projected 2016-2018 roadway preservation plan - · pdf fileprojected 2016-2018 roadway...

33
Projected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation December 10, 2015

Upload: vuongcong

Post on 16-Feb-2018

224 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Projected 2016-2018 Roadway Preservation Plan

Major Projects Asset Preservation December 10, 2015

Page 2: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected

Treatment Year2016201720182014-2015 (Completed)

Roadway Preservation

Page 3: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Roadway Preservation Asset Management

Roadway Asset Management is a process of monitoring, maintaining, and preserving our roads effectively throughout their lifecycle. Our goal is to employ effective decision making to optimize a cost effective mix of treatments, to maximize the number of road treated to improve the roadway network as a whole.

Assumptions

The following assumptions were used to produce this preliminary roadway preservation document:

• For 2016 Target funding is achieved, although it is a combination of one-time funding and base funding.

• Target base funding, if approved, should be reached in 2017 and maintained for 2018.

• Treatment quantities developed are based on adjusted previous year close out reports. Treatment quantities and locations may vary once contract pricing is received or after construction is initiated.

• The unit rate cost estimates are based on but not limited to: contractor unit rates, project management, administration, traffic control, miscellaneous surface prep work, testing, and a contingency.

• The attached document includes proposed treatments. Actual locations and quantities treated may vary prior to construction.

• A lane-km, as referred to in this document, is the calculation of the current paved area divided by a lane width of 3.8 metres and then divided by 1000 metres per kilometre which results the Lane-km.

• Sidewalk preservation of severely damaged sidewalk panels and safety maintenance of lightly damaged sidewalk panels will be performed adjacent to the treated roadways.

Page 4: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

2016-2018 Projected Budgets

In addition to the roadway preservation work, sidewalk preservation of severely damaged sidewalk panels and safety maintenance of lightly damaged sidewalk panels will be performed adjacent to the treated roadways. In order to maintain a safe, navigable pedestrian corridor, budget reallocations from roadway treatment are required to cover additional sidewalk work for 2016 and potentially for 2017 and 2018. Below tables outline the budgets for 2016 and projected budgets for 2017 and 2018.

2016 Surface Preservation Budget 2016 Base + One-Time Funding Dedicated Funding for Idylwyld Dr from 39th St. to 51st St.

$ 29,010,000 $ 936,000

Total 2016 Construction Year Budget $ 29,946,000

2016 Projected Expenditures Program Development $ 1,125,000 Building Better Roads Communication $ 300,000 Roadway Preservation Projects $ 24,355,000 Pavement Marking $ 250,000 Sidewalk/Curb Preservation Projects $ 3,910,000 Total Estimated Expenditures: $ 29,940,000

2017 / 2018 Projected Budgets

Base Funding: 2017 2018

$ 29,010,000 $ 29,010,000

2017 / 2018 Projected Expenditures Program Development $ 1,130,000 $ 1,135,000 Roadway Network Condition Assessment $ - $ 400,000 Building Better Roads Communication $ 300,000 $ 300,000 Roadway Preservation Projects $ 24,520,000 $ 24,115,000 Pavement Marking $ 250,000 $ 250,000 Sidewalk/Curb Preservation Projects $ 2,810,000 $ 2,810,000 Total Projected Expenditures: $ 29,010,000 $ 29,010,000

Page 5: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

2016 Planned Treatments, Costs and Lane-km Preserved

Treatment Unit Rates Projected Costs

Projected Treatment Quantity

Crack Sealing $8-11 /lin.m. $ 300,000 30 000 m Patching (Blade/Shallow/Deep) $25-140 /m2 $ 990,000 7.1 ln-km Microsurfacing $11-13 /m2 $ 4,561,000 91.7 ln-km Blade Level $17-20 /m2 $ 745,000 10.0 ln-km Ultra-Thin Overlay $19-22 /m2 $ 276,000 3.8 ln-km Structural Overlay $25-30 /m2 $ 1,706,000 16.3 ln-km Resurfacing $40-45 /m2 $ 10,830,000 71.0 ln-km Reconstruction $70-150 /m2 $ 250,000 9.1 ln-km Water/Sewer Coordinated Road Works $65-75 /m2 $ 2,810,000 10.0 ln-km

2016 Total Projected Lane-Kilometres Treated: 219 ln-km

Page 6: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Treatment Descriptions Crack Sealing – Crack sealing is a rubberized asphaltic material that is used to seal transverse and longitudinal cracks, open longitudinal seams, and minor fatigue cracking. Crack sealing prevents moisture infiltration into the roadway structure to reduce the chance of premature structural failure and potholes.

Typical Crack Filling Project

Microsurfacing - Microsurfacing is a surfacing treatment involving the placement of specified crushed graded aggregate with an asphalt emulsion. This treatment is placed on roads that are structurally sound, with limited or no cracking, and with no significant surface imperfections. This treatment is typically used to address roadways with weathered or ravelled surfaces.

Typical Microsurfacing

Page 7: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Blade Level – Blade levelling is placing a layer of hot mix asphalt with a motor grader and then compacted with steel and rubber tire rollers for entire road segment. Blade levelling is currently performed by City Public Works crews. Its primary purpose is to improve the roadway surface profile, which results in improved drainage and ride.

Typical Blade Level Project

Structural Overlays – A structural overlay is an overlay to provide additional structure to the existing roadway to accommodate current and future traffic loads. Structural overlays are intended to have a thickness of no less than 40mm. Additional design based on AASHTO 93 principles may be required to assess whether the roadway needs greater than 40mm. This treatment is used on roads identified through condition assessment that have a rural cross section or sufficient curb height present to accommodate additional thickness of asphalt.

Typical Overlay Project

Page 8: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Ultra Thin Overlays – The Ultra Thin Overlay (UTO) is a heavier and smoother wearing course than that of microsurfacing. It utilizes a fine graded aggregate combined with a polymer modified asphalt bitumen. UTOs are typically placed in a thickness ranging from 25-35mm to provide a little extra structure but more so act as a higher quality wearing surface and improve ride quality. This treatment may require spot milling where existing asphalt is fatigue cracked and will not provide sound foundation for the UTO. Typically it is used on roads with minor surface imperfections and signs of raveling or weathering.

Typical Ultra Thin Overlay Project Resurfacing – Resurfacing uses a milling machine to remove a layer of existing deteriorated pavement surface as well as to restore the roadway profile prior to adding a new asphalt layer. This treatment replaces the surface and restores the road profile.

Typical Resurfacing Project

Page 9: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Reconstruction – Reconstruction is used when the entire section of roadway has structurally failed or the asphalt pavement has deteriorated and is unable to support its intended loads. Reconstruction involves the complete removal and replacement of the asphalt, base and sub base and may involve the removal and/or strengthening of a portion of the sub grade of the entire roadway section. When ground water is a factor in the full depth structural failure, a subdrain system is typically installed during the repair. There are two types of reconstruction currently being practiced; Conventional full depth reconstruction or Remove and Replace asphalt only with spot deep repairs as required.

Typical Reconstruction Project Water/Sewer Coordinated Road Works – Water and Sewer Road Restoration is used to restore the roadway outside the limits of the water/sewer work. It is the responsibility of the water/sewer to restore the roadway within its work limits and be charged to the water/sewer budget. Outside of the water/sewer limit, the roadway budget will cover the costs.

Typical Water/Sewer Coordinated Road Project

Page 10: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Patching – Patching is used when an isolated sections of the roadway has deteriorated asphalt, poor ride, poor drainage, or is structurally failed and is unable to support its intended loads. This can occur from premature weathering, raveling, settlements, traffic loading is greater than the road was designed to carry, rising water table weakening the subgrade, or poor construction control. Patching involves the restoring the localized failures on the roadway to a competent state by either surface patching to improve the ride and drainage, up to complete removal and replacement of the asphalt, and possibly base and subbase. Patching shall be used as required in conjunction with other treatments to improve the entire roadway segment.

Typical Patching Project

Page 11: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Projected 2016-2018 Roadway Preservation Plan Project Locations by Ward and Expressways

Page 12: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 1

Page 13: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 1Street Name From To Road Class Treatment Lane-Km Cost Estimate111th St W Lanyon Ave Egbert Ave Local Blade Level 1.5 108,000$ 113th St W Lanyon Ave Egbert Ave Local Microsurface 1.5 73,000$ 115th St W Rutherford Cres Egbert Ave Local Microsurface 0.2 11,000$ 40th St E Quebec Ave 1st Ave N Local Structural Overlay 0.7 68,000$ Alexandra Ave Windsor St Hazen St Local Microsurface 1.0 50,000$ Bryans Ave 113th St W Rita Cres Local Microsurface 0.5 23,000$ Central Ave 110th St W 115th St E / 115th St W Arterial Resurface 2.3 305,000$ Central Ave Reid Rd / Rossmo Rd Attridge Dr Arterial Resurface 1.6 210,000$ College Dr WB Preston Ave N Campus Dr Arterial Resurface 1.4 184,000$ Hazen St Warman Rd Prince of Wales Ave Collector Resurface 1.3 174,000$ Imperial St Gray Ave End Local Reconstruction 0.5 140,000$ Jessop Ave 103rd St E 103rd St E Local Resurface 1.7 327,000$ Kusch Cres Valens Dr Howell Ave Local Reconstruction - W&S 0.6 149,000$ Lanyon Ave 113th St W Rutherford Cres Local Microsurface 0.8 41,000$ Reid Way Reid Rd Reid Rd Local Blade Level 0.8 60,000$ Rita Ave 108th St W 113th St W Local Microsurface 1.6 81,000$ Rita Cres 113th St W 113th St W Local Microsurface 2.0 97,000$ Rutherford Cres Rutherford Way 115th St W Local Microsurface 1.6 81,000$ Rutherford Lane Rutherford Way Rutherford Cres Local Microsurface 0.3 17,000$ Rutherford Way Rutherford Cres Rutherford Cres Local Microsurface 0.8 42,000$ Valens Dr 33rd St W Howell Ave Collector Resurface 2.2 299,000$

2016 Totals 24.6 2,540,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate32nd St W Ave L N Ave I N Local Microsurface 0.8 41,000$ 39th St W Ave C N Idylwyld Dr N Collector Resurface 0.7 117,000$ Ave C N 38th St W Circle Dr Collector Resurface 2.3 330,000$ Ave I N 32nd St W 33rd St W Local Microsurface 0.5 27,000$ Ave J N 31st St W 33rd St W Local Microsurface 0.9 48,000$ Ave K N 31st St W 33rd St W Local Microsurface 0.9 48,000$ Ave L N 31st St W 33rd St W Local Microsurface 1.0 50,000$ Dunlop St Spark Ave Prairie Ave Collector Reconstruction - W&S 0.5 121,000$ Idylwyld Dr N SB 39th St W 33rd St W Arterial Resurface 3.0 422,000$ Quebec Ave 33rd St E 40th St E Arterial Resurface 4.3 603,000$ Queen St 2nd Ave N Spadina Cres E Collector Resurface 2.8 406,000$ Rossmo Rd Reid Rd Kellins Cres Collector Resurface 2.3 337,000$

2017 Totals 20.0 2,550,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate108th St W 108th St W / Circle Dr Overpass Bryans Ave Arterial Resurface 0.8 124,000$ 108th St W Preston Ave N 108th St W / Circle Dr Overpass Arterial Microsurface 2.7 139,000$ 115th St E Central Ave Forest Dr Collector Microsurface 3.3 172,000$ 26th St E 2nd Ave N 5th Ave N Collector Blade Level 0.7 58,000$ 3rd Ave N 25th St E 2nd Ave N Collector Resurface 2.3 346,000$ 4th Ave N 25th St E WB Duchess St Local Microsurface 2.5 134,000$ 5th Ave N Queen St Duchess St Local Microsurface 1.5 82,000$ 6th Ave N Queen St Duchess St Local Microsurface 1.6 85,000$ Central Ave College Dr 107th St W Arterial Resurface 3.1 450,000$ Central Ave 115th St E / 115th St W Reid Rd / Rossmo Rd Arterial UTO 1.7 133,000$ King Cres 9th Ave N Duke St Local Blade Level 1.0 82,000$ Warman Rd SB Warman Rd / Circle Dr Overpass SB 33rd St E Arterial Resurface 4.6 669,000$

2018 Totals 25.8 2,474,000$

Lane-Km Cost Estimate2016 24.6 2,540,000$ 2017 20.0 2,550,000$ 2018 25.8 2,474,000$

2016-2018 Totals 70.4 7,564,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 14: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 2

Page 15: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 2Street Name From To Road Class Treatment Lane-Km Cost Estimate11th St W Dawes Ave Ave P S Arterial Resurface 3.3 441,000$ 12th St W Ave P S Ave H S Local Microsurface 2.1 104,000$ 15th St W Ave K S Ave I S Local Blade Level 0.6 44,000$ 15th St W Ave I S Ave H S Local Microsurface 0.3 13,000$ 16th St W Ave P S Ave K S Local Microsurface 1.4 69,000$ 16th St W Ave K S Ave H S Local Blade Level 0.9 64,000$ Ave F N Rusholme Rd 29th St E Local Reconstruction 0.4 100,000$ Ave J S 11th St W 15th St W Local Microsurface 0.9 45,000$ Ave O S 12th St W 16th St W Local Microsurface 1.1 53,000$ Ave T S Dudley St 11th St W Local Blade Level 0.6 42,000$ Dudley St McLeod Ave Schuyler St Collector Blade Level 1.0 71,000$ Dudley St Dawes Ave Ave X S Local Blade Level 0.7 56,000$

2016 Totals 37.6 3,642,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate11th St W Ave P S Ave H S / Spadina Cres W Arterial Resurface 2.9 414,000$ 19th St W Ave K S Ave H S Local Blade Level 1.0 76,000$ Ave H S 16th St W 19th St W Arterial Resurface 1.8 257,000$ Ave P S 11th St W 17th St W Arterial Resurface 2.8 393,000$ Ave W S 18th St W 22nd St W Arterial Resurface 2.8 399,000$ Dieppe St Haida Ave Crerar Dr Collector Reconstruction 0.7 197,000$ Rockingham Ave Crescent Blvd / Ortona St Caen St Local Reconstruction 0.5 327,000$

2017 Totals 12.6 2,063,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate16th St W Ave H S Ave G S Collector Resurface 0.3 42,000$ 22nd St W EB Ave H N / Ave H S Idylwyld Dr N / Idylwyld Dr S Arterial Microsurface 2.4 123,000$ 22nd St W WB Idylwyld Dr N / Idylwyld Dr S Ave H N / Ave H S Arterial Microsurface 2.3 121,000$ Ave C S 19th St W 22nd St W Local Resurface 1.8 266,000$ Ave D N 25th St W 29th St W Local Microsurface 0.9 48,000$ Ave N S 18th St W Rail Local Structural Overlay 0.5 52,000$ Ave N S Rail 20th St W Local Resurface 0.6 111,000$ Ave P S Rail 22nd St W Arterial Resurface 2.6 385,000$ Ave P S 17th St W Rail Arterial Structural Overlay 0.5 53,000$ Ave W S 11th St W 18th St W Arterial Resurface 3.1 460,000$ Dieppe St Elevator Rd Haida Ave Collector Reconstruction 0.8 234,000$ Spadina Cres W Ave G S Ave C S Collector Resurface 1.4 214,000$

2018 Totals 17.2 2,109,000$

Lane-Km Cost Estimate2016 37.6 3,642,000$ 2017 12.6 2,063,000$ 2018 17.2 2,109,000$

2016-2018 Totals 67.5 7,814,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 16: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 3

Page 17: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 3Street Name From To Road Class Treatment Lane-Km Cost EstimateForrester Rd Pendygrasse Rd Pendygrasse Rd Collector UTO 3.8 276,000$ Fusedale Terr McCormack Rd End Local Blade Level 0.2 17,000$ Henigman Pl Pendygrasse Rd End Local Microsurface 0.5 24,000$ John A MacDonald Rd Steeves Ave Confederation Dr Collector Microsurface 5.8 277,000$ Thomas Cres Pendygrasse Rd Pendygrasse Rd Local Microsurface 1.2 61,000$ Thomas Way Thomas Cres Thomas Cres Local Microsurface 0.6 30,000$

2016 Totals 12.2 685,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateCentennial Dr Lisgar Ave Tache Cres Collector Resurface 2.7 385,000$ Clancy Dr Pendygrasse Rd Circle Dr Collector Resurface 1.4 200,000$ Galbraith Cres Olmstead Rd Olmstead Rd Local Microsurface 1.7 88,000$ Gooding Pl McCormack Rd End Local Microsurface 0.2 13,000$ Hull Cres Forrester Rd Forrester Rd Local Blade Level 1.5 120,000$ Hull Crt Hull Cres End Local Microsurface 0.3 15,000$ Hull Pl Hull Cres End Local Microsurface 0.3 15,000$ Poth Cres McCormack Rd McCormack Rd Local Microsurface 1.4 74,000$ Poth Way Poth Cres Poth Cres Local Microsurface 0.6 31,000$ Streb Cres McCormack Rd McCormack Rd Local Microsurface 2.0 101,000$ Streb Way Streb Cres Streb Cres Local Microsurface 0.6 34,000$ Tache Cres Centennial Dr Centennial Dr Local Microsurface 1.7 88,000$ Tache Cres Tache Cres Tache Cres Local Microsurface 0.4 22,000$

2017 Totals 14.9 1,186,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateCartier Cres John A MacDonald Rd John A MacDonald Rd Local Microsurface 2.0 105,000$ Diggle Pl Pendygrasse Rd End Local Microsurface 0.4 20,000$ Fairburn Crt End McCormack Rd Local Microsurface 0.2 13,000$ Fairmont Dr Clancy Dr Forrester Rd Collector Resurface 1.4 205,000$ Lisgar Ave Centennial Dr Diefenbaker Dr Collector Microsurface 1.8 94,000$ Lochrie Cres Pendygrasse Rd Pendygrasse Rd Local Microsurface 1.3 69,000$ Neatby Cres Neatby Cres End Local Microsurface 0.1 8,000$ Neatby Cres McCormack Rd McCormack Rd Local Microsurface 1.4 75,000$ Neatby Pl Neatby Cres End Local Microsurface 0.2 10,000$ Needham Cres McCormack Rd McCormack Rd Local Microsurface 1.8 98,000$ Needham Way Needham Cres Needham Cres Local Microsurface 0.6 33,000$ Peeling Ave Pendygrasse Rd Forrester Rd Local Microsurface 0.7 38,000$ Tilley Ave John A MacDonald Rd 33rd St W Local Microsurface 0.6 31,000$

2018 Totals 12.5 799,000$

Lane-Km Cost Estimate2016 12.2 685,000$ 2017 14.9 1,186,000$ 2018 12.5 799,000$

2016-2018 Totals 39.5 2,670,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 18: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 4

Page 19: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 4Street Name From To Road Class Treatment Lane-Km Cost Estimate27th St W Ave M N Ave K N Local Microsurface 0.4 22,000$ 29th St W EB Ave P N Ave I N Collector Reconstruction 1.6 315,000$ 29th St W WB Ave I N Ave P N Collector Resurface 1.6 218,000$ Ave I N 22nd St W 29th St E Local Microsurface 3.0 150,000$ Ave K N 22nd St W 29th St W EB Local Microsurface 2.0 101,000$ Ave L N 22nd St W WB 23rd St W Local Blade Level 0.2 17,000$ Ave L N 23rd St W Bedford Rd Local Reconstruction - W&S 0.4 116,000$ Ave L N Bedford Rd Rusholme Rd Local Microsurface 0.4 19,000$ Ave L N Rusholme Rd 27th St W Local Reconstruction - W&S 0.4 101,000$ Ave L N 27th St W 29th St E Local Microsurface 0.6 30,000$ Ave M N 22nd St W 29th St W EB Local Microsurface 2.7 133,000$ Ave P N 29th St W 33rd St W Arterial Resurface 2.9 386,000$ Malta Pl Northumberland Ave Northumberland Ave Local Blade Level 0.2 14,000$ Northumberland Ave Milton St Massey Dr Collector Microsurface 1.2 67,000$ Rusholme Rd Ave M N Ave H N Collector Reconstruction 1.8 461,000$

2016 Totals 19.3 2,150,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate22nd St W EB Ave P N / Ave P S Ave H N / Ave H S Arterial Resurface 2.9 473,000$ 22nd St W WB Ave H N / Ave H S Ave P N / Ave P S Arterial Microsurface 2.7 133,000$ 23rd St W Ave P N Ave I N Local Blade Level 2.1 165,000$ 27th St W Ave J N Ave I N Local Microsurface 0.2 12,000$ 28th St W Ave I N End Local Microsurface 1.1 55,000$ 29th St W Ave T N Ave P N Collector Microsurface 1.6 81,000$ 29th St W WB Ave H N Ave I N Collector Reconstruction - W&S 0.3 79,000$ Ave J N 22nd St W WB 29th St W EB Local Microsurface 2.0 103,000$ Ave N N 22nd St W WB Bedford Rd Local Microsurface 0.7 39,000$ Bedford Rd McMillan Ave Ave J N Local Microsurface 1.2 60,000$ Kirkpatrick Cres George Rd George Rd Local Microsurface 1.9 98,000$ Kirkpatrick Crt Kirkpatrick Cres End Local Microsurface 0.5 24,000$ Manning Cres Wedge Rd Wedge Rd Local Microsurface 1.7 89,000$ Manning Lane Manning Cres Manning Cres Local Microsurface 0.6 32,000$ McMillan Ave 23rd St W End Local Microsurface 0.8 40,000$ Vancouver Ave N Rusholme Rd 29th St W Local Blade Level 1.6 123,000$ Witney Ave N 22nd St W 29th St W Collector Resurface 2.8 402,000$

2017 Totals 24.7 2,008,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate29th St W Vancouver Ave N Ave W N Local Resurface 1.7 303,000$ Ave Q N 22nd St W WB 29th St W Local Microsurface 2.5 135,000$ Ave R N 22nd St W WB 29th St W Local Microsurface 2.5 135,000$ Ave S N 22nd St W WB 29th St W Local Microsurface 2.0 108,000$ Ave W N 33rd St W Richardson Rd Collector Resurface 1.2 184,000$ Bedford Rd Ave T N Ave P N Local Microsurface 1.1 60,000$ Bedford Rd Ave J N Ave H N Local Reconstruction 0.5 143,000$ Junor Ave Makaroff Rd 37th St W Collector Resurface 2.0 380,000$ Makaroff Rd George Rd Junor Ave Local Microsurface 1.3 70,000$ Maxwell Cres Matheson Dr Matheson Dr Local Blade Level 1.4 113,000$ Rusholme Rd Witney Ave N Ave W N Collector Resurface 1.1 161,000$ Rylston Rd Ave T N Ave P N Local Microsurface 1.1 60,000$

2018 Totals 18.5 1,852,000$

Lane-Km Cost Estimate2016 19.3 2,150,000$ 2017 24.7 2,008,000$ 2018 36.9 3,704,000$

2016-2018 Totals 80.9 7,862,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 20: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 5

Page 21: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 5Street Name From To Road Class Treatment Lane-Km Cost Estimate1st Ave N Circle Dr 46th St E Collector Resurface 2.6 385,000$ 1st Ave N 40th St E Circle Dr Local Reconstruction 1.3 511,000$ 45th St E Faithfull Ave McKee Ave Local Resurface 2.7 381,000$ 45th St E McKee Ave Millar Ave Local Microsurface 1.1 56,000$ 58th St E Miners Ave Wells Ave Local Resurface 2.5 484,000$ 59th St E Miners Ave Millar Ave Local Resurface 3.0 556,000$ Faithfull Ave Circle Dr 50th St E Arterial Resurface 5.6 757,000$ Pinehouse Dr Reindeer Rd Spadina Cres E / Whiteswan Dr Collector Resurface 2.5 342,000$ Quebec Ave 40th St E Circle Dr Arterial Resurface 1.3 249,000$ Ravine Crt Churchill Dr End Local Microsurface 0.6 31,000$ Ravine Dr Assiniboine Dr Churchill Dr Collector Microsurface 1.1 51,000$ Redberry Rd Frobisher Cres / Wathaman Cres Candle Cres / Frobisher Cres Collector Resurface 2.6 356,000$ Stechishin Cres Meilicke Rd Meilicke Rd Local Microsurface 1.7 86,000$ Stechishin Terr Stechishin Cres End Local Microsurface 0.3 13,000$ Stechishin Way Stechishin Cres Meilicke Rd Local Microsurface 0.7 33,000$

2016 Totals 29.5 4,291,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate60th St E Miners Ave Millar Ave Collector Reconstruction 3.0 791,000$ Airport Dr NB Circle Dr Claypool Dr Arterial Resurface 1.9 383,000$ Albany Cres St Lawrence Cres Assiniboine Dr Local Reconstruction 1.2 742,000$ Ave C N NB Circle Dr 45th St W / Cynthia St Arterial Resurface 0.4 51,000$ Ave C N SB 45th St W / Cynthia St Circle Dr Arterial Resurface 0.4 70,000$ Ball Cres Silverwood Rd Silverwood Rd Local Microsurface 2.3 118,000$ Ball Crt Ball Cres End Local Microsurface 0.3 15,000$ Ball Pl Ball Cres End Local Microsurface 0.3 15,000$ Ball Way Ball Cres Ball Cres Local Microsurface 0.7 35,000$ Dore Cres Redberry Rd Redberry Rd Local Microsurface 2.0 105,000$ Dore Way Dore Cres Dore Cres Local Microsurface 0.6 30,000$ Frobisher Cres Redberry Rd Redberry Rd Local Microsurface 1.9 98,000$ Frobisher Crt Frobisher Cres End Local Microsurface 0.3 17,000$ Frobisher Pl Frobisher Cres End Local Microsurface 0.2 12,000$ Frobisher Terr Frobisher Cres End Local Microsurface 0.4 19,000$ Marquis Dr W EB Highway 16 Thatcher Ave Arterial Resurface 3.0 420,000$ Marquis Dr W WB Thatcher Ave Highway 16 Arterial Resurface 2.5 354,000$ Robin Cres Airport Dr Cynthia St Local Reconstruction 2.8 1,577,000$ Robin Way Robin Cres Cynthia St Local Resurface 0.8 111,000$ Sturgeon Dr Assiniboine Dr Assiniboine Dr Local Microsurface 2.3 118,000$ Sturgeon Pl Sturgeon Dr End Local Microsurface 0.4 20,000$ Sturgeon Terr Sturgeon Dr End Local Microsurface 0.5 25,000$

2017 Totals 28.0 5,126,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate60th St E Millar Ave End Local Resurface 1.8 271,000$ Albany Cres St Lawrence Cres St Lawrence Cres Local Microsurface 0.9 46,000$ Athabasca Cres Assiniboine Dr Assiniboine Dr Local Microsurface 0.9 50,000$ Cardinal Cres Airport Dr SB Cardinal Cres Local Resurface 2.9 432,000$ Cardinal Pl End Cardinal Cres Local Microsurface 0.8 46,000$ Cochin Cres Redberry Rd Redberry Rd Local Microsurface 1.8 97,000$ Cochin Pl Cochin Way End Local Microsurface 0.1 7,000$ Cochin Terr Cochin Cres End Local Microsurface 0.2 14,000$ Cochin Way Cochin Cres Cochin Cres Local Microsurface 0.6 31,000$ Kootenay Dr St Lawrence Cres Assiniboine Dr Local Reconstruction 1.0 271,000$ La Ronge Rd Nahanni Dr Saguenay Dr Collector Microsurface 1.3 65,000$ La Ronge Rd Pinehouse Dr Nahanni Dr Collector Resurface 1.8 265,000$ Miners Ave 56th St E 60th St E Collector Resurface 3.3 493,000$ Neepawa St Thatcher Ave Wakooma St Local Microsurface 1.8 96,000$ Pembina Ave Spadina Cres E Columbia Dr Local Blade Level 1.9 154,000$ Pembina Ave Columbia Dr Red River Rd Local Reconstruction 0.3 70,000$ Pembina Pl End Pembina Ave Local Microsurface 0.3 16,000$ Red Deer Rd Pembina Ave Columbia Dr Local Microsurface 0.8 42,000$ Redberry Rd Lenore Dr Reindeer Rd Collector Resurface 2.5 383,000$ Souris Crt Red Deer Rd End Local Microsurface 0.2 13,000$ St Lawrence Cres Assiniboine Dr Columbia Dr Local Microsurface 1.4 77,000$ Tobin Cres Redberry Rd Redberry Rd Local Microsurface 2.8 148,000$ Tobin Crt End Tobin Cres Local Microsurface 0.3 15,000$ Tobin Pl Tobin Cres End Local Microsurface 0.2 14,000$ Tobin Terr End Tobin Way Local Microsurface 0.4 20,000$ Tobin Way Tobin Cres Tobin Cres Local Microsurface 0.7 40,000$ Turtle Cres Redberry Rd Redberry Rd Local Microsurface 1.0 52,000$ Turtle Crt End Turtle Cres Local Microsurface 0.2 10,000$ Turtle Pl Turtle Cres End Local Microsurface 0.2 12,000$ Wakooma St Thatcher Ave Neepawa St Local Microsurface 2.4 130,000$

2018 Totals 34.8 3,380,000$

Lane-Km Cost Estimate2016 29.5 4,291,000$ 2017 28.0 5,126,000$ 2018 34.8 3,380,000$

2016-2018 Totals 92.3 12,797,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 22: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 6

Page 23: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 6Street Name From To Road Class Treatment Lane-Km Cost Estimate10th St E Eastlake Ave Dufferin Ave Local Reconstruction - W&S 1.1 284,000$ 10th St E Dufferin Ave Clarence Ave S Local Microsurface 1.1 57,000$ 11th St E Eastlake Ave Broadway Ave Collector Reconstruction - W&S 0.4 98,000$ 11th St E Albert Ave NB / Albert Ave SB Clarence Ave S Local Microsurface 0.3 15,000$ 12th St E Broadway Ave Dufferin Ave Collector Reconstruction - W&S 0.7 159,000$ 19th St E Broadway Bridge / 4th Ave S 1st Ave S Arterial Resurface 2.3 429,000$ 2nd Ave N 23rd St E 25th St E Collector Resurface 2.2 299,000$ 2nd Ave N 22nd St E 23rd St E Local Resurface 0.9 126,000$ 9th St E Broadway Ave Clarence Ave S Local Microsurface 1.5 74,000$ Albert Ave NB 8th St E WB 10th St E Local Microsurface 0.6 32,000$ Albert Ave NB 12th St E 14th St E Local Microsurface 0.4 20,000$ Albert Ave SB 10th St E 8th St E WB Local Microsurface 0.6 30,000$ Albert Ave SB 14th St E 12th St E Local Microsurface 0.4 20,000$ Broadway Ave NB 8th St E Broadway Bridge Arterial Reconstruction - W&S 1.8 432,000$ Broadway Ave SB Broadway Bridge 8th St E Arterial Reconstruction - W&S 2.0 490,000$ Dufferin Ave NB 8th St E 12th St E Local Microsurface 1.1 52,000$ Dufferin Ave SB 12th St E 8th St E Local Microsurface 1.3 64,000$ Lansdowne Ave NB 8th St E 9th St E Local Microsurface 0.2 10,000$ Lansdowne Ave NB 9th St E 12th St E Local Reconstruction 0.9 220,000$ Lansdowne Ave SB 9th St E 8th St E Local Microsurface 0.2 10,000$ Lansdowne Ave SB 12th St E 10th St E Local Microsurface 0.4 20,000$ Lansdowne Ave SB 10th St E 9th St E Local Reconstruction 0.4 107,000$ Main St EB Victoria Ave Lansdowne Ave Local Reconstruction - W&S 1.4 354,000$ Main St WB Lansdowne Ave Victoria Ave Local Reconstruction - W&S 1.4 363,000$ Ontario Ave 24th St E 25th St E Local Resurface 0.4 62,000$ Taylor St E Broadway Ave McKinnon Ave S Arterial Resurface 3.0 406,000$

2016 Totals 26.9 4,233,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate10th St E Victoria Ave Eastlake Ave Local Microsurface 0.4 21,000$ 11th St E Victoria Ave Eastlake Ave Collector Microsurface 0.4 22,000$ 13th St E Clarence Ave S McKinnon Ave S Local Blade Level 0.4 34,000$ 13th St E McKinnon Ave S Wiggins Ave S Local Microsurface 0.8 42,000$ 14th St E Clarence Ave S Wiggins Ave S Local Microsurface 1.7 89,000$ 22nd St E 3rd Ave N / 3rd Ave S 4th Ave N / 4th Ave S Arterial Resurface 0.5 72,000$ 22nd St E 4th Ave N / 4th Ave S 5th Ave N Local Resurface 0.5 72,000$ 23rd St E 4th Ave N Spadina Cres E Collector Resurface 1.2 167,000$ 3rd St E Lorne Ave McPherson Ave Local Blade Level 0.5 36,000$ 3rd St E McPherson Ave Broadway Ave Local Microsurface 1.7 86,000$ 4th St E Lorne Ave Melrose Ave Local Microsurface 0.8 44,000$ 5th St E Lorne Ave Melrose Ave Local Microsurface 0.9 44,000$ 6th St E Lorne Ave Melrose Ave Local Microsurface 0.8 42,000$ 7th St E Lorne Ave Melrose Ave Local Microsurface 0.8 43,000$ Arthur Ave 14th St E 15th St E Local Blade Level 0.2 20,000$ Elliott St Wiggins Ave N Bottomley Ave N Local Reconstruction - W&S 0.4 125,000$ Hugo Ave 14th St E 15th St E Local Blade Level 0.2 19,000$ McKinnon Ave S 12th St E 15th St E Local Microsurface 0.7 38,000$ McPherson Ave 3rd St E 6th St E Local Reconstruction 0.8 223,000$ McPherson Ave 6th St E 8th St E Local Microsurface 0.5 25,000$ Munroe Ave S 12th St E 15th St E Local Microsurface 0.7 38,000$ Taylor St E Lorne Ave McPherson Ave Arterial Reconstruction 0.7 488,000$ Taylor St E McPherson Ave Victoria Ave Arterial Resurface 1.3 274,000$ Wiggins Ave N Aird St College Dr Collector Resurface 1.1 153,000$ Wiggins Ave S 12th St E Aird St Collector Resurface 1.9 268,000$

2017 Totals 20.1 2,485,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate1st Ave N 24th St E 25th St E Arterial Resurface 0.9 129,000$ 1st St E Cumberland Ave S Sommerfeld Ave Local Reconstruction 1.6 1,011,000$ 20th St E 2nd Ave S 3rd Ave S Collector Resurface 0.5 80,000$ 20th St E EB Idylwyld Dr S NB 1st Ave S Arterial Resurface 0.6 89,000$ 20th St E WB 1st Ave S Idylwyld Dr S NB Arterial Resurface 0.6 82,000$ 22nd St E 5th Ave N Spadina Cres E Local Resurface 0.2 38,000$ 5th Ave N 22nd St E 25th St E Local Resurface 1.6 248,000$ 5th St E Clarence Ave S Munroe Ave S Local Reconstruction 0.9 237,000$ 8th St W Saskatchewan Cres W Lorne Ave Collector Resurface 0.8 119,000$ 9th St E Clarence Ave S Wiggins Ave S Local Blade Level 1.3 104,000$ Dufferin Ave Taylor St E 8th St E Local Microsurface 4.3 227,000$ Eastlake Ave NB 9th St E 10th St E Local Resurface 0.4 58,000$ Eastlake Ave SB 10th St E 9th St E Local Resurface 0.4 58,000$ Idylwyld Dr S NB 20th St W 22nd St W Arterial Resurface 1.1 168,000$ Idylwyld Dr S SB 22nd St W 20th St W Arterial Resurface 1.2 173,000$ Pacific Ave 22nd St E 25th St E Local Resurface 1.5 220,000$ Victoria Ave NB 8th St E 11th St E Collector Resurface 0.9 139,000$ Victoria Ave SB 11th St E 8th St E Collector Resurface 1.3 199,000$ Wall St 23rd St E 24th St E Local Reconstruction 0.4 100,000$

2018 Totals 20.4 3,479,000$

Lane-Km Cost Estimate2016 26.9 4,233,000$ 2017 20.1 2,485,000$ 2018 20.4 3,479,000$

2016-2018 Totals 67.4 10,197,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 24: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 7

Page 25: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 7Street Name From To Road Class Treatment Lane-Km Cost EstimateBroadway Ave Ruth St E Taylor St E Arterial Resurface 3.1 419,000$ Eastview 2400 Blk Eastview 2700 blk Easthill 2300 blk Local Microsurface 1.6 77,000$ Eastview 2500 Blk Eastview 2400 Blk Eastview 2400 Blk Local Microsurface 1.2 61,000$ Eastview 2600 Blk Eastview 2400 Blk Eastview 2400 Blk Local Microsurface 1.1 56,000$ Eastview 2700/3100 blks Arlington Ave Arlington Ave Local Microsurface 3.3 164,000$ Eastview 2800 Blk Eastview 2700 blk Eastview 3100 blk Local Blade Level 0.7 52,000$ Eastview 2900 Blk Eastview 2700 blk Eastview 3100 blk Local Blade Level 0.7 52,000$ Eastview 3000 Blk Eastview 2700 blk Eastview 3100 blk Local Blade Level 0.7 52,000$ Edson St Jasper Ave S Portage Ave Local Microsurface 1.8 87,000$ Ferguson Ave Calder Cres Wilson Cres Local Reconstruction 1.0 250,000$ Jasper Ave S Melville St Portage Ave Local Microsurface 1.0 48,000$ Melville St Portage Ave Brand Rd Collector Microsurface 0.9 45,000$ Portage Ave Melville St Edson St Local Microsurface 0.7 35,000$ St Henry Ave Ruth St W Hilliard St W Collector Reconstruction 1.2 297,000$

2016 Totals 18.9 1,695,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateBrown Cres Wilson Cres Wilson Cres Local Microsurface 2.0 101,000$ Deborah Cres Wilson Cres Wilson Cres Local Microsurface 2.0 102,000$ Dumont Cres Preston Ave S SB Wilson Cres Local Microsurface 1.1 57,000$ East Centre East Drive East Centre Local Microsurface 1.3 65,000$ East Centre East Drive East Centre Local Microsurface 0.6 34,000$ MacLean Cres Wilson Cres Wilson Cres Local Microsurface 2.2 115,000$ Middleton Cres Wilson Cres Wilson Cres Local Microsurface 2.0 103,000$ Riel Cres Wilson Cres Wilson Cres Local Microsurface 2.0 103,000$ Ruth St W St Henry Ave Herman Ave Collector Reconstruction 1.2 759,000$ Wiggins Ave S MacKenzie Cres McLorg St Local Reconstruction 0.3 82,000$ Young Cres Glasgow St Melrose Ave Local Blade Level 1.0 76,000$

2017 Totals 15.6 1,597,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateBute St Royal Ave Hanover Ave Local Blade Level 1.1 94,000$ Calder Ave Calder Cres Wilson Cres Local Microsurface 1.0 52,000$ Calder Cres Clarence Ave S Calder Ave / Calder Crt Local Microsurface 1.5 78,000$ Calder Crt End Calder Cres Local Microsurface 0.3 17,000$ Calder Pl End Calder Cres Local Microsurface 0.3 17,000$ Calder Terr Calder Cres End Local Microsurface 0.3 19,000$ Clarence Ave S (Side Street) Lane Glasglow St Local Microsurface 0.1 5,000$ Easthill 2300 blk Arlington Ave Easthill 2200 blk Local Resurface 1.2 185,000$ Glasgow St Clarence Ave S Ferguson Ave Local Microsurface 0.3 18,000$ Glasgow St Young Cres Broadway Ave Collector Resurface 1.4 216,000$ Melrose Ave Young Cres Young Cres Collector Reconstruction 0.9 254,000$ Melville St Jasper Ave S Portage Ave Collector Reconstruction 1.4 397,000$ Melville St Lorne Ave Jasper Ave S Collector Structural Overlay 0.4 44,000$ Ruth St E Lorne Ave Broadway Ave Arterial Resurface 3.2 464,000$ Turner Ave Glasgow St McAskill Cres Local Reconstruction 0.2 65,000$ Wiggins Ave S McLorg St Taylor St E Local Blade Level 3.7 306,000$ Yorath Ave Glasgow St Harrison Cres Local Reconstruction 0.2 63,000$

2018 Totals 17.8 2,294,000$

Lane-Km Cost Estimate2016 18.9 1,695,000$ 2017 15.6 1,597,000$ 2018 17.8 2,294,000$

2016-2018 Totals 52.3 5,586,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 26: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 8

Page 27: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 8Street Name From To Road Class Treatment Lane-Km Cost Estimate8th St E WB Arlington Ave Preston Ave S Arterial Resurface 2.6 459,000$ Argyle Ave 7th St E End Local Microsurface 0.1 8,000$ Arlington Ave 7th St E 8th St E Collector Microsurface 0.5 26,000$ Campbell Ave 7th St E 8th St E Local Microsurface 0.5 26,000$ Conn Ave Salisbury Dr 7th St E Local Microsurface 0.5 27,000$ Duncan Cres McKercher Dr NB McKercher Dr NB Local Blade Level 1.3 96,000$ Emerson Ave 7th St E 8th St E Local Microsurface 0.5 26,000$ Goodwin Ave 7th St E 8th St E Local Microsurface 0.5 26,000$ Harris Ave 7th St E 8th St E EB Local Microsurface 0.5 26,000$ Walpole Ave 7th St E 8th St E EB Local Microsurface 0.5 26,000$

2016 Totals 7.7 746,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateAcadia Crt Acadia Dr Acadia Dr Local Blade Level 0.7 56,000$ Baldwin Cres Arlington Ave Arlington Ave Local Blade Level 1.2 94,000$ Brandon Pl Boychuk Dr End Local Blade Level 0.3 23,000$ Cambridge Cres Carleton Dr Harvard Cres Local Microsurface 1.3 66,000$ Campion Cres Acadia Dr Acadia Dr Local Microsurface 1.9 99,000$ Harvard Cres Cambridge Cres Carleton Dr Local Microsurface 1.7 89,000$ McGill St Carleton Dr Acadia Dr Local Microsurface 0.8 40,000$ Moncton Pl Boychuk Dr End Local Blade Level 0.4 32,000$ Trent Cres DeGeer St DeGeer St Local Microsurface 2.4 125,000$ Trent Cres Trent Cres Trent Cres Local Microsurface 0.9 46,000$ Trent Crt Trent Cres End Local Microsurface 0.2 13,000$ Trent Pl Trent Cres End Local Microsurface 0.3 14,000$ Yale Cres Carleton Dr McGill St Local Microsurface 0.7 34,000$

2017 Totals 12.8 731,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate8th St E EB Preston Ave S Arlington Ave Arterial Resurface 2.7 398,000$ Boychuk Dr 8th St E McKercher Dr Collector Resurface 6.8 1,019,000$ Laurentian Dr Boychuk Dr Boychuk Dr Collector Microsurface 3.4 175,000$ Mitchell St Arlington Ave Lindsay Dr Local Blade Level 0.5 44,000$

2018 Totals 13.4 1,636,000$

Lane-Km Cost Estimate2016 7.7 746,000$ 2017 12.8 731,000$ 2018 13.4 1,636,000$

2016-2018 Totals 33.9 3,113,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 28: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 9

Page 29: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 9Street Name From To Road Class Treatment Lane-Km Cost EstimateBrightsand Cres Brightsand Way Kingsmere Blvd Local Microsurface 2.9 141,000$ Brightsand Crt Brightsand Lane End Local Microsurface 0.3 14,000$ Brightsand Lane Brightsand Cres Brightsand Cres Local Microsurface 0.7 35,000$ Brightsand Pl Brightsand Lane End Local Microsurface 0.2 11,000$ Brightsand Terr Brightsand Cres End Local Microsurface 0.3 14,000$ Brightsand Way Brightsand Lane Kingsmere Blvd Local Microsurface 0.6 29,000$ Coldspring Bay Coldspring Way End Local Microsurface 0.2 11,000$ Coldspring Cres Stillwater Dr Stillwater Dr Local Microsurface 2.5 126,000$ Coldspring Crt Coldspring Cres End Local Microsurface 0.2 9,000$ Coldspring Pl Coldspring Cres End Local Microsurface 0.2 13,000$ Coldspring Rise Coldspring Cres End Local Microsurface 0.1 7,000$ Coldspring Way Coldspring Cres Coldspring Cres Local Microsurface 0.8 38,000$ Crean Cres Kingsmere Blvd Kingsmere Blvd Local Microsurface 2.4 118,000$ Crean Lane Crean Cres Crean Way Local Microsurface 0.6 28,000$ Crean Way Crean Cres Crean Cres Local Microsurface 0.5 25,000$ Whiteshore Bay Whiteshore Way End Local Microsurface 0.1 7,000$ Whiteshore Cres Kingsmere Blvd Whiteshore Way Local Microsurface 1.0 50,000$ Whiteshore Crt Whiteshore Way End Local Microsurface 0.2 11,000$ Whiteshore Pl Whiteshore Way End Local Microsurface 0.1 7,000$ Whiteshore Way Kingsmere Blvd Whiteshore Cres Local Microsurface 0.9 47,000$

2016 Totals 14.7 741,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateBrightwater Bay Brightwater Cres Brightwater Cres Local Reconstruction 0.2 44,000$ Brightwater Cres Brightwater Way Kingsmere Blvd Local Reconstruction 0.2 63,000$ Brightwater Cres Kingsmere Blvd Brightwater Way Local Microsurface 1.3 65,000$ Brightwater Way Brightwater Cres Brightwater Cres Local Microsurface 0.5 24,000$ Bronson Cres Kingsmere Blvd Kingsmere Blvd Local Microsurface 1.6 82,000$ Bronson Way Bronson Cres Bronson Cres Local Microsurface 0.5 26,000$ Kingsmere Blvd Brightsand Way / Waterbury Rd Boychuk Dr Collector Microsurface 2.9 143,000$ Weyakwin Dr Kingsmere Blvd Taylor St E Collector Microsurface 2.6 131,000$

2017 Totals 9.7 578,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateCostigan Bay Costigan Rd End Local Microsurface 0.2 9,000$ Costigan Cres Costigan Rd Costigan Rd Local Microsurface 1.3 69,000$ Costigan Crt Costigan Way End Local Microsurface 0.2 11,000$ Costigan Pl Costigan Way End Local Microsurface 0.3 15,000$ Costigan Rd Kingsmere Blvd Kingsmere Blvd Local Microsurface 2.7 145,000$ Costigan Way Costigan Rd Costigan Rd Local Microsurface 0.8 40,000$ Emmeline Rd Waterbury Rd Lavalee Rd Local Microsurface 1.4 76,000$ McKercher Dr SB 8th St E Taylor St E Arterial Resurface 4.3 635,000$ Swan Cres Emmeline Rd Emmeline Rd Local Microsurface 2.5 132,000$ Swan Crt Swan Lane End Local Microsurface 0.3 17,000$ Swan Lane Swan Cres Swan Cres Local Microsurface 1.0 53,000$

2018 Totals 14.9 1,202,000$

Lane-Km Cost Estimate2016 14.7 741,000$ 2017 9.7 578,000$ 2018 14.9 1,202,000$

2016-2018 Totals 39.4 2,521,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 30: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected Roadway Preservation

Treatment Year2016201720182014-2015 (Completed)

Ward 10

Page 31: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - Ward 10Street Name From To Road Class Treatment Lane-Km Cost EstimateBerini Dr NB 115th St E Attridge Dr Arterial Resurface 0.9 119,000$ Berini Dr SB Attridge Dr 115th St E Arterial Resurface 0.9 170,000$ Brunst Cres Kenderdine Rd Kenderdine Rd Local Microsurface 1.4 70,000$ Cowley Rd Kerr Rd Rogers Rd Collector Microsurface 1.6 77,000$ Gillam Cres Kerr Rd Kenderdine Rd Local Microsurface 0.9 47,000$ Gillam Pl Gillam Cres End Local Microsurface 0.2 12,000$ Kenderdine Rd Staigh Cres Kerr Rd Collector Microsurface 1.9 93,000$ Laycoe Cres Konihowski Rd Konihowski Rd Local Microsurface 2.2 111,000$ Laycoe Crt Laycoe Cres End Local Microsurface 0.3 17,000$ Laycoe Lane Laycoe Cres Laycoe Cres Local Microsurface 0.5 27,000$ Laycoe Terr Laycoe Cres End Local Microsurface 0.3 17,000$ Staigh Cres Kenderdine Rd Kenderdine Rd Local Microsurface 1.5 76,000$ Willowgrove Blvd EB McOrmond Dr Stensrud Rd Collector Microsurface 1.2 60,000$ Willowgrove Blvd WB Stensrud Rd McOrmond Dr Collector Microsurface 1.3 61,000$

2016 Totals 15.4 957,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateBeckett Cres Beckett Green Beckett Green Local Microsurface 1.4 73,000$ Beckett Green Kenderdine Rd Kenderdine Rd Local Microsurface 0.7 38,000$ Beerling Cres Konihowski Rd Konihowski Rd Local Microsurface 1.9 97,000$ Budz Bay Budz Cres Budz Cres Local Microsurface 0.2 9,000$ Budz Cres Kenderdine Rd Kenderdine Rd Local Microsurface 2.0 101,000$ Budz Crt Budz Cres Budz Cres Local Microsurface 0.2 9,000$ Budz Green Budz Cres Budz Cres Local Microsurface 1.2 60,000$ Budz Lane Budz Green Budz Cres Local Microsurface 0.2 11,000$ Budz Terr Budz Cres Budz Cres Local Microsurface 0.2 9,000$ Guenter Bay Guenter Cres End Local Microsurface 0.3 15,000$ Guenter Cres Kenderdine Rd Kenderdine Rd Local Microsurface 1.3 66,000$ Guenter Terr Guenter Cres Guenter Cres Local Microsurface 0.3 14,000$ Kenderdine Rd Mulcaster Cres / Vincent Cres 115th St E Collector Reconstruction 2.2 939,000$ Kutz Cres Kenderdine Rd Kenderdine Rd Local Microsurface 1.3 65,000$ Kutz Cres Kutz Cres Kutz Cres Local Microsurface 0.2 8,000$ Kutz Crt Kutz Cres Kutz Cres Local Microsurface 0.1 8,000$ Steiger Cres Kenderdine Rd Kenderdine Rd Local Microsurface 1.3 67,000$ Steiger Pl Steiger Cres End Local Microsurface 0.2 10,000$ Steiger Way Steiger Cres Steiger Cres Local Microsurface 0.9 49,000$

2017 Totals 15.9 1,648,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateBornstein Cres Kerr Rd Cowley Rd Local Microsurface 1.2 67,000$ Bornstein Crt Bornstein Cres End Local Microsurface 0.3 16,000$ Bornstein Terr Bornstein Cres End Local Reconstruction 0.4 235,000$ Epp Ave Kenderdine Rd Perehudoff Cres Local Microsurface 0.6 33,000$ Epp Crt Epp Ave End Local Microsurface 0.3 16,000$ Epp Pl Epp Ave End Local Microsurface 0.3 17,000$ Haslam Cres Haslam Cres Konihowski Rd Local Microsurface 0.3 15,000$ Haslam Pl Haslam Way End Local Microsurface 0.2 11,000$ Haslam Way Haslam Cres Haslam Cres Local Microsurface 1.1 58,000$ Konihowski Rd Central Ave Garvie Rd Collector Microsurface 3.2 166,000$ Perehudoff Cres Kenderdine Rd Kenderdine Rd Local Microsurface 2.0 107,000$ Perehudoff Crt Perehudoff Cres End Local Microsurface 0.3 19,000$ Pezer Cove Pezer Lane End Local Microsurface 0.8 42,000$ Pezer Cres Konihowski Rd Konihowski Rd Local Microsurface 2.4 128,000$ Pezer Lane Pezer Cres Pezer Cres Local Microsurface 0.5 25,000$ Scissons Cres Garvie Rd Garvie Rd Local Microsurface 1.8 97,000$ Scissons Crt Scissons Cres End Local Microsurface 0.2 13,000$ Scissons Terr Scissons Cres End Local Microsurface 0.2 13,000$

2018 Totals 16.2 1,078,000$

Lane-Km Cost Estimate2016 15.4 957,000$ 2017 15.9 1,648,000$ 2018 16.2 1,078,000$

2016-2018 Totals 47.5 3,683,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS

Page 32: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

±2016-2018 Projected

Treatment Year2016201720182014-2015 (Completed)

Roadway PreservationExpressways

Page 33: Projected 2016-2018 Roadway Preservation Plan - · PDF fileProjected 2016-2018 Roadway Preservation Plan Major Projects Asset Preservation ... Central Ave Reid Rd / Rossmo Rd Attridge

Terms of Reference - ExpresswaysStreet Name From To Road Class Treatment Lane-Km Cost EstimateCircle Dr / 33rd St W NE Ramp 33rd St W Circle Dr NB Expressway Resurface 0.7 102,000$ Circle Dr / 33rd St W SE Ramp Circle Dr NB 33rd St W Expressway Resurface 1.2 169,000$ Circle Dr EB Airport Dr Ave C N Expressway Resurface 3.8 628,000$ Circle Dr NB Circle Dr / 33rd St W NE Ramp Airport Dr Expressway Structural Overlay 5.1 528,000$ College Dr EB Preston Ave N Central Ave Expressway Structural Overlay 6.3 673,000$ College Dr WB Circle Dr / College Dr NE Ramp Preston Ave N Expressway Structural Overlay 4.3 437,000$ Idylwyld Dr N / Cirlcle Dr NW Ramp Idylwyld Dr N SB Circle Dr Expressway Resurface 0.7 206,000$ Idylwyld Dr N / Cirlcle Dr SE Ramp Idylwyld Dr N NB Circle Dr Expressway Resurface 0.6 78,000$ Idylwyld Dr N / Cirlcle Dr SW Ramp Circle Dr Idylwyld Dr N SB Expressway Resurface 0.3 44,000$ Idylwyld Dr N SB Idylwyld Dr N / 51st St E / Ave C N SW Ramp 39th St W Expressway Resurface 6.0 957,000$ Idylwyld Dr S SB Idylwyld Dr S / Ruth St W Overpass SB Ruth St / Idylwyld Dr S SW Ramp Expressway Resurface 0.8 103,000$

2016 Totals 29.8 3,925,000$

Street Name From To Road Class Treatment Lane-Km Cost Estimate1st Ave S NB 1st Ave S / 19th Street Overpass NB 20th St E Expressway Resurface 0.5 66,000$ 1st Ave S SB 19th St E WB Sid Buckwold Bridge SB Expressway Resurface 0.2 30,000$ Circle Dr / Warman Rd NE Ramp NE Ramp From Circle Dr WB Warman Rd Expressway Resurface 0.9 125,000$ Circle Dr / Warman Rd SE Loop Circle Dr EB Warman Rd NB Expressway Resurface 0.6 82,000$ Circle Dr EB Idylwyld Dr S SB Circle Dr / Clarence Ave S SE Ramp Expressway Resurface 2.8 400,000$ Idylwyld Dr N SB Marquis Dr W Idylwyld Dr N / 51st St E / Ave C N NW Ramp Expressway Resurface 10.2 1,698,000$ Idylwyld Dr S / Taylor St W NE Ramp Taylor St W Idylwyld Dr S NB Expressway Structural Overlay 0.4 40,000$ Idylwyld Dr S NB Taylor St E / Idylwyld Dr S NE Ramp Idylwyld Dr S / 19th St E Overpass NB Expressway Resurface 4.3 615,000$ Idylwyld Dr S NB Idylwyld Dr S / Taylor St W Overpass NB Taylor St E / Idylwyld Dr S NE Ramp Expressway Structural Overlay 0.4 45,000$ Idylwyld Dr S NB Idylwyld Dr S / 19th St E Overpass 100m South of 20th St Expressway Resurface 0.2 37,000$ Lorne Ave 8th St E Idylwyld Dr S NB Expressway Resurface 0.6 84,000$

2017 Totals 21.0 3,222,000$

Street Name From To Road Class Treatment Lane-Km Cost EstimateCircle Dr / 14th St E NE Ramp 14th St E Circle Dr NB Expressway Resurface 0.3 41,000$ Circle Dr / Taylor St E NE Ramp Taylor St E Circle Dr NB Expressway Resurface 0.5 79,000$ Circle Dr / Taylor St E NW Ramp Circle Dr SB Taylor St E Expressway Resurface 0.6 93,000$ Circle Dr / Taylor St E SE Ramp Circle Dr NB Taylor St E Expressway Resurface 1.3 184,000$ Circle Dr / Taylor St E SW Ramp Taylor St E Circle Dr SB Expressway Resurface 0.9 168,000$ Circle Dr EB Circle Dr / Warman Rd SE Ramp Circle Dr N Bridge EB Expressway Resurface 2.0 428,000$ College Dr / Mckercher Dr SE Ramp Mckercher Dr College Dr EB Expressway Resurface 0.6 92,000$ College Dr / Mckercher Dr SW Ramp College Dr EB Mckercher Dr Expressway Resurface 0.9 128,000$ Idylwyld Dr N NB Idylwyld Dr N / 51st St E / Ave C N NE Ramp Highway 16 WB Ramp Expressway Resurface 3.7 539,000$ Idylwyld Dr S / Ruth St NE Ramp Adelaide St W / Coy Ave Idylwyld Dr S NB Expressway Resurface 0.2 35,000$ Idylwyld Dr S NB Circle Dr / Idylwyld Dr S NE Ramp Idylwyld Dr S / Ruth St W Overpass NB Expressway Resurface 1.4 211,000$ Idylwyld Dr S NB Idylwyld Dr S / Ruth St W Overpass NB Idylwyld Dr S / Taylor St W Overpass Expressway Structural Overlay 2.4 268,000$ Ruth St / Idylwyld Dr S SE Ramp Idylwyld Dr S NB Vernon Ave Expressway Resurface 0.3 40,000$ Ruth St / Idylwyld Dr S SW Ramp Lorne Ave Idylwyld Dr S SB Expressway Resurface 0.9 130,000$

2018 Totals 16.1 2,436,000$

Lane-Km Cost Estimate2016 29.8 3,925,000$ 2017 21.0 3,222,000$ 2018 16.1 2,436,000$

2016-2018 66.8 9,583,000$

2016 TERMS OF REFERENCE LOCATIONS

2017 TERMS OF REFERENCE LOCATIONS

2018 TERMS OF REFERENCE LOCATIONS