Combee Road (State Road 659) PD&E StudyFrom US 98 to North Crystal Lake DriveFinancial Project ID No.: 440274-1-22-01
CONTACT INFORMATION
HOW TO PARTICIPATE
PROJECT OVERVIEW
Study website: www.swflroads.com/sr659/us98toncrystallakedr
Alternatives Public Workshop - March 7, 2019
PROJECT LOCATION MAP
N.T.S.
POTENTIAL IMPROVEMENTS
6’ wide sidewalks
Two-way center turn lane
7’ wide buffered bicycle lanes
COMBEE ROAD
PROJECT SCHEDULE
We welcome your comments on how to improveCombee Road. Share your thoughts and ideas andhelp identify areas of the roadway that need ourattention. Please complete the comment form andleave it with us this evening, or you can take it home,complete it, and mail it to us by March 18, 2019. Youcan send your comments to the contact provided below.
The Florida Department of Transportation (FDOT) isconducting a Project Development and Environment(PD&E) study to determine how to improve Combee Roadfrom US 98 to North Crystal Lake Drive. Therecommendations from this study will be used to guidefuture design and construction activities. Potentialimprovements to Combee Road include a two-way centerturn lane, designated bicycle lanes, and sidewalks on bothsides. Other improvements are proposed at theintersections to help the flow of traffic and reduce crashes.Throughout the study, a no-build or “do-nothing” alternativeis also considered and will remain an option until the end ofthe process.
Patrick Bateman, EIFDOT District One Project Manager
P.O. Box 1249, Bartow, FL 33831
Ph: (863) 519-2792
Email: [email protected]
August 2018 Kickoff Meeting
March 7, 2019
Late Summer 2019
Early 2020
Alternatives Workshop
Public Hearing
Study Complete
Public participation is solicited without regard to race, color, nationalorigin, age, sex, religion, disability or family status. Persons wishing toexpress their concerns relative to FDOT compliance with Title VI may doso by contacting Cynthia Sykes, Title VI Coordinator, at (863) 519-2287or by email at [email protected].
Combee Road (State Road 659) PD&E Study from US 98 to North Crystal Lake Drive
The environmental review, consultation, and other actions required byapplicable federal environmental laws for this project are being, or havebeen, carried-out by FDOT pursuant to 23 U.S.C. § 327 and aMemorandum of Understanding dated December 14, 2016, and executedby FHWA and FDOT.
ALTERNATIVES EVALUATION MATRIX
PD&E Ongoing
Design Funded
Right-of-Way (Land) Acquisition Not Funded
Construction Not Funded
PROJECT FUNDING
FDOT Adopted 5-Year Work Program (July 1, 2018 to June 30, 2023)