INTRODUCTION OF RUBBER Rubber was known to the indigenous peoples of the American’s long before the arrival of European explorers. In 1525, padre d’ Anghieria reported that he had seen Mexican tribesipeople playing with elastic balls. The first scientific study of rubber was undertaken by Charles de la condomine. When he encountered it during his trip to Peru in1735. Based on the source of raw material, they are two kinds of rubber: 1. Natural Rubber (NR) 2. Synthetic Rubber(SR) NATURAL RUBBER 1. Extracted from plants. 2. Many plant species that natural rubber is many other plants that contain Rubber latex. SYNTHETIC RUBBER Derived from petroleum, oil, natural gas and acetylene. 1

Upload: hema-ramasamy

Post on 01-Dec-2014

520 views

Category:

Documents


20 download

TRANSCRIPT

Page 1: Project Veegrip Belts

INTRODUCTION OF RUBBER

Rubber was known to the indigenous peoples of the American’s long before the arrival of

European explorers. In 1525, padre d’ Anghieria reported that he had seen Mexican tribesipeople

playing with elastic balls. The first scientific study of rubber was undertaken by Charles de la

condomine. When he encountered it during his trip to Peru in1735. Based on the source of raw

material, they are two kinds of rubber:

1. Natural Rubber (NR)

2. Synthetic Rubber(SR)

NATURAL RUBBER

1. Extracted from plants.

2. Many plant species that natural rubber is many other plants that contain Rubber

latex.

SYNTHETIC RUBBER

Derived from petroleum, oil, natural gas and acetylene.

It is over a dozen major classes, many of them are copolymers i.e., polymers

consisting of more than one monomer.

1

Page 2: Project Veegrip Belts

INDUSTRY PROFILE

Rubber Factory is the third album by American blues-rock duo, The Black Keys. It

continues the Black Keys' tradition of raw, heavily blues-influenced indie rock. Rubber Factory

was recorded in an abandoned coal burning power plant in the Black Keys' hometown of Akron,

Ohio, and like Thickfreakness, was recorded and produced by Patrick Carney. The now-

demolished Akron factory in which the Black Keys recorded Rubber Factory. The song "When

the Lights Go Out" was used in the film Black Snake Moan.

Additionally, the song "10 A.M. Automatic" was featured in an American Express

commercial, in the movie Live Free or Die, in the soundtrack for MLB '06: The Show and in the

movie The Go-Getter; this motion picture also features "Keep Me". Their version of "Grown So

Ugly" can be heard during the party scene in the movie Cloverfield. "Girl Is on My Mind" was

used on a commercial for Sony Ericsson mobile phones, as well as a Victoria's Secret

commercial. "Stack Shot Billy" was performed on Late Show with David Letterman.

Carney stated the coal burning power plant had been removed in 2010. The factory was

located on the west side of Route 8's Howe Road exit ramp.

BASANT RUBBER FACTORY LTD

Basant Rubber Factory Ltd., an ISO – 9001-2000 Quality System Certified Company,

with over 40 years of experience is involved in manufacturing of Rubber Extruded, Molded and

also Rubber to Metal Bonded Products for Household, Railways, Automobiles, Defense and

Civil Engineering industries. Basant rubber factory is at Mumbai.

Beginning on a small scale manufacturing Solid tyres for horse driven vehicles, today

Basant Rubber is capable of manufacturing rubber molded parts of the smallest size i.e.

2

Page 3: Project Veegrip Belts

‘O’ Rings to big size of Rubber to Metal Bonded Pads. We are also pioneer in

manufacturing of rubber extrusion parts of ¼ inches to 12 inches running lengths.

Automatic of manufacturing process of as well as our detailed in house quality check

makes it possible for us to achieve all international standards for producing quality products.

Apart from the leading technology in the Indian rubber industry, Basant Rubber has also

acquired the evolving technology for manufacturing of Thermoplastic Polyurethane Elastomer

parts from M/s.Merquinsa Mercados Quimicos S.L., Spain.

The search for better, more economical and effective solutions to our customer need is

continuous process at Basant Rubber Factory Ltd.

RUBBER FACTORY ABLAZE

A rubber factory in Charley Mount estate in Udukawa, Weligama is ablaze with several

employees trapped inside, causing much anxiety among their relatives and the residents of the

area.

Police and the Galle Fire Brigade who rushed to the scene are currently carrying on a

rescue operation with the help of the people. Reports say that the fire has spread to an area of

about four acres in the estate, causing damage to property and the rubber plantations close by

Krishnan Jeewaka.

3

Page 4: Project Veegrip Belts

DELHI RUBBER FACTORY

New Delhi, March 26 (IANS) a fire broke out at a rubber factory in outer Delhi's

Jahangirpuri Saturday morning, fire officials said. No casualties were reported.

'The accident happened around 4.30 a.m. The rubber materials in the factory made the

fire spread easily. We are looking into the possible causes,' a fire brigade official said.

The factory is located in the Jahangirpuri industrial area that houses factories and shops.

'Around 16 fire tenders were rushed to the spot and the fire was extinguished around 7.15 a.m.,'

added the official.

MADRAS RUBBER FACTORY

Madras Rubber Factory, popularly known as MRF, is a major tyre manufacturing

company located in Chennai, Tamil Nadu, and India. MRF is mainly involved in making vehicle

tyres. It is India's largest tyre manufacturing company, and among the dozen largest worldwide.

It exports to more than 65 countries.

PRESENT

It is also involved in a range of other activities via subsidiaries. Funskool India, a Joint

venture between Hasbro and MRF, is a major toy manufacturing company in the country. MRF

Pretreads offers world class precured tyre retreading service, and MRF Muscle flex is involved

in making conveyor belts. It is presently under the leadership of Vinoo Mammen, son of the late

K.M.Mammen Mappillai.

4

Page 5: Project Veegrip Belts

SPORTS

MRF has been involved in the development of cricket through its sponsorship of many

cricketers and MRF Pace Foundation. At one point of time, MRF was the bat sponsor of world-

class batsmen including Brian Lara, Sachin Tendulkar, and former Australian captain Steve

Waugh.

After Waugh's and Lara's retirement from international cricket, on 4 September 2009,

MRF's contract with Sachin Tendulkar too expired. Sachin now uses Adidas bats, and MRF are

currently sponsoring Gautam Gambhir and Rohit Sharma two other members of the Indian

cricket team.

At IPL 2010, MRF got the charge of the moored balloon floating above the cricket

grounds. It contained a high-definition camera recording live actions of the cricket match.

SPONSORSHIPS

INDIA - Sachin Tendulkar (1994-2009)

Gautam Gambhir (2011)

Rohit Sharma

BANGLADESH - Ashrafull

WEST INDIES

AUSTRALIA - Steve Waugh

5

Page 6: Project Veegrip Belts

COMPANY PROFILE

A well established company “CHANDRU RUBBER FACTORY” was founded by

Mr.P.Muniyandi in 1984. It is one of the leading v-belt manufacturing companies. Now is

headed by Mr.M.Panneer Selvam CMD and Mr.Chandrasekar JMD. And well experienced staffs

are working under their control. The company manufacturing VEE Grip Belts. It was established

in 1993.

At the beginning the company was started with 15 employees. At present the company is

generating job opportunities for 212 employees and more than 1000 employees in an indirect

way. By the hard work they reached the production capacity of 3 million per year. The initial

production was 500 belts every day. Now it becomes 5000 belts per day. The Average

production per month 82000 belts.

With the help of ISO and our own systems of development currently we are leaping out

for innovative methods of production to bring our fruitful results to fulfill the renewed customer

requirements.

VEEGRIP BELTS is a fast growing manufacturer of world-class rubber products.

Headquartered at the temple city of Madurai, Tamilnadu, India. It is involved in the

manufacturer of rubber belts for industrial, agricultural and automotive applications. The

company has been certified with IS: 2494 1974 by the Bureau of Indian Standards for its

industrial belts range. VEEGRIP is committed towards customer satisfaction by ensuring

product and process quality at all stages of manufacturing. Product range includes small, medium

and large sizes of V-Belts, Cogged belts, Poly V belts, etc.

6

Page 7: Project Veegrip Belts

MISSION STATEMENT

To manufacture and distribute high quality, world-class and environmental friendly

rubber components to serve “Delighted Customers” in global markets under the VEEGRIP

brand,and render business profitable and dependable for all customers and partners.

VISION

“Anywhere and Everywhere”

To be a Global player in the V-belt industry 2020

QUALITY POLICY

Chandru Rubber is committed to achieve and maintain quality of the products that exceed

customer’s need and satisfaction through

Systematic control of processes

Innovative technologies

Continuous improvement

Cost effectiveness and

Team work

AWARDS

M/S Whirlpool India Ltd presented the “QUALITY SUPPLIER AWARD” for the year

1994-95. And it is ISO 9001-2000 certified organization.

7

Page 8: Project Veegrip Belts

BRANCHES

1. Chennai

2. Madurai

3. Bangalore

4. Mumbai

5. Raipur

6. Dharshini –Indore

7. Dharshini-Jaipur

ASSOCIATED AND INDEPENDENT COMPANIES

Anju Rubber Factory

Foam Vishnu Rubber

REGISTERED OFFICE

Chandru Rubber Factory

172/2, Bye Pass Road,

Bethaniyapuram,

Madurai.

Visit us: www.veegripbelts.com

CORPORATE OFFICE

Knivraj complex, 11-486,

8

Page 9: Project Veegrip Belts

Annasalai, Nanadanam,

Chennai-600 035.

FACTORY ADDRESS

Thiruvalayanalur (P.O),

Nagari, Vadipatti-Taluk,

Madurai-625 221.

BOARD OF DIRECTORS

Mr.M.Panneer Selvam

Mr.M.Chandra Sekar

TOTAL NO OF EMPLOYEES

Workman 212

Management catered Staffs 140

________

352

________

9

Page 10: Project Veegrip Belts

PRODUCT PROFILE

Our company has produced the Veegrip belts, Washing machine Belts, WetGrinder

belts.VEEGRIP belts are manufactured using best raw materials and neoprene rubber blended

outer fabric to protect the belts from heat, oil fatigue while running.

WASHING MACHINE BELTS

COMPANY NAME SIZE MODEL PRICE

WHIRLPOOL

24 V-BELT 101.00

27 NBO-CHINA 106.00

22.5 DRIVE BELT 100.00

22.6 DRIVE BELT 100.00

SAMSUNG 20.5

VIDEOCON

21 45FDX 95.00

25LA/680 MULTIE 6000 134.00

25LA/688 MULTIE 6000 140.00

34.4 VNA45 NOTCHED 154.00

10

Page 11: Project Veegrip Belts

WET GRINDER

SIZE PRICE

340 126.00

345 126.50

350 128.00

30.5

LA857 124.00

355 132.00

370 135.00

920 ABOVE 146

The VEEGRIP belts are:

11

Page 12: Project Veegrip Belts

1. Power bond – V-Belts

2. Cogged Belt

3. Power line poly-V-Belts

The main functions of the belts are transmission of power from one to another.

1. POWER POND V-BELTS:

Production Ranges:

Wrapped Classical Belts:

“A” Section 17 inches -250 inches

“B” Section 22 inches – 500 inches

“C” Section 45 inches – 500 inches

“D” Section 75 inches -500 inches

“E” Section 150 inches-500 inches

Wedge Belt

“FHP” Section 17 inches – 60 inches

12

Page 13: Project Veegrip Belts

“SPZ” Section 630 LP – 3800 LP

“SPA” Section 800 LP-3800 LP

“SPB” Section 100LP – 12700LP

“SPC” Section 2120LP -6000LP

Wrapped Hexagonal Belts

Hexagonal Belt BB75-BB350

WRAPPED CLASSICAL BELTS AND WEDGE BELT:

Construction:

Strong Wear resistant bias cut neoprene rubberized fabric.

High tenacity, low stretch, specially treated cable card.

Heat resistant card embedding cushion rubber compounded.

Specially compounded high modules compression rubber.

Application:

General Engineering Industries

Agriculture Industries

Domestic Appliances

13

Page 14: Project Veegrip Belts

WRAPPED HEXAGONAL BELTS:

Construction:

Hexagonal V-Belts also known as Double V-Belts.

They can be in simple terms considered as two v-belts joined back to back.

The neutral axis containing the tension cord is exactly half way up the section.

The polyester tension cord placed at the center of this belt provides extreme

flexibility & low stretch properties. It is because of this positioning of the cord

the same is not subjected to any other forces as in the case of normal V-Belts.

Application:

Hexagonal belts find applications in drives where several pulleys in the same

plane are to be driven in the clockwise & anti-clockwise direction

simultaneously.

Double V-Belts normally finds its application in agricultural machinery,

textile machinery & rice mills.

WRAPPED BANDED BELTS

Construction:

Wedge (SPZ, SPA, SPB, SPC) or narrow belts with strong tied over them.

14

Page 15: Project Veegrip Belts

Each Band may contain the required number of belts, maximum up to 5 belts

in one band depending on the drive conditions.

Application:

Reciprocating compressors

Stone Crushers

Cold forging machines

V-Belt drives.

Vertical Shaft drives

Agriculture Drives

WRAPPED HARVESTER BELTS:

Construction:

Strong wear resistant bias cut neoprene rubberized fabric.

High tenacity, low stretch, specially treated cable card.

Heat resistant card embedding cushion rubber compound.

Specially compounded high modules compression rubber.

Application:

15

Page 16: Project Veegrip Belts

Agriculture Machines

Textile Machines

Machine tool equipment

Printing Machines.

2. COGGED BELT

Construction:

Special top layer.

Polychloroprene cushion rubber compound.

Specially treated & stabilized polyester cord.

Fiber filled polychloreprene base.

Molded cogs for better flexibility.

Application:

Automotive industries (IC Engine, Cooling pump, Water pump, Compressor

Alternator).

General Engineering Industries.

Agriculture Industries.

3. POWER LINE POLY-V-BELT

Construction:

Polychloroprene impregnated fabric.

16

Page 17: Project Veegrip Belts

High tensile polyester cord.

Polychloroprene Cushion Rubber.

Fiber loaded Polychloroprene ribs

Application:

To transmit power from IC engines to AC pump compressor, Dynamo

Housekeeping electrical Appliances.

OBJECTIVES

1. To acquire in-depth knowledge about functions of every department.

2. To know the information about the storage of finished products and raw material.

3. To familiarize the student to the practical work environment.

4. Latest techniques followed by the concern.

5. To get thorough industrial exposure

17

Page 18: Project Veegrip Belts

6. To know about the welfare activities given to the workers.

ORGANISATION CHART

18

CHANDRU RUBBER FACTORY

CHIEF MANAGING DIRECTOR

JOINT MANAGING DIRECTOR

MARKETING PURCHASE ACCOUNTS

BUSINESS DEVELOPMENT

MANAGER

ASSISTANT MANAGEREXECUTIVESWORKERS

ASSISTANT MANAGER

EXECUTIVES

WORKERS

ASSISTANT MANAGER

PURCHASE EXECUTIVES

PRODUCTION ADMIN HUMAN RESOURCE

MANAGER

ASSISTANT MANAGER

QUALITY CONTROLSUPERVISION

CHIEF MECHANICSWORKERS

ASSISTANT MANAGER

HR EXECUTIVEWORKERS

SALES EXECUTIVES

GENERAL A/C EXECUTIVESWORKERSWORKERSWORKERS

Page 19: Project Veegrip Belts

PRODUCTION DEPARTMENT

PRODUCTION PROCESS

MIXING

BASE

CALENDERING

19

Page 20: Project Veegrip Belts

BUILDING

CUTTING OR TAPPING

FLIPPING

CURING

TRIMMING

DYEING

INSPECTION

MIXING

In the mixing the different types of rubber and different raw materials are mixed to get

rubber sheet. And they are following formula according the quality of product. There will be

some variation in the belt. So according to the belt we mix the material. The materials used are

Natural Rubber, Artificial Rubber, carbon, oil, acids, chemicals, wax, zinc oxide, sulphur

etc.After taking all these materials they are taking the things to deck room and according to

the formula they are weighing and putting the mix in to roller to get rubber sheet. The mixing

room is called as rubber mill.

BASE

20

Page 21: Project Veegrip Belts

According to the order size the fabric cloth which is produced in mill is cut here. Fabric is

a cloth which is used to cover the belt, fabric is first inserted into the machine, it is called Three

Roll fabric calendar in this stage the output is to take the rubber coating to the fabric cloth.

CALENDARING

The machine is called as profile calendaring. The rubber sheet is put in to the profile

calendar. The profile calendar contains a grooved bowl under the bowl can be changing the size

on the basis of requirement. The bowl size is A, B, C, and D when the bowl are insert for final

product.

BUILDING

The machine is called as Profile building. Converting the belt into required size. A

machine contains a cord is should be rolled within the rubber sheet. But group of belts are

produced here called sleeve.

TAPPING

In this process the machine called as profile cutting. In this process group of belts are

produced, here the belts are cut into individual pieces.

FLIPPING

In this process individual belts are covered with fabric. The fabric cloth is coated over the

belt.

CURING

21

Page 22: Project Veegrip Belts

In following steps, belts are undergone some building process. Here to make the

complete product. This process is carried down to make the product hard. After flipping process

the belt is wrapped with a fifty meter cloth and this will be subjected to steaming .In the steam

engine steaming the wood ,And is done through vulcanize. Which appears horizontal and steam

will be passed for forty minutes at 130 degree-150 degree Celsius .The belt is attached with

mould and get boiled 30 minutes. In this process 200 belt per process produced. In one mould 24

rings. The mould will be differing according to the size. In the pot curing 3000 belts per day.

In the press curing this will be vertical is appearance, and is done especially for OE

(Original Equipment) the belt is pressed all size and then we get output. In this press curing the

platterns is used. And it is used to make the belt in required size, hard, the shape of the belt. In

the one hour 24 belts will be curing. In this 2000 belts will be produced.

TRIMMING

In flipping some fabrics are not properly attached in the belt, in the process of trimming

the unwanted fabric is trimmed.

DYEING

After the curing process some belts are un-uniform in color, by dyeing all the belts are

painted in uniform color. It is a final stage.HSS machine and reverse cooling process for getting

the perfect belt. In this process4-5 belts per set (7 minutes process time). In per shift 150 belts

dyeing and checking (1/2 hr).

INSPECTION

22

Page 23: Project Veegrip Belts

In the inspection it checks the belts whether it is accurate size, width and length. The

main error in the belts are trimming error and flipping error. After the inspection the finished

goods are sent to store room.

PACKAGING

The company’s home appliance products are packed in an attractive cover and the other

product are packaged in the boxes.

QUALITY CONTROL

It checks the quality in raw material and machines are in proper condition or not. The

curing mould is in correct stage.

STORE ROOM

There is separate place for storing the raw material and finished goods. And is kept in

clean and correct place. The belts are placed according to size, model.

BELT STORAGE TIPS

Under proper conditions, Veegrip belts can be stored for many years without shortening

service life. Follow these guidelines: Store belts in a cool, dry, dust free area, away from

radiators and direct sunlight.

23

Page 24: Project Veegrip Belts

Temperatures below 85 degree and relative humidity below 70% are recommended. Store

belts away from ozone producing unguarded fluorescent lights, mercury vapor lights and high

voltage electrical equipment. Don’t store belts near chemicals, oils, solvents, lubricants, or acids.

Belts can be coiled on shelves or hung on pegs. Avoid sharp bend and stresses that can

cause permanent deformation and cracks. Stack belts no higher than 12” to prevent damage to

bottom belts. When hanging, coil longer belts to prevent distortion from belt weight.

PURCHASE DEPARTMENT

The purchase department made an order to suppliers for the component item of the

products and also purchase is the centralized department in the organization. The Purchase

Department purchasing the following items are: Raw material, Packing item, Engineering Goods,

24

Page 25: Project Veegrip Belts

Electric Light and stationary items. The suppliers deliver the goods immediately but in Chennai

it takes two days to purchase. The purchase requisition made by the department, they consider

the following factors while preparing purchase requisition.

Quantity of component items available in Store Room.

Consumption rate for the month and year.

Lead time of particular raw material

Safety stock required to overtake unforeseen situation

Quality of Product

Availability of funds

Availability of Raw Material

Economic Condition and market condition

Fluctuation in pricing Policies

Inventory carrying cost, etc.

PROCEDURE FOR PURCHASE ORDER

The Raw materials are available in the factory for production of one month process.

Remaining required materials and quantities approved by the factory in charge and send it to the

Purchase Department. Then the Purchase Department makes order from supplier.

The Finance Department paid the amount of Raw Material and other purchases.

25

Page 26: Project Veegrip Belts

PURCHASE DEPARTMENT IS SUB-DIVIDED INTO FOLLOWING:

Raw material procurement

Engineering stores material procurement for purchase.

Requisition letter from production department

Obtaining letter from production department.

Obtaining approval from Research and Development Department

Obtaining quotation from relative suppliers.

SUPPLIER SELECTION

The group of suppliers is selected on the basis of quality, price and other transport

cost, etc.

Then the purchase order makes to particular selected supplier for the particular

product.

PURCHASE PROCESS

MATERIAL REQUISTION

AUTHORITY SIGNATURE

26

Page 27: Project Veegrip Belts

RECEIVED BY PURCHASE DEPT.

GETTING APPROVAL

ORDERING

DENOTING DELIVERY, DATE & QTY.

RECEIVING MATERIAL

ICR

GETTING APPROVED FROM DEPARTMENT’S

PAYMENT

MATERIAL REQUISITION

This is given by several departments to purchase department according to the material

need for the department.

QUOTATION

27

Page 28: Project Veegrip Belts

This is, for how much amount suppliers are ready to supply the materials to CRF,

Purchase Department purchases the material from one whom least quoted.

APPROVAL

The quotation is approved by Chief Managing Director (CMD).

ICR

The ICR income cum receipt is given to the department which is receiving material by

purchase department to verify the material quality, quantity & numbers.

The main suppliers of the company:

1. Synthetic rubber - Samir supply-chennai, Rishi-Mumbai.

2. Natural rubber - Kurin Abreham professional Rubbers from Kerala, Polyron

products,Tulasi Ram

3. Carbon-RK polymer-Chennai, Riddhi polymer –chennai, Ramcharan –Madurai.

4. Oil- Ram charan petroleum- Madurai, Rubber Park.

5. Powder- Rubber park

6. Fabric –GD

At first they receive material requisition from departments. The material requisitions have

to be signed by concern Department Manager and Executive. After checking these signatures.

Purchase Department receives the request. And they get quotation from suppliers. Purchase

Department gets quotation for raw materials every month once. The quotation was approved by

CMD. After getting approval from CMD the approved quotation is given by order.

28

Page 29: Project Veegrip Belts

In the purchase Order they mention:

1. PO date

2. Delivery date

3. Material quantity

4. Payment date

In the purchase order, they send a model invoice according to the quotation given and the

invoice to the CRF has to be sent according to that. Normally in CRF the raw materials are

ordered for a month and date of delivery is splitted. After that, they send the details to ICR. ICR

is Income Cum Receipt and it is for the department who receives the material. In this receiving

department checks the quantity, quality and they also check damages. If any rejections, they

indicate in the ICR and send back to the purchase department.

The ICR has to send back to the purchase department within one week. And it was signed

by the authority who is receiving the material.

And there are three copies of invoice are received, from that:

1. One is send to Accounts.

2. One is send to the Departments who is receiving.

3. One is with Purchase Department.

Different payment days are allotted by the suppliers for payment and it’s normally 30-45

days. Some supplier is allowing up to 60 days. For rubber they are making advance and also

immediate payment. The same process is adopted for capital items and other things. There are

29

Page 30: Project Veegrip Belts

two executives working in purchase department and each one taking of different purchases. If

any non payments and any problems arises the concern executives takes care of that.

HUMAN RESOURCE DEPARTMENT

30

Page 31: Project Veegrip Belts

Human Resource Management (HRM) is the function within an organization that focuses

on recruitment of, management of, and providing direction for the people who work in the

organization. Human Resource Management can also be performed by line managers.

Human Resource Management is the organizational function that deals with issues

related to people such as compensation, hiring, performance management, organization

development, safety, wellness, benefits, employee motivation, communication, administration,

and training.

Human Resource Management is also a strategic and comprehensive approach to

managing people and the workplace culture and environment. Effective HRM enables employees

to contribute effectively and productively to the overall company direction and the

accomplishment of the organization's goals and objectives.

HR POLICY

To place the right person in the right job with their educational background at the right

place. The policy of Hr executive is to change the dissatisfaction in the work to fully satisfy.

The second one is to reduce the absenteeism rate. And for operators the minimum qualification is

“Xth” standard. And for other jobs persons want to be a graduate.

HR PROCESS

31

Page 32: Project Veegrip Belts

PLANNING

ADVERTISING

RECRUITMENT

CONSULTANCY

SELECTION

ADMIN TECHNICAL

TEST APTITUDE

EVALUATION ROUND EVALUATION ROUND

FINAL SELECTION BY MD FINAL SELECTION BY MD

PLANNING

32

Page 33: Project Veegrip Belts

If they are in need of man power, the Department head gives the list to HR Department,

and according to that the HR department selects the candidate. In the list the department gives

job requirements, job responsibilities, years of experience and educational qualification. And

according to the department list HR executive selects the person.

RECRUITMENT AND SELECTION

The recruitment is announced through news paper and they tie up with some consultancy

and recruiting person through that too. At first they are conducting test for both admin and

technical persons. After that the evaluation round is conducted by AO and HR executive. If the

persons get passed in this round, the final selection is done by MD for admin and technical staffs.

For admin staffs general questions are asked in test. And for technical staffs, questions related to

their subjects are asked. Technical persons are selected by Production Manager along with CMD.

TRAINING

Here the training is given by “ON THE JOB METHOD”. The person is trained by

Department Head. First three days the person is made to just observe the things happening. At

the next step, the person is given by the works that the executives carrying. And the performance

of the worker is observed by HR Executive. If the performance of the worker is satisfied he will

be given by appointment order. Else the person is withdrawn from CRF. Training program is

conducted at every Friday regarding safety awareness and 5S. And to factory employees training

is given regarding machines to work safely and also about 5S.

PERFORMANCE EVALUATION

33

Page 34: Project Veegrip Belts

The worker is measured by

1. Performance in the work

2. Involvements in others work

3. Reporting to MD

4. Implementing 5s

5. Leave rate

6. How the person responding to other’s queries.

For evaluation, these points are considered and this is recorded for each day and every

month. This is reported to MD by HR executive. And the points are assigned and recorded for

every month. For the annual evaluation the monthly points are taken in account and

If its>80 the person is promoted and

If its>60 the person is given by increment more than usual

If its<60 the employee is given my normal increment.

DISCIPLINARY ACTIVITIES

If the employees took leave for 2 days continuously without informing the concern

department head, the employee will be suspended for 3 days. If they came late to office, they are

warned for two times and if its continues the late coming employee is reported to CMD.

MRM

This is monthly review meeting with discussion of HR with MD. HR executive report to

MD, what employees did and each one have to report to MD what they did.

WAGES AND SALARY ADMINISTRATION

34

Page 35: Project Veegrip Belts

Wages are paid daily or weekly on the basis to works. Salary is paid monthly one time to

the Managers and other official employees.

WORKING TIME

There are three shifts in the factory timing 24 hours of production

1st shift – 6.00 AM to 2.00 PM

2nd shift – 2.00 PM to 10.00 PM

3rd shift – 10.00 PM to 6.00 AM

For Office Staffs and Ladies employees

--- 9.00 AM to 5.00 PM

UNIFORM FOR WORKERS

All workers should be wearing the uniform provided by the organization. Only uniform

provided to the permanent workers.

LEAVE POLICY

One casual Leave is allowed for a month. 2 hours permissions are allowed for a month.

SAFETY MEASURES

1. Gloves

Workers in chemical areas should wear Gloves. It make some Skin Diseases.

35

Page 36: Project Veegrip Belts

2. Mask

A worker who is working in pot curing. Because in that it evaporates. so in order

the employees should wear mask

3. Shoes

The Employees who are moving heavy machines or chemicals should wear shoes.

4. Shield

The employees should wear helmet in working pot curing.

WELFARE MEASURES

ESI-12.5%, Insurance for medicals, Star health card, Loan facilities is provided for the

workers. Providing mobile phone it depends upon the grade in officers.

STATUTORY REQUIREMENTS

Statutory requirements of the workers like provident fund (PF)

Bonus- per annum *12.5% it will be in during festival(Diwali)

Other facilities are provided to the workers in the organization

Also make the rest room, first aid appliance were available.

If they work overtime but it will be permitted only 1 hour

It will be given only for the 1 hour what they work.

36

Page 37: Project Veegrip Belts

ACCOUNTS DEPARTMENT

This department will maintain and update the accounts of the employer’s and the

employees in the organization. They will allot the funds, for the production expenses to the

factory and the factory will send the expense which is incurred for the production. Employer’s

and Employee salary details. Production expenses details. Preparing the final accounts of the

company which includes the Trading accounts, Profit and Loss Accounts and Balance Sheet.

FUNCTIONS:

1. Preparing Annual Budget for production.

2. Arrangement for the working capital according to the requirement in the factory

inventory.

3. Financial planning for working capital for running the business.

4. Safeguard of the organizational asset.

5. Investment planning and others.

6. Collection from customers.

7. Paid to the creditors.

8. Purchase planning for technical machinery and others.

9. Financial Management and Liquidity Management.

LOANS

Short term, Long term and Project loan from Canara Bank, ICICI and SBI Bank.

APPLICATION OF FUND:

37

Page 38: Project Veegrip Belts

The Organization applies the funds of following:

Maintenance

Salary and Wages

Purchases

Extension Program

Research and Development

New Product Development

ACCOUNTS MAINTENANCE

The Accounts are recorded with the help of packages like Vaarida, Excel, Tally, etc.

BUDGET PREPARATION

The yearly and monthly budgets are planned at the end of each month and financial year.

Then the actual is compared from standard, the deviations can made corrective action maintained

for further budget.

SOURCE OF CAPITAL

The company runs the unit from their investment in various shares and receives loans

from banks.

DOUBLE ENTRY SYSTEM

In CRF, double entry system followed, if debited in one account means it is also credited

in concern account. For Ex, if the advance given for factory means it’s debited to factory

advance account and credited in bank account.

GENERAL ACCOUNTS

38

Page 39: Project Veegrip Belts

In general Account, all tax payment and government related reports tasks are carried on.

For selling rubber products, CRF have to pay Duty + VAT + Cess.

DUTY

Duty is kind of tax, which is paid for production. It is 10% for rubber products and if

selling in inner state CRF pays Duty + Cess + VAT. If in Intra state means CRF pays Cess +

Duty +CST.

CESS

Cess is also kind of tax it is paid for Educational Purpose.

TAX PERCENTAGES

Duty - 10%

Cess – 2%

VAT - 4%

CST - 4%

If the Customer provides “C” form to CRF the CST is 2% if not 4%.

CASH BOOK

All Cash related transactions are entered in this book. From this cash are drawn to

account for factory and Office expenses. Petty cash is part of cash book it is given for expenses

like petrol, tea and other expenses.

And different types of accounts maintained are:

39

Page 40: Project Veegrip Belts

1. Carriage Inward

2. Carriage Outward

3. Factory Advance

4. Advance Account

5. Staff Welfare Account

6. Labour Welfare Account

7. Travelling Expenses

CARRIAGE INWARD

This is the amount paid for receiving goods.

CARRIAGE OUTWARD

The amount paid for depatching goods to customers.

FACTORY ADVANCE

This is amount given to factory for factory expenses, and finally they want to submit the

voucher with valid reasons for expense.

ADVANCE ACCOUNT

This is the amount paid to employees in advance for their emergency expense and they

give the voucher with MD signed after sometime.

STAFF WELFARE ACCOUNT

Expenses related to tea, meals are credited in this account. This is for office employees.

LABOUR WELFARE ACCOUNT

40

Page 41: Project Veegrip Belts

Expenses related to tea, meals are credited in this account. This is for factory employees.

TRAVELLING EXPENSES

Travelling expenses like petrol and executives travel allowances are credited in this

account, and other travelling expenses related to office works also credited in this account

RUBBER BOARD

To Rubber Board, CRF have to submit the consumption of rubbers for every month like

purchase, sales and closing stock. The consumption details are sent through FORM K,L.

And for every six months they have to report the consumption

From

1. April – September

2. October – March.

Yearly once report is also reported to rubber India in Form K with production quantity in

numbers and with auditor certificate want to be submitted.

PURCHASE ACCOUNTS

The Purchase Account deals with the payment of raw material and other materials required for

production. Purchase of materials and collect the invoice from suppliers and make purchase Account and

forward the bill to accounts department. At first the invoice is verified whether it is according to the given

quotation. For rubber purchases duty is checked whether it is subbed. And purchase Account deals with

payment of purchased goods.

41

Page 42: Project Veegrip Belts

SALES ACCOUNTS

All sales related transactions are entered. From factory they receive the invoice, and this invoice

is debited in the customer name who is receiving, and it is send to the customers along with LR receipt

with covering letter. And they also collect the C form from customers.

SUPPLIER ACCOUNT

The goods are supplied to the agents or distributors through tempo, auto etc. In supplier account

they prepare three type of bills.

Original bill – This bills is given to the buyer.

Duplicate bill – This bills given to the transport agents.

Triplicate bill – This bills kept by the company for record.

CREDIT NOTE

When there is any damage in goods, less in quantity while delivering credit note is given, and

also for special discounts, additional discounts, turnover discounts credit note is given.

DEBIT NOTE

Debit note is given when there is price difference and when cheque bounced due to insufficient

funds the service charge is given as debit note.

MARKETING DEPARTMENT

42

Page 43: Project Veegrip Belts

MARKETING POLICY

It functions as keeping financial as well as the customer satisfaction and services. We

have evolved our marketing policy. The primary aim of the marketing of this company is fulfills

the Customer needs and wants and after sales and service marketing.

TECHNICAL EXHIBITION

Technical exhibition is conducted in Madurai, Coimbatore and Chennai, mainly focused

on Marketing in Madurai.

DISTRIBUTION CHANNEL

The distribution channel in all over India. Executive are appointed to distribution center,

provide sales commission incentives and motivate them to full performance in their work.

OBJECIVES OF DISTRIBUTION CHANNEL

To existing customer to increase sales volume.

To create awareness about the company attract new customers.

To ensure availability of products at the point of sale.

To identify our organization at the level.

To efficient and effective distribution system to make your products and services

are available.

43

Page 44: Project Veegrip Belts

DISTRIBUTION CHANNEL

PRODUCT CHANNEL

DISTRIBUTOR OEM PSU’S

(Wholesaler) (Own Equipment Manufacturing) (Public Sector Unit)

DEALER

(Stockist)

SUBDEALER

END USER

MARKETING PROCESS

44

Page 45: Project Veegrip Belts

1. FOR EXISTING CUSTOMERS

TELEMARKETING

GETTING ORDERS

SENDS PRODUCTION REQUEST TO FACTORY

REVIEWING PENDING ORDERS

DESPATCHING

FOLLOW UP FOR PAYMENT

2. FOR NEW CUSTOMERS

45

Page 46: Project Veegrip Belts

APPROACHING

GIVING SAMPLES

IF OK

GETTING ORDERS

TELEMARKETING

SENDS PRODUCTION REQUEST TO FACTORY

DESPATCHING

FOLLOW UP FOR PAYMENT

46

Page 47: Project Veegrip Belts

In Chandru Rubber Factory, the Marketing process is done through telemarketing and it

is heart of the company because above 90% of products are sell through telemarketing to reach

wide range of customers. In telemarketing, the executives make a call to existing customers and

gets order. After getting Orders from customers, they inform the order to factory and they follow

the orders and review the pending orders.

Marketing Department is headed by Chief Managing director, under him there are two

Senior Executives and 9 Executives in Tamilnadu and 5 Executives for over all India are there.

Marketing Department is divided into internal and external marketing. In Internal there

are two senior executives, and they control Sales Executive and Sales Assistance team. In

External team, under CMD manager and business development manager, focus sales throughout

India.

The Vision of the Internal Team is to increase 10% of sales every month. The Vision of

the External team is to increase sales of company anywhere and everywhere in India. There are 5

executives working under telemarketing executives and they cover all over India. Each executive

covers four states and reports to office every month once.

Tour plan is framed for Executives and they travel according to that. Telemarketing

Executives make a call to them frequently and check whether they are according to tour plan or

not. They make a call to them frequently and get feedback, from everyone they visited and take a

note of it.

The report got from the Executives is examined by Department head & CMD. The main

task of Marketing in CRF is follow up. They make a call and ask for a payment, if it’s not paid

on the time which is given for the customer.

47

Page 48: Project Veegrip Belts

Normally the time period of payment is 10 days and for north side it’s expanded to 45

days because it takes 10 days time for delivery. Marketing Department rates the customers

according to their Stock turnover, payment and target sales.

Discounts are given to customers according to the amount purchased, special discounts

are allowed to customers who made their payment quickly. In Tamilnadu there are 12 executives

working in BRF and each one covers 4 districts except Chennai. They report to office every 15

days once and submits tour plan and gets invoice and collection list from office. And they’ll be

in office at first three days of month.

Normally Telemarketing Executives gets order from customers and visited by executives

too. There are two types of Marketing in CRF Macro and Micro.

MACRO

The Macro Marketing is a distributor and wholesaler of existing customer to reach our target

market in the particular area. Demanding a customer to distributor and wholesaler directly ordered to

factory. In this existing customers are regularly contacted and staffs get order from them.

MACRO MARKETING FUNCTIONS

1. To find tune the existing customers.

2. To maintain all the customers.

3. To obtain order from all customers at regular interval.

MICRO

It considers local market, customer direct conduct with the organization.In this new

customers are approached and compliments are given to attract them.

48

Page 49: Project Veegrip Belts

For new customers they give samples and if it is ok for them, Executives get order. The

target for the Marketing Department is 20 crores per year and at the end of the year they want to

collect the amount which they sold.

The market is segmented as South, East, North, West zones. Business development

manager goes along with Executives to zones according to his tour plan.

Western Zone Market

Maharastra

Gujarat

Goa

Madhya Pradesh

Eastern Zone Market

Orissa

Jharkhand

Chattisgarh

West Bengal

Meghalaya

North Zone Market

Delhi

Haryana

Rajasthan

MICRO MARKETING FUNCTIONS

49

Page 50: Project Veegrip Belts

1. To cover all over India by policy of anywhere and everywhere.

2. Finding new avenues and create the genuine customers.

3. To establish good business network.

ADVERTISEMENT

Mouth Advertisement is only strength of full advertisement. The company followed this

way to introduce our product in the huge market. Marketing executives are sent to the particular

customer place and told them about the product usage and create awareness about the product.

AFTER SALES SERVICE

The company served to customer as after sales service.Technical team to solve major and

minor problem of our product. Complaint belts are taken from customer and to check it them to

identify the faults then clear it.

CUSTOMER CARE

To solve the customer problem by the way of Customer care Department. Technical

people are all over India in order to solve the Customer problem.

SALES PROMOTION

They are providing sales promotion like Calendar, Letterpad, Banner, Measurement Tap,

Purse, Key chain etc are provided.

50

Page 51: Project Veegrip Belts

TRANSPORTING

For transporting the goods and services by the booking or transport agencies will differ

according to the state and countries. In each country the service may differ. For example VRL,

homem, ARC, NECC.

SALES NETWORK

Though the committed the sales force to achieve the planned target within the stipulated

time period. The company having excellent distributors and networking all over India to deliver

our products anywhere and everywhere.

OUR RENOWNED CREDENTIALS

O.E CUSTOMERS:

Minir Engineering (Amrithas) - Erode

Sonalika Agro - Hoshiarpur, Punjab

STEEL PLANT:

Rourkela Steel Plant - Rourkela

Bhilai Steel Plant - Bhilai

PAPER INDUSTRY:

Seshayee Paper Mill - Erode

THERMAL POWER STATION

51

Page 52: Project Veegrip Belts

National Thermal Power Corporation - Faridabad

National Thermal Power Corporation -Panipet

Venkateshwara Power Project - Belgaum

GOVERNMENT

Tamilnadu Civil Supplies Corp -Tanjore

SUGAR FACTORY

Kumbi Kasari - Kholapur

Yeshwant Sahakari Sakhar - Pune

COAL FIELDS

BCCL -Dhanbad

GENERAL

Fertilizers and Chemicals - Cochin

V.S.T.Tillers & Tractors - Bangalore

TTK LIG - Pondicherry

52

Page 53: Project Veegrip Belts

PROBLEM IDENTIFICATION

1. In the Factory there is no facility for drinking water.

2. In the canteen provide meal at feasible price for the employees.

3. In the pot curing while vulcanizing the lot of heat evaporates. So provide shield to

every employees.

4. In rubber mill they mixing rubber and chemicals. So provide them Gloves. And

they have to follow this precaution.

5. And provide some Welfare facilties for customers and social.

6. In the company delivering the goods too late. So deliver the goods at right time

and right place. There should not be pending order in the company.

53

Page 54: Project Veegrip Belts

CONCLUSION

During the training period, I have gained more practical Knowledge about the company,

its department activities. It was a very good experience for me in CHANDRU RUBBER

FACTORY; MADURAI. It helped me a lot to know about working functions of the

Organisation.This will be very helpful for my carrier.

REFERENCE

54

Page 55: Project Veegrip Belts

www.veegripbelts.com

55

Page 56: Project Veegrip Belts

ANNEXURE

WRAPPED CLASSICAL BELT WEDGE BELT

WRAPPED HEXAGONAL BELT WRAPPED BANDED BELTS

56

Page 57: Project Veegrip Belts

WRAPPED HARVESTER BELTS COGGED BELT

POWER LINE POLY-V-BELT

57