DETAILED PROJECT REPORT –MHOW MANDLESHWER
GHAT SECTION (SH-1)
&
A Observational Training Report Submitted to
Rajiv Gandhi Proudyogiki Vishwavidyalaya, hopal
!n partial "ul#llment o" degree o"
BACHELOR OF ENGINEERING
IN
CIVIL ENGINEERING
By- SHUBHAM GEETE (08!CE110"#)
DEPERTMENT OF CIVIL ENGINEERING
-
8/16/2019 project report on lcd and led display.docx
2/17
A$%'* I+*,,,. O/ T.$+y A+2
R.*.3%$4 I+2%.
C+,.+,
1. Project Description
2. Flexible Pavement
3. Embankment & Tests of preparation for Embankment
4. Sub grade & Tests of preparation for sub grade
. !.S.". #!ranular sub base$ & Tests for preparation of
!.S.".
%. .'.'. #et mix 'acadum$ & Tests for preparation of
.'.'.
(. D.".'. #Dense "itumen 'acudum$ & Tests for preparation
of D.".'.
). ".*. #"itumen *arpet$
-
8/16/2019 project report on lcd and led display.docx
3/17
P%5.$,
D.*$%',+Rau - Mhow - Jamghat - Mandleshwar road is a segment of Old NH-3 and SH-1
situated at western part of Madhya Pradesh State having Proe!t length of "#$#%
&ms$ 'ut the a!tual length of the proe!t is redu!ed to ("$))* &ms$ due to the
introdu!tion of +awli Palasia ,ypass and Medh ,ypass$
LOCATION OF THE PROJECT ROAD
he starting point of the proe!t is at e.isting /m$ 1#$"0% of old NH-3 near Rau with
new NH-3 un!tion$ he proe!t road passes through two distri!t of Madhya Pradesh
namely ndore and &hargone$ he end point of proe!t road is at e.isting /m$ %$%%%
at Mandleshwar town with three arm un!tion on SH-30$ he e.isting length of proe!t
road is "#$#% /m as per agreement whi!h is redu!ed to ("$))* /m$ as stated a,ove$
TERRAIN CLASSIFICATION
he Proe!t highway road alignment traverses through Plain errain2 Hilly errain
appro.imate 11 /ms$ Reserve 4orest 5h$ 6)7("% to #17("% in ndore 8istri!t 1(
/ms$ from 5h$ #17("% to )%7("% in &hargone 8istri!t * &ms$
TOWN AND VILLAGES
he alignment passes through village Harniya &hedi2 Rasalpura2 &ishangan2 Mhow
5antonment 2 8ongargaon2 +awli Palasia2 'adgonda2 Mendh2 'adhtalai2 5hoti Jam2 9alpura2
5holi2 8hapla2 :angaon and Mandleshwar$
he strip plan en!losed showing the s!ope of wor/ i$e$ sele!ted stret!hes passing through
,uiltup area shall ,e widened to two lane with paved shoulder !arriageway in length )$3 /ms$
2 # laning !arriageway 1 /m$2 oll Pla;a 2 'us Shelter 2ru!/ 9ay 'ay 2 Maor
-
8/16/2019 project report on lcd and led display.docx
4/17
SALIENT FEATURES1$ Name of =or/ 8evelopment of Rau > Mhow > Mandleshwar Road on
'$O$$ 7 +rant 'asis from 5h$ %7%% to "#7#%%6$ ?stimated 5ost Rs$ 1"($%( 5rores
3$ 9ength of the Proe!t @s per agreement "#$#% /m2 Revised ("$)( /m
#$ Num,er of 9ane < 5arriageway ?.isting 5arriageway from 5h$ Start to ?nd is proposed to
,e widen to two lane undivided !arriageway width with
6$)m granular shoulder in rural and 1$)m wide paved
shoulder in 'uilt-up area$
)$ Maor 'ridge %1 No$
($ Minor 'ridge ARetainedB 16 Nos$"$ Minor 'ridge A=ideningB %# Nos$
0$ Minor 'ridge ANew <
Re!onstru!tionB
10 Nos$
*$ New 5onstru!tion < =idening
of Pipe 5ulverts
1%0
1%
$
New 5onstru!tion < =idening
of Sla,
-
8/16/2019 project report on lcd and led display.docx
5/17
Mandleshwar$
PROJECT FACILITIES
16 T P373
S.No. Location of Toll Plaza
(Design Chainage)
Homogeneous Section
(Design Chainage)
Length
(Km)
1 &m 3$%%% to &m #$%%% Rau > Mhow
A&m %$%% to &m 6%$)%B
6%$)%
6 &m (3$%%% to &m (#$%%% Mhow - Mandleshwar
A&m 6%$)% to &m "#$#%B
)3$*%
6 T%$ L3y-By.
S.No. Locations (Km) Side Remars
! "!.#$ %oth Near Toll Plaza
96 B* S.,.%
S.No. &'isting Chainage
(Km)
Proosed
Chainage (Km)
Side illage Name
1 1"$)% 6$"3 RHS Harniya &hedi
6 10$%) 3$6( RHS :i/rant nst$ Of e!h$
3 10$%) 3$#6 9HS :i/rant nst$ Of e!h$
# 6#$(% *$0% RHS Near @rmy 5ommando
@rea
) 6)$(% 1%$"6 RHS 8ongargaon :illage( 6($#) 11$() RHS 'alasia :illage
" 6($#) 11$() 9HS 'alasia :illage
0 6($"% 11$0% 9HS 'alasia :illage
* "$1% 6"$)) RHS 'adgonda :illage
1% 1#$1) (%$)) RHS Som/heda :illage
F.:;. P3
-
8/16/2019 project report on lcd and led display.docx
6/17
Pavement - Pavement is the a!tual travel surfa!e espe!ially made dura,le and
servi!ea,le to withstand the traffi! load !ommuting upon it$ Pavement grants fri!tion
for the vehi!les thus providing !omfort to the driver and transfers the traffi! load from
the upper surfa!e to the natural soil$
Fle!"le Pavement - hose pavements whi!h refle!t the deformation of su,grade and the su,seCuent layers to the surfa!e$ 4le.i,le2 usually asphalt2 is laid
with no reinfor!ement or with a spe!iali;ed fa,ri! reinfor!ement that permits limited
flow or repositioning of the road,ed underground !hanges$
he design of fle.i,le pavement is ,ased on load distri,uting !hara!teristi! of the
!omponent layers$ he ,la!/ top pavement in!luding water gravel ,ound ma!adam
fall in this !ategory$
4le.i,le pavement on the whole has low or negligi,le fle.i,le strength fle.i,le in theirstru!tural a!tionB$ he fle.i,le pavement layers transmit the verti!al or !ompressive
stresses to the lower layers ,y grain transfer through !onta!t points of granular
stru!ture$
he verti!al !ompressive stress is ma.imum on the pavement surfa!e dire!tly under
the wheel load and is eCual to !onta!t pressure under the wheels$ 8ue to the a,ility
to distri,ute the stress to large area in the shape of trun!ated !one the stresses get
de!reased in the lower layer$
@s su!h the fle.i,le pavement may ,e !onstru!ted in a num,er of layers and the top
layer has to ,e strongest as the highest !ompressive stresses$
o ,e sustained ,y this layer2 in addition to wear and tear2 the lower layer have
to ta/e up only lesser magnitude of stress as there is no dire!t wearing a!tion die to
traffi! loads2 therefore inferior material with lower !ast !an ,e used in the lower
layers$
-
8/16/2019 project report on lcd and led display.docx
7/17
$le%ible Pavement
A2
-
8/16/2019 project report on lcd and led display.docx
8/17
E=;3+=.+, 3+2 S;%32.
!. op of em,an/ment should ,e $."m to !.$m a,ove H49$
*. 'efore !onstru!tion of em,an/ment !learing and gru,,ing of soil surfa!e is done$
+. 9imits are mar/ed ,y fi.ing pegs on ,oth sides and drawing lime line$ hen earth
!olle!tion starts$,. t should ,e !he!/ed prior to 5 and + that )%% mm ,elow the top of em,an/ment
there should not ,e any e.pensive soil$ t is to ,e removed ,y digging ,efore
!onstru!tion of em,an/ment ASoil 4S E )%B$
#. he soil will ,e spread in layers not e.!eeding 6%% mm thi!/ness and with
pre!aution to maintain the !am,er from start of wor/ ,y motor grader$
". he water is spread evenly with a tan/er over it !al!ulating the amount of water
reCuired to maintain the OM5 A1F a,ove or 6 F ,elowB $han soil is mi.ed
thoroughly ,y ,lading2 dis!ing or harrowing for uniformity of moisture$ he
moisture is !he!/ed ,y moisture meter$-. @fter this stage !ompa!tion starts$ t should ,e done ,y 0% &N to 1%% &N
vi,ratory roller from sides to !entre so as to maintain the reCuired !am,er$ 9ayer
is thoroughly !ompa!ted until the reCuired density is a!hived$ 8ensity is !he!/ed
,y sand repla!ement method AS-6"6% Part-60B$
. ?a!h layer A6%%mmB of ?m,an/ment is 5ompa!ted to the desired density A*)F of
M88 for em,an/ment *"F for su,-gradeB and only than the ne.t layer over it is
laid$
/. he side slope of em,an/ement should ,e maintained as ,elow$
S.No. Descrition H0
-
8/16/2019 project report on lcd and led display.docx
9/17
-
8/16/2019 project report on lcd and led display.docx
10/17
")$% mm 1%% - -
)3$% mm - 1%% -
6($) mm ))-") )%-0% 1%%
*$)% mm
#$") mm 1%-3% 1)-3) 6)-#)
6$3( mm
%$#6) mm
$%") mm E1% E1% E1%
5'R :alue 3% 6) 6%
#. Ph;sical re=uirements0
he material shall have a 1% per !ent fines value of )% /N or more Afor sample in
soa/ed !onditionB$
he water a,sorption value of the !oarse aggregate shall ,e determined as per SG
630( APart 3BI if this value is should not ,e greater than 6 per!ent
". Strength of su:7:ase
t shall ,e ensured prior to a!tual e.e!ution that the material to ,e used in the su,>
,ase satisfies the reCuirements of 5'R and other physi!al reCuirements when
!ompa!ted and finished$ =hen dire!ted ,y the ?ngineer2 this shall ,e verified ,y
performing 5'R tests in the la,oratory as reCuired on spe!imens remolded at field
dry density and moisture !ontent and any other tests for the CualityK of materials2 as
may ,e ne!essary$
:alues for a,ove test should lie ,etweenG-
5'R tests -
8ry density -Moisture !ontent -
-. Construction 5erations
Sreading0 he su,-,ase material of grading spe!ified in the 5ontra!t shall ,e spread
on the prepared su, grade with the help of a motor grader of adeCuate !apa!ity2 its
,lade having hydrauli! !ontrols suita,le for initial adustment and for maintaining the
reCuired slope and grade during the operation$
Mi.ing shall ,e done me!hani!ally ,y the mi.-in-pla!e method$
Comacting0
4or a !ompa!ted single layer upto 66) mm the !ompa!tion shall ,e done with
the help of a vi,ratory roller of minimum 0% to 1%% /N stati! weight with plaindrum or pad foot-drum or heavy pneumati! tyred roller of minimum 6%% to 3%%
/N weight having a minimum tyre pressure of %$" MN
-
8/16/2019 project report on lcd and led display.docx
11/17
W., M: M3$32=
!. he thi!/ness of =MM varies from ")-6%% mm$
*. his wor/ shall !onsist of laying and !ompa!ting !lean2 !rushed2 graded
aggregate and granular material2 premi.ed with water2 to a dense mass on aprepared su,grade
-
8/16/2019 project report on lcd and led display.docx
12/17
Sreading of mi'0
• mmediately after mi.ing2 the aggregates shall ,e spread uniformly and evenly
upon the prepared su,grade
• f the thi!/ness of single !ompa!ted layer does not e.!eed 1%% mm2 smooth
wheel roller of 0% to 1%% /N weight may ,e used$
• 4or a !ompa!ted single layer upto 6%% mm2 the !ompa!tion shall ,e done with
the help of vi,ratory roller of minimum stati! weight of 0% to 1%% /N or
eCuivalent !apa!ity roller$
• he speed of the roller shall not e.!eed ) /m
-
8/16/2019 project report on lcd and led display.docx
13/17
D.+*. B,=.+ =3$323=
1$ 8ense 'ituminous Ma!adam !onsists of !onstru!tion of a single !ourse of )%
to 1%% mm thi!/ ,ase
-
8/16/2019 project report on lcd and led display.docx
14/17
he filler shall ,e free from organi! impurities and have a Plasti!ity nde. not greater
than #$ he Plasti!ity nde. reCuirement shall not apply if filter is !ement or lime$
=hen the !oarse aggregate is gravel2 6 per !ent ,y mass of total aggregate of
portland !ement or hydrated lime shall ,e added and the per!entage of fine
aggregate redu!ed a!!ordingly$
+. 2ggregate gradation0
211R&12T& 1R2D2T35N 45R D&NS& %3T683N56S 82C2D28
Sie9e Designation Percentage assing the sie9e :;
-
8/16/2019 project report on lcd and led display.docx
15/17
weight vi,ratory roller or with a pneumati! tyred roller of 1)%-6)% /N weight having a
tyre pressure of at least %$" MPa$
he finish rolling shall ,e done with (%-0% /N weight smooth wheeled tandem roller$
Rolling shall ,e !ontinued till the density a!hieved is at least *0 per !ent of that of
la,oratory Marshall spe!imen A!ompa!ted as defined in a,le )%%-1%B and all roller
mar/s are eliminated$Rolling operations shall ,e !ompleted in all respe!ts ,efore the temperature of the
mi. falls ,elow 1%%%5$
S/in pat!hing of an area that has ,een rolled will not ,e permitted$
". 5ening to Traffic0 raffi! may ,e allowed after !ompletion of the final rolling
when the mi. has !ooled down to the surrounding temperature$ he 8ense
'ituminous Ma!adam shall ,e provided with an appropriate wearing !ourse as
early as possi,le prior to regular opening to normal traffi! and
-
8/16/2019 project report on lcd and led display.docx
16/17
1$ his wor/ shall !onsist of !onstru!tion in a single layer2 ,ituminous !on!rete
Aasphalti! !on!reteB of thi!/ness 6)-1%% mm on previously prepared
,ituminous !ourse$
*. 8aterials
%itumen0 Same as that of 8'M is applied
Coarse aggregates0 Same as that of 8'M is appliedhe Stone Polishing :alue as measured ,y 'SG 016 APart 11#B shall not ,e less than
))$
he ma.imum value for the water a,sorption should ,e 1 per !ent$
4ine aggregates0 Same as that of 8'M is applied
4iller0 Same as that of 8'M is applied
+. 211R&12T&S 1R2D2T35N 45R %3T683N56S C5NCR&T&
3S Sie9e Designation Per cent assing the sie9e :;
-
8/16/2019 project report on lcd and led display.docx
17/17
". 5ening to Traffic0 raffi! may ,e allowed immediately after !ompletion of the
final rolling when the mi. has !ooled down to the surrounding temperature$
-. 8easurements for Pa;ment0 'ituminous !on!rete shall ,e measured as
finished wor/ in !u,i! metres or tonnes as provided in the 5ontra!t$