PLANNING AND DESIGN OF MINOR IRRIGATION TANK ACROSS KAMPINEELA VANKA,NEAR KOTHA VEPAKUPPAM VILLAGE,
RAMACHANDRAPURAM MANDAL, CHITTOOR DISTRICT, ANDHRAPRADESH.
BYM.DHANRAJ(106204)
K.GIRISHKUMAR(106206) B.MADHULATHA(106209)
![Page 2: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/2.jpg)
LIST OF CONTENTS
5
INTRODUCTION1
2
3
4
RESERVOIR PLANNING
GEOTECHNICAL INVESTIGATIONS
ESTIMATION AND COSTING
DESIGN OF EARTHEN EMBANKMENT
![Page 3: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/3.jpg)
IRRIGATION
Irrigation is the process of supplying of water to land by artificial means for the purpose of cultivation.
CLASSIFICATION OF PROJECT
Major irrigation project Above 10000ha
Medium irrigation project Between 2000 to 10000ha
Minor irrigation project Below 2000ha
LOCATION
Kampineela vanka,near Kotha Vepakuppam village,Ramachandrapuram mandal, Chittoor district, Andhra Pradesh.
PURPOSE AND SCOPE OF PROJECT
This minor irrigation tank is proposed to meet the demands of farmers and to use the available resources efficiently.
![Page 4: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/4.jpg)
INVESTIGATIONS FOR RESERVOIR PLANNING
ENGINEERINGSURVEY
GEOLOGICAL
CONTOUR
MAPS
HYDROLOGICAL
GEOTECHNICAL
INVESTIGATIONS
![Page 5: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/5.jpg)
INVESTIGATIONS
1
Catchments areaCatchments area
Free catchments Free catchments ==2.098sqkm2.098sqkm
• Intercepted catchments Intercepted catchments = = NilNil
• Nature of catchments Nature of catchments = = GoodGood
2
• Quantity of water available Quantity of water available in the riverin the river• Dependable flows Dependable flows • Storage capacity of River Storage capacity of River and its levels and its levelsCollection of data Collection of data HYDROLOGICHYDROLOGIC CROP DETAILSCROP DETAILSComputation of runoffComputation of runoff
3
Casing soil
Hearting Soil
Foundation soil.
ENGINEERINGSURVEY HYDROLOGICAL GEOTECHNICAL
![Page 6: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/6.jpg)
CATCHMENT AREA MAP
![Page 7: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/7.jpg)
CONTOUR MAP
![Page 8: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/8.jpg)
Yield Of The River
From the computed runoff 75% dependable yield of the basin is From the computed runoff 75% dependable yield of the basin is determined determined From flow duration curveFrom flow duration curve75%dependable yield of the 75%dependable yield of the basin=0.315M.cumbasin=0.315M.cum
Computation Of DemandComputation Of Demand
Crop water requirements in both Kharif and Rabi Crop water requirements in both Kharif and Rabi seasons are seasons are computed by Modified Penman method. computed by Modified Penman method.
Monthly potential evapotranspiration at Arogyavaran metrological Monthly potential evapotranspiration at Arogyavaran metrological station are used forcomputing the irrigation demand.station are used forcomputing the irrigation demand.
![Page 9: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/9.jpg)
FLOW DURATION CURVE
![Page 10: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/10.jpg)
COMPUTATIONAL PROCEDURE
COMPUTATIONAL PROCEDURE
Consumptive Irrigation Requirement (CIR) =ET
Net irrigation Requirement (NIR) =CIR-Re
Field Irrigation Requierment (FIR) = NIR/ηa
Gross Irrigation Requierment (GIR) = FIR/ηc
where , ηa = Application Effciency and ηc = Conveyance Efficiency
Demand in Kharif season = 0.1536M.cum
Demand in Rabi season = 0.0908M.cum
Total demand = 0.2444M.cum/year
![Page 11: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/11.jpg)
RAINFALL CURVE -SEPTEMBER
![Page 12: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/12.jpg)
RAINFALL CURVE -AUGUST
![Page 13: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/13.jpg)
RAINFALL CURVE -OCTOBER
![Page 14: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/14.jpg)
RAINFALLCURVE -DECEMBER
![Page 15: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/15.jpg)
CROP WATER REQUIREMENTS
Crop : Groundnut Field efficiency :80%Period :120days Conveyance efficiency : 85%Ayacut : 80 hectaresSeason : Karif
MODIFIED PENMAN
Crop : Hybrid sajja Field efficiency :80%Period :90days Conveyance efficiency : 85%Ayacut : 80 hectaresSeason : Rabi
![Page 16: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/16.jpg)
FLOW MASS CURVE
![Page 17: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/17.jpg)
STORAGE CAPACITY AT DIFFERENT WATER SURFACE ELEVATION
![Page 18: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/18.jpg)
STORAGE CAPACITY
![Page 19: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/19.jpg)
GEOTECHNICAL INVESTIGATIONS
Liquid limit and plastic limit Sieve analysis
Proctors compaction
Permeability
Triaxial compression
![Page 20: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/20.jpg)
LIQUID LIMIT TEST
![Page 21: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/21.jpg)
HEARTING SOIL
![Page 22: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/22.jpg)
FOUNDATION SOIL
![Page 23: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/23.jpg)
SIEVE ANALYSIS
Coefficient of Uniformity Cu = 6.67 Coefficient of Curvature Cc = 1.1 Since Cu > 6 and Cc lies between 1 and 3, SW – Well graded Sand.
![Page 24: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/24.jpg)
SOIL CLASSIFICATION
![Page 25: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/25.jpg)
FOUNDATION SOIL
![Page 26: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/26.jpg)
STANDARD PROCTOR’S COMPACTION TEST
![Page 27: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/27.jpg)
HEARTING SOIL
![Page 28: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/28.jpg)
FOUNDATION SOIL
![Page 29: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/29.jpg)
TRIAXIAL COMPRESSION TEST
![Page 30: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/30.jpg)
HEARTING SOIL
![Page 31: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/31.jpg)
FOUNDATION SOIL
![Page 32: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/32.jpg)
Design of preliminary section
Seepage analysis
Introduction
Determination of seepage flow net
Computation of seepage
Stability analysis
Introduction
Computations for stability analysis
![Page 33: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/33.jpg)
SEEPAGE ANALYSIS
![Page 34: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/34.jpg)
![Page 35: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/35.jpg)
![Page 36: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/36.jpg)
![Page 37: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/37.jpg)
STABILITY ANALYSIS
![Page 38: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/38.jpg)
![Page 39: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/39.jpg)
![Page 40: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/40.jpg)
![Page 41: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/41.jpg)
SURPLUS WEIR
![Page 42: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/42.jpg)
TANK SLUICE WITH TOWER HEAD
![Page 43: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/43.jpg)
ESTIMATION
11DETAILED AND ABSTRACT ESTIMATE OF EARTHEN BUND
22DETAILED AND ABSTRACT ESTIMATE OF SURPLUS WEIR
33. DETAILED AND ABSTRACT ESTIMATE OF TANK SLUICE WITH A TOWER HEAD
![Page 44: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/44.jpg)
S.No Quantity Description of work Rate Per Amount (Rs)
1 LSClearing light jungle along the bund, etc
6000
2 11940Earthwork excavationFor stripping soils 33.35 Cum 397005
3 1350Earthwork excavation for toe wall and toe drain 45.13 Cum 60926
4 1690 Earthwork excavation for cutoff 45.13 Cum 76270
5 4260Earthwork excavation for hearting soils
182.20 cum 776172
6 608Rough stone dry packing for revetment300mm thick 501.30 Cum 304791
7 558Gravel backing underRevetment 0.30m thick 289.15 Cum 617046
8 53Spreading gravel on top of bund 150mm thick 199.48 Cum 10573
9 1444Laying horizontal and vertical sand filters
210.20 Cum 303529
10 34300mm thick graded metal 25mm to 50mm size 601.40 Cum 20448
11 259 Rock toe using 225mm tick 390.40 Cum 101114
12 89 225mm thick rough stone for toe drain 478.15 Cum 42556
13 LSProvision for bailing out water in excavation of cut off, etc 10000
14 LSProvision for removal of surface boulders,etc 10000
15 LS Provision for forming ramps 10000
16 LS Provision for rounding off 2603Total 2743033
ABSTRACT ESTIMATE OF EARTHEN BUND
![Page 45: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/45.jpg)
S no QuantityDescription of work
Rate PerAmount
(Rs)
1 268cum
Earthwork excavation in all soils by machine and depositing spoil within 5m radius for foundations
16.70 Cum 4475.60
2 156cum
Laying CC(1:6:10) mix using 40mm size HBG metal for foundations
1414.20
Cum 220615.2
3 7.92cum
Laying wearing coat with CC(1:2:4) mix using using 20mm size HBG metal for body wall
2371.80
Cum 187846.656
4 202cumConstruction of RR masonry in CM(1:5)
1284.50
Cum 259469
5 14.62cum
Laying CC(1:3:6) mix using 50% of 20 mm HBG metal for body wall
2345.00
Cum 34283.9
6 189.1sqm
Plastering the exposed faces of RR masonary in CM(1:4) mix 20mm thick
1040.00
Sqm 196664
7 115cum
Rough stone dry packing for apron using 0.30m thick stone
498.40
Sqm 57316
Total 960671
ABSTRACT ESTIMATE OF SURPLUS WEIR
![Page 46: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/46.jpg)
S no
QuantityDescription of work Rate Per Amount(RS)
1 80.478
Earthwork excavation in all soils by machine and depositing spoil within 5m radius for foundations
16.70 1cum 1344
2 80.478
Laying CC(1:6:10) mix using 40 mm size HBG metal for foundations
1414.20
1cum 113812
3 9.98
Laying CC(1:3:6) mix using 50% of 20mm HBG metal
2345.00
1cum 23403
4 93.57Construction of RR masonry in CM(1:5)
1284.50
1cum 120191
5 170.08
Plastering the exposed faces of RR masonry in CM (1:4) mix 20mm thick
1040.00
1sqm 176884
6 -LS-Provision towards bank connections 25000
7 -LS-
Provision for arranging plug and arrangements
15000
Total 475634
ABSTRACT ESTIMATE OF TANK SLUICE WITH A TOWER HEAD
![Page 47: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/47.jpg)
Estimated cost of the earthen bund = Rs. 2743033
Estimated cost of surplus weir = Rs. 960671
Estimated cost of tank sluice with a tower head = Rs. 475634
Total cost of the project = Rs. 4179338
ESTIMATED COST OF THE PROJECT
![Page 48: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/48.jpg)
CONCLUSIONS
IT IS PROVOKED THAT IRRIGATION PROJECTS ARE ASCERTAINED. THESE ARE HIGHLY VALUED PROJECTS , AND SPECIAL ATTRIBUTE KEEN INTEREST TAKEN BY GOVERNMENT IN CONVEYING WATER TO VILLAGES.
ATTRITUBE TO THIS , IRRIGATION PROJECTS ARE TIME DEPENDENT AND LESS FEASILBLE ECONOMICAL PROJECT , WE HAVE TO WORK UNDER VARIOUS PRESSURES.
REGRADELESS OF THE EFFORTS AND AMBIGUITIES TAKEN IN DOING THIS PROJECT, WE HAD THE PRIVILEGE OF DETAIL LEARNING AND EXPOSURE TO FIELD CONDITION.
![Page 49: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/49.jpg)
ACKNOWLEDGEMENT
WE ARE THANKFUL TO TIRUPATI IRRIGATION DEPARTMENT , WHO HAVE GIVEN EMANCE INFORMATION IN PUT THIS PROJECT FORWARD
WE ARE DELIGHTED TO THANK PROF P.MALLIKARUJAN . WHO SPARED HIS VALUABLE GUIDELINES AND SPARED THIS VALUABLE TIME.
LAST BUT NOT LEAST , WE ARE EXTREMLY HUMBLEMED TO EXPRESS OUR THANKS TO PROF ARUNA JOYTHI , WHO HELPED US IN ALL THE DIFFICULTS WHICH TEASED US WHILE EXCUTING THIS PROJECT
![Page 50: Project Report on Tank Prefianl](https://reader034.vdocuments.us/reader034/viewer/2022042512/546b0986b4af9fc6128b48d2/html5/thumbnails/50.jpg)