Combee Road (State Road 659) PD&E Study From US 98 to North Crystal Lake Drive Financial Project ID No.: 440274-1-22-01 CONTACT INFORMATION HOW TO PARTICIPATE PROJECT OVERVIEW Study website: www.swflroads.com/sr659/us98toncrystallakedr Alternatives Public Workshop - March 7, 2019 PROJECT LOCATION MAP N.T.S. POTENTIAL IMPROVEMENTS 6’ wide sidewalks Two-way center turn lane 7’ wide buffered bicycle lanes COMBEE ROAD PROJECT SCHEDULE We welcome your comments on how to improve Combee Road. Share your thoughts and ideas and help identify areas of the roadway that need our attention. Please complete the comment form and leave it with us this evening, or you can take it home, complete it, and mail it to us by March 18, 2019. You can send your comments to the contact provided below. The Florida Department of Transportation (FDOT) is conducting a Project Development and Environment (PD&E) study to determine how to improve Combee Road from US 98 to North Crystal Lake Drive. The recommendations from this study will be used to guide future design and construction activities. Potential improvements to Combee Road include a two-way center turn lane, designated bicycle lanes, and sidewalks on both sides. Other improvements are proposed at the intersections to help the flow of traffic and reduce crashes. Throughout the study, a no-build or “do-nothing” alternative is also considered and will remain an option until the end of the process. Patrick Bateman, EI FDOT District One Project Manager P.O. Box 1249, Bartow, FL 33831 Ph: (863) 519-2792 Email: [email protected] August 2018 Kickoff Meeting March 7, 2019 Late Summer 2019 Early 2020 Alternatives Workshop Public Hearing Study Complete

Upload: others

Post on 20-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROJECT OVERVIEW PROJECT LOCATION MAP · 2019-03-11 · Alternatives Public Workshop - March 7, 2019 PROJECT LOCATION MAP N.T.S. POTENTIAL IMPROVEMENTS 6’ wide sidewalks Two-way

Combee Road (State Road 659) PD&E StudyFrom US 98 to North Crystal Lake DriveFinancial Project ID No.: 440274-1-22-01

CONTACT INFORMATION

HOW TO PARTICIPATE

PROJECT OVERVIEW

Study website: www.swflroads.com/sr659/us98toncrystallakedr

Alternatives Public Workshop - March 7, 2019

PROJECT LOCATION MAP

N.T.S.

POTENTIAL IMPROVEMENTS

6’ wide sidewalks

Two-way center turn lane

7’ wide buffered bicycle lanes

COMBEE ROAD

PROJECT SCHEDULE

We welcome your comments on how to improveCombee Road. Share your thoughts and ideas andhelp identify areas of the roadway that need ourattention. Please complete the comment form andleave it with us this evening, or you can take it home,complete it, and mail it to us by March 18, 2019. Youcan send your comments to the contact provided below.

The Florida Department of Transportation (FDOT) isconducting a Project Development and Environment(PD&E) study to determine how to improve Combee Roadfrom US 98 to North Crystal Lake Drive. Therecommendations from this study will be used to guidefuture design and construction activities. Potentialimprovements to Combee Road include a two-way centerturn lane, designated bicycle lanes, and sidewalks on bothsides. Other improvements are proposed at theintersections to help the flow of traffic and reduce crashes.Throughout the study, a no-build or “do-nothing” alternativeis also considered and will remain an option until the end ofthe process.

Patrick Bateman, EIFDOT District One Project Manager

P.O. Box 1249, Bartow, FL 33831

Ph: (863) 519-2792

Email: [email protected]

August 2018 Kickoff Meeting

March 7, 2019

Late Summer 2019

Early 2020

Alternatives Workshop

Public Hearing

Study Complete

Page 2: PROJECT OVERVIEW PROJECT LOCATION MAP · 2019-03-11 · Alternatives Public Workshop - March 7, 2019 PROJECT LOCATION MAP N.T.S. POTENTIAL IMPROVEMENTS 6’ wide sidewalks Two-way

Public participation is solicited without regard to race, color, nationalorigin, age, sex, religion, disability or family status. Persons wishing toexpress their concerns relative to FDOT compliance with Title VI may doso by contacting Cynthia Sykes, Title VI Coordinator, at (863) 519-2287or by email at [email protected].

Combee Road (State Road 659) PD&E Study from US 98 to North Crystal Lake Drive

The environmental review, consultation, and other actions required byapplicable federal environmental laws for this project are being, or havebeen, carried-out by FDOT pursuant to 23 U.S.C. § 327 and aMemorandum of Understanding dated December 14, 2016, and executedby FHWA and FDOT.

ALTERNATIVES EVALUATION MATRIX

PD&E Ongoing

Design Funded

Right-of-Way (Land) Acquisition Not Funded

Construction Not Funded

PROJECT FUNDING

FDOT Adopted 5-Year Work Program (July 1, 2018 to June 30, 2023)