project presentation 1
TRANSCRIPT
Copyright © Seaways 2010
PROJECT CARGO LOGISTICS - An Overview- An Overview
Copyright © Seaways 2010
To be a leading and global company offering To be a leading and global company offering turnkey solutions in shipping, trading & turnkey solutions in shipping, trading & logistics and providing high standards of quality logistics and providing high standards of quality services to all its customers world-wide.services to all its customers world-wide.
Seaways / Vision
Copyright © Seaways 2010
Seaways Shipping Limited
Maxicon Container
Line
Seaways Shipping
Line
Maxicon Shipping Agencies
SeaMaster Shipping & Logistics
Seabird Sea & Air Logistics
Seaways / Group Companies
Copyright © Seaways 2010
Seaways / Management Structure
Overall Incharge Key Decision Making Joint Ventures
Intl. Marketing
Capt. PVK MohanC M D
Corporate Marketing Project Management
Biz Development Corp. Communication New
Biz Initiatives
Mr. P. Vivek Anand Director (Marketing)
Corporate Finance Funds Raising
Planning & investment
Acquisitions
Mr. R. RameshDirector (F&A)
Human Resources Gen. Administration International Trading PSU’s Business
CSR Initiatives
Mr. P. Sarat KumarDirector (HR & ITD)
Copyright © Seaways 2010
AhmedabadAurangabadBengaluruBarodaBhubaneshwarChennaiDahejGandhidham / KandlaGoaHyderabadIndoreJaipurJodhpurKakinadaKochiKolkata / HaldiaLudhianaMangaloreMumbaiMundraNagpurNew DelhiParadipPipavavPuneTuticorinVisakhapatnam
National Network
Seaways / The Power in India
Copyright © Seaways 2010
Freight ForwardingContainer Handling
Line ActivitiesStevedoring
Clearing & ForwardingCustoms House AgencySupply Chain LogisticsChartering & Brokerage
Vessel AgencyLiner Agency
Feeder Vessel OperationsProject Cargo Logistics
Warehousing & DistributionOverseas Operations
Vessel Management & OwnershipPort & Terminal Management
Marine Surveys & ConsultancyOffshore ServicesCFS Operations
Transportation of Containers / Bulk / Break Bulk to & from
ports
Transportation of Project Material & ODC / OWCMulti-modal Logistics
Transportation of Hazardous & Dangerous Cargo
Sea
Clearing & ForwardingFreight Forwarding
Door to Door LogisticsSupply Chain Logistics
Dangerous Cargo LogisticsPerishable Cargo Logistics
Project Cargo LogisticsInbound / Outbound
Consolidation
Air Land
Seaways / High Quality Services
Copyright © Seaways 2010
ODC and OWC cargoes
Mainly in Oil & Gas, Power, Steel sectors etc
Ocean, Sea, River transportation
Super Cargo Services
Customs Clearance and Project Registration
Route Survey
Dredging and construction of civil structures
Including Ro-Ro Jetties, Bridges, Culverts and Roads
Seaways / Services / Project Cargo Logistics
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
Seaways undertake and execute turnkey logistics for project cargo comprising of Over-Dimensional (ODC) and Over-Weight cargoes (OWC) mainly in the oil & Gas, power and steel sectors.
These projects are executed on a turnkey basis, with our worldwide network of Associates
The scope of work begins from packaging of the Over-Dimensional, Over-Weight, Containerized, Air cargo and General Cargo at the factory point any where in the world, to delivery of the same at the project site in India, involving
Ocean Sea/River Transportation Super Cargo Services Customs Clearance Project Registration Route Survey Inland Transportation Dredging
Construction of civil structures including Ro-Ro Jetties Bridges Culverts and Roads.
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
Sl Name of Client Project Brief1 Oil & Natural Gas Commission Helipads for Oil Rigs at Heerapanna Oil Fields,
Mumbai High Installation of 550 MTWT/ 27 MTR High. Loading onto Barge & Tugging to Oil Field
2 GVK Industries (Power Project)
230 MW CCPP Generator & Thermal Blocks (192 MT & 99 MT) at Kakinada . Unloading from vessel onto Barge, Offloading at Jetty (specially constructed) and transport to site
3 Spectrum Power Corporation 208 MW CCPP Power Generation equipment at Vizag Port to site Unloading equipment and transport to site
4 APSEB / Vijeshwaram Power
170 MW CCPP. Power Generation equipment for Phase II expansion Unloading onto Barges at Kakinada anchorage, towed to Chinchinada at the mouth of Vasishta Godavari River and unloading to trailers for onward transportation.
Partial List of Projects Handled
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
Sl Name of Client Project Brief5 Nagarjuna Fertilizers &
Chemicals LtdPlant expansion project at Kakinada Unloading of cargo and transportation to site.
6 Goldstar Steel & Alloys Steel Plant
ODC Coastal movement from Chennai to Vizag (14x100 MT) onward transportation to site.
7 Bharat Heavy Electricals Limited
Sea Transportation of Gas Turbine & Route Surveys. Frame 9 Gas Turbine (197 Tons) from Kakinada to Cochin . A special heavy lift self propelled vessel was chartered for this operation. Several Route survey works undertaken for BHEL.
8 BAPL Power Project 230 MW CCPP. Project Registration, Customs Clearance, Local Logistics.
Partial List of Projects Handled
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
Sl Name of Client Project Brief9 APPM Total Logistics (including transportation) for
project cargo shipment comprising of Used Paper Making machinery from Plant in Germany to Rajahmundry , Andhra Pradesh India.
10 Oil India Total Logistics for 4 Rig's from Australia to Rajasthan in India.
11 Rainbow Paper Mill Total Logistics (including transportation) for project cargo shipment comprising of Used Paper Making machinery from Germany to Project site in Gujarat, India.
Partial List of Projects Handled
Copyright © Seaways 2010
355 MW (ISO) CCPP, Kondapalli Complete logistics for project material (15,000 Cbm) including ODC / OWC from Kakinada / Chinchinada to Kondapalli using
multi-modal transportation. Services included;
Ocean Freight Sea/River Transportation Super Cargo Services Customs Clearance Project Registration Route Survey Inland Transportation Dredging construction of Ro-Ro Jetties Strengthening of Bridges Culverts and Roads Delivery at Project Site
Seaways / Services / Project Cargo Logistics
LANCO Kondapalli Power Project - a Brief
Copyright © Seaways 2010
Shipper – Global Geo
Cargo - Survey Boat (catamaran)
Volume – 200cbm
Port of Loading - Kochi
Port of Discharge – Kakinada
The entire operation was completed at Kochi and Kakinada.
Loading the Catamaran with suitable gears to be lifted from water and dropped back in water as a single piece.
Carriage of Boat Global Mirage from Kochi to Kakinada
Seaways / Services / Project Cargo Logistics
Global Geco - a Brief
Copyright © Seaways 2010
Shipper – ZINKCON MARINE SINGAPORE
Cargo - 5 Pkgs Project Cargo
Volume - 205 cbm / 110 mtons
Port of Loading - Chennai
Port of Discharge – ANTWERP, BELGIUM
Seaways / Services / Project Cargo Logistics
Winch & Other Accessories from Chennai to AntwerpZinkcon Marine - a Brief
Copyright © Seaways 2010
Shipper – Vestas Wind TechnologyCargo - Wind Mill NACHELLES / HUBS / BLADES Volume – 15000 cbmPort of Loading - TuticorinPort of Discharge – Suape, BRAZIL
The entire loading and lashing took 12 shifts. Loading of Blades was very challenging as its length is 40 meters.
Weight of Nachelles is 55 mtons each
Seaways / Services / Project Cargo Logistics
Wind Mill Shipment from TuticorinVestas Wind - a Brief
Copyright © Seaways 2010
Shipper – SeForge ( Suzlon Group)
Cargo - Wind mill Wings
Volume – 5000 cbm
Port of Loading - Mumbai
Port of Discharge – Hamburg
Entire shipment was handled on door to door basis
Seaways / Services / Project Cargo Logistics
Wind Mill Flanges from Mumbai to HamburgSeforge - a Brief
Copyright © Seaways 2010
This was a 11,885 Net tonnage is the biggest power plant of 229 MW on the barge in the world.
This barge was loaded on to a vessel called MV hawk within 5 hrs at Mangalore.
Seaways / Services / Project Cargo Logistics
From Mangalore to kakinada
GMR Barge mounted power project
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
What Seaways going to do for Sesa Goa project?
• The Project cargo movement is a very well planned operation, everything has to be planned well in advance.
• Right from selecting the type of ship and properly stowing it inside the ship so that damage is avoided. In case required will charter vessel with gear appropriate to lift the OWC.
• We normally procure the GA plan of the ship before putting the cargo onboard. Precisely advising the location of the cargo on vessel. So even if little bit of space is lost then we compensate the ship owners.
• We will assign a super Cargo at the loading port to see all items are loaded as per plan.
• We take in to account the Lashing arrangement of the cargo onboard for countering the rolling as well as pitching effect, advising the Master for making arrangement of additional lashing points, if required.
• We at seaways have many Master mariners so discuss all the aspects with the Master of the vessel before cargo being loaded.
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
• As in the project cargo there will be various sizes of packets, so all packets lifting arrangement is planned well in advance to reduce the time of handling and also special kinds of spreader and slings will be arranged as required.
•Every ODC movement is very special even if many would have been moved on the same road.
• We take care of all the safety measures to be taken well in advance and getting all permits before the arrival of the cargo.
• All discharging operation will be closely monitored by a Master Mariner.
• All road movement will be done with close co ordination.
•Proper risk assessment to be done for each stage to avoid any kind of accidents.
• Security arrangements will be done to avoid pilferage of the items.
• All permits for road movement to be taken well in advance and to be planned to avoid interference with normal life of the population, so that unnecessary hurdles are not faced due to agitation of the people.
Copyright © Seaways 2010
Seaways / Services / Project Cargo Logistics
• As the road movement will be slow due to numerous curves and bends.
• Few electrical connections to be dismantled for the passing of ODC.
• The carriage is being planned for the most extreme case is taken in to consideration.
• The cargo to be stowed in the insured shed at Goa port after discharging from the vessel and then will be transported to the site phase wise at the earliest.
• All items to be placed on the stools or supports safely.
• To be precise every cargo movement will be planned taking the minimum risk to avoid any accidents.