Page 1: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

New Ringgold Middle School

Project SlideshowFebruary 25, 2017

Page 2: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from East

Provided by Hudson Group – Taken 2.20.2017

Page 3: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from Southeast

Provided by Hudson Group – Taken 2.20.2017

Page 4: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from South

Provided by Hudson Group – Taken 2.20.2017

Page 5: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from Northwest

Provided by Hudson Group – Taken 2.20.2017

Page 6: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Aerial Photo from North

Provided by Hudson Group – Taken 2.20.2017

Page 7: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Building Areas

Provided by Hudson Group – Taken 2.20.2017

Page 8: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – Kitchen - Area A

Page 9: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – Kitchen - Area A

Page 10: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – Kitchen - Area A

Page 11: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – Area A

Page 12: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Brick Installation – Area A

Page 13: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Bulkhead Framing - Cafeteria – Area A

Page 14: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 1st Floor - Area A

Page 15: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Stud Wall Framing - 2nd Floor – Area A

Page 16: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Framing – Radius – Area A

Page 17: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

GlasRoc Installation at Radius - Area A

Page 18: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 2nd Floor – Area A

Page 19: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Brick Installation – Area B

Page 20: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 1st Floor - Area B

Page 21: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 1st Floor – Area C

Page 22: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 1st Floor - Area C

Page 23: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor- Area B

Page 24: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor- Area B

Page 25: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor- Area B

Page 26: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Brick Installation – Area B

Page 27: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 2nd Floor - Area B

Page 28: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor – Area C

Page 29: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor – Area C

Page 30: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation – 2nd Floor – Area C

Page 31: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – 2nd Floor - Area C

Page 32: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation - Area D

Page 33: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation - Area D

Page 34: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation - Area D

Page 35: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Masonry Installation - Area D

Page 36: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Brick Installation - Area D

Page 37: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Work Progress – Area D

Page 38: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Roof Decking – Area A

Page 39: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Roof Installation – Area A

Page 40: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Bar Joist/Roof Structure Installation – Area B

Page 41: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Bar Joist/Roof Structure Installation – Area B

Page 42: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Long Spans Installation – Auditorium - Area D

Page 43: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Steel Detailing – Auditorium - Area D

Page 44: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Bar Joist Installation – Area D

Page 45: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Bar Joist Installation – Area D

Page 46: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Roof Deck Installation – Low Roof – Area D

Page 47: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Roof Deck Installation – Gym – Area D

Page 48: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Roof Progress

Page 49: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Continue Setting Door Frames

Page 50: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Window Installation – Area A

Page 51: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Window Installation – Area B

Page 52: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Window Installation – Area C

Page 53: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Cuts for Sleeves at Tennis Courts

Page 54: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Plumbing Rough In – Kitchen – Area A

Page 55: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Plumbing Rough In – 2nd Floor – Area A

Page 56: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Installation of Water Line

Page 57: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Installation of Water Line & Fire Hydrant

Page 58: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Water Lines – Fitness Center

Page 59: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

West Penn – Installation of Permanent Power

Page 60: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Installation of Conduit for Telecommunications from HS to MS

Page 61: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Electrical Rough In – 2nd Floor – Area A

Page 62: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

HVAC Piping Installation - Kitchen – Area A

Page 63: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

HVAC Piping Installation – 2nd Floor - Area A

Page 64: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

HVAC Piping Installation – 2nd Floor - Area A

Page 65: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

HVAC Ductwork Installation – 1st Floor - Area A

Page 66: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

Sprinkler Piping Installation – Area B

Page 67: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

School Board Tour – February 18, 2017

Page 68: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

• Finish Masonry Installation – 2nd Floor – Areas C• Continue Masonry Installation – Area D• Continue Brick Installation – Area B• Continue Plumbing & Electrical Wall Rough In• Parapet Framing - Fitness Center• Complete Roof Decking – Gym - Area D• Roof Decking – Auditorium – Area D• Continue Roofing – Area A • Roofing - Fitness Center• Continue Stud Wall Installation• Continue Window Installation – Area A, B & C• Continue Door Frame Installation• Continue HVAC Piping Installation – 1st Floor - Areas A, B, & C• Continue HVAC Ductwork Installation• Sprinkler Piping Installation – Area A, B & C• Site Concrete – Loading Dock

Scheduled Work for Next Few Weeks

Page 69: Project Slideshow February 25, 2017 · Aerial Photo from Southeast Provided by Hudson Group – Taken 2.20.2017. Aerial Photo from South Provided by Hudson Group – Taken 2.20.2017

The End