Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements and goals easily and according to the global standards and specially API standards and in time although the time provided to it is limited and critical. Projects Projects

Upload: kailey

Post on 14-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

- PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Projects

Projects is one of the sectors of the engineering department that is paid a great attention because it supports all other departments to achieve its requirements and goals easily and according to the global standards and specially API standards and in time although the time provided to it is limited and critical.

ProjectsProjects

Page 2: Projects

Why we start any project? Why we start any project?

There are many points that could lead to start a projectThere are many points that could lead to start a project

1.1. The company's expansion, by starting up a new rig.The company's expansion, by starting up a new rig.

2.2. The company's equipment upgrading, by installing a new equipment.The company's equipment upgrading, by installing a new equipment.

3.3. Modification done to simplify and assist the operation of the rig and Modification done to simplify and assist the operation of the rig and make it comply with the global standards, especially API standard.make it comply with the global standards, especially API standard.

4.4. Problems facing operation or maintenance crew due to breakdownsProblems facing operation or maintenance crew due to breakdowns

Engineering department Engineering department does believe that project does believe that project planning is the key to planning is the key to succeed any project; succeed any project; projects can run on time projects can run on time and interact effectively with and interact effectively with both operators and both operators and suppliers. Everyone involved suppliers. Everyone involved understands what is wanted understands what is wanted and emerging problems are and emerging problems are foreseen (and dealt with) foreseen (and dealt with) long before they cause long before they cause damage. damage.

Project planningRig in time &Safely

Professional personnel

All Materials Needed

The Time Frame

EXCUTE

SELECT

ISSUE

Plan

Page 3: Projects

Projects doneProjects done

New rigs & Refurbishing old rigs2-1

Top Drive & new equipment installation 2-2

Equipment overhaul2-3

In progress projects2-4

Page 4: Projects

Rig up project for the following rigs:Rig up project for the following rigs:

Rig ..………………………………………start operation Rig ..………………………………………start operation

ST# 1 (2000 HP)……………………………January,2006ST# 1 (2000 HP)……………………………January,2006ST# 2 (1500 HP)…………………………....January,2006 ST# 2 (1500 HP)…………………………....January,2006 ST# 3 (2000 HP)……………………………January, 2007ST# 3 (2000 HP)……………………………January, 2007ST# 4 (2000 HP)……………………………September,2007 ST# 4 (2000 HP)……………………………September,2007 ST# 5 (1500 HP)…………………………..April ,2008ST# 5 (1500 HP)…………………………..April ,2008ST# 6 (1500 HP)…………………………..End of April ,2008ST# 6 (1500 HP)…………………………..End of April ,2008ST# 7 (1000 HP)…………………………..July ,2008ST# 7 (1000 HP)…………………………..July ,2008ST# 8 (1500 HP)…………………………..June,2008ST# 8 (1500 HP)…………………………..June,2008ST# 9 (2000 HP…………………………...March, 2008ST# 9 (2000 HP…………………………...March, 2008ST# 10 (1500 HP)……………………….....End of June,2008ST# 10 (1500 HP)……………………….....End of June,2008ST# 11 (2000 HP)……………………….....End of Oct.,2008ST# 11 (2000 HP)……………………….....End of Oct.,2008ST# 12 (2000 HP)………………………….Febrauary,2009ST# 12 (2000 HP)………………………….Febrauary,2009ST# 21 (650 HP-work over)………………January, 2007ST# 21 (650 HP-work over)………………January, 2007ST# 22 (650 HP-work over)………………November ,2007 ST# 22 (650 HP-work over)………………November ,2007 ST#23 (650 HP-work over)………………End of March ,2008 ST#23 (650 HP-work over)………………End of March ,2008 ST#24 (650 HP-work over)………………End of August,2008 ST#24 (650 HP-work over)………………End of August,2008

Sinotharwa Rigs 2-1

Page 5: Projects

Rigs Rigs RefurbishingRefurbishing

St1 Refurbished , April 2007

Upgrade the rig (Mast, substructure sandblast including MPI)

Mud System modification & upgrading upon the operator needs & operation demands

Page 6: Projects

Rigs Rigs RefurbishingRefurbishing

St2 Refurbished , December 2007

Modify the Rigs (Mast, sub base sandblast steel fabrications, renew rig floor including MPI)

Fabricated high pressure mud pump lines & standard standpipe manifold

Page 7: Projects

Top Drive & new equipment installation 2-2

Reduce man power

Eliminates the

hazard of

Drilling operation

No need for

traditional KellyDrill complete stand

Reduce the

Drilling time By 30%

Reasons to use Top Drive over classical drilling equipment

2-1) Top Drive2-1) Top Drive

Page 8: Projects

Install the Top Drive on the following Rigs:

•(Varco TDS-11SA)

ST#1,3,4,5,6,8,12

•(Tesco ECI900 )

ST#9,10,11

So weSo we

Page 9: Projects

Install H2S & LEL system on all rigs

Man Rider Installation for all rigs

Install new alarm panels for

main engines

Install Fuel Purifier on all

rigs

New installed equipments

Install SCR CO2 fire fighting system on all rigs

Isolate all engines

exhaust pipe manifolds

Page 10: Projects

ST#1,9

Complete overhaul for the Power Tong

ST#2 Top end overhaul for the ShanDong power engine Complete overhaul for the ShanDong power engine

ST#5,7

Complete overhaul for the Air hoist 5 ton

Equipment overhaul2-3

Page 11: Projects

ST#10

Complete overhaul for the Crown Block

ST#1,21

Complete overhaul for Mud Pump

Page 12: Projects

In progress projects2-4

2-4-1) 2-4-1) Jack Up rigJack Up rig

Start fabrication : By End of year 2008 Electrical Rig ,VFD system MAST 170 ft clear height Rotary table 49 ½ ” TDS -8SA top drive system Drawworks power: 4600 HP. Operating water depth: 400 ft (122 m). Drilling depth: 30000 ft (9,144 m). Quarters capacity: 120 persons. 3 -Mud pumps 2200 HP. Power system of 5 Cat Engines ( 3516B) & 1 Emergency Cat Engine (3512). Three pedestal cranes with 120 ft (36.6 m) boom. Horizontal & vertical pipe handling systems. Three lifeboats (60 person each). Four life rafts (35 persons each). Cascading shaker system & 1 vacuum degasser. Storage of 4,720 bbls fuel oil. Storage of 10,540 bbls drill water. Storage of 2,180 bbls potable water. Storage of 15,800 tons preload ballast. Storage of 17,400 cu.m bulk mud/cement. Storage of 3,960 bbls active & reserve pits. 5000 sack storage.

Page 13: Projects

2-4-22-4-2 ( (Badr yardBadr yard

Badr yard is one of the expansion projects that our company is looking forward to complete as soon as possible.Badr yard will play a very big role for the engineering department which will deduct the outsourcing and hiringcost of workshops to make overhauls in .