.' PROJECT TITLE: REPAIR/REPAINTING OF EXTERIOR PORTION FACADE
PROJECT LOCATION: CRIC BUILDING
BID PROPOSALFloor Area: 1,904.90 sq.m.
BREAKDOWN EXPENDITUREAmount~ Qty I Unit I Description
1I0tI. Mobilization, Overhead, Insurance & Miscellaneous
Unit Cost
H. PAINTING -WORKS -FOR -EXTERIORS WALLING & -WINDOW-GRILL20 tin Quick dry enamel45 tin Flat Latex Boysen50 tin Gloss Latex Boysen50 kls. Patching Compound15 pes. Roller brush #720 pes. Paint brush # 1 & 250 mts. Sandpaper # 1003M "
250 .pcs. Sandpaper # 240 & 12020 kls Rugs (stopa) white25 qtrs Aeri-color Raw sienna30 qtrs Aeri--color Hansa yellow35 qtrs Acri-color red40 qtrs Aeri-eolor black35 qtrs Aeri-color blue30 gals Q,D.E. thalo blue60 gals Red Oxide20 tin Flat wall enamel25 pes. Roller brush cotton #420 tin. Q_DT chocolate brown20 gals Paint thinner15 gals Stiekwell40 gals Emerald green roofguard20 pes. 1x1x8 solid wood (for roller brush handle)
Material CostLaberCostTotal Cost
Ill. REPAIR OF GUTTER, FACIA BOARD, CEILING EAVES &EXTENSION 1STORAGE ROOM ROOFING
20 pes. Gutter10 gals Vuleaseal18 tubes Sealant8 kls G,I. wire
2500 pes. Blind rivet8 kls C.W, nail I"8 kls C.W.naiI2"8 kls C.W. nail 3"12 pes. Plain sheet G.I.
- , ...15 pCS. 2xl0x12 Solid Tanguile25 pCS. 1/2 Plywood20 pCS. 1/4 Plywood6 kls Concrete nail # 2"6 klsConcrete nail # 3"15 pCS. Plain sheet G.I.13 pcs. 2x2x12 Rough tanguile
Material CostLabor CostTotal Cost
IV. CHIPPING & DISMANTLING WORKS
V. FORMWORKS & SCAFFOLDING1 lot scaffolding67 pcs 2x3x12 Rough tanguile67 pcs 2x2x12 Rough tanguile15 pcs 1/2x4x8 Plywood10 kls. C.w nails # 210 kls. C.w nails # 4
Material CostLabor-CostTotal Cost
VI. PATCHING & PLASTERING OF CRACK WALL25 bags Cement100 sack Sand
Material CostLabor CostTotal Cost
GRAND TOTAL:
Amount in Words: _
Prepared & Submitted By:
Name of'theConrractorSignature
1 Lot