PROJECT SPECIFIC AGREEMENT General Contractor: MASTER TERMS The terms and conditions of the Master Subcontract Agreement dated Subcontractor: Telephone: Contact Person: Subcontractor shall perform the work required by this Project Specific Agreement in accordance with the following: 1. BASIC INFORMATION Project: Job Site Address: Owner: Architect (or engineer): Anticipated Project Start Date: 3. THE WORK - See Exhibit A attached. 2. CONTRACT SUM: 4. CONTRACT DOCUMENTS - See Exhibit B attached. 5. INSURANCE REQUIREMENTS - See Exhibit C attached. 6. ADDITIONAL PROVISIONS - See Exhibit D attached. Subcontractor {{ *_es_:signer1:signature}} {{ *_es_:signer1:title}} Fax: Project: Date: General Description of the Work: Power Job No. Power Construction Company,LLC COD Homeland Security Training Center Rockford Central Tile & Terrazzo 5139 American Road 52820 COD Homeland Security Training Cente SEP-18-2014 Tile 425 Fawell Boulevard, Glen Ellyn, IL College of DuPage Legat Architects AUG-14-2014 $76,820.00 Rockford Central Tile & Terrazzo Power Construction Company,LLC Rockford, 61109 815/874-0888 815/874-3300 JAN-24-2008 between Contractor and Subcontractor shall govern this Project Specific Agreement and are fully incorporated herein by reference. General Contractor {{ *_es_:signer2:signature}} {{ *_es_:signer2:title}} Louis DeMarco General Contract Date: APR-18-2014 Anticipated Project Substantial Completion Date: AUG-05-2015 The parties acknowledge and agree that (i) from time to time the parties may execute by way of electronic signature, (ii) such electronic signatures are sufficient to bind the party who purports to so executes by way of electronic signature, and (iii) each party shall be entitled to rely on the electronic signature of the other party. Louis DeMarco President Mary Ann Lukowicz Project Executive Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Upload: doandieu

Post on 27-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

PROJECT SPECIFIC AGREEMENTGeneral Contractor:

MASTER TERMSThe terms and conditions of the Master Subcontract Agreement dated

Subcontractor:

Telephone:

Contact Person:

Subcontractor shall perform the work required by this Project Specific Agreement in accordance with the following:

1. BASIC INFORMATION

Project:Job Site Address:Owner:Architect (or engineer):

Anticipated Project Start Date:

3. THE WORK - See Exhibit A attached.

2. CONTRACT SUM:

4. CONTRACT DOCUMENTS - See Exhibit B attached.

5. INSURANCE REQUIREMENTS - See Exhibit C attached.

6. ADDITIONAL PROVISIONS - See Exhibit D attached.

Subcontractor

{{ *_es_:signer1:signature}}

{{ *_es_:signer1:title}}

Fax:

Project:

Date:

General Description of the Work:

Power Job No.

Power Construction Company,LLC

COD Homeland Security Training Center

Rockford Central Tile & Terrazzo5139 American Road

52820COD Homeland Security Training Cente

SEP-18-2014

Tile

425 Fawell Boulevard, Glen Ellyn, ILCollege of DuPage

Legat Architects

AUG-14-2014

$76,820.00

Rockford Central Tile & Terrazzo Power Construction Company,LLC

Rockford, 61109815/874-0888

815/874-3300

JAN-24-2008between Contractor and Subcontractor shall govern this Project Specific Agreement and are fully incorporated herein by reference.

General Contractor

{{ *_es_:signer2:signature}}

{{ *_es_:signer2:title}}

Louis DeMarco

General Contract Date: APR-18-2014

Anticipated Project Substantial Completion Date: AUG-05-2015

The parties acknowledge and agree that (i) from time to time the parties may execute by way of electronic signature, (ii) such electronic signatures are sufficient to bind the party who purports to so executes by way of electronic signature, and (iii) each party shall be entitled to rely on the electronic signature of the other party.

Louis DeMarco

President

Mary Ann LukowiczProject Executive

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT A THE WORK

1

The following is a general description of Subcontractor's Work. Also included is a list of certain portions of the Contract Documents that bear upon the performance of Subcontractor’s Work; provided, however, that such list is included solely for the convenience of Subcontractor and is not necessarily comprehensive. Other portions of the Contract Documents also may bear upon the performance of Subcontractor’s Work, and therefore, Subcontractor is responsible to independently review all Contract Documents for applicability to Subcontractor’s Work. Subcontractor is responsible to perform all Subcontractor’s Work required by the Contract Documents, and all other work reasonably inferable from the Contract Documents as necessary to produce the results intended, regardless of whether expressly set forth in the following description; provided, however, that Subcontractor is not required to perform items specifically identified below as excluded from Subcontractor’s Work. SPECIFICATION SECTION: TITLE: Division 00 Bidding and Contract Requirements Division 01 General Requirements 03 54 00 Cast Underlayment (as applicable) 07 90 05 Joint Sealants (as applicable) 09 05 61 Common Work Results for Flooring Preparation 09 30 00 Tiling Inclusions:

1. Weekly Certified Payroll is required. 2. Floor and wall tile including tile base, trim accessories, and grout. 3. Waterproofing and crack membrane as required by contract documents at all tile locations. 4. Moisture barrier adhesive at all concrete slab locations. 5. Subcontractor is responsible for proper installation at concrete expansion and control joints. 6. Transition strips and thresholds to like or unlike materials. Contractor to provide all ramping required for

acceptable installation tolerances. 7. Caulking of this contractors work as required and to all adjacent contractors work. 8. Coordinate setting of floor drains. 9. Protect adjacent contractors work. 10. Upon completion of work, contractor to furnish and install masonite protection board over the flooring

material. Prior to turnover, contractor to remove this protection at Power Construction’s direction. 11. Scribe, cut, and fit materials to all permanent fixtures on or penetrating the floor surface 12. Include floor leveling and floor prep as required. 13. Subcontract to include minor repairs to tile necessitated by installation of toilet accessories,

toilet partitions, and countertops. 14. Pitch floor to floor drains as required. 15. Contractor to include concrete slab moisture level and alkalinity testing. Contractor will notify the CM in

writing in the event that any concrete slab is above the allowable threshold as required by the manufacturer and contract documents.

16. Contractor to include broom cleaning and scraping of floor area prior to installation. 17. Provide final clean of tile as directed by Power Construction. 18. Performance Bond and Labor and Material Payment Bond in accordance with Article 10 of the Master

Agreement between Contractor and Subcontractor.

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT A THE WORK

2

Exclusions:

1 Taxes in accordance with the Illinois Department of Revenue letter referenced in Exhibit D. Schedule:

Subcontractor acknowledges and agrees that time is of the essence in completing the Work. Work to be performed in accordance with the project schedule as developed and updated by the General Contractor. This trade to meet or reduce durations per contract documents. Rockford Central Tile & Terrazzo Power Construction Company, LLC {{ *_es_:signer1:signature}} {{ *_es_:signer2:signature}}Louis DeMarco Mary Ann Lukowicz

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT B CONTRACT DOCUMENTS

3

DRAWING INDEX SHEET TITLE DATE G-001 TITLE SHEET 06/11/2014 G-002 CONSTRUCTION OPERATIONS PLAN 06/11/2014 C-100 EXISTING CONDITIONS 06/11/2014 C-200 SITE PREPARATION PLAN 06/11/2014 C-201 EROSION CONTROL PLAN 06/11/2014 C-202 EROSION CONTROL DETAILS 06/11/2014 C-203 EROSION CONTROL NOTES 06/11/2014 C-300 LAYOUT & MATERIALS PLAN 06/11/2014 C-400 GRADING PLAN 06/11/2014 C-500 STORM DRAINAGE PLAN 06/11/2014 C-501 UTILITY PLAN 06/11/2014 C-502 UTILITY DETAILS 06/11/2014 C-600 SITE DETAILS 06/11/2014 S-000 GENERAL NOTES 06/11/2014 S-101A BASEMENT PLAN AND FIRST FLOOR PLAN – MODULE A 06/11/2014 S-101B FIRST FLOOR PLAN – MODULE B 06/11/2014 S-102A ROOF PLAN – MODULE A AND WIND GIRT PLAN 06/11/2014 S-102B ROOF PLAN – MODULE B 06/11/2014 S-200 FOUNDATION DETAILS 06/11/2014 S-201 FOUNDATION DETAILS 06/11/2014 S-300 PRECAST DETAILS 06/11/2014 S-400 STEEL DETAILS 06/11/2014 S-401 STEEL DETAILS 06/11/2014 A-000 CODE INFORMATION 06/11/2014 A-101A BASEMENT AND FIRST FLOOR PLAN – MODULE A 06/11/2014 A-101B FIRST FLOOR PLAN – MODULE B 06/11/2014 AC-101A BASEMENT AND FIRST FLOOR REFLECTED CEILING PLAN – MODULE A 06/11/2014 AC-101B FIRST FLOOR REFLECTED CEILING PLAN – MODULE B 06/11/2014 AF-101A BASEMENT AND FIRST FLOOR FINISH PLAN – MODULE A 06/11/2014 AF-101B FIRST FLOOR FINISH PLAN – MODULE B 06/11/2014 AR-100 ROOF PLAN 06/11/2014 A-200 BUILDING ELEVATIONS 06/11/2014 A-210 ENLARGED FLOOR PLAN, EXTERIOR AND INTERIOR ELEVATIONS 06/11/2014 A-211 INTERIOR ELEVATIONS 06/11/2014 A-212 INTERIOR ELEVATIONS 06/11/2014 A-213 INTERIOR ELEVATIONS 06/11/2014 A-300 BUILDING SECTIONS 06/11/2014 A-310 WALL SECTIONS 06/11/2014 A-311 WALL SECTIONS 06/11/2014 A-312 WALL SECTIONS 06/11/2014 A-400 ENLARGED PLANS TOILET PLAN, ELEVATIONS, MOUNTING HEIGHTS 06/11/2014 A-410 STAIR PLANS AND SECTIONS 06/11/2014 A-500 DETAILS 06/11/2014 A-501 DETAILS 06/11/2014 A-502 DETAILS 06/11/2014 A-510 PRECAST DETAILS 06/11/2014 A-520 TYPICAL ROOF DETAILS 06/11/2014 A-600 DOOR SCHEDULE AND TYPES, PARTITION TYPES, MOUNTING HEIGHTS 06/11/2014 A-610 GLAZING ELEVATIONS 06/11/2014 A-900 PERSPECTIVES 06/11/2014

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT B CONTRACT DOCUMENTS

4

SPECIFICATION INDEX SPEC SECTION DESCRIPTION DATE DIV. 00 ALL SECTIONS DIV. 01 ALL SECTIONS 02 10 00 TREE AND PLANT PROTECTION 02 41 00 DEMOLITION 03 10 00 CONCRETE FORMING AND ACCESSORIES 03 20 00 CONCRETE REINFORCING 03 30 00 CAST-IN-PLACE CONCRETE 03 35 11 CONCRETE FLOOR FINISHES 03 54 00 CAST UNDERLAYMENT 04 05 11 MASONRY MORTARING AND GROUTING 04 20 02 SINGLE WYTHE UNIT MASONRY 05 40 00 COLD-FORMED METAL FRAMING 06 10 00 ROUGH CARPENTRY 06 20 00 FINISH CARPENTRY 06 25 00 PREFINISHED BAMBOO VENEER PANELING 06 64 00 CUSTOM CABINETS 07 14 00 FLUID-APPLIED WATERPROOFING 07 21 19 FOAMED-IN-PLACE INSULATION 07 42 13 METAL WALL PANELS 07 42 64 METAL COMPOSITE MATERIAL WALL PANELS 07 42 65 THERMAL AND AIR BARRIER WALL SYSTEM 07 54 00 THERMOPLASTIC MEMBRANE ROOFING – FULLY ADHERED 07 62 00 SHEET METAL FLASHING AND TRIM 07 72 00 ROOF ACCESSORIES 07 84 00 FIRESTOPPING 07 90 05 JOINT SEALERS 08 11 13 STEEL DOORS AND FRAMES 08 14 16 FLUSH WOOD DOORS 08 31 00 ACCESS DOORS AND PANELS 08 33 26 SIDE FOLDING GRILLES 08 38 00 SOUND CONTROL/BULLET RESISTANT DOORS 08 42 30 AUTOMATIC DOOR OPERATORS 08 43 13 ALUMINUM-FRAMED STOREFRONTS 08 44 13 GLAZED ALUMINUM CUTRAIN WALLS 08 56 54 SECURITY AND DETENTION WINDOWS 08 65 30 VERTICAL LIFT ACOUSTICAL DOORS 08 71 00 DOOR HARDWARE 08 80 00 GLAZING 08 91 00 LOUVERS 09 06 61 COMMON WORK RESULTS FOR FLOORING PREPARATION 09 21 16 GYSPUM BOARD ASSEMBLIES 09 30 00 TILING 09 51 00 ACOUSTICAL CEILINGS 09 65 00 RESILIENT FLOORING AND ACCESSORIES 09 68 13 CARPET TILE 09 84 00 ACOUSTIC ROOM COMPONENTS 09 90 00 PAINTING AND COATING 10 11 01 VISUAL DISPLAY BOARDS 10 21 13 SOLID CORE REINFORCED COMPOSITE (SCRC) TOILET PARTITIONS 10 22 13 WIRE MESH PARTITIONS 10 22 26.33 OPERABLE PANEL PARTITIONS 10 26 01 CORNER GUARDS AND WALL RUB STRIPS 10 28 00 TOILET AND BATH ACCESSORIES

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT B CONTRACT DOCUMENTS

5

10 42 00 EMERGENCY AID SPECIALTIES 10 44 00 FIRE EXTINGUISHERS, CABINETS AND ACCESSORIES 11 67 20 FIRING RANGE EQUIPMENT 12 24 00 WINDOW SHADE SYSTEM 12 26 00 COUNTERTOPS 31 10 00 SITE PREPARATION 31 20 00 EARTH MOVING 31 23 00 FOUNDATION EXCAVATING AND BACKFILLING 31 25 00 EROSION AND SEDIMENT CONTROLS 32 12 16 ASPHALT PAVING 32 13 12 CAST-IN-PLACE CONCRETE (SITE) 32 13 14 CONCRETE CURBS 32 13 73 SITE JOINT SEALANTS 33 11 00 SITE WATER UTILITY DISTRIBUTION PIPING & FITTINGS 33 31 00 SANITARY SEWERS 33 41 00 STORM DRAINAGE PIPING OTHER DOCUMENTS TITLE DATE ADDENDUM NUMBER 1 BID RELEASE NUMBER 3 06/27/2014 C-500 – STORM DRAINAGE PLAN 06/27/2014 SKETCH A-SK02 – CEILING DETAIL 06/27/2014 SKETCH A-SK03 – PARTIAL ROOF PLAN 06/27/2014 Rockford Central Tile & Terrazzo Power Construction Company, LLC {{ *_es_:signer1:signature}} {{ *_es_:signer2:signature}}Louis DeMarco Mary Ann Lukowicz

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT C INSURANCE REQUIREMENTS

6

6

Adequate Certificates of Insurance, with additional insured endorsements attached, in carriers having an A.M. Best rating of A-/VII or better and licensed to do business in the State of Illinois, shall be filed with General Contractor before commencement of Subcontractor’s Work. Fax transmissions of such certificates should be sent to General Contractor at 847-214-6044. Name of Certificate Holder: Power Construction Company, LLC 8750 W. Bryn Mawr Ave., Suite 500 Chicago, IL 60631 Project Description: COD Homeland Security Training Center including “miscellaneous Work at same location” 425 Fawell Blvd Glen Ellyn, IL 60137

A. Commercial General Liability - Including coverage for Premises-Operations, Independent Contractors’ liability, Products and Completed Operations, Contractual Liability, Personal Injury, and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground hazards) with limits not less than the following:

Each Occurrence $ 1,000,000 General Aggregate per Project $ 2,000,000 Per Project or Per Location Aggregate $ 2,000,000 Personal and Advertising Injury: $ 1,000,000 Products - Completed Operations Aggregate $ 2,000,000

Completed Operations insurance maintained for a minimum period of two (2) years after Substantial Completion. Such Policy shall include a Blanket Additional Insured listed herein with a Blanket Waiver of Subrogation in favor of Additional Insured’s.

B. Auto Liability - Single limit bodily injury and property damage combined for owned, non-owned, and leased vehicles with a limit not less than the following:

Each Occurrence: $ 1,000,000

C. Excess Umbrella Liability - Combined single limit bodily injury and property damage with a limit not less than the following:

Each Occurrence $ 5,000,000 General Aggregate $ 5,000,000

Such Policy shall include a “Broad as Primary Endorsement” or “Follow Form Endorsement”. D. Worker’s Compensation - In accordance with the laws of the State of Illinois including Employer’s

Liability insurance with a limit not less than the following: Bodily Injury by Accident $ 500,000 each accident Bodily Injury by Disease $ 500,000 policy limit Bodily Injury by Disease $ 500,000 each employee

Such Policy shall include a Blanket Waiver of Subrogation for those agreed to by written contract.

E. Contractors’ Equipment Floater – Subcontractor shall maintain Contractors’ Equipment Floater Insurance for owned or leased equipment and tools under its care, custody and control as required for the performance of Subcontractor’s duties.

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT C INSURANCE REQUIREMENTS

7

7

ADDITIONAL INSURED Commercial General Liability and Excess Umbrella Liability policies described above shall include the following as additional insured’s, including their officers, directors, and employees (the spelling of these parties must be exactly correct):

Power Construction Company LLC (General Contractor) Power Contracting and Engineering Corp. (General Contractor) Power Construction Company (General Contractor) College of DuPage, its board of trustees/regents, employees, agents, and volunteers (Owner) Legat Architects (Architect) KJWW Engineering (Structural Engineer) SmithGroup JJR (Civil Engineer) AMSCO Engineering, Inc (MEP Engineering) MWL Architects (Public Safety Consultant) Stan Roller and Associates (Acoustical Engineer) Brubaker Design (Design Consultant) And any additional to be added

The underlying coverage afforded to the additional insured under these policies shall be primary and non-contributory insurance. If the additional insured has other insurance that is applicable to the loss, such other insurance shall be in excess to the Subcontractor’s insurance. The amount of the subcontractor’s liability under this policy shall not be reduced by the existence of such other insurance. A Blanket Additional Insured Endorsement shall be provided so that the coverage afforded to the additional insured’s shall apply to “Ongoing Operations” and “Completed Operations-Hazards.” It is further agreed that the coverage afforded to the additional insured shall not apply to the sole negligence of the additional insured’s. Cancellation Clause: 30 days written notice. Failure to provide the projects insurance shall not relieve the Subcontractor of any liability it may have under this Agreement or at law. Rockford Central Tile & Terrazzo Power Construction Company, LLC {{ *_es_:signer1:signature}} {{ *_es_:signer2:signature}}Louis DeMarco Mary Ann Lukowicz

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT D ADDITIONAL PROVISIONS

8

8

1. Safety: Strict compliance with all OSHA requirements and additional safety requirements as described in the General

Contractor’s Subcontractor Site Safety Requirements and Procedures manual located at http://www.powerconstruction.net/safety_req.html are made part of this Agreement. Strict compliance with all Quality requirements specified in the Contract Documents and further described in the General Contractor’s Quality Guidelines located at http://www.powerconstruction.net/business-partners/pdf/PowerQualityGuidelines.pdf are made a part of this Agreement.

2. Unit Prices:

The following unit prices include all necessary labor, materials, insurance, overhead and profit, and payment and performance bonds.

Furnish and install CT-1 tile $17.40 /SF Furnish and install CT-2 tile $17.40 /SF Furnish and install CT-3 tile $17.40 /SF Furnish and install CT-4 tile $17.40 /SF Furnish and install CT-5 tile $23.70 /SF Furnish and install bullnose cove base $14.50 /LF Moisture mitigation membrane $1.00 SF

3. Hourly Rates:

The following hourly rates include all necessary labor, insurance, overhead and profit, and payment and performance bonds. Subcontractor acknolwedges that the hourly wage rates are subject to audit and subsequent modification if necessary to comply with the General Contract. Hourly rates to be submitted for review and approval by COD Auditor.

4. Alternates: Not Applicable

5. Submittals:

Subcontractor acknowledges that all submittals other than samples for this Project shall be submitted in electronic format as Adobe Acrobat (.pdf) files and that these files shall be generated directly from the originating software. Subcontractor understands that this is a requirement and condition of this Agreement. Subcontractor shall submit files which are more than 5MB by uploading them to the website or ftp site established for this Project. Subcontractor can submit files which are less than 5MB either through e-mail or uploading them to the website or ftp site established for this Project. Consult General Contractor for instructions or questions regarding uploading submittal files. Subcontractor shall separately submit hard copies of submittals, if any, requiring a signature or a seal stamp. In addition, Subcontractor shall provide hard copies of any other submittals requested by General Contractor. Shop drawing submittals shall be properly identified and referenced in accordance with the Contract Documents. Product data submittals for each construction system shall be collected into a single submittal. Three (3) product samples shall be submitted for each required sample submittal.

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

Subcontract Agreement between Power Construction Company, LLC and Rockford Central Tile & Terrazzo for the construction of COD Homeland Security Training Center located at 425 Fawell Blvd, Glen Ellyn, IL 60137 (Job #52820).

EXHIBIT D ADDITIONAL PROVISIONS

9

9

a. Name or trade designation. b. Quality or grade, and further designation to identify the item or material. c. Applicable specification section and/or drawing number. d. Name of manufacturer or producer. e. Name of General Contractor, Subcontractor and Project. Subcontractor shall transmit to General Contractor submittals to permit adequate time for review and, if necessary, re-submittal in order to avoid any delay to construction progress due to late or untimely submittals.

6. Change Order Overhead and Profit:

Maximum allowable percentages for overhead and profit are limited to 10% for overhead and 0% for profit with no additional markup allowed for bond premiums (unless said additional markup for bond premiums is specifically allowed by the General Contract, and General Contractor received payment for same). For work performed by Sub-Subcontractors, markup shall be limited to 0%.

7. Additional Exhibits:

Illinois Department of Revenue Letter dated January 15, 2010 (1 page) Labor Rate Sheet (1 page) COD Bond Forms (4 pages) Billing Instructions (1page)

8. Sales Tax Exemption:

E9997-3391-06 9. Payment and Performance Bonds:

Subcontractor shall provide and pay for a Performance Bond and a Labor and Material Payment Bond. In addition, subcontractor shall provide a Multiple Obligee Rider.

10. Contract Sum Calculation: The Contract Sum was calculated as follows: Description of Work Qty Cost

Base Bid 1 LS 76,820$

The above contract sum calculation is to be used only for accounting purposes and not for any other purpose.

Rockford Central Tile & Terrazzo Power Construction Company, LLC {{ *_es_:signer1:signature}} {{ *_es_:signer2:signature}} Louis DeMarco Mary Ann Lukowicz

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

10

10

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

11

11

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

12

12

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

13

13

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

14

14

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

15

15

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X

16

16

Document Integrity Verified EchoSign Transaction Number: XFCWYJAXZ4L5N3X