DY MANAGER (MM) Indra Devi 01‐Jan‐1953 65 years11months30 days
61‐65 Mother F 200000Vadodara Office
158 01‐Jan‐19 31‐Dec‐19 39413 E3 Krishan Swaroop DY MANAGER (MM) Matadeen Meena 01‐Jan‐1948 70 years11months30 days
66‐70 Father M 200000Vadodara Office
159 01‐Jan‐19 31‐Dec‐19 39414 E2 Vijay Govind RaoAsstt.CE (Catalyst Store)
BABY OF Kanchan43359 0 years3months15
days0‐18 Son M 200000
Sindri Office
160 01‐Jan‐19 31‐Dec‐19 39414 E2 Vijay Govind RaoAsstt.CE (Catalyst Store)
Kanchan 31229 33 years5months30 days
31‐35 Spouse F 200000Sindri Office
161 01‐Jan‐19 31‐Dec‐19 39414 E2 Vijay Govind RaoAsstt.CE (Catalyst Store)
S P G Rao 25‐Jan‐1958 60 years11months6 days
56‐60 Father M 200000Sindri Office
162 01‐Jan‐19 31‐Dec‐19 39414 E2 Vijay Govind RaoAsstt.CE (Catalyst Store)
Dharmavati 28‐Feb‐1960 58 years10months3 days
56‐60 Mother F 200000Sindri Office
163 01‐Jan‐19 31‐Dec‐19 39415 E2 Vikrant DimaniaAssistant Manager (Accounts)
Ayaan Dimania 41814 4 years6months7 days
0‐18 Son M 200000Vadodara Office
164 01‐Jan‐19 31‐Dec‐19 39415 E2 Vikrant DimaniaAssistant Manager (Accounts)
Sushma Dimania 20‐Aug‐1986 32 years4months11 days
31‐35 Spouse F 200000Vadodara Office
165 01‐Jan‐19 31‐Dec‐19 39417 W6 Amit MajumdarSr.Technician (Mechanical)
Aharshi Majumdar 41954 4 years1months20 days
0‐18 Son M 200000Noida Office
166 01‐Jan‐19 31‐Dec‐19 39417 W6 Amit MajumdarSr.Technician (Mechanical)
Kumkum Majumdar 27‐May‐1986 32 years7months4 days
31‐35 Spouse F 200000Noida Office
167 01‐Jan‐19 31‐Dec‐19 39418 W5Muralidhar Pradhan
Sr.Technician Instrument
Snehalata Pradhan 31538 32 years7months25 days
31‐35 Spouse F 200000Sindri Office
168 01‐Jan‐19 31‐Dec‐19 39418 W5Muralidhar Pradhan
Sr.Technician Instrument
Jhumpei Pradhan 17965 69 years9months23 days
66‐70 Mother F 200000Sindri Office
169 01‐Jan‐19 31‐Dec‐19 39418 W5Muralidhar Pradhan
Sr.Technician Instrument
Gaur Pradhan 16076 74 years11months26 days
71‐75 Father M 200000Sindri Office
170 01‐Jan‐19 31‐Dec‐19 39419 W6 Kultar ChandSr.Tchnician Mechnicial
Yaksh Katoch 42359 3 years0months10 days
0‐18 Son M 200000Sindri Office
171 01‐Jan‐19 31‐Dec‐19 39419 W6 Kultar ChandSr.Tchnician Mechnicial
Sonika 33248 27 years11months21 days
26‐30 Spouse F 200000Sindri Office
172 01‐Jan‐19 31‐Dec‐19 39419 W6 Kultar ChandSr.Tchnician Mechnicial
Jamuna Devi 15‐Aug‐1960 58 years4months16 days
56‐60 Mother F 200000Sindri Office
173 01‐Jan‐19 31‐Dec‐19 39421 E1 Niladri Mukherjee Sr. Officer (MM) Renuka Mukherjee 22751 56 years8months16 days
56‐60 Mother F 200000Noida Office
174 01‐Jan‐19 31‐Dec‐19 39422 E1 Gautam SinhaSr. Engineer (EIA1‐LAB)
Madhu Sinha 09‐Jan‐1962 56 years11months22 days
56‐60 Mother F 200000Sindri Office
Page 6 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
175 01‐Jan‐19 31‐Dec‐19 39422 E1 Gautam SinhaSr. Engineer (EIA1‐LAB)
Manoj Kumar Sinha 16‐Sep‐1955 63 years3months15 days
61‐65 Father M 200000Sindri Office
176 01‐Jan‐19 31‐Dec‐19 50091 E5 Harsh Singh BishtCHIEF MANAGER(P & A)
Neeta Bisht 07‐Oct‐1966 52 years2months24 days
51‐55 Spouse F 200000Noida Office
177 01‐Jan‐19 31‐Dec‐19 50091 E5 Harsh Singh BishtCHIEF MANAGER(P & A)
Jasoda Bisht 22‐Jul‐1938 80 years5months9 days
Above 80 Mother F 200000Noida Office
178 01‐Jan‐19 31‐Dec‐19 50093 E4Pawan Kumar Sharma
MANAGER(FINANCE) Uma Sharma 01‐Feb‐1932 86 years10months30 days
Above 80 Mother F 200000Noida Office
179 01‐Jan‐19 31‐Dec‐19 50098 E4A D Sivadas Menon
MANAGER(INSP.) Bindu S Menon 07‐Mar‐1966 52 years9months24 days
51‐55 Spouse F 200000Noida INS &
NDT
180 01‐Jan‐19 31‐Dec‐19 50101 W6 Jagat Singh SR. OFF.ATNDT Shanti Devi 05‐Apr‐1964 54 years8months26 days
51‐55 Spouse F 200000Noida Office
181 01‐Jan‐19 31‐Dec‐19 50101 W6 Jagat Singh SR. OFF.ATNDT Chana Devi 10‐May‐1936 82 years7months21 days
Above 80 Mother F 200000Noida Office
182 01‐Jan‐19 31‐Dec‐19 50127 E3Chandra Prakash Wadhwa
DY.MANAGER(SS) Kusum Lata 28‐Aug‐1964 54 years4months3 days
51‐55 Spouse F 200000Noida Office
183 01‐Jan‐19 31‐Dec‐19 50130 E3 Suman Arora DY. MANAGER(MM)Bharat Bhushan Arora
21‐Dec‐1960 58 years0months10 days
56‐60 Spouse M 200000Noida Office
184 01‐Jan‐19 31‐Dec‐19 50130 E3 Suman Arora DY. MANAGER(MM) Bimla Arora 01‐Jan‐1933 85 years11months30 days
Above 80 Mother F 200000Noida Office
185 01‐Jan‐19 31‐Dec‐19 50138 E1 Kishan Pal Sr. Officer Savita 10‐Mar‐1970 48 years9months21 days
46‐50 Spouse F 200000Noida Office
186 01‐Jan‐19 31‐Dec‐19 50149 W6 Dhirender Singh Sr RECORD KEEPER Kamlesh 15‐Jan‐1966 52 years11months16 days
51‐55 Spouse F 200000Noida Office
187 01‐Jan‐19 31‐Dec‐19 50149 W6 Dhirender Singh Sr RECORD KEEPER Bhagwati Devi 20‐Feb‐1944 74 years10months11 days
71‐75 Mother F 200000Noida Office
188 01‐Jan‐19 31‐Dec‐19 50150 E3 Shanta Sabharwal DY.MANAGER(SS) Ankita Sabharwal 05‐Jun‐1998 20 years6months26 days
19‐25 Daughter F 200000Noida Office
189 01‐Jan‐19 31‐Dec‐19 50150 E3 Shanta Sabharwal DY.MANAGER(SS) Nikita Sabharwal 05‐Jun‐1998 20 years6months26 days
19‐25 Daughter F 200000Noida Office
190 01‐Jan‐19 31‐Dec‐19 50150 E3 Shanta Sabharwal DY.MANAGER(SS) Krishna Chopra 12063 85 years11months22 days
Above 80 Mother F 200000Noida Office
191 01‐Jan‐19 31‐Dec‐19 50156 W5 Kirpal Singh OFF. ASST.‐I Prateek Negi 07‐Jun‐1995 23 years6months24 days
19‐25 Son M 200000Noida Office
192 01‐Jan‐19 31‐Dec‐19 50156 W5 Kirpal Singh OFF. ASST.‐I Tarun Negi 18‐Feb‐1999 19 years10months13 days
19‐25 Son M 200000Noida Office
193 01‐Jan‐19 31‐Dec‐19 50156 W5 Kirpal Singh OFF. ASST.‐I Kamla Negi 10‐Jun‐1975 43 years6months21 days
41‐45 Spouse F 200000Noida Office
194 01‐Jan‐19 31‐Dec‐19 50158 W5 Girdhari Lal Gaur OFF. ASST.‐I Mohit Gaur 30‐Jan‐1994 24 years11months1 days
19‐25 Son M 200000Noida Office
195 01‐Jan‐19 31‐Dec‐19 50159 W5 Mool Chand OFF. ASST.‐I Monika 29‐Sep‐1995 23 years3months2 days
19‐25 Daughter F 200000Noida Office
196 01‐Jan‐19 31‐Dec‐19 50159 W5 Mool Chand OFF. ASST.‐I Mohit 04‐Jul‐1997 21 years5months27 days
19‐25 Son M 200000Noida Office
197 01‐Jan‐19 31‐Dec‐19 50159 W5 Mool Chand OFF. ASST.‐I Jaiwanti 11‐May‐1970 48 years7months20 days
46‐50 Spouse F 200000Noida Office
198 01‐Jan‐19 31‐Dec‐19 50163 E2 Narain SinghASSISTANT MANAGER (FINANCE)
Sanjogta 01‐Apr‐1969 49 years8months30 days
46‐50 Spouse F 200000Noida Office
199 01‐Jan‐19 31‐Dec‐19 50174 E1 Kamal Bhasin Sr. Officer (Reception) Anil Bhasin 21118 61 years2months6 days
61‐65 Spouse M 200000Noida Office
200 01‐Jan‐19 31‐Dec‐19 50178 E3Kumar Anil Dhawan
Dy. Manager (Mechanical)
Neelesh Dhawan 30‐Mar‐1996 22 years9months1 days
19‐25 Son M 200000Noida Office
201 01‐Jan‐19 31‐Dec‐19 50178 E3Kumar Anil Dhawan
Dy. Manager (Mechanical)
Asha Devi 25264 49 years9months29 days
46‐50 Spouse F 200000Noida Office
202 01‐Jan‐19 31‐Dec‐19 50178 E3Kumar Anil Dhawan
Dy. Manager (Mechanical)
Gulabi Devi 01‐Jan‐1940 78 years11months30 days
76‐80 Mother F 200000Noida Office
203 01‐Jan‐19 31‐Dec‐19 50179 E3 Manish Sethi Dy. Manager (Pers.) Sachi Sethi 04‐Sep‐2006 12 years3months27 days
0‐18 Daughter F 200000Noida Office
Page 7 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
204 01‐Jan‐19 31‐Dec‐19 50179 E3 Manish Sethi Dy. Manager (Pers.) Rekha Sethi 10‐Oct‐1976 42 years2months21 days
41‐45 Spouse F 200000Noida Office
205 01‐Jan‐19 31‐Dec‐19 50180 E2 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
S Sujith Kumar 29‐Jul‐1994 24 years5months2 days
19‐25 Son M 200000Noida Office
206 01‐Jan‐19 31‐Dec‐19 50180 E2 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
S Surabhi 19‐Oct‐1998 20 years2months12 days
19‐25 Daughter F 200000Noida Office
207 01‐Jan‐19 31‐Dec‐19 50180 E2 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
Sujatha Suresh 26‐May‐1970 48 years7months5 days
46‐50 Spouse F 200000Noida Office
208 01‐Jan‐19 31‐Dec‐19 50180 E2 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
Sarusammal 16‐Aug‐1942 76 years4months15 days
76‐80 Mother F 200000Noida Office
209 01‐Jan‐19 31‐Dec‐19 50180 E2 Suresh Kumar VASSISTANT MANAGER (CMD's SECTT.)
N V Pillai 22‐May‐1937 81 years7months9 days
Above 80 Father M 200000Noida Office
210 01‐Jan‐19 31‐Dec‐19 50195 E2Abraham Varughese
ASSISTANT MANAGER (DESIGN‐INSTT.)
Agna Abraham 10‐Feb‐1995 23 years10months21 days
19‐25 Daughter F 200000Noida Office
211 01‐Jan‐19 31‐Dec‐19 50195 E2Abraham Varughese
ASSISTANT MANAGER (DESIGN‐INSTT.)
Salimma Chacko 25‐Mar‐1967 51 years9months6 days
51‐55 Spouse F 200000Noida Office
212 01‐Jan‐19 31‐Dec‐19 50196 E7 Brijesh AGM(CIVIL) Medha 17‐Jul‐2000 18 years5months14 days
0‐18 Daughter F 200000Noida Office
213 01‐Jan‐19 31‐Dec‐19 50196 E7 Brijesh AGM(CIVIL) Ranjana Singh 18‐May‐1971 47 years7months13 days
46‐50 Spouse F 200000Noida Office
214 01‐Jan‐19 31‐Dec‐19 50196 E7 Brijesh AGM(CIVIL) Param Jyoti Devi 01‐Jan‐1945 73 years11months30 days
71‐75 Mother F 200000Noida Office
215 01‐Jan‐19 31‐Dec‐19 50225 E4Ram Prasad Manjhi
MGR. (DESIGN‐CIVIL) Hansraj Hansda 07‐Jan‐1994 24 years11months24 days
19‐25 Son M 200000Noida Office
216 01‐Jan‐19 31‐Dec‐19 50225 E4Ram Prasad Manjhi
MGR. (DESIGN‐CIVIL) Arati Manjhi 06‐May‐1969 49 years7months25 days
46‐50 Spouse F 200000Noida Office
217 01‐Jan‐19 31‐Dec‐19 50227 E6 Renuka Mittal DGM(VIG.) Surbhit Mittal 23‐Apr‐2003 15 years8months8 days
0‐18 Son M 200000Noida Office
218 01‐Jan‐19 31‐Dec‐19 50227 E6 Renuka Mittal DGM(VIG.) Ankur Mittal 09‐Apr‐1994 24 years8months22 days
19‐25 Son M 200000Noida Office
219 01‐Jan‐19 31‐Dec‐19 50227 E6 Renuka Mittal DGM(VIG.) Praveen Mittal 04‐Oct‐1965 53 years2months27 days
51‐55 Spouse M 200000Noida Office
220 01‐Jan‐19 31‐Dec‐19 50227 E6 Renuka Mittal DGM(VIG.) Satya Gupta 21‐Mar‐1939 79 years9months10 days
76‐80 Mother F 200000Noida Office
221 01‐Jan‐19 31‐Dec‐19 50239 E7 Ujjwal Peter Tudu AGM(CIVIL) Aman John Tudu 20‐Sep‐1997 21 years3months11 days
19‐25 Son M 200000Noida Office
222 01‐Jan‐19 31‐Dec‐19 50239 E7 Ujjwal Peter Tudu AGM(CIVIL)Chaya Monica Hembrom
17‐Mar‐1970 48 years9months14 days
46‐50 Spouse F 200000Noida Office
223 01‐Jan‐19 31‐Dec‐19 50241 E7 Shalini Katiyar AGM(ELECT.) Saloni Stuti 09‐Jan‐2002 16 years11months22 days
0‐18 Daughter F 200000Noida Office
224 01‐Jan‐19 31‐Dec‐19 50241 E7 Shalini Katiyar AGM(ELECT.) Kalplata Katiyar 17065 72 years3months11 days
71‐75Mother‐in‐
lawF 200000
Noida Office
225 01‐Jan‐19 31‐Dec‐19 50333 E7Amarendra Kumar
AGM(Mech) Aryaman Singh 28‐Jul‐2007 11 years5months3 days
0‐18 Son M 200000Noida Office
226 01‐Jan‐19 31‐Dec‐19 50333 E7Amarendra Kumar
AGM(Mech) Apoorva Singh 26‐Jun‐1998 20 years6months5 days
19‐25 Daughter F 200000Noida Office
227 01‐Jan‐19 31‐Dec‐19 50333 E7Amarendra Kumar
AGM(Mech) Sangeeta Kumari 16‐Dec‐1973 45 years0months15 days
41‐45 Spouse F 200000Noida Office
228 01‐Jan‐19 31‐Dec‐19 50339 E7Praveen Kumar Yadav
ADDL.GENERAL MANAGER(MECH.)
Pratik Kumar 10‐Jun‐2000 18 years6months21 days
0‐18 Son M 200000Noida Office
229 01‐Jan‐19 31‐Dec‐19 50339 E7Praveen Kumar Yadav
ADDL.GENERAL MANAGER(MECH.)
Neharika 20‐Aug‐1998 20 years4months11 days
19‐25 Daughter F 200000Noida Office
230 01‐Jan‐19 31‐Dec‐19 50339 E7Praveen Kumar Yadav
ADDL.GENERAL MANAGER(MECH.)
Hima Yadav 02‐Mar‐1971 47 years9months29 days
46‐50 Spouse F 200000Noida Office
231 01‐Jan‐19 31‐Dec‐19 50339 E7Praveen Kumar Yadav
ADDL.GENERAL MANAGER(MECH.)
Krishna Devi 05‐Mar‐1949 69 years9months26 days
66‐70 Mother F 200000Noida Office
232 01‐Jan‐19 31‐Dec‐19 50362 E6Dinesh Kumar Sant
Deputy General Manager & HOD (PM & MS)
Kritika Sant 29‐Jul‐2000 18 years5months2 days
0‐18 Daughter F 200000Noida Office
Page 8 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
233 01‐Jan‐19 31‐Dec‐19 50362 E6Dinesh Kumar Sant
Deputy General Manager & HOD (PM & MS)
Ankit Sant 07‐Nov‐1995 23 years1months24 days
19‐25 Son M 200000Noida Office
234 01‐Jan‐19 31‐Dec‐19 50362 E6Dinesh Kumar Sant
Deputy General Manager & HOD (PM & MS)
Radhika Sant 22‐Jun‐1973 45 years6months9 days
41‐45 Spouse F 200000Noida Office
235 01‐Jan‐19 31‐Dec‐19 50383 E7 D K KaramataADDL.GENERAL MANAGER (CIVIL)
Priyanshu Karamata 12‐Oct‐2004 14 years2months19 days
0‐18 Son M 200000Vadodara Office
236 01‐Jan‐19 31‐Dec‐19 50383 E7 D K KaramataADDL.GENERAL MANAGER (CIVIL)
Krunal Karamata 24‐Mar‐1999 19 years9months7 days
19‐25 Son M 200000Vadodara Office
237 01‐Jan‐19 31‐Dec‐19 50383 E7 D K KaramataADDL.GENERAL MANAGER (CIVIL)
Mamta Karamata 07‐Aug‐1978 40 years4months24 days
36‐40 Spouse F 200000Vadodara Office
238 01‐Jan‐19 31‐Dec‐19 50383 E7 D K KaramataADDL.GENERAL MANAGER (CIVIL)
Kacharabhai Karamata
02‐May‐1938 80 years7months29 days
Above 80 Father M 200000Vadodara Office
239 01‐Jan‐19 31‐Dec‐19 50383 E7 D K KaramataADDL.GENERAL MANAGER (CIVIL)
Rudibeni Karamata 01‐Jun‐1938 80 years6months30 days
Above 80 Mother F 200000Vadodara Office
240 01‐Jan‐19 31‐Dec‐19 50392 E7Rajesh I Upadhyay
ADDL.G.M. (CIVIL) Yakshita Upadhyay 09‐May‐2000 18 years7months22 days
0‐18 Daughter F 200000Vadodara Office
241 01‐Jan‐19 31‐Dec‐19 50392 E7Rajesh I Upadhyay
ADDL.G.M. (CIVIL) Ishita Upadhyay 23‐Apr‐2004 14 years8months8 days
0‐18 Daughter F 200000Vadodara Office
242 01‐Jan‐19 31‐Dec‐19 50392 E7Rajesh I Upadhyay
ADDL.G.M. (CIVIL) Seema Upadhyay 20‐Sep‐1975 43 years3months11 days
41‐45 Spouse F 200000Vadodara Office
243 01‐Jan‐19 31‐Dec‐19 50392 E7Rajesh I Upadhyay
ADDL.G.M. (CIVIL)Bhanumati Upadhyay
17‐Mar‐1949 69 years9months14 days
66‐70 Mother F 200000Vadodara Office
244 01‐Jan‐19 31‐Dec‐19 50426 E1 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
Shivam 29‐Jul‐2002 16 years5months2 days
0‐18 Son M 200000Noida Office
245 01‐Jan‐19 31‐Dec‐19 50426 E1 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
Adarsh Gupta 21‐Dec‐1995 23 years0months10 days
19‐25 Son M 200000Noida Office
246 01‐Jan‐19 31‐Dec‐19 50426 E1 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
Akanhsha 15‐Nov‐1998 20 years1months16 days
19‐25 Daughter F 200000Noida Office
247 01‐Jan‐19 31‐Dec‐19 50426 E1 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
R K Gupta 01‐Jul‐1965 53 years5months30 days
51‐55 Spouse M 200000Noida Office
248 01‐Jan‐19 31‐Dec‐19 50426 E1 Chhavi GuptaSr. Officer (HINDI & CS’s Sectt.)
Kasturi Devi 10‐Feb‐1945 73 years10months21 days
71‐75 Mother F 200000Noida Office
249 01‐Jan‐19 31‐Dec‐19 50438 E6 Syam Kumar P Dy. GM (Insp.) Sreyas Syam 21‐Jul‐2003 15 years5months10 days
0‐18 Son M 200000Mumbai INS & NDT
250 01‐Jan‐19 31‐Dec‐19 50438 E6 Syam Kumar P Dy. GM (Insp.) Sradha Syam 31‐Mar‐2007 11 years9months0 days
0‐18 Daughter F 200000Mumbai INS & NDT
251 01‐Jan‐19 31‐Dec‐19 50438 E6 Syam Kumar P Dy. GM (Insp.) Sruthi Syam 11‐Sep‐1999 19 years3months20 days
19‐25 Daughter F 200000Mumbai INS & NDT
252 01‐Jan‐19 31‐Dec‐19 50438 E6 Syam Kumar P Dy. GM (Insp.) Lathika G 24‐Apr‐1975 43 years8months7 days
41‐45 Spouse F 200000Mumbai INS & NDT
253 01‐Jan‐19 31‐Dec‐19 50438 E6 Syam Kumar P Dy. GM (Insp.)Chandramathi Amma
01‐Jan‐1936 82 years11months30 days
Above 80 Mother F 200000Mumbai INS & NDT
254 01‐Jan‐19 31‐Dec‐19 50441 E6 Ragunath B Dy.GM (Insp.) R Guha Narayanan 13‐Jun‐2011 7 years6months18 days
0‐18 Son M 200000Chennai INS
& NDT
255 01‐Jan‐19 31‐Dec‐19 50441 E6 Ragunath B Dy.GM (Insp.)R Prasanna Karthikeyan
16‐May‐2007 11 years7months15 days
0‐18 Son M 200000Chennai INS
& NDT
256 01‐Jan‐19 31‐Dec‐19 50441 E6 Ragunath B Dy.GM (Insp.) R Manimozhi 22‐Feb‐1982 36 years10months9 days
36‐40 Spouse F 200000Chennai INS
& NDT
257 01‐Jan‐19 31‐Dec‐19 50441 E6 Ragunath B Dy.GM (Insp.) B Bhuvaneshwari 28‐Mar‐1947 71 years9months3 days
71‐75 Mother F 200000Chennai INS
& NDT
258 01‐Jan‐19 31‐Dec‐19 50441 E6 Ragunath B Dy.GM (Insp.) R Bakthavatchalam 14‐May‐1938 80 years7months17 days
Above 80 Father M 200000Chennai INS
& NDT
259 01‐Jan‐19 31‐Dec‐19 50444 E6 Debabrata Maji Dy.GM (Mech) Aprajita 07‐Aug‐2012 6 years4months24 days
0‐18 Daughter F 200000Noida Office
260 01‐Jan‐19 31‐Dec‐19 50444 E6 Debabrata Maji Dy.GM (Mech) Sneha 22‐Jul‐2005 13 years5months9 days
0‐18 Daughter F 200000Noida Office
261 01‐Jan‐19 31‐Dec‐19 50444 E6 Debabrata Maji Dy.GM (Mech) Tumpa Maji 19‐Oct‐1977 41 years2months12 days
41‐45 Spouse F 200000Noida Office
Page 9 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
262 01‐Jan‐19 31‐Dec‐19 50444 E6 Debabrata Maji Dy.GM (Mech) Hira Bala Maji 02‐Jul‐1948 70 years5months29 days
66‐70 Mother F 200000Noida Office
263 01‐Jan‐19 31‐Dec‐19 50444 E6 Debabrata Maji Dy.GM (Mech) Kasinath Maji 31‐Jan‐1942 76 years11months0 days
76‐80 Father M 200000Noida Office
264 01‐Jan‐19 31‐Dec‐19 50461 E6Rajeev Kumar Varshney
Dy.GM (Electrical) Kalrav Varshney 30‐Oct‐2002 16 years2months1 days
0‐18 Son M 200000Noida Office
265 01‐Jan‐19 31‐Dec‐19 50461 E6Rajeev Kumar Varshney
Dy.GM (Electrical) Kavita Varshney 09‐Oct‐1975 43 years2months22 days
41‐45 Spouse F 200000Noida Office
266 01‐Jan‐19 31‐Dec‐19 50461 E6Rajeev Kumar Varshney
Dy.GM (Electrical)Ramesh Chandra Gupta
03‐Dec‐1938 80 years0months28 days
Above 80 Father M 200000Noida Office
267 01‐Jan‐19 31‐Dec‐19 50463 E6 Sanjeev KumarDY.GENERAL MANAGER(ELECT.)
Krisha Sahu 42866 1 years7months20 days
0‐18 Daughter F 200000Noida Office
268 01‐Jan‐19 31‐Dec‐19 50463 E6 Sanjeev KumarDY.GENERAL MANAGER(ELECT.)
Kalpana Sahu 13‐Nov‐1975 43 years1months18 days
41‐45 Spouse F 200000Noida Office
269 01‐Jan‐19 31‐Dec‐19 50463 E6 Sanjeev KumarDY.GENERAL MANAGER(ELECT.)
Sharda Prasad 03‐Jan‐1929 89 years11months28 days
Above 80 Father M 200000Noida Office
270 01‐Jan‐19 31‐Dec‐19 50463 E6 Sanjeev KumarDY.GENERAL MANAGER(ELECT.)
Sarswati Devi 01‐Jan‐1938 80 years11months30 days
Above 80 Mother F 200000Noida Office
271 01‐Jan‐19 31‐Dec‐19 50464 E6Chandrama Prasad
DGM (Insp.) Shubhanshu Patel 37576 16 years1months15 days
0‐18 Son M 200000Kolkota INS & NDT
272 01‐Jan‐19 31‐Dec‐19 50464 E6Chandrama Prasad
DGM (Insp.) Himanshu Patel 08‐Dec‐1998 20 years0months23 days
19‐25 Son M 200000Kolkota INS & NDT
273 01‐Jan‐19 31‐Dec‐19 50464 E6Chandrama Prasad
DGM (Insp.) Soni Prasad 23‐Aug‐1975 43 years4months8 days
41‐45 Spouse F 200000Kolkota INS & NDT
274 01‐Jan‐19 31‐Dec‐19 50464 E6Chandrama Prasad
DGM (Insp.) Lalli Devi 03‐Apr‐1947 71 years8months28 days
71‐75 Mother F 200000Kolkota INS & NDT
275 01‐Jan‐19 31‐Dec‐19 50465 E6Sanjoy Kumar Brnwal
DGM(ELECT.) Kshitij Barnwal 27‐Dec‐2001 17 years0months4 days
0‐18 Son M 200000Noida Office
276 01‐Jan‐19 31‐Dec‐19 50465 E6Sanjoy Kumar Brnwal
DGM(ELECT.) Kshitika Barnwal 10‐Aug‐2007 11 years4months21 days
0‐18 Daughter F 200000Noida Office
277 01‐Jan‐19 31‐Dec‐19 50465 E6Sanjoy Kumar Brnwal
DGM(ELECT.) Kanak Kumari 11‐Jul‐1978 40 years5months20 days
36‐40 Spouse F 200000Noida Office
278 01‐Jan‐19 31‐Dec‐19 50465 E6Sanjoy Kumar Brnwal
DGM(ELECT.) Chinta Devi 20‐Jun‐1948 70 years6months11 days
66‐70 Mother F 200000Noida Office
279 01‐Jan‐19 31‐Dec‐19 50468 E6 Leena Bansal DGM(MM) Madhur Agrawal 26‐Jan‐2002 16 years11months5 days
0‐18 Son M 200000Noida Office
280 01‐Jan‐19 31‐Dec‐19 50468 E6 Leena Bansal DGM(MM) Shailesh Agrawal 02‐Aug‐1967 51 years4months29 days
51‐55 Spouse M 200000Noida Office
281 01‐Jan‐19 31‐Dec‐19 50468 E6 Leena Bansal DGM(MM) Savitri Devi Agrawal 01‐Jan‐1933 85 years11months30 days
Above 80 Mother F 200000Noida Office
282 01‐Jan‐19 31‐Dec‐19 50481 E7Sanjeev Kumar Nangia
AGM (BD) Saksham Nangia 07‐Mar‐2008 10 years9months24 days
0‐18 Son M 200000Noida Office
283 01‐Jan‐19 31‐Dec‐19 50481 E7Sanjeev Kumar Nangia
AGM (BD) Charu Nangia 05‐Jan‐1975 43 years11months26 days
41‐45 Spouse F 200000Noida Office
284 01‐Jan‐19 31‐Dec‐19 50486 E7 Manisha NarangAGM & HOD(Planning‐MR & Process)
Kapish Narang 14‐Jan‐2006 12 years11months17 days
0‐18 Son M 200000Noida Office
285 01‐Jan‐19 31‐Dec‐19 50486 E7 Manisha NarangAGM & HOD(Planning‐MR & Process)
Arushi Narang 15‐Dec‐1997 21 years0months16 days
19‐25 Daughter F 200000Noida Office
286 01‐Jan‐19 31‐Dec‐19 50486 E7 Manisha NarangAGM & HOD(Planning‐MR & Process)
Anil Narang 06‐Oct‐1968 50 years2months25 days
46‐50 Spouse M 200000Noida Office
287 01‐Jan‐19 31‐Dec‐19 50486 E7 Manisha NarangAGM & HOD(Planning‐MR & Process)
J C Narang 17‐Jan‐1940 78 years11months14 days
76‐80 Father M 200000Noida Office
288 01‐Jan‐19 31‐Dec‐19 50486 E7 Manisha NarangAGM & HOD(Planning‐MR & Process)
Satya Narang 15601 76 years3months14 days
76‐80 Mother F 200000Noida Office
289 01‐Jan‐19 31‐Dec‐19 50490 E6 Anupama DGM (COMPUTERS) Seharish Khan 41314 5 years10months22 days
0‐18 Daughter F 200000Noida Office
290 01‐Jan‐19 31‐Dec‐19 50512 E6 Anjali Thakur DGM(MM) Achintya Raj 17‐Oct‐2002 16 years2months14 days
0‐18 Son M 200000Noida Office
Page 10 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
291 01‐Jan‐19 31‐Dec‐19 50512 E6 Anjali Thakur DGM(MM) Priya Jha 05‐Apr‐2005 13 years8months26 days
0‐18 Daughter F 200000Noida Office
292 01‐Jan‐19 31‐Dec‐19 50512 E6 Anjali Thakur DGM(MM) Udai Kumar Thakur 27‐Nov‐1940 78 years1months4 days
76‐80 Father M 200000Noida Office
293 01‐Jan‐19 31‐Dec‐19 50512 E6 Anjali Thakur DGM(MM) Banita Thakur 02‐Mar‐1942 76 years9months29 days
76‐80 Mother F 200000Noida Office
294 01‐Jan‐19 31‐Dec‐19 50535 E3 Manoj Kumar JhaDY.CHIEF ENGINEER(INSP.)
Aditya Kr Jha 29‐Jan‐2003 15 years11months2 days
0‐18 Son M 200000Hydrabad INS & NDT
295 01‐Jan‐19 31‐Dec‐19 50535 E3 Manoj Kumar JhaDY.CHIEF ENGINEER(INSP.)
Aditi Jha 29‐Jan‐2006 12 years11months2 days
0‐18 Daughter F 200000Hydrabad INS & NDT
296 01‐Jan‐19 31‐Dec‐19 50535 E3 Manoj Kumar JhaDY.CHIEF ENGINEER(INSP.)
Vijay Laxmi Jha 13‐Mar‐1978 40 years9months18 days
36‐40 Spouse F 200000Hydrabad INS & NDT
297 01‐Jan‐19 31‐Dec‐19 50535 E3 Manoj Kumar JhaDY.CHIEF ENGINEER(INSP.)
Heera Devi 01‐Jan‐1954 64 years11months30 days
61‐65 Mother F 200000Hydrabad INS & NDT
298 01‐Jan‐19 31‐Dec‐19 50691 E6Rajeev Kumar Ranjan
Dy GM (Instt.) Ritvika Ranjan 31‐Mar‐2009 9 years9months0 days
0‐18 Daughter F 200000Noida Office
299 01‐Jan‐19 31‐Dec‐19 50691 E6Rajeev Kumar Ranjan
Dy GM (Instt.) Viraj Ranjan 41790 4 years7months0 days
0‐18 Son M 200000Noida Office
300 01‐Jan‐19 31‐Dec‐19 50691 E6Rajeev Kumar Ranjan
Dy GM (Instt.) Kumari Kavita Rani 20‐Dec‐1981 37 years0months11 days
36‐40 Spouse F 200000Noida Office
301 01‐Jan‐19 31‐Dec‐19 50691 E6Rajeev Kumar Ranjan
Dy GM (Instt.) Lal Pari Devi 05‐Mar‐1955 63 years9months26 days
61‐65 Mother F 200000Noida Office
302 01‐Jan‐19 31‐Dec‐19 50691 E6Rajeev Kumar Ranjan
Dy GM (Instt.) Lalan Mehta 19‐Dec‐1952 66 years0months12 days
66‐70 Father M 200000Noida Office
303 01‐Jan‐19 31‐Dec‐19 50778 E4 Kavita SinghAddl. Chief Engineer(Elec.)
Anushka Singh 05‐Oct‐2009 9 years2months26 days
0‐18 Daughter F 200000Noida Office
304 01‐Jan‐19 31‐Dec‐19 50778 E4 Kavita SinghAddl. Chief Engineer(Elec.)
Shreya Singh 14‐Jun‐2013 5 years6months17 days
0‐18 Daughter F 200000Noida Office
305 01‐Jan‐19 31‐Dec‐19 50778 E4 Kavita SinghAddl. Chief Engineer(Elec.)
Saroj Devi 09‐May‐1957 61 years7months22 days
61‐65 Mother F 200000Noida Office
306 01‐Jan‐19 31‐Dec‐19 50778 E4 Kavita SinghAddl. Chief Engineer(Elec.)
Aditya Narayan Singh
21‐Aug‐1946 72 years4months10 days
71‐75 Father M 200000Noida Office
307 01‐Jan‐19 31‐Dec‐19 50780 E4Kumar Anand Goyal
Manager (BD) Naman Goyal 16‐Mar‐2009 9 years9months15 days
0‐18 Son M 200000Noida Office
308 01‐Jan‐19 31‐Dec‐19 50780 E4Kumar Anand Goyal
Manager (BD) Saumya Goyal 22‐Mar‐2013 5 years9months9 days
0‐18 Daughter F 200000Noida Office
309 01‐Jan‐19 31‐Dec‐19 50780 E4Kumar Anand Goyal
Manager (BD) Harshita Goyal 03‐Jan‐1984 34 years11months28 days
31‐35 Spouse F 200000Noida Office
310 01‐Jan‐19 31‐Dec‐19 50780 E4Kumar Anand Goyal
Manager (BD) Pushpa Goyal 22647 56 years11months30 days
56‐60 Mother F 200000Noida Office
311 01‐Jan‐19 31‐Dec‐19 50780 E4Kumar Anand Goyal
Manager (BD) Om Prakash Goyal 20183 63 years8months27 days
61‐65 Father M 200000Noida Office
312 01‐Jan‐19 31‐Dec‐19 50781 E4 Rahul S BhisikarAddl. Chief Engineer (Process)
Trisha Bhisikar41293 5 years11months12
days0‐18 Daughter F 200000
Noida Office
313 01‐Jan‐19 31‐Dec‐19 50781 E4 Rahul S BhisikarAddl. Chief Engineer (Process)
Pinkee R Bhisikar 26‐Sep‐1985 33 years3months5 days
31‐35 Spouse F 200000Noida Office
314 01‐Jan‐19 31‐Dec‐19 50781 E4 Rahul S BhisikarAddl. Chief Engineer (Process)
Seema S Bhisikar 20‐Aug‐1955 63 years4months11 days
61‐65 Mother F 200000Noida Office
315 01‐Jan‐19 31‐Dec‐19 50781 E4 Rahul S BhisikarAddl. Chief Engineer (Process)
Suresh M Bhisikar 17‐Apr‐1947 71 years8months14 days
71‐75 Father M 200000Noida Office
316 01‐Jan‐19 31‐Dec‐19 50783 E4 Swai Asaf AliADDL. CHIEF ENGINEER (INSP.)
Farhan Asaf Ali 18‐Aug‐2009 9 years4months13 days
0‐18 Son M 200000Mumbai INS & NDT
317 01‐Jan‐19 31‐Dec‐19 50783 E4 Swai Asaf AliADDL. CHIEF ENGINEER (INSP.)
Nikhat Asaf Ali 18‐May‐2006 12 years7months13 days
0‐18 Daughter F 200000Mumbai INS & NDT
318 01‐Jan‐19 31‐Dec‐19 50783 E4 Swai Asaf AliADDL. CHIEF ENGINEER (INSP.)
Abida Bano 15‐Jan‐1986 32 years11months16 days
31‐35 Spouse F 200000Mumbai INS & NDT
319 01‐Jan‐19 31‐Dec‐19 50783 E4 Swai Asaf AliADDL. CHIEF ENGINEER (INSP.)
Mohurabibegum 14‐Apr‐1959 59 years8months17 days
56‐60 Mother F 200000Mumbai INS & NDT
Page 11 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
320 01‐Jan‐19 31‐Dec‐19 50784 E4 Rajeev Kumar Addl.CE(INSP) Akshara 03‐Mar‐2010 8 years9months28 days
0‐18 Daughter F 200000Mumbai INS & NDT
321 01‐Jan‐19 31‐Dec‐19 50784 E4 Rajeev Kumar Addl.CE(INSP) Kundan 13‐Oct‐2012 6 years2months18 days
0‐18 Son M 200000Mumbai INS & NDT
322 01‐Jan‐19 31‐Dec‐19 50784 E4 Rajeev Kumar Addl.CE(INSP) Archana 24‐Sep‐1980 38 years3months7 days
36‐40 Spouse F 200000Mumbai INS & NDT
323 01‐Jan‐19 31‐Dec‐19 50784 E4 Rajeev Kumar Addl.CE(INSP) Murli Devi 05‐Jun‐1955 63 years6months26 days
61‐65 Mother F 200000Mumbai INS & NDT
324 01‐Jan‐19 31‐Dec‐19 50784 E4 Rajeev Kumar Addl.CE(INSP) M Prasad 01‐Oct‐1949 69 years2months30 days
66‐70 Father M 200000Mumbai INS & NDT
325 01‐Jan‐19 31‐Dec‐19 50786 E4 Namita SaikiaAddl. Chief Engineer (Mechanical)
Trinabh Singh 01‐Aug‐2012 6 years4months30 days
0‐18 Son M 200000Noida Office
326 01‐Jan‐19 31‐Dec‐19 50786 E4 Namita SaikiaAddl. Chief Engineer (Mechanical)
Jyoti Saikia 01‐Jan‐1954 64 years11months30 days
61‐65 Mother F 200000Noida Office
327 01‐Jan‐19 31‐Dec‐19 50786 E4 Namita SaikiaAddl. Chief Engineer (Mechanical)
Puna Saikia 16‐Dec‐1949 69 years0months15 days
66‐70 Father M 200000Noida Office
328 01‐Jan‐19 31‐Dec‐19 50789 E5 Nadeem QureshiChief Engineer(Instrumentation
Maira Afreen 30‐Jan‐2009 9 years11months1 days
0‐18 Daughter F 200000Noida Office
329 01‐Jan‐19 31‐Dec‐19 50789 E5 Nadeem QureshiChief Engineer(Instrumentation
Raiyan 27‐Dec‐2004 14 years0months4 days
0‐18 Son M 200000Noida Office
330 01‐Jan‐19 31‐Dec‐19 50789 E5 Nadeem QureshiChief Engineer(Instrumentation
Balquees Akhter 01‐Jan‐1957 61 years11months30 days
61‐65 Mother F 200000Noida Office
331 01‐Jan‐19 31‐Dec‐19 50789 E5 Nadeem QureshiChief Engineer(Instrumentation
M Ishaq 15‐Jan‐1944 74 years11months16 days
71‐75 Father M 200000Noida Office
332 01‐Jan‐19 31‐Dec‐19 50791 E4Sanjiv Kumar Mishra
Addl.CE (Mechanical) Kaushtubh Mishra 14‐Sep‐2009 9 years3months17 days
0‐18 Son M 200000Noida Office
333 01‐Jan‐19 31‐Dec‐19 50791 E4Sanjiv Kumar Mishra
Addl.CE (Mechanical) Supriya Mishra 01‐Mar‐1983 35 years9months30 days
31‐35 Spouse F 200000Noida Office
334 01‐Jan‐19 31‐Dec‐19 50791 E4Sanjiv Kumar Mishra
Addl.CE (Mechanical) Kishore Devi 01‐Sep‐1940 78 years3months30 days
76‐80 Mother F 200000Noida Office
335 01‐Jan‐19 31‐Dec‐19 50791 E4Sanjiv Kumar Mishra
Addl.CE (Mechanical) V B Mishra 01‐Aug‐1933 85 years4months30 days
Above 80 Father M 200000Noida Office
336 01‐Jan‐19 31‐Dec‐19 50797 E4 Rajeev MishraAddl. Chief Engineer(Mechanical)
Shambhavi Mishra 07‐May‐1984 34 years7months24 days
31‐35 Spouse F 200000Noida Office
337 01‐Jan‐19 31‐Dec‐19 50797 E4 Rajeev MishraAddl. Chief Engineer(Mechanical)
Nirmala Mishra 12‐Nov‐1960 58 years1months19 days
56‐60 Mother F 200000Noida Office
338 01‐Jan‐19 31‐Dec‐19 50797 E4 Rajeev MishraAddl. Chief Engineer(Mechanical)
Rajesh Kant Mishra 06‐Aug‐1957 61 years4months25 days
61‐65 Father M 200000Noida Office
339 01‐Jan‐19 31‐Dec‐19 50798 E3Bikash Bhanu Adhikari
DY. CHIEF ENGINEER(INSP.)
Arpita Adhikari 13‐Jun‐2012 6 years6months18 days
0‐18 Daughter F 200000Noida INS &
NDT
340 01‐Jan‐19 31‐Dec‐19 50798 E3Bikash Bhanu Adhikari
DY. CHIEF ENGINEER(INSP.)
Mrinmayee Adhikari 27‐Dec‐1986 32 years0months4 days
31‐35 Spouse F 200000Noida INS &
NDT
341 01‐Jan‐19 31‐Dec‐19 50798 E3Bikash Bhanu Adhikari
DY. CHIEF ENGINEER(INSP.)
Kabita Adhikari 28‐Feb‐1958 60 years10months3 days
56‐60 Mother F 200000Noida INS &
NDT
342 01‐Jan‐19 31‐Dec‐19 50798 E3Bikash Bhanu Adhikari
DY. CHIEF ENGINEER(INSP.)
Bhuban Chandra Adhikari
19152 66 years6months24 days
66‐70 Father M 200000Noida INS &
NDT
343 01‐Jan‐19 31‐Dec‐19 50799 E4Amit Kumar Gupta
ADDL. CHIEF ENGINEER (MECH.)
MUGDHA GUPTA 06‐Aug‐2013 5 years4months25 days
0‐18 Daughter F 200000Noida Office
344 01‐Jan‐19 31‐Dec‐1950799
E4 Amit Kumar GuptaADDL. CHIEF ENGINEER (MECH.)
NIYATI GUPTA42982 1 years3months27
days0‐18 Daughter F 200000
Noida Office
345 01‐Jan‐19 31‐Dec‐19 50799 E4Amit Kumar Gupta
ADDL. CHIEF ENGINEER (MECH.)
Vartika Gupta 31‐Dec‐1981 37 years0months0 days
36‐40 Spouse F 200000Noida Office
346 01‐Jan‐19 31‐Dec‐19 50799 E4Amit Kumar Gupta
ADDL. CHIEF ENGINEER (MECH.)
Sushma Gupta 17338 71 years6months11 days
71‐75 Mother F 200000Noida Office
347 01‐Jan‐19 31‐Dec‐19 50801 E4 Abhijit MahataAddl. Chief Engineer (Mech.)
Hrridaan N Mahata 42233 3 years4months14 days
0‐18 Son M 200000Noida Office
348 01‐Jan‐19 31‐Dec‐19 50801 E4 Abhijit MahataAddl. Chief Engineer (Mech.)
Satabdi Mahata 19‐Dec‐1986 32 years0months12 days
31‐35 Spouse F 200000Noida Office
Page 12 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
349 01‐Jan‐19 31‐Dec‐19 50801 E4 Abhijit MahataAddl. Chief Engineer (Mech.)
Sova Rani Mahata 18‐Sep‐1956 62 years3months13 days
61‐65 Mother F 200000Noida Office
350 01‐Jan‐19 31‐Dec‐19 50801 E4 Abhijit MahataAddl. Chief Engineer (Mech.)
Sitaram Mahata 03‐Oct‐1946 72 years2months28 days
71‐75 Father M 200000Noida Office
351 01‐Jan‐19 31‐Dec‐19 50804 E3 Sushil KumarDy. Chief Engineer (Insp.)
B/o Prity Singh 01‐Feb‐2017 1 years10months30 days
0‐18 Daughter F 200000Mumbai INS & NDT
352 01‐Jan‐19 31‐Dec‐19 50804 E3 Sushil KumarDy. Chief Engineer (Insp.)
Priti Singh 01‐Jan‐1989 29 years11months30 days
26‐30 Spouse F 200000Mumbai INS & NDT
353 01‐Jan‐19 31‐Dec‐19 50804 E3 Sushil KumarDy. Chief Engineer (Insp.)
Chand Kaur 01‐Jun‐1949 69 years6months30 days
66‐70 Mother F 200000Mumbai INS & NDT
354 01‐Jan‐19 31‐Dec‐19 50804 E3 Sushil KumarDy. Chief Engineer (Insp.)
Chander Bhan 02‐Nov‐1945 73 years1months29 days
71‐75 Father M 200000Mumbai INS & NDT
355 01‐Jan‐19 31‐Dec‐19 50805 E4Ashok Kumar Malik
Addl. Chief Engineer(INSP.)
M Abani Kriti 41848 4 years5months3 days
0‐18 Daughter F 200000Noida INS &
NDT
356 01‐Jan‐19 31‐Dec‐19 50805 E4Ashok Kumar Malik
Addl. Chief Engineer(INSP.)
Bandita Malik 05‐Jul‐1989 29 years5months26 days
26‐30 Spouse F 200000Noida INS &
NDT
357 01‐Jan‐19 31‐Dec‐19 50805 E4Ashok Kumar Malik
Addl. Chief Engineer(INSP.)
Rama Malik 02‐Jan‐1968 50 years11months29 days
46‐50 Mother F 200000Noida INS &
NDT
358 01‐Jan‐19 31‐Dec‐19 50805 E4Ashok Kumar Malik
Addl. Chief Engineer(INSP.)
Srihari Malik 24‐Mar‐1950 68 years9months7 days
66‐70 Father M 200000Noida INS &
NDT
359 01‐Jan‐19 31‐Dec‐19 50812 E4 Hemendra SainiAddl. Chief Engineer(Instt.)
Prajval 30‐May‐2012 6 years7months1 days
0‐18 Son M 200000Noida Office
360 01‐Jan‐19 31‐Dec‐19 50812 E4 Hemendra SainiAddl. Chief Engineer(Instt.)
Priyanka 30‐Oct‐1989 29 years2months1 days
26‐30 Spouse F 200000Noida Office
361 01‐Jan‐19 31‐Dec‐19 50812 E4 Hemendra SainiAddl. Chief Engineer(Instt.)
SHAKUNTLA24874 50 years10months25
days46‐50
MotherF 200000
Noida Office
362 01‐Jan‐19 31‐Dec‐19 50812 E4 Hemendra SainiAddl. Chief Engineer(Instt.)
DHARAMPAL SINGH21188 60 years11months28
days56‐60
FATHERM 200000
Noida Office
363 01‐Jan‐19 31‐Dec‐19 50814 E4Jitendra Kumar Singh
Addl. Chief Engineer Ishaan Singh 25‐Apr‐2010 8 years8months6 days
0‐18 Son M 200000Noida Office
364 01‐Jan‐19 31‐Dec‐19 50814 E4Jitendra Kumar Singh
Addl. Chief EngineerBaby Of Ranjana Singh
42556 2 years5months26 days
0‐18 Son M 200000Noida Office
365 01‐Jan‐19 31‐Dec‐19 50814 E4Jitendra Kumar Singh
Addl. Chief Engineer Ranjana Singh 18‐May‐1971 47 years7months13 days
46‐50 Spouse F 200000Noida Office
366 01‐Jan‐19 31‐Dec‐19 50814 E4Jitendra Kumar Singh
Addl. Chief Engineer Nirmala Devi 10‐Apr‐1953 65 years8months21 days
61‐65 Mother F 200000Noida Office
367 01‐Jan‐19 31‐Dec‐19 50814 E4Jitendra Kumar Singh
Addl. Chief Engineer Hub Lal Singh 08‐Jan‐1950 68 years11months23 days
66‐70 Father M 200000Noida Office
368 01‐Jan‐19 31‐Dec‐19 50816 E4Yogendra Kumar Bhargava
Addl. Chief Engineer (PM)
Neelam 18‐Apr‐1984 34 years8months13 days
31‐35 Spouse F 200000Noida Office
369 01‐Jan‐19 31‐Dec‐19 50816 E4Yogendra Kumar Bhargava
Addl. Chief Engineer (PM)
Chimman Lal 16998
72 years5months16 days
71‐75 Father M 200000Noida Office
370 01‐Jan‐19 31‐Dec‐19 50816 E4Yogendra Kumar Bhargava
Addl. Chief Engineer (PM)
Maya Devi 20000
64 years2months28 days
61‐65 Mother F 200000Noida Office
371 01‐Jan‐19 31‐Dec‐19 50817 E4 Santosh AnandAddl. Chief Engineer (Civil)
Snehal Anand 10‐Jan‐2011 7 years11months21 days
0‐18 Daughter F 200000Noida Office
372 01‐Jan‐19 31‐Dec‐19 50817 E4 Santosh AnandAddl. Chief Engineer (Civil)
Shreya Anand 21‐Jul‐2008 10 years5months10 days
0‐18 Daughter F 200000Noida Office
373 01‐Jan‐19 31‐Dec‐19 50817 E4 Santosh AnandAddl. Chief Engineer (Civil)
Geeta Anand 30‐Dec‐1983 35 years0months1 days
31‐35 Spouse F 200000Noida Office
374 01‐Jan‐19 31‐Dec‐19 50817 E4 Santosh AnandAddl. Chief Engineer (Civil)
Phulkeshwari Devi 19481 65 years7months29 days
61‐65 Mother F 200000Noida Office
375 01‐Jan‐19 31‐Dec‐19 50817 E4 Santosh AnandAddl. Chief Engineer (Civil)
Surendra Nath Das 18300 68 years10months25 days
66‐70 Father M 200000Noida Office
376 01‐Jan‐19 31‐Dec‐19 50818 E4Rawindra Nath Satyarthy
Addl. Chief Engineer (Civil)
Bo Anjali Satyarthy 42122 3 years8months3 days
0‐18 Son M 200000Noida Office
377 01‐Jan‐19 31‐Dec‐19 50818 E4Rawindra Nath Satyarthy
Addl. Chief Engineer (Civil)
Anjali Satyarthy 09‐Aug‐1985 33 years4months22 days
31‐35 Spouse F 200000Noida Office
Page 13 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
378 01‐Jan‐19 31‐Dec‐19 50818 E4Rawindra Nath Satyarthy
Addl. Chief Engineer (Civil)
Manti Devi 06‐Oct‐1962 56 years2months25 days
56‐60 Mother F 200000Noida Office
379 01‐Jan‐19 31‐Dec‐19 50818 E4Rawindra Nath Satyarthy
Addl. Chief Engineer (Civil)
Fakira Paswan 25‐May‐1955 63 years7months6 days
61‐65 Father M 200000Noida Office
380 01‐Jan‐19 31‐Dec‐19 50819 E4 Bipin Bihari Das ADDL. CH.ENGR(INSP.) Indu Das 08‐Sep‐1988 30 years3months23 days
26‐30 Spouse F 200000Kolkota INS & NDT
381 01‐Jan‐19 31‐Dec‐19 50819 E4 Bipin Bihari Das ADDL. CH.ENGR(INSP.) Bilasi Devi 19‐May‐1959 59 years7months12 days
56‐60 Mother F 200000Kolkota INS & NDT
382 01‐Jan‐19 31‐Dec‐19 50819 E4 Bipin Bihari Das ADDL. CH.ENGR(INSP.) Sanatan Das 26‐Aug‐1953 65 years4months5 days
61‐65 Father M 200000Kolkota INS & NDT
383 01‐Jan‐19 31‐Dec‐19 50820 E4 Rakesh KumarAddl. Chief Engineer (Mechanical)
Pramila Devi 19497 65 years7months13 days
61‐65 Mother F 200000Noida Office
384 01‐Jan‐19 31‐Dec‐19 50820 E4 Rakesh KumarAddl. Chief Engineer (Mechanical)
Ram Nandan Singh 17671 70 years7months13 days
66‐70 Father M 200000Noida Office
385 01‐Jan‐19 31‐Dec‐19 50822 E4Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
Saumyaa Singh 12‐Dec‐2013 5 years0months19 days
0‐18 Daughter F 200000Noida Office
386 01‐Jan‐19 31‐Dec‐19 50822 E4Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
Atharv Singh 43371 0 years3months3 days
0‐18 Son M 200000Noida Office
387 01‐Jan‐19 31‐Dec‐19 50822 E4Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
Shashikala Kumari 18‐Aug‐1979 39 years4months13 days
36‐40 Spouse F 200000Noida Office
388 01‐Jan‐19 31‐Dec‐19 50822 E4Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
Maya Singh 21689 59 years7months12 days
56‐60 Mother F 200000Noida Office
389 01‐Jan‐19 31‐Dec‐19 50822 E4Ajay Kumar Singh Ruhel
Addl. Chief Engineer (Mechanical)
Onkar Singh 20244 63 years6months27 days
61‐65 Father M 200000Noida Office
390 01‐Jan‐19 31‐Dec‐19 50823 E2 Inder MohanASSISTANT CHIEF ENGINEER (MECHANICAL)
Devansh 13‐Mar‐2013 5 years9months18 days
0‐18 Son M 200000Noida Office
391 01‐Jan‐19 31‐Dec‐19 50823 E2 Inder MohanASSISTANT CHIEF ENGINEER (MECHANICAL)
Kamini 07‐Feb‐1986 32 years10months24 days
31‐35 Spouse F 200000Noida Office
392 01‐Jan‐19 31‐Dec‐19 50823 E2 Inder MohanASSISTANT CHIEF ENGINEER (MECHANICAL)
Bhagwan Devi 01‐Jan‐1965 53 years11months30 days
51‐55 Mother F 200000Noida Office
393 01‐Jan‐19 31‐Dec‐19 50823 E2 Inder MohanASSISTANT CHIEF ENGINEER (MECHANICAL)
Hiralal 01‐Jan‐1946 72 years11months30 days
71‐75 Father M 200000Noida Office
394 01‐Jan‐19 31‐Dec‐19 50824 E0 Jai Raman DESIGNER(INST.) Aarav 42370 2 years11months30 days
0‐18 Son M 200000Noida Office
395 01‐Jan‐19 31‐Dec‐19 50824 E0 Jai Raman DESIGNER(INST.) Shweta Rani 30154 36 years5months9 days
36‐40 Spouse F 200000Noida Office
396 01‐Jan‐19 31‐Dec‐19 50824 E0 Jai Raman DESIGNER(INST.) Darshna Rani 04‐Apr‐1958 60 years8months27 days
56‐60 Mother F 200000Noida Office
397 01‐Jan‐19 31‐Dec‐19 50824 E0 Jai Raman DESIGNER(INST.) Chhaju Ram 11‐Oct‐1956 62 years2months20 days
61‐65 Father M 200000Noida Office
398 01‐Jan‐19 31‐Dec‐19 50830 E4Dharmdeo Ravidas
Addl. Chief Engineer (Mechanical)
Rishika Deo 42387 2 years11months13 days
0‐18 Daughter F 200000Noida Office
399 01‐Jan‐19 31‐Dec‐19 50831 E4 Anish KumarAddl. Chief Engineer (Mechanical)
Nilam Bhagat 01‐Jan‐1957 61 years11months30 days
61‐65 Mother F 200000Noida Office
400 01‐Jan‐19 31‐Dec‐19 50831 E4 Anish KumarAddl. Chief Engineer (Mechanical)
Sri Arun Kumar Bhagat
18‐Feb‐1951 67 years10months13 days
66‐70 Father M 200000Noida Office
401 01‐Jan‐19 31‐Dec‐19 50834 E4 Amit KumarADDL.CHIEF ENGINEER(PM)
Amol Kumar 10‐Dec‐2012 6 years0months21 days
0‐18 Son M 200000Noida Office
402 01‐Jan‐19 31‐Dec‐19 50834 E4 Amit KumarADDL.CHIEF ENGINEER(PM)
Minu Kumari 20‐Oct‐1987 31 years2months11 days
31‐35 Spouse F 200000Noida Office
403 01‐Jan‐19 31‐Dec‐19 50834 E4 Amit KumarADDL.CHIEF ENGINEER(PM)
Sushila Devi 17958 69 years9months30 days
66‐70 Mother F 200000Noida Office
404 01‐Jan‐19 31‐Dec‐19 50835 E4 Hitesh Pundir Addl. CE(PM) Shatakashi Pundir 11‐Nov‐2012 6 years1months20 days
0‐18 Daughter F 200000Noida Office
405 01‐Jan‐19 31‐Dec‐19 50835 E4 Hitesh Pundir Addl. CE(PM) Parul Pundir 02‐Nov‐1986 32 years1months29 days
31‐35 Spouse F 200000Noida Office
406 01‐Jan‐19 31‐Dec‐19 50836 E4 Abhishek SharmaAddl. Chief Engineer (Mechanical)
Poorvi Sharma 07‐Oct‐2010 8 years2months24 days
0‐18 Daughter F 200000Noida Office
Page 14 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
407 01‐Jan‐19 31‐Dec‐19 50836 E4 Abhishek SharmaAddl. Chief Engineer (Mechanical)
Tanush Sharma 41881 4 years4months1 days
0‐18 Son M 200000Noida Office
408 01‐Jan‐19 31‐Dec‐19 50836 E4 Abhishek SharmaAddl. Chief Engineer (Mechanical)
Krishna Sharma 01‐Jun‐1984 34 years6months30 days
31‐35 Spouse F 200000Noida Office
409 01‐Jan‐19 31‐Dec‐19 50836 E4 Abhishek SharmaAddl. Chief Engineer (Mechanical)
Rajni Sharma 01‐Jan‐1957 61 years11months30 days
61‐65 Mother F 200000Noida Office
410 01‐Jan‐19 31‐Dec‐19 50839 E4 Brajesh KumarAddl. Chief Engineer (Mechanical)
Yashita 19‐Oct‐2012 6 years2months12 days
0‐18 Daughter F 200000Noida Office
411 01‐Jan‐19 31‐Dec‐19 50839 E4 Brajesh KumarAddl. Chief Engineer (Mechanical)
NIHAN RAI43304 0 years5months8
days0‐18 Son M 200000
Noida Office
412 01‐Jan‐19 31‐Dec‐19 50839 E4 Brajesh KumarAddl. Chief Engineer (Mechanical)
Premlata Yadav 03‐Nov‐1983 35 years1months28 days
31‐35 Spouse F 200000Noida Office
413 01‐Jan‐19 31‐Dec‐19 50839 E4 Brajesh KumarAddl. Chief Engineer (Mechanical)
Rajdei Devi 15‐Jan‐1950 68 years11months16 days
66‐70 Mother F 200000Noida Office
414 01‐Jan‐19 31‐Dec‐19 50839 E4 Brajesh KumarAddl. Chief Engineer (Mechanical)
Jagannath Prasad 11‐Aug‐1946 72 years4months20 days
71‐75 Father M 200000Noida Office
415 01‐Jan‐19 31‐Dec‐19 50842 E4Manas Kumar Senapati
Manager (MM) Krisha Senapati 42535 2 years6months17 days
0‐18 Daughter F 200000Noida Office
416 01‐Jan‐19 31‐Dec‐19 50842 E4Manas Kumar Senapati
Manager (MM) Rashmi Mala Danaik 02‐Mar‐1991 27 years9months29 days
26‐30 Spouse F 200000Noida Office
417 01‐Jan‐19 31‐Dec‐19 50842 E4Manas Kumar Senapati
Manager (MM) Palanga Dei 18720 67 years8months29 days
66‐70 Mother F 200000Noida Office
418 01‐Jan‐19 31‐Dec‐19 50844 E4Anantshree Pandey
Addl. Chief Engineer (Electrical)
Shashwat Pandey 41537 5 years3months11 days
0‐18 Son M 200000Noida Office
419 01‐Jan‐19 31‐Dec‐19 50844 E4Anantshree Pandey
Addl. Chief Engineer (Electrical)
Pradipta 11‐Dec‐1983 35 years0months20 days
31‐35 Spouse F 200000Noida Office
420 01‐Jan‐19 31‐Dec‐19 50846 E4Dheerendra Kumar Verma
Addl. Chief Engineer (Insp.)
Kohina 25‐Feb‐2010 8 years10months6 days
0‐18 Daughter F 200000Noida INS &
NDT
421 01‐Jan‐19 31‐Dec‐19 50846 E4Dheerendra Kumar Verma
Addl. Chief Engineer (Insp.)
Chiraag 41729 4 years9months0 days
0‐18 Son M 200000Noida INS &
NDT
422 01‐Jan‐19 31‐Dec‐19 50846 E4Dheerendra Kumar Verma
Addl. Chief Engineer (Insp.)
Neetu 01‐Jan‐1986 32 years11months30 days
31‐35 Spouse F 200000Noida INS &
NDT
423 01‐Jan‐19 31‐Dec‐19 50851 E3 Kailash RawatDy. Chief Engineer (Insp. & NDT)
Rishab Rawat 41360 5 years9months4 days
0‐18 Son M 200000Kolkota INS & NDT
424 01‐Jan‐19 31‐Dec‐19 50851 E3 Kailash RawatDy. Chief Engineer (Insp. & NDT)
Babita Rawat 11‐Nov‐1987 31 years1months20 days
31‐35 Spouse F 200000Kolkota INS & NDT
425 01‐Jan‐19 31‐Dec‐19 50851 E3 Kailash RawatDy. Chief Engineer (Insp. & NDT)
Rachit Rawat 43249
0 years7months2 days
0‐18 Son M 200000Kolkota INS & NDT
426 01‐Jan‐19 31‐Dec‐19 50852 E4Raghvendra Kumar Tiwari
ADDL. CHIEF ENGINEER (MECHANICAL)
Adrisha Tiwari 42029 3 years11months6 days
0‐18 Daughter F 200000Noida Office
427 01‐Jan‐19 31‐Dec‐19 50852 E4Raghvendra Kumar Tiwari
ADDL. CHIEF ENGINEER (MECHANICAL)
AADVIK TIWATI 42960 1 years4months18 days
0‐18 Son M 200000Noida Office
428 01‐Jan‐19 31‐Dec‐19 50852 E4Raghvendra Kumar Tiwari
ADDL. CHIEF ENGINEER (MECHANICAL)
Ekta Tiwari 09‐Dec‐1985 33 years0months22 days
31‐35 Spouse F 200000Noida Office
429 01‐Jan‐19 31‐Dec‐19 50852 E4Raghvendra Kumar Tiwari
ADDL. CHIEF ENGINEER (MECHANICAL)
Meena Tiwari 24335 52 years4months15 days
51‐55 Mother F 200000Noida Office
430 01‐Jan‐19 31‐Dec‐19 50855 E2 Sushil KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Tejas 09‐Sep‐2011 7 years3months22 days
0‐18 Son M 200000Noida Office
431 01‐Jan‐19 31‐Dec‐19 50855 E2 Sushil KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Maneesha 01‐May‐1983 35 years7months30 days
31‐35 Spouse F 200000Noida Office
432 01‐Jan‐19 31‐Dec‐19 50855 E2 Sushil KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Rajkali 21310 60 years7months26 days
56‐60 Mother F 200000Noida Office
433 01‐Jan‐19 31‐Dec‐19 50855 E2 Sushil KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Jai Pal Singh 20149 63 years9months30 days
61‐65 Father M 200000Noida Office
434 01‐Jan‐19 31‐Dec‐19 50860 E4 Rupanshu JauhariAddl. Chief Engineer(Mechanical)
AVANI JAUHARI 21‐Jun‐2013 5 years6months10 days
0‐18 Daughter F 200000Noida Office
435 01‐Jan‐19 31‐Dec‐19 50860 E4 Rupanshu JauhariAddl. Chief Engineer(Mechanical)
Shubhi Raj 06‐Nov‐1985 33 years1months25 days
31‐35 Spouse F 200000Noida Office
Page 15 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
436 01‐Jan‐19 31‐Dec‐19 50860 E4 Rupanshu JauhariAddl. Chief Engineer(Mechanical)
Krishna Jauhari 11‐Mar‐1944 74 years9months20 days
71‐75 Mother F 200000Noida Office
437 01‐Jan‐19 31‐Dec‐19 50865 E3 JAY PRAKASH VERMDy. Chief Engineer(Comp.)
EKTA VERMA 32175 30 years10months29 days
26‐30 WIFE F 200000Noida Office
438 01‐Jan‐19 31‐Dec‐19 50866 E4 Vishal ShuklaAddl. Chief Engineer(Instt.)
Nehal Shukla 07‐Feb‐2012 6 years10months24 days
0‐18 Daughter F 200000Noida Office
439 01‐Jan‐19 31‐Dec‐19 50866 E4 Vishal ShuklaAddl. Chief Engineer(Instt.)
Vidisha Shukla 42261 3 years3months17 days
0‐18 Daughter F 200000Noida Office
440 01‐Jan‐19 31‐Dec‐19 50866 E4 Vishal ShuklaAddl. Chief Engineer(Instt.)
Shikha Shukla 25‐Aug‐1988 30 years4months6 days
26‐30 Spouse F 200000Noida Office
441 01‐Jan‐19 31‐Dec‐19 50866 E4 Vishal ShuklaAddl. Chief Engineer(Instt.)
Nirmala Shukla 07‐Jan‐1952 66 years11months24 days
66‐70 Mother F 200000Noida Office
442 01‐Jan‐19 31‐Dec‐19 50867 E5Rajeev Ranjan Kumar
Chief Engg(Mechanical)
Kashvi 42591 2 years4months22 days
0‐18 Daughter F 200000Noida Office
443 01‐Jan‐19 31‐Dec‐19 50867 E5Rajeev Ranjan Kumar
Chief Engg(Mechanical)
Samridh Chaudhary 05‐Sep‐2006 12 years3months26 days
0‐18 Son M 200000Noida Office
444 01‐Jan‐19 31‐Dec‐19 50867 E5Rajeev Ranjan Kumar
Chief Engg(Mechanical)
Premlata Sinha 10‐Mar‐1978 40 years9months21 days
36‐40 Spouse F 200000Noida Office
445 01‐Jan‐19 31‐Dec‐19 50867 E5Rajeev Ranjan Kumar
Chief Engg(Mechanical)
Savitri Devi 15‐Feb‐1941 77 years10months16 days
76‐80 Mother F 200000Noida Office
446 01‐Jan‐19 31‐Dec‐19 50867 E5Rajeev Ranjan Kumar
Chief Engg(Mechanical)
Ram Lakhan Prasad 23‐Nov‐1937 81 years1months8 days
Above 80 Father M 200000Noida Office
447 01‐Jan‐19 31‐Dec‐19 50870 E5Dilip Kumar Chaturvedi
CHIEF ENGINEER (MECH.)
Akshat 20‐Mar‐2011 7 years9months11 days
0‐18 Son M 200000Noida Office
448 01‐Jan‐19 31‐Dec‐19 50870 E5Dilip Kumar Chaturvedi
CHIEF ENGINEER (MECH.)
Sarthak Chaturvedi 31‐Jan‐2007 11 years11months0 days
0‐18 Son M 200000Noida Office
449 01‐Jan‐19 31‐Dec‐19 50870 E5Dilip Kumar Chaturvedi
CHIEF ENGINEER (MECH.)
Renu Chaturvedi 15‐Jul‐1982 36 years5months16 days
36‐40 Spouse F 200000Noida Office
450 01‐Jan‐19 31‐Dec‐19 50870 E5Dilip Kumar Chaturvedi
CHIEF ENGINEER (MECH.)
Ramlali Devi 14‐Jan‐1952 66 years11months17 days
66‐70 Mother F 200000Noida Office
451 01‐Jan‐19 31‐Dec‐19 50871 E4 Rabindra BeheraADDL. CHIEF ENGINEER (INSP.)
Samikhya 29‐Aug‐2012 6 years4months2 days
0‐18 Daughter F 200000Baroda INS & NDT
452 01‐Jan‐19 31‐Dec‐19 50871 E4 Rabindra BeheraADDL. CHIEF ENGINEER (INSP.)
Ipsita Behra 24‐Jul‐1983 35 years5months7 days
31‐35 Spouse F 200000Baroda INS & NDT
453 01‐Jan‐19 31‐Dec‐19 50871 E4 Rabindra BeheraADDL. CHIEF ENGINEER (INSP.)
Pasil Behra 17‐Mar‐1947 71 years9months14 days
71‐75 Mother F 200000Baroda INS & NDT
454 01‐Jan‐19 31‐Dec‐19 50871 E4 Rabindra BeheraADDL. CHIEF ENGINEER (INSP.)
Kartik Behra 20‐Jun‐1940 78 years6months11 days
76‐80 Father M 200000Baroda INS & NDT
455 01‐Jan‐19 31‐Dec‐19 50873 E4 Darshan Kumar MANAGER(P & A) Shona Panchal 24‐Feb‐2008 10 years10months7 days
0‐18 Daughter F 200000Noida Office
456 01‐Jan‐19 31‐Dec‐19 50873 E4 Darshan Kumar MANAGER(P & A) Neetu Panchal 11‐Jan‐1982 36 years11months20 days
36‐40 Spouse F 200000Noida Office
457 01‐Jan‐19 31‐Dec‐19 50873 E4 Darshan Kumar MANAGER(P & A) Mahendri Devi 20434 63 years0months20 days
61‐65 Mother F 200000Noida Office
458 01‐Jan‐19 31‐Dec‐19 50875 E7Shankarlal Samadani
AGM (FINANCE ‐ CORPORATE)
Madhu Samadani 24‐Apr‐1970 48 years8months7 days
46‐50 Spouse F 200000Noida Office
459 01‐Jan‐19 31‐Dec‐19 50875 E7Shankarlal Samadani
AGM (FINANCE ‐ CORPORATE)
Sita Devi 01‐Jan‐1943 75 years11months30 days
71‐75 Mother F 200000Noida Office
460 01‐Jan‐19 31‐Dec‐19 50876 E6Bishwamitra Singh
Dy. GM(finance) Soumya Bhagwat 15‐Sep‐2004 14 years3months16 days
0‐18 Daughter F 200000Noida Office
461 01‐Jan‐19 31‐Dec‐19 50876 E6Bishwamitra Singh
Dy. GM(finance) Vaibhav Kumar 22‐Feb‐2008 10 years10months9 days
0‐18 Son M 200000Noida Office
462 01‐Jan‐19 31‐Dec‐19 50876 E6Bishwamitra Singh
Dy. GM(finance) Lakshmi Singh 05‐Jan‐1981 37 years11months26 days
36‐40 Spouse F 200000Noida Office
463 01‐Jan‐19 31‐Dec‐19 50876 E6Bishwamitra Singh
Dy. GM(finance) Kamla Devi 01‐Jan‐1930 88 years11months30 days
Above 80 Mother F 200000Noida Office
464 01‐Jan‐19 31‐Dec‐19 50883 E4Digvijay Kumar Verma
ADDL. CHIEF ENGINEER (PLANNING)
Archita Verma 24‐May‐2014 4 years7months7 days
0‐18 Daughter F 200000Noida Office
Page 16 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
465 01‐Jan‐19 31‐Dec‐19 50883 E4Digvijay Kumar Verma
ADDL. CHIEF ENGINEER (PLANNING)
Savita 10‐Mar‐1970 48 years9months21 days
46‐50 Spouse F 200000Noida Office
466 01‐Jan‐19 31‐Dec‐19 50886 E4Kulwinder Kaur Jhalli
ADDL. CHIEF ENGINEER(PLANNING)
Keerat Kaur Jhalli 31‐Jul‐2009 9 years5months0 days
0‐18 Daughter F 200000Noida Office
467 01‐Jan‐19 31‐Dec‐19 50886 E4Kulwinder Kaur Jhalli
ADDL. CHIEF ENGINEER(PLANNING)
Gurcyber Singh Jhalli 14‐Aug‐2005 13 years4months17 days
0‐18 Son M 200000Noida Office
468 01‐Jan‐19 31‐Dec‐19 50886 E4Kulwinder Kaur Jhalli
ADDL. CHIEF ENGINEER(PLANNING)
Tajinder Singh Jhalli 04‐Apr‐1944 74 years8months27 days
71‐75 Father M 200000Noida Office
469 01‐Jan‐19 31‐Dec‐19 50886 E4Kulwinder Kaur Jhalli
ADDL. CHIEF ENGINEER(PLANNING)
Manjeet Kaur Jhalli 10‐May‐1947 71 years7months21 days
71‐75 Mother F 200000Noida Office
470 01‐Jan‐19 31‐Dec‐19 50890 E4Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
Kashivi Bhati 22‐May‐2004 14 years7months9 days
0‐18 Daughter F 200000Noida INS &
NDT
471 01‐Jan‐19 31‐Dec‐19 50890 E4Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
Devansh Bhati 06‐Jan‐2006 12 years11months25 days
0‐18 Son M 200000Noida INS &
NDT
472 01‐Jan‐19 31‐Dec‐19 50890 E4Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
Jyoti Bhati 10‐Aug‐1986 32 years4months21 days
31‐35 Spouse F 200000Noida INS &
NDT
473 01‐Jan‐19 31‐Dec‐19 50890 E4Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
Vijay Singh Bhati 01‐Apr‐1954 64 years8months30 days
61‐65 Father M 200000Noida INS &
NDT
474 01‐Jan‐19 31‐Dec‐19 50890 E4Sandeep Singh Bhati
ADDL. CHIEF ENGINEER (INSPECTION)
Vidyavati 01‐Aug‐1956 62 years4months30 days
61‐65 Mother F 200000Noida INS &
NDT
475 01‐Jan‐19 31‐Dec‐19 50891 E2Sumit Chandra Samant
Asst Chief Engineer(Comp)
Mehaansh Samant 43078 1 years0months22 days
0‐18 Son M 200000Noida Office
476 01‐Jan‐19 31‐Dec‐19 50891 E2Sumit Chandra Samant
Asst Chief Engineer(Comp)
Shatabdi Chakraborty
32462 30 years1months16 days
26‐30 Spouse F 200000Noida Office
477 01‐Jan‐19 31‐Dec‐19 50891 E2Sumit Chandra Samant
Asst Chief Engineer(Comp)
Meenu Samant 20‐Aug‐1965 53 years4months11 days
51‐55 Mother F 200000Noida Office
478 01‐Jan‐19 31‐Dec‐19 50891 E2Sumit Chandra Samant
Asst Chief Engineer(Comp)
Kc Samant 14‐Apr‐1960 58 years8months17 days
56‐60 Father M 200000Noida Office
479 01‐Jan‐19 31‐Dec‐19 50892 E1 Gurnam SinghSr Engineer(Mechanical)
JAPMEET SINGH43270 0 years6months12
days0‐18 Son M 200000
Noida Office
480 01‐Jan‐19 31‐Dec‐19 50892 E1 Gurnam SinghSr Engineer(Mechanical)
Amandeep Kaur 32465 30 years1months13 days
26‐30 Spouse F 200000Noida Office
481 01‐Jan‐19 31‐Dec‐19 50892 E1 Gurnam SinghSr Engineer(Mechanical)
Surjit Kaur 01‐Nov‐1958 60 years1months30 days
56‐60 Mother F 200000Noida Office
482 01‐Jan‐19 31‐Dec‐19 50892 E1 Gurnam SinghSr Engineer(Mechanical)
Sukhdev Singh 01‐Jan‐1951 67 years11months30 days
66‐70 Father M 200000Noida Office
483 01‐Jan‐19 31‐Dec‐19 50893 E4Dilip Kumar Sahoo
Addl. Chief Engineer(Insp.)
Sanskriti Souravi Sahoo
25‐Oct‐2010 8 years2months6 days
0‐18 Daughter F 200000Kolkota INS & NDT
484 01‐Jan‐19 31‐Dec‐19 50893 E4Dilip Kumar Sahoo
Addl. Chief Engineer(Insp.)
Monalisha Sahoo 29‐Jul‐1987 31 years5months2 days
31‐35 Spouse F 200000Kolkota INS & NDT
485 01‐Jan‐19 31‐Dec‐19 50893 E4Dilip Kumar Sahoo
Addl. Chief Engineer(Insp.)
Siva Charan Sahoo 12‐Apr‐1954 64 years8months19 days
61‐65 Father M 200000Kolkota INS & NDT
486 01‐Jan‐19 31‐Dec‐19 50893 E4Dilip Kumar Sahoo
Addl. Chief Engineer(Insp.)
Susama Sahoo 20‐Oct‐1957 61 years2months11 days
61‐65 Mother F 200000Kolkota INS & NDT
487 01‐Jan‐19 31‐Dec‐19 50894 E4 Rajesh KumarAddl. Chief Engineer (Insp.)
Zaya Kumari 41642 4 years11months28 days
0‐18 Daughter F 200000Kolkota INS & NDT
488 01‐Jan‐19 31‐Dec‐19 50894 E4 Rajesh KumarAddl. Chief Engineer (Insp.)
Mamta Kumari 04‐Jan‐1987 31 years11months27 days
31‐35 Spouse F 200000Kolkota INS & NDT
489 01‐Jan‐19 31‐Dec‐19 50894 E4 Rajesh KumarAddl. Chief Engineer (Insp.)
Jageshwari Devi 05‐Jun‐1955 63 years6months26 days
61‐65 Mother F 200000Kolkota INS & NDT
490 01‐Jan‐19 31‐Dec‐19 50894 E4 Rajesh KumarAddl. Chief Engineer (Insp.)
Kailash Paswan 11‐Jul‐1950 68 years5months20 days
66‐70 Father M 200000Kolkota INS & NDT
491 01‐Jan‐19 31‐Dec‐19 50898 E2Arun Kumar Tomar
Asst Chief Engineer (Mechanical)
Ritu Tomar 15‐Oct‐1985 33 years2months16 days
31‐35 Spouse F 200000Noida Office
492 01‐Jan‐19 31‐Dec‐19 50899 E0 Yogendra Kumar Desinger (Mech).ISHANI
43072 1 years0months28 days
0‐18 Daughter F 200000Noida Office
493 01‐Jan‐19 31‐Dec‐19 50899 E0 Yogendra Kumar Desinger (Mech). Rajni 31334 33 years2months17 days
31‐35 Spouse F 200000Noida Office
Page 17 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
494 01‐Jan‐19 31‐Dec‐19 50899 E0 Yogendra Kumar Desinger (Mech). Munni Devi 08‐Feb‐1967 51 years10months23 days
51‐55 Mother F 200000Noida Office
495 01‐Jan‐19 31‐Dec‐19 50899 E0 Yogendra Kumar Desinger (Mech). Khachedu Singh 01‐Mar‐1961 57 years9months30 days
56‐60 Father M 200000Noida Office
496 01‐Jan‐19 31‐Dec‐19 50902 E3 Saumitra KishoreDy. Chief Engineer.(Elect.)
Saryu 42092 3 years9months2 days
0‐18 Daughter F 200000Noida Office
497 01‐Jan‐19 31‐Dec‐19 50902 E3 Saumitra KishoreDy. Chief Engineer.(Elect.)
Chandani 34339 24 years11months26 days
19‐25 Spouse F 200000Noida Office
498 01‐Jan‐19 31‐Dec‐19 50902 E3 Saumitra KishoreDy. Chief Engineer.(Elect.)
Manjula 25593 48 years11months6 days
46‐50 Mother F 200000Noida Office
499 01‐Jan‐19 31‐Dec‐19 50902 E3 Saumitra KishoreDy. Chief Engineer.(Elect.)
Raj Kishore Prasad 20091 63 years11months29 days
61‐65 Father M 200000Noida Office
500 01‐Jan‐19 31‐Dec‐19 50904 E3 Alok SiddhuDy. Chief Engineer(Mech.)
Meenu Chaudhary 06‐Aug‐1988 30 years4months25 days
26‐30 Spouse F 200000Noida Office
501 01‐Jan‐19 31‐Dec‐19 50905 E3 Shiv KumarDy. Chief Engineer (Insp.)
Mannat Gupta 11‐Aug‐2013 5 years4months20 days
0‐18 Daughter F 200000Noida INS &
NDT
502 01‐Jan‐19 31‐Dec‐19 50905 E3 Shiv KumarDy. Chief Engineer (Insp.)
Shaily Gupta 15‐Dec‐1983 35 years0months16 days
31‐35 Spouse F 200000Noida INS &
NDT
503 01‐Jan‐19 31‐Dec‐19 50905 E3 Shiv KumarDy. Chief Engineer (Insp.)
Rajoli 01‐Jan‐1968 50 years11months30 days
46‐50 Mother F 200000Noida INS &
NDT
504 01‐Jan‐19 31‐Dec‐19 50905 E3 Shiv KumarDy. Chief Engineer (Insp.)
Mamnnu Lal Gupta 04‐Feb‐1965 53 years10months27 days
51‐55 Father M 200000Noida INS &
NDT
505 01‐Jan‐19 31‐Dec‐19 50906 E3 Deepan KumarDy. Chief Engineer (Insp.)
Chandani Kumari 31533 32 years7months30 days
31‐35 Spouse F 200000Kolkota INS & NDT
506 01‐Jan‐19 31‐Dec‐19 50906 E3 Deepan KumarDy. Chief Engineer (Insp.)
Swarnlata Devi 21‐Oct‐1957 61 years2months10 days
61‐65 Mother F 200000Kolkota INS & NDT
507 01‐Jan‐19 31‐Dec‐19 50914 E3 Suneeta KumariDy. Chief Engineer(Process)
Jhalak 03‐Sep‐2012 6 years3months28 days
0‐18 Daughter F 200000Noida Office
508 01‐Jan‐19 31‐Dec‐19 50914 E3 Suneeta KumariDy. Chief Engineer(Process)
Ishwar Ch Dhungia 22‐Apr‐1979 39 years8months9 days
36‐40 Spouse M 200000Noida Office
509 01‐Jan‐19 31‐Dec‐19 50924 E3Sohit Kumar Khandelwal
Dy. Chief Engineer(Mech.)
Shubhan Khandelwal
41949 4 years1months25 days
0‐18 Son M 200000Noida Office
510 01‐Jan‐19 31‐Dec‐19 50924 E3Sohit Kumar Khandelwal
Dy. Chief Engineer(Mech.)
Shaifali Kishore 28‐Jun‐1986 32 years6months3 days
31‐35 Spouse F 200000Noida Office
511 01‐Jan‐19 31‐Dec‐19 50924 E3Sohit Kumar Khandelwal
Dy. Chief Engineer(Mech.)
Jyotsna Devi 06‐Nov‐1965 53 years1months25 days
51‐55 Mother F 200000Noida Office
512 01‐Jan‐19 31‐Dec‐19 50924 E3Sohit Kumar Khandelwal
Dy. Chief Engineer(Mech.)
Kanhaya Lal Khandelwal
10‐Aug‐1956 62 years4months21 days
61‐65 Father M 200000Noida Office
513 01‐Jan‐19 31‐Dec‐19 50925 E3 Devendra ShuklaDy. Chief Engineer(Mech.)
Pallavi Shukla 01‐Jun‐1991 27 years6months30 days
26‐30 Spouse F 200000Noida Office
514 01‐Jan‐19 31‐Dec‐19 50925 E3 Devendra ShuklaDy. Chief Engineer(Mech.)
Rajeshwari Shukla 22653 56 years11months24 days
56‐60 Mother F 200000Noida Office
515 01‐Jan‐19 31‐Dec‐19 50925 E3 Devendra ShuklaDy. Chief Engineer(Mech.)
Shiv Kant Shukla 21021 61 years5months11 days
61‐65 Father M 200000Noida Office
516 01‐Jan‐19 31‐Dec‐19 50926 E3Saiyad Avsaru Ul Haq Hasmi
DY.CHIEF ENGINEER(MECH.)
Alhamd Hashmi 09‐Dec‐2013 5 years0months22 days
0‐18 Son M 200000Noida Office
517 01‐Jan‐19 31‐Dec‐19 50926 E3Saiyad Avsaru Ul Haq Hasmi
DY.CHIEF ENGINEER(MECH.)
Tarannum Hasmi 08‐Aug‐1985 33 years4months23 days
31‐35 Spouse F 200000Noida Office
518 01‐Jan‐19 31‐Dec‐19 50926 E3Saiyad Avsaru Ul Haq Hasmi
DY.CHIEF ENGINEER(MECH.)
Naznee Bagum 01‐Jan‐1962 56 years11months30 days
56‐60 Mother F 200000Noida Office
519 01‐Jan‐19 31‐Dec‐19 50926 E3Saiyad Avsaru Ul Haq Hasmi
DY.CHIEF ENGINEER(MECH.)
Saiyad Mansoorul Haq Hasmi
12‐Sep‐1945 73 years3months19 days
71‐75 Father M 200000Noida Office
520 01‐Jan‐19 31‐Dec‐19 50927 E3 Shubhra Sharma DY.MANAGER(BD)Mr.Pradeep Sharma
23491 54 years8months7 days
51‐55
FatherM 200000
Noida Office
521 01‐Jan‐19 31‐Dec‐19 50927 E3 Shubhra Sharma DY.MANAGER(BD)Mrs Aditi Sharma
24368 52 years3months13 days
51‐55
MotherF 200000
Noida Office
522 01‐Jan‐19 31‐Dec‐19 50928 E3Rakesh Kumar Verma
Dy. Chief Engineer(Mech.)
Aanya 14‐Feb‐2013 5 years10months17 days
0‐18 Daughter F 200000Noida Office
Page 18 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
523 01‐Jan‐19 31‐Dec‐19 50928 E3Rakesh Kumar Verma
Dy. Chief Engineer(Mech.)
Kanchan 08‐Sep‐1981 37 years3months23 days
36‐40 Spouse F 200000Noida Office
524 01‐Jan‐19 31‐Dec‐19 50929 E3 Sumit ChauhanDy. Chief Engineer(Mech.)
Vyom Chauhan 42662 2 years2months12 days
0‐18 Son M 200000Noida Office
525 01‐Jan‐19 31‐Dec‐19 50929 E3 Sumit ChauhanDy. Chief Engineer(Mech.)
Namita Singh 10‐Jan‐1990 28 years11months21 days
26‐30 Spouse F 200000Noida Office
526 01‐Jan‐19 31‐Dec‐19 50929 E3 Sumit ChauhanDy. Chief Engineer(Mech.)
Usha Rani 07‐Jan‐1963 55 years11months24 days
51‐55 Mother F 200000Noida Office
527 01‐Jan‐19 31‐Dec‐19 50931 E7Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
Adarsh Sahu 25‐Apr‐2000 18 years8months6 days
0‐18 Son M 200000Noida Office
528 01‐Jan‐19 31‐Dec‐19 50931 E7Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
Adheesh Sahu 17‐Sep‐2008 10 years3months14 days
0‐18 Son M 200000Noida Office
529 01‐Jan‐19 31‐Dec‐19 50931 E7Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
Bandana Sahu 10‐Nov‐1973 45 years1months21 days
41‐45 Spouse F 200000Noida Office
530 01‐Jan‐19 31‐Dec‐19 50931 E7Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
Binapani Sahu 22‐Feb‐1943 75 years10months9 days
71‐75 Mother F 200000Noida Office
531 01‐Jan‐19 31‐Dec‐19 50931 E7Prakash Ranjan Sahu
ADDL.GENERAL MANAGER(MM)
Kunja Behari Sahu 23‐Oct‐1935 83 years2months8 days
Above 80 Father M 200000Noida Office
532 01‐Jan‐19 31‐Dec‐19 50933 E6 Ritu AgarwalDY. GENERAL MANAGER(INSTT.)
Ishita Agarwal 30‐Nov‐2013 5 years1months1 days
0‐18 Daughter F 200000Noida Office
533 01‐Jan‐19 31‐Dec‐19 50933 E6 Ritu AgarwalDY. GENERAL MANAGER(INSTT.)
Pradeep Agarwal 24‐Feb‐1971 47 years10months7 days
46‐50 Spouse M 200000Noida Office
534 01‐Jan‐19 31‐Dec‐19 50934 E3 Nitin KumarDY.CHIEF ENGINEER(COMP.)
Sakshi Kumari 31‐Jan‐2009 9 years11months0 days
0‐18 Daughter F 200000Noida Office
535 01‐Jan‐19 31‐Dec‐19 50934 E3 Nitin KumarDY.CHIEF ENGINEER(COMP.)
Tanu Chandra 14‐Jan‐1987 31 years11months17 days
31‐35 Spouse F 200000Noida Office
536 01‐Jan‐19 31‐Dec‐19 50934 E3 Nitin KumarDY.CHIEF ENGINEER(COMP.)
Indu Devi 01‐Jan‐1958 60 years11months30 days
56‐60 Mother F 200000Noida Office
537 01‐Jan‐19 31‐Dec‐19 50934 E3 Nitin KumarDY.CHIEF ENGINEER(COMP.)
Bharat Prasad Gupta 01‐Jan‐1954 64 years11months30 days
61‐65 Father M 200000Noida Office
538 01‐Jan‐19 31‐Dec‐19 50935 E3 Shashi PrakashDY.CHIEF ENGINEER(MS)
Master Medhansh Prakash
15‐Jul‐2010 8 years5months16 days
0‐18 Son M 200000Noida Office
539 01‐Jan‐19 31‐Dec‐19 50935 E3 Shashi PrakashDY.CHIEF ENGINEER(MS)
Manika Kumari 10‐Aug‐1977 41 years4months21 days
41‐45 Spouse F 200000Noida Office
540 01‐Jan‐19 31‐Dec‐19 50935 E3 Shashi PrakashDY.CHIEF ENGINEER(MS)
Rama Devi Prajapati 01‐Jan‐1943 75 years11months30 days
71‐75 Mother F 200000Noida Office
541 01‐Jan‐19 31‐Dec‐19 50937 E3 SupriyaDy. Chief Engineer(Comp.)
Chandra Mohan H 30‐May‐1979 39 years7months1 days
36‐40 Spouse M 200000Noida Office
542 01‐Jan‐19 31‐Dec‐19 50937 E3 SupriyaDy. Chief Engineer(Comp.)
Prema H 01‐Sep‐1959 59 years3months30 days
56‐60 Mother F 200000Noida Office
543 01‐Jan‐19 31‐Dec‐19 50937 E3 SupriyaDy. Chief Engineer(Comp.)
Hari Krishnan P 05‐Mar‐1948 70 years9months26 days
66‐70 Father M 200000Noida Office
544 01‐Jan‐19 31‐Dec‐19 50941 E3 Bhag SinghDy. Chief Engineer(Mech.)
Rudraksh 42264 3 years3months14 days
0‐18 Son M 200000Noida Office
545 01‐Jan‐19 31‐Dec‐19 50941 E3 Bhag SinghDy. Chief Engineer(Mech.)
Sarita 16‐Apr‐1984 34 years8months15 days
31‐35 Spouse F 200000Noida Office
546 01‐Jan‐19 31‐Dec‐19 50941 E3 Bhag SinghDy. Chief Engineer(Mech.)
Sant Kaur 24108 52 years11months30 days
51‐55 Mother F 200000Noida Office
547 01‐Jan‐19 31‐Dec‐19 50941 E3 Bhag SinghDy. Chief Engineer(Mech.)
Mehar Singh 20828 61 years11months23 days
61‐65 Father M 200000Noida Office
548 01‐Jan‐19 31‐Dec‐19 50942 E3Yesh Kumar Gautam
Dy. Chief Engineer(Mech.)
Yashika Gautam 01‐Nov‐2011 7 years1months30 days
0‐18 Daughter F 200000Noida Office
549 01‐Jan‐19 31‐Dec‐19 50942 E3Yesh Kumar Gautam
Dy. Chief Engineer(Mech.)
Sakshi Gautam 30‐Jan‐1987 31 years11months1 days
31‐35 Spouse F 200000Noida Office
550 01‐Jan‐19 31‐Dec‐19 50942 E3Yesh Kumar Gautam
Dy. Chief Engineer(Mech.)
Krishna Gautam 13‐Jun‐1955 63 years6months18 days
61‐65 Mother F 200000Noida Office
551 01‐Jan‐19 31‐Dec‐19 50942 E3Yesh Kumar Gautam
Dy. Chief Engineer(Mech.)
Brahm Singh Gautam
01‐Jan‐1950 68 years11months30 days
66‐70 Father M 200000Noida Office
Page 19 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
552 01‐Jan‐19 31‐Dec‐19 50943 E3 Nazrul IslamDy. Chief Engineer(Mech.)
Tahzibun Nisa 31‐May‐1966 52 years7months0 days
51‐55 Mother F 200000Noida Office
553 01‐Jan‐19 31‐Dec‐19 50943 E3 Nazrul IslamDy. Chief Engineer(Mech.)
Md Suhail 26‐Oct‐1955 63 years2months5 days
61‐65 Father M 200000Noida Office
554 01‐Jan‐19 31‐Dec‐19 50944 E3Akhilesh Kumar Shah
Dy. Chief Engineer (Insp.)
Aniruddha Prasad Shah
41681 4 years10months20 days
0‐18 Son M 200000Chennai INS
& NDT
555 01‐Jan‐19 31‐Dec‐19 50944 E3Akhilesh Kumar Shah
Dy. Chief Engineer (Insp.)
Rajni Prasad 20‐May‐1987 31 years7months11 days
31‐35 Spouse F 200000Chennai INS
& NDT
556 01‐Jan‐19 31‐Dec‐19 50945 E3Amanpreet Kaur Saini
Dy. Chief Engineer (Instt.)
Damanpreet Singh 31582 32 years6months12 days
31‐35 Spouse M 200000Noida Office
557 01‐Jan‐19 31‐Dec‐19 50945 E3Amanpreet Kaur Saini
Dy. Chief Engineer (Instt.)
Rajinder Singh 21094 61 years2months30 days
61‐65 Father M 200000Noida Office
558 01‐Jan‐19 31‐Dec‐19 50948 E3 Abhimanyu SinghDy. Chief Engineer(Mech.)
Aayushmaan Kumar 08‐Mar‐2013 5 years9months23 days
0‐18 Son M 200000Noida Office
559 01‐Jan‐19 31‐Dec‐19 50948 E3 Abhimanyu SinghDy. Chief Engineer(Mech.)
Smita Singh 01‐Nov‐1989 29 years1months30 days
26‐30 Spouse F 200000Noida Office
560 01‐Jan‐19 31‐Dec‐19 50948 E3 Abhimanyu SinghDy. Chief Engineer(Mech.)
Radha Devi Singh 01‐Jan‐1958 60 years11months30 days
56‐60 Mother F 200000Noida Office
561 01‐Jan‐19 31‐Dec‐19 50948 E3 Abhimanyu SinghDy. Chief Engineer(Mech.)
Chandra Bhushan Singh
01‐Jan‐1955 63 years11months30 days
61‐65 Father M 200000Noida Office
562 01‐Jan‐19 31‐Dec‐19 50950 E3 Ranveer Kumar Dy. Manager(MM) Atul Kumar 21‐Jul‐2012 6 years5months10 days
0‐18 Son M 200000Noida Office
563 01‐Jan‐19 31‐Dec‐19 50950 E3 Ranveer Kumar Dy. Manager(MM) Kanishka 42366 3 years0months3 days
0‐18 Daughter F 200000Noida Office
564 01‐Jan‐19 31‐Dec‐19 50950 E3 Ranveer Kumar Dy. Manager(MM) Rubi Kumari 17‐Jul‐1989 29 years5months14 days
26‐30 Spouse F 200000Noida Office
565 01‐Jan‐19 31‐Dec‐19 50950 E3 Ranveer Kumar Dy. Manager(MM) Luxmi Devi 01‐Jan‐1959 59 years11months30 days
56‐60 Mother F 200000Noida Office
566 01‐Jan‐19 31‐Dec‐19 50950 E3 Ranveer Kumar Dy. Manager(MM) Paltoo Prasad Singh 01‐Jan‐1939 79 years11months30 days
76‐80 Father M 200000Noida Office
567 01‐Jan‐19 31‐Dec‐19 50954 E3 Harish KumarDy. Chief Engineer(Mech.)
Arnavi Daksh 41940 4 years2months3 days
0‐18 Daughter F 200000Noida Office
568 01‐Jan‐19 31‐Dec‐19 50954 E3 Harish KumarDy. Chief Engineer(Mech.)
Pinky 02‐Sep‐1989 29 years3months29 days
26‐30 Spouse F 200000Noida Office
569 01‐Jan‐19 31‐Dec‐19 50954 E3 Harish KumarDy. Chief Engineer(Mech.)
Kailashi Devi 21551 59 years11months30 days
56‐60 Mother F 200000Noida Office
570 01‐Jan‐19 31‐Dec‐19 50954 E3 Harish KumarDy. Chief Engineer(Mech.)
Ramjee Lal 20350 63 years3months13 days
61‐65 Father M 200000Noida Office
571 01‐Jan‐19 31‐Dec‐19 50955 E3 Bobby KumarDy. Chief Engineer.(Elect.)
AARYHI 43008 1 years3months1 days
0‐18 Daughter F 200001Noida Office
572 01‐Jan‐19 31‐Dec‐19 50955 E3 Bobby KumarDy. Chief Engineer.(Elect.)
Sheetal Kanojia 23‐Jul‐1988 30 years5months8 days
26‐30 Spouse F 200000Noida Office
573 01‐Jan‐19 31‐Dec‐19 50955 E3 Bobby KumarDy. Chief Engineer.(Elect.)
Vishan Lal 01‐May‐1949 69 years7months30 days
66‐70 Father M 200000Noida Office
574 01‐Jan‐19 31‐Dec‐19 50955 E3 Bobby KumarDy. Chief Engineer.(Elect.)
Ram Devi 02‐Apr‐1950 68 years8months29 days
66‐70 Mother F 200000Noida Office
575 01‐Jan‐19 31‐Dec‐19 50962 E3 Mahatab Alam Dy. Manager(MM) Arshan Alam 17‐Oct‐2012 6 years2months14 days
0‐18 Son M 200000Noida Office
576 01‐Jan‐19 31‐Dec‐19 50962 E3 Mahatab Alam Dy. Manager(MM) Nikhat Anjum 26‐Jun‐1988 30 years6months5 days
26‐30 Spouse F 200000Noida Office
577 01‐Jan‐19 31‐Dec‐19 50962 E3 Mahatab Alam Dy. Manager(MM) Shahzadi Begum 16803 72 years11months30 days
71‐75 Mother F 200000Noida Office
578 01‐Jan‐19 31‐Dec‐19 50963 E8Sunil Kumar Gupta
GROUP GENERAL MANAGER
Dr Sneh Lata Gupta 06‐Jan‐1963 55 years11months25 days
51‐55 Spouse F 200000Noida Office
579 01‐Jan‐19 31‐Dec‐19 50967 E3 Vikram PatodiaDy. Chief Engineer (Civil)
Suvigya Patodia 42773 1 years10months24 days
0‐18 Daughter F 200000Noida Office
580 01‐Jan‐19 31‐Dec‐19 50967 E3 Vikram PatodiaDy. Chief Engineer (Civil)
Suman 33787 26 years5months29 days
26‐30 Spouse F 200000Noida Office
Page 20 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
581 01‐Jan‐19 31‐Dec‐19 50967 E3 Vikram PatodiaDy. Chief Engineer (Civil)
Champa 01‐Jan‐1964 54 years11months30 days
51‐55 Mother F 200000Noida Office
582 01‐Jan‐19 31‐Dec‐19 50967 E3 Vikram PatodiaDy. Chief Engineer (Civil)
Shyam Lal 01‐Dec‐1960 58 years0months30 days
56‐60 Father M 200000Noida Office
583 01‐Jan‐19 31‐Dec‐19 50971 E3 Harish KumarDy Chief Engineer (Instt.)
Pratibha Kain 32370 30 years4months16 days
26‐30 Spouse F 200000Noida Office
584 01‐Jan‐19 31‐Dec‐19 50977 E3George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
Emmanuel George 41863 4 years4months19 days
0‐18 Son M 200000Noida Office
585 01‐Jan‐19 31‐Dec‐19 50977 E3George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
Preethu James Elangikal
07‐May‐1986 32 years7months24 days
31‐35 Spouse F 200000Noida Office
586 01‐Jan‐19 31‐Dec‐19 50977 E3George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
Molly Antony 12‐Dec‐1963 55 years0months19 days
51‐55 Mother F 200000Noida Office
587 01‐Jan‐19 31‐Dec‐19 50977 E3George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
P Antony George 19‐Sep‐1951 67 years3months12 days
66‐70 Father M 200000Noida Office
588 01‐Jan‐19 31‐Dec‐19 50977 E3George Antony Pidiyancheril
Dy. Chief Engineer (Instt.)
Ephrem George 42979
1 years3months30 days
0‐18 Son M 200000Noida Office
589 01‐Jan‐19 31‐Dec‐19 50980 E3Pradeep Narayan Singh
Dy. Chief Engineer(MS)
Baby Of Anita Singh 42427 2 years10months4 days
0‐18 Son M 200000Noida Office
590 01‐Jan‐19 31‐Dec‐19 50980 E3Pradeep Narayan Singh
Dy. Chief Engineer(MS)
Anita Singh 01‐Mar‐1984 34 years9months30 days
31‐35 Spouse F 200000Noida Office
591 01‐Jan‐19 31‐Dec‐19 50980 E3Pradeep Narayan Singh
Dy. Chief Engineer(MS)
Malti Devi 07‐Oct‐1962 56 years2months24 days
56‐60 Mother F 200000Noida Office
592 01‐Jan‐19 31‐Dec‐19 50981 E5Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
M Someshwar 05‐Aug‐2012 6 years4months26 days
0‐18 Son M 200000Noida Office
593 01‐Jan‐19 31‐Dec‐19 50981 E5Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
M Padmeshwar 42152 3 years7months3 days
0‐18 Son M 200000Noida Office
594 01‐Jan‐19 31‐Dec‐19 50981 E5Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
S Sivasakthi 30‐May‐1978 40 years7months1 days
36‐40 Spouse F 200000Noida Office
595 01‐Jan‐19 31‐Dec‐19 50981 E5Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
M Satyam 10‐May‐1948 70 years7months21 days
66‐70 Father M 200000Noida Office
596 01‐Jan‐19 31‐Dec‐19 50981 E5Mada Rama Lingeswar
CHIEF MANAGER (PERS.)
M Rajeswari 03‐Feb‐1948 70 years10months28 days
66‐70 Mother F 200000Noida Office
597 01‐Jan‐19 31‐Dec‐19 50982 E3 Arvind KumarDy. Chief Engineer(Mech.)
Kinjal Srivastava 42335 3 years1months4 days
0‐18 Daughter F 200000Noida Office
598 01‐Jan‐19 31‐Dec‐19 50982 E3 Arvind KumarDy. Chief Engineer(Mech.)
Swati Srivastava 32234 30 years8months30 days
26‐30 Spouse F 200000Noida Office
599 01‐Jan‐19 31‐Dec‐19 50982 E3 Arvind KumarDy. Chief Engineer(Mech.)
Sharda Devi 13‐Feb‐1961 57 years10months18 days
56‐60 Mother F 200000Noida Office
600 01‐Jan‐19 31‐Dec‐19 50982 E3 Arvind KumarDy. Chief Engineer(Mech.)
Jagdish Saran 15‐Jan‐1956 62 years11months16 days
61‐65 Father M 200000Noida Office
601 01‐Jan‐19 31‐Dec‐19 50985 E2 Ashish AroraASSISTANT CHIEF ENGINEER (INSTT.)
Raj Arora 19‐Mar‐1954 64 years9months12 days
61‐65 Mother F 200000Noida Office
602 01‐Jan‐19 31‐Dec‐19 50985 E2 Ashish AroraASSISTANT CHIEF ENGINEER (INSTT.)
Ashok Arora 19‐Mar‐1955 63 years9months12 days
61‐65 Father M 200000Noida Office
603 01‐Jan‐19 31‐Dec‐19 50986 E2Deepak Kumar Gupta
ASSISTANT CHIEF ENGINEER (ELECTRICAL)
Mihika Gupta 42015 3 years11months20 days
0‐18 Daughter F 200000Noida Office
604 01‐Jan‐19 31‐Dec‐19 50986 E2Deepak Kumar Gupta
ASSISTANT CHIEF ENGINEER (ELECTRICAL)
Cherry Chittora 29‐Jun‐1986 32 years6months2 days
31‐35 Spouse F 200000Noida Office
605 01‐Jan‐19 31‐Dec‐19 50986 E2Deepak Kumar Gupta
ASSISTANT CHIEF ENGINEER (ELECTRICAL)
Satyanarayan Gupta 01‐Apr‐1959 59 years8months30 days
56‐60 Father M 200000Noida Office
606 01‐Jan‐19 31‐Dec‐19 50986 E2Deepak Kumar Gupta
ASSISTANT CHIEF ENGINEER (ELECTRICAL)
Nirmala Devi 10‐Apr‐1953 65 years8months21 days
61‐65 Mother F 200000Noida Office
607 01‐Jan‐19 31‐Dec‐19 50989 E2 Amit Kumar SinghASST.CHIEF ENGINEER (INSTRUMENTATION)
Susheela Verna 10‐Aug‐1957 61 years4months21 days
61‐65 Mother F 200000Noida Office
608 01‐Jan‐19 31‐Dec‐19 50989 E2 Amit Kumar SinghASST.CHIEF ENGINEER (INSTRUMENTATION)
B R Verma 12‐Apr‐1950 68 years8months19 days
66‐70 Father M 200000Noida Office
609 01‐Jan‐19 31‐Dec‐19 50991 E2Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
Ritvik Kumar Singh 19‐Mar‐2014 4 years9months12 days
0‐18 Son M 200000Noida Office
Page 21 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
610 01‐Jan‐19 31‐Dec‐19 50991 E2Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
Shaurya Singh 43017 1 years2months22 days
0‐18 Son M 200000Noida Office
611 01‐Jan‐19 31‐Dec‐19 50991 E2Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
Priti Singh 01‐Jan‐1989 29 years11months30 days
26‐30 Spouse F 200000Noida Office
612 01‐Jan‐19 31‐Dec‐19 50991 E2Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
Nirdesh Singh 23471 54 years8months27 days
51‐55 Mother F 200000Noida Office
613 01‐Jan‐19 31‐Dec‐19 50991 E2Hemant Kumar Singh
ASSISTANT CHIEF ENGINEER (MECH.)
Premraj Singh 22020 58 years8months17 days
56‐60 Father M 200000Noida Office
614 01‐Jan‐19 31‐Dec‐19 50995 E0 Awanesh Kumar DESIGNER(CIVIL) Prachi Srivastava 06‐Aug‐2007 11 years4months25 days
0‐18 Daughter F 200000Noida Office
615 01‐Jan‐19 31‐Dec‐19 50995 E0 Awanesh Kumar DESIGNER(CIVIL) Jyoti Srivastava 05‐Apr‐1977 41 years8months26 days
41‐45 Spouse F 200000Noida Office
616 01‐Jan‐19 31‐Dec‐19 50995 E0 Awanesh Kumar DESIGNER(CIVIL)Satish Chandra Srivastava
17361 71 years5months18 days
71‐75 Father M 200000Noida Office
617 01‐Jan‐19 31‐Dec‐19 50996 E2 Vikas BhariaASSISTANT CHIEF ENGINEER (MECHANICAL)
Kirti 01‐Feb‐1988 30 years10months30 days
26‐30 Spouse F 200000Noida Office
618 01‐Jan‐19 31‐Dec‐19 50997 E2Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
Arti 30‐Nov‐2001 17 years1months1 days
0‐18 Daughter F 200000Noida Office
619 01‐Jan‐19 31‐Dec‐19 50997 E2Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
Shobhit Vaish 28‐Jan‐2007 11 years11months3 days
0‐18 Son M 200000Noida Office
620 01‐Jan‐19 31‐Dec‐19 50997 E2Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
Keshamati Devi 02‐Mar‐1983 35 years9months29 days
31‐35 Spouse F 200000Noida Office
621 01‐Jan‐19 31‐Dec‐19 50997 E2Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
Babua Ram 19‐Jun‐1958 60 years6months12 days
56‐60 Father M 200000Noida Office
622 01‐Jan‐19 31‐Dec‐19 50997 E2Vinod Kumar Vaish
ASSISTANT CHIEF ENGINEER (MECH.)
Dhanau Devi 11‐Sep‐1960 58 years3months20 days
56‐60 Mother F 200000Noida Office
623 01‐Jan‐19 31‐Dec‐19 51000 E4Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
Rohit Yadav 20‐Sep‐2010 8 years3months11 days
0‐18 Son M 200000Noida Office
624 01‐Jan‐19 31‐Dec‐19 51000 E4Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
Baby Of Neetu Yadav
12‐Mar‐2017 1 years9months19 days
0‐18 Son M 200000Noida Office
625 01‐Jan‐19 31‐Dec‐19 51000 E4Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
Neetu Yadav 29‐Sep‐1978 40 years3months2 days
36‐40 Spouse F 200000Noida Office
626 01‐Jan‐19 31‐Dec‐19 51000 E4Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
Ram Janki Yadav 02‐Jan‐1958 60 years11months29 days
56‐60 Mother F 200000Noida Office
627 01‐Jan‐19 31‐Dec‐19 51000 E4Jitendra Kumar Yadav
ADDL.CHIEF ENGINEER(MECH.)
Virendra Kumar Yadav
02‐Jan‐1953 65 years11months29 days
61‐65 Father M 200000Noida Office
628 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Yosita Panchal 30‐Mar‐2011 7 years9months1 days
0‐18 Daughter F 200000Noida Office
629 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Harshvardhan Panchal
42152 3 years7months3 days
0‐18 Son M 200000Noida Office
630 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Tanushree 29‐May‐2006 12 years7months2 days
0‐18 Daughter F 200000Noida Office
631 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Rekha 18‐Oct‐1982 36 years2months13 days
36‐40 Spouse F 200000Noida Office
632 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Sarla 13‐Jan‐1960 58 years11months18 days
56‐60 Mother F 200000Noida Office
633 01‐Jan‐19 31‐Dec‐19 51001 W6 Anil PanchalSR.DRAFTSMAN(MECH.)
Satya Prakash 02‐Feb‐1957 61 years10months29 days
61‐65 Father M 200000Noida Office
634 01‐Jan‐19 31‐Dec‐19 51004 E2 Avinash SinghASSISTANT CHIEF ENGINEER (MECHANICAL)
Suman Priti 34124 25 years6months27 days
19‐25 Spouse F 200000Noida Office
635 01‐Jan‐19 31‐Dec‐19 51004 E2 Avinash SinghASSISTANT CHIEF ENGINEER (MECHANICAL)
Mauleshwar Prasad Singh
08‐Aug‐1949 69 years4months23 days
66‐70 Father M 200000Noida Office
636 01‐Jan‐19 31‐Dec‐19 51005 E3Shiv Narayan Mohapatra
Dy. Chief Engineer (MR)
Tusar Kanti Mohapatra
16‐Apr‐1984 34 years8months15 days
31‐35 Spouse F 200000Noida Office
637 01‐Jan‐19 31‐Dec‐19 51005 E3Shiv Narayan Mohapatra
Dy. Chief Engineer (MR)
Sarojini Mohapatra 01‐Jan‐1945 73 years11months30 days
71‐75 Mother F 200000Noida Office
638 01‐Jan‐19 31‐Dec‐19 51006 E3Kailash Prasad Joshi
Dy. Chief Engineer(PM)
Shreya Joshi 41183 6 years2months30 days
0‐18 Daughter F 200000Noida Office
Page 22 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
639 01‐Jan‐19 31‐Dec‐19 51006 E3Kailash Prasad Joshi
Dy. Chief Engineer(PM)
Baby Of Asha Joshi 42352 3 years0months17 days
0‐18 Son M 200000Noida Office
640 01‐Jan‐19 31‐Dec‐19 51006 E3Kailash Prasad Joshi
Dy. Chief Engineer(PM)
Asha Joshi 03‐Oct‐1984 34 years2months28 days
31‐35 Spouse F 200000Noida Office
641 01‐Jan‐19 31‐Dec‐19 51007 E3 Pawan KumarDy. Chief Engineer(PM)
Shanti Devi 05‐Apr‐1964 54 years8months26 days
51‐55 Mother F 200000Noida Office
642 01‐Jan‐19 31‐Dec‐19 51007 E3 Pawan KumarDy. Chief Engineer(PM)
Suresh Mishra 01‐Feb‐1954 64 years10months30 days
61‐65 Father M 200000Noida Office
643 01‐Jan‐19 31‐Dec‐19 51009 E2Iswar Chandra Sahu
ASSISTANT CHIEF ENGINEER (CIVIL)
Ishashree 20‐Jul‐2007 11 years5months11 days
0‐18 Daughter F 200000Noida Office
644 01‐Jan‐19 31‐Dec‐19 51009 E2Iswar Chandra Sahu
ASSISTANT CHIEF ENGINEER (CIVIL)
SHAISHREE SAHU 43065 1 years1months5 days
0‐18 Daughter F 200001Noida Office
645 01‐Jan‐19 31‐Dec‐19 51009 E2Iswar Chandra Sahu
ASSISTANT CHIEF ENGINEER (CIVIL)
Sradhanjali Maharana
20‐Jul‐1984 34 years5months11 days
31‐35 Spouse F 200000Noida Office
646 01‐Jan‐19 31‐Dec‐19 51009 E2Iswar Chandra Sahu
ASSISTANT CHIEF ENGINEER (CIVIL)
Chakradhar Sahu 15‐Mar‐1935 83 years9months16 days
Above 80 Father M 200000Noida Office
647 01‐Jan‐19 31‐Dec‐19 51012 E0Ashwani Kumar Mittal
Designer(Mech.)Baby Of Shefali Mittal
42714 2 years0months21 days
0‐18 Son M 200000Noida Office
648 01‐Jan‐19 31‐Dec‐19 51012 E0Ashwani Kumar Mittal
Designer(Mech.) Shefali Mittal 32109 31 years1months3 days
31‐35 Spouse F 200000Noida Office
649 01‐Jan‐19 31‐Dec‐19 51012 E0Ashwani Kumar Mittal
Designer(Mech.) Saroj Mittal 03‐Apr‐1964 54 years8months28 days
51‐55 Mother F 200000Noida Office
650 01‐Jan‐19 31‐Dec‐19 51012 E0Ashwani Kumar Mittal
Designer(Mech.)Mahender Pratap Mittal
16‐Apr‐1958 60 years8months15 days
56‐60 Father M 200000Noida Office
651 01‐Jan‐19 31‐Dec‐19 51014 E2 Rupesh KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Deepa Kumari 34791 23 years8months29 days
19‐25 Spouse F 200000Noida Office
652 01‐Jan‐19 31‐Dec‐19 51014 E2 Rupesh KumarASSISTANT CHIEF ENGINEER (MECHANICAL)
Sudha Devi 22‐May‐1952 66 years7months9 days
66‐70 Mother F 200000Noida Office
653 01‐Jan‐19 31‐Dec‐19 51022 E2 Abhishek GuptaAsst Chief Engineer(Mechanical)
DIVIT KHANDELWAL43040 1 years1months30
days0‐18 Son M 200000
Noida Office
654 01‐Jan‐19 31‐Dec‐19 51022 E2 Abhishek GuptaAsst Chief Engineer(Mechanical)
DEEPIKA GUPTA32705 29 years5months15
days26‐30 Spouse F 200000
Noida Office
655 01‐Jan‐19 31‐Dec‐19 51023 E2 Anil Kumar RayAsst Chief Engineer(MS)
JASSI PATEL33482 27 years3months30
days26‐30 Spouse F 200000
Noida Office
656 01‐Jan‐19 31‐Dec‐19 51024 E2Mambers Kartheek
Asst Chief Engineer (Instt.)
M Krishna Rao 21558 59 years11months23 days
56‐60 Father M 200000Noida Office
657 01‐Jan‐19 31‐Dec‐19 51024 E2Mambers Kartheek
Asst Chief Engineer (Instt.)
M Vaidehi 22969 56 years1months12 days
56‐60 Mother F 200000Noida Office
658 01‐Jan‐19 31‐Dec‐19 51024 E2Mambers Kartheek
Asst Chief Engineer (Instt.)
Vaishnavi Gundamraj
34909 23 years5months2 days
19‐25 Wife F 200000Noida Office
659 01‐Jan‐19 31‐Dec‐19 51025 E2 Abhishek JoshiASSISTANT CHIEF ENGINEER (MECHANICAL)
Abir Joshi 42647 2 years2months27 days
0‐18 Son M 200000Noida Office
660 01‐Jan‐19 31‐Dec‐19 51025 E2 Abhishek JoshiASSISTANT CHIEF ENGINEER (MECHANICAL)
Shruti 32439 30 years2months8 days
26‐30 Spouse F 200000Noida Office
661 01‐Jan‐19 31‐Dec‐19 51025 E2 Abhishek JoshiASSISTANT CHIEF ENGINEER (MECHANICAL)
Chaman Bala 21047 61 years4months16 days
61‐65 Mother F 200000Noida Office
662 01‐Jan‐19 31‐Dec‐19 51025 E2 Abhishek JoshiASSISTANT CHIEF ENGINEER (MECHANICAL)
A P Joshi 02‐Feb‐1957 61 years10months29 days
61‐65 Father M 200000Noida Office
663 01‐Jan‐19 31‐Dec‐19 51026 E2Pushker Mahendra
Asst Chief Engineer(Process)
Ekta Khatri 33601 27 years0months2 days
26‐30 Spouse F 200000Noida Office
664 01‐Jan‐19 31‐Dec‐19 51026 E2Pushker Mahendra
Asst Chief Engineer(Process)
Ragini Mahendra 03‐Jun‐1964 54 years6months28 days
51‐55 Mother F 200000Noida Office
665 01‐Jan‐19 31‐Dec‐19 51028 E2Vipin Kumar Sachan
Asst Chief Engineer(Process)
Shivani Sachan 33251 27 years11months18 days
26‐30 Spouse F 200000Noida Office
666 01‐Jan‐19 31‐Dec‐19 51028 E2Vipin Kumar Sachan
Asst Chief Engineer(Process)
Anusuiya Sachan 08‐Sep‐1957 61 years3months23 days
61‐65 Mother F 200000Noida Office
667 01‐Jan‐19 31‐Dec‐19 51028 E2Vipin Kumar Sachan
Asst Chief Engineer(Process)
Sukhdev Sachan 01‐Sep‐1952 66 years3months30 days
66‐70 Father M 200000Noida Office
Page 23 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
668 01‐Jan‐19 31‐Dec‐19 51031 E2 Vivek TiwariASST.CHIEF ENGR. (MECH.)
Atharva Tiwari 42671 2 years2months3 days
0‐18 Son M 200000Vadodara Office
669 01‐Jan‐19 31‐Dec‐19 51031 E2 Vivek TiwariASST.CHIEF ENGR. (MECH.)
Shailja Tiwari 33118 28 years3months29 days
26‐30 Spouse F 200000Vadodara Office
670 01‐Jan‐19 31‐Dec‐19 51035 E2 Sumit KumarASSISTANT CHIEF ENGINEER (MS)
MANAN SINGH 43051 1 years1months19 days
0‐18Noida Office
671 01‐Jan‐19 31‐Dec‐19 51035 E2 Sumit KumarASSISTANT CHIEF ENGINEER (MS)
Jagriti Swetamber 33981 25 years11months19 days
19‐25 Spouse F 200000Noida Office
672 01‐Jan‐19 31‐Dec‐19 51035 E2 Sumit KumarASSISTANT CHIEF ENGINEER (MS)
Santosh Kumar 01‐Dec‐1981 37 years0months30 days
36‐40 Father M 200000Noida Office
673 01‐Jan‐19 31‐Dec‐19 51035 E2 Sumit KumarASSISTANT CHIEF ENGINEER (MS)
Meena 05‐Nov‐1965 53 years1months26 days
51‐55 Mother F 200000Noida Office
674 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Rupali Sarkar 06‐Jun‐2009 9 years6months25 days
0‐18 Daughter F 200000Noida Office
675 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Krish Nendo Sarkar 01‐Sep‐2010 8 years3months30 days
0‐18 Son M 200000Noida Office
676 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Shefali Sarkar 04‐Jan‐2008 10 years11months27 days
0‐18 Daughter F 200000Noida Office
677 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Shreoshi Sarkar 16‐Dec‐1983 35 years0months15 days
31‐35 Spouse F 200000Noida Office
678 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Arati Sarkar 01‐Jan‐1941 77 years11months30 days
76‐80 Mother F 200000Noida Office
679 01‐Jan‐19 31‐Dec‐19 51036 E5Sandip Kumar Sarkar
Chief Engineer (Civil) Sachin Kr Sarkar 01‐Jan‐1938 80 years11months30 days
Above 80 Father M 200000Noida Office
680 01‐Jan‐19 31‐Dec‐19 51037 E5 Ashish VaidyaCHIEF ENGINEER(PROCESS)
Aradhya Jain 42569 2 years5months13 days
0‐18 Daughter F 200000Noida Office
681 01‐Jan‐19 31‐Dec‐19 51037 E5 Ashish VaidyaCHIEF ENGINEER(PROCESS)
Ananya Jain 20‐Dec‐2008 10 years0months11 days
0‐18 Daughter F 200000Noida Office
682 01‐Jan‐19 31‐Dec‐19 51037 E5 Ashish VaidyaCHIEF ENGINEER(PROCESS)
Niketa Jain 24‐Aug‐1980 38 years4months7 days
36‐40 Spouse F 200000Noida Office
683 01‐Jan‐19 31‐Dec‐19 51037 E5 Ashish VaidyaCHIEF ENGINEER(PROCESS)
Tara Vaidya 06‐Aug‐1950 68 years4months25 days
66‐70 Mother F 200000Noida Office
684 01‐Jan‐19 31‐Dec‐19 51038 E2 Ankit AroraASSISTANT CHIEF ENGINEER (INSPECTION)
Diti 01‐Jan‐2012 6 years11months30 days
0‐18 Daughter F 200000Noida INS &
NDT
685 01‐Jan‐19 31‐Dec‐19 51038 E2 Ankit AroraASSISTANT CHIEF ENGINEER (INSPECTION)
Bhawna 22‐Dec‐1984 34 years0months9 days
31‐35 Spouse F 200000Noida INS &
NDT
686 01‐Jan‐19 31‐Dec‐19 51038 E2 Ankit AroraASSISTANT CHIEF ENGINEER (INSPECTION)
Arun Arora 06‐Nov‐1954 64 years1months25 days
61‐65 Father M 200000Noida INS &
NDT
687 01‐Jan‐19 31‐Dec‐19 51038 E2 Ankit AroraASSISTANT CHIEF ENGINEER (INSPECTION)
Santosh Kumari 21042 61 years4months21 days
61‐65 Mother F 200000Noida INS &
NDT
688 01‐Jan‐19 31‐Dec‐19 51039 E2 Gulshan SachdevaASSISTANT CHIEF ENGINEER (MECH.‐INSP.)
Tejas Sachdeva 42401 2 years10months30 days
0‐18 Son M 200000Noida INS &
NDT
689 01‐Jan‐19 31‐Dec‐19 51039 E2 Gulshan SachdevaASSISTANT CHIEF ENGINEER (MECH.‐INSP.)
Rekha Rani 31373 33 years1months9 days
31‐35 Spouse F 200000Noida INS &
NDT
690 01‐Jan‐19 31‐Dec‐19 51039 E2 Gulshan SachdevaASSISTANT CHIEF ENGINEER (MECH.‐INSP.)
Ramesh Kumar Sachdeva
21856 59 years1months29 days
56‐60 Father M 200000Noida INS &
NDT
691 01‐Jan‐19 31‐Dec‐19 51039 E2 Gulshan SachdevaASSISTANT CHIEF ENGINEER (MECH.‐INSP.)
Bimla Sachdeva 23773 53 years11months0 days
51‐55 Mother F 200000Noida INS &
NDT
692 01‐Jan‐19 31‐Dec‐19 51040 E3Marzia Firdaus Rizvi
Dy. Chief Engineer(MS)
Mohammad Farhaann
06‐Jun‐2013 5 years6months25 days
0‐18 Son M 200000Noida Office
693 01‐Jan‐19 31‐Dec‐19 51040 E3Marzia Firdaus Rizvi
Dy. Chief Engineer(MS)
Aliza Kazmi 42948 1 years4months30 days
0‐18 Daughter F 200000Noida Office
694 01‐Jan‐19 31‐Dec‐19 51040 E3Marzia Firdaus Rizvi
Dy. Chief Engineer(MS)
Mazhar Abbas Kazmi
02‐Oct‐1979 39 years2months29 days
36‐40 Spouse M 200000Noida Office
695 01‐Jan‐19 31‐Dec‐19 51040 E3Marzia Firdaus Rizvi
Dy. Chief Engineer(MS)
Shamim Akhtar 01‐Feb‐1955 63 years10months30 days
61‐65 Mother F 200000Noida Office
696 01‐Jan‐19 31‐Dec‐19 51041 E4 Srikanth Gedala Manager (P&A) G Vasi Dhar 02‐Feb‐2012 6 years10months29 days
0‐18 Son M 200000Vadodara Office
Page 24 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
697 01‐Jan‐19 31‐Dec‐19 51041 E4 Srikanth Gedala Manager (P&A) Gedala Nihal 41911 4 years3months2 days
0‐18 Son M 200000Vadodara Office
698 01‐Jan‐19 31‐Dec‐19 51041 E4 Srikanth Gedala Manager (P&A) G Suneetha 07‐Aug‐1988 30 years4months24 days
26‐30 Spouse F 200000Vadodara Office
699 01‐Jan‐19 31‐Dec‐19 51041 E4 Srikanth Gedala Manager (P&A) G Lakshmi 11‐Dec‐1954 64 years0months20 days
61‐65 Mother F 200000Vadodara Office
700 01‐Jan‐19 31‐Dec‐19 51041 E4 Srikanth Gedala Manager (P&A) G K Swamy 14‐Jun‐1946 72 years6months17 days
71‐75 Father M 200000Vadodara Office
701 01‐Jan‐19 31‐Dec‐19 51042 E4Makesh Gopalakrishnan
ADDL. CHIEF ENGINEER (PM)
M Tarun Krishna 28‐Feb‐2011 7 years10months3 days
0‐18 Son M 200000Chennai INS
& NDT
702 01‐Jan‐19 31‐Dec‐19 51042 E4Makesh Gopalakrishnan
ADDL. CHIEF ENGINEER (PM)
S Maheshwari 31‐Dec‐1984 34 years0months0 days
31‐35 Spouse F 200000Chennai INS
& NDT
703 01‐Jan‐19 31‐Dec‐19 51042 E4Makesh Gopalakrishnan
ADDL. CHIEF ENGINEER (PM)
G Banumathi 11‐Jul‐1955 63 years5months20 days
61‐65 Mother F 200000Chennai INS
& NDT
704 01‐Jan‐19 31‐Dec‐19 51043 E2 Ashima PalASSISTANT MANAGER (P&A)
Ankit Verma 09‐May‐1981 37 years7months22 days
36‐40 Spouse M 200000Noida Office
705 01‐Jan‐19 31‐Dec‐19 51043 E2 Ashima PalASSISTANT MANAGER (P&A)
S N Verma 05‐Jan‐1941 77 years11months26 days
76‐80 Father M 200000Noida Office
706 01‐Jan‐19 31‐Dec‐19 51045 E2Devendra Singh Chohan
Asst Chief Engineer(Process)
Tanmay Chauhan 42619 2 years3months25 days
0‐18 Son M 200000Noida Office
707 01‐Jan‐19 31‐Dec‐19 51045 E2Devendra Singh Chohan
Asst Chief Engineer(Process)
Megha Chauhan 20‐May‐1987 31 years7months11 days
31‐35 Spouse F 200000Noida Office
708 01‐Jan‐19 31‐Dec‐19 51045 E2Devendra Singh Chohan
Asst Chief Engineer(Process)
Kamlesh Devi 24420 52 years1months22 days
51‐55 Mother F 200000Noida Office
709 01‐Jan‐19 31‐Dec‐19 51045 E2Devendra Singh Chohan
Asst Chief Engineer(Process)
Bheem Singh Chohan
22407 57 years7months25 days
56‐60 Father M 200000Noida Office
710 01‐Jan‐19 31‐Dec‐19 51046 E0Sanjeev Prabhakar
DESIGNER(CIVIL) Vartika Tanya 42129 3 years7months26 days
0‐18 Daughter F 200000Noida Office
711 01‐Jan‐19 31‐Dec‐19 51046 E0Sanjeev Prabhakar
DESIGNER(CIVIL) Pratibha Rawat 03‐Feb‐1985 33 years10months28 days
31‐35 Spouse F 200000Noida Office
712 01‐Jan‐19 31‐Dec‐19 51046 E0Sanjeev Prabhakar
DESIGNER(CIVIL) Maya Rani 23‐Jul‐1953 65 years5months8 days
61‐65 Mother F 200000Noida Office
713 01‐Jan‐19 31‐Dec‐19 51046 E0Sanjeev Prabhakar
DESIGNER(CIVIL) Girdhari Lal 07‐Mar‐1949 69 years9months24 days
66‐70 Father M 200000Noida Office
714 01‐Jan‐19 31‐Dec‐19 51051 E2 Tarun KumarAsst Manager (Finance)
Jigyasa Kathuria 30706 34 years11months6 days
31‐35 Spouse F 200000Noida Office
715 01‐Jan‐19 31‐Dec‐19 51051 E2 Tarun KumarAsst Manager (Finance)
Usha 21295 60 years8months11 days
56‐60 Mother F 200000Noida Office
716 01‐Jan‐19 31‐Dec‐19 51051 E2 Tarun KumarAsst Manager (Finance)
Puran Prakash 19921 64 years5months15 days
61‐65 Father M 200000Noida Office
717 01‐Jan‐19 31‐Dec‐19 51055 E4 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
Mrigank Singh 14‐May‐2009 9 years7months17 days
0‐18 Son M 200000Noida Office
718 01‐Jan‐19 31‐Dec‐19 51055 E4 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
Mrinali Singh 14‐May‐2009 9 years7months17 days
0‐18 Daughter F 200000Noida Office
719 01‐Jan‐19 31‐Dec‐19 51055 E4 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
Shalini 13‐Jun‐1981 37 years6months18 days
36‐40 Spouse F 200000Noida Office
720 01‐Jan‐19 31‐Dec‐19 51055 E4 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
Shakuntala Devi 21‐Apr‐1954 64 years8months10 days
61‐65 Mother F 200000Noida Office
721 01‐Jan‐19 31‐Dec‐19 51055 E4 Narendra SinghAddl. Chief Engineer (Mech‐Mat.Hand.)
Mahavir Singh 15‐Dec‐1952 66 years0months16 days
66‐70 Father M 200000Noida Office
722 01‐Jan‐19 31‐Dec‐19 51057 E5 Nikesh ManikkaraChief Engg. (Mech.‐Const.)
Devanandana Nikesh
15‐Dec‐2011 7 years0months16 days
0‐18 Daughter F 200000Noida Office
723 01‐Jan‐19 31‐Dec‐19 51057 E5 Nikesh ManikkaraChief Engg. (Mech.‐Const.)
Remyasree P V 31176 33 years7months22 days
31‐35 Spouse F 200000Noida Office
724 01‐Jan‐19 31‐Dec‐19 51057 E5 Nikesh ManikkaraChief Engg. (Mech.‐Const.)
Remavathi V P 03‐Jul‐1955 63 years5months28 days
61‐65 Mother F 200000Noida Office
725 01‐Jan‐19 31‐Dec‐19 51057 E5 Nikesh ManikkaraChief Engg. (Mech.‐Const.)
M Balakrishnan 17715 70 years5months30 days
66‐70 Father M 200000Noida Office
Page 25 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
726 01‐Jan‐19 31‐Dec‐19 51059 E2 Nishant KumarAsst Chief Engineer (NDT)
Khushboo Kumari 31905 31 years7months23 days
31‐35 Spouse F 200000Noida INS &
NDT
727 01‐Jan‐19 31‐Dec‐19 51059 E2 Nishant KumarAsst Chief Engineer (NDT)
Rameshwar Nath Thakur
15‐May‐1951 67 years7months16 days
66‐70 Father M 200000Noida INS &
NDT
728 01‐Jan‐19 31‐Dec‐19 51060 E2Bhupendra Kumar Chandrakar
Asst Chief Engineer (Mechanical ‐Piping)
ADVITA CHANDRAKA 42958 1 years4months20 days
0‐18 Daughter F 200000Noida Office
729 01‐Jan‐19 31‐Dec‐19 51060 E2Bhupendra Kumar Chandrakar
Asst Chief Engineer (Mechanical ‐Piping)
Shweta Chandrakar 33076 28 years5months9 days
26‐30 Spouse F 200000Noida Office
730 01‐Jan‐19 31‐Dec‐19 51060 E2Bhupendra Kumar Chandrakar
Asst Chief Engineer (Mechanical ‐Piping)
Kanti Chandrakar 17‐Jun‐1970 48 years6months14 days
46‐50 Mother F 200000Noida Office
731 01‐Jan‐19 31‐Dec‐19 51060 E2Bhupendra Kumar Chandrakar
Asst Chief Engineer (Mechanical ‐Piping)
Chandrahash Chandrakar
15‐Jul‐1960 58 years5months16 days
56‐60 Father M 200000Noida Office
732 01‐Jan‐19 31‐Dec‐19 51061 E2 Abhilesh KumarAsst. Chief Engineer(Mechanical ‐Const.)
Nandita Agrahari 33933 26 years1months6 days
26‐30 Spouse F 200000Noida Office
733 01‐Jan‐19 31‐Dec‐19 51061 E2 Abhilesh KumarAsst. Chief Engineer(Mechanical ‐Const.)
Madhuri Gupta 01‐Jan‐1951 67 years11months30 days
66‐70 Mother F 200000Noida Office
734 01‐Jan‐19 31‐Dec‐19 51063 E2Jagannath Selvaraj
Asst Chief Engineer(ERP)
M Sivakami 20603 62 years7months3 days
61‐65 Mother F 200000Noida Office
735 01‐Jan‐19 31‐Dec‐19 51063 E2Jagannath Selvaraj
Asst Chief Engineer(ERP)
M Selvaraj 23‐May‐1950 68 years7months8 days
66‐70 Father M 200000Noida Office
736 01‐Jan‐19 31‐Dec‐19 51064 E2 Ali Imran NaqviAsst Chief Engineer(Mechanical‐Machinery
Anjum Naqvi 14‐Apr‐1959 59 years8months17 days
56‐60 Mother F 200000Noida Office
737 01‐Jan‐19 31‐Dec‐19 51064 E2 Ali Imran NaqviAsst Chief Engineer(Mechanical‐Machinery
M A Naqvi 16‐Aug‐1954 64 years4months15 days
61‐65 Father M 200000Noida Office
738 01‐Jan‐19 31‐Dec‐19 51066 E4 Neeraj BaswanAddl.Chief Engineer (Mechanical‐ P.V.)
Priyanka Baswan 21‐Sep‐2009 9 years3months10 days
0‐18 Daughter F 200000Noida Office
739 01‐Jan‐19 31‐Dec‐19 51066 E4 Neeraj BaswanAddl.Chief Engineer (Mechanical‐ P.V.)
ANKITA BASWAN 42441 2 years9months19 days
0‐18 Daughter F 200000Noida Office
740 01‐Jan‐19 31‐Dec‐19 51066 E4 Neeraj BaswanAddl.Chief Engineer (Mechanical‐ P.V.)
Vishal Singh Baswan 27‐Mar‐2006 12 years9months4 days
0‐18 Son M 200000Noida Office
741 01‐Jan‐19 31‐Dec‐19 51066 E4 Neeraj BaswanAddl.Chief Engineer (Mechanical‐ P.V.)
Rakhi Rani Baswan 28‐Oct‐1979 39 years2months3 days
36‐40 Spouse F 200000Noida Office
742 01‐Jan‐19 31‐Dec‐19 51068 E1 Sudhakar SharmaSr. Designer (Electrical)
Megha Sharma 04‐May‐2000 18 years7months27 days
0‐18 Daughter F 200000Noida Office
743 01‐Jan‐19 31‐Dec‐19 51068 E1 Sudhakar SharmaSr. Designer (Electrical)
Paras Sharma 05‐Jul‐2005 13 years5months26 days
0‐18 Son M 200000Noida Office
744 01‐Jan‐19 31‐Dec‐19 51068 E1 Sudhakar SharmaSr. Designer (Electrical)
Mamta Sharma 05‐Jul‐1977 41 years5months26 days
41‐45 Spouse F 200000Noida Office
745 01‐Jan‐19 31‐Dec‐19 51068 E1 Sudhakar SharmaSr. Designer (Electrical)
Usha Sharma 01‐Jan‐1950 68 years11months30 days
66‐70 Mother F 200000Noida Office
746 01‐Jan‐19 31‐Dec‐19 51070 E1 Ramesh HanraSr. Designer (Mechanical ‐Piping)
Riddhima Hanra 41052 6 years7months8 days
0‐18 Daughter F 200000Noida Office
747 01‐Jan‐19 31‐Dec‐19 51070 E1 Ramesh HanraSr. Designer (Mechanical ‐Piping)
Debashri Bari (Hanra)
24‐May‐1990 28 years7months7 days
26‐30 Spouse F 200000Noida Office
748 01‐Jan‐19 31‐Dec‐19 51070 E1 Ramesh HanraSr. Designer (Mechanical ‐Piping)
Durga Hanra 20‐Feb‐1954 64 years10months11 days
61‐65 Mother F 200000Noida Office
749 01‐Jan‐19 31‐Dec‐19 51070 E1 Ramesh HanraSr. Designer (Mechanical ‐Piping)
Prabhas Chandra Hara
03‐Jun‐1944 74 years6months28 days
71‐75 Father M 200000Noida Office
750 01‐Jan‐19 31‐Dec‐19 51071 E2Hemant Singh Bisht
Asst Chief Engineer (Elect.‐Insp.)
Tatsat Singh Bisht 42101 3 years8months24 days
0‐18 Son M 200000Kolkota INS & NDT
751 01‐Jan‐19 31‐Dec‐19 51071 E2Hemant Singh Bisht
Asst Chief Engineer (Elect.‐Insp.)
Uma Bisht 32094 31 years1months18 days
31‐35 Spouse F 200000Kolkota INS & NDT
752 01‐Jan‐19 31‐Dec‐19 51071 E2Hemant Singh Bisht
Asst Chief Engineer (Elect.‐Insp.)
Anandi Bisht 24‐Dec‐1965 53 years0months7 days
51‐55 Mother F 200000Kolkota INS & NDT
753 01‐Jan‐19 31‐Dec‐19 51071 E2Hemant Singh Bisht
Asst Chief Engineer (Elect.‐Insp.)
Mahendra Singh Bisht
08‐Aug‐1957 61 years4months23 days
61‐65 Father M 200000Kolkota INS & NDT
754 01‐Jan‐19 31‐Dec‐19 51072 E1 Binod Kumar Sr. Engineer (Process)Priti Barnwal
31533 32 years7months30 days
31‐35 Spouse F 200000Noida Office
Page 26 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
755 01‐Jan‐19 31‐Dec‐19 51073 E4Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
Somya Samridhi 09‐Jul‐2012 6 years5months22 days
0‐18 Daughter F 200000Noida Office
756 01‐Jan‐19 31‐Dec‐19 51073 E4Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
Kunal Kumar 31‐Oct‐2007 11 years2months0 days
0‐18 Son M 200000Noida Office
757 01‐Jan‐19 31‐Dec‐19 51073 E4Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
Sumitra Sahoo 28‐Feb‐1982 36 years10months3 days
36‐40 Spouse F 200000Noida Office
758 01‐Jan‐19 31‐Dec‐19 51073 E4Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
Laxmi 09‐Jul‐1954 64 years5months22 days
61‐65 Mother F 200000Noida Office
759 01‐Jan‐19 31‐Dec‐19 51073 E4Basant Kumar Sahoo
COMANY SECRETARY & LEGAL OFFICER
Dharam Sahoo 28‐Feb‐1948 70 years10months3 days
66‐70 Father M 200000Noida Office
760 01‐Jan‐19 31‐Dec‐19 51075 E3 Ranjana SharmaDY. CHIEF ENGINEER(CHEMICAL)
Aarav Jaswal 41521 5 years3months27 days
0‐18 Son M 200000Noida Office
761 01‐Jan‐19 31‐Dec‐19 51075 E3 Ranjana SharmaDY. CHIEF ENGINEER(CHEMICAL)
Vikesh Jaswal 31169 33 years7months29 days
31‐35 Spouse M 200000Noida Office
762 01‐Jan‐19 31‐Dec‐19 51076 E3 Ankur Saxena Dy. Manager (BD) KAVERI VERMA 31924 31 years7months4 days
31‐35 Spouse F 200001Noida Office
763 01‐Jan‐19 31‐Dec‐19 51076 E3 Ankur Saxena Dy. Manager (BD) Dhairya Saxena 27/3/2017 #VALUE! 0‐18 Son M 200000Noida Office
764 01‐Jan‐19 31‐Dec‐19 51077 E2Amit Kant Varshney
Asst. Manager (MM) Jyoti Varshney 30631 35 years1months20 days
31‐35 Spouse F 200000Noida Office
765 01‐Jan‐19 31‐Dec‐19 51077 E2Amit Kant Varshney
Asst. Manager (MM) Meera Varshney 21200 60 years11months16 days
56‐60 Mother F 200000Noida Office
766 01‐Jan‐19 31‐Dec‐19 51077 E2Amit Kant Varshney
Asst. Manager (MM)Ratan Gopal Varshney
20651 62 years5months16 days
61‐65 Father M 200000Noida Office
767 01‐Jan‐19 31‐Dec‐19 51078 E1 Vishal RathiSr. Engineer(Mechanical)
Priti Rathi 32429 30 years2months18 days
26‐30 Spouse F 200000Noida Office
768 01‐Jan‐19 31‐Dec‐19 51080 E1 Amita Rawat Sr. Officer (Finance) Aahana Bhadula 41675 4 years10months26 days
0‐18 Daughter F 200000Noida Office
769 01‐Jan‐19 31‐Dec‐19 51080 E1 Amita Rawat Sr. Officer (Finance) Subda Devi 24167 52 years9months30 days
51‐55 Mother F 200000Noida Office
770 01‐Jan‐19 31‐Dec‐19 51080 E1 Amita Rawat Sr. Officer (Finance)Chandan Singh Rawat
21186 60 years11months30 days
56‐60 Father M 200000Noida Office
771 01‐Jan‐19 31‐Dec‐19 51081 E1 Poonam Singh Sr. Officer(C‐P&A) Anaahita Singh 41786 4 years7months4 days
0‐18 Daughter F 200000Noida Office
772 01‐Jan‐19 31‐Dec‐19 51081 E1 Poonam Singh Sr. Officer(C‐P&A) Arastya Singh 42618 2 years3months26 days
0‐18 Son M 200000Noida Office
773 01‐Jan‐19 31‐Dec‐19 51081 E1 Poonam Singh Sr. Officer(C‐P&A) Madhuri Singh 20675 62 years4months23 days
61‐65 Mother F 200000Noida Office
774 01‐Jan‐19 31‐Dec‐19 51081 E1 Poonam Singh Sr. Officer(C‐P&A)Madan Mohan Singh
16198 74 years7months25 days
71‐75 Father M 200000Noida Office
775 01‐Jan‐19 31‐Dec‐19 51082 E2Ch Surya Kumar Nalla
Asst. Chief Engineer(Inst.‐Insp.)
N Sanyasi Naidu 26850 45 years5months26 days
41‐45 Father M 200000Mumbai INS & NDT
776 01‐Jan‐19 31‐Dec‐19 51082 E2Ch Surya Kumar Nalla
Asst. Chief Engineer(Inst.‐Insp.)
N Venkata Ratnam 26230 47 years2months7 days
46‐50 Mother F 200000Mumbai INS & NDT
777 01‐Jan‐19 31‐Dec‐19 51082 E2Ch Surya Kumar Nalla
Asst. Chief Engineer(Inst.‐Insp.)
Varri Lavanya Kumari
21/8/1990 #VALUE! 26‐30 Spouse F 200000Mumbai INS & NDT
778 01‐Jan‐19 31‐Dec‐19 51083 W6 Bilal KhanSR.DRAFTSMAN MECHANICAL PIPING 3D MODELR
Musarrat Jahan 23743 53 years11months30 days
51‐55 Mother F 200000Noida Office
779 01‐Jan‐19 31‐Dec‐19 51083 W6 Bilal KhanSR.DRAFTSMAN MECHANICAL PIPING 3D MODELR
Tanvir Ahmad 19158 66 years6months18 days
66‐70 Father M 200000Noida Office
780 01‐Jan‐19 31‐Dec‐19 51085 E2 Subeen MathurAsst. Chief Engineer(Planning)
Ayra Mathur 41415 5 years7months10 days
0‐18 Daughter F 200000Noida Office
781 01‐Jan‐19 31‐Dec‐19 51085 E2 Subeen MathurAsst. Chief Engineer(Planning)
Shruti Kirti Mathur 31880 31 years8months18 days
31‐35 Spouse F 200000Noida Office
782 01‐Jan‐19 31‐Dec‐19 51085 E2 Subeen MathurAsst. Chief Engineer(Planning)
Khushiram Mathur 21916 58 years11months30 days
56‐60 Father M 200000Noida Office
783 01‐Jan‐19 31‐Dec‐19 51085 E2 Subeen MathurAsst. Chief Engineer(Planning)
Himandini Mathur 22685 56 years10months23 days
56‐60 Mother F 200000Noida Office
Page 27 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
784 01‐Jan‐19 31‐Dec‐19 51087 W6 Arun KumarSR. DRAFTSMAN(CIVIL 3D MODELLER)
Aadish 41087 6 years6months4 days
0‐18 Son M 200000Noida Office
785 01‐Jan‐19 31‐Dec‐19 51087 W6 Arun KumarSR. DRAFTSMAN(CIVIL 3D MODELLER)
Kalpana Arya 30033 36 years9months8 days
36‐40 Spouse F 200000Noida Office
786 01‐Jan‐19 31‐Dec‐19 51087 W6 Arun KumarSR. DRAFTSMAN(CIVIL 3D MODELLER)
Mayawati 18445 68 years5months30 days
66‐70 Mother F 200000Noida Office
787 01‐Jan‐19 31‐Dec‐19 51088 E2 Ganesh ChAsst. Chief Engineer (Civil)
Jignesh Ch 40702 7 years6months23 days
0‐18 Son M 200000Noida Office
788 01‐Jan‐19 31‐Dec‐19 51088 E2 Ganesh ChAsst. Chief Engineer (Civil)
Agnivesh Ch 41282 5 years11months23 days
0‐18 Son M 200000Noida Office
789 01‐Jan‐19 31‐Dec‐19 51088 E2 Ganesh ChAsst. Chief Engineer (Civil)
Lata Ch 31909 31 years7months19 days
31‐35 Spouse F 200000Noida Office
790 01‐Jan‐19 31‐Dec‐19 51088 E2 Ganesh ChAsst. Chief Engineer (Civil)
Laxmi Bal Ch 19775 64 years10months11 days
61‐65 Mother F 200000Noida Office
791 01‐Jan‐19 31‐Dec‐19 51090 E3 Saima ShireenDeputy Chief Engineer(Civil)
Sabiha Sultana 21074 61 years3months20 days
61‐65 Mother F 200000Noida Office
792 01‐Jan‐19 31‐Dec‐19 60063 E2 Bakul S ShahASST.MANAGER (FINANCE)
Rajeshree B Shah 19‐Jan‐1963 55 years11months12 days
51‐55 Spouse F 200000Vadodara Office
793 01‐Jan‐19 31‐Dec‐19 60063 E2 Bakul S ShahASST.MANAGER (FINANCE)
Surendra N Shah 30‐Jul‐1932 86 years5months1 days
Above 80 Father M 200000Vadodara Office
794 01‐Jan‐19 31‐Dec‐19 60068 E1 J P Dabhi Sr. Designer (Mech.) Mrugesh 05‐Apr‐2001 17 years8months26 days
0‐18 Son M 200000Vadodara Office
795 01‐Jan‐19 31‐Dec‐19 60068 E1 J P Dabhi Sr. Designer (Mech.) Harsh 18‐Jan‐1995 23 years11months13 days
19‐25 Son M 200000Vadodara Office
796 01‐Jan‐19 31‐Dec‐19 60068 E1 J P Dabhi Sr. Designer (Mech.) Mandakini 23‐Jun‐1965 53 years6months8 days
51‐55 Spouse F 200000Vadodara Office
797 01‐Jan‐19 31‐Dec‐19 60070 E2 M A NerlekarAsst. Manager (Admin)
S M Nerlekar 18‐Jul‐2003 15 years5months13 days
0‐18 Son M 200000Vadodara Office
798 01‐Jan‐19 31‐Dec‐19 60070 E2 M A NerlekarAsst. Manager (Admin)
S M Nerlekar 18‐Jul‐2003 15 years5months13 days
0‐18 Spouse F 200000Vadodara Office
799 01‐Jan‐19 31‐Dec‐19 60070 E2 M A NerlekarAsst. Manager (Admin)
M A Nerlekar 15‐Mar‐1939 79 years9months16 days
76‐80 Mother F 200000Vadodara Office
800 01‐Jan‐19 31‐Dec‐19 60075 E2Urvashi Manoj Jadhav
ASST.CHIEF ENGINEER(CIVIL)
Bhargav M Jadhav 17‐Mar‐2001 17 years9months14 days
0‐18 Son M 200000Vadodara Office
801 01‐Jan‐19 31‐Dec‐19 60075 E2Urvashi Manoj Jadhav
ASST.CHIEF ENGINEER(CIVIL)
Priya M Jadhav 02‐Jul‐1998 20 years5months29 days
19‐25 Daughter F 200000Vadodara Office
802 01‐Jan‐19 31‐Dec‐19 60075 E2Urvashi Manoj Jadhav
ASST.CHIEF ENGINEER(CIVIL)
SHASHIKALA M JADH15493 76 years6months30
days76‐80
MOTHE IN F 200000
Vadodara Office
803 01‐Jan‐19 31‐Dec‐19 60079 E2Sunita Rajesh Ramnani
ASST.MANAGER DESIGN (ELECT.)
Juhi Rajesh Ramnani 26‐Jun‐1994 24 years6months5 days
19‐25 Daughter F 200000Vadodara Office
804 01‐Jan‐19 31‐Dec‐19 60080 E2 R M ShahAsst.Manager (Design‐PE)
Yesha R Shah 05‐Feb‐1994 24 years10months26 days
19‐25 Daughter F 200000Vadodara Office
805 01‐Jan‐19 31‐Dec‐19 60080 E2 R M ShahAsst.Manager (Design‐PE)
Parth R Shah 08‐May‐1998 20 years7months23 days
19‐25 Son M 200000Vadodara Office
806 01‐Jan‐19 31‐Dec‐19 60080 E2 R M ShahAsst.Manager (Design‐PE)
Rupal R Shah 07‐Jul‐1972 46 years5months24 days
46‐50 Spouse F 200000Vadodara Office
807 01‐Jan‐19 31‐Dec‐19 60090 W6 J C JoshiSR.RECORD KEEPER (MECH.)
Kirtika Joshi 06‐Dec‐2000 18 years0months25 days
0‐18 Daughter F 200000Vadodara Office
808 01‐Jan‐19 31‐Dec‐19 60090 W6 J C JoshiSR.RECORD KEEPER (MECH.)
Karan Joshi 21‐Jan‐1997 21 years11months10 days
19‐25 Son M 200000Vadodara Office
809 01‐Jan‐19 31‐Dec‐19 60090 W6 J C JoshiSR.RECORD KEEPER (MECH.)
Chandrakala Joshi 03‐May‐1973 45 years7months28 days
41‐45 Spouse F 200000Vadodara Office
810 01‐Jan‐19 31‐Dec‐19 60094 E4 Nitin Singh YadavAddl.Chief Engineer (Piping)
Baby Of Parul Yadav 42471 2 years8months20 days
0‐18 Son M 200000Noida Office
811 01‐Jan‐19 31‐Dec‐19 60094 E4 Nitin Singh YadavAddl.Chief Engineer (Piping)
Aarav Yadav42471 2 years8months20
days0‐18 Son M 200000
Noida Office
812 01‐Jan‐19 31‐Dec‐19 60094 E4 Nitin Singh YadavAddl.Chief Engineer (Piping)
Parul Yadav 01‐Jan‐1991 27 years11months30 days
26‐30 Spouse F 200000Noida Office
Page 28 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
813 01‐Jan‐19 31‐Dec‐19 60094 E4 Nitin Singh YadavAddl.Chief Engineer (Piping)
Asha Yadav 01‐Jan‐1964 54 years11months30 days
51‐55 Mother F 200000Noida Office
814 01‐Jan‐19 31‐Dec‐19 60094 E4 Nitin Singh YadavAddl.Chief Engineer (Piping)
Kailash Yadav 01‐Jan‐1960 58 years11months30 days
56‐60 Father M 200000Noida Office
815 01‐Jan‐19 31‐Dec‐19 60096 E3Ashish Mahendrabhai Shah
Dy.CE (Inspection) Jaime A Shah 09‐Apr‐2010 8 years8months22 days
0‐18 Son M 200000Baroda INS & NDT
816 01‐Jan‐19 31‐Dec‐19 60096 E3 ASHISH SHAH Dy.CE (Inspection) RENCY 42402 2 years10months29 days
0‐18 DAUGHTER F 200000Baroda INS & NDT
817 01‐Jan‐19 31‐Dec‐19 60096 E3Ashish Mahendrabhai Shah
Dy.CE (Inspection) Nisha A Shah 05‐Feb‐1979 39 years10months26 days
36‐40 Spouse F 200000Baroda INS & NDT
818 01‐Jan‐19 31‐Dec‐19 60096 E3Ashish Mahendrabhai Shah
Dy.CE (Inspection) Varshaben M Shah 29‐Nov‐1955 63 years1months2 days
61‐65 Mother F 200000Baroda INS & NDT
819 01‐Jan‐19 31‐Dec‐19 60096 E3Ashish Mahendrabhai Shah
Dy.CE (Inspection)Mahendrabhai S Shah
05‐Oct‐1947 71 years2months26 days
71‐75 Father M 200000Baroda INS & NDT
820 01‐Jan‐19 31‐Dec‐19 60099 E4Nageswara Rao Are
ADDL. CHIEF ENGR.(PROCESS)
Are Rakshitha 16‐Jan‐2012 6 years11months15 days
0‐18 Daughter F 200000Vadodara Office
821 01‐Jan‐19 31‐Dec‐19 60099 E4Nageswara Rao Are
ADDL. CHIEF ENGR.(PROCESS)
Are Sarthvik 42548 2 years6months4 days
0‐18 Son M 200000Vadodara Office
822 01‐Jan‐19 31‐Dec‐19 60099 E4Nageswara Rao Are
ADDL. CHIEF ENGR.(PROCESS)
Are Kauitha 25‐Aug‐1983 35 years4months6 days
31‐35 Spouse F 200000Vadodara Office
823 01‐Jan‐19 31‐Dec‐19 60099 E4Nageswara Rao Are
ADDL. CHIEF ENGR.(PROCESS)
Are Aseervadam 01‐Jan‐1960 58 years11months30 days
56‐60 Mother F 200000Vadodara Office
824 01‐Jan‐19 31‐Dec‐19 60101 E4Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
Aaradhya 06‐Nov‐2013 5 years1months25 days
0‐18 Daughter F 200000Vadodara Office
825 01‐Jan‐19 31‐Dec‐19 60101 E4Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
Anika Pandey 42783 1 years10months14 days
0‐18 Daughter F 200000Vadodara Office
826 01‐Jan‐19 31‐Dec‐19 60101 E4Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
Priyamvada 01‐Nov‐1984 34 years1months30 days
31‐35 Spouse F 200000Vadodara Office
827 01‐Jan‐19 31‐Dec‐19 60101 E4Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
Savita Pandey 21‐Apr‐1958 60 years8months10 days
56‐60 Mother F 200000Vadodara Office
828 01‐Jan‐19 31‐Dec‐19 60101 E4Krishnakumar Pandey
ADDL.CHIEF ENGR. (MECH.)
Ramakant Pandey 10‐Jan‐1943 75 years11months21 days
71‐75 Father M 200000Vadodara Office
829 01‐Jan‐19 31‐Dec‐19 60103 E4 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
Devishi Vishwakarama
25‐Nov‐2012 6 years1months6 days
0‐18 Daughter F 200000Vadodara Office
830 01‐Jan‐19 31‐Dec‐19 60103 E4 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
Tanvee Vishwakarma43001 1 years3months8
days0‐18 Daughter F 200000
Vadodara Office
831 01‐Jan‐19 31‐Dec‐19 60103 E4 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
Preeti Vishwakarma 13‐Jun‐1985 33 years6months18 days
31‐35 Spouse F 200000Vadodara Office
832 01‐Jan‐19 31‐Dec‐19 60103 E4 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
Shashi Vishwakarma 01‐Jan‐1959 59 years11months30 days
56‐60 Mother F 200000Vadodara Office
833 01‐Jan‐19 31‐Dec‐19 60103 E4 P VishwakarmaADDL. CHIEF ENGR. (P.M.)
Vishwakarma 09‐Jul‐1952 66 years5months22 days
66‐70 Father M 200000Vadodara Office
834 01‐Jan‐19 31‐Dec‐19 60109 E4Abhishek Shrivastava
ADDL. CHIEF ENGR. (Mech.)
Rudraditya Shrivastava
21‐Jun‐2013 5 years6months10 days
0‐18 Son M 200000Vadodara Office
835 01‐Jan‐19 31‐Dec‐19 60109 E4Abhishek Shrivastava
ADDL. CHIEF ENGR. (Mech.)
Abhilasha Shrivastava
28‐Nov‐1984 34 years1months3 days
31‐35 Spouse F 200000Vadodara Office
836 01‐Jan‐19 31‐Dec‐19 60109 E4Abhishek Shrivastava
ADDL. CHIEF ENGR. (Mech.)
Ramkrishna Shrivastava
19731 64 years11months24 days
61‐65 Father M 200000Vadodara Office
837 01‐Jan‐19 31‐Dec‐19 60109 E4Abhishek Shrivastava
ADDL. CHIEF ENGR. (Mech.)
Rashmi Shrivastava 20455 62 years11months30 days
61‐65 Mother F 200000Vadodara Office
838 01‐Jan‐19 31‐Dec‐19 60113 E4 Subhash C SinghADDL.C.E. (INDL.ENGG.)
Harshvardhan Singh 01‐Jan‐2011 7 years11months30 days
0‐18 Son M 200000Vadodara Office
839 01‐Jan‐19 31‐Dec‐19 60113 E4 Subhash C SinghADDL.C.E. (INDL.ENGG.)
ARJUN SINGH43265 0 years6months17
days0‐18 Son M 200000
Vadodara Office
840 01‐Jan‐19 31‐Dec‐19 60113 E4 Subhash C SinghADDL.C.E. (INDL.ENGG.)
Rachana Singh 09‐Jun‐1985 33 years6months22 days
31‐35 Spouse F 200000Vadodara Office
841 01‐Jan‐19 31‐Dec‐19 60113 E4 Subhash C SinghADDL.C.E. (INDL.ENGG.)
Shakuntala Singh 22112 58 years5months16 days
56‐60 Mother F 200000Vadodara Office
Page 29 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
842 01‐Jan‐19 31‐Dec‐19 60114 E3 Sandeep KumarDY CHIEF ENGR.(INSTN.)
Apexa 28‐Mar‐2013 5 years9months3 days
0‐18 Daughter F 200000Vadodara Office
843 01‐Jan‐19 31‐Dec‐19 60114 E3 Sandeep KumarDY CHIEF ENGR.(INSTN.)
Rashmi 08‐Jan‐1987 31 years11months23 days
31‐35 Spouse F 200000Vadodara Office
844 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) Nirmit J Vaniya 24‐Sep‐2009 9 years3months7 days
0‐18 Daughter F 200000Vadodara Office
845 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) Mayan Vaniya 42668 2 years2months6 days
0‐18 Son M 200000Vadodara Office
846 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) Pranjal J Vaniya 20‐Oct‐2006 12 years2months11 days
0‐18 Daughter F 200000Vadodara Office
847 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) Sudha J Vaniya 15‐Dec‐1983 35 years0months16 days
31‐35 Spouse F 200000Vadodara Office
848 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.)Manjula Ben M Vaniya
01‐Jan‐1952 66 years11months30 days
66‐70 Mother F 200000Vadodara Office
849 01‐Jan‐19 31‐Dec‐19 60116 E4Jitesh Manubhai Vaniya
ADDL. C.E.(INSTN.) Manubhai H Vaniya 16742 73 years1months30 days
71‐75 Father M 200000Vadodara Office
850 01‐Jan‐19 31‐Dec‐19 60118 E0 Urvi J Patel DESIGNER (CIVIL) Patel Meet Jaymin 23‐Mar‐2013 5 years9months8 days
0‐18 Son M 200000Vadodara Office
851 01‐Jan‐19 31‐Dec‐19 60118 E0 Urvi J Patel DESIGNER (CIVIL) Sarlaben C Patel 20721 62 years3months8 days
61‐65 Mother F 200000Vadodara Office
852 01‐Jan‐19 31‐Dec‐19 60118 E0 Urvi J Patel DESIGNER (CIVIL) Chandu Bhai R Patel 17521 71 years0months11 days
71‐75 Father M 200000Vadodara Office
853 01‐Jan‐19 31‐Dec‐19 60120 E4 Arunkumar GuptaADDL. CHIEF ENGR. (Mech.)
Radha Gupta 15‐Jan‐1959 59 years11months16 days
56‐60 Mother F 200000Vadodara Office
854 01‐Jan‐19 31‐Dec‐19 60120 E4 Arunkumar GuptaADDL. CHIEF ENGR. (Mech.)
Shyam Narayan Gupta
10‐Mar‐1952 66 years9months21 days
66‐70 Father M 200000Vadodara Office
855 01‐Jan‐19 31‐Dec‐19 60121 E0Tejaskumar J Vesuwala
DESIGNER (CIVIL) Tanish T Vesuwala 19‐Apr‐2011 7 years8months12 days
0‐18 Son M 200000Vadodara Office
856 01‐Jan‐19 31‐Dec‐19 60121 E0Tejaskumar J Vesuwala
DESIGNER (CIVIL) Hetal T Vesuwala 01‐May‐1990 28 years7months30 days
26‐30 Spouse F 200000Vadodara Office
857 01‐Jan‐19 31‐Dec‐19 60121 E0Tejaskumar J Vesuwala
DESIGNER (CIVIL)Jayashreeben J Vesuwala
14‐Oct‐1964 54 years2months17 days
51‐55 Mother F 200000Vadodara Office
858 01‐Jan‐19 31‐Dec‐19 60121 E0Tejaskumar J Vesuwala
DESIGNER (CIVIL)Jashavantlal L Vesuwala
07‐Jun‐1958 60 years6months24 days
56‐60 Father M 200000Vadodara Office
859 01‐Jan‐19 31‐Dec‐19 60123 E6 Mukesh KumarDY GENERAL MANAGER (FINANCE)
Anmol Aaditya Verma
20‐Oct‐2011 7 years2months11 days
0‐18 Son M 200000Vadodara Office
860 01‐Jan‐19 31‐Dec‐19 60123 E6 Mukesh KumarDY GENERAL MANAGER (FINANCE)
Aaditya Verma 26‐Jun‐2004 14 years6months5 days
0‐18 Son M 200000Vadodara Office
861 01‐Jan‐19 31‐Dec‐19 60123 E6 Mukesh KumarDY GENERAL MANAGER (FINANCE)
Rashmi Verma 01‐Mar‐1980 38 years9months30 days
36‐40 Spouse F 200000Vadodara Office
862 01‐Jan‐19 31‐Dec‐19 60123 E6 Mukesh KumarDY GENERAL MANAGER (FINANCE)
Urmila Verma 01‐Sep‐1948 70 years3months30 days
66‐70 Mother F 200000Vadodara Office
863 01‐Jan‐19 31‐Dec‐19 60125 E3Satyendra Kumar Verma
DY CHIEF ENGR.(COMPUTER)
Raghvendra Kumar 13‐Jul‐2013 5 years5months18 days
0‐18 Son M 200000Vadodara Office
864 01‐Jan‐19 31‐Dec‐19 60125 E3Satyendra Kumar Verma
DY CHIEF ENGR.(COMPUTER)
Sandhya Verma 30‐Jun‐1987 31 years6months1 days
31‐35 Spouse F 200000Vadodara Office
865 01‐Jan‐19 31‐Dec‐19 60127 E3Riteshkumar Pandey
DY.CHIEF ENGINEER (ELECT.)
PRISHA PANDEY43117 0 years11months14
days0‐18 Daughter F 200000
Noida Office
866 01‐Jan‐19 31‐Dec‐19 60127 E3Riteshkumar Pandey
DY.CHIEF ENGINEER (ELECT.)
Shalini Pandey 31463 32 years10months11 days
31‐35 Spouse F 200000Noida Office
867 01‐Jan‐19 31‐Dec‐19 60127 E3Riteshkumar Pandey
DY.CHIEF ENGINEER (ELECT.)
Sushila Pandey 02‐Jul‐1953 65 years5months29 days
61‐65 Mother F 200000Noida Office
868 01‐Jan‐19 31‐Dec‐19 60127 E3Riteshkumar Pandey
DY.CHIEF ENGINEER (ELECT.)
Madan Pandey 01‐Jul‐1950 68 years5months30 days
66‐70 Father M 200000Noida Office
869 01‐Jan‐19 31‐Dec‐19 60132 E3Ajaypalsinh N Sisodiya
DY.MANAGER (MM)Sisodiya Jayveersinh Ajaypalsinh
14‐Apr‐2012 6 years8months17 days
0‐18 Son M 200000Vadodara Office
870 01‐Jan‐19 31‐Dec‐19 60132 E3Ajaypalsinh N Sisodiya
DY.MANAGER (MM)Sisodiya Archanaben Ajaypalsinh
05‐Dec‐1984 34 years0months26 days
31‐35 Spouse F 200000Vadodara Office
Page 30 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
871 01‐Jan‐19 31‐Dec‐19 60132 E3Ajaypalsinh N Sisodiya
DY.MANAGER (MM)Sisodiya Jayaba Narendrasinh
15‐May‐1960 58 years7months16 days
56‐60 Mother F 200000Vadodara Office
872 01‐Jan‐19 31‐Dec‐19 60132 E3Ajaypalsinh N Sisodiya
DY.MANAGER (MM)Sisodiya Narendrasinh Jethusinh
15‐Feb‐1955 63 years10months16 days
61‐65 Father M 200000Vadodara Office
873 01‐Jan‐19 31‐Dec‐19 60136 E3 Mukesh KumarDY CHIEF ENGR. (MECH.)
Ojas Mehta 01‐Jul‐2013 5 years5months30 days
0‐18 Son M 200000Vadodara Office
874 01‐Jan‐19 31‐Dec‐19 60136 E3 Mukesh KumarDY CHIEF ENGR. (MECH.)
Poonam Kumari 19‐Dec‐1983 35 years0months12 days
31‐35 Spouse F 200000Vadodara Office
875 01‐Jan‐19 31‐Dec‐19 60136 E3 Mukesh KumarDY CHIEF ENGR. (MECH.)
Manju Devi 21950 58 years10months27 days
56‐60 Mother F 200000Vadodara Office
876 01‐Jan‐19 31‐Dec‐19 60136 E3 Mukesh KumarDY CHIEF ENGR. (MECH.)
Chamru Mehta 20885 61 years9months25 days
61‐65 Father M 200000Vadodara Office
877 01‐Jan‐19 31‐Dec‐19 60138 E3Kr Shashi Bhushan
DY CHIEF ENGR. (MECH.)
Tanu 05‐Apr‐2012 6 years8months26 days
0‐18 Daughter F 200000Vadodara Office
878 01‐Jan‐19 31‐Dec‐19 60138 E3Kr Shashi Bhushan
DY CHIEF ENGR. (MECH.)
Tanay 42108 3 years8months17 days
0‐18 Son M 200000Vadodara Office
879 01‐Jan‐19 31‐Dec‐19 60138 E3Kr Shashi Bhushan
DY CHIEF ENGR. (MECH.)
Anuradha Kumari 05‐Jun‐1984 34 years6months26 days
31‐35 Spouse F 200000Vadodara Office
880 01‐Jan‐19 31‐Dec‐19 60138 E3Kr Shashi Bhushan
DY CHIEF ENGR. (MECH.)
Munna Devi 09‐Jan‐1964 54 years11months22 days
51‐55 Mother F 200000Vadodara Office
881 01‐Jan‐19 31‐Dec‐19 60142 E3 Qamar AhmadDY CHIEF ENGR.(ELECT.)
Tariq Qamar 42093 3 years9months1 days
0‐18 Son M 200000Vadodara Office
882 01‐Jan‐19 31‐Dec‐19 60142 E3 Qamar AhmadDY CHIEF ENGR.(ELECT.)
Fareeda 03‐Feb‐1988 30 years10months28 days
26‐30 Spouse F 200000Vadodara Office
883 01‐Jan‐19 31‐Dec‐19 60146 E3 Mrudul G PatilDY CHIEF ENGR.(INSTN.)
Saudamini Mrudul Patil
33697 26 years8months28 days
26‐30 Spouse F 200000Vadodara Office
884 01‐Jan‐19 31‐Dec‐19 60146 E3 Mrudul G PatilDY CHIEF ENGR.(INSTN.)
Sadhna Gunderao Patil
22088 58 years6months10 days
56‐60 Mother F 200000Vadodara Office
885 01‐Jan‐19 31‐Dec‐19 60146 E3 Mrudul G PatilDY CHIEF ENGR.(INSTN.)
Gunderao Kachroji Patil
19614 65 years3months19 days
61‐65 Father M 200000Vadodara Office
886 01‐Jan‐19 31‐Dec‐19 60148 E3Ganesh Krishnamurthy
DY CHIEF ENGR.(CIVIL) G Sai Vilashini 41701 4 years9months28 days
0‐18 Daughter F 200000Vadodara Office
887 01‐Jan‐19 31‐Dec‐19 60148 E3Ganesh Krishnamurthy
DY CHIEF ENGR.(CIVIL) Hemavathy Ganesh 26‐Jan‐1990 28 years11months5 days
26‐30 Spouse F 200000Vadodara Office
888 01‐Jan‐19 31‐Dec‐19 60148 E3Ganesh Krishnamurthy
DY CHIEF ENGR.(CIVIL)Rama Krishnamurthy
01‐May‐1959 59 years7months30 days
56‐60 Mother F 200000Vadodara Office
889 01‐Jan‐19 31‐Dec‐19 60148 E3Ganesh Krishnamurthy
DY CHIEF ENGR.(CIVIL) A Krishnamurthy 31‐May‐1955 63 years7months0 days
61‐65 Father M 200000Vadodara Office
890 01‐Jan‐19 31‐Dec‐19 60156 E3Prashant P Dhakate
Dy CHIEF ENGR. (MECH.)
Snehal Dhakate 33104 28 years4months12 days
26‐30 Spouse F 200000Vadodara Office
891 01‐Jan‐19 31‐Dec‐19 60158 E2 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
Arshika Pandit 41982 4 years0months22 days
0‐18 Daughter F 200000Vadodara Office
892 01‐Jan‐19 31‐Dec‐19 60158 E2 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
Jay Kumar Pandit 42859 1 years7months27 days
0‐18 Son M 200000Vadodara Office
893 01‐Jan‐19 31‐Dec‐19 60158 E2 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
Shweta Kumari 14‐Mar‐1993 25 years9months17 days
19‐25 Spouse F 200000Vadodara Office
894 01‐Jan‐19 31‐Dec‐19 60158 E2 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
Sanjukta Devi 01‐Jan‐1959 59 years11months30 days
56‐60 Mother F 200000Vadodara Office
895 01‐Jan‐19 31‐Dec‐19 60158 E2 Aminesh AmarASST.CHIEF ENGINEER (I.E.)
Shankar Pandit 01‐Jan‐1953 65 years11months30 days
61‐65 Father M 200000Vadodara Office
896 01‐Jan‐19 31‐Dec‐19 60162 E2 Anand Prakash ASST. CE (MECH.) Aanvi Prakash 42299 3 years2months9 days
0‐18 Daughter F 200000Vadodara Office
897 01‐Jan‐19 31‐Dec‐19 60162 E2 Anand Prakash ASST. CE (MECH.) Mona Prakash 30‐Jan‐1996 22 years11months1 days
19‐25 Spouse F 200000Vadodara Office
898 01‐Jan‐19 31‐Dec‐19 60162 E2 Anand Prakash ASST. CE (MECH.) Yugal Kishore 20418 63 years1months6 days
61‐65 Father M 200000Vadodara Office
899 01‐Jan‐19 31‐Dec‐19 60162 E2 Anand Prakash ASST. CE (MECH.) Saroj Devi 09‐May‐1957 61 years7months22 days
61‐65 Mother F 200000Vadodara Office
Page 31 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
900 01‐Jan‐19 31‐Dec‐19 60163 E0 Surajit Maity DESIGNER (MECH.) Srija Maity 41920 4 years2months23 days
0‐18 Daughter F 200000Vadodara Office
901 01‐Jan‐19 31‐Dec‐19 60163 E0 Surajit Maity DESIGNER (MECH.) Suvam Maity 27‐Nov‐2007 11 years1months4 days
0‐18 Son M 200000Vadodara Office
902 01‐Jan‐19 31‐Dec‐19 60163 E0 Surajit Maity DESIGNER (MECH.) Bharati Maity 12‐Dec‐1980 38 years0months19 days
36‐40 Spouse F 200000Vadodara Office
903 01‐Jan‐19 31‐Dec‐19 60163 E0 Surajit Maity DESIGNER (MECH.) Kalyani Maity 10‐Jun‐1963 55 years6months21 days
51‐55 Mother F 200000Vadodara Office
904 01‐Jan‐19 31‐Dec‐19 60163 E0 Surajit Maity DESIGNER (MECH.) Ajit Kr Maity 27‐Mar‐1953 65 years9months4 days
61‐65 Father M 200000Vadodara Office
905 01‐Jan‐19 31‐Dec‐19 60164 E2 Sunil KumarASST.CHIEF ENGINEER (MECH.)
Nehansh Narayan 42329 3 years1months10 days
0‐18 Son M 200000Vadodara Office
906 01‐Jan‐19 31‐Dec‐19 60164 E2 Sunil KumarASST.CHIEF ENGINEER (MECH.)
Neha Kumari 32855 29 years0months18 days
26‐30 Spouse F 200000Vadodara Office
907 01‐Jan‐19 31‐Dec‐19 60164 E2 Sunil KumarASST.CHIEF ENGINEER (MECH.)
Kanti Devi 10‐Mar‐1962 56 years9months21 days
56‐60 Mother F 200000Vadodara Office
908 01‐Jan‐19 31‐Dec‐19 60164 E2 Sunil KumarASST.CHIEF ENGINEER (MECH.)
Jeewan Kumar 17‐Aug‐1952 66 years4months14 days
66‐70 Father M 200000Vadodara Office
909 01‐Jan‐19 31‐Dec‐19 60166 E3 Mukesh Kumar Dy CHIEF ENGR. (CIVIL) Prishu 17‐Jun‐2013 5 years6months14 days
0‐18 Son M 200000Vadodara Office
910 01‐Jan‐19 31‐Dec‐19 60166 E3 Mukesh Kumar Dy CHIEF ENGR. (CIVIL) Prity Kumari 28‐Aug‐1986 32 years4months3 days
31‐35 Spouse F 200000Vadodara Office
911 01‐Jan‐19 31‐Dec‐19 60167 E3Bhoopendra Kumar Marskole
Dy CHIEF ENGR. (MECH.)
Aarav Marskole 07‐Dec‐2011 7 years0months24 days
0‐18 Son M 200000Vadodara Office
912 01‐Jan‐19 31‐Dec‐19 60167 E3Bhoopendra Kumar Marskole
Dy CHIEF ENGR. (MECH.)
TVISHA 42786 1 years10months11 days
0‐18 DAUGHTER F 200000Vadodara Office
913 01‐Jan‐19 31‐Dec‐19 60167 E3Bhoopendra Kumar Marskole
Dy CHIEF ENGR. (MECH.)
Chetna Marskole 06‐Feb‐1985 33 years10months25 days
31‐35 Spouse F 200000Vadodara Office
914 01‐Jan‐19 31‐Dec‐19 60167 E3Bhoopendra Kumar Marskole
Dy CHIEF ENGR. (MECH.)
Pratap Singh Marskole
08‐Apr‐1944 74 years8months23 days
71‐75 Father M 200000Vadodara Office
915 01‐Jan‐19 31‐Dec‐19 60168 E3Niladri Shekhar Kar
Dy. Chief Engineer(Mech.)
Atiksh Shekhar Kar 01‐Dec‐2012 6 years0months30 days
0‐18 Son M 200000Noida Office
916 01‐Jan‐19 31‐Dec‐19 60168 E3Niladri Shekhar Kar
Dy. Chief Engineer(Mech.)
Aditi Das Kar 08‐Jan‐1987 31 years11months23 days
31‐35 Spouse F 200000Noida Office
917 01‐Jan‐19 31‐Dec‐19 60168 E3Niladri Shekhar Kar
Dy. Chief Engineer(Mech.)
Anjana Kar 05‐Jan‐1962 56 years11months26 days
56‐60 Mother F 200000Noida Office
918 01‐Jan‐19 31‐Dec‐19 60168 E3Niladri Shekhar Kar
Dy. Chief Engineer(Mech.)
Himadri Shekhar Kar 22‐Jul‐1953 65 years5months9 days
61‐65 Father M 200000Noida Office
919 01‐Jan‐19 31‐Dec‐19 60172 E2 Rajesh KumarASST.CHIEF ENGINEER (MECHANICAL)
Pihu Soni 40832 7 years2months15 days
0‐18 Daughter F 200000Vadodara Office
920 01‐Jan‐19 31‐Dec‐19 60172 E2 Rajesh KumarASST.CHIEF ENGINEER (MECHANICAL)
Rani Kumari Verma 26‐Dec‐1981 37 years0months5 days
36‐40 Spouse F 200000Vadodara Office
921 01‐Jan‐19 31‐Dec‐19 60172 E2 Rajesh KumarASST.CHIEF ENGINEER (MECHANICAL)
Asha Devi 01‐Jan‐1958 60 years11months30 days
56‐60 Mother F 200000Vadodara Office
922 01‐Jan‐19 31‐Dec‐19 60172 E2 Rajesh KumarASST.CHIEF ENGINEER (MECHANICAL)
Ram Awatar Prasad 01‐Dec‐1952 66 years0months30 days
66‐70 Father M 200000Vadodara Office
923 01‐Jan‐19 31‐Dec‐19 60175 E2 Balbir SinghASST.CHIEF ENGINEER (COMPUTER)
Daksh 17‐Aug‐2012 6 years4months14 days
0‐18 Son M 200000Vadodara Office
924 01‐Jan‐19 31‐Dec‐19 60175 E2 Balbir SinghASST.CHIEF ENGINEER (COMPUTER)
Meenakshi 22‐Sep‐1983 35 years3months9 days
31‐35 Spouse F 200000Vadodara Office
925 01‐Jan‐19 31‐Dec‐19 60176 E4 J SudhersonADDL. CHIEF ENGINEER (MECH. ‐ PIPING)
J Maniammal 07‐Sep‐1957 61 years3months24 days
61‐65 Mother F 200000Vadodara Office
926 01‐Jan‐19 31‐Dec‐19 60176 E4 J SudhersonADDL. CHIEF ENGINEER (MECH. ‐ PIPING)
V Jagannathan 11‐Jul‐1950 68 years5months20 days
66‐70 Father M 200000Vadodara Office
927 01‐Jan‐19 31‐Dec‐19 60177 E3 Prashant MohanDy. Chief Engineer (Mech. Mach)
Kaavya Srivastava 42126 3 years7months29 days
0‐18 Daughter F 200000Noida Office
928 01‐Jan‐19 31‐Dec‐19 60177 E3 Prashant MohanDy. Chief Engineer (Mech. Mach)
Deepintika Srivastava
16‐Jun‐1989 29 years6months15 days
26‐30 Spouse F 200000Noida Office
Page 32 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
929 01‐Jan‐19 31‐Dec‐19 60177 E3 Prashant MohanDy. Chief Engineer (Mech. Mach)
Sushil Kumar Srivastava
04‐Jan‐1953 65 years11months27 days
61‐65 Father M 200000Noida Office
930 01‐Jan‐19 31‐Dec‐19 60177 E3 Prashant MohanDy. Chief Engineer (Mech. Mach)
Anju Rani Srivastava 10‐Aug‐1954 64 years4months21 days
61‐65 Mother F 200000Noida Office
931 01‐Jan‐19 31‐Dec‐19 60179 E2Urjit Ashokkumar Parikh
ASST.CHIEF ENGINEER (MECH.‐INSPECTION)
Hetvi Urjit Parikh 26‐May‐2012 6 years7months5 days
0‐18 Daughter F 200000Baroda INS & NDT
932 60179 E2Urjit Ashokkumar Parikh
ASST.CHIEF ENGINEER (MECH.‐INSPECTION)
KUNJALATA ASHOK K19140 66 years7months5
days66‐70
MOTHERF 200000
Baroda INS & NDT
933 60179 E2Urjit Ashokkumar Parikh
ASST.CHIEF ENGINEER (MECH.‐INSPECTION)
ASHOK KUMAR GORD17503 71 years0months29
days71‐75
FATHERM 200000
Baroda INS & NDT
934 01‐Jan‐19 31‐Dec‐19 60181 E2 Shailendra SinghASST.CHIEF ENGR.(CIVIL)
Usha Devi 01‐May‐1973 45 years7months30 days
41‐45 Mother F 200000Vadodara Office
935 01‐Jan‐19 31‐Dec‐19 60181 E2 Shailendra SinghASST.CHIEF ENGR.(CIVIL)
Subash Chandra Singh
22798 56 years6months30 days
56‐60 Father M 200000Vadodara Office
936 01‐Jan‐19 31‐Dec‐19 60184 E5 Vinay PrabhakarCHIEF ENGINEER (PROCESS)
Manan Verma 03‐Sep‐2006 12 years3months28 days
0‐18 Son M 200000Vadodara Office
937 01‐Jan‐19 31‐Dec‐19 60184 E5 Vinay PrabhakarCHIEF ENGINEER (PROCESS)
Anand Prakash 06‐Jul‐1986 32 years5months25 days
31‐35 Father M 200000Vadodara Office
938 01‐Jan‐19 31‐Dec‐19 60184 E5 Vinay PrabhakarCHIEF ENGINEER (PROCESS)
Sonal Prabhakar 09‐Jul‐1974 44 years5months22 days
41‐45 Spouse F 200000Vadodara Office
939 01‐Jan‐19 31‐Dec‐19 60187 E2Anilchowdary Jagarlamudi
ASST. CHIEF ENGR. (PE)
JAGARLAMUNDI ESHA43070 1 years0months30
days0‐18
SONM 200000
Vadodara Office
940 01‐Jan‐19 31‐Dec‐19 60187 E2Anilchowdary Jagarlamudi
ASST. CHIEF ENGR. (PE)
Jagarlamudi Prasanthi
33647 26 years10months18 days
26‐30 Spouse F 200000Vadodara Office
941 01‐Jan‐19 31‐Dec‐19 60187 E2Anilchowdary Jagarlamudi
ASST. CHIEF ENGR. (PE)
Bapamma 14‐Apr‐1966 52 years8months17 days
51‐55 Mother F 200000Vadodara Office
942 01‐Jan‐19 31‐Dec‐19 60187 E2Anilchowdary Jagarlamudi
ASST. CHIEF ENGR. (PE)
Jagarlamudi Subbarao
15‐Mar‐1962 56 years9months16 days
56‐60 Father M 200000Vadodara Office
943 01‐Jan‐19 31‐Dec‐19 60189 E2 Uday PrakashASST.CHIEF ENGR. (MECH.)
Aditi Pateriya 32218 30 years9months15 days
26‐30 Spouse F 200000Vadodara Office
944 01‐Jan‐19 31‐Dec‐19 60190 E2 Nakka Nooka RajuASST. CHIEF ENGR. (PROCESS)
Nakka Appalanarasamma
11‐Oct‐1968 50 years2months20 days
46‐50 Mother F 200000Vadodara Office
945 01‐Jan‐19 31‐Dec‐19 60190 E2 Nakka Nooka RajuASST. CHIEF ENGR. (PROCESS)
Nakka Sanyasirao 15‐Jul‐1961 57 years5months16 days
56‐60 Father M 200000Vadodara Office
946 01‐Jan‐19 31‐Dec‐19 60191 E2 Nikhil GoyalASST. CHIEF ENGR. (MECHANICAL)
Pawan Kumar Goyal 05‐May‐1971 47 years7months26 days
46‐50 Father M 200000Vadodara Office
947 01‐Jan‐19 31‐Dec‐19 60191 E2 Nikhil GoyalASST. CHIEF ENGR. (MECHANICAL)
Mamta Rani Goyal 15‐Feb‐1971 47 years10months16 days
46‐50 Mother F 200000Vadodara Office
948 01‐Jan‐19 31‐Dec‐19 60192 E2Sujeet Kumar Choudhary
ASST.CHIEF ENGR.(PROCESS)
Indra Devi 01‐Jan‐1953 65 years11months30 days
61‐65 Mother F 200000Vadodara Office
949 01‐Jan‐19 31‐Dec‐19 60192 E2Sujeet Kumar Choudhary
ASST.CHIEF ENGR.(PROCESS)
Lallan Ram 15‐Feb‐1947 71 years10months16 days
71‐75 Father M 200000Vadodara Office
950 01‐Jan‐19 31‐Dec‐19 60194 E4 Koushik BiswasADDL. C.E. (MECH. PIPING)
Nayantika Biswas 13‐Mar‐2012 6 years9months18 days
0‐18 Daughter F 200000Vadodara Office
951 01‐Jan‐19 31‐Dec‐19 60194 E4 Koushik BiswasADDL. C.E. (MECH. PIPING)
Manjuri Biswas 02‐Jan‐1983 35 years11months29 days
31‐35 Spouse F 200000Vadodara Office
952 01‐Jan‐19 31‐Dec‐19 60194 E4 Koushik BiswasADDL. C.E. (MECH. PIPING)
Keya Biswas 02‐Jan‐1954 64 years11months29 days
61‐65 Mother F 200000Vadodara Office
953 01‐Jan‐19 31‐Dec‐19 60194 E4 Koushik BiswasADDL. C.E. (MECH. PIPING)
Krishna Kumar Biswas
22‐Mar‐1948 70 years9months9 days
66‐70 Father M 200000Vadodara Office
954 01‐Jan‐19 31‐Dec‐19 60196 E2 AmarjeetASST.CHIEF ENGR.(MECH‐CONSTN.)
Reon 07‐Jan‐2013 5 years11months24 days
0‐18 Son M 200000Vadodara Office
955 01‐Jan‐19 31‐Dec‐19 60196 E2 AmarjeetASST.CHIEF ENGR.(MECH‐CONSTN.)
DORIS 41738 4 years8months22 days
0‐18 DAUGHTER F 200000Vadodara Office
956 01‐Jan‐19 31‐Dec‐19 60196 E2 AmarjeetASST.CHIEF ENGR.(MECH‐CONSTN.)
Geeta 14‐Jul‐1979 39 years5months17 days
36‐40 Spouse F 200000Vadodara Office
957 01‐Jan‐19 31‐Dec‐19 60197 E1 Ram Kumar SR. DESIGNER (ELECT.) Atikesh Kumar 06‐Jun‐2012 6 years6months25 days
0‐18 Son M 200000Vadodara Office
Page 33 of 34
Sl.No. PolStartDate
PolEndDatePriBenefEmp
CodeGRADE
PriBeneficiaryName
DESIGNATION BenefNameDate of Birth
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insure
d
BenefAreaCode
Dependants List of Employees as on 30.11.2018
958 01‐Jan‐19 31‐Dec‐19 60197 E1 Ram Kumar SR. DESIGNER (ELECT.) Anuja Kumari 05‐Jun‐1988 30 years6months26 days
26‐30 Spouse F 200000Vadodara Office
959 01‐Jan‐19 31‐Dec‐19 60198 W6 Anil KumarSR.DRAFTSMAN (MECH. ‐ PIPING)
Shanti Devi 05‐Apr‐1964 54 years8months26 days
51‐55 Mother F 200000Vadodara Office
960 01‐Jan‐19 31‐Dec‐19 60198 W6 Anil KumarSR.DRAFTSMAN (MECH. ‐ PIPING)
Jawahar Prasad 20152 63 years9months27 days
61‐65 Father M 200000Vadodara Office
961 01‐Jan‐19 31‐Dec‐19 60199 E2Kishu Mayank Sinha
ASST. CHIEF ENGR. (P.M.)
Kavya Sinha 42125 3 years7months30 days
0‐18 Daughter F 200000Vadodara Office
962 01‐Jan‐19 31‐Dec‐19 60199 E2Kishu Mayank Sinha
ASST. CHIEF ENGR. (P.M.)
Swati Sinha 24‐Jun‐1990 28 years6months7 days
26‐30 Spouse F 200000Vadodara Office
963 01‐Jan‐19 31‐Dec‐19 60200 W6 Ravi BholaSr. Draftsman‐1 (Mech‐PV)
Hian 42175 3 years6months11 days
0‐18 Son M 200000Noida Office
964 01‐Jan‐19 31‐Dec‐19 60200 W6 Ravi BholaSr. Draftsman‐1 (Mech‐PV)
Mohini 10‐Sep‐1991 27 years3months21 days
26‐30 Spouse F 200000Noida Office
965 01‐Jan‐19 31‐Dec‐19 60200 W6 Ravi BholaSr. Draftsman‐1 (Mech‐PV)
Kailash Bhola 08‐Mar‐1959 59 years9months23 days
56‐60 Mother F 200000Noida Office
966 01‐Jan‐19 31‐Dec‐19 60201 E5 Sahabuddin CHIEF ENGINEER (PE) Silmi Ahmed 39855 9 years10months20 days
0‐18 Daughter F 200000Vadodara Office
967 01‐Jan‐19 31‐Dec‐19 60201 E5 Sahabuddin CHIEF ENGINEER (PE) Aliya Ahmed 42283 3 years2months25 days
0‐18 Daughter F 200000Vadodara Office
968 01‐Jan‐19 31‐Dec‐19 60201 E5 Sahabuddin CHIEF ENGINEER (PE) Alivia Yeasmin 31142 33 years8months26 days
31‐35 Spouse F 200000Vadodara Office
969 01‐Jan‐19 31‐Dec‐19 60201 E5 Sahabuddin CHIEF ENGINEER (PE) Chhayatun Begam 22622 57 years0months24 days
56‐60 Mother F 200000Vadodara Office
970 01‐Jan‐19 31‐Dec‐19 60201 E5 Sahabuddin CHIEF ENGINEER (PE) Sajauddin Molla 20090 63 years11months30 days
61‐65 Father M 200000Vadodara Office
971 01‐Jan‐19 31‐Dec‐19 60202 E4Ganesan Kaliappan
ADDL. CHIEF ENGR. (P.M.)
Pon Janani 41251 6 years0months23 days
0‐18 Daughter F 200000Vadodara Office
972 01‐Jan‐19 31‐Dec‐19 60202 E4Ganesan Kaliappan
ADDL. CHIEF ENGR. (P.M.)
Annapoorani 31590 32 years6months4 days
31‐35 Spouse F 200000Vadodara Office
973 01‐Jan‐19 31‐Dec‐19 60202 E4Ganesan Kaliappan
ADDL. CHIEF ENGR. (P.M.)
Ponnuthai 18375 68 years8months9 days
66‐70 Mother F 200000Vadodara Office
974 01‐Jan‐19 31‐Dec‐19 60202 E4Ganesan Kaliappan
ADDL. CHIEF ENGR. (P.M.)
Kaliyappanadar 17530 71 years0months2 days
71‐75 Father M 200000Vadodara Office
975 01‐Jan‐19 31‐Dec‐19 60204 W6 Sanjib KarmakarSr.DRAFTSMAN (MECH.‐PIPING)
Siddhartha Karmakar
41416 5 years7months9 days
0‐18 Son M 200000Vadodara Office
976 01‐Jan‐19 31‐Dec‐19 60204 W6 Sanjib KarmakarSr.DRAFTSMAN (MECH.‐PIPING)
Sudipa Karmakar 31150 33 years8months18 days
31‐35 Spouse F 200000Vadodara Office
977 01‐Jan‐19 31‐Dec‐19 60204 W6 Sanjib KarmakarSr.DRAFTSMAN (MECH.‐PIPING)
Manika Karmakar 21612 59 years9months28 days
56‐60 Mother F 200000Vadodara Office
978 01‐Jan‐19 31‐Dec‐19 60204 W6 Sanjib KarmakarSr.DRAFTSMAN (MECH.‐PIPING)
Somendra Nath Karmakar
20527 62 years9months18 days
61‐65 Father M 200000Vadodara Office
979 01‐Jan‐19 31‐Dec‐19 60206 E3 Neeraj Mishra Dy.Manager (BD)Akanksha Kaushik
31259 33 years5months0 days
31‐35 Spouse F 200000Vadodara Office
980 01‐Jan‐19 31‐Dec‐19 60206 E3 Neeraj Mishra Dy.Manager (BD) Shakuntala Mishra 18511 68 years3months26 days
66‐70 Mother F 200000Vadodara Office
981 01‐Jan‐19 31‐Dec‐19 60206 E3 Neeraj Mishra Dy.Manager (BD)Ramesh Chandra Mishra
15201 77 years4months18 days
76‐80 Father M 200000Vadodara Office
982 01‐Jan‐19 31‐Dec‐19 60208 E3 Bhupesh KumarDy CHIEF ENGINEER (CIVIL)
Vani Brahiwal 42721 2 years0months14 days
0‐18 Daughter F 200000Noida Office
983 01‐Jan‐19 31‐Dec‐19 60208 E3 Bhupesh KumarDy CHIEF ENGINEER (CIVIL)
Sarita Gautam 31152 33 years8months16 days
31‐35 Spouse F 200000Noida Office
984 01‐Jan‐19 31‐Dec‐19 60209 E1 Neeraj Dubey SR. ENGINEER (CIVIL) Indu Devi 01‐Jan‐1958 60 years11months30 days
56‐60 Mother F 200000Vadodara Office
985 01‐Jan‐19 31‐Dec‐19 60209 E1 Neeraj Dubey SR. ENGINEER (CIVIL) Baban Dubey 22109 58 years5months19 days
56‐60 Father M 200000Vadodara Office
Page 34 of 34
Sl.no.PolStartDate PolEndDate
PriBenefEmpCode GRADE
PriBeneficiaryName BenefName DOB
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insured
1 01‐Jan‐19 31‐Dec‐19 3861 E3 Sant Ram Sant Ram 24‐Mar‐1955 63 years9months7 days 61‐65 Self M 300000
2 01‐Jan‐19 31‐Dec‐19 7957 E2Maradana Simhachalam
Maradana Simhachalam
01‐Jul‐1951 67 years5months30 days 66‐70 Self M 300000
3 01‐Jan‐19 31‐Dec‐19 16453 E5Shit Basant Prasad
Shit Basant Prasad 15‐Nov‐1950 68 years1months16 days 66‐70 Self M 300000
4 01‐Jan‐19 31‐Dec‐19 16463 E4 S S Prasad S S Prasad 01‐Aug‐1951 67 years4months30 days 66‐70 Self M 300000
5 01‐Jan‐19 31‐Dec‐19 16478 E6Ramchandra Prasad Sah
Ramchandra Prasad Sah
14‐Jul‐1950 68 years5months17 days 66‐70 Self M 300000
6 01‐Jan‐19 31‐Dec‐19 18908 E7Anuranjan Prasad Sinha
Anuranjan Prasad Sinha
19‐Jul‐1957 61 years5months12 days 61‐65 Self M 400000
7 01‐Jan‐19 31‐Dec‐19 18909 E7Jogesh Chander Ghai
Jogesh Chander Ghai 17‐Aug‐1951 67 years4months14 days 66‐70 Self M 400000
8 01‐Jan‐19 31‐Dec‐19 18916 E8Subhash Chandra
Subhash Chandra 26‐Nov‐1950 68 years1months5 days 66‐70 Self M 400000
9 01‐Jan‐19 31‐Dec‐19 18917 E7Satish Chandra Tiwari
Satish Chandra Tiwari 17‐May‐1956 62 years7months14 days 61‐65 Self M 400000
10 01‐Jan‐19 31‐Dec‐19 32686 E6 Sheodhar Sheodhar 29‐Sep‐1952 66 years3months2 days 66‐70 Self M 300000
11 01‐Jan‐19 31‐Dec‐19 33572 E8Subhash Chandra Agarwal
Subhash Chandra Agarwal
14‐Oct‐1953 65 years2months17 days 61‐65 Self M 400000
12 01‐Jan‐19 31‐Dec‐19 34130 E3 Md Muslim Md Muslim 25‐Dec‐1957 61 years0months6 days 61‐65 Self M 30000013 01‐Jan‐19 31‐Dec‐19 34154 E7 Saryu Prasad Saryu Prasad 11‐Sep‐1949 69 years3months20 days 66‐70 Self M 400000
14 01‐Jan‐19 31‐Dec‐19 34180 E3Sunil Kanti Chowdhury
Sunil Kanti Chowdhury 29‐Oct‐1952 66 years2months2 days 66‐70 Self M 300000
15 01‐Jan‐19 31‐Dec‐19 34876 E2Deo Nandan Singh
Deo Nandan Singh 06‐May‐1950 68 years7months25 days 66‐70 Self M 300000
16 01‐Jan‐19 31‐Dec‐19 36065 E3Gouri Shankar Mukhopadhyay
Gouri Shankar Mukhopadhyay
17‐Jan‐1951 67 years11months14 days 66‐70 Self M 300000
17 01‐Jan‐19 31‐Dec‐19 36262 E3 Arjun Prasad Arjun Prasad 12‐Sep‐1951 67 years3months19 days 66‐70 Self M 300000
18 01‐Jan‐19 31‐Dec‐19 36263 E4Ram Lakhan Gupta
Ram Lakhan Gupta 10‐Nov‐1953 65 years1months21 days 61‐65 Self M 300000
19 01‐Jan‐19 31‐Dec‐19 36272 E2 Shukram Puran Shukram Puran 13‐Feb‐1949 69 years10months18 days 66‐70 Self M 300000
20 01‐Jan‐19 31‐Dec‐19 36293 E6 A K Mitra A K Mitra 20‐Jun‐1949 69 years6months11 days 66‐70 Self M 300000
21 01‐Jan‐19 31‐Dec‐19 36320 E7 Ramesh Prasad Ramesh Prasad 13‐Jul‐1951 67 years5months18 days 66‐70 Self M 400000
22 01‐Jan‐19 31‐Dec‐19 36359 E7 Manjula Rawat Manjula Rawat 23‐Aug‐1950 68 years4months8 days 66‐70 Self F 400000
23 01‐Jan‐19 31‐Dec‐19 36637 E4Binod Kumar Jaiswal
Binod Kumar Jaiswal 10‐Feb‐1950 68 years10months21 days 66‐70 Self M 300000
24 01‐Jan‐19 31‐Dec‐19 36679 E4Dinesha Nand Mihsra
Dinesha Nand Mihsra 12‐Feb‐1952 66 years10months19 days 66‐70 Self M 300000
25 01‐Jan‐19 31‐Dec‐19 36721 E4Swaraj Bijoy Mukheree
Swaraj Bijoy Mukheree 03‐Jun‐1949 69 years6months28 days 66‐70 Self M 300000
26 01‐Jan‐19 31‐Dec‐19 36724 E3 Qurban Mian Qurban Mian 01‐Jul‐1951 67 years5months30 days 66‐70 Self M 30000027 01‐Jan‐19 31‐Dec‐19 36744 E4 Basu Deo Roy Basu Deo Roy 03‐Feb‐1950 68 years10months28 days 66‐70 Self M 300000
28 01‐Jan‐19 31‐Dec‐19 37000 E5 C A Narayanan C A Narayanan 18‐Oct‐1953 65 years2months13 days 61‐65 Self M 300000
29 01‐Jan‐19 31‐Dec‐19 37043 E0Prasanna Kumar Ganguly
Prasanna Kumar Ganguly
17‐Nov‐1951 67 years1months14 days 66‐70 Self M 300000
30 01‐Jan‐19 31‐Dec‐19 38001 E2Gajendra Prasad Shrivastava
Gajendra Prasad Shrivastava
20‐May‐1951 67 years7months11 days 66‐70 Self M 300000
31 01‐Jan‐19 31‐Dec‐19 38059 E8 Amit Kumar Pal Amit Kumar Pal 01‐Feb‐1950 68 years10months30 days 66‐70 Self M 400000
32 01‐Jan‐19 31‐Dec‐19 38078 E6 Raj Niti Singh Raj Niti Singh 10‐Aug‐1952 66 years4months21 days 66‐70 Self M 300000
33 01‐Jan‐19 31‐Dec‐19 38081 E4 Shivkant Singh Shivkant Singh 24‐Apr‐52 66 years8months7 days 66‐70 Self M 300000
34 01‐Jan‐19 31‐Dec‐19 38082 E4Dhirendra Pal Singh
Dhirendra Pal Singh 05‐Nov‐1955 63 years1months26 days 61‐65 Self M 300000
35 01‐Jan‐19 31‐Dec‐19 38092 E6 Binod Kumar Binod Kumar 15‐May‐1959 59 years7months16 days 56‐60 Self M 300000
36 01‐Jan‐19 31‐Dec‐19 38095 E4Shiv Nath Prasad Garg
Shiv Nath Prasad Garg 01‐Nov‐1952 66 years1months30 days 66‐70 Self M 300000
37 01‐Jan‐19 31‐Dec‐19 38258 E6Laxman Das Khatri
Laxman Das Khatri 27‐Dec‐1949 69 years0months4 days 66‐70 Self M 300000
38 01‐Jan‐19 31‐Dec‐19 38348 E7Suresh Chandra Poddar
Suresh Chandra Poddar 01‐Jul‐1950 68 years5months30 days 66‐70 Self M 400000
39 01‐Jan‐19 31‐Dec‐19 38363 E7Binodanand Mishra
Binodanand Mishra 19‐Feb‐1961 57 years10months12 days 56‐60 Self M 400000
40 01‐Jan‐19 31‐Dec‐19 38369 E7Ajay Kumar Sinha
Ajay Kumar Sinha 19‐Aug‐1952 66 years4months12 days 66‐70 Self M 400000
41 01‐Jan‐19 31‐Dec‐19 38376 E7Birendra Kumar Chaubey
Birendra Kumar Chaubey
10‐Nov‐1952 66 years1months21 days 66‐70 Self M 400000
42 01‐Jan‐19 31‐Dec‐19 38379 E4
Indu Sharma W/O Ram Panchanand Sharma
Indu Sharma W/O Ram Panchanand Sharma
05‐Jan‐1962 56 years11months26 days 56‐60 Self F 300000
43 01‐Jan‐19 31‐Dec‐19 38380 E7Ram Naresh Singh
Ram Naresh Singh 20‐Sep‐1958 60 years3months11 days 56‐60 Self M 400000
44 01‐Jan‐19 31‐Dec‐19 38390 E3 Banshidhar Jha Banshidhar Jha 10‐Dec‐54 64 years0months21 days 61‐65 Self M 300000
45 01‐Jan‐19 31‐Dec‐19 38395 E3Shambhu Prasad Singh
Shambhu Prasad Singh 26‐Jan‐1952 66 years11months5 days 66‐70 Self M 300000
Ex‐Employees List as on 30.11.2018
Page 1 of 3
Sl.no.PolStartDate PolEndDate
PriBenefEmpCode GRADE
PriBeneficiaryName BenefName DOB
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insured
Ex‐Employees List as on 30.11.2018
46 01‐Jan‐19 31‐Dec‐19 38421 E4 Satish Kumar Satish Kumar 01‐Sep‐1956 62 years3months30 days 61‐65 Self M 300000
47 01‐Jan‐19 31‐Dec‐19 38422 E3Satyendra Kumar Tiwary
Satyendra Kumar Tiwary
1‐Dec‐58 60 years0months30 days 56‐60 Self M 300000
48 01‐Jan‐19 31‐Dec‐19 38435 E2Sohan Prasad Sinha
Sohan Prasad Sinha 09‐Jan‐1953 65 years11months22 days 61‐65 Self M 300000
49 01‐Jan‐19 31‐Dec‐19 38449 E3Misbah Uddin Khan
Misbah Uddin Khan 7‐Jan‐55 63 years11months24 days 61‐65 Self M 300000
50 01‐Jan‐19 31‐Dec‐19 38471 E3Suhash Chandra Sinha
Suhash Chandra Sinha 27‐Aug‐54 64 years4months4 days 61‐65 Self M 300000
51 01‐Jan‐19 31‐Dec‐19 38532 E3Chhote Lal Singh
Chhote Lal Singh 21‐Nov‐55 63 years1months10 days 61‐65 Self M 300000
52 01‐Jan‐19 31‐Dec‐19 38535 E5Upendra Kumar Singh
Upendra Kumar Singh 02‐Oct‐1955 63 years2months29 days 61‐65 Self M 300000
53 01‐Jan‐19 31‐Dec‐19 38562 E4 K Srikantan K Srikantan 18‐Apr‐55 63 years8months13 days 61‐65 Self M 300000
54 01‐Jan‐19 31‐Dec‐19 38573 E7Ajit Kumar Baghel
Ajit Kumar Baghel 10‐Oct‐1953 65 years2months21 days 61‐65 Self M 400000
55 01‐Jan‐19 31‐Dec‐19 38576 E8Yogendra Prasad
Yogendra Prasad 09‐Jul‐1953 65 years5months22 days 61‐65 Self M 400000
56 01‐Jan‐19 31‐Dec‐19 38599 E3 B N Sah B N Sah 12‐Feb‐1955 63 years10months19 days 61‐65 Self M 300000
57 01‐Jan‐19 31‐Dec‐19 38614 E2Manoranjan Kumar Das
Manoranjan Kumar Das 24‐Aug‐55 63 years4months7 days 61‐65 Self M 300000
58 01‐Jan‐19 31‐Dec‐19 38620 E4 Murari Singh Murari Singh 06‐Feb‐1956 62 years10months25 days 61‐65 Self M 300000
59 01‐Jan‐19 31‐Dec‐19 38624 E2 P Vaidyanathan P Vaidyanathan 25‐Oct‐1950 68 years2months6 days 66‐70 Self M 300000
60 01‐Jan‐19 31‐Dec‐19 38630 E5K R Muraleedharan
K R Muraleedharan 26‐Apr‐56 62 years8months5 days 61‐65 Self M 300000
61 01‐Jan‐19 31‐Dec‐19 38638 E3 A B Khan A B Khan 25‐Jan‐1955 63 years11months6 days 61‐65 Self M 300000
62 01‐Jan‐19 31‐Dec‐19 38668 E4Rabindra Kumar Prasad
Rabindra Kumar Prasad 12‐Mar‐1955 63 years9months19 days 61‐65 Self M 300000
63 01‐Jan‐19 31‐Dec‐19 38669 E3 Arbind Kumar Arbind Kumar 05‐Jun‐1956 62 years6months26 days 61‐65 Self M 300000
64 01‐Jan‐19 31‐Dec‐19 38675 E3Bijon Kumar Seal
Bijon Kumar Seal 28‐Feb‐1953 65 years10months3 days 61‐65 Self M 300000
65 01‐Jan‐19 31‐Dec‐19 38679 E7 Bichitra Prasad Bichitra Prasad 03‐Jun‐1960 58 years6months28 days 56‐60 Self M 400000
66 01‐Jan‐19 31‐Dec‐19 38682 E7Suresh Chandra Gupta
Suresh Chandra Gupta 01‐Jul‐1950 68 years5months30 days 66‐70 Self M 400000
67 01‐Jan‐19 31‐Dec‐19 38691 E2 Ashok Kumar Ashok Kumar 05‐Jan‐1956 62 years11months26 days 61‐65 Self M 30000068 01‐Jan‐19 31‐Dec‐19 38701 E8 R K Vashist R K Vashist 13‐Mar‐1952 66 years9months18 days 66‐70 Self M 400000
69 01‐Jan‐19 31‐Dec‐19 38708 E7Ranbir Singh Suhag
Ranbir Singh Suhag 06‐Oct‐1950 68 years2months25 days 66‐70 Self M 400000
70 01‐Jan‐19 31‐Dec‐19 38711 E6Subrata Bhattacharya
Subrata Bhattacharya 10‐Feb‐1951 67 years10months21 days 66‐70 Self M 300000
71 01‐Jan‐19 31‐Dec‐19 38714 E7 Krishna Kumar Krishna Kumar 02‐Jan‐1956 62 years11months29 days 61‐65 Self M 400000
72 01‐Jan‐19 31‐Dec‐19 38779 E4Pramod Kumar Rakesh
Pramod Kumar Rakesh 2‐Jul‐55 63 years5months29 days 61‐65 Self M 300000
73 01‐Jan‐19 31‐Dec‐19 38780 E4 R C Prasad R C Prasad 15‐Jul‐54 64 years5months16 days 61‐65 Self M 300000
74 01‐Jan‐19 31‐Dec‐19 38786 E7 Umesh Kumar Umesh Kumar 22‐Mar‐1951 67 years9months9 days 66‐70 Self M 400000
75 01‐Jan‐19 31‐Dec‐19 38798 E6 Dwarika Singh Dwarika Singh 26‐Feb‐1954 64 years10months5 days 61‐65 Self M 300000
76 01‐Jan‐19 31‐Dec‐19 38801 E8Anil Kumar Gupta
Anil Kumar Gupta 28‐Oct‐1954 64 years2months3 days 61‐65 Self M 400000
77 01‐Jan‐19 31‐Dec‐19 38808 E6 G G Roy G G Roy 19‐Oct‐1960 58 years2months12 days 56‐60 Self M 30000078 01‐Jan‐19 31‐Dec‐19 38837 E8 Sumita Sinha Sumita Sinha 18‐Apr‐1954 64 years8months13 days 61‐65 Self F 400000
79 01‐Jan‐19 31‐Dec‐19 38878 E8Deepak Kumar Vohra
Deepak Kumar Vohra 04‐Mar‐1956 62 years9months27 days 61‐65 Self M 400000
80 01‐Jan‐19 31‐Dec‐19 38879 E8 Devendra Jha Devendra Jha 02‐Jan‐1954 64 years11months29 days 61‐65 Self M 400000
81 01‐Jan‐19 31‐Dec‐19 38919 E6Purushottam Choudhary
Purushottam Choudhary
01‐Jan‐1962 56 years11months30 days 56‐60 Self M 300000
82 01‐Jan‐19 31‐Dec‐19 38923 E7Ajit Kumar Mishra
Ajit Kumar Mishra 1‐Jan‐55 63 years11months30 days 61‐65 Self M 400000
83 01‐Jan‐19 31‐Dec‐19 38945 E8Prabir Chakraborty
Prabir Chakraborty 27‐Apr‐1956 62 years8months4 days 61‐65 Self M 400000
84 01‐Jan‐19 31‐Dec‐19 38951 E6 Kapil Deo Singh Kapil Deo Singh 13‐May‐1951 67 years7months18 days 66‐70 Self M 300000
85 01‐Jan‐19 31‐Dec‐19 38956 E7 D K Mallik D K Mallik 26‐Apr‐55 63 years8months5 days 61‐65 Self M 400000
86 01‐Jan‐19 31‐Dec‐19 38959 E6 Rakesh Sharma Rakesh Sharma 01‐Feb‐1953 65 years10months30 days 61‐65 Self M 300000
87 01‐Jan‐19 31‐Dec‐19 38974 E7 P C Chaudhary P C Chaudhary 05‐Aug‐1953 65 years4months26 days 61‐65 Self M 400000
88 01‐Jan‐19 31‐Dec‐19 38977 E4 Dipen Dutta Dipen Dutta 03‐May‐1958 60 years7months28 days 56‐60 Self M 300000
89 01‐Jan‐19 31‐Dec‐19 38995 E8Pradeep Kumar Singh Pradeep Kumar Singh
09‐06‐195860 years6months22 days 61‐65 Self M 400000
90 01‐Jan‐19 31‐Dec‐19 38996 E7GHANSHYAM SINGH
GHANSHYAM SINGH 13‐Nov‐57 61 years1months18 days 61‐65 Self M 400000
91 01‐Jan‐19 31‐Dec‐19 38999 E7Anup Kumar Goswami
Anup Kumar Goswami 11‐Sep‐1958 60 years3months20 days 56‐60 Self M 400000
92 01‐Jan‐19 31‐Dec‐19 39000 E8 BRIJ DEO SINGH BRIJ DEO SINGH 22‐Oct‐1957 61 years2months9 days 61‐65 Self M 40000093 01‐Jan‐19 31‐Dec‐19 39009 E7 Shreekant Lal Shreekant Lal 16‐Jan‐1957 61 years11months15 days 61‐65 Self M 40000094 01‐Jan‐19 31‐Dec‐19 39025 E8 Ashok Kumar Ashok Kumar 05‐Jan‐1956 62 years11months26 days 61‐65 Self M 400000
Page 2 of 3
Sl.no.PolStartDate PolEndDate
PriBenefEmpCode GRADE
PriBeneficiaryName BenefName DOB
Age as on 31.12.2018 Age Group RelName
BenefSex
Basic_Sum_Insured
Ex‐Employees List as on 30.11.2018
95 01‐Jan‐19 31‐Dec‐19 39026 E7Bharat Bhushan Mishra
Bharat Bhushan Mishra 31‐Dec‐54 64 years0months0 days 61‐65 Self M 400000
96 01‐Jan‐19 31‐Dec‐19 39027 E8Mukesh Kumar Sinha
Mukesh Kumar Sinha 27‐Oct‐54 64 years2months4 days 61‐65 Self M 400000
97 01‐Jan‐19 31‐Dec‐19 39033 E7Sangram Bir Bahadur Verma
Sangram Bir Bahadur Verma
5‐Feb‐56 62 years10months26 days 61‐65 Self M 400000
98 01‐Jan‐19 31‐Dec‐19 39034 E8Ran Vijoy Verma
Ran Vijoy Verma 11‐Oct‐1954 64 years2months20 days 61‐65 Self M 400000
99 01‐Jan‐19 31‐Dec‐19 39056 E6Shambhu Gupta
Shambhu Gupta 18‐Feb‐1954 64 years10months13 days 61‐65 Self M 300000
100 01‐Jan‐19 31‐Dec‐19 39063 E7 B Mukherjee B Mukherjee 14‐Apr‐55 63 years8months17 days 61‐65 Self M 400000
101 01‐Jan‐19 31‐Dec‐19 39085 E7Upendra Bhakta Upendra Bhakta 20‐Oct‐1958 60 years2months11 days 56‐60 Self M 400000
102 01‐Jan‐19 31‐Dec‐19 39278 E6Makhan Lal Biswas Makhan Lal Biswas 15‐Sep‐1958 60 years3months16 days 56‐60 Self M 300000
103 01‐Jan‐19 31‐Dec‐19 50035 E7 S Dayal S Dayal 13‐Jun‐1949 69 years6months18 days 66‐70 Self M 400000
104 01‐Jan‐19 31‐Dec‐19 50074 E4Arjun Dev Narula
Arjun Dev Narula 12‐Dec‐1951 67 years0months19 days 66‐70 Self M 300000
105 01‐Jan‐19 31‐Dec‐19 50092 E3Satish Kumar Gupta
Satish Kumar Gupta 28‐Jun‐1955 63 years6months3 days 61‐65 Self M 300000
106 01‐Jan‐19 31‐Dec‐19 50102 E0 Om Parkash Om Parkash 10‐Apr‐55 63 years8months21 days 61‐65 Self M 300000
107 01‐Jan‐19 31‐Dec‐19 50117 E1Mahendra Prasad
Mahendra Prasad 09‐Dec‐1954 64 years0months22 days 61‐65 Self M 300000
108 01‐Jan‐19 31‐Dec‐19 50118 E1Pramod Kumar Singh
Pramod Kumar Singh 09‐Aug‐1956 62 years4months22 days 61‐65 Self M 300000
109 01‐Jan‐19 31‐Dec‐19 50424 E7Santosh Kumar Vaid
Santosh Kumar Vaid 29‐Apr‐1950 68 years8months2 days 66‐70 Self M 400000
110 01‐Jan‐19 31‐Dec‐19 50556 DF K C Katta K C Katta 01‐Aug‐1951 67 years4months30 days 66‐70 Self M 500000
111 01‐Jan‐19 31‐Dec‐19 60007 E3G Satheesa Kumar
G Satheesa Kumar 29‐Jun‐1953 65 years6months2 days 66‐70 Self M 300000
112 01‐Jan‐19 31‐Dec‐19 60015 E2Patel Ranjitbhai Somabhai
Patel Ranjitbhai Somabhai
13‐Nov‐55 63 years1months18 days 61‐65 Self M 300000
113 01‐Jan‐19 31‐Dec‐19 60024 E4 J M Padalia J M Padalia 6‐Dec‐56 62 years0months25 days 61‐65 Self M 300000
114 01‐Jan‐19 31‐Dec‐19 60030 E4Mehta Mahesh Kumar Dhirubhai
Mehta Mahesh Kumar Dhirubhai
14‐Oct‐1952 66 years2months17 days 66‐70 Self M 300000
115 01‐Jan‐19 31‐Dec‐19 60041 E4Jaswantsinh Mohansinh Baria
Jaswantsinh Mohansinh Baria
1‐Sep‐55 63 years3months30 days 61‐65 Self M 300000
116 01‐Jan‐19 31‐Dec‐19 60043 E2 A S Pawar A S Pawar 1‐Dec‐54 64 years0months30 days 61‐65 Self M 300000
117 01‐Jan‐19 31‐Dec‐19 60044 E4Ranchhodbhai P Bhadgaonkar
Ranchhodbhai P Bhadgaonkar
09‐Aug‐1955 63 years4months22 days 61‐65 Self M 300000
118 01‐Jan‐19 31‐Dec‐19 60047 E6Amrutbhai G Patel
Amrutbhai G Patel 26‐Jul‐1956 62 years5months5 days 61‐65 Self M 300000
119 01‐Jan‐19 31‐Dec‐19 60049 E3Arun D Pewekar
Arun D Pewekar 04‐Mar‐1955 63 years9months27 days 61‐65 Self M 300000
120 01‐Jan‐19 31‐Dec‐19 60062 E3 Paritosh Dutta Paritosh Dutta 01‐Sep‐1958 60 years3months30 days 56‐60 Self M 300000
Page 3 of 3
Sl.no. PolStartDate PolEndDatePriBenefEmpCode
GRADEPriBeneficiaryName
BenefName DOBAge
groupRelName
BenefSex
Basic_Sum_Insured
1 01‐Jan‐19 31‐Dec‐19 3861 E3 Sant Ram Savetri Devi 21‐May‐1958 56‐60 Spouse F 300000
2 01‐Jan‐19 31‐Dec‐19 7957 E2Maradana Simhachalam
Gunavathi 27‐Nov‐1957 61‐65 Spouse F 300000
3 01‐Jan‐19 31‐Dec‐19 16453 E7 Shit Basant Prasad Kanti Prasad 02‐Jun‐1955 61‐65 Spouse F 400000
4 01‐Jan‐19 31‐Dec‐19 16463 E4 S S Prasad Asha Devi 01‐Jan‐1958 56‐60 Spouse F 300000
5 01‐Jan‐19 31‐Dec‐19 16478 E6Ramchandra Prasad Sah
Chameli Sah 30‐Jun‐1955 61‐65 Spouse F 300000
6 01‐Jan‐19 31‐Dec‐19 18908 E7Anuranjan Prasad Sinha
Jayshree 19‐Jul‐1957 61‐65 Spouse F 400000
7 01‐Jan‐19 31‐Dec‐19 18909 E7Jogesh Chander Ghai
Renu Ghai 20‐Nov‐1956 61‐65 Spouse F 400000
8 01‐Jan‐19 31‐Dec‐19 18916 E8 Subhash Chandra Laxmi Chandra 03‐Nov‐1955 61‐65 Spouse F 400000
9 01‐Jan‐19 31‐Dec‐19 18917 E7Satish Chandra Tiwari
Nirmala Tiwari 17‐May‐1956 61‐65 Spouse F 400000
10 01‐Jan‐19 31‐Dec‐19 32686 E6 Sheodhar Manju 19‐Jul‐1960 56‐60 Spouse F 300000
11 01‐Jan‐19 31‐Dec‐19 33572 E8Subhash Chandra Agarwal
Sushma Agarwal 14‐Oct‐1953 61‐65 Spouse F 400000
12 01‐Jan‐19 31‐Dec‐19 34130 E3 Md Muslim Imran Nisha 25‐Dec‐1957 61‐65 Spouse F 30000013 01‐Jan‐19 31‐Dec‐19 34154 E7 Saryu Prasad Snehaprabha 01‐Jan‐1959 56‐60 Spouse F 400000
14 01‐Jan‐19 31‐Dec‐19 34180 E3Sunil Kanti Chowdhury
Sudipa Chowdhary 11‐Dec‐1959 56‐60 Spouse F 300000
15 01‐Jan‐19 31‐Dec‐19 36065 E3Gouri Shankar Mukhopadhyay
Suparna Mukhopadhyay
07‐Oct‐1957 61‐65 Spouse F 300000
16 01‐Jan‐19 31‐Dec‐19 36263 E4 Ram Lakhan Gupta Urmila Devi 01‐Jan‐1958 56‐60 Spouse F 300000
17 01‐Jan‐19 31‐Dec‐19 36272 E2 Shukram Puran Radhamani Devi 22‐Jan‐1959 56‐60 Spouse F 30000018 01‐Jan‐19 31‐Dec‐19 36293 E6 A K Mitra Chandana Mitra 01‐Jan‐1957 61‐65 Spouse F 30000019 01‐Jan‐19 31‐Dec‐19 36320 E7 Ramesh Prasad Prabha Devi 15‐Jun‐1953 61‐65 Spouse F 400000
20 01‐Jan‐19 31‐Dec‐19 36359 E7 Manjula RawatJanendra Pal Singh Rawat
15‐Aug‐1947 71‐75 Spouse M 400000
21 01‐Jan‐19 31‐Dec‐19 36637 E4Binod Kumar Jaiswal
Shobha Jaiswal 11‐Feb‐1960 56‐60 Spouse F 300000
22 01‐Jan‐19 31‐Dec‐19 36679 E4Dinesha Nand Mihsra
Uma Mishra 04‐Jan‐1955 61‐65 Spouse F 300000
23 01‐Jan‐19 31‐Dec‐19 36721 E4Swaraj Bijoy Mukheree
Sunanda Mukherjee 08‐Oct‐1951 66‐70 Spouse F 300000
24 01‐Jan‐19 31‐Dec‐19 36724 E3 Qurban Mian Ishrat Jahan 22‐Dec‐1953 61‐65 Spouse F 30000025 01‐Jan‐19 31‐Dec‐19 36744 E4 Basu Deo Roy Urmila Kumari 04‐Jan‐1952 66‐70 Spouse F 30000026 01‐Jan‐19 31‐Dec‐19 37000 E5 C A Narayanan Usha Narayanan 17‐May‐1962 56‐60 Spouse F 300000
27 01‐Jan‐19 31‐Dec‐19 37043 E0Prasanna Kumar Ganguly
Manashi Ganguly 01‐May‐1955 61‐65 Spouse F 300000
28 01‐Jan‐19 31‐Dec‐19 38001 E2Gajendra Prasad Shrivastava
Raginin Srivastava 19‐Nov‐1956 61‐65 Spouse F 300000
29 01‐Jan‐19 31‐Dec‐19 38059 E8 Amit Kumar Pal Kheyali Pal 23‐Nov‐1959 56‐60 Spouse F 400000
30 01‐Jan‐19 31‐Dec‐19 38078 E6 Raj Niti Singh Manju Devi 01‐May‐1955 61‐65 Spouse F 300000
31 01‐Jan‐19 31‐Dec‐19 38081 E4 Shivkant Singh Sunita Singh 12‐Jun‐1966 51‐55 Spouse F 300000
32 01‐Jan‐19 31‐Dec‐19 38082 E4 Dhirendra Pal Singh Prem Lata 05‐Nov‐1955 61‐65 Spouse F 300000
33 01‐Jan‐19 31‐Dec‐19 38092 E6 Binod Kumar Bina Devi 15‐May‐1959 56‐60 Spouse F 300000
34 01‐Jan‐19 31‐Dec‐19 38095 E4Shiv Nath Prasad Garg
Shobha Garg 03‐Jun‐1953 61‐65 Spouse F 300000
35 01‐Jan‐19 31‐Dec‐19 38258 E6 Laxman Das Khatri Kajal Khatri 01‐Jun‐1955 61‐65 Spouse F 300000
36 01‐Jan‐19 31‐Dec‐19 38348 E7Suresh Chandra Poddar
Vimalesh Podar 01‐Jul‐1952 66‐70 Spouse F 400000
37 01‐Jan‐19 31‐Dec‐19 38363 E7 Binodanand Mishra Usha Mishra 19‐Feb‐1961 56‐60 Spouse F 400000
38 01‐Jan‐19 31‐Dec‐19 38369 E7 Ajay Kumar Sinha Kala Sinha 03‐Oct‐1949 66‐70 Spouse F 400000
39 01‐Jan‐19 31‐Dec‐19 38376 E7Birendra Kumar Chaubey
Usha Chaubey 03‐Oct‐1953 61‐65 Spouse F 400000
40 01‐Jan‐19 31‐Dec‐19 38380 E7 Ram Naresh Singh Anshumala Singh 20‐Sep‐1958 56‐60 Spouse F 400000
41 01‐Jan‐19 31‐Dec‐19 38390 E3 Banshidhar Jha Saroj Jha 02‐Jun‐1966 51‐55 Spouse F 300000
42 01‐Jan‐19 31‐Dec‐19 38395 E3Shambhu Prasad Singh
Usha Singh 11‐Oct‐1964 51‐55 Spouse F 300000
43 01‐Jan‐19 31‐Dec‐19 38421 E4 Satish Kumar Nirmala Satish 24‐Jan‐1963 51‐55 Spouse F 300000
44 01‐Jan‐19 31‐Dec‐19 38422 E3Satyendra Kumar Tiwary
Bulbul Tiwary 20‐Jun‐1957 61‐65 Spouse F 300000
45 01‐Jan‐19 31‐Dec‐19 38435 E2 Sohan Prasad Sinha Maya Sinha 10‐Jan‐1961 56‐60 Spouse F 300000
46 01‐Jan‐19 31‐Dec‐19 38449 E3 Misbah Uddin Khan Waseema Khatoon 15‐Dec‐1968 46‐50 Spouse F 300000
47 01‐Jan‐19 31‐Dec‐19 38471 E3Suhash Chandra Sinha
Sutapa Sinha 27‐Aug‐54 61‐65 Spouse F 300000
48 01‐Jan‐19 31‐Dec‐19 38532 E3 Chhote Lal Singh Sunita Singh 12‐Jun‐1966 51‐55 Spouse F 300000
Ex‐Employee Dependants List as on 30.11.2018
Page 1 of 3
Sl.no. PolStartDate PolEndDatePriBenefEmpCode
GRADEPriBeneficiaryName
BenefName DOBAge
groupRelName
BenefSex
Basic_Sum_Insured
Ex‐Employee Dependants List as on 30.11.2018
49 01‐Jan‐19 31‐Dec‐19 38535 E5Upendra Kumar Singh
Indira Singh 20‐Jun‐1963 51‐55 Spouse F 300000
50 01‐Jan‐19 31‐Dec‐19 38562 E4 K Srikantan Vani Srikantan 17‐Nov‐1961 56‐60 Spouse F 30000051 01‐Jan‐19 31‐Dec‐19 38573 E7 Ajit Kumar Baghel Draupti Devi 17‐Sep‐1954 61‐65 Spouse F 40000052 01‐Jan‐19 31‐Dec‐19 38576 E8 Yogendra Prasad Meena Prasad 06‐Jul‐1958 56‐60 Spouse F 40000053 01‐Jan‐19 31‐Dec‐19 38599 E3 B N Sah Vina Kumari Sah 01‐Dec‐1965 51‐55 Spouse F 300000
54 01‐Jan‐19 31‐Dec‐19 38614 E2Manoranjan Kumar Das
Anima Das 11‐Sep‐1961 56‐60 Spouse F 300000
55 01‐Jan‐19 31‐Dec‐19 38620 E4 Murari Singh Sheela Singh 11‐Feb‐1959 56‐60 Spouse F 30000056 01‐Jan‐19 31‐Dec‐19 38624 E3 P Vaidyanathan Subbalakshmi 01‐Dec‐1953 61‐65 Spouse F 300000
57 01‐Jan‐19 31‐Dec‐19 38630 E5 K R Muraleedharan Thulasy Murali 30‐May‐67 51‐55 Spouse F 300000
58 01‐Jan‐19 31‐Dec‐19 38638 E3 A B Khan Shamimara Khan 10‐Jun‐1962 56‐60 Spouse F 300000
59 01‐Jan‐19 31‐Dec‐19 38668 E4Rabindra Kumar Prasad
Urmila Prasad 21‐Oct‐1959 56‐60 Spouse F 300000
60 01‐Jan‐19 31‐Dec‐19 38669 E3 Arbind Kumar Asha Sinha 02‐Feb‐1964 51‐55 Spouse F 30000061 01‐Jan‐19 31‐Dec‐19 38675 E3 Bijon Kumar Seal Rita Seal 01‐Jan‐1965 51‐55 Spouse F 30000062 01‐Jan‐19 31‐Dec‐19 38679 E7 Bichitra Prasad Poonam Prasad 03‐Jun‐1960 56‐60 Spouse F 400000
63 01‐Jan‐19 31‐Dec‐19 38682 E7Suresh Chandra Gupta
Kusum Lata Gupta 15‐Aug‐1953 61‐65 Spouse F 400000
64 01‐Jan‐19 31‐Dec‐19 38691 E2 Ashok Kumar Mahorama Devi 14‐Dec‐1959 56‐60 Spouse F 300000
65 01‐Jan‐19 31‐Dec‐19 38701 E8 R K Vashist Sudershana Vashisht 05‐Jan‐1957 61‐65 Spouse F 400000
66 01‐Jan‐19 31‐Dec‐19 38708 E7 Ranbir Singh Suhag Sandhya Suhang 15‐Jul‐1957 61‐65 Spouse F 400000
67 01‐Jan‐19 31‐Dec‐19 38711 E6Subrata Bhattacharya
Aryya Bhattacharya 13‐Jul‐1955 61‐65 Spouse F 300000
68 01‐Jan‐19 31‐Dec‐19 38714 E7 Krishna Kumar Ranjana Sinha 02‐Jan‐1956 61‐65 Spouse F 400000
69 01‐Jan‐19 31‐Dec‐19 38779 E4Pramod Kumar Rakesh
Manju Rakesh 18‐May‐1960 56‐60 Spouse F 300000
70 01‐Jan‐19 31‐Dec‐19 38780 E4 R C Prasad Malti Devi 07‐Oct‐1962 56‐60 Spouse F 30000071 01‐Jan‐19 31‐Dec‐19 38786 E7 Umesh Kumar Pramila Kumar 28‐Jul‐1955 61‐65 Spouse F 40000072 01‐Jan‐19 31‐Dec‐19 38798 E6 Dwarika Singh Asha Singh 26‐Feb‐1954 61‐65 Spouse F 30000073 01‐Jan‐19 31‐Dec‐19 38808 E6 G G Roy Papia Roy 19‐Oct‐1960 56‐60 Spouse F 300000
74 01‐Jan‐19 31‐Dec‐19 38878 E8Deepak Kumar Vohra
Usha Vohra 22‐Aug‐1964 51‐55 Spouse F 400000
75 01‐Jan‐19 31‐Dec‐19 38879 E8 Devendra Jha Prabha Jha 10‐Jan‐1959 56‐60 Spouse F 400000
76 01‐Jan‐19 31‐Dec‐19 38919 E6Purushottam Choudhary
Manju Choudhary 01‐Jan‐1962 56‐60 Spouse F 300000
77 01‐Jan‐19 31‐Dec‐19 38923 E7 Ajit Kumar Mishra Mili Mishra 21‐Jan‐1960 56‐60 Spouse F 400000
78 01‐Jan‐19 31‐Dec‐19 38945 E8 Prabir ChakrabortyAlokananda Chakraborty
07‐Nov‐1967 51‐55 Spouse F 400000
79 01‐Jan‐19 31‐Dec‐19 38951 E6 Kapil Deo Singh Neelam Singh 01‐Jan‐1960 56‐60 Spouse F 30000080 01‐Jan‐19 31‐Dec‐19 38956 E7 D K Mallik Bijaya Mallik 07‐Jun‐1965 51‐55 Spouse F 40000081 01‐Jan‐19 31‐Dec‐19 38959 E6 Rakesh Sharma Meena Sharma 28‐Feb‐1959 56‐60 Spouse F 300000
82 01‐Jan‐19 31‐Dec‐19 38974 E7 P C Chaudhary Vandana Chaudhary 23‐Aug‐1963 51‐55 Spouse F 400000
83 01‐Jan‐19 31‐Dec‐19 38977 E4 Dipen Dutta Manidipa Dutta 21‐Sep‐1963 51‐55 Spouse F 300000
84 01‐Jan‐19 31‐Dec‐19 38995 E8Pradeep Kumar Singh Bina Singh
30‐01‐196651‐55 Spouse F 400000
85 01‐Jan‐19 31‐Dec‐19 38996 E7GHANSHYAM SINGH
MADHU SINGH 16‐Dec‐1959 56‐60 SPOUSE F 400000
86 01‐Jan‐19 31‐Dec‐19 38999 E7Anup Kumar Goswami
Shyamasree Goswami
01‐Jan‐1963 51‐55 Spouse F 400000
87 01‐Jan‐19 31‐Dec‐19 39000 E8 BRIJ DEO SINGH KALPANA SINGH 17‐Sep‐1962 56‐60 SPOUSE F 40000088 01‐Jan‐19 31‐Dec‐19 39009 E7 Shreekant Lal Sadhana Lal 12‐Jan‐1965 51‐55 Spouse F 40000089 01‐Jan‐19 31‐Dec‐19 39025 E8 Ashok Kumar Shobha Kumari 31‐Dec‐1957 61‐65 Spouse F 400000
90 01‐Jan‐19 31‐Dec‐19 39026 E7Bharat Bhushan Mishra
Bina Mishra 15‐Jan‐1958 56‐60 Spouse F 400000
91 01‐Jan‐19 31‐Dec‐19 39033 E7Sangram Bir Bahadur Verma
Minoo Verma 09‐May‐1961 56‐60 Spouse F 400000
92 01‐Jan‐19 31‐Dec‐19 39034 E8 Ran Vijoy Verma Sandhya Verma 17‐Jan‐59 56‐60 Spouse F 40000093 01‐Jan‐19 31‐Dec‐19 39056 E6 Shambhu Gupta Ranjana Gupta 05‐Jan‐1961 56‐60 Spouse F 30000094 01‐Jan‐19 31‐Dec‐19 39063 E7 B Mukherjee Bubu Mukherjee 23‐Dec‐1962 56‐60 Spouse F 40000095 01‐Jan‐19 31‐Dec‐19 39085 E7 Upendra Bhakta Abita Rani 05‐Dec‐1971 46‐50 Spouse F 400000
96 01‐Jan‐19 31‐Dec‐19 39278 E6 Makhan Lal Biswas Amala Biswas 20‐Jan‐1963 51‐55 Spouse F 300000
97 01‐Jan‐19 31‐Dec‐19 50035 E7 S Dayal Shobha Dayal 01‐May‐1954 61‐65 Spouse F 40000098 01‐Jan‐19 31‐Dec‐19 50074 E4 Arjun Dev Narula Saraswati Narula 13‐Jul‐1954 61‐65 Spouse F 300000
99 01‐Jan‐19 31‐Dec‐19 50092 E3 Satish Kumar Gupta Manju Gupta 17‐Feb‐1955 61‐65 Spouse F 300000
100 01‐Jan‐19 31‐Dec‐19 50102 E0 Om Parkash Saroj Devi 09‐May‐1957 61‐65 Spouse F 300000101 01‐Jan‐19 31‐Dec‐19 50117 E1 Mahendra Prasad Sushila Sinha 20‐Apr‐1956 61‐65 Spouse F 300000
102 01‐Jan‐19 31‐Dec‐19 50118 E1Pramod Kumar Singh
Kalawati Devi 08‐Jul‐1961 56‐60 Spouse F 300000
103 01‐Jan‐19 31‐Dec‐19 50424 E7Santosh Kumar Vaid
Geeta Vaid 06‐Feb‐1952 66‐70 Spouse F 400000
104 01‐Jan‐19 31‐Dec‐19 50556 DF K C Katta Pushpa Katta 20‐Feb‐1959 56‐60 Spouse F 500000
Page 2 of 3
Sl.no. PolStartDate PolEndDatePriBenefEmpCode
GRADEPriBeneficiaryName
BenefName DOBAge
groupRelName
BenefSex
Basic_Sum_Insured
Ex‐Employee Dependants List as on 30.11.2018
105 01‐Jan‐19 31‐Dec‐19 60007 E3 G Satheesa Kumar P Suprabha Devi 06‐Jun‐1958 56‐60 Spouse F 300000
106 01‐Jan‐19 31‐Dec‐19 60015 E2Patel Ranjitbhai Somabhai
Sulochana Ranjitbhai Patel
1‐Jun‐57 61‐65 Spouse F 300000
107 01‐Jan‐19 31‐Dec‐19 60024 E4 J M PadaliaAnjaana Jitendra Padalia
17‐Jun‐1963 51‐55 Spouse F 300000
108 01‐Jan‐19 31‐Dec‐19 60030 E4Mehta Mahesh Kumar Dhirubhai
Bhanuben Mehta 18‐Nov‐1955 61‐65 Spouse F 300000
109 01‐Jan‐19 31‐Dec‐19 60041 E4Jaswantsinh Mohansinh Baria
Dharmistha Jaswantsinh Baria
1‐Jun‐59 56‐60 Spouse F 300000
110 01‐Jan‐19 31‐Dec‐19 60043 E2 A S Pawar Meena Ashok Pawar 1‐Dec‐54 61‐65 Spouse F 300000
111 01‐Jan‐19 31‐Dec‐19 60044 E4Ranchhodbhai P Bhadgaonkar
Lata R Bhadgaonkar 04‐Dec‐1957 61‐65 Spouse F 300000
112 01‐Jan‐19 31‐Dec‐19 60049 E3 Arun D Pewekar Smita A Pewekar 09‐Dec‐1967 51‐55 Spouse F 300000113 01‐Jan‐19 31‐Dec‐19 60062 E3 Paritosh Dutta Tapati Dutta 04‐Feb‐1966 51‐55 Spouse F 300000
Page 3 of 3