Project Proponent:
M/s. Shree Om Rolling Mills Pvt. Ltd
(A Unit of SRJ Peety Steel Pvt. Ltd.)
Gut No. Gut No. 53, 56 and 57, Village-Daregaon, Adjacent to MIDC Phase II,
Taluka-Jalna,
District – Jalna, Maharashtra.
Environment Consultant:
Sri Sai Manasa Nature Tech Pvt. Ltd., Certificate no.: NABET/EIA/1720/RA0111 valid till 05.08.2020
Plot No. 74/A, Flat No 102, Central Bank Building
Kalyan Nagar, Hyderabad 500038
E-mail: [email protected] , web: www.ssmntech.com
Contact no. 040-2316333, Fax No.: 040-23816222
June, 2019
PRE FEASIBILITY REPORT for
Proposed Production of MS Billets /Alloys Billets -5,50,000 TPA, TMT
Bars/MS Structural Steel/Gutter/Angles/Channels/Pipes- 5,50,000
TPA and Ferro Manganese 12,800 TPA /Silico Manganese 9,500 TPA at
Gut No. 56 & 57, Village-Daregaon, Adjacent to MIDC Phase II, Taluka - Jalna,
District – Jalna, Maharashtra.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
1
1.0 Introduction India is the third-largest crude steel producer in the world. In FY18, India produced 104.98
million tonnes (MT) of finished steel. Crude Steel production during 2017-18 stood at 102.34
MT Steel consumption is expected to grow 5.7 per cent year-on-year to 92.1 MT in 2018. India’s
steel production is expected to increase from 102.34 MT in FY18 to 128.6 MT by 2021. The
Government of India has allowed 100 per cent foreign direct investment (FDI) in the steel
sector under the automatic route. Nearly 301 MoUs have been signed with various states for
planned capacity of about 486.7 MT.
India’s per capita consumption of steel grew at a CAGR of 4.75 per cent from 45 kgs in FY09 to
65.25 kgs in FY17. The figure stood at 68 kgs during April-February 2017-18. National Steel
Policy 2017 seeks to increase per capita steel consumption to the level of 160 kgs.
M/s. Shree Om Rolling Mills Pvt. Ltd. is proposing steel plant at Gat no. 56 and 57 Village
Daregaon, Adjacent to MIDC Phase II, Taluka-Jalna, District – Jalna, Maharashtra. The company
already acquired 11.97 ha of land and proposed Project.
The salient features of the project are given Table 1.
Table 1-Salient Features of the Project
Project Name M/s. Shree Om Rolling Mills Pvt. Ltd,
Total Area 11.97 ha
Location of Project Gat no. 56 and 57 , village Daregaon, Adjacent to MIDC
Phase II, Taluka-Jalna, District – Jalna, Maharashtra
Production Capacity
Proposed Production Capacity
MS Billets/Alloys Billets – 5,50,000 TPA
TMT Bars/MS Structural
Steel/Gutter/Angles/Channels/Pipes – 5,50,000 TPA
Ferro alloys unit with 1 x 5 MVA Submerged Electric Arc
Furnace – Ferro Manganese – 12,800 TPA or
Silico Manganese – 9,500 TPA
Raw Material
Billets
Sponge Iron (40%) Scrap (57%) and Other Minerals (3%)
TMT Bars/MS Structural
Steel/Gutter/Angles/Channels/Pipes
Billets
Ferro Alloys
Manganese Ore, Dolomite and Quartz
Water Demand Total Water Quantity– 250 KLD
Sources of Water Own water reservoir
Man Power Proposed- 600 Nos.
Electricity Consumption Total – 25 MW
Source: Maharashtra State Electricity Distribution.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
2
Nearest railway station Jalna Railway Station –9.0Km, ESE
Nearest airport Aurangabad – 48 Km, SW
Proposed Project Cost Total – INR 200.0 Crores
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
2.1 Identification of Project and Project Proponent
The SRJ Peety group foray into steel manufacturing began in 1971 in Jalna and M/s. Shree Om
Rolling Mills Pvt. Ltd. was established in 1994. Shree Om started its unit with mere 3 MT
capacity, Shree Om is the first company to start billet manufacturing unit in Jalna. The only
manufacturing unit with in-house production capacity, have adopted various technology with
great success. The only company innovated the Ready to use concept of cut n bent in
Maharashtra. Also supplies billets to various other plant in Maharashtra, Over the years have
introduced various concept in the revolution of steel industry with the latest of Shree Om
Torkari which is the best replacement of 6mm.
Company started it’s manufacturing with Tor steel Technology
As the industry upgrade company also practices with newest technology like Thermax,
Quenching & self tempering technology, Latest introduction is the Con–COST Technology and
Hot Roll Process For the better quality product. Company is going through various tests like
Spectrometer etc.
2.2 Brief Information about the Project
The company is proposing to install induction furnace and rolling mill along with adding new 5
MVA Electric Arc Furnace at Gat no. 56 and 57 village Daregaon,, Adjacent to MIDC Phase II,
Taluka-Jalna, District – Jalna, Maharashtra.
2.3 Need for the Project and Its Importance to the Country or Region
The demands of steel are increasing day by day in India due to rapid Industrialization, Booming
in construction sector and other infrastructure project. Considering the said scenario, M/s.
Shree Om Rolling Mills Pvt. Ltd. is proposing to install steel plant.
2.4 Employment Generation
This plant will keep the skilled manpower hence the local village people are exposed to the
skilled jobs and get feeding to their livelihood. The estimated manpower requirement for
expansion is 600 nos. Employment will be provided for the surrounding village’s on the basis of
skill and education. The status of socio economic will improve in these rural areas.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
3
3.0 PROJECT DESCRIPTION
3.1 Type of Project Including Interlinked and Interdependent Projects, If Any.
No interlinked projects were associated with this project.
3.2 Location
M/s. Shree Om Rolling Mills Pvt. Ltd, will be located at Gat no. 56 and 57 Daregaon, Adjacent to
MIDC Phase II, Taluka-Jalna, District – Jalna, Maharashtra. The industry is situated at around 46
km from Aurangabad city.
Location of the Project is shown in Figure – 1 and study area map is given in Figure -2.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
4
FIGURE – 1: LOCATION MAP
Project Site
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
5
FIGURE – 2: 10-KM TOPOGRAPHICAL MAP
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
6
3.3 Details of Alternate Sites
No alternate site was considered. As this site is meet the site selection criteria:
Site is very close the Jalna Industrial area,
No forest land involved in the site,
Site is more than 500 meters from the National/State highway,
Site is more than 500 meters from the human settlement,
No eco sensitive zone with in 10 kms radius of project area,
Site is away from the flood zone, and
Adequate infrastructure is available for transportation of Raw Material and Finished good.
3.4 Size or Magnitude of Operation
Production Capacity
IMS Billets/Alloys Billets 5,50,000 TPA
TMT Bars/MS Structural
Steel/Gutter/Angles/Channels/Pipes
5,50,000 TPA
Ferro Alloys
Ferro Manganese – 12,800 TPA or
Silica Manganese – 9,500 TPA
3.5 Project Description with Process Details
3.5.1 Induction furnace
The induction arc furnace operates as a batch melting process producing batches of molten
steel known “heats”. The furnace operating cycle is called the tap-to-tap cycle and is made up
of the following operations:
• Furnace charging
• Melting
• Refining
• De-slagging
• Tapping
• Furnace turn-around
Furnace Details
3 x 40 TPH Induction Furnaces will be installed.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
7
The process flow diagram is given below:
3.5.2 TMT Bars/MS Structural Steel/Gutter/Angles/Channels/Pipes
Hot Billet received from Steel Melt Shop are inspected and cut to length as per the size of TMT
to be rolled. These hot billets are directly sent to rolling mill via hot charging convey or without
any preheating.
The hot Billets are passed through roughing stands and then go to Continuous Stands. These
stands are with A.C. motor for Variable speeds. After that the bar passes through TMT Box
where it goes under Thermo Mechanical Treatment to improve upon Corrosion Resistance and
Mechanical properties like Yields tress, Elongation, Bending, Tensile strength, etc.
After passing through TMT box, the bar is cut into lengths to accommodate on cooling bed.
After the bar is cooled it is cut into fix lengths as per requirement of market through Shearing
Machine. At an interval of 1 hour a sample is drawn for checking weight per meter and
mechanical properties.
3.5.2 Ferro Alloys
Ferro-alloys are produced by reducing metals from their oxides contained in ores by using a
suitable reduction under conditions created to ensure a high recovery of the valuable elements
from the starting materials. Such reduction reactions are characterized by stability of an oxide
at high temperatures. The stability of all oxides will become more stable with increasing
temperature. An element which forms a stronger oxide can under appropriate conditions be
used as reductant for a less strong oxide. The reaction will proceed successfully if the difference
Procurement of Raw Materials
Melting of Raw material in induction Furnace
Casting of M S Billet in continue Casting Machine
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
8
of oxygen involved with a small difference, favorable conditions should be formed to make the
reaction proceed.
The presence of iron or iron oxides can facilitate some reduction processes. Iron dissolves the
reduced element, forms a compound with it, and thus lowers the melting point of an iron
element alloy is lower than that of the pure element, e.g. in Ferro-manganese production, and
therefore the reaction of reduction of the element can proceed at a lower temperature.
Figure: 2.3 Process Flow Chart of Ferro Alloy Project
3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final
Product/S, Mode of Transport of Raw Material and Finished Product
The raw materials required for the production induction furnace and TMT Bar is given below:
Billets Raw Material
Sr. No. Particular Quantity (TPA) Source Mode of
Transportation
1 Scrap 323400 Sister Industry/Open
Market By road
2 Sponge Iron 236775 Open Market By road
3 Other
Minerals
17325 Open Market By road
Total 5,77,500
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
9
TMT Bars/MS Structural Steel/Gutter/Angles/Channels/Pipes Raw Materials
Sr. No. Particular Quantity (TPA) Source
1 Billets 5,50,000 In-house
Ferro Alloys Raw Material
Ferro Manganese
S. No. Raw Materials Quantity (MT)
1 Manganese Ore (with Average Mn 44%)
2.1 – 2.4
2 Coke (with average Fixed Carbon 80%)
0.30
3 Coal (with average Fixed Carbon 60%)
0.3
4 Dolomite
0.2
Silico Manganese
S. No. Raw Materials Quantity (MT)
1 Manganese Ore (with Average Mn 44%)
2.5 – 2.8
2 Coke (with average Fixed Carbon 80%)
0.40
3 Coal (with average Fixed Carbon 60%)
0.40
4 Dolomite
0.2
Material Balance for Billets
Input TPA Out Put TPA
Sponge Iron 323400 Billets 550000
Scrap 236775 Slag 17,325
Additives 17325 Burning Losses 10,175
Total 5,77,500 5,77,500
Rolling Mill
Input TPA Out Put TPA
Billets 550000 TMT bar 550000
Total 550000 550000
3.7 Resource Optimization/ Recycling and Reuse
Water will use for cooling system, Scrubbers, Domestic and greenbelt purposes. Cooling water
will be recirculating in system. Slag will be sold to bricks and construction industry.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
10
3.8 Availability of Water Its Source, Energy/ Power Requirement and Source
3.8.1 Water Requirement
The manufacturing process does not require water in process. The water requirement in the
Project will be for cooling purpose, domestic consumption and green belt development. The
details of water requirement for different purposes are presented below:
Water Requirement
Item Total Water Requirement
(KLD)
Cooling Purpose 205
Domestic Purpose 30
Dust Suppression 15
Total 250
3.9 Quantity of Wastes to be Generated (Liquid And Solid) And Scheme For Their
Management/ Disposal
3.9.1 Solid Waste Generation& its Disposal
Slag will be sold to construction industry and mill waste will be sold to cement industry. The
details of solid waste are given in below table:
Particular Quantity (TPA)
Slag from Induction Furnace 17,325
Slag from SEAF 8,250
3.9.2 Liquid Effluent
No liquid effluent will be generated at the plant site. The domestic wastewater (24 KLD)
generated will be treated in STP and treated water will be reuse for green belt development.
4.0 SITE ANALYSIS
4.1 Connectivity
4.1.1 Nearest Railway Station
Jalna Railway Station –5.0 Km, ESE
4.1.2 Nearest Airport
Aurangabad airport is 48 km from the plant site.
4.2 Landform, Landuse and Land Ownership
The Land use will be converted in Industrial uses.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
11
4.3 Topography
The topography of the region is mostly plain dry industrial land and the climatic conditions are
semi-arid. The average annual rainfall is 700 mm, and the maximum and minimum
temperatures are 45 oC & 18
oC respectively.
There are no Ecological and Sensitive areas like Religious and Historic places, Archeological
Monuments, Scenic Areas, Hill Resorts, Biosphere reserves, National Parks and Sanctuaries,
Seismic Zones and Defense installations within the circular area of 10 km radius from plant site.
5.0 PLANNING BRIEF
5.1 Planning Concept
The proposed project will be involved in installation of Induction furnace along with rolling mill
and Electric Arc Furnace.
5.2 Population projection
The man power of plants includes manager, Engineer, skilled and unskilled labors and medical
officers etc. As per the socio-economic is concerned from the plant activity nearby villagers
shall get in direct employment for about 600 persons. The proposed plant activities also shall
bring the positive change in the villages as the project shall provide direct employment to more
than 500 people indirectly.
5.3 Land use planning
The project is located in 11.97 ha land. There will not be change in land use as the land already
has converted in Industrial Area.
Sr. No. Particulars Area (m2) Area (%)
1 Plant Area 13237.71 11.1
2 Green Belt Area 39573.73 33.03
3 Parking Area 14341.85 11.9
4 Open Area 26203.17 21.8
5 Road Area 16278.83 13.7
6 Others 10160.61 8.47
Total 119795.9 100
5.4 Assessment of Infrastructure Demand (Physical & Social)
On the basis of the preliminary site visit, the infrastructure demand in the villages was assessed
on the basis of need and priority. The assessment will be made in the socio economic survey
&will be submitted at the time of final presentation regarding Environment Clearance.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
12
5.5 Amenities/Facilities
Rest shed, first-aid center, ambulance service, drinking water facilities, will be provided.
6.0 PROPOSED INFRASTRUCTURE
6.1 Plant Area (Processing Area)
The main plant area comprises of Induction furnace area and rolling mill area, raw material
handling area, storage area and greenbelt area etc.
6.2 Residential Area (Non Processing Area)
As the local persons will be given employment, no residential area/ housing is proposed within
the mining lease area.
6.3 Air Pollution Control
Adequate nos of bag filters with min. 30-m high stack will be installed to control the emissions.
6.4 Green Belt
More than 1/3rd
(3.95 ha) of total land availability are reserved for greenbelt development plan.
Plant species will be plated after consultation of local forest department.
Greenbelt of 33% of the area will be developed in the plant premises as per CPCB
guidelines.
The tree species to be selected for the plantation are pollutant tolerant, fast growing, and
wind firm, deep rooted. A three tier plantation is proposed comprising of an outer most
belt of taller trees which will act as barrier, middle core acting as air cleaner and the
innermost core which may be termed as absorptive layer consisting of trees which are
known to be particularly tolerant to pollutants.
6.5 Water Management
About 250 KLD will be required for steel project. This water will be supplied from own water
reservoir.
6.6 Sewerage System
The domestic wastewater generated will be sent to STP for treatment and treated water will be
used for green belt.
6.7 Industrial Waste Management
No industrial waste will be generated at the plant site. The domestic wastewater generated will
Treated in STP.
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
13
6.8 Solid Waste management
Slag will be sold to construction industry and cement industry and mill waste will be used in
house.
7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN
There will be no displacement of houses. Hence rehabilitation and resettlement is not
envisaged.
8.0 PROJECT COST ESTIMATES
The total cost for proposed project will be around Rs. 200.0 Crores.
8.1 Environment Management
To mitigate the negative impact of the project adequate mitigation measures will be taken.
About INR 19.5 crores will be the EMP cost
9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS)
9.1 Financial and Social Benefits with Special Emphasis on the Benefit to the Local People
Including Tribal Population, If Any, In the Area.
The proposed plant will provide employment to about 600 people and helping them earn
livelihood. The infrastructure facilities also will be improved in the surrounding area.
***********
M/s Shree Om Rolling Mills Pvt. Ltd. (Unit-2) Pre-Feasibility Report
14