Project Scope Constructed a 300,000 BBL greenfield terminal for receipt and storage of Niobrara shale condensate. Receipt primarily by a single pipeline, with additional truck rack receipt. The truck rack was constructed to allow ten bays of truck unloading, including five bays usable for truck loading. Product stored in the tankage is delivered to an adjacent wholesale pipeline via pipeline pumps and LACT metering units. Project Description Williams Industrial Services was selected to provide engineering, procurement and construction (EPC) services. Williams Industrial Services the “Prime” EPC Contractor and Engineering contract holder provided overall project management, safety management, and subcontract management for civil, structural and electrical. Williams also provided subcontract management for the LACT Skids and Tanks and self-performed all prefabrication & field installation for the mechanical systems including BOM and Welding. Challenges Remote site location Oil and Gas boom in region (lack of available subs, materials, labor and housing) Fast track schedule Winter conditions Difficult permitting requirements Lead time on major equipment with fast track schedule Project Highlights The project started as a paid proposal/feed study and expanded to a full-service EPC Zero OSHA Recordables and Zero Lost Time Injuries Met all contractual and “added” milestone dates Extra Scope for the project totalled over $6M ° Transformer / Power / Conduit ° Tank Mixers ° 5 additional truck LACTS including concrete, steel canopy expansion and divert valves totalling 15 bays ° 6 12F tanks and concrete pad ° PXP Pipeline ° Commissioning PROJECT PROFILE Pawnee Crude Terminal Location: Pawnee Grassland, Colorado Project Schedule: 12 months including engineering Project Value: approx. $25M+ Contract Method: Target Price 100 Crescent Centre Parkway, Suite 1240 | Tucker, GA 30084 USA | office: 770.879.4400 | www.wisgrp.com Ring Beam for Tanks

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT PROFILE Pawnee Crude Terminal · loading. Product stored in the tankage is delivered to an adjacent wholesale pipeline via pipeline pumps and LACT metering units. Project

Project Scope Constructed a 300,000 BBL greenfield terminal for receipt and storage of Niobrara shale condensate. Receipt primarily by a single pipeline, with additional truck rack receipt. The truck rack was constructed to allow ten bays of truck unloading, including five bays usable for truck loading. Product stored in the tankage is delivered to an adjacent wholesale pipeline via pipeline pumps and LACT metering units.

Project DescriptionWilliams Industrial Services was selected to provide engineering, procurement and construction (EPC) services.

Williams Industrial Services the “Prime” EPC Contractor and Engineering contract holder provided overall project management, safety management, and subcontract management for civil, structural and electrical.

Williams also provided subcontract management for the LACT Skids and Tanks and self-performed all prefabrication & field installation for the mechanical systems including BOM and Welding.

Challenges• Remote site location

• Oil and Gas boom in region (lack of available subs, materials, labor and housing)

• Fast track schedule

• Winter conditions

• Difficult permitting requirements

• Lead time on major equipment with fast track schedule

Project Highlights• The project started as a paid proposal/feed study and expanded

to a full-service EPC

• Zero OSHA Recordables and Zero Lost Time Injuries

• Met all contractual and “added” milestone dates

• Extra Scope for the project totalled over $6M

° Transformer / Power / Conduit

° Tank Mixers

° 5 additional truck LACTS including concrete, steel canopy expansion and divert valves totalling 15 bays

° 6 12F tanks and concrete pad

° PXP Pipeline

° Commissioning

PROJECT PROFILE

Pawnee Crude Terminal

Location: Pawnee Grassland, Colorado

Project Schedule: 12 months including engineering

Project Value: approx. $25M+

Contract Method: Target Price

100 Crescent Centre Parkway, Suite 1240 | Tucker, GA 30084 USA | office: 770.879.4400 | www.wisgrp.com

Ring Beam for Tanks