project scope and planning - energex · the design consultant and the electrical contractor are...
TRANSCRIPT
--
~1 "'~ <( a_ 0 Cl <N
z I->-0 z ...J F Luz 9= ~o Cl:'. Ux u Ow Cf) 0 '-'
w 3' 15 Cl wz
zw
~
0
DEVELOPER DETAILS
THE DEVELOPER MAY BEA LAND DEVELOPER/ PROPERTY DEVELOPER/ PRIVATE COMPANY I PUBLIC COMPANY/ PRIVAlE INDIVIDUAL ENGAGING THE SERVICES OF THE ENERGEX ACCREDITTED DESIGN CONSULTANT FORACONTESTIBLE WORKS SUBDIVISION PROJECT.
THE DEVELOPER MAY ALSO BE A LOCAL COUNCIL ENGAGING THE SERVICES OF THE EN ERG EX ACCREDITTED DESIGN CONSUL TANT FOR A CQNlESTIBLE WORK$ SUBDIVISION PROJECT.
MASTERPLAN / MULTI-STAGE DEVELOPMENTS
ON MUL Tl-$TAGE PROJECTS, THE DESIGN CONSULTANT SHALL PROVIDE A COPY OF THE OVERALL MASTER PLAN (FROM THE DEVELOPER) SO AS TO ENABLE EN ERG EX TO PROVIDE ACCURATE PLANNING FEEDBACK. THIS MASTER PLAN MAY INCLUDE STAGES OF THE OVERALL DEVELOPMENT FOR WHICH THE DESIGN CONSUL TANT HAS NOT BEEN YET BEEN ENGAGED TO DESIGN.
LOCAL COUNCIL APPROVAL
TOGETHER WITH COMPLIANCE WITH ENERGEX'S STANDARDS, POLICIES AND PROJECT SPECIFIC PLANNING REQUIREMENTS, THE DESIGN CONSUL TANT IS RESPONSIBLE FOR ENSURING THAT THE ELECTRICAL RETICULATION DESIGN AND THE STREETLIGHT DESIGN FOR THE SUBDIVISION IS IN ACCORDANCE WITH SUBDIVISION STANDARDS OF THE LOCAL COUNCIL, TOGETHER WITH ANY SPECIFIC REQUIREMENTS CONTAINED WITHIN THE CONDITIONS OF THE DEVELOPMENT PERMIT ISSUED TO THE DEVELOPER BY THE LOCAL COUNCIL.
SUBDIVISION ELECTRICITY SUPPLY AGREEMENT
THE SUBDIVISION ELECTRICITY SUPPLY AGREEMENT IS THE 'CONTRACT'' BETWEEN THE DEVELOPER AND ENERGEX THAT PERMITS THE DEVELOPER TO UNDERTAKE CONTESTIBLE WORKS ON THE ENERGEX DISTRIBUTION NETWORK
NO WORKS OF ANY TYPE CAN BE UNDERTAKEN ON THE ENERGEX DISTRIBUTION NETWORK WITHOUT A SUBDIVISION ELECTRICITY SUPPLY AGREEMENT.
I
EASEMENTS
IF EASEMENTS ARE REQUIRED ON A PROJECT, ENERGEX REQUIRES A COPY OF THE SURVEY PLAN TOGETHER WITH ALL APPLICABLE EASEMENT DOCUMENTS, PRIOR TO THE ISSUING OF THE 'CERTIFICATE OF SUPPLY" AND PRIOR TO THE ISSUING OF THE SWITCHING APPROVAL TO ENABLE THE ELECTRCIAL CONTRACTOR TO COMMISSION THE NEWLY CONSTRUCTED ASSETS ,
I I I I I I I
r
r
(
-.
START )
THE DEVELOPER ENGAGES THE SUBDIVISION
DESIGN CONSULTANT
THE CONSUL TANT SUBMITS ELECTRONIC CORRESPONDENCE TO ENERGEXWITH A REQUEST FORA MAPS PACKAGE.
THE CORRESPONDENCE SHALL INCLUDE INFORMATION ON THE LOCATION AND SCOPE OF n-tE PROJECT.
ENERGEX PROVIDES NETWORK MAPPING
INFORMATION TO THE DESIGN CONSUL TANT
PROJECT SCOPE AND PLANNING
THE DESIGN CONSUL TANT SCOPES AND PLANS ALL PROPOSED WORKS, INCLUDING ANY REQUIRED ALTERATIONS TO THE
EXISTING DISTRIBUTION NETWORK
CONCEPT PLAN
THE CONSUL TANT SHALL SUBMIT A CONCEPT PLAN TO ENERGEX FOR ALL PROJECTS THAT INVOLVE HV WORKS SO AS TO DISCUSS AND RESOLVE ANY ISSUES SUCH AS:
(1) 11 KV FEEDER TIES. (2) 11KV RING MAIN UNITS. (3) ADDITIONAL FUTURE USE CONDUITS. (4) NETWORK ASSET MANAGEMENT REQUIREMENTS. (5) INTERCONNECTION WITH ACJACENT SUBDIVISIONS. (6) NON--CONTESTIBLE WORK (7) ANY OTHER PROJECT SPECIFIC PLANNING IS.SUES.
DETAILED DESIGN
THE CONSULTANT DESIGNS THE '1 I ~UBDIVISION PROJECT INCLUDING
ALL REQUIRED ALTERATIONS TO THE EXISTING DISTRIBUTION
NETWORK
LOCAL COUNCIL APPROVAL OF THE
ELECTRICAL RETICULATION DESIGN
AND THE PUBLIC LIGHTING DESIGN
DESIGN COMPLIES WITH ENERGEX STANDARDS. POLICIES AND SPECIFIC
OTHER APPROVALS AS MAY BE REQUIRED:
DESIGN ACCEPTED
YES
NO NO
PLANNING REQUIREMENTS
DESIGN COMPLIES
YES
THE CONSUL TANT SUBMITS THE DESIGN PACKAGE AND
ALL SUPPORTING DOCUMENTATION TO
ENERGEX
ENERGEX ACCEPTS PACKAGE
YES
NO
POWERLINK, DERM, QUU, APA GAS, DTMR.
DESIGN ACCEPTED
YES
NO
~
- ENERGEX MAKE A "LETTER OF OFFER" AND A SUBDIVISION ELECTRICITY SUPPLY AGREEMENT (SESA) TO THE DEVELOPER
VIA THE CONSULTANTS OFFICE
ENERGEX ISSUES A LETTER OF OFFER ANDA
PROJECT WITH NO SECURITY BOND
ENERGEX WILL ISSUE THE CERTIFICATE OF ELECTRICITY SUPPLY TO THE DEVELOPERAT THE CLOSURE STAGE OF THE SUBDIVISION PROJECT.
NO • NIL BOND
SUBDIVISION ELECTRICITY SUPPLY AGREEMENT
NO THE PROJECT DOES NOT PROCEED AND ENERGEX
THE DEVELOPER SIGNS THE ENERGEX SUPPLY AGREEMENT AND PAYS ALL FEES
>-------1 WILL CANCEL THE
YES
THE DEVELOPER RETURNS THE SIGNED PUBLIC LIGHTING SUPPLY
AGREEMENT TO EN ERG EX, VIA CONSULTANTS OFFICE.
THE DEVELOPER LODGES A SECURITY
BOND?
PROJECT AND ARCHIVE THE MASTER FILE
YES • BOND
CERTIFICATE OF ELECTRICITY SUPPLY
THE CERTIFICATE OF ELECTRICITY SUPPLY IS THE DOCUMENT REQUIRED BY THE DEVELOPER TO ENABLE 'PLAN SEALING' BY THE LOCAL COUNCIL SO THAT THE SURVEY PLANS CAN BE REGISTERED WITH THE DEPARMENT OF NATURAL RESOURCES (TITLES OFFICE).
PROJECT WITH SECURITY BOND CERTIFICATE OF ELECTRICITY SUPPLY
PROJECT WITH A SECURITY BOND
ENE.RGEX ISSUE.$ THE CERTIFICATE OF ELECTRICITY SUPPLY TO THE.
DE.SIGN CONSUL TANT
THE DESIGN CONSUL TANT ISSUES THE CERTIFICATE OF ELECTRICITY
SUPPLY TO THE DEVELOPER
NAME -
SITE CONTACT DETAILS
COMPANY -PHONE -
MOBILE -FAX -E-MAIL -
I
•
PROJECT CONSTRUCTION
CONSTRUCTION OF THE PROJECT CAN ONLY COMMENCE WHEN THE ENERGEX ACCREDITTED ELECTRICAL CONTRACTOR IS IN POSSES ION OF THE APPROVAL TO CONSTRUCT - ISSUED BY ENERGEX.
ENERGEX ISSUES THE APPROVAL TO CONSTRUCT
PROJECT CONSTRUCTION
ELECTRICAL CONTRACTOR
THE DEVELOPER, WITH THE ASSISTANCE OF THE DESIGN CONSUL TANT, TENDERS THE
PROPOSED WORKS TO ENERGEX ACCREDITTED ELECTRICAL
CONTRACTORS
' THE EN ERG EX ACCREDITTED
ELECTRICAL CONTRACTORS SUBMIT TI-lEIR TENDER PRICES TO THE
CONSUL TANT AND THE DEVELOPE.R
'
THE DEVELOPER APPOINTS THE SUCCESSFUL ENERGEXACCREDITTED
ELECTRICAL CONTRACTOR
THE CONSUL TANT PROVIDES THE DETAILS OF THE APPOINTED
ELECTRICAL CONTRACTOR TO ENERGEX
NOTE: THESE DETAfLS MAY HAVE A""iJiEi.DY BE SUBMITTED wm-1 THE
DESIGN PACKAGE
' ENE.RGE.X ISSUE.S THE APPROVAL TO
CONSTRUCT TO THE. DESIGN CONSUL TANT AND THE. ACCRE.DITTE.D
ELECTRICAL CONTRACTOR
'
START OF CONSTRUCTION OF THE SUBDIVISION PROJECT
THE ACCREDITED ELECTRICAL CONTRACTOR CONSTRUCTS THE SUBDIVISION ELECTRICAL RETICULATION WORKS USING ENERGEX APPROVED MATERIALS AND IN ACCORDANCE WITH ENERGEX'S CONSTRUCTION STANDARDS.
DESIGN CONSULTANT THE DESIGN CONSUL TANT PROVIDES ONGOING TECHNICAL SUPPORT TO THE ELECTRICAL CONTRACTOR DURING THE CONSTRUCTION PHASE OF THE PROJECT FOR ISSUES SUCH AS: {i) NON STANDARD CONSTRUCTION APPROVALS. {ii) OLJT OF ALIGNMENT APPROVALS. {iii) SHALLOW CONDUIT APPROVALS. {iv) DESIGN AMENDMENTS. {v) REVISED WORKSPLANS, ETC.
SWITCHING AND COMMISSIONING
TI-lE ACCREDITED ELECTRICAL CONTRACTOR LIAISES DIRECT WITH THE ENERGEXASSESSMENT OFFICER IN THE LOCAL ENERGEX HUB DEPOT WITH REGARD TO SWITCHING AND COMMISSIONING OF THE NEWLY BUil T ASSETS.
EN ERG EX SWITCHES AND COMMISSIONS THE HIGH VOLTAGE ASSETS, AS BUILT BY THE ELECTRICAL CONTRACTOR. ENERGEX UNDERTAKES ANY HV LIVE LINE ACTIVITIES REQUIRED DURING THE PROJECT.
THE ELECTRICAL CONTRACTOR SWITCHES AND COMMISSIONS THE LOWVOLTAGEASSETSANDTHE RATE 2 PUBLIC LIGHTING ASSETS. AS BUil T BY THE ELECTRICAL CONTRACTOR
ENERGEX UNDERTAKES NO SWITCHING AND NO COMMISSIONING OF THE LOWVOLTAGEASSETS OR THE RATE2 PUBLIC LIGHTING ASSETS, THIS IS THE RESPONSIBLITY OF THE ACCREDITED ELECTRICAL CONTRACTOR.
COMPLETION PACKAGE
FOLLOWING COMMISSIONING OF THE ASSETS, THE ELECTRICAL CONTRACTOR SUBMITS THE "COMPLETION PACKAGE" TO THE ENERGEX CONTESTABLE WORKS TEAM. SPECIFIC TIME LIMITS APPLY TO THIS PROCESS.
THE CONTESTABLE WORKS TEAM THEN SCHEDULES A FINAL PRODUCT AUDIT OF THE COMMISSIONED ASSETS.
THE CERTIFICATE OF COMPLETION FROM THE ELECTRICAL CONTRACTOR IS
INCLUDED IN THE "COMPLETION PACKAGE"
ENERGEX UNDERTAKES A FINAL PRODUCT AUDIT OF THE
COMMISSIONED AS BUILT ASSETS
PROJECT WITH A SECURITY BOND PROJECT WITH NO SECURITY BOND
ENERGEX ISSUES THE CERTIFICATE OF ACCEPTANCE
'
THE EN ERG EX ASSESSMENT OFFICER CONDUCTS A
COMPLIANCE AUDIT OF THE AS CONSTRUCTED WORKS
THE WORKS
PASS AUDIT
YES
'
NO
ENERGEX ADVISES THE DESIGN CONSUL TANT TI-lAT THERE ARE OUTSTANDING
MATTERS THAT NEED TO BE FINALISED
' ENERGEX ACCEPTS OWNERSHIP OF THE
NEW ELECTRICAL RETICULATION AND
ISSUES A CERTIFICATE OF ACCEPTANCE TO
THE ELECTRICAL CONTRACTOR AND TI-lE DESIGN CONSUL TANT
I CONSTRUCTION DEFECTS THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR RECTIFYING ANY CONSTRUCTION NON-CONFORMANCES (DEFECTS) FOUND DURING TI-lE FINAL PRODUCT AUDIT
DESIGN DEFECTS THE DESIGN CONSULTANT IS RESPONSIBLE FOR RECTIFYING ANY DESIGN NON-CONFORMANCES (DEFECTS) FOUND DURING THE FINAL PRODUCT AUDIT
I
THE DESIGN CONSULTANT PROVIDES ANY DOCUMENTATION REQUESTED BY ENERGEX TO FINALISE THE PROJECT AND ISSUE THE CERTIFICATE OF ACCEPTANCE.
DOCUME.NTATION SUCH AS SURVEY PLANS, WAYLE.AVE.S, REGISTRATION CONFIRMATION STATE.ME.NT$ FOR EASE.MENTS, ETC
PROJECT WITH NO SECURITY BOND
ENERGEX ISSUES THE CERTIFICATE OF ELECTRICITY SUPPLY TO THE
DESIGN CONSUL TANT
PROJECT WITH NO SECURITY BOND
ENERGEX ISSUES THE CERTIFICATE OF ELECTRICITY SUPPLY
CERTIFICATE OF ELECTRICITY SUPPLY PROJECT WITH A SECURITY BOND
ENERGEX RELEASES THE SECURITY BOND TO THE DEVELOPER
ENERGEX RELEASES THE SECURITY BOND TO THE DEVELOPER WITHIN 30 WORKING DAYS AFTER THE ISSUE OF
THE CERTIFICATE OF ACCEPTANCE
THE ELECTRICAL CONTRACTOR FORWARDS A COPY OFTI-lE
CERTIFICATE OF ACCEPTANCE TO THE DEVELOPER
TI-lE DESIGN CONSUL TANT ISSUES THE CERTIFICATE OF ELECTRICITY
SUPPLY TO THE DEVELOPER
THE CERTIFICATE OF ELECTRICITY SUPPLY IS THE DOCUMENT REQUIRED BY THE DEVELOPER TO ENABLE "PLAN SEALING" BY THE LOCAL COUNCIL SO THAT TI-lE SURVEY PLANS CAN BE REGISTERED WITH THE DEPARMENT OF NATURAL RESOURCES (TITLES OFFICE).
( FINISH ) NOMENCLATURE The design consultant and the electrical contractor are referred to as Accredited Service Providers or ASP's for the purpose of DD&C (Developer Design and Construct) Contestable Works Projects.
ALIGNMENTS WORKS COORDINATOR: - APPROVED: - ENERGEX WORKPLANS VERSION 5.0
ENERGEXOH PARENT PROJECT No: -- RPEQNo: - SCALE: NOT APPLICABLE
ENERGEXUG - WORKS REQUEST No: - CHECKED: PROJECT/SUB PROJECT No.
TELSTRA - PHONE: (07) DEVELOPER DESIGN AND CONSTRUCT GAS - PROPOSED LOTS: - DESIGNER : J. LAMBERT CONTESTABLE WORKS
I Sxxxxxxx HP GAS - CANCELLING LOT - PHONE : (07) 3664 7244
WATER - PLANNER: J.LAMBERT
STORMWATER PHONE : (07) 3664 7244 SUBDIVISION ELECTRICITY SUPPLY - LOCAL AUTHORITY: - SHEET 1 OF 1 A1 SEWERAGE - UBD GRID REF: - HIGH LEVEL PROCESS FLOWCHART ISSUE DATE: 22.04.2019
01 I I I I OTHER - MAINS POLES PEGGED: -
I I